Keel Infrastructure Corp. (KEEL) Earnings Call Transcript & Summary
November 14, 2022
Earnings Call Speaker Segments
David Barnard
executiveThanks, Nick. Hello everyone, and good morning. It's great to have you join Bitfarms' Q3 2022 earnings call. Joining me today are Geoff Morphy, our President and Chief Operating Officer, along with Jeff Lucas, our Chief Financial Officer. Before we get started, I want to let you know that this call is being webcast live and there's a presentation that goes with it. If you'd like to follow along with the slides, just head over to our website at www.bitfarms.com and look under the Investors Presentations section. You can also grab the presentation there if you'd rather listen on your smartphone. I'd like to point out that this morning Bitfarms put out a press release sharing its financial results for the third quarter of 2022. Let's move to slide two. I want to remind everyone that we'll be making certain forward-looking statements during this call, and actual future results might not match what's implied in those statements. This forward-looking information rests on certain assumptions and carries risk and uncertainty, and I encourage you to check Bitfarms' MD&A for a full list of these. Also, throughout the call we'll be referencing supporting slides, and once again, you can locate the presentation on our website in the Investor Relations section. The company will also discuss certain measures that aren't recognized under IFRS, which don't have a standardized meaning prescribed by IFRS, so they might not be comparable to similar measures that other companies present. We ask listeners to look at today's earnings release and the company's third quarter 2022 MD&A for definitions of those non-IFRS measures and the reconciliations to IFRS measures. Please keep in mind that all financial references are in U.S. dollars unless stated otherwise. On today's call, our President and COO, Geoff Morphy, will go over our operations for the quarter; then CFO Jeff Lucas will give a detailed financial review, and after the Q&A, Geoff Murphy will come back for some closing remarks; and with that, I'm happy to hand the call over to Geoff Morphy.
Geoff Morphy
executiveHello, everyone, and good morning. We appreciate you being here today. We're eager to discuss the wins we've achieved lately and explain why Bitfarms is set up nicely to navigate this crypto winter and prosper over the long term. The price of Bitcoin is something nobody can predict or control. That's just how this industry works. Every miner has seen margins squeezed. That being said, Bitfarms continues to distinguish itself both operationally and financially, which comes from having a low cost structure, running efficient operations and fleet, and benefiting from stable energy pricing — all of which yields better mining profitability than peers. We've worked hard to establish a reliable track record of executing against the objectives and growth plan we set out. In fact, our hashrate has doubled year-to-date, reaching 4.4 exahash per second. Now, let me speak plainly regarding Argentina: our farm in Rio Cuarto has moved forward in construction, remaining on plan and on budget. However, macro developments within that country prevent the importation of any foreign equipment, including our miners. We're working to resolve these issues and will share more details shortly. Let's turn to the key points from what we reported. In the third quarter of 2022, Bitfarms' mining output came to 1,515 bitcoin, which was 21% higher than what we achieved in Q2 2022, and during October we mined another 487 bitcoin. Although softer bitcoin pricing canceled out the increase in Q3 2022 production, we continued to post strong performance measures and reduced our direct costs as well as our total cash costs of production. As a result, adjusted EBITDA came in at $10 million. In addition to regularly placing among the biggest bitcoin producers, Bitfarms remains among those with the lowest costs. Over the past two years, our direct cost of production has stayed below $10,000 per bitcoin, and in the latest quarter we actually cut those costs by $500. We've kept expenses fairly level, thanks to a collection of hydropower agreements spread across different regions that supply inexpensive power. With additional generation starting up in Canada as well as Argentina, our company-wide hashrate rose 17% between the close of Q2 and the close of Q3, reaching 4.2 times a half per second. In October, our daily output averaged 15.7 bitcoin, and we achieved a bit more than 115 bitcoin for each average exahash per second — placing us in the top percentile of the industry for efficiency and performance. Although the sector is dealing with difficulties caused by bitcoin's steep price drop, our history of navigating previous industry downturns works in our favor, and we also gain an advantage from consistent power expenses, whereas escalating energy costs hit disproportionately hard for competitors depending on electricity produced from fossil fuels. We keep taking bold steps to preserve our financial adaptability and boost our liquidity. Jeff Lucas will walk through the specifics shortly. On slide four, you'll find an overview of where our farms stand. We ended the quarter with 10 sites and 176 megawatts of capacity, up 39 megawatts from the nine locations and 137 megawatts we held as of June 30, 2022. In October, we brought six megawatts online across the company, which brings our total capacity to 182 megawatts. Now I'd like to spend a few minutes going over what's happening at some of these locations — operations, what we have planned, and what's recently taken place. Please go to slide five. Altogether, our power supply agreements with Hydro Sherbrooke come to 96 megawatts. The three sites that form our Sherbrooke campus are located in very close proximity to each other, which delivers a lot of efficiency advantages, and our 2022 expansion plan is in its last phase. At Leger, operations continue smoothly at 30 megawatts of capacity, generating 740 petahash per second with 7,400 miners. We got the first six megawatts up and running at the Garlock farm on November 10. That site is 18,000 square feet, and we're looking for the full 18 megawatts to be producing in early December. Over at The Bunker, Phase 3 is progressing on schedule. Six megawatts came online in late October, and the remaining six megawatts should also be up in early December. The Bunker first went live in March 2022, and right now it's drawing 42 megawatts with 9,400 miners running. When it's completely built out in December, The Bunker will be a 48 megawatt farm that houses 12,400 latest generation miners and puts out more than 1.2 exahash per second. We're looking at shutting down the de la Point farm before this month wraps up, and we figure the sale will close sometime in December, bringing in $3.5 million in cash that we'll put toward growth. On top of that, getting the permits squared away to close that facility, plus replacing it and fully building out our Sherbrooke campus in an industrial zone, is moving along three months sooner than we'd planned. Once it's finished soon and running at 96 megawatts — versus 30 megawatts back in 2021 — the surrounding area will see more tax money and other revenue coming in, along with more jobs. During the November 4 press release, we mentioned that our Quebec hydraulic energy contracts are still active, and we're enthusiastic about working alongside nearby communities going forward. Slide six, please. Regarding Rio Cuarto, Argentina, on November 1 we shared that our Argentina expansion strategy has been revised; warehouse number one finished construction within the last seven days, and commissioning work is ongoing. To be more precise, the first 10 megawatt unit within the initial 50 megawatt warehouse wrapped up in September, while the remaining four 10 megawatt units were finished across October and the beginning of November. Right now, we're running just under nine megawatts, with 2,300 miners producing 237 petahash. At the start of this month, we revised our guidance for the year's end, bringing it down from 6 exahash per second to 5 exahash per second. Our ability to bring in miners has been affected by Argentina's broader economic situation. We're coordinating with regulators and our logistics partners to fix this. The country is facing high inflation, a weakening currency, and a significant debt burden. The green light to import mining and ID equipment has been delayed, which limited our ability to bring in the additional 12,000 miners we need in order for the first warehouse to operate at full capacity. Beyond that, the independent electricity generator we work with in Rio Cuarto has yet to receive the last approval needed to begin delivering power to our operation. While we're bringing the facility online and testing it, the site is drawing from the provincial electric utility instead, and that utility charges us a higher rate than the one we negotiated with the generator. We continue to review how the farm is running and look at these elevated energy expenses every single day. That short-term gap accounts for about 4% of overall output, which means the impact on our overall direct production cost stays contained. Even though the electricity generator expects to receive the necessary authorization prior to the close of 2022, we foresee elevated production expenses at that site until we're able to pull a minimum of 26 megawatts. Kindly advance to slide seven. From the time we began in January, activities in Paraguay have kept running without issues, reliably delivering roughly 125 petahash. Given this substantial hydroelectric framework, we keep searching for fresh possibilities within that nation. Let's go to slide eight. To wrap up, when the quarter closed, we were running 10 farms across four nations, with the bulk of our electricity coming from three separate hydroelectric providers in different regions. Our current capacity stands at 182 megawatts, delivering 4.4 exahash per second, and we can see a straightforward route to finishing the year at 188 megawatts and five exahash per second, with substantial additional potential ahead in Argentina. Here at Bitfarms, we take pride in running things efficiently, and we gauge that in a couple of ways. The first is uptime: our farms reliably hit 98% to 99%. Because miners earn nothing while offline, that strong utilization rate directly fuels our revenue. Next, let's discuss bitcoin output relative to average exahash — that's an indicator of how well we run and produce. During October, our figure came in at 115.7 bitcoin for each average exahash, a level some analysts describe as the best in the industry and one where we regularly place near the top. Moving on, joules per terahash serves as the yardstick for energy efficiency among bitcoin miners, and our company-wide number keeps trending favorably. In Q3 2022, we averaged 40, a gain of 12%, versus 45.5% in Q3 2021. To dig deeper into our mining equipment, I invite you to check out our site, bitfarms.com, where you can find details on the machines we run and the way they're set up. Now, please go to slide nine. That wraps up the metrics, so now I'll pass things along to Jeff Lucas for the financial side.
Jeff Lucas
executiveThanks, Geoff. We're glad to share that during 2022's third quarter, we kept up our profitable expansion and preserved the financial strength and flexibility needed to carry out our growth plan. A few highlights follow. At the close of Q3, we held $36 million in cash plus 2,064 bitcoin, valued at September 30 at $40 million, giving us total liquidity of $76 million. We mined 1,515 bitcoin, which is up from 1,257 bitcoin during the second quarter — a gain of more than 20%. Revenue for the quarter came to $33 million, versus $42 million in Q2 2022, which mirrors a 21% rise in the bitcoin mine offset by a 35% drop in the average bitcoin price quarter-over-quarter. We also delivered adjusted EBITDA of $10.3 million in Q3, a 31% margin, compared with adjusted EBITDA of $18.7 million and a 45% margin in the second quarter of 2022. I'll say more about that shortly. First, let's look at mining economics. As slide 10 shows, Bitfarms' direct cost of production for bitcoin during Q3 averaged $9,400, and as Geoff mentioned, that ranks among the lowest figures reported in the industry. That's a $500, or 5%, reduction in production costs from $9,900 per BTC in Q2. Several factors drove it: somewhat lower average network difficulty, roughly a 2% to 3% gain in our mining efficiency as measured by joules per terahash, and the favorable effect of a stronger U.S. dollar against the Canadian dollar on our Canadian electricity costs. The quarter's direct cost of production factors in extra electricity costs tied to the startup and commissioning phase in Argentina, plus a full accrual for potential Canadian value added tax, or VAT, legislation affecting the VAT rate, which has not yet become law. If you exclude the accrual for that potential legislation, our direct cost of production for the quarter would have come to $8,300 per bitcoin. A coalition of Canadian miners, with whom we are actively involved, is actively challenging this proposed legislation, and we're only now seeing early signs of success so far. It's worth emphasizing that among the <<inaudible>> of bidding over 95% hydroelectric energy, we enjoy very stable electricity costs. Across the last two years, our quarterly direct cost of mine bitcoin has stayed within a tight band of $6,900 to $9,900 per bitcoin. While plenty of our industry peers struggle with the effects of rising fossil fuel costs, our electricity costs have stayed comparatively untouched by that pressure. Total cash cost of production for the quarter was $14,300 per bitcoin. That figure covers direct mining cost, fixed cost of sales, including rent, ignition salaries, et cetera, as well as cash, general, and administrative expenses. Also known as G&A. At $14,300 per bitcoin, total cost of production is a $2,700 decrease, or 16%, from $17,000 per bitcoin in Q2, and it landed well below bitcoin's current price. Lower production costs overall came from reduced direct mining expenses and a 15% drop in cash G&A, equal to $1.1 million, which shows the management steps taken specifically to cut discretionary outlays such as professional services, travel and other overhead. Gross money profit across the company for the quarter reached $17 million, versus $27 million during the second quarter. That works out to a 52% gross money margin this quarter, against 66% the quarter before. Moving to slide 11, our attention is on IFRS reported results. An operating loss of $98 million was recorded for the quarter, encompassing a $44 million realized loss on disposition of digital assets, a $46 million change in unrealized gain on revaluation digital assets and an $84 million impairment charge against our property, plant and equipment. Compare that with a second quarter 2022 operating loss of $173 million, encompassing a $78 million realized loss on disposition of digital assets, a $70 million change in unrealized loss of revaluation digital assets and an $18 million goodwill impairment. Allow me to pause and dig deeper into that impairment charge. $70 million of it related to our Argentinian activity, and while the present low BTC price created the need for an impairment analysis, the charge itself stems largely from the mechanism used to convert U.S. dollars into Argentine pesos to fund our expansion. We exchange U.S. dollars for Argentine pesos at an appealing commercial rate in order to buy construction assets and cover construction costs. Under IFRS reporting rules, though, the value of those assets on our books gets translated into U.S. dollars at a lower official rate. This multi-exchange rate mechanism causes us to record a foreign exchange gain, and the Argentinean assets are reported at a value higher than the U.S. dollars actually spent to fund them. What the impairment charge does is essentially align reported value more closely with the quantity of U.S. dollars used to fund them. Through this multi-exchange rate mechanism, the government provides an incentive to bring hard currencies like the U.S. dollar into Argentina's monetary reserve. The gap between the two rates can be quite large. Right now, the commercial rate sits at about MXN305 per U.S. dollar, while the official rate sits at about MXN167 per U.S. dollar, almost half. Since we started funding the Argentinean build out, we have recorded related foreign exchange gains on our income statement of roughly $50 million, plus an additional expected $20 million of future gain, for a total of roughly $70 million, alongside the corresponding increase in the reported value of our Argentinian assets in our impairment assessment. Bringing it back to our reported results, net loss for the quarter was $85 million, or $0.40 per basic and diluted share, versus a second quarter 2022 net loss of $142 million, or $0.70 per basic and diluted share. Above all, we keep producing cash, with mining activities in the quarter delivering adjusted EBITDA of $10.3 million. Regarding adjusted EBITDA, we say with a bit of a wink that roughly 15 publicly traded miners exist, yet there are around 17 separate ways to define adjusted EBITDA; in our view, adjusted EBITDA represents the most accurate gauge of how our operations perform. Accordingly, adjusted EBITDA captures solely our operating results for the reported period and excludes any effect from shifts in the value of balance sheet assets versus liabilities, among them the effect of price movements in BTC and our treasury, plus foreign currency translation gains and losses. To sum up, even with average B2C price for the third quarter coming in 35% lower than the second quarter, we stayed on course in the quarter by posting positive cash flow from operations, with adjusted EBITDA of $10.3 million, equal to 31% of revenue. Moving to slide 12, on our financing strategy. Strength and flexibility on the balance sheet remain our top priority. Our strategy focuses on safeguarding shareholders' investment, while backing our core objectives of funding financial commitments, growing the plan, responsive to communities, at a fairly low overall cost of capital. So our method for financial management is simple.
Jeff Lucas
executiveThe money we get from selling our daily B2C output is meant to cover operating costs and go toward what we owe on debt service. Our at-the-market, or ATM, program gets used with a lot of care so that growth investment can be funded while dilution for shareholders stays as small as possible. Beyond that, we lean on B2C Holdings and Treasury to bring leverage down and keep the financial room we need to keep growing, even with the BTC price swinging around the way it is now. Here's what we got done in the quarter: altogether, 2,595 bitcoins were sold — 1,515 of them mined from production and 1,080 pulled from treasury — which brought in $56 million, cut down what we owe, deleveraged the balance sheet further, and brought interest expense lower. A $15 million paydown went against our revolving bitcoin back credit facility, which brought borrowings under that facility down to $23 million and released roughly $5.5 million of bitcoin that had otherwise been pledged as collateral for loans. Another $12 million went toward equipment debt financing, leaving $55 million of equipment indebtedness for the quarter in total. During the quarter, we fully settled the debt on a pair of our longest-standing sites that had the steepest interest rates. Our ATM offering, which we introduced over a year ago, generated $13 million in net proceeds. From the time that ATM program kicked off on August 16, 2021, we have sold approximately 45 million shares, yielding $200 million in gross proceeds, equivalent to $4.48 per share. To restate that, we ended the third quarter with $76 million in total liquidity, which consisted of $36 million in cash along with 2,064 bitcoin worth $40 million. Once more, looking back at the quarter: we reduced our equipment-backed facilities by another $3.2 million and retired from 12, our costliest loans. Also, we brought in an additional $1.9 million through our ATM after costs were deducted. And we've finalized a deal to offload a <<inaudible>> property for $3.6 million, from which we anticipate netting roughly $3.5 million, adding to our cash reserves in Q4. To finish my initial points and today's comments, here are two more notable items. To start, by modifying our BTC-backed facility so that its maturity date moved out to December 29, 2022, we secured better conditions—specifically, the collateral coverage requirement came down from 143% of the loan value to 135% of the loan value, while the stated interest rate stayed the same, even though interest rates generally had risen. That reflects how Bitfarms is viewed by its lenders in terms of credit quality. Next, it’s important to point out that we expand and operate our company with 2024 in our sights. Every piece of debt we currently carry is set to come due on or before February ’24, ahead of the expected time and date. Ahead of handing things back to Geoff Murphy, I want to note that several investor conferences are on our schedule, among them the Ladenburg Thalmann Second virtual Crypto Expo 2022 Conference, taking place in December, and the Needham 25th Annual Growth Conference, which arrives in early January. Moving on to slide 13 now. At this point, I'll hand the call back to Geoff.
Geoff Morphy
executiveThanks, Jeff. Ahead of opening the floor to your questions, let me walk through where we stand in the market and how we intend to grow. Right now, our operations run at 182 megawatts alongside 4.4 exahash per second — that's a doubling achieved over only the last 11 months. Our footprint is diversified, with mining activity spread across 4 nations: Canada, the United States, Paraguay and Argentina. Sustainability is core to what we do: hydro electricity currently supplies 95% of our fleet's power. Transparency matters to us too. From the moment we set the standard for monthly production reporting, through to our corporate website — which offers unmatched detail on our mining operations — we've consistently been the industry's transparency leader. We also take pride in having undergone audits by a big four firm ever since we went public. Consistently low direct production costs have been our hallmark. At $9,400, our Q3 2022 direct mining cost ranks among the industry's lowest. Since electricity makes up the bulk of those direct mining costs on an ongoing basis, this reflects the strategy we favor: locating and locking in PPAs where surplus power exists, paired with stable hydro electricity. Indeed, across more than five years since we began, our gross mining cost per bitcoin has stayed below $10,000 at all times. Holding costs down reliably stands as proof of our seasoned team and our contracts. On performance metrics, we consistently set the industry pace. During October, we hit 115.7 bitcoin mined per average exahash, which put our assets at the very top of industry performance. Even with bitcoin prices where they've recently been, mining operations keep throwing off positive cash; we've reduced financial leverage and kept both a flexible balance sheet and financing resources, all while honoring our financing obligations — something we've managed since inception. Bitfarms' internationally based, experienced management team has shown it is highly capable of locating and constructing new farms cost effectively, and of delivering sector leading results. Given that bitcoin prices have fallen, this performance is genuinely impressive and leaves the company very well positioned for future growth — whether snapping up distressed and underperforming companies or consolidating on a larger scale. Considering our present situation, we hold a strong balance sheet and financing resources, non-dilutive and otherwise, among them positive cash flow from operations, to fund our continued growth. And we're pursuing growth with discipline, as our record of operating excellence demonstrates. We are genuinely well positioned to seize emerging opportunities and act as a consolidator in the industry. Operator, please open up the call for questions.
Analyst
analystHello, everyone. I really appreciate you making the time, and nice work on those strong results. I'd like to get a clearer picture of how much financial wiggle room you have regarding your obligations. To begin with — those electricity agreements in Quebec, are they take-or-pay? In other words, could you scale back your operations should that become necessary? And on flexibility as well, could you describe how much leeway exists around your CapEx bills? Does it depend on whether you have to take on newer machine deals, or your site building contracts too? Many thanks.
Geoff Morphy
executiveAll right. We'll begin with Quebec. Within that province, we hold 8 contracts, and we possess the rights to receive power. Each month there are electricity capacity and demand charges, though we're able to reset them on a monthly basis. So I believe what you're really getting at is — in a more severe scenario, if we shut down miners or ran them underclocked, would we be able to bring down our electricity charges and the costs tied to them? Yes, we would. That said, I'd point out that our efficiencies have already been reported on. In that province we run a fleet of modern, current generation miners performing extremely well; because it's air cooled, capital costs there are lower. Some of the most efficient mining operations anywhere in the world are these. We were producing positive cash flow, and others might see this differently. For us, though, the bitcoin price would need to fall — not much more, but more — before we'd even think about doing something like that. Jeff Lucas, is there anything else? Would you like to add to that before we get into CapEx builds and minor deals?
Jeff Lucas
executiveNo. I suppose, though I wasn't exactly thrilled about discussing a portion of the CapEx we've already committed for the miners. If I could, I'll begin right there. Alexander, after that I'll get to your question — we have really strong ties, as you know, with the miners. With the folks who build the mining equipment here, and roughly 2 months back we shared that we'd reached an arrangement with the manufacturer letting us line up both the schedule and the delivery, plus the payments tied to the miners, much more closely with the moment our infrastructure comes on — goes live and is ready. So that flexibility has been there, and we keep holding continuing conversations with the manufacturer as we move forward, and we keep honing things to guarantee we truly are in sync between what we spend on infrastructure and what we spend on miners too, so that's actually progressing quite nicely. But to your point, I'll add that if you looked at our financial statements, you'd find the projected commitments for the coming 3 quarters, and that isn't the situation right now. And I want to emphasize that thanks to that flexibility we do have, with a manufacturer allowing for some variability there; we can genuinely push toward adjusting that very tightly to match what we actually need, as the infrastructure becomes ready to put those miners to work.
Kevin Dede
analystMorning, gentlemen. I appreciate you fielding this. Dr. Morphy, could we unpack the Argentina circumstances a bit further? Mr. Lucas already shared excellent perspective regarding the currency aspect. I'm curious how you believe we ought to frame this moving ahead? And perhaps elaborate somewhat on your expectations for how the import matter gets settled, along with some kind of timeline for it?
Geoff Morphy
executiveMorning, Kevin. Indeed, Argentina represents a wonderful opportunity for expansion on our part. We hold an excellent contract in that country at among the most favorable rates. It's simply requiring more time before the advantages truly materialize there. None of us could have predicted that the government would encounter the economic upheaval it faces, with IMF complications, debt, and inflation. They've been forced to tighten their grip. We manage what falls within our power. What lies beyond our power, we cannot manage. Argentina is a case where their economy is being shielded at present, and actions have been taken. We must defer to a government's direction here, and we're monitoring it intently. We've simply needed to modify our activities for the initial warehouse and subsequently the subsequent one as required; yet once the door opens, which we strongly hope will occur soon, though that remains uncertain, we'll respond and proceed; meanwhile, our funds are being spent quite carefully there and we are achieving results. We regard this as short-term, and it genuinely constitutes, owing to the efforts completed at the Rio Cuarto location, a chance once the door opens, likely more so in the coming year, to scale up quite effectively and swiftly there.
Kevin Dede
analystSo then, I believe you brought up 26 megawatts prior to being able to draw power from the nearby power station — basically, does that mean moving off the grid into more of a behind-the-meter type of setup?
Geoff Morphy
executiveExactly right.
Kevin Dede
analystAll right.
Geoff Morphy
executiveGiven how large they are, my understanding is this is a generation facility built for wholesale utility scale, and we sit right next to them. And sure, we've had to rely on grid power until we reach a particular size, since the turbines they operate are big ones. So the local government hasn't yet granted permission for them to supply electricity to us. And once they do supply it, that supply must come at an industrial scale. Sadly, we lack enough miners on site to consume at that level. The facility — the warehouse we put up — can handle 50 megawatts. All five modules are built and set to operate. Only the first module has miners, owing to the importation restrictions. Therefore, we must handle this in tandem. We have — we need to bring the miners into the nation, get them installed, and we need the electricity contract approved. Once both of those are finished at the same time, we'll be running smoothly. Until then, we must monitor everything very closely.
Kevin Dede
analystAll right, that's useful. Thank you. Mr. Lucas, could you go a bit deeper into the balance sheet? I'm grateful for the slides you provide showing how debt has shifted, but can you tell us where the levels sit at present?
Jeff Lucas
executiveCertainly. Right now, our BTC backed facility stands at $23 million, and our equivalent backed facility is at $55 million — the two biggest pieces of that being the debt we carry and that we took on this year. In February, we took on a $32 million facility, and a substantial portion of that has now been paid down; only about $22 million remains, and then in June, we took on a $36 million facility with another lender, and both of these, by the way, are non-recourse loans. I want to make that clear. Roughly $36 million, and at this point we're down to just over $31 million outstanding. Then there's an additional roughly $1.6 million of debt out there, slightly under that, plus some smaller loans taken on about two years ago. Those are the loans sitting around the 17 to 18 percentage point level. So we've done quite a bit when it comes to reducing our overall debt. But that's where things stand. So again, to summarize, we now have roughly $55 million in equipment backed loans, all non-recourse, and $23 million outstanding on our BTC backed facility.
Kevin Dede
analystAll right. Regarding that equipment loan, when you describe it as non-recourse, does that mean the equipment isn't serving as collateral?
Jeff Lucas
executiveNo. Sorry, let me clarify. What I mean is that the equipment alone backs it, and there's no general or corporate guarantee tied to it.
Kevin Dede
analystAll right, got it. So in a way, this is a distinct financing arrangement?
Jeff Lucas
executiveBasically, that's right. From a corporate structuring perspective, that's not how it's set up; however, when you look at the loan agreement itself and how that agreement is put together, the sole collateral debt play, there's a small amount of BTC under certain conditions that can’t be relevant in this case, but not right now. It's mostly just the equipment asset itself.
Kevin Dede
analystAll right, and regarding that $23 million loan, which bitcoin served as the collateral?
Jeff Lucas
executiveAs we mentioned, the ratio of collateral to the loan's value declined from 143% down to 135%. So as of today, at this moment, roughly just above $30 million in big claim is backing that $23 million facility.
Kevin Dede
analystOkay. Right, right. Understood. Okay, okay. Fine, so regarding the equipment loan terms, you're expecting those to be fully wrapped up by the end or the early part of — let's say, is February 24 what you mentioned?
Jeff Lucas
executiveYes, both of them. The two facilities we took on this year — the February one at $32 million and the June one at $36 million — are each on schedule to be completely repaid ahead of that, by the time February arrives, correct, and settled by February 2024, which is when they mature; if it makes sense, we can choose to pay them off earlier. Naturally, when we look at that, we'll weigh the cost of capital along with other considerations.
Kevin Dede
analystAll right. Would you be willing to walk us through where your orders stand on the equipment side? My understanding is that you've got some flexibility in that area, and it depends on whether the infrastructure is there or not. Still, could you remind us of what you're holding and how much additional cash that adds up to?
Jeff Lucas
executiveSure, I'll begin with this.
Geoff Morphy
executiveStarting to that. No, go ahead, Jeff.
Jeff Lucas
executiveAlright, alright. So my remarks here — I think the main thing you're asking about is that order for 48,000 units that we tied to it early last year, and as soon as you lock it in, the price sits there at mid-year. So as far as where things stand right now out of that 48,000, we're in pretty good shape on roughly 36,000 of it, and there are 12,000 units we haven't yet paid for as we go; and naturally those are being talked over with the manufacturer regarding when they'll come, since they relate to warehouse number two for Argentina. But aside from that, for the remaining 36,000 we paid in full for approximately 93,000 of those — wait, roughly 93,000 — and what's left is about 3,000 or so, maybe 4,000 or so, on which we carry a balance of approximately 40%, which comes to around $6 million, and that we've shown in our payment schedule on the financial statements you're looking at for the fourth quarter, which is the quarter we're in right now, whether we end up making those payments or whether it slips a little into the first quarter. That again hinges on the timing of the infrastructure, our deployment of miners to ensure we're aligned so that we're truly receiving those miners and putting them to work alongside when the infrastructure becomes available.
Kevin Dede
analystAll right.
Geoff Morphy
executiveKevin, given how big we are, we keep direct ties with the biggest minor manufacturers. And since our orders are so large, that connection has really paid off, and they're cooperating with us so that, as much as we're able, we get the infrastructure built and at the same time supply the miners. And I suppose we've arranged to postpone delivery of a number of those miners, on account of what's happening in Argentina plus the second warehouse being built up. They are definitely cooperating with us, and actually, since they keep developing even better machines and miners, depending on when we move to activate or go further, we might receive some of those improved miners thanks to our connection with them, given the timing and how their new equipment is developing. So there might be genuine upside when it comes to better efficiencies and what miners cost as we head into the next year and look into the opportunities together with them.
Kevin Dede
analystSo Geoff, give us some insight into — how many miners would you say are stuck at the port in Argentina? And obviously you can't provide a timeline on that, which is fair, but I'm curious how that ties to the 36 units, or 36,000 units, that you've already paid for?
Geoff Morphy
executiveRight; it isn't really a case of them being stuck at the port in Argentina; this has been a broad problem with importing into Argentina. So it's not just miners, not just IT equipment, it's every kind of foreign direct investment entering the country that's experiencing the strain from these measures, since they're attempting to balance their budgets, their debt, and everything else involved there; it's a pretty significant macro impact. There have been some political shifts involving ministers, and those are now resolved, and they're talking with the international community about loans, balances, and fiscal restraints, and they will work those out. It's simply a question of time. And so we've got miners that we needed to slow down. So they aren't — all those miners for the first warehouse that we're currently short on are actually located in China. We simply haven't issued the shipping instructions to send them across the ocean yet for entry into Argentina.
Kevin Dede
analystAll right. When you take a look at that fleet, and you consider your 40 joules per terahash across the whole fleet, is there any internal discussion about keeping an upgrade path going and swapping out perhaps a portion of the older equipment for the units you've already purchased?
Geoff Morphy
executiveKevin, that's a great thought, and we've already gotten there. We've had a fleet upgrade initiative running for a while now, and the great majority of our prior generation miners are no longer in service. A number were sold, and we did relocate quite a few of them in Paraguay during late last year and into January of this year. But we aren't setting these kinds of efficiency records by relying on older machines. So in Washington, we have the newest generation machines, essentially all of Quebec is newest generation machines; and what's being installed in Argentina is newest generation machines. So yes, we do have some of those miners, but we're pretty confident that the government in Argentina will reopen soon, and then we'll be back to the plant.
Kevin Dede
analystAll right, gentlemen, that's everything I can come up with right now. I really appreciate you answering my questions.
Jeff Lucas
executiveAppreciate it, Kevin.
Geoff Morphy
executiveAppreciate it, Kevin.
Geoff Morphy
executiveMany thanks, Nick. These are extremely difficult days for all of us, both personally and professionally. When you look at what Bitfarms has pulled off this quarter and across this year, context and results matter enormously; given how many performance metrics and comparisons exist in this industry, I want to restate three things regarding Bitfarms. Since the start of the year, our mined total stands at 4,219 bitcoin. That puts us in third place for overall production among publicly traded miners, which speaks to our capacity to grow the business. Second, thanks to steady, cheap power, every quarter we've kept mining operations profitable, and the proof is the $10 million in positive adjusted EBITDA we generated during this year's third quarter. Third, we've brought down leverage on our balance sheet, cutting financial risk and putting ourselves in a stronger spot to weigh the growing number of opportunities in this industry. I'm grateful to everyone for joining today's conference call. We're eager to bring you updates through our monthly production reports, along with other developments; and on our Q4 conference call in March 2023. Thanks so much.
Operator
operatorAppreciate it. That brings the conference to a close. Thanks for being with us for today's presentation. You're free to disconnect at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Keel Infrastructure Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Keel Infrastructure Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Keel Infrastructure Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.