Keel Infrastructure Corp. (KEEL) Earnings Call Transcript & Summary

November 15, 2021

NASDAQ CA Information Technology Software earnings 43 min

Earnings Call Speaker Segments

David Barnard

executive
#1

Thank you. Hello everyone, and good afternoon. We're glad you could join us for Bitfarms' Q3 2021 earnings call. With me on the line are Emiliano Grodzki, our Chief Executive Officer, Jeff Morphy, who is President, and our Chief Financial Officer, Jeff Lucas. Before we get going, I'd like to note that this session is being streamed live and includes a slide deck. If you'd like to view those slides, head over to our site, click on Investors, and then Presentations. If you'd prefer to tune in through your phone, you can grab the presentation there as well. A quick heads-up: a short while after today's market close — actually, at just about any moment now — Bitfarms will have issued a press release sharing its Q3 2021 financial results. Turning to slide 2, I want to note that certain remarks we may deliver on this conference call could be considered forward-looking statements. Bitfarms cautions those listening that forward-looking information and statements depend on specific assumptions and risk factors, and those could cause actual outcomes to differ materially from what the company expects. Those listening shouldn't place undue reliance on forward-looking information or statements. Kindly review today's press release and consult the risks described in Bitfarms' public documents filed at www.sedar.com and www.sec.gov/edgar. Except as applicable securities laws require, the company assumes no obligation to revise or update any forward-looking information or statements. On today's call, we'll be discussing some metrics that aren't defined under IFRS. Since IFRS doesn't prescribe a standard meaning for these, they might not line up with how other companies calculate similar figures. The non-IFRS measures we use are gross mining profit, gross mining margin, EBITDA margin, adjusted EBITDA, and adjusted EBITDA margin. We provide these alongside our IFRS numbers as extra context, so you can get a clearer picture of how management views our operating results. Gross mining profit means gross profit, but it leaves out depreciation and amortization, plus some smaller items that sit in cost of sales for the company's mining segment. When we talk about gross mining margin, we mean the percentage you get by taking gross mining profit and dividing it by the revenues from the company's mining segment. As for direct cost of production, that's the direct cost of Bitcoin, calculated by taking all electricity and hosting expenses tied to mining Bitcoin and dividing that by how many Bitcoin were mined in total. We'd encourage everyone listening to check today's earnings release along with the company's Q3 2021 management's discussion and analysis, where you'll find definitions for these non-IFRS measures as well as reconciliations to IFRS measures. Also, unless we say otherwise, every financial figure we mention is in U.S. dollars. Now, Geoffrey Morphy is going to walk us through our operations for the quarter. CFO Jeff Lucas is up next to walk through the financials in depth, and after that CEO Emiliano Grodzki will wrap things up by going over where we see the business heading and what we expect. Ahead of time, we asked investors to submit their questions, and once we start taking live Q&A from analysts, I'll read those out to management. Now, on slide three, I'm happy to pass it to Jeff Morphy. Jeff, go ahead.

Geoffrey Morphy

executive
#2

Thanks, David. It's great to have everyone joining us today, and I want to give you all a warm welcome. For Bitfarms, the third quarter of 2021 turned out to be an outstanding period, which our operational and financial figures reflect — a lot of them hit all-time highs. We boosted output at a number of our sites, and that drove our hash rate upward, and I'm pleased to report that we've now crossed two exahash per second. Over the course of Q3, we mined 1,051 Bitcoin, which is a 38% rise from Q2 of 2021 on a sequential basis, and we brought our average production cost down to roughly $6,900 per Bitcoin, compared with $9,000 per Bitcoin during Q2 of 2021. Speaking of costs, only last week we picked up a new site in Washington State, where production costs are even lower — it's currently running at around $4,000 per Bitcoin. These figures really show how committed we are to investing in growth, and they speak to the hard work of the entire Bitfarms team. With this acquisition, we now have six farms running — five located in Quebec and one in the U.S. — plus another four being built in Canada, Paraguay, and Argentina. As of today, our capacity stands at 106 MW, which is up from 69 MW as of 30 June. On top of that, we have 298 MW more in development, which should be operational during 2022. Counting our 10 farms that are operating or in development, our overall planned capacity now totals 404 MW. Along with our bold purchases and installations of miners, we've lifted our hash rate above two exahash per second — roughly 2.4 times what it was 12 months back — and pushed our daily Bitcoin output to nearly 12 Bitcoin per day. Jeff Lucas is going to walk through more of the financial side shortly. But first, let me go over a few key highlights. In Q3, our total revenues climbed to a record $44.8 million, which is 22% higher than Q2 of 2021 sequentially and more than 550% higher year-over-year compared with $6.8 million in Q3 of 2020. Gross mining profit came in at $35.4 million, which is yet another record. Our total liquidity — cash plus our Bitcoin inventory — grew to $144.5 million. Let's move to slide four. Bitfarms keeps drawing in plenty of new investors. For those of you who are new, a quick reminder: Bitfarms ranks among the biggest and most profitable Bitcoin miners anywhere in the world. Since we started out in 2017, we've operated as a vertically integrated, decentralized, global self-mining business. Our robust in-house capabilities and infrastructure — including our repair center and our fully owned electrical contractor subsidiary, which has more than 30 licensed electricians — help keep us among the industry's lowest cost miners. Our approach remains focused on diversifying our mining portfolio by favoring sites with affordable electricity. Having decentralized farms lowers the chance of disruption while opening the door to further expansion. We'll leverage both our investments and our understanding of these regions to capture additional opportunities. Just like we did in late last year and again this year, we're still actively hunting for appealing chances to grow the business across several regions. Let's move to slide five. As I noted, we just bought a fully operational site in Washington State. That gives us our very first operation in the U.S. that we own entirely, and the U.S. is the biggest nation for Bitcoin mining. This deal, which is highly accretive, extends and ends the sole hosting arrangement we had, which covered 12 MW; this turnkey facility comes with 24 MW of capacity, 620 petahash, and 3.7 in daily Bitcoin production, plus hydropower contracts priced at only $0.026-$0.031 per kWh, which is 25% below what our Quebec farms pay. Before control changed hands, we had already put in a number of new S19j Pro miners. At this point, since we're coordinating with the hosting partner we used previously, integration has gone very smoothly. Additionally, through this transaction, we signed a memorandum of understanding to jointly develop an expansion of a 75 MW substation. Should that be finished, it would push total capacity for Washington State operations up to as high as 99 MW. It makes me proud that development work across multiple geographies remains on schedule and that we've achieved meaningful progress in every aspect of operations. Now I'll recap a few other recent items. Please go to slide six. In Cowansville, Quebec, we fully reconstructed our initial farm. We applied every bit of our newest site development and design knowledge gained from constructing five farms during the last four years. Among the benefits we built in are repositioning the transformer to cut down on wiring, enhancing the intake and exhaust airflow, and greatly lowering sound emissions. While rebuilding, we seized our contractual chance to raise capacity from the initial 4 MW up to 17 MW. Moving to slide seven. In Sherbrooke, Quebec, we came to terms with the city to jointly build three new farms. Under the cooperation agreement we signed in early September, we committed to eventually shutting down the original farm in that location; by doing so, we intend to add 78 MW of capacity for a total of 96 MW. Furthermore, we brought to bear expertise in the newest sound mitigation design and technology to upgrade the original farm and greatly cut its operating decibel levels, and to use that same know-how to lessen sound propagation at our remaining farms where residents live nearby. Over the last 60 days, we kicked off work at two new farms, which we call Leger and The Bunker. Within the last two weeks, I went to see both locations. At the Leger site, concrete for the footing has been poured; we anticipate that construction of this 30-MW farm will continue through the rest of 2021, with operations beginning in Q1 and Q2 of 2022. The Bunker, a sizable building, is going up in three phases. We anticipate energizing 18 MW during Q1 of 2022, an additional 18 MW in Q2 of 2022, and the remaining 12 MW in H2 of 2022. Moving to slide eight. Over in Paraguay, we began building a 10-MW site; that project is advancing rapidly, and as we've said before, we anticipate finishing the build-out in the coming month and kicking off initial production on schedule by year-end; on the slides, you can observe how the building in Asunción, Paraguay's largest city, is progressing. Moving to slide nine. Down in Argentina, the engineering, design, and development work have been wrapped up, and site preparation is in progress. The 210 MW facility will be made up of 4MW style buildings within the gates of a private power company, which will make use of available and otherwise stranded power. As we've said before, we've secured power at an appealing rate of only $0.022 per kWh, which will significantly cut our already low cost of mining Bitcoin. In October, we executed engineering contracts and started construction. The farm is anticipated to house more than 55,000 miners, among them many of the 48,000 latest generation MicroBT miners that Bitfarms bought in early 2021. Speaking of miners, please move to slide 10; this summer, following the Chinese government's announcement to curtail Bitcoin mining, we capitalized on uncertain market conditions to renegotiate certain terms of those purchase orders.

Geoffrey Morphy

executive
#3

We managed to lock in an average purchase price for those 48,000 miners at roughly $38.50 per terahash. That's a big drop compared with what the market used to charge and what it charges now, somewhere in the $80-$100 per terahash range. By doing that, we cut the total cost of this order by an estimated $200 million-$250 million. Given today's economics and gross costs, we expect an ROI of about 125 days on these miners, and their economic and useful life ought to go beyond five years. This was a major win, and it came from moving quickly when the market shifted unexpectedly. Delivery of the 48,000 miners we ordered remains on schedule, in equal monthly installments through 2022. The first monthly batches will all go to our existing sites and to sites we're building right now in Quebec. As for our 2021 miner deliveries, 1,290 arrived before Q3 ended. In Q4 of 2021 so far, 3,670 miners have arrived. Thanks to them, our hash rate climbed past two exahash per second this past weekend. During the last two weeks of November, we expect to take delivery of nearly 3,200 more miners. Being able to deploy our mining assets flexibly sits at the heart of our ongoing fleet optimization strategy. We track miners and shift them to wherever they'll perform most efficiently. Even older miners that are fully depreciated can still make economic sense to keep producing if they're sitting in farms that use low-cost energy. Soon, we'll begin moving a large number of older, less efficient miners to our new farm in Paraguay. Finally, our average daily production is now roughly 12 Bitcoin per day, which, at recent prices of about $63,500 per Bitcoin, works out to around $762,000 per day in daily revenue. As our new farms get built out, over the next few months we'll add capacity, install new miners, and keep growing our hash rate. With that in mind, we're confident we'll hit our targets of three exahash per second by 31 March 2022 and eight exahash per second by 31 December 2022. Please turn to slide 11. I'll now hand the call over to Jeff Lucas.

Jeffrey Lucas

executive
#4

Thanks, Jeff. Now I'll walk through our Q3 in more detail. Just so you're aware, roughly 97% of our revenue and about 99% of our gross profit come from our mining operations, while the rest comes from Volta Électrique, the electrical contractor subsidiary we own 100%. Today I'll go over our mining metrics. In Q3 of 2021, we brought in record quarterly mining revenues of $43.5 million, which is seven times higher than the $6.1 million we saw in Q3 of 2020, and that reflects how successfully we've been expanding our footprint quickly, along with the rise in Bitcoin's average price and the growth in Bitfarms' hash rate, plus a drop in overall network difficulty. Over that period, we boosted the company's hash rate by 142 petahash per second, which is 11%, reaching 1,490 petahash per second as of 30 September 30. Today we announced that our hash rate has passed two exahash, which is a 35% gain since the quarter ended. Moving to gross mining profit; in Q3 of 2021, we hit a record $35.4 million, rising sequentially from $28.1 million in Q2 of 2021. Our gross mining margin grew to 82% from 79% in Q2, which is a gain of more than three percentage points. Several things drove this improvement, among them the fact that we're actively buying more efficient miners that are starting to produce more Bitcoin per miner, and we intend to keep doing that going forward, along with the benefit we got from China's mining ban, which lowered the average network computational difficulty for a stretch of time; because of all this, our average Q3 2021 direct cost of production for Bitcoin fell to roughly $6,900 from $9,000 in Q2 of 2021. Also, thanks to the Washington acquisition, we've done away with our only hosting agreement, which we expect will improve our margins even more. On the whole, we remain focused on being a low-cost producer, and we're actively pushing for efficiency toward that goal across all our operations and as we chase growth opportunities. As Jeff said earlier, our recent acquisition in Washington State carries a direct cost of production of only $4,000 per Bitcoin, which sits well below what it cost us to produce during Q3. Now let's look at how our bottom line has improved. With a gain of $13.9 million from revaluing our Bitcoin holdings at 30 September 2021, and a $1.9 million pickup from reversing impairment charges on earlier generation miners and existing infrastructure, net income climbed to a record $23.7 million for the quarter, or $0.13 per fully diluted share. That's compared with a net loss of $4.8 million in Q3 of 2020, which, including a $557,000 loss on disposition of miners, works out to a net loss per basic share of $0.06; in Q3 of 2021, adjusted EBITDA came to $31.9 million, up from $23.8 million in Q2 of 2021, and an increase from roughly break-even in the same period a year earlier. Consequently, our adjusted EBITDA margin came in at 71% for the Q3, compared with 65% during the Q2 of 2021. Moving to slide 12, let's take a look at the balance sheet now. We closed out the Q3 holding roughly $23.3 million in cash along with $101.2 million in Bitcoin, giving us total liquidity of $144.5 million, which is an increase over the $5.9 million in total liquidity, made up solely of cash, as of 31 December 2020. This cash position is a reflection of robust financing activity amounting to slightly less than $200 million across the nine months that ended 30 September 2021. That includes $114.5 million in net proceeds stemming from private placements we completed during the H1 of 2021. It also includes $60.4 million generated through the exercise of warrants and stock options. On top of that, there was $35.2 million in net proceeds from selling 6.3 million shares through our ATM program, which we launched on 16 August 2021, at an average share price of about $5.75. Then there's financing of $10.5 million — pardon me, $10.9 million — in new long-term debt, which was offset by repayments totaling $21.4 million to retire existing long-term debt, repay lease liabilities, and cover other financing costs. Over those nine months, the financing proceeds were primarily directed toward investing $57.4 million in mining and infrastructure equipment, along with making prepayments that totaled $75 million for future miner deliveries, plus the funds were also used to expand our existing Bitcoin retention program. From the close of the quarter through 12 November, we issued another 12.4 million shares under the ATM program at an average price of $6.06 per share, yielding net proceeds of $72.6 million. Since the ATM program began in August 2021, the total shares issued under it reached 18.7 million, which contributed net proceeds of roughly $108 million. The average price per share sold through the ATM program came to $5.96 overall. This leads us into a discussion of our financing strategy. Our main objectives are to fund the rapid growth we have planned and to preserve enough flexibility that we can move quickly on opportunities we spot, all while keeping our overall cost of capital relatively low. The ATM program continues to be one of the financing options available to us, though it isn't the only one. We turn to the ATM carefully as a funding source to pursue our business plan and growth opportunities. It helped support our recent acquisition in Washington State, payments for mined deliveries in the Q3 and Q4 of this year, and the opportunistic purchase of miners. Throughout the Q3, we kept growing our asset base, in both Bitcoin and miners; we plan to leverage these assets for non-dilutive financing at fairly attractive rates; right now we are evaluating Bitcoin-backed facilities as well as equipment financing programs. Even though we have already raised $108 million through the ATM program, this flexible financing facility is still in place and has 22 months remaining on its term. Beyond that, with approximately 12 BTC mined each day, the quantity of Bitcoin on our balance sheet keeps increasing, which adds to our overall liquidity and funding capability. We're in a capital-intensive business that delivers strong margins. When it comes to putting money into new miners, we recoup that investment in a pretty brief window — only 7 to 9 months — even though such equipment typically remains useful for 5 years or more. Because this business is so capital-intensive and those payback windows are so brief, a goal of how we finance things has been — and still is — making sure we have the financial flexibility and liquidity we need for both planned and opportunistic miner purchases, all in full support of our growth strategy. Being able to act fast and decisively on that front remains a key advantage for Bitfarms. Moving to slide 13. At this point I'll hand things over to Emmy, who will wrap up his prepared remarks and then open the call up for Q&A. Emmy?

Emiliano Grodzki

executive
#5

Thanks, Jeff. Like Jeff mentioned, we just crossed two exahash per second and set numerous financial records during this quarter. We keep moving forward with our expansion plan. Our reach really spans the globe. Having grown our footprint to four countries now, production is underway in Canada and the U.S. We anticipate starting operations in Paraguay before the year is out, and development of the Argentina site remains on schedule. We believe this work will keep driving significant increases in our hash rate and market share. To sum up, creating a collection of farms across various geographies and decentralized sites forms part of our strategy to grow and diversify production operations quickly. Currently, we have 10 farms altogether that are either running or being developed, with planned capacity of 404 MW and 48,000 miners set to be delivered in 2022. Thanks to our stronger balance sheet and adaptable capital plan, we are positioned well to hit our goal of an exahash rate of three by 31 March 2022 and eight by 31 December 2022. Operator, please open the line for questions now. Go ahead. Thank you.

David Barnard

executive
#6

David Barnard here, representing LHA Investor Relations. A bunch of inquiries have arrived from investors, so I can begin by going through a few of them.

Emiliano Grodzki

executive
#7

Regarding Washington has nobody queued?

David Barnard

executive
#8

No. Hi there, David Barnard here, calling from LHA Investor Relations. Some questions have come in from investors, and I'd like to ask them.

Geoffrey Morphy

executive
#9

Okay, David, go ahead.

David Barnard

executive
#10

Jeff, when it comes to Washington, should we anticipate deals like this one down the road? Are there additional acquisitions currently being chased or weighed? And building on that same point, at what size would something become too large to manage, or on the flip side, so small that pursuing it wouldn't justify the effort?

Geoffrey Morphy

executive
#11

Appreciate that, David. That's a fair question. To provide investors with some context, since last December we've been actively evaluating possibilities — inorganic possibilities — to acquire businesses and assets. As you're aware, one week ago we had completed just a single one of those deals, which was Washington, at 24 MW. When it comes to size, anything smaller than 10 MW-20 MW wouldn't really interest us, since that's roughly the threshold where a deal becomes worth our while. Opportunities with scale definitely appeal to us more. We've come across a fair number of private company situations involving mid-sized firms, but they lack a real edge when it comes to electricity contracts, and their miners have grown old. It's essentially the same story every time: no access to capital. They're unable to upgrade their fleet. So without an appealing electricity contract, plus a fleet that's aging, we don't find it very attractive. Should an opportunity arise — private or public — featuring a solid electricity contract, a reasonably competent team and a good layout, we'd be quite keen to take a look. My expectation is that we'll keep seeing opportunities. According to the lifecycle hypothesis, consolidation is on its way in this industry, and I believe we're only now beginning to witness pieces of it. We're keeping our eyes open. Thanks to our team and our know-how when it comes to deploying new facilities, I believe we make an appealing partner for anyone who wants to approach us, especially considering our expanding international expertise.

David Barnard

executive
#12

All right, thank you, Jeff. I have one more question, and perhaps this one is directed at Jeff Lucas. When it comes to the extra capital that was brought in through the ATM, how do you intend to use those proceeds moving forward?

Jeffrey Lucas

executive
#13

Okay, David, so what we're aiming to do is, number one, keep putting money behind the growth projects and the build-out work we've got underway right now in Canada, and also in Paraguay, and of course Argentina. On top of that — and you raised this, or tried to raise it, earlier in this same call — we're constantly on the lookout for chances to pick up more miner units when they come along. It's pretty common for one of the big manufacturers to come to us with something where the pricing works strongly in our favor, but you have to be ready to act fast, so having the financial room to do that is what we're after. And finally, we want to be able to back a lot of the openings Jeff just mentioned, the kind that can pop up pretty much out of nowhere.

David Barnard

executive
#14

All right. Jeff, as you're taking on a few finance-related questions, perhaps I can ask one that came from an investor. What's the reason you aren't realizing the complete economic upside from the Bitcoin you hold, and going forward, what do you intend to do with those holdings?

Jeffrey Lucas

executive
#15

Okay, so we certainly hold a sizable Bitcoin position, and right now we're moving forward with steps that let us capitalize on it. To my mind, this shows up in a couple of ways, and the first involves what we refer to as BTC collateralized loan facilities. For us, the rates on those are fairly appealing, and the clear upside there is that it lets us keep up our HODL approach with the Bitcoin we mine, while we're able to handle and cover our operating expenses through those extra borrowings. Like you, we're obviously quite bullish about Bitcoin in general, and we genuinely believe the potential gains from Bitcoin far exceed the added cost of capital that comes with these facilities. From our standpoint, it makes a lot of sense to rely on Bitcoin-collateralized facilities for that purpose. That said, I'll add one thing. I'm aware that certain peers on the Street deploy this as a way to produce yield. We're always looking at possibilities like that, but we're extremely cautious when it comes to custodial duties and counterparty risk. We want to be sure we've fully handled and grasped that before we step into that territory. Honestly, even though there are returns from doing it, the yields, you know, going back historically are perhaps around 2%-4%, give or take. You know, we're not yet at the point where we can judge that it's worth the extra risk being taken on regarding the counterparty.

David Barnard

executive
#16

All right, that’s helpful. One more thing as well, on the Bitcoin mining output side — at present it’s running at roughly 12 each day. As you keep pushing your hash rate higher down the road, what kind of shift should we expect there?

Geoffrey Morphy

executive
#17

Appreciate it, David. This is Jeff Morphy. I'll handle that question. Since Washington started up and the miners showed up last week, we've now crossed 2 exahash, which I noted earlier in my remarks. That puts our current output at 11.5, 11.6, 11.7 Bitcoin each day, which is quite near 12 Bitcoin. As I also said, we have slightly fewer than 3,200 miners on the way within the next couple of weeks — 3,191 miners, to be exact. Once those get installed over the coming couple of weeks, we anticipate reaching roughly 14 Bitcoin per day. Hopefully that addresses your question, David.

David Barnard

executive
#18

All right, sounds good. When it comes to those miners, could you perhaps give us a bit more detail? Could you share where things stand with getting the machines we just bought up and running, and sort of how the year has gone so far, plus what we should anticipate for hash rate as we move ahead and enter Q1?

Geoffrey Morphy

executive
#19

Alright. The new miners, consisting of Bitmain S19j Pros along with WhatsMiner M30S series units — with more from Bitmain than from MicroBT — during September we got 1,290 of these. Distribution was between Washington and our upgraded Cowansville location. During October, the majority of S19j Pro machines were sent by us to Washington so that facility could be upgraded and filled out. A portion of the M30S units got set up in Cowansville. Thus far in November, five shipments have arrived. Every one of them was S19j Pros. All of those went to Washington. Of the roughly 3,200 machines still remaining, most — more than half — are headed to Washington. Certain ones are destined for Cowansville, while others will go to Saint-Hyacinthe so that site can be upgraded and prepared for removing some older equipment there and making those ready for Paraguay. At present we sit above two exahash; that figure will climb as these machines get connected across the coming couple of weeks. Paraguay is going to be switched on, and we'll obtain some initial output there prior to this year's conclusion. We anticipate the bunker — its phase one — beginning to come online in early 2022 as well; via those advancements, our expectation is reaching three exahash, on target, by the close of Q1 of 2022.

David Barnard

executive
#20

Thanks. One more item we wanted to raise goes back to perhaps the economics and a look at your direct cost of Bitcoin; in Q3 it declined versus Q2. Do you expect it to decline more in Q4? Perhaps just a bit of color on what's driving those costs.

Geoffrey Morphy

executive
#21

Jeff Lucas, I think that's a good question for you to handle.

Jeffrey Lucas

executive
#22

Alright, I'll handle that question. To begin with the simpler part of the answer, there are macroeconomic forces influencing this. As all of you are aware, throughout the quarter, the general level of difficulty was not as high as what we saw in Q2. That played a major role in bringing the cost down. Another thing worth keeping in mind involves several other elements, and one of them is, as was mentioned, we're now receiving and installing more productive miners, and producing far more terahash — or achieving far greater terahash for each watt of power — makes a substantial difference. Next, we're realizing certain advantages from the reality that, as we noted earlier, a number of expenses, energy expenses in Washington among them, have come down. Those gains will accrue to us moving forward, even relative to the inexpensive rate of $0.04 per kWh that we presently pay in Canada. Those are among the things driving that result. On top of that, with a greater quantity of Bitcoin, we clearly gain from spreading a bigger base across our fixed costs. Now, fixed costs within mining, as a lot of you understand, don't represent a particularly big share of the total cost structure, yet they still add something. Broadly speaking, we gained from the macroeconomic situation regarding events in China. We've additionally implemented and brought about numerous efficiencies internally that have influenced our total cost. One final element I'd like to mention is that across Q2 and Q3, part of our Bitcoin came from locations where hosting services are used. As a lot of you understand, a profit-sharing structure was involved there, and that can heavily affect what that Bitcoin costs. What I can tell you is that regarding our Bitcoin costs during Q2 and Q3, that figure runs roughly $400-$600 extra per Bitcoin in cost terms. With that no longer present as we move into Q4, it will definitely assist our overall Bitcoin costs moving forward.

David Barnard

executive
#23

All right. Perhaps there’s one more item you can address on behalf of the investors listening, and sort of wrap things up with a longer-range company roadmap. When it comes to corporate strategy, what exactly does Bitfarms intend to do past 2022? Could you perhaps share a few of the key points on what you’re focused on during 2022, and then beyond that, where you see the approach heading?

Geoffrey Morphy

executive
#24

David, I'll take that question first, and afterward Emmy or Jeff can chime in. For us, 2022 is going to be an incredibly thrilling year, since we're moving up from the two exahash level we're at right now to three exahash during the Q1, and then to eight exahash by the close of next year. That means we'll be bringing the full output online from our new Quebec facilities, along with the full capabilities in Argentina and Paraguay. My guess is there are likely additional opportunities in Washington, and with luck in Quebec too, to push even further than that. In 2022 we have to deliver; since March we've been telling investors that now is the moment to truly get it done, and that's exactly what we intend to do. We've been growing the team in Canada and the U.S. We've been growing a team in South America, and we're set up to succeed. The team keeps getting bigger, we've brought in some excellent talent, and we'll be adding more people shortly to guarantee we handle this efficiently and have the people needed to guide this company going forward. Looking past 2022, I believe we've taken a strategic approach. We've stated that we'll be seeking further opportunities in Canada. Quebec is a fantastic province with plenty of hydroelectricity. There are additional spots in Canada where we're having conversations too. The U.S. and Washington hydroelectric power. The Columbia supplies a great deal of hydroelectric power in that region. Opportunities exist there for both organic and inorganic growth. Down in South America, now that people have begun to grasp what we do, we're receiving interest from many different quarters and many different countries. My expectation is that we'll keep going and uncover further opportunities in Argentina and Paraguay, and maybe in some of the other South American countries too. On top of that, we have some other early-stage talks in other parts of the world. I believe the kind of investment we've made in our team and our expertise is genuinely going to pay off, and I'm thrilled to carry that momentum into 2022 and beyond. Emmy, Jeff, anything you'd like to add?

Jeffrey Lucas

executive
#25

Okay, Jeff speaking. The one thing I want to say is that something we are incredibly thrilled about is having an extremely capable group of both operators and developers. Like Jeff mentioned before during this call, we do hear from quite a few people who either already hold a power contract or perhaps own some land they believe would be a perfect spot, and we are in a strong position to be the party that can most accurately judge and assess that opportunity, put together a highly effective strategy, and then run it; we are now on our sixth version of farm design. We have picked up a tremendous amount across the last 4 years, and we can now construct these facilities extremely rapidly and efficiently while running a highly effective operation. That ranks among our biggest strengths, and I believe that is where a tremendous amount of leverage lies for us moving forward.

Emiliano Grodzki

executive
#26

Appreciate that, Jeff. Like Phil and Jeff said, I think our greatest strength comes down to the people and what they know. We're hands-on operators at heart; we grasp quite well that in our line of business, everything revolves around efficiency and mission; our vision for where this sector is headed is extremely clear, and a strong plan is already in motion. I'm confident we'll encounter lots of fresh opportunities over the coming 12 months to keep making our company more efficient and get it ready for the next halving. It makes me very happy to have this team, expanding each day and always learning and putting all of our power to work.

David Barnard

executive
#27

Perfect. Appreciate it, Emmy. Operator, there don't appear to be any more questions from anyone. Perhaps we can just pass it over to Jeff Morphy so he can make a few closing remarks.

Geoffrey Morphy

executive
#28

Alright, David, and thanks to everyone for joining us on today's call. Our aim is to stand among the biggest and most profitable Bitcoin miners, and we're eager to share news about how we're advancing down the road. Just a note that we'll be presenting at the Ladenburg Thalmann Virtual Technology Expo on November 18th, as well as at the B. Riley Financial Crypto Conference on December 8th. So with that, I appreciate your joining our call and hearing us out. Enjoy your evening. Thanks.

Jeffrey Lucas

executive
#29

Thank you all.

Operator

operator
#30

That brings this call to a close. We appreciate your joining us for today's presentation. You're welcome to leave the line now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Keel Infrastructure Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Keel Infrastructure Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Keel Infrastructure Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.