David Barnard
executiveThanks, Jamie. Morning, everyone, and thanks for joining the Bitfarms call for Q1 2023. With me today are our President and Chief Executive Officer, Geoffrey Morphy, and our Chief Financial Officer, Jeff Lucas. Before we begin, I want to let you know this call is being streamed live and that we have slides that go with it. If you'd like to follow those slides, just head to our site, www.bitfarms.com, and you can locate them in the Investor Relations area, listed under Presentations. If you'd prefer to tune in through your phone instead, you can grab the presentation there as well. Before we begin, I want to note that earlier today, Bitfarms issued a press release sharing its financial results for the first quarter of 2023. If you turn to slide 2, please keep in mind that some forward-looking statements will be shared on this call, and actual future outcomes may not match what those statements suggest. These forward-looking statements rest on specific assumptions and carry risks and uncertainties, and we encourage you to review Bitfarms' MD&A for the full list. Additionally, we referenced supporting slides during this call, and you can view that presentation on our website, www.bitfarms.com, in the Investor Relations section. You'll hear us mention some metrics that aren't defined under IFRS and lack the standard meaning IFRS sets, which means they might not line up with how other companies present similar figures; for the definitions of those non-IFRS measures, plus how they reconcile back to IFRSs, we point listeners to today's earnings release along with the company's first quarter 2023 MD&A. Also, unless we say otherwise, every financial figure mentioned is in U.S. dollars. On this call, our CEO Geoffrey Morphy will walk through how operations went during the quarter. Then CFO Jeff Lucas will give a closer look at the financials. Once the Q&A wraps up, Geoffrey Morphy will come back to share a few closing thoughts. Moving on to slide 3 now, I'm happy to hand things over to Geoffrey Morphy.
Geoffrey Morphy
executiveThanks for being here today. I hope you come away understanding why Bitfarms is set up nicely to benefit from better economics in Bitcoin mining. On that note, there are four things I want you to take away. First, we've built the financial and operational discipline that provides the strength and flexibility needed to complete our current growth plan faster than planned. Second, and this matters, we've moved our target of 6 exahash per second by the end of the year up to the end of the third quarter of 2023. Third, given our foundation and momentum, we intend to capture opportunities both right now and around the upcoming Bitcoin halving, which arrives in April of 2024. Fourth, in Q1 2023 we strengthened our balance sheet, and more recently we cleared some major obstacles in Argentina that open up the industry's best economics. As a low-cost producer with fairly stable energy costs and a fixed operating structure, Bitfarms delivers asymmetrical upside, with financial results that beat Bitcoin's performance. Moving to slide four, I'll go over several accomplishments from Q1 2023. We finished March 2023 at 4.8 exahash per second, which is 7% higher than December 31, 2022, and 78% higher than March 31, 2022. Since then, we've added another 4% to our hash rate, reaching 5.0 exahash per second. In Q1 2023, we mined 1,297 Bitcoin, a 35% increase over Q1 2022. In April, we announced a significant milestone: 21,000 Bitcoin mined using 100% renewable energy; given Bitcoin's finite supply of 21 million, Bitfarms has now mined more than one one-thousandth of all Bitcoin that will ever be mined. We think we're the first publicly traded miner in the industry to hit this milestone using renewable energy. Bitcoin prices are climbing, which pushed Q1 2023 revenue above $30 million; thanks to our low-cost operations, we generated gross mining profit of $12 million, a gross mining margin of 42%. Our direct cost of production is $12,500 and our all-in cash cost of production is $17,600, which support strong margins and remain a strategic advantage as we head toward the next halving in under a year. Adjusted EBITDA went from $1 million in Q4 2022 to $6.3 million in Q1 2023. As we look toward the halving, we've kept deleveraging our balance sheet and boosted our financial flexibility. In a bit, Jeff will go into detail about how we cut more than $140 million of debt over 10 months, down to just $19 million as of April 30, 2023. Slide 5 shows we have 10 farms across 4 countries. In April, we hit 196 MW of operating capacity, with 91% of that powered by sustainable hydroelectricity. Now I'll go over our operations and development plans. Please turn to slide 6; in Q1, 2023. In Río Cuarto, Argentina, we're moving out of our startup phase. We currently have 18 MW online plus another 32 MW of built capacity. In April, we made a great deal of progress. To start, our private power provider got its operating permit allowing it to supply as much as 100 MW, which set off our small acquisition plan at the 50-MW warehouse we built. Next, we turned on 2,100 more miners, which raised the total to 4,400 and lifted operating MW from 8 to 18. Then, once our power permit was cleared and the miners were in place, we began pulling power under our power purchase agreement at roughly 3 cents per kilowatt-hour. That figure is the cheapest across our portfolio, and it lowered our overall corporate production cost. After that, we completed testing and commissioned our substation, whose capacity is more than sufficient to serve the permitted 100 MW. Following that, we bought another 6,200 miners from Bitmain and MicroBT. Roughly half of them are being transported, while the rest should ship within the coming two weeks. Once they are installed, the first warehouse will reach above 75% capacity. As we said before, we already had approval to import the MicroBT miners, and today we obtained approval for the Bitmain miners. In both instances, the importation green light came roughly 10 days after we submitted the request. 6. We are moving quickly to scale production at our first 50-MW warehouse up to full capacity by the close of Q3, 2023. Toward that goal, we are currently securing 3,000 more miners. 7. Given this greater visibility in Argentina, we have pulled forward our 6 exahash per second target from the close of the fourth quarter, 2023, to the close of the third quarter. Now on slide 7. In Paraguay, during January 2023, we brought in 2,888 new, more efficient miners, pushing the farm's hash rate up to 290 petahash per second. We feel positive about upcoming opportunities in that region, since it offers plentiful and underused hydropower. We think the nation is nearing greater clarity regarding the industry, now that the election wrapped up on April 30th and a new president will take office in August. In North America, we hold 178 MW, with the option to access an additional 10 MW in Quebec. In Washington state, we have ongoing modifications and cost improvements planned throughout 2023. Every facility keeps running smoothly, as shown by our miner uptime, which we define as actual production output compared with the theoretical capacity of all our miners. Our proprietary GPMG miner and facilities monitoring system gives our team the ability to maximize our return on assets. Our repair facilities are excellent at quickly returning miners to service. Uptime shifts with weather conditions, curtailment programs, and other factors like parts availability. With summer approaching in North America, the winter curtailment programs have finished, and we are moving into a stretch of peak power availability; in April, our uptime hit 97.7%, showing what can be achieved with moderate weather, solid contracts, and optimized operations. Indeed, operating reliability through both miner uptime and our power sourcing is a signature of Bitfarms and helps drive strong and consistent margins and cash flow. In Quebec, we're carefully carrying out our growth plan in a way that adds megawatts accretively and builds operating synergies. Up in Baie-Comeau, we signed an agreement covering a new farm that could provide as much as 22 MW of hydropower capacity. Under our plan, which has two phases, 11 MW is scheduled to begin operating in 2023, with a further 11 MW following in 2024. We anticipate the deal will be finalized before Q2 2023 ends. Once that happens, we expect our exahash projections to rise. Slide 8, if you would. At this point, I'll pass the call to Jeff Lucas, who will take us through the financial review.
Jeff Lucas
executiveThanks, Jeff. I'd like to kick off my remarks by highlighting five crucial aspects of our financial standing and approach. To start, Bitfarms holds power agreements that are both steady and inexpensive, which regularly keep us in the ranks of the lowest-cost miners. Next, the liquidity on our books gives us room to maneuver. That matters because we're now under 12 months from the upcoming halving. Third, in March, as economics improved and debt came down, we began to HODL part of our free cash flow, which mirrors the surplus cash generated by operations once debt service is covered. Fourth, we've rolled out a hedging initiative, adding more room to maneuver by softening some of the effect that Bitcoin market conditions have on our financial results. Fifth, our balance sheet can support the strong pipeline of opportunities and the growth we've planned for 2023. Now I'll walk through our mining economics, our results, and our balance sheet. Kindly go to slide nine; during Q1 2023, we mined 1,297 Bitcoin, versus 1,434 Bitcoin in Q4 2022, and 961 in Q1 2022. That quarter-to-quarter gap stems mainly from a 13% rise in average total network difficulty. Revenue for the first quarter came in at $30 million, made up of $29 million from mining operations and $1 million from our Volta Electric subsidiary; that's against $27 million in Q4 2022, which mirrors a 24% quarter-over-quarter climb in the average Bitcoin price. It also mirrors 10% less Bitcoin mined across the quarter because network difficulty rose, partly offset by our greater hash rate. Turning to our mining economics, kindly go to slide 10. During Q1 2023, Bitfarms' direct cost of production for Bitcoin stayed among the lowest reported across the industry, averaging roughly $12,500 per Bitcoin; that's higher than $11,100 per Bitcoin in Q4 2022. The shift mirrors the 13% rise in network difficulty plus roughly 2% greater energy costs quarter-over-quarter. Gross mining profit for the first quarter reached $12 million, or 42% of revenue, versus $8 million, or 33% of revenue in the fourth quarter. That mirrors an average Bitcoin price during Q1 2023 of $22,500, which is 24% above the average price of $18,100 in last year's fourth quarter. Our total cash cost of production, defined as direct mining costs plus the fixed cost of revenue, including rent and technician salaries, as well as overhead, such as cash, general, and administrative expenses, came to $17,600. Most of this $800 rise from the fourth quarter came from the $1,400 increase in direct mining costs. Conversely, we are keeping our cash G&A costs in check, which fell by 25% from the fourth quarter, and on a recurring basis, stripping out a one-time expense in last year's fourth quarter, our cash G&A dropped by $900,000, or 13% sequentially, and 25% year-over-year. What stands out is that despite a lower number of Bitcoin being mined in the quarter — something that usually drives up overhead per Bitcoin — we cut mining costs by an even greater amount, which also puts us in a stronger position ahead of the halving. Moving to slide 11 now. In the first quarter, our operating loss narrowed to $15 million, versus an operating loss of $20 million in the fourth quarter of 2022. We posted a net loss of $2 million for the first quarter, equal to $0.01 per basic and fully diluted share, compared with a net loss of $17 million in the fourth quarter of 2022, equal to $0.08 per basic and fully diluted share. Improved profitability came from combining our low-cost mining operations with higher Bitcoin prices, as adjusted EBITDA climbed from $1 million in the fourth quarter to $6 million in the first quarter of 2023. Let's turn to slide 12. I want to walk through the strength of our assets. At Río Cuarto, we have 50 MW of built-out and in-place capacity, and as of today, $20 million is available to us under vendor credits. As a result, our planned growth in Argentina and in Baie-Comeau comes with minimal funding requirements. On March 31st, cash stood at $29 million along with 435 Bitcoin valued at $12 million, giving us total liquidity of $41 million, up against $38 million of liquidity on December 31st, 2022. As I noted, during the first quarter we mined 1,297 Bitcoin, placed 30 Bitcoin into treasury, and sold 1,267 Bitcoin, which produced $29 million of proceeds; in March, we began hedging activities aimed at lowering the variability of future cash flows from digital asset sales and delivering greater financial stability to the company. In April, we placed an additional 30 Bitcoin into custody, bringing Bitcoin held on April 30th of 2023 to 465 Bitcoin, worth roughly $13.6 million based on that day's Bitcoin price of $29,300; during the first quarter of 2023, we also brought in $16 million in net proceeds from our ATM program. From the start of the second quarter of 2023 through May 14th, we raised a further $5 million in net proceeds. The money raised through the ATM is designated for existing growth initiatives and future opportunities; we keep deleveraging our balance sheet, bringing total indebtedness down to $21 million on March 31st, and then to $19 million as of April 30th. Now to slide 13. I'll hand the call back over to Geoff.
Geoffrey Morphy
executiveThanks, Jeff. At Bitfarms, our attention stays on growing the business in a disciplined way. We keep assessing ways to broaden our geographic reach in a value-accretive manner, pick up sites, build out farms, and get more out of our miners. Our plan is to direct capital toward strengthening what sets us apart: a cost structure that keeps us competitive, dependable and excess energy supplies at appealing rates, our own mining and facility management software, our fully integrated electrical arm, and a standout leadership group. Given how strong that mix is, we anticipate further gains in efficiency and continued expansion of our operations. That leaves us set up strategically to expand during this year while spending very little capital, hitting our near-term goal of 6 exahash per second, and being ready for the halving in 2024. Just as important, we will stay in a strong spot to seize chances that fit what we look for, before the halving and afterward too. Before I take questions, I'd like to ask you to come see us later this week at Bitcoin 2023 in Miami, or join online at the 18th annual Needham Technology & Media Conference. Operator, let's go ahead and open the line for questions.
Bill Papanastasiou
analystHi. Good morning, gentlemen.
Geoffrey Morphy
executiveHi.
Bill Papanastasiou
analystNice work on the strong results for this quarter.
Geoffrey Morphy
executiveI appreciate that.
Jeff Lucas
executiveHello, Bill.
Bill Papanastasiou
analystHi there. To begin, I'd like to discuss cash operating expenses. As you're aware, our company experienced a reduction during the quarter, and the sequential change exceeded our own projections, which clearly contributed to generating a solid $6.3 million in adjusted EBITDA. Could you elaborate on what drove that decline? It appears largely attributable to professional fees and possibly insurance obligations. I'm hoping to better grasp whether this represents a solid or more suitable foundation for predicting future quarters, plus any insight into how costs might increase once Argentina becomes operational. That would be helpful. Thanks.
Jeff Lucas
executiveI'll begin on that, and then Geoff may chime in too. To provide some background, the main reason we ended up with excess cash this quarter is primarily that you reduced our debt servicing quite significantly. Next, naturally, we benefit from the rising Bitcoin price moving forward, despite difficulty increasing considerably too. Incidentally, regarding what you asked, when examining our current debt servicing, it has dropped enormously. We've mentioned previously that roughly $165 million in debt existed around 9 or 10 months back, and now it stands at under $19 million. This means our present debt servicing needs sit near $2 million each month, which is roughly one-third of what they used to be previously; concerning what you said about cash G&A operating expenses ahead, I believe the quarter just concluded offers a solid picture for the future. You're spot on about certain savings realized here. Primarily, we trimmed around $300,000 since the replacement value of the miners—for which we hold coverage—has declined along with the broader market, so our insurance expenses dropped considerably. The next thing to remember is, you're correct, we scrutinize our professional fees closely. Typically, we've worked to adjust those items substantially moving forward. I should note, Bill, that some fluctuation is possible there, since while investigating different new efforts and ventures, we inevitably rack up certain professional service charges for due diligence, analysis, and similar matters. There might be slight fluctuation in that ahead. Overall, once more, the G&A from Q1 provides a solid picture going forward. We don't expect really any rise at all when it comes to Argentina ahead for extra G&A expenses. Honestly, the expenses we're going to take on in this case will clearly be mostly for electricity. I should mention that during the quarter that just closed, we paid slightly less than $0.05 per kilowatt-hour for power. And now that we're truly pulling directly from the supplier, as Geoff mentioned, we expect those expenses to decline to slightly below $0.03 per kilowatt-hour; beyond that, we also expect Argentina, which is going to represent around 9%-10% of both our total revenues and capacity moving forward. That should generally bring down what we pay for electricity overall.
Bill Papanastasiou
analystGreat.
Geoffrey Morphy
executiveI'll step in here. I'll step in. You asked me to provide a bit more detail. Bill, this has come up between us before, and I've mentioned it during earlier calls about earnings. The emphasis was on costs. Ours is an industry that's maturing, and like we witnessed in the prior year, pricing declined, and margins were under pressure. Roughly 1.5 to 2 years back, we'd made an investment in a fresh management group of greater caliber that had the ability to scale. My sense is that by now we've given those people the runway and the ramp-up needed to truly reach full speed and be operating well. And the payoff is showing up at this point. That group is extremely productive, they're motivated, they understand what their jobs are, they support one another, and they genuinely round each other out. This group was assembled by us with scaling in mind. We're in the middle of that scaling now, and we're beginning to produce the results from that investment that truly got underway a couple of years back. We take real pride in that. Part of it also carried forward, in that we've moved away from certain professional fees and certain consulting setups, and handled some of that internally, and every bit of that is having an effect. Our preference is to keep our variables under control. That's all I'd add.
Bill Papanastasiou
analystThanks for that explanation. Moving on to my second question. So, Bitfarms entered 2023 with an equipment purchase credit, and it's clearly started being drawn on to support shorter-term growth, particularly given the ASICs bought recently. From what I understand, part of that credit along with cash has been utilized. Could you give us some detail on what portion of the credit still remains as of today? And then address how you're ranking the expansion projects in Argentina and Quebec. I think you also received approval in Washington for 6 MW.
Geoffrey Morphy
executiveJeff, why don't you kick things off.
Jeff Lucas
executiveSure.
Geoffrey Morphy
executiveFinancial aspect of this question.
Jeff Lucas
executiveSo we did have that. The credit started out at roughly $22.4 million. Right now, it sits just under $20 million, and that figure reflects us drawing down part of those credits, which we talked about, since we're currently constructing the initial warehouse in Río Cuarto.
Geoffrey Morphy
executiveI'll step in regarding the deployment side of things. To give a quick recap on Río Cuarto, Argentina: right now we're running 18 MW at that site. That works out to roughly 518 petahash. Later this month, we intend to energize 11 MW, coming from those MicroBT machines we ordered, which are currently being shipped. That should contribute roughly 290 petahash. As I mentioned earlier today in my comments, importation approval came through for the Bitmain units, which should show up around June and bring an additional 11 MW. Those machines perform a bit better; typically you'd expect 384 petahash from them. That ought to get us to roughly 40 MW, meaning 75% of the site's capacity, by the close of the quarter on June 30th. At that stage it should be running somewhere between 1.1 and 1.2 exahash. Another 10 MW remains; we're actively searching for favorable deals on miners. Like we've mentioned, the infrastructure already exists, so we'll simply add that capacity in. With luck, those miners arrive over the coming months. That would take us to approximately 50 MW around September 30th, roughly 1.5 exahash from that site; we're quite enthusiastic about getting that launched. It feels like it's taken quite a while, and now that things have opened up, we're moving forward. Along those lines, let me discuss Baie-Comeau briefly. The transaction isn't closed yet; we anticipate completing it by June 30th. If all goes according to plan, we currently hold 0 MW there. What we're acquiring is a company holding the power contract, so it's somewhat greenfield — we'll take over a building, sign a lease, then install our own infrastructure. We're expecting 3 MW in early summer, which is about 85 petahash, another 3 MW in late summer, another 85 petahash, then 5 MW later in the year. That comes to roughly 140 petahash, totaling around 310 petahash across 11 MW in 2023. Keep in mind these figures aren't part of our guidance since the deal hasn't closed. As I noted in the remarks, once it closes, we'll revise guidance to reflect that. Then the following 11 MW, we plan to construct and energize during the next year. Bill, I rambled a bit there, but I know this is the sort of thing you enjoy hearing.
Bill Papanastasiou
analystYeah. No, that's wonderful. I appreciate the context. It simplifies things for me. Thanks; with that said, I'll drop off the queue. Thank you.
Geoffrey Morphy
executiveThank you, Bill.
Jeff Lucas
executiveAppreciate it.
Kevin Dede
analystThank you. Good morning, everyone.
Geoffrey Morphy
executiveHi there, Kevin.
Kevin Dede
analystA few items. I believe it may have been your comments, Mr. Morphy, about energy expenses rising on a sequential basis, or perhaps that was Mr. Lucas. I was simply curious whether you could. This came up, I think, in a comparison from one period to the next. Yes, it was Mr. Lucas. When you discussed the higher costs in mining in March versus December. I was just wondering whether you could say more about what took place there and how you expect that to shift across the coming couple of quarters.
Jeff Lucas
executiveAll right. To begin with, the thing I brought up regarding the rise in energy costs on a per Bitcoin basis was truly caused by difficulty. There was a slight 2% rise in electricity prices overall. Perhaps that is actually what you are referring to.
Geoffrey Morphy
executiveIt is exactly what I was speaking to. Yes.
Jeff Lucas
executiveOkay, happy to take that one. To give you exact figures, electricity cost during Q4 came in at roughly $0.0427 per kilowatt-hour on a consolidated basis. During Q1, that figure stood at approximately $0.0441 per kilowatt-hour. The slight bump we saw there resulted from rises in Paraguay and Washington, plus a smaller gain in Canada as a whole. Argentina stayed essentially unchanged, sitting just below $0.05. Regarding our outlook for power rates, or rather per kilowatt-hour, the dominant element is what I mentioned earlier: we expect Argentina to drop from around $0.047 per kilowatt-hour to slightly below $0.03 per kilowatt-hour. That represented roughly 5% of our overall capacity during Q1. With the warehouse now scaling up, it should reach about 10% in Q2 as we move forward. So what we're describing is 5% of total capacity at close to $0.05 in Q1. By Q2, 10% of capacity will sit at $0.03. We foresee cost reductions from this point onward.
Geoffrey Morphy
executiveAs for the remaining 90% moving ahead, Jeff, would you expect that to stay pretty steady? That's roughly what I was trying to figure out. I wasn't certain. What I'd picked up on, more or less through hearsay, is that gas prices generally had been declining, and I couldn't tell whether that was showing up in the hydropower expenses you're encountering in Washington and Paraguay.
Jeff Lucas
executiveFor the most part, no. The real advantage for us—beyond the fact that it's renewable energy—is that hydro gives us genuine stability in what we pay for power, both when markets turn unfavorable, meaning fossil fuel prices are elevated, and also stability when prices decline here. What we're showing here, though, and what the figures from the first quarter mostly capture, is that we did mention roughly a 6% rise in electricity in Canada. That took place during the first quarter here. There was also a slight bump we observed in Washington too, ticking up a bit. Once again, Washington represents a fairly small share of our overall production here. As far as we can tell, Paraguay has remained comparatively steady. And in Argentina, we anticipate a decline.
Geoffrey Morphy
executiveYeah. Let me jump in.
Jeff Lucas
executiveOkay.
Geoffrey Morphy
executiveWhen it comes to Washington, inflation is indeed hitting that power provider, and on top of that there are rehabilitation projects, work on river embankments, plus upgrades to their hydro facilities and similar things. They've got a sizable capital program that they've informed us they must carry out across several years. That doesn't come cheap, and they're forced to push a portion of those expenses onto the customer base. So yes, an increase there did affect us. One more point I want to make regarding Argentina: in contrast to what we face in North America, they're moving into their winter season, which means natural gas costs them more at the moment. We do anticipate those costs will drop around October of this year, more or less, once they exit the winter months — a period when they burn more gas — and as they extend infrastructure to our site and further out. Additional gas will be able to move through the pipelines in that region; that should help too. Our expectation is that gas prices, and consequently electricity prices for our Argentina project, will in fact fall below current levels in a matter of a few months, given their seasonal pattern. Thank you.
Jeff Lucas
executiveOkay.
Geoffrey Morphy
executivefor letting me add that.
Jeff Lucas
executiveRight, right. No, I appreciate you including that. Geoff, does that private power provider of yours also feed electricity into the grid?
Geoffrey Morphy
executiveYes. Yes.
Jeff Lucas
executiveOkay.
Geoffrey Morphy
executiveThey've got quite a few plants, and the site where we're based has turbines that can be switched on whenever they're dispatched to back up the grid; they sell electricity to EPEC, the utility serving that area; on top of that, CAMMESA oversees all of it from a nationwide perspective, along with every regional distributor. Right, they deliver power to those parties too.
Jeff Lucas
executiveThe, um-
Geoffrey Morphy
executiveThat raises a different matter, Kevin Dede, and it's a good one, since the buses—the electricity buses—are right there, so this gives us redundancy as well. It isn't only an electricity supplier we rely on; thanks to those buses, should anything go wrong in either direction, those connections let us pull power off the grid if a problem arises with the turbines at that site. Think of it as a kind of insurance policy too. Yes, the private power producer located right on site will supply our main power, and it will be transferred via those high voltage buses.
Jeff Lucas
executiveGeoff, regarding what you brought up about the importation side and getting that down to 10 days — how did that stack up against when the first group of miners came in? My recollection is that it took months. Honestly, I just stopped keeping track of how long it was.
Geoffrey Morphy
executiveYeah, we didn't. We were very conscious of that. An application alone wouldn't do it. In the old setup, when you could obtain a favorable exchange rate, brokers were required, and on a recurring schedule the government handed those brokers allocations for importing equipment. You had to reach out to the brokers, bargain with them, secure a piece of their allocation, and after that you were typically capped by what they had. In North America we can simply order thousands of miners on a single purchase order, but that wasn't possible in Argentina. The process was: approach the broker, work out the capital cost along with how many units, get it spec'd in, and then, you know, it would usually take roughly 30 to 60 days, yet merely getting into those brokers' allocation consumed time. After you were in the allocation, you could proceed with your logistics and get it done. It was cumbersome and extremely labor-intensive. This new system, where essentially you have your packing list and you've split your application, has proven to be much easier, and now that we've had two successes, it's far more predictable.
Kevin Dede
analystYeah, could you share a bit more detail about the two wins you've had — or co-color, I should say — the two wins you've had, plus that single Bitmain shipment currently in progress? Could you walk us through it step by step, so maybe it builds a bit more confidence that this is actually going to happen?
Geoffrey Morphy
executiveOkay. So the initial order covered 2,982 MicroBT miners, specifically M30S units. Back in April, the moment we got the green light to energize the facility, we also, quite by coincidence, received approval that very same day for our very first importation permit allowing us to act as a direct importer — April the 21st, or somewhere right around there. Those units are en route, and with any luck they'll show up and get through customs sometime within the coming week or so. Our strong hope is to have them plugged in and running before this month ends. With the Bitmain miners, we didn't have the full set of details, which slowed things down a bit; we required a packing list spelling out specifics on the miners and the equipment; we submitted that just over 7 days ago covering 3,200 S19 Pro+s, and it came back quickly; the turnaround on that application has been under 10 days; we'll sort out logistics and start them moving toward the site. As I said, our hope is to get them activated in June.
Kevin Dede
analystAre the folks from your electrical outfit — that in-house company of yours based in Quebec — the ones handling installation down there, or do you need to bring in outside contractors?
Geoffrey Morphy
executiveOutside contractors. The business unit you're referring to is a fully owned operation of ours named Volta, and it's been part of the company for over 3 years. They've got more than 30 certified electricians on staff, though we're keeping those people occupied up in Quebec, and they're capable of handling both residential and industrial work as well. No, not once have we relocated any of those electricians to South America. As a matter of fact, the codes over there plus how things get measured — imperial against metric, that sort of thing. You run into all sorts of differing practices in this line of work. Sure, they're absolutely competent at what they do, but we brought on electricians from the local area in Argentina and we're building up our expertise on the ground there. Honestly, that approach has turned out quite nicely. The low voltage side inside the plant has progressed smoothly with zero problems. During April, we additionally brought the high voltage substation online, transitioning away from a temporary 50MW connection — that was an interim line used to complete the initial warehouse — over to a substation constructed specifically as a component of the 210-MW campus at that location. Over 50% of it has already been built out, and it's prepared to handle 100 MW. Far greater redundancy, several lines, significantly better control, and that's the point where EPEC came in along with the local crew, who required training on Siemens equipment and certain safety hookups. Every bit of that got finished in April, and now it's complete and functioning perfectly.
Kevin Dede
analystCould we pull back for a moment and examine the entire Bitfarms network sitting at 39 joules per terahash? Would you mind discussing that $20 million credit facility you're holding in reserve? Clearly, a portion of it has already gone toward completing Río Cuarto, and I assume the remainder gets you to your 40 MW. Could you address—I mean, considering how old some of the machines in the fleet are, what's your thinking on how you'd go about enhancing the fleet overall and its efficiency ahead of the halving?
Geoffrey Morphy
executiveAbsolutely. To start, that credit sits at roughly $20 million at present. Our intention is to deploy it entirely within this year, through some mix of Argentina and Baie-Comeau plus anything else that emerges down the road. I don't believe there's any concern around that. Just as we've always done, Kevin, we continuously refresh the fleet. To illustrate, quite a few of our M20s got pulled offline, and we've been offloading them, generating some proceeds, and directing that toward our fresh CapEx. Everything across the board is now M30s and S19s; that 39 joules per terahash figure will decline notably once we install those miners we just mentioned, the 6,182 units currently on their way to Argentina. That brings the joules down; after that, with the extra miners, we'll push it toward 30 by later in the year, and I'd anticipate below 30 perhaps near the end of the year or into next year. It isn't simply about having machines that generate output; what matters is the cost per terahash. It isn't simply about purchasing hardware. It isn't simply about purchasing a high performance sports car. You want something where you aren't shelling out premium dollar, yet you receive an immediate return and essentially a payback. We could go purchase the truly high performance miners and pay two or three times as much, except the payback extends outward and reaches into the halving period, where it extends even further. Achieving a modest performance combination that you can genuinely operate—and we do operate, as you're aware, and the performance and output we extract from our assets ranks among the industry's best. Frequently, we achieve superior performance from our miners compared to even the higher performance miners that other operators run. That stems from our GPMG system and the reality that we've accumulated 5+ years of running miners in this environment; we have repair centers. We will bring that number down. As capital costs get allocated, we act as prudent stewards of capital; and a payback on your miners is essential. Currently, the miners we're acquiring deliver a payback of less than one year under current, under current economics. We will have them fully repaid prior to the halving. We will conduct comparable analysis as we build and potentially acquire and evaluate other opportunities this year. Right now we're aggressively hunting for fresh opportunities, because we want them built and up and running prior to the upcoming halving. That halving sits under 12 months away. With any luck, whatever we construct and execute at this point, we can wrap up within six to eight months, getting there before the halving happens. All of it is accretive, and we're lean and mean.
Kevin Dede
analystCould we spend a moment on the hedging approach? I'm not sure this has come up from you folks before. What I'd like to know is which kinds of derivatives you happen to be employing, what the cost looks like, and how broad the coverage is. Any additional detail you can share would be helpful.
Jeff Lucas
executiveAbsolutely. I'll take that one. Happy to do it; in fact, this has been something we've been developing across several months. The initial step, going back a couple of months now, has really been confirming that the control processes and practices were properly established here; we do have a risk committee in place. There's a VP of risk management we added at the start of the year, though he'd been working alongside us through much of the latter portion of last year, tasked with examining the risk exposures we carry and the enterprise risk we confront as a whole, you know, considering how volatile the business we operate in can be. To give you some foundation, Kevin, behind why we set up this hedging operation, part of our thinking was recognizing, just as every company in our space does, that there's, you know, minimal control and regular variability affecting our top line, driven largely, of course, by Bitcoin's price, over which we have virtually no control. So we asked ourselves, what can be done on our end to better deliver stability, visibility, and consistency to our earnings? With that in mind, we started down this hedging path. We're moving into it very carefully and very thoughtfully. By no means are we being overly aggressive. Quite frankly, the aim here is a way of insulating or protecting our downside. At present, we're accomplishing that mainly, you know, through either writing or purchasing options, though we're exploring other, you know, more sophisticated instruments as we progress further; also, to some extent on the upside, we offset a portion of that premium cost by writing some dramatically out of the money calls. That's how we began it at first. Again, what we're after here is greater visibility, predictability, and stability from our top line through to our earnings streams.
Kevin Dede
analystOkay. I appreciate that, Jeff. Thanks.
Jeff Lucas
executiveYeah.
Kevin Dede
analystWhen it comes to what Bill asked about before, you're figuring SG&A will show somewhat lower costs. Would the hedging expenses show up there?
Jeff Lucas
executiveNo. Please continue.
Kevin Dede
analystYes, absolutely. Please continue. Yeah, share some perspective on that, plus perhaps what the expense amounts to.
Jeff Lucas
executiveAbsolutely. There are a few points to make. To begin with, regarding the effect and how G&A will appear moving forward, I believe my remark was that our position during the first quarter gives a reasonable picture of where we will be later on. Obviously, some uncertainty exists there, especially when we take on certain professional service fees tied to the due diligence we perform across our different acquisitions. As for what the hedging actually costs, for us it has really been mostly de minimis. Second, since we don't apply something known as hedge accounting, whatever P&L effect there is—the, you know, the recognition, whether gains or losses might occur—shows up within financing expense; that line actually sits beneath operating income.
Kevin Dede
analystAll right. Yes. Okay, that's great, that's great. Thanks for explaining that. I'm grateful. Sorry for not knowing about this. Could we spend a bit of time on Baie-Comeau? I'm not familiar with how that site appears, but my understanding is that a single building sits there. Would it require retrofitting, or would you need to construct it entirely new?
Geoffrey Morphy
executiveRegarding the 11 MW we intend to complete during this year, a building already stands there. Honestly, we are already at work on it. Our confidence is strong that the deal will be finalized before June 30th. Work on that building has begun for us right now. As I believe we've said previously, we gain a significant head start on this because certain pieces of equipment that we removed from the de la Pointe site in Sherbrooke were placed in storage, since we knew they'd serve a purpose down the road. And wouldn't you know it, that moment has arrived. Those machines are being sent there now, which lets us bring 3 MW online quite fast in early summer, followed by another 3 MW later in summer. Our expectation is that 11 MW will be operational at that location during this year, ahead of September 30th if all goes well; the only thing we need is for the deal to be completed so we can truly run our operations there at maximum capacity, and we'll update guidance to reflect that. Baie-Comeau sits at a greater distance than the sites we currently operate, our farms today. Driving there from our current facilities takes roughly 8 hours, and it lies farther east, yet the region holds a massive supply of hydroelectricity. My understanding is that 4 or 5 gigawatts of hydroelectricity exist there. This is a region that was built up many decades in the past for forestry and aluminum industries. An enormous quantity of hydro power is available in that place. Going there is strategic not just because of this particular contract, but our hope is that since we're able to move to where the power supply sits, and since we're acting as a responsible company within Quebec, the region may be opened up by them for future growth, given that the electricity exists there while transmitting it to Quebec's population centers is quite distant, along with a portion of their wholesale agreements in the US that they sell into; that too makes it strategic.
Kevin Dede
analystIs it possible that they might direct as much as 280 MW toward that? I recall hearing some discussion about Régie de l'énergie potentially offering that amount. Do you see that site as a candidate for an allocation like that?
Geoffrey Morphy
executiveWe're hoping so — that would be a strong location. It aligns with their strategy, just like a number of other spots in Quebec where we've invested considerable time and energy building relationships with nearby towns, cities, mayors, councils, and companies across the province. This is among the regions with excess power, and it would be quite logical, particularly since we create employment; for certain of those sites we can present the province with a business case showing added value, jobs — tech jobs — and capital investment. Our view is that the province holds more potential, though things move slowly with that RFP while they reshuffle their priorities. The most recent word we've gotten, just within the past week or two, is that they intend to examine it further during the summer and issue some announcements in the fall. Behind the scenes, we're supplying all sorts of figures and data to back up the value we add in the province, since we — unlike anyone else — are able to reduce our power usage during periods of high demand when it's extremely cold in most parts there. That flexibility matters a great deal to the province, in my view, and we intend to make that argument and help them understand us better. That's an effort we're putting substantial time and energy into.
Kevin Dede
analystThat's my final question, gentlemen. I bet you're happy to hear that. Could you just bring us up to speed on the Río Cuarto installation facilities? I understand one building is finished at 50. I understand you have 210, so you could go, I believe, to 4 buildings altogether. I was just curious about where the remaining 3 sit in your schedule and strategic planning.
Geoffrey Morphy
executiveKevin, I appreciate that question. This is a significant update. Yes, we hold a 210 MW power purchase agreement, and as first conceived, the campus would have been 4 warehouses of 50 MW each. We put this together back in 2021, when Bitcoin economics were far stronger than they were a year ago and even compared with today. We put out word that we were altering our expectation. We would shrink it from 4 warehouses down to 2, and of those, we would construct the first and then reassess the market once the gates opened, so we could take another look. That moment has arrived. That moment is here now. We have the initial 50 MW warehouse. We are filling it across the coming months, as I've already outlined. At this point we're examining the second warehouse and asking whether it makes sense. The substation was constructed for it and stands ready, so that capital has already been spent. When we first laid out the entire campus, we made deposits with steel vendors and transformer vendors and the like, and a number of those deposits remain; it would be good to actually put those deposits to use, and that's why our capital cost for the rest of this year is quite lean, since we've already made investments in the future. The second warehouse exists, it's designed. We're currently in talks with Albanesi, with the permitting folks, with the suppliers regarding timelines, because as you'll recall, what I stated was that whatever we do now, we want it constructed and accretive before the halving. If we can't construct it and have it be accretive by the halving, then it will have to wait. If we can line up the ingredients so that it makes sense, then we'll approach the board and request approval for it. It's a heated subject at the moment, and we're examining it. Jeff Lucas, why don't you jump in and provide a few additional details on that?
Jeff Lucas
executiveAlright, that's a fair point. There are a few things worth adding: for that second warehouse, we expect the build cost would come in well under $300,000 per MW. I should note, though, that given certain payments being made toward the larger complex there, the actual cash needed going forward — if we did go ahead and put up that second warehouse — would land more in the range of just a bit above $200,000 per megawatt. Beyond that, I'd say our position is fairly strong, and right now we're working through the evaluation of how to carry this out in the most economical way going forward.
Geoffrey Morphy
executiveWell.
Jeff Lucas
executiveDoes that answer the question, Kevin?
Geoffrey Morphy
executiveMuch appreciated, sirs. Indeed, indeed. I appreciate it. I appreciate it. I'll hand things back to you.
Geoffrey Morphy
executiveThanks, Jamie. I want to restate three things and wrap up with them regarding Bitfarms. To start, as shown by the fact that we've mined more than 21,000 Bitcoin using 100% renewable energy, we have demonstrated that we can grow this business. Next, because we're committed to keeping energy and operating costs steady and low, we've kept our mining operations profitable every quarter. And third, from our current portfolio, we anticipate hitting 6 exahash per second by the close of Q3 with minimal capital spending, plus additional potential from the expected completion of our planned 22 MW farm in Baie-Comeau, while 1 or more acquisitions will deliver still more value to shareholders. I appreciate all of you joining today's conference call. We're eager to bring you updates through our monthly production reports, along with other developments, and on our Q2 conference call in August. Thank you, and have a good day.
Jeff Lucas
executiveThank you. Take care.
Operator
operatorEveryone, that wraps up our call. We appreciate your joining us for today’s presentation. At this point, you’re welcome to hang up your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Keel Infrastructure Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Keel Infrastructure Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Keel Infrastructure Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.