Keel Infrastructure Corp. (KEEL) Earnings Call Transcript & Summary
March 28, 2022
Earnings Call Speaker Segments
David Barnard
executiveThanks, Gary. Hi everyone, and welcome to Bitfarms' call about Q4 2021. With me today are our Chief Executive Officer Emiliano Grodzki, President and Chief Operating Officer Geoff Morphy, and Chief Financial Officer Jeff Lucas. Before we begin, please note that this call is streaming live, and a slide deck accompanies it. To view those slides, head over to www.bitfarms.com and check the Investors Presentations section. If you'd prefer to listen on your phone, you can grab the presentation from that same page. Also, a reminder that this morning Bitfarms issued a press release sharing its Q4 2021 financial results. On slide two, just a brief note before we go further: a number of things we say on this conference call may count as forward-looking information and statements. Bitfarms wants listeners to understand that such forward-looking information and statements depend on particular assumptions and risk factors, and those could lead actual results to differ materially from what the company expects. Anyone listening shouldn't put undue reliance on forward-looking information or statements. Take a look at today's press release, and please refer to the risks described in Bitfarms' public documents filed on sedar.com, along with the SEC documents filed on EDGAR. Except where applicable securities laws require it, the company assumes no obligation to revise or update any forward-looking information or statements. On today's call, we'll be talking about some metrics that aren't defined under IFRS. IFRS doesn't set a standard meaning for these, so they might not line up with how other companies calculate similar figures. We rely on these non-IFRS metrics — gross mining profit, gross mining margin, EBITDA margin, adjusted EBITDA, and adjusted EBITDA margin — as extra context layered on top of our IFRS numbers, so you can get a clearer picture of how management views our operating results. Gross mining profit means gross profit, minus depreciation and amortization, along with other small items that sit in cost of sales for the company's mining segment. We determine gross mining margin by taking the mining segment's gross mining profit and dividing it by that segment's revenues, then expressing the result as a percentage. When we talk about direct cost of production, we mean the direct expense tied to Bitcoin, calculated by adding together all electricity costs and hosting costs connected to Bitcoin mining, then dividing that sum by the overall count of Bitcoin mined. As for EBITDA, that stands for earnings before interest, taxes, depreciation, and amortization. When we talk about adjusted EBITDA, we mean EBITDA after removing fluctuations in the worth of the Bitcoin we hold, along with non-cash general and administrative costs that appear within equity compensation expense. As analytical tools, these alternative IFRS measures come with constraints, so they shouldn't be viewed on their own or as replacements for examining the company's results as reported under IFRS. Listeners are encouraged to check today's earnings release along with the company's fourth quarter 2021 management discussion and analysis, where definitions for these non-IFRS measures and the reconciliations to IFRS measures can be found. One quick note: any financial figure we reference is denominated in U.S. dollars unless stated otherwise. During this call, Geoff Morphy, our President, will review how the business did over the quarter. After that, CFO Jeff Lucas will give a thorough rundown of the numbers, and once the Q&A wraps up, CEO Emiliano Grodzki will offer a few closing thoughts. We asked investors to submit their questions ahead of time, and I'll read those to management after we turn things over to analysts for the live Q&A. Now, if you'll look at slide three, I'm happy to hand the floor to Geoff Morphy.
Geoff Morphy
executiveThanks, David. Hello from Argentina, and welcome, everybody, to the call today. Following up on what we achieved in Q3 of 2021, we turned in yet another profitable quarter, posting $60 million in revenues, $49 million in gross mining profit—an 84% gross mining margin—and adjusted EBITDA of $44 million, a 74% adjusted EBITDA margin. At December 31, our hash rate stood at 2.2 exahash per second, which is 47% higher than the 1.5 exahash per second we had when Q4 began, and 166% above the 965 petahash recorded at the start of 2021. Right now, our hash rate sits at 2.7 exahash per second, and we expect it to pass 3 exahash per second over the coming 7 to 10 days. While our hash rate expands, it's worth noting that our growth outpaces that of the Bitcoin network, which was measured not long ago at 205 exahash per second. Because of that, we now hold roughly 1.3% of the market, and that figure should climb. We remain focused both on growing in absolute terms and on picking up relative market share as we carry out our worldwide expansion strategy. In Q4, we mined 1,045 Bitcoin, roughly matching what we mined in Q3 of 2021. From the standpoint of the worldwide network, though, Q3 was an odd period, since the whole industry gained from the mining disruptions across the network that took place in China last summer. Mining costs during Q4 came to $8,000 per Bitcoin, broadly in line with prior levels, apart from Q3 2021, which, as I noted, gained from those macro events. Turning to further specifics about what we accomplished in Q4, we finished building a new 10-MW site in Paraguay and bought a facility in Washington State that runs at 17 MW today and has a clear route to reach its full 24 MW potential. On slide four, let me spend a moment on Washington. That site is our cheapest facility, and most of the miners we have there are Bitmain S19j Pros, which rank among the most efficient and profitable miners available on the market right now; combining inexpensive power with efficient miners means this farm produces our strongest gross mining margins. We brought in close to $8 million of revenue across the 52 days spanning the November 9, 2021 acquisition date through the close of the quarter, and we anticipate recovering our investment in this purchase by the middle of 2022. Slide five lays out where we currently operate. To go into more detail, we started Q4 of 2021 running five farms, all of them in Quebec; we then brought the Washington State farm I mentioned on board during that quarter, which took us to six by year-end. Since that point, we've expanded to eight operating locations, as this slide shows, and our worldwide expansion plan keeps moving ahead. With that, here are a few of the highlights from after the quarter closed. Please turn to slide six. In January, we started up operations at our 10-MW site in Paraguay; shown here is a photo of the finished structure situated close to Asunción, which is Paraguay's biggest city. Right now this farm runs at 6 MW, and we anticipate it will scale up to its maximum 10 MW over the coming weeks, once the last batch of miners has been put in and the rest of the capacity gets switched on. As part of our approach to optimizing the fleet, machines at this location include moving older, less productive miners that had been based at certain Québec farms so they work more effectively here, given Paraguay's cheaper energy. Let's move to slide seven. Two weeks ago, we kicked off operations at one of our newest farms in Sherbrooke, Québec, known as The Bunker. Phase one of The Bunker covers 18 MW, and we are drawing 12 MW from it at the moment. Currently being built are phases two and three, covering 18 MW and 12 MW respectively. Completion is targeted for the second and third quarters of 2022. Once fully built out, The Bunker should become a 48-MW site containing 13,000 miners and is projected to produce nearly 1.3 EH/s. A different site in Sherbrooke, situated a short distance from The Bunker, goes by the name Leger. Production there is set to commence within the next 10 days, and it will eventually become a 30-MW facility able to deliver more than 740 PH/s. Also in Sherbrooke, a short distance from both The Bunker and Leger farms, sits our recently acquired location called Garlock. The Garlock property, together with The Bunker and Leger facilities, is meant to take the place of the de la Pointe facility and make full use of the company's power contracts in the municipality, consistent with the agreement we announced previously with the City of Sherbrooke, made in September 2021. Altogether, Sherbrooke is set to become a multi-location farming campus running at 96 MW. Kindly go to slide eight. In Rio Cuarto, Argentina, we have secured plans for as much as 210 MW, made up of four warehouse-style buildings within the gates of a private power company, which will draw on available capacity and otherwise stranded power. Taking a four-phase approach to this project, 105 MW of capacity is presently under construction across the first two phases. In those phases, we intend to put in 27,500 of the 48,000 latest generation MicroBT miners being delivered this year, and we expect production to start sequentially by year-end 2022. Our power is locked in under an eight-year agreement, which includes fixed pricing on part of the contract for the first four years, after which the agreement requires repricing for the remaining four years. With full development, the Argentina farm should be able to house more than 55,000 miners. After looking at how the global surge in natural gas costs is affecting us, we now anticipate that our farm in Rio Cuarto will play a reduced role in the 2022 blueprint we had for reaching 8 exahash per second, and so we've reworked both our development schedule and how we allocate our fleet. I'll say more on that shortly. Let's move to slide nine. To sum up, we currently have eight farms in production, compared with six when 2022 began. That figure covers two active sites in Canada, one in Washington, and one more in Paraguay — all of which are running today and undergoing expansion. Right now our capacity sits at 121 MW, whereas on September 30 it was 69 MW. Another 118 MW is being developed and should be energized during 2022, bringing total plant capacity to 289 MW, and we're also evaluating further megawatt possibilities so that our production capacity reaches our 8 exahash goal and goes past it. Given today's shifting energy landscape — among other things, the steep climb in natural gas prices over the last three months — we're going back over our current production strategy and weighing alternatives that are better shielded from the danger of wild energy price fluctuations, which might stay elevated for a great many years, so that we keep our mining structure low cost. If we carry out this plan as intended, we should hit 7.2 exahash by the close of the year.
Geoff Morphy
executiveOn top of that, we're actively looking into and holding talks regarding growth possibilities in Canada, Paraguay and the United States, which would get us to 8 exahash by the end of the year and beyond that in 2023, mainly using green hydro power. Now let's move to slide 10. Bitfarms is still among the biggest and most profitable Bitcoin miners anywhere in the world. From when we started back in 2017, we've operated as a vertically integrated, decentralized, global self-mining business. Our robust internal capabilities and infrastructure — this includes our authorized repair center plus our fully owned electrical contractor, Volta Electrique, which has more than 30 licensed electricians — help keep us among the industry's lowest cost miners. Our approach remains one of diversifying our mining portfolio by favoring sites that offer cost-effective electricity. Thanks to demonstrated expertise, a larger infrastructure footprint and a solid management team, we're positioned better than at any prior point to carry out our growth plans for 2022 and after. To go over miners and fleet activity, kindly turn to slide 11. During Q4 2021, deliveries and installation from MicroBT and Bitmain totaled more than 7,000 of the newest generation of miners. Across all of 2021, we took receipt of and set up roughly 12,000 miners, and we finished the year with about 27,000 miners online. As of today, roughly 30,800 miners make up our total installed fleet. Importantly, the most dependable miners available make up our fleet, and we take pride in operating to maximize uptime, extracting productivity from this key asset. Deliveries on the 48,000 miners ordered during 2021 began this January, with 27,500 slated for Argentina and 20,500 set for installation in Quebec. So far in 2022, we've received or have in transit close to 11,000 miners, which have been installed, or are being installed, across multiple farms, among them our recently opened site at The Bunker, plus other locations, in order to optimize our mining fleet. Other than a halt for Chinese New Year during the first half of February and recent COVID lockdowns in that nation, deliveries have proceeded on schedule and keep running at roughly 4,000 miners each month. With respect to these miners, we stress that they are extremely cost-effective, owing partly to our successful mid-2021 negotiation that repriced these 48,000 miners to an average cost per terahash of $38.50, far under prevailing market prices per terahash for miners of this kind. Our average daily output is now roughly 12.5 Bitcoin per day, which, using recent prices above $47,000 per Bitcoin, works out to about $590,000 in revenue each day; apart from the macro conditions that pushed production unusually higher during the third quarter of 2021, this represents our highest production level since before the last halving event in May 2020. Before handing things over to Jeff Lucas' part of the presentation, I want to stress that, despite swings in the price of Bitcoin, we finished the year with profitable results and reported net income of $10 million in the fourth quarter of 2021. Kindly turn to slide 12. Having said that, I'll pass things over now to Jeff Lucas.
Jeff Lucas
executiveThanks, Geoff. To start, I want to walk through a few key points from our fourth quarter of 2021. Our mining output during that period was 1,045 Bitcoin, and the average cost came to $8,000 per Bitcoin, which aligns with what we've seen historically, aside from the lower production costs we saw in the third quarter of 2021, which we've already addressed. Broadly speaking, we remain committed to operating as a low cost producer, and we're constantly pushing for efficiencies to support that goal across everything we do, including as we look for ways to grow. In the fourth quarter of 2021, we brought in record quarterly revenues of $60 million, which is a 426% increase compared to the same period a year earlier, driven by a higher average Bitcoin price along with our hash rate growing more than network difficulty did, which means our market share went up. We turned a profit, with net income of $10 million for the quarter, compared to a loss of $5 million in the year ago period, and adjusted EBITDA came in at $44 million versus $4 million in the year ago period. On the financing side, at the close of the quarter we secured a $100 million revolving credit facility backed by some of our Bitcoin, and we've drawn $60 million against it. Now let's go through our bottom line in more detail. Our net income of $10 million for the fourth quarter, which works out to $0.05 per fully diluted share, factors in a $4 million loss from revaluing our Bitcoin holdings as of December 31, 2021. It also includes an impairment charge tied to earlier generation miners and existing infrastructure, an $800 thousand gain on disposition of property plant equipment, and income tax expense of $8 million. That's compared with a net loss of $5 million in the fourth quarter of 2020, or a net loss per share of $0.06. As I said earlier, adjusted EBITDA for the fourth quarter of 2021 was $44 million. That's an increase of $32 million from the third quarter of 2021, and it's up from $4 million in the prior year period. Consequently, our adjusted EBITDA margin reached 74% in the fourth quarter of 2021, compared to 71% in the third quarter. Now, if you turn to slide 13, we'll look at the balance sheet. We closed the fourth quarter with $126 million in cash and 3,301 Bitcoin, and 1,875 of those Bitcoin are being used as collateral for the $60 million working capital facility. As of December 31, working capital was $186 million. Our financial position also reflects the corporate decision we made in early January 2021 to hold onto the Bitcoin we mined. Over the full year, we kept more than 96% of the Bitcoin we mined, and only used a small amount for commitments that were contractually payable in Bitcoin. The cash position as of December 31, 2021 reflects the following financing activity, which totaled $371 million for the twelve-month period. $115 million in net proceeds from private placements completed in the first half of 2021. $63 million from the exercise of warrants and stock options. $60 million in proceeds from our new $100 million Bitcoin credit facility. We brought in $146 million of net proceeds by selling 23.9 million common shares through our ATM program, which kicked off on August sixteenth, at an average price of roughly $6.28 per share. On the financing side, we took on $14 million in new long-term debt, which was offset by $25 million in repayments to retire existing long-term debt, pay down lease liabilities, and cover other financing costs. Across 2021, those financing proceeds mostly went toward $180 million invested in mining and infrastructure equipment, $23 million for buying our Washington operations, and prepayments adding up to $85 million on future mined delivery. So far in the current quarter, we've issued another 6.4 million shares under the ATM at an average price of $3.97 per share, generating $25 million in net proceeds. All told, from when the ATM program began on August 16, 2021, we've issued 30.4 million shares through it, bringing net proceeds to the company of $171 million. That leads us into talking about our financial strategy, which has picked up two new components since our third quarter report. The main objectives here are funding our planned rapid growth and keeping enough flexibility to move quickly on opportunities we spot, all at a relatively low overall cost of capital. Our equity ATM program is still active and stands as our most flexible financing source. Our $100 million Bitcoin-backed credit facility is an appealing way to leverage the value of our Bitcoin holdings, and there's still substantial credit available on it. Our $32 million equipment financing agreement is one more instrument in our financial toolbox, and we anticipate making further use of equipment-based financing and similar methods to leverage the value of our expanding asset base. I'll also note that the attractive pricing we've locked in for our miners, combined with their rapid payback, makes this financing route very appealing to us. Finally, with strong mining production, the count of Bitcoin on our balance sheet keeps climbing. Jeff mentioned we're presently adding more than 12.5 Bitcoin every day, which further bolsters our overall financial strength and our options for leveraging this and other assets. All in all, Bitfarms is well capitalized and positioned to execute on the growth opportunities ahead of us, and we're eager to build on success in 2022. Before I hand the call back to Geoff Morphy, I'll note that beyond our continued presence at investor conferences, we'll be taking part in industry events next quarter, with upcoming ones including Bitcoin 2022 in Miami in April and the AIM Summit in London in mid-May. If you'd like to meet with us at either event, please reach out to LHA Investor Relations. Now moving to slide 14. With that, I'll pass the call back to Geoff, who will wrap up our prepared remarks before we open things up for Q&A. Geoff?
Geoff Morphy
executiveThanks, Jeff. We’re entering 2022 in a stronger position than at any prior point to grow the company and carry out our expansion initiatives. At present, we have mining operations running in 3 nations: Canada, the United States, and Paraguay. By the end of the year, we anticipate launching operations in Argentina, and we’re actively exploring further possibilities across those regions as well as others. To sum up, today we’re running at 121 MW and are close to reaching a fresh milestone for hash rate of 3 EH/s within the next few days. During 2021, we grew faster than the network hash rate and therefore picked up market share; given a solid balance sheet, a flexible approach to capital, and a larger management team, we’re ready to invest aggressively in our business plan so that this trend continues and we achieve our objective of surpassing 8 EH/s by year-end. Importantly, because of our low-cost structure and efficient operations, we’re producing profitable outcomes for shareholders amid volatile conditions. Operator, we’re ready to take questions now. Please go ahead.
Kevin Dede
analystMorning, Geoff and Jeff. This is Kevin Dede. I appreciate the excellent presentation. Could you clarify for me precisely what the year-end goal is — I believe it sits at eight, though seven came up in discussion. I'd like to know exactly where you expect to land and what you can achieve using the miners you currently own or have contracted.
Geoff Morphy
executiveHello, Kevin, good to hear your voice. Our target for the end of the year remains unchanged — eight exahash has been the figure for more than twelve months now, and we're sticking with it. What's changed, given the rise in energy costs, is simply the route we'll take to reach it. We've always taken pride in a long-term view toward margins, and hitting our objectives has consistently mattered to us. Since power prices have climbed — literally triple what they were three months back — and given this global transformation in energy supply, we've concluded that Argentina requires a cautious approach. We have numerous promising prospects in Paraguay, Washington, and Quebec — all hydro-powered sites with fairly stable rates, where we anticipate no surprises, and which offer far greater protection than natural gas. Regarding Argentina, our plan is to complete half of the build this year, then focus on the remaining half next year, making sure we grasp where gas prices are headed, since we don't want to subject a site or a portion of our operations to potentially unprofitable conditions. Kevin, and everyone else listening, recall that this contract runs eight years. The last four years are entirely exposed to market pricing, and we're very aware of that. It worries us, we're monitoring it carefully, but we want to make sound, deliberate choices. Thanks to a fairly strong pipeline of opportunities, we have solid options across the other regions where we're confident about energy costs. Consequently, we've revised this year's installation infrastructure timeline — not dramatically, but sufficiently that we can deploy our current miners into operations already developed or presently under construction and development, without losing any momentum. I hope that addresses your question, Kevin.
Kevin Dede
analystGeoff, out of the 8 exahash you've got, what portion is already under contract or actually installed?
Geoff Morphy
executiveOur path is clearly mapped out to reach 7.2 exahash — we'll get there by expanding our Québec sites, making those operations more efficient and adding further capacity in Québec, plus additional buildouts in Paraguay and Argentina.
Kevin Dede
analystOkay, that was the part that threw me off.
Geoff Morphy
executiveRight. As for the rest, we’re at different points — mainly just talking things through in those regions — and we’re pretty confident we can get those extra deals and opportunities signed so we reach 8 exahash and, in fact, go past it.
Kevin Dede
analystAlright, I value the remarks regarding power costs, especially those tied to natural gas. Could you share a bit about Hydro-Québec and if you happen to be observing any shift in their rates?
Geoff Morphy
executiveNothing at all is showing up for us; regarding pricing movement at Hydro-Québec, in Washington State, or in Paraguay, we possess zero insight; in Quebec we remain at roughly $0.04 per kWh on average. Should a rate hike occur in Quebec, it would likely be tied more to inflation indexing, yet they have shown hesitation to proceed, since these are, and Quebec stands apart from certain other regions where we operate, given that it is a provincial utility supplying electricity to essentially every household and company across Quebec, and they carry an obligation to do so. That practice has continued for more than a century. They recognize that any increase in rates would hurt everyone and slow growth in that area. Hydro-Québec holds excess electricity that they put to good strategic use; their approach is deliberate, though we know of no impending rate hikes from Hydro-Québec or via municipalities such as Hydro-Sherbrooke, Hydro-Magog, with whom we likewise hold contracts.
Kevin Dede
analystGreat. Thank you, Geoff. Would you mind discussing a bit the possible geopolitical danger involved in running operations over in Argentina? How would you answer people who criticize you, who might have expressed worries regarding your capacity to keep your existing agreements in place there? And perhaps you could elaborate a bit more on the way the government there perceives your project.
Geoff Morphy
executiveAll right. Let me attempt to address several of those items. At the start, when our project in Argentina became public, plenty of curiosity arose. A lot of emails also arrived from individuals interested in working for us. In addition, the government reached out with questions, seeking further details. After that, the media asked us questions, wanting to know if we were obtaining subsidies from the Argentine government in order to establish ourselves in that country. The truth is that no subsidies are coming our way. After both the public and the government understood that we were pursuing this entirely by our own choice, everyone became more encouraging and grasped our perspective. These days, the climate in Argentina for establishing something new is harder than it is in other places, yet it does exist. Luckily, our founders hail from Argentina. They understand how things operate here; they know the way to accomplish things, and that's what they're doing. During roughly the past 12 months, we've opened a Buenos Aires office staffed with highly skilled individuals. We've entered into contracts with the engineering construction companies and an engineering firm that supports us. So we have some quite talented individuals collaborating with us. As we've grown, Kevin, it's been fascinating, since the government now actually introduces us to contacts and points out additional sites and tries to, you know, assist us in gaining a stronger foothold in this nation and, you know, unlock further opportunities, which brings about jobs along with additional development and construction and capital flowing in. We're being cautious as we evaluate those facilities. It has become quite fascinating. I would be somewhat negligent if we didn't mention other LatAm opportunities. Paraguay is. I believe I said something at one of the recent quarterly meetings. We built our 10-MW facility to test how things would turn out. It has succeeded, and it's hydro in that nation, plenty of hydro. We're also noticing quite a few solid opportunities in Paraguay. In that case, it's actually a geography, a nation where we think there's a chance that electricity rates will actually decline instead of rise, owing to certain structural issues, structural benefits stemming from them paying off some debt on one of their hydroelectric dams. That's favorable, though we've kept proceeding cautiously.
Kevin Dede
analystNice work on the Garlock acquisition. From what you showed us, my read is that this is a retrofit of a fixture that's already there, and I wanted to ask how much time Bitfarms might need before that site is up and running as a working Bitcoin mine.
Geoff Morphy
executiveYes. Our expectation is that we'll be at full 18 MW and producing in Q4 of this year. This site became available through a receivership. It had been on our radar for some time, and we'd been putting work into it for a while too. As you're aware, procuring miners, transformers, supplies and similar equipment involves a fairly substantial lead time. Even so, given how the receivership was structured and the negotiations that followed, we felt quite confident that eventually we'd come out on top for that acquisition, and that's what happened. The process actually ran longer than we'd anticipated, but we decided to place orders early for transformers and a number of the racks; possession only came to us about a week ago. Engineering work and build-out planning for the site are now getting underway; because we'd already been inside the facility, we knew exactly what it looked like. It's a solid facility. We closed on it. There's additional land surrounding it, which gives us a comfortable buffer. Down the road, if we secure another hydro contract, there's room to grow it. We've set it up to be producing in the fourth quarter. My sense is it won't come together any earlier than that, but what we commit to doing in Quebec has always proven fairly reliable, and we feel really good about Q4 and getting 18 MW out of that site.
Kevin Dede
analystAll right, got it. Thanks for explaining that, Geoff. Yeah, you covered several other things there as well. There's more power and additional space available to you. So we're eager to learn more on that front. Thanks so much for fielding our questions.
Geoff Morphy
executiveHappy to, Kevin. Any time. Let me just be clear — additional power isn't something we have. Within the city of Sherbrooke, we hold 96 MW via a contract that already exists. Those 18 MW bring our 96 MW to full. Power isn't something we can access there, though through more conversations, perhaps we will, and ideally we will, and at that point building it out would be straightforward. As things stand, that will wrap up what we're building in the city of Sherbrooke.
Kevin Dede
analystOh, that's great. I appreciate you clearing that up.
Chris Brendler
analystHello. Thank you. Good morning, and I appreciate you taking my question. It's nice to speak with you folks once more. Kevin covered many of the things I had intended to ask, but I just wanted to get clarity on the following: to what extent do rising commodity prices, particularly natural gas, affect your approach and your 2022 plans? Does that represent a significant shift, or is it simply minor adjustments?
Geoff Morphy
executiveSure, it has an effect. We aren't anticipating that phases 1 and 2 will be delivered. Phase 1 is warehouse number one, and phase 2 is warehouse number two, both of which are scheduled for this year. We anticipate getting them running; that's going to take away from part of our economics in that region. I suppose none of us truly knows where natural gas prices will head from this point. I don't anticipate they will decline at any point in the near future, but should they rise, we along with everyone else across the globe will be forced to adapt. No, we are moving at full speed on warehouses one and two. As I said during the remarks, this is an 8-year contract featuring a complete price reset after 4 years. That is really the part that worries us more, since, you know, we are committed for 8 years at this facility. Across that period, we will pass through 2 halvings. Ensuring we have low cost operations to help return on investment and return on assets is something we continually examine, and we will reassess as we move forward. But at this moment, we remain inside the parameters that make this a green light project.
Jeff Lucas
executiveAlso, Chris, I want to make sure everyone listening understands this: as you're aware, in all other locations, our power comes completely from hydro, which means we're mostly protected from the shifts in energy costs that other companies are experiencing.
Chris Brendler
analystOkay, that sounds good. Absolutely. We’re likely seeing even more of that nowadays. My second question is this: I really value the slide on page 13 that details the ins and outs regarding capital. So, my ask is — since the market has shifted so much already in 2022, have any of those capital sources become more or less appealing compared to how they were in 2021? What I mean is, you know, you’re still observing a growing number of providers and greater supply from every company and financial institution aiming to fund mining — whether for equipment or secured by your Bitcoin reserves. Aside from possibly the equity markets, it seems like things remain quite strong, but I just wanted to hear your perspective on that.
Jeff Lucas
executiveAlright, I'll take that one, and happy to do it. To start with, it goes without saying that equity costs are far greater at present than they were at the same moment a year ago. What that has driven us toward is going after non-dilutive financing options much more forcefully. A benefit we've enjoyed as time has passed is a base of assets that keeps expanding — through our Bitcoin holdings, and likewise through our miners and infrastructure assets. We're now uncovering plenty of chances, as we started to do not long ago, to secure funding using that type of collateralized, non-recourse collateralized arrangement we're able to establish. It genuinely brings down our overall cost of capital, and in fact opens up to us far more financing choices than we'd weighed previously; this is truly coming together quite well alongside our broader financing approach. Among the financings we arranged that we mentioned was that $100 million BTC-backed facility. The purpose of that facility — let me address it briefly — is that beyond being a fairly cheap source of capital, and crucially, we're able to deploy those funds to satisfy our operational needs and our debt service obligations. That lets us keep holding our Bitcoin and capture the ongoing upside appreciation we all expect for Bitcoin. That genuinely creates a very persuasive case for us as we move ahead. What's fascinating here, Chris, is that we're witnessing what you might call a maturing of the financing possibilities open to the crypto community, and to Bitcoin miners especially. What we observe because of that is that through some of these assorted options, our real cost of capital on that base is starting to decline as time goes on. We're acknowledging that there exist wider sources of capital, more sophisticated and intricate sources of capital. Part of what we aim for in preserving financing flexibility is being positioned to capitalize on some of those cheaper sources of capital as the market broadens and as it matures and expands in general.
Chris Brendler
analystOkay. Given how spread out you are geographically, does that add some difficulty, or is that basically a non-issue with your lenders?
Jeff Lucas
executiveOkay, so Argentina's financing scene is obviously a completely separate beast, and we're going after it hard. To put it plainly, at this point that's mostly being bankrolled—and has mostly been bankrolled—by the equity we've been raising here. As for being in the U.S. and Canada, that's opened up more doors for us. Some people, whether because of their own structural reasons or something else, might lean toward lending to a U.S. or Canadian entity; we've managed to take advantage of both, at a lower cost of capital overall; in short, it works in our favor. Then again, South America—even though we're in talks right now and there are various financing opportunities there—is somewhat of a different beast from what we're seeing in other places.
Chris Brendler
analystMakes sense. Congrats on the results. Thanks, guys.
Jeff Lucas
executiveAbsolutely, and thanks to everyone for joining us on today's call.
Emiliano Grodzki
executiveBitfarms currently operates at a hash rate of 2.7 exahash per second, which puts us at roughly 1.3% of the Bitcoin network. That's an increase from under 1 exahash per second and a 0.6% share when 2020 began. Our growth has outpaced that of the Bitcoin network, and as we commence production across several new sites in 2022, we anticipate continuing to capture additional share. To wrap up, we're incredibly enthusiastic about what lies ahead: we've put together a world-class team, constructed and now run eight farms across various geographies, and secured the capital needed to back our expansion plans throughout 2022 and afterward. Our sights remain set on ranking among the biggest and most profitable Bitcoin miners, and we're eager to share future updates on how we're doing. Thanks so much.
Operator
operatorThat brings us to the end of this call. We appreciate everyone joining us for today's presentation. At this point, you're free to leave the line.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Keel Infrastructure Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Keel Infrastructure Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Keel Infrastructure Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.