Keel Infrastructure Corp. (KEEL) Earnings Call Transcript & Summary

August 15, 2022

NASDAQ CA Information Technology Software earnings 57 min

Earnings Call Speaker Segments

David Barnard

executive
#1

Appreciate that, MJ. Good morning to all of you, and welcome. This is Bitfarms's quarterly call, and today we're discussing Q2 of 2022. Alongside me are our President and Chief Operating Officer, Geoff Morphy, and our Chief Financial Officer, Jeff Lucas. A quick note before we dive in: this session is being streamed live over the web, and we've prepared a slide deck to accompany it. To view those slides, head over to our website, www.bitfarms.com, and navigate to the Investors Presentations section. If you'd rather listen on your phone, you can grab the presentation for download there as well. Also worth noting — earlier today, Bitfarms issued a press release sharing its financial results for the second quarter of 2022. Now on Slide 2, just a quick note that certain things we say during this call could count as forward-looking information and statements. Bitfarms wants to caution everyone listening that this kind of forward-looking information and statements depends on particular assumptions and risk factors, and those could cause actual results to come out materially different from what the company anticipates. Anyone listening shouldn't place excessive reliance on forward-looking information or statements. As for those risks, please check today's press release along with the risks described in Bitfarms public documents filed on SEDAR and also sec.gov. Unless applicable securities law demands it, the company isn't obligated to revise or update any forward-looking information or statements. During this call, we'll bring up some metrics that fall outside IFRS recognition and lack the standardized definition that IFRS sets, which means they could differ from how other companies report comparable figures. The non-IFRS metrics we rely on include gross mining profit, gross mining margin, EBITDA margin, adjusted EBITDA, and adjusted EBITDA margin. These serve as supplementary details alongside our IFRS figures, offering a clearer picture of how management views the company's operating results. We calculate gross mining profit by taking gross profit and removing depreciation and amortization, along with other minor items that sit within cost of sales for the company's mining segment. When we talk about gross mining margin, we mean the percentage you get by taking gross mining profit and dividing it by the revenues from the company's mining segment. Direct cost of production is the direct cost of Bitcoin coin, calculated by taking total electricity cost plus hosting costs tied to Bitcoin mining and dividing that by the total number of Bitcoin mined. EBITDA stands for earnings before interest, taxes, and depreciation and amortization. Adjusted EBITDA is EBITDA minus changes in the value of our Bitcoin holdings and non-cash Q&A charges included in equity compensation expense; these alternative IFR measures have limitations as analytical tools, and you shouldn't look at them either on their own or as replacements for analyzing the company's results as reported under IFRS. Listeners should consult the earnings release issued today, along with the company's management's discussion and analysis for the second quarter of 2022, to find definitions of those non-IFR measures described above as well as reconciliations to IFR measures. Keep in mind that every financial figure mentioned is stated in US dollars, except where specified otherwise. Joining us on this call, our President and COO, Geoff Morphy, will take us through the business's results for the quarter. After that, CFO Jeff Lucas will give a thorough rundown of the financials, and once the Q&A wraps up, Geoff Morphy will come back to make a few closing comments; we asked investors to submit their questions ahead of time, and I'll read those to management prior to opening things up to analysts who want to join the live Q&A. So if we move to Slide 3, I'm happy to hand things over to Geoff Morphy.

Geoff Morphy

executive
#2

Thanks, David. I want to extend a welcome to everybody joining us on this call. During the second quarter of 2022, Bitfarms produced 1,257 Bitcoin, which represents a 31-unit sequential increase over Q1 2022. Extending the production momentum we've built, we generated 500 Bitcoin during July. Our robust Q2 2022 output fully counterbalanced softer Bitcoin pricing, allowing us to also achieve sequential revenue growth to $42 million while continuing to produce cash from mining operations, measured through adjusted EBITDA of $19 million. As the results from our publicly listed Bitcoin mining competitors demonstrate, these operating results aren't merely solid — they're superior. Owing to the steep drop in Bitcoin's price beginning in November 2021 and an even harsher price depression that began in early May 2022, 2022 ranks among the most difficult stretches in the Bitcoin mining sector's history. Even so, within this climate, we kept advancing our growth path and broadening our operations. Production began at The Bunker Phase One during March, followed by Leger in April. We additionally raised our corporate hash rate by 33% between the close of Q1 and the close of the second quarter, reaching 3.6 EH/s. At present, our corporate hash rate sits just under 4 EH/s, meaning we keep capturing additional market share. We calculate that we now account for roughly 2% of the network hash rate — a new company record. During June and July, we made decisive moves to preserve our financial flexibility and boost our liquidity; in doing so, we lowered the outstanding balance of our Bitcoin-backed loan facility from $100 million to $23 million as of the close of July, and obtained $37 million in new equipment financing. Jeff Lucas will walk through the financial details shortly. On the operations side, notable accomplishments include the following. During Q2, we activated The Bunker Phase two in Sherbrooke, Québec, adding 18 MW of fresh capacity, deploying 10,300 miners, and producing 1,257 Bitcoin — confirming our exceptional operating performance. Since the quarter closed, we've boosted total electrical capacity across every site by 29 MW to 166 MW. As of today, we're nearing 18 Bitcoin of daily output at a July average of 135 EH/s, reflecting top quartile efficiency and performance. Slide 4 outlines where our farms stand. We finished the quarter with nine sites and 137 MW of capacity, compared with eight sites and 121 MW of capacity on March 31, 2022. Leger began producing in April, initially contributing 16 MW of capacity, which has since grown to its maximum capacity of 30 MW, and together with The Bunker Phase Two, brought our total corporate capacity to 166 MW as of August 15, 2022. Building work is ongoing at two Canadian facilities and at the first of two warehouses in Argentina. I'll now spend a moment outlining the operations, plans, and latest developments at several of these sites. Moving to Slide 5. As you'll remember, we hold a contracted power arrangement with Hydro-Sherbrooke in Sherbrooke, Quebec, totaling 96 MW. So once we've brought Bunker, Leger, and Garlock online, our expectation is that these farms will be running at full capacity by the close of December — that puts us a whole two months ahead of the timeline we'd set. All three of these sites sit right near one another, and that gives us a lot of efficiency benefits. We're moving into brand-new, state-of-the-art farms, leaving behind an older location called de la Pointe, which was our very first site in Sherbrooke. Right now de la Pointe runs at 18 MW, and we plan to shut it down before 2022 ends. That's another two months earlier than planned. Because it's wrapping up sooner than we thought, we're able to kick off the process of selling the property, and we anticipate turning this debt-free real estate into cash during early 2023. The Bunker came online for the first time in March 2022, and at present it draws 36 MW while running 9,000 miners across its initial two phases. Phase three is set to wrap up in Q4 of this year and will bring an additional 12 MW. Once everything is built out, The Bunker should become a 48-MW farm with 13,000 miners, and we expect it to deliver 1.3 EH/s in total. As I mentioned, Leger adds 30 MW and runs 7,400 miners, producing more than 740 PH/s. You might remember that back in mid-March 2022, we picked up our newest site, Garlock, located in Sherbrooke. This asset is entirely ours; we've finished cleaning up the warehouse and making building upgrades, and electrical infrastructure, louvers, fans, racks, and miners will come next in September. Our expectation is that Garlock will reach full operation before the year is out. Every one of these sites on our Sherbrooke campus comes with sophisticated design and sound-reduction monitoring systems. Between 18 MW at Garlock, 48 MW at The Bunker, and 30 MW at Leger, we'll make full use of the 96-MW power contract we hold in Sherbrooke. If you'll go to Slide 6: in Rio Cuarto, Argentina, we've secured agreements for as much as 210 MW, made up of four warehouse-style structures situated within the grounds of a private power company, which will tap into capacity that's available and power that would otherwise go unused. Warehouses Number 1 and 2 are being built out, while warehouses Number 3 and 4 are still being evaluated for expansion down the road. Over the quarter, we achieved substantial progress constructing our first two 50-MW warehouses along with the related infrastructure. The first electrical supply line is almost finished, and we expect it to be connected sometime in the coming 30 days. To date, we've brought in more than 4,800 miners. Work is ongoing to install racking, miners, servers, and data cabling in warehouse one, and miners should start going in around mid-September. Importantly, we still anticipate launching production at the first 50-MW warehouse during the fourth quarter of 2022, and we expect to finish building the second 50-MW warehouse in the first quarter of 2023. Last week, so that our capital plan lined up better with our production schedule, we managed to renegotiate when certain miner deliveries would arrive for our second 50-MW warehouse. All told, that move pushed $39 million of planned CapEx out of Q4 2022 and into the first nine months of 2023. Let's go to Slide 7. Our LATAM group also handles the operations we currently run in Paraguay, and on this slide you can see our 10-MW farm located in Villarrica. Just like the farms we have in Canada and the United States, this one operates using inexpensive and plentiful hydropower. The economics at this site look very favorable, and we can put some of the older miners in our fleet to productive use here, which lets us optimize assets, performance and capital deployment. In Paraguay, we are drawing on what we learned from building eight farms across North America. As we said on our previous earnings call, we still see Paraguay as full of potential for expansion. We began assembling the core LATAM team in early 2021 to back our growth and development in this vital region that is rich with opportunity, and we now have 15 people on board across Argentina and Paraguay. We kicked off the hiring process for technicians at the first Rio Cuarto warehouse. Now to Slide 8. To wrap up, as the quarter closed we had nine farms producing across three countries, and we are pulling power from five hydroelectric providers.

Geoff Morphy

executive
#3

As of right now, our capacity stands at 166 MW, plus another 63 MW being built that should be energized within this year, giving us a planned total of 229 MW by year-end — that works out to 89% growth across nine months. Let's go to Slide 9. A key instrument we use for ongoing improvement is our proprietary miner management platform, recently overhauled, known as MGMT Two, which lets us oversee hundreds of thousands of machines at the level of each individual miner throughout our decentralized farms worldwide, with the goal of maximizing uptime. MGMT Two brings better controls, tracking, sensors, alarms, visualizations and performance metrics, which drives greater operational efficiency. As mentioned before, in July we sit at 135 Bitcoin for each average exahash per second, which ranks in the top quartile for both efficiency and performance. Joules per terahash, another efficiency gauge, keeps showing consistent gains. At the close of July 2022, the figure was 40.6, a 17% improvement from 49.1 on June 30, 2021. Going forward, our plan is to optimize fleet performance further by putting the most economical repairs at the front of the queue, ensuring our focus stays on cash flow. Features we're still developing include variable load, hash rate control and underclocking. Beyond folding Bitcoin mining economics into the mix, we'll also bring in outside data to fine-tune how we operate — things like grid load balancing and market pricing — which elevates our operational control to a higher level. On fleet activity, we installed 10,300 of the newest generation miners during the quarter. On top of that, the initial 4,800 came into Argentina and are being stored for our first 50-MW warehouse, set to become operational over the next few months. So far this year, more than 25,000 miners have been installed, which lifts our total installed base past 44,000 active miners. Another 4,000 miners are in transit right now, and together with what we've already gotten, that covers roughly 80% of the miner deliveries we expect for 2022. Now please turn to Slide 10, where we'll discuss our revised quarterly hash rate targets. Given where our infrastructure build and miner delivery timelines stand, we're aiming for 4.2 EH/s by September 30, 2022, and 6 EH/s by December 31, 2022. Furthermore, with the deliveries we've contracted, we anticipate adding 1.2 EH/s once fully operational during the first half of 2023. Please turn to Slide 11; at this point, I'll pass the call over to Jeff Lucas.

Jeff Lucas

executive
#4

Thanks, Geoff. It's a real pleasure to share that our growth stayed operationally profitable through Q2. Let me walk through a few of the key points. I want to emphasize again that 1,257 Bitcoin was mined during the quarter. That result lifted both our top and bottom lines and also informed how we approached financing, since we kept taking steps to preserve liquidity and flexibility so we can carry out our growth plan. Revenue for the quarter came to $42 million, which is 3% above the previous quarter, as Bitcoin output rose 31% and more than made up for a 20% drop in Bitcoin prices. Against the same quarter a year earlier, revenues climbed 16%, driven by roughly 500 additional BTC mined in that earlier period, though this was offset by an average BTC price 30% below the year-ago period. As Slide 12 shows, Bitfarms' average direct cost of producing Bitcoin during Q2 2022 stood at $9,900, one of the lowest figures reported anywhere in the industry. That represents a 14% rise in production costs versus the $8,700 recorded in Q1 2022. Here's how that increase breaks down. 4 percentage points came from higher average network difficulty quarter over quarter, partly offset by the equivalent of a 3 percentage point reduction from incremental operating efficiencies we achieved in the quarter. 5 percentage points of the increase stemmed from an accrual tied to potential Canadian tax legislation affecting VAT tax rates, or VAT rates, and our electricity costs. Absent that accrual, our production cost for Q2 would have come in at $8,700. Likewise, without this tax accrual, the average direct cost of producing each bitcoin in Q1 would have been roughly $8,000. Moving to Slide 13. Gross mining margin, hit by the fall in Bitcoin's price, was 66% in Q2, versus 76% the prior quarter and 79% in the year-ago quarter. Gross mining profit reached $27 million, compared with $28 million in Q2 2021. During the quarter, we posted an operating loss of $173 million, which comprised a $78 million realized loss on disposing of digital assets, a $70 million unrealized loss from revaluing digital assets, and an $18 million goodwill impairment charge; that compares with an operating loss of $2 million in Q2 2021, which at the time included a $15 million unrealized loss on digital asset revaluation. The quarter's net loss was $142 million, or a $0.70 loss for basic and diluted share. That figure includes $8 million of non-cash compensation expense and $5 million of interest expense, offset by $20 million of foreign exchange gain tied to funding our Argentinian expansion, plus an income tax recovery of $19 million. Compare that with a Q2 2021 net loss of $4 million, which, inclusive of a $5 million loss in digital assets, produced a comprehensive net loss of $9 million, or $0.02 for basic and diluted share. Above all, our mining operations keep producing cash. For the quarter, adjusted EBITDA came in at $19 million, which equals 45% of revenue, versus $24 million at 65% of revenue in Q2 2021 and $21 million at 53% of revenue in Q1 2022. Now to Slide 14. Our approach to financing remains centered on keeping our balance sheet strong and flexible, safeguarding shareholders' investment, and advancing our main financial objective of paying for planned growth at a comparatively low cost of capital. Accordingly, we revised how we manage Bitcoin so that we sell some of both our mined Bitcoin and our treasury holdings, which helps cover part of our operating requirements and continuing growth investments. In the quarter, here is what we carried out. A total of 3,357 Bitcoin was sold, producing $69 million in proceeds while lowering leverage and interest expense; we repaid $62 million on our revolving Bitcoin-backed credit facility, which brought borrowings there down to $38 million and released $27 million of Bitcoin that had been pledged as collateral for the loan. A new $37 million non-recourse equipment financing was arranged during the quarter. That comes in addition to the $32 million non-recourse facility established in February. We brought in $9.6 million in net proceeds through prudent use of our ATM program, which we introduced roughly 12 months ago. Altogether, we closed the second quarter holding $46 million in cash plus 3,144 Bitcoin worth $62 million as of June 30, giving total liquidity of $108 million. Also, after the quarter ended, we repaid an additional $15 million on our Bitcoin-backed facility and brought in $4.1 million more, net of expenses, through our ATM. Before I hand the call back to Geoff, I want to note that several industry events are ahead of us, among them the Needham Second Annual Virtual Crypto Conference on September 8, the H.C. Wainwright 24th Annual Global Investment Conference running from September 12th to the 14th, and the B. Riley Second Annual Crypto Conference on September 29th, with all of these taking place in New York City. Moving on to Slide 15 now. I'll give the call back to Geoff.

Geoff Morphy

executive
#5

Thanks, Jeff. Ahead of opening the floor to your questions, I want to walk through where we stand in the market and how we intend to grow. Right now, our operations run at 166 MW and 3.9 EH/s, enough to power roughly 2% of the whole Bitcoin network — a record for this company. Our mining takes place across three nations: Canada, the United States, and Paraguay, and we have every expectation of launching operations in Argentina prior to the year's end. Whereas competing Bitcoin miners fight to contain electricity expenses driven by commodities, we hold long-term hydroelectric agreements that keep our production costs near the bottom of the industry. Our average direct cost of mining Bitcoin in the second quarter, $9,900, demonstrates exactly that. We keep producing positive cash from mining operations even under recent pricing levels. Our balance sheet is flexible, and we have financing resources available. An international management team has been assembled, one that contributes operational expertise and capabilities needed to deliver operations that are as efficient and profitable as any in the industry, both now and going forward; discipline guides our growth path, and given the operating excellence we've shown, we are positioned well to seize emerging opportunities and act as a consolidator within the industry. David, would you begin with the questions you gathered beforehand, and perhaps turn things over to the operator afterward?

David Barnard

executive
#6

Thanks, Geoff. We had a few questions lined up beforehand, and I'll kick things off with the first one. Other than warehouse Number 2 in Argentina, what's your plan for growth in 2023?

Geoff Morphy

executive
#7

Looking ahead to 2023, plenty of thrilling prospects are on the table. As we touched on, in Argentina the initial warehouse — 50 MW — comes online during the first half of the year. Construction is already progressing, and that excites us, since lessons from putting up the first warehouse, especially around completing work faster and at lower expense, can be carried over to the second warehouse. That's thrilling, and Argentina also holds many opportunities for us. Beyond that, as we've said on earlier earnings calls, Paraguay has us quite enthusiastic. Opportunities abound there, including large scale ones, thanks to their plentiful hydro situation. As also noted on prior calls, Washington is a region rich in hydroelectricity, with opportunities available. Right in our home backyard, our original home backyard in Québec, we have several facilities, some still being built out; they've put out information on the RFP process, which will involve roughly 267 MW being awarded across the industry. According to what's posted on Hydro-Québec's website, further details should be available, and I believe the formal submission process is now underway. Qualified applicants will be in a position to submit their offers, including locations and all the other criteria listed in the RFP, around mid-September. Although it's unclear when those megawatts will be awarded, based on past performance we'd expect it will likely be later this year, in a November, December type of timeframe. As the biggest Bitcoin mining company in the province, with what we consider one of the strongest social responsibility records there, and having devoted considerable time and effort to securing new locations, we believe we're well positioned to do very well in that RFP process. Those are the things in our geographies at present, but we also believe that given where the industry stands now, opportunities will arise both to merge and consolidate. Opportunities will also come with some of the other miners that may be less efficient, who need the kind of operational prowess we possess in order to actually pursue mine expansion as well. Based on what we hear from investment bankers, we're getting closer to seeing more of those kinds of opportunities this year, and we're ready. We have the management team to embrace those opportunities and a strong and flexible balance sheet. We're very excited about what will come this year and what's gonna come next year. While we're not providing a lot of guidance for next year, much of it will depend on the economics in the industry and the opportunities presented to ourselves, because we will remain disciplined, and we're ready for it.

David Barnard

executive
#8

Okay, thank you, Geoff. There's another question that came in beforehand. You made a change to your HODL strategy. What could cause you to return to HODLing BTC?

Jeff Lucas

executive
#9

Let me answer that one.

David Barnard

executive
#10

Yeah. Thank you.

Geoff Morphy

executive
#11

Sure. Go ahead. No.

Jeff Lucas

executive
#12

Our HODL approach has been adjusted, and honestly, that decision came from reviewing where we stand financially overall and the best way to pay for the investment activity behind our operations as our growth continues. We do this in a quite straightforward manner, keeping a sharp focus on limiting dilution for shareholders while preserving as much financial flexibility as possible. We expect to sell some of what we produce in order to cover our operating needs and our debt service obligations. In fact, with production where it is today and at present BTC prices, what we produce brings in more than our continuing operating costs, including both principal and interest on that debt. At this moment, we believe quite strongly that drawing on the Bitcoin we generate represents one of the cheapest sources of capital available to us for meeting those operating and debt service needs. Beyond that, something we consider extremely important is being situated with the financial flexibility to properly support our growth needs down the road. And to accomplish that in a way that keeps our cost of capital as low as we can reasonably make it. This has genuinely been among the central factors behind our choice to start drawing on our Bitcoin reserves and to keep doing so, at a bare minimum, at the amount we mine each day, once again, to cover our operating requirements ahead and as a fairly low-cost method of supporting our future growth objectives too.

Geoff Morphy

executive
#13

Appreciate that, Jeff. David, do you have anything else to ask, or should we hand things over to MJ so the audience can be polled?

David Barnard

executive
#14

That covers the two questions that came in beforehand. I'll hand things over to MJ now for the poll.

Kevin Dede

analyst
#15

Thanks. Morning, everyone. Appreciate you letting me join. Jeff — Mr. Lucas — could we begin with a question about your situation? I just want to confirm I've got it right: your equipment financing stood at roughly 32. You mentioned, I believe, that you added 35, bringing it to 67. Does that cover all of the 1.2 exahash machines that would be installed during phase two over in Argentina?

Jeff Lucas

executive
#16

To begin with, the machines we're installing in Argentina aren't included in that figure, since those sit in Latin America, and you can likely understand certain collateral issues a lender would weigh. What I would note, Kevin, is that we currently hold other miners in Canada and North America that aren't encumbered, and additional new units are arriving too, none of which have been pledged yet for any borrowing arrangement — and we can definitely use them that way to help cover our capital needs at a fairly low cost moving forward.

Kevin Dede

analyst
#17

All right. It seems reasonable to think that equipment shipped into Latin America needs to be free of any liens, and that the $67 million relates to — or sits behind — the units you're putting in place in Quebec and Washington.

Jeff Lucas

executive
#18

Yes, that's right. Keep in mind that several of those units serving as collateral for those loans had already been fully paid off beforehand. A large portion of the money we raised through those two loan facilities is in fact being put to work, and at a low cost, to support our other expansion opportunities, among them, for instance, Argentina, and Paraguay too.

Kevin Dede

analyst
#19

Perhaps we could approach this from the standpoint of what infrastructure CapEx is required, and maybe you can clarify something for me: regarding phase three at Bunker, is everything in place on your end to meet the requirements there? Do you already have the financing or the capital necessary to move ahead with phase two in Argentina, purely on the infrastructure side?

Jeff Lucas

executive
#20

Sure. Yes, when it comes to funding our infrastructure work, we're actually in good shape. As you're surely quite aware, Kevin, infrastructure expenses represent a fairly small share of the overall cost relative to, say, the miners especially. On the whole, as far as our capital expenditures go, it's going to — you know, for the infrastructure growth we're pursuing in both Canada and Argentina, we're in good shape.

Kevin Dede

analyst
#21

All right. When you consider phase one along with phase two, you're referring to roughly 100 MW. Yet from my perspective, it appeared the power demand from the miners at that location would come to approximately 85 MW. Does that leave you somewhat more flexibility to expand those facilities? You're basically fixed at the capacity you've already proposed.

Geoff Morphy

executive
#22

Kevin, to fully populate the second warehouse, we require roughly 1,000 additional miners.

Kevin Dede

analyst
#23

All right.

Geoff Morphy

executive
#24

As things stand, this isn't much of an obstacle right now. For instance, at present, when it comes to acquiring miners, there's plenty of supply available, and pricing is quite attractive.

Kevin Dede

analyst
#25

Yes.

Geoff Morphy

executive
#26

Enjoying.

Kevin Dede

analyst
#27

Yes, some of the feedback.

Geoff Morphy

executive
#28

At this point.

Kevin Dede

analyst
#29

Of course. Absolutely. Yes, definitely, Geoff.

Geoff Morphy

executive
#30

I expect our warehouse will largely be operational sometime in Q1 of the coming year. Having that degree of flexibility is something we feel good about. We know the miners are en route, but we intend to handle this the right way. Given how valuable capital is right now, it's important to put it to work punctually and sensibly. Our plan is to make sure the infrastructure gets built first, and only afterward do we bring the miners in. To build on what Jeff Lucas said, the biggest portion of your expense comes from the miners. We need to make sure the infrastructure and warehouses are finished first, and then have the miners arrive at the same time. We can do that because of the miners we postponed, the ones already under contract, and spot purchases, which right now might be very profitable for us. Having that kind of flexibility is a good thing. Regarding the warehouses, transformers are still the major lead-time issue, and every one of these items has already been ordered for all the construction we're doing at present. On that front, we're in a solid position. Compared to a year and a half back, mining companies now have far greater liquidity, which gives us the ability to bring them on board.

Kevin Dede

analyst
#31

All right. Could we spend a moment on electricity rates, Geoff? Was there any reflection of the swings we witnessed during the second quarter in what Hydro-Québec charges? How have the counterparts you've been in discussions with for the Rio Cuarto build-out responded to the pricing? What I mean is, from what I gather, you pulled back somewhat, since there could be some shifts on that front. You were looking to reevaluate. Since conditions appear to have settled into something more sensible now, perhaps that has created a chance to ramp up the build-out.

Geoff Morphy

executive
#32

Thanks, Kevin. The initial question concerned electricity rates in Québec. The tariff we benefit from in Québec carries on as before. No adjustment to the amount charged by Hydro-Québec has occurred. As Jeff noted, though, Canada's government has introduced measures to alter certain VAT pricing, and that drives up what we pay for electricity — that's really a political, tax-driven matter rather than Hydro-Québec adjusting its rates. If you'd like to dig into that, we could address it under a separate question and answer. Regarding Argentina. Indeed, you're correct. We felt a great deal of concern about rising natural gas prices. Only one segment of the electricity contract is locked in. For the initial 4 years, we hold it at $0.022. Everything else follows market-based pricing. Our worry was significant, and justified. Electricity costs have risen. We've observed that globally; we've seen it hit some of our rivals who rely on electricity produced from natural gas. We had no desire to find ourselves launching facilities that operate at marginal profitability. Thankfully, rates have improved, and, helpfully, the exchange rate for converting U.S. dollars into Argentina has shifted in our favor too. We're rather pleased with the cost dynamics at our first and second warehouses in Argentina. We also expect that this winter — at least across the Northern Hemisphere — as Europe hunts for natural gas to heat homes, prices will climb again. We're keeping caution around that. Luckily, Argentina sits in the Southern Hemisphere and is somewhat more shielded from that, yet it still feels the effect of global prices, and we anticipate rates will rise. Considering the fixed share alongside the market-driven share, we're quite content with where rates appear to stand at present, and that has enabled us to proceed with the second warehouse. Should rates improve because worldwide pricing for commodities — for energy commodities — falls again, then we're fully prepared to advance on warehouses three and four, and possibly additional opportunities in Argentina as well.

Kevin Dede

analyst
#33

All right. This is my final question, Geoff. Could you spend a moment discussing some of the immersion testing that's underway in Washington? To what extent have you pushed things there? I noticed on your slide that there's a chance to grow by, what was it, 1 additional megawatt up to 21 in Washington. If my memory serves, that involves two distinct sites. You've also hinted at room to expand in that location. Perhaps you could give me a quick picture of what's happening in Washington State.

Geoff Morphy

executive
#34

Certainly; we keep experimenting with immersion cooling. Our view is that it could well be a force that eventually transforms the sector. Even so, entering immersion remains extremely costly when you look at capital expenses; however, we must get to know this technology along with all its details. Our initial container in Washington is an immersion unit. At present it remains in testing. We're observing decent output from it, yet we haven't taken full advantage of it. We're continuing to fine-tune it; we're continuing to get it running; that container arrived just weeks back. We keep progressing through that process, becoming acquainted with the container itself and beyond. I believe we remain quite lucky that our air-cooled sites carry a reduced capital expense. We operate in settings where it performs extremely well; it's hard to beat, comparing air-cooled with newer cooling methods today, given the steep capital costs and the slimmer operating costs at present. We're continuing to work through this, Kevin; as I mentioned, there are possibilities in Washington. It goes beyond merely immersion cooling and what we're experimenting with there. We're engaged in positive talks with nearby power suppliers. There are smaller operations around the region. Whether we acquire or whether we build out, we're pursuing every one of those possibilities. Washington possesses abundant hydroelectric power that came about in numerous ways via Alcoa and large dams constructed many decades back along the Columbia. The aluminum businesses have all departed, meaning there's excellent clean power at appealing rates on offer. I think we've noted on prior calls, and it holds true still, that our Washington site is the cheapest to run among all our locations. Another aspect is that we've possessed that site for nearly a year now, coming up on a year, and we currently have personnel and a crew there whom we trust and who can handle more. We've established that solid base to build upon, which leaves me and the rest of us far more at ease when examining fresh prospects within the state.

Kevin Dede

analyst
#35

Great. I really appreciate you gentlemen taking the time to answer my questions.

Geoff Morphy

executive
#36

Thank you, Kevin.

Kevin Dede

analyst
#37

Be well.

Chris Brendler

analyst
#38

Hey there. Appreciate it. Morning to you all. First thing I want to do is pick up where Kevin left off regarding power. You know, we've watched plenty of miners operating either behind the meter or with grid-connected setups where electricity expenses came in above what they'd budgeted during this summer. Many of those sit in Texas, dealing with the heat problems, but I'd just like you to refresh my memory. Given the strong numbers you've posted, with cost per coin sitting under $10,000, even amid these power prices, does that stem mostly from the hydro, or mostly from your PPAs and the power contracts that locked in cheap rates, or is there another factor?

Geoff Morphy

executive
#39

Okay, I'll kick things off, and then Jeff Lucas can jump in, since there's a ton of arithmetic behind this involving many different variables. Right, we feel really lucky to have hydropower that hasn't shifted because of what's happening with commodity pricing. The rates we saw in the past are identical to the rates today; unlike plenty of other players, we haven't been exposed to rising commodity costs. Because of that, we keep benefiting from strong, steady, reliable hydro rates across every site we operate. Once Argentina comes online, that picture will shift. A big chunk of that agreement is locked in at a fairly cheap rate, $0.022 per kilowatt; it appears that this could rank among our lowest-cost facilities too. Jeff, go ahead and expand a bit on how that math works for the expense of mining a Bitcoin, since other factors come into play as well.

Jeff Lucas

executive
#40

Absolutely. Happy to do that. Let me just underscore what Geoff said there, Chris, since one of the real advantages hydropower gives us is how steady our expenses are. As you can see, the price of mining Bitcoin — the direct mining expense, which consists of electricity, and previously, though not right now, hosting expenses when we had them — those were the components that formed the direct mining or incremental mining expense. All told, if you look at where we stood during the quarter that recently closed, what it costs us, the cash expense of mining Bitcoin, and the direct mining expense comes to roughly $9,900. Beyond that, there's approximately $1,100 in additional costs that make up the total. When you add it all up, you get an all-in cash basis cost of approximately $11,000 for mining Bitcoin. That places us, in my view, in a rather strong position. To go even further, were you to include CapEx, which is a reasonable thing to ask about, the cash CapEx, even so, it still takes us to a total cash expense of approximately $16,500; we believe that overall, we have the framework in place, including the hydropower advantages here, to have and to keep having a highly appealing pricing structure, or cost structure, pardon me.

Chris Brendler

analyst
#41

That's excellent. I appreciate the specifics. To build on what was asked, I noticed in the presentation on — I believe it was — page 12, there's this figure of 5 percentage points tied to the VAT tax matter; does that come in addition to, you know, certain of these figures being pushed higher because of this VAT tax?

Jeff Lucas

executive
#42

That's right. And to put a finer point on it, really, the effect amounted to 5 percentage points of that 14% gain we recorded over the period. Going a bit deeper, up in Canada, the Canada Revenue Agency is looking at legislation that, in fact, would take away the ability to recover your VAT or input taxes, which currently works out to roughly 15% of what we pay for energy. Basically, our Canadian costs move from CAD 0.04 to CAD 0.046. And by the way, I want to stress this, that is baked into the $9,900 figure I gave you earlier; now, it's possible this won't happen. You know, the legislation hasn't been fully approved yet. Staying consistent with IFRS accounting, we were required to recognize that accrual in our financials. So, properly, we also factor it into our various operational measures, including the direct mining cost of Bitcoin. Once again, that affects the Canadian portion. Incidentally, you know, out of all our electricity costs, Canada accounts for roughly 88% of our total cost of electricity, you know, every quarter. Yes, we saw a 15% increase on the Canadian side. Clearly, no increase occurred in Paraguay or Washington, which, as Geoff mentioned, is sub-$0.03. Paraguay sits at about $0.036, and now Canada is at roughly $0.046. Should that legislation fail to pass, we will go back to the $0.04 and naturally, have a massive catch up from the prior two quarters when we haven't even been accruing this amount. All things considered, even if that legislation passes, we believe we'll be in a very strong and very competitive position with the cost to mine Bitcoin.

Geoff Morphy

executive
#43

Chris, to build on what you said, the Canadian government made that announcement back in February. Like Jeff said, we're setting aside funds for it since we believe that's the wise approach and what IFRS mandates; we actually stepped up as a leader, given that we're among the biggest mining companies in Canada, by forming an alliance to engage the specialists needed to give us guidance on this, to examine the proposed legislation, and to genuinely collaborate with the Canadian government to determine if this is the appropriate action for them to take. Clearly, our view is that it isn't the appropriate action. What we've discovered is that it doesn't align with how they handle certain other sectors. We remain optimistic, though we definitely can't count on it, that the Canadian government will reverse this and we'll manage to get our Canadian energy mining costs reduced once more. Until then, we're simply ensuring we set aside the funds and ensure we avoid an unexpected cash impact later this year or next year or whenever this may or may not occur.

Jeff Lucas

executive
#44

Also, Chris, the backing we're receiving is substantial, since more than twelve businesses are collaborating alongside us within this coalition.

Chris Brendler

analyst
#45

Great. Best of luck.

Jeff Lucas

executive
#46

Thank you.

Chris Brendler

analyst
#47

My second question concerns the fleet. I genuinely appreciate how much you disclose on this front. Compared with most companies, you provide much clearer fleet details. To be sure, that works out to slightly above 40 joules per terahash. As you noted, ideally that figure will decline eventually. What I'd really like to know is whether we've reached a stage where a portion of the older fleet is getting shut down. Also, do you consider that a primary factor behind the overall network hash rate not climbing further, given how many people are bringing rigs online, since hash rates have been fairly moderate lately? My sense is that it's due to inefficient machines from earlier times getting powered off.

Geoff Morphy

executive
#48

Sure, we've either observed directly or picked up via other channels that profitability has led to many S9s being shut down. A portion of the new MicroBT miners we acquired have been relocated to Quebec, which fits within our broader upgrade initiative—swapping out M20s in favor of M30s. This boosts our efficiency levels while also growing the total fleet through additional M30s that gradually expand capacity as additional infrastructure and megawatts come online. Indeed, our fleet upgrade efforts are ongoing. Washington stands fully updated with brand-new hardware. Argentina has new equipment lined up for deployment. As we noted regarding Paraguay, we shipped a few of our pre-owned miners there—three distinct series of secondhand rigs. That installation came at an extremely low expense; over in Quebec, our older sites remain; they're certainly not antiquated relics. Upgrades keep happening there. We've fully renovated facilities, such as Cowansville during the previous year, making it a completely fresh setup. de la Pointe is gradually being retired and substituted by three fresh locations in Sherbrooke. Essentially all of these are benefiting from newer-generation, state-of-the-art mining units.

Jeff Lucas

executive
#49

Yeah, just to add.

Geoff Morphy

executive
#50

We're getting the performance.

Chris Brendler

analyst
#51

Go ahead.

Geoff Morphy

executive
#52

Go ahead.

Jeff Lucas

executive
#53

I'd like to chime in on that point, Chris, and provide some context. Many of the machines we're currently offering for sale, such as our older S9 units, were rated at 90 W/TH. The S19 Pros we deployed in Washington run at roughly 31 W/TH, and the M30s are likewise in the mid-30s. As for the M30Ss being installed at the bunker in Leger, those sit in the mid-30s when it comes to watts per terahash. That gives you a sense of just how significant the impact on our efficiency has been.

Chris Brendler

analyst
#54

All right, that’s excellent. One last brief thing on that: as you know, with pricing having declined, there are definitely chances to acquire a few more machines at a lower cost. Do you prefer the newest model, or is it entirely about, you know, the XP, or is everything simply determined by cost and what you’re spending for each terahash?

Geoff Morphy

executive
#55

Kind of a mixed picture. MicroBT has had our strong backing for a long time; Bitmain is in the mix too, with the S19 series up in Washington, yet MicroBT remains one we've gotten behind heavily; that's the source of the 48,000 miner order; they've backed Bitfarms strongly as well. So, we're evaluating M30s, M50s, S19s. Our relationships will be put to work as we shop for miners and aim for the most favorable terms we can get. At the moment, machines are plentiful. If we could choose, we'd lean toward certain top-tier MicroBT units, since our repair center has logged more time with them. Their track record shows they keep running longer and stronger without breaking down. As things stand, we'll depend on no fewer than two main manufacturers, and we're very comfortable with their equipment. Indeed, with profitability under pressure and a halving on the way, it matters that we keep deploying miners of the highest quality and performance that can be found.

Chris Brendler

analyst
#56

That matches my view, and it's really useful detail. Appreciate it, Jeff and Geoff, and well done on those strong results.

Geoff Morphy

executive
#57

Thanks for that. Appreciate it, Chris.

Dillon Heslin

analyst
#58

Hi, thanks for letting me ask. In that July update on operations, I believe you mentioned something about power curtailment in Canada caused simply by temperatures. Could you expand on that a bit? What kind of effect does it have on your uptime, and how do you approach power costs relative to Bitcoin prices, plus what options might exist at some of the new sites scheduled to come online later?

Geoff Morphy

executive
#59

Dillon, I appreciate the question; good to speak with you. Dillon, during July, no miners of ours were offline because of curtailment. In Quebec, curtailment is something we contend with, though it only happens in winter. Our contracts in Washington and Paraguay don't include curtailment, and neither will Argentina. I'm unclear where you got that July element from.

Dillon Heslin

analyst
#60

Perhaps I used the wrong term when I said curtailment — what I really meant was something more like elevated temperatures, or higher seasonal heat.

Geoff Morphy

executive
#61

All right, that's a separate matter. Right — when temperatures climb, that becomes difficult for our miners, and it truly strains our facilities, our infrastructure, and our ability to push air across the machines so those facilities can hold the miners at a temperature low enough for optimal performance. In Washington and Quebec this year, we ran into hotter conditions, and because of that, miners occasionally drop offline owing to hardware. They overheat, they safeguard themselves, and a reboot becomes necessary — and usually we do that rebooting when conditions are somewhat cooler, during the evenings and overnight. Sure, we gave up some efficiency in that situation; in fact, it has pushed us, at a number of our Quebec sites — the more recently built ones — to refine the airflow more effectively within some of those locations. Well, we figure we're now on our sixth design iteration for our facilities, so we believe we've gotten it right, though improvement is always possible; given how profit margins across the industry are being squeezed at present as a result of Bitcoin prices, we're attempting to achieve maximum uptime and produce as many Bitcoins as we can. We are definitely examining the airflow at those facilities and figuring out how to optimize it, drive more air through them, and we're making progress. You know, each percentage point of uptime you gain is money in your pocket — it's value for our investors. We keep pushing on that very aggressively across every one of our facilities, and our operations staff have genuinely managed to elevate it to the next level in that respect. You'll keep seeing gains along those lines as we move forward.

Dillon Heslin

analyst
#62

Great. Thank you.

Geoff Morphy

executive
#63

I appreciate everyone joining us on this conference call today. We're eager to bring you up to speed through our monthly production reports, plus other developments, on our Q3 conference call in November. One last thing. Our new website goes live later this week. Beyond a better look and feel and simpler navigation, it features numerous metrics from our operations and monthly production reports that we're confident you'll find helpful for tracking our results and progress. We have plans for additional functionality, and that will be added to the site down the road. Please make a point of visiting bitfarms.com over the next several days. Many thanks to all of you for being on today's call, and have a good day.

Jeff Lucas

executive
#64

Take care all.

Operator

operator
#65

That brings our session to a close. We appreciate everyone joining us for today's presentation. You're free to log off at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Keel Infrastructure Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Keel Infrastructure Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Keel Infrastructure Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.