Operator

operator
#1

This is the conference operator. Thank you for your patience. The call will begin shortly. Please continue to hold. Thank you. Good morning, and welcome to the Bitfarms Fourth Quarter and Full Year 2023 Conference Call. [Operator Instructions]. I would now like to turn the conference over to Tracy Krumme, Senior Vice President, Head of Investor Relations at Bitfarms. Please go ahead.

Tracy Krumme

executive
#2

Thank you. Good morning, everyone, and welcome to Bitfarms' Fourth Quarter and Year-End 2023 Conference Call. With me on the call today is Geoff Morphy, President and Chief Executive Officer; Jeff Lucas, Chief Financial Officer; and Ben Gagnon, Chief Mining Officer. Before we begin, please note that this call is being webcast with an accompanying presentation. Today's press release and our presentation can be accessed at our website, bitfarms.com under the Investors section. Turning to Slide 2. I'll remind everyone that certain forward-looking statements will be made during the call and that future results could differ from those implied in the statement. The forward-looking information is based on certain assumptions and is subject to risks and uncertainties, and I invite you to also consult Bitfarms MD&A for a complete list of those. Please note that reference will be made to certain measures not recognized under IFRS, and therefore, may not be comparable to similar measures presented by other companies. We invite listeners to refer to today's press release and our MD&A for definitions of the aforementioned non-IFRS measures and the reconciliation to IFRS measures. Please note that all financial references are denominated in U.S. dollars unless otherwise noted. Turning to Slide 3. It is now my pleasure to turn the call over to Geoff Morphy. Geoff, please go ahead.

L. Morphy

executive
#3

Thank you, Tracy, and thank you, everyone, for joining us today. I am happy to present and discuss with you our Q4 and full year results at such an exciting time in the industry. Multiple conversion catalysts are leading to a very bullish sentiment, which is sending the bitcoin price soaring and the market cap of bitcoin to over $1.3 trillion. The favorable industry tailwinds include: an improving regulatory and macro backdrop, the recent bitcoin ETF approvals by the SEC, which are leading to rapid retail and institutional adoption, the upcoming halving, which Ben will speak to more in a minute. The positive impact of bitcoin supply constraints with current daily demand exceeding 5 to 10x the daily supply of newly mined coins, and this prospect of a lower global interest rate environment, which has historically been very favorable to the bitcoin sector. Over the last 2 months, these catalysts have caused a surge in investment interest, and investment in publicly traded bitcoin miners and bitcoin ETFs. The ETFs have charted unprecedented growth with net inflows exceeding $8 billion. This is not just an anomaly, but a paradigm shift for the industry, partially, as a result of this insatiable demand. Earlier this week, bitcoin achieved a new all-time high price, which is exceptional as this is the first time bitcoin has attained a new all-time high, leading into a halving. With this demand supply backdrop, 2024 looks to be a banner year for Bitfarms. Turning to Slide 4. I want to start off today's call with a quick reminder of what bitcoin is, why we mine it, and how Bitfarms does it better. Bitcoin is a simple idea, flawlessly executed and code, and organically adopted by people around the world at massive scale. This powerful technology is empowering individuals, entrepreneurs, corporations and even countries and governments to participate in the world's most open, fair and secure financial system on the planet. As shown in the chart on the left, bitcoin's ongoing adoption and organic growth has made it the best performing financial asset of last year and over the last decade, outperforming the S&P 500, NASDAQ 100, MSCI World Index and Gold, in our opinion, and according to others, bitcoin is the hardest monetary asset on the planet. Bitfarms is a vertically integrated global bitcoin mining company that provides investors with high-quality exposure to bitcoin. Through our publicly traded shares, we are democratizing and making it available to investors exposure to some of the world's best built, best operated and lowest cost bitcoin mining operations, and the operating cash flows they generate. What makes us a leveraged investment play is that every single day since this farms was founded in 2017, we have produced bitcoin at materially lower costs than what people, institutions, and ETFs can purchase it for in the open market. We have earned over 24,000 bitcoin since inception. I am thrilled to report that in 2023, Bitfarms was the best performing stock on the Toronto Stock Exchange and the eighth best-performing stock on NASDAQ. A moment ago, I commented that our shares represent a high beta exposure to bitcoin. As the chart on the right illustrates, in 2023, Bitfarms outperformed bitcoin by 286% and outperformed the mining industry represented by the Valkyrie Bitcoin Miners ETF by 95%. Bitfarms annual share price return of 592% compares to bitcoin's annual price appreciation of 155%, which is a beta of approximately 3x. So, how do we outperform bitcoin in 2023? Let's turn to Slide 5. In 2023, we acted with a strong discipline to dramatically transform our balance sheet by growing the company's hashrate 44%, improving our energy efficiency by 12.5%, thereby reducing our operating cost per terahash, paying down 85% of our debt, increasing our bitcoin and treasury by 99%, ending the year with $118 million in liquidity. And in November, announcing our transformative fleet upgrade with a contract to purchase up to 63,888-that made T21 miners. These powerful new miners, combined with our new farms under development are a game changer and put Bitfarms on track to triple our hashrate to 21 exahash by year-end 2024, and improve energy efficiency up to 34% to 23 watts per terahash. Not only does this represent the greatest growth in our 6-year history, but importantly, our integrated strategic growth plan will drive what we believe will be the biggest relative improvement in energy efficiency in our industry this year. Turning to Slide 6. I would like to elaborate on the impact of our transformative and accretive fleet upgrade program, while speaking to our financial discipline and cost-focused approach. This month, in Quebec, we will begin to upgrade our fleet starting with a replacement of approximately 11,000 M31S and M31S+ miners with the first batch of new T21 miners, as a testimonial to our highly efficient operating structure. It is important to note that while these M31S miners are our least efficient and oldest miners, they were purchased around the time of the last halving in 2020. They are still profitable due to our low-cost energy and high operating efficiencies. During these 4 years, these group of miners have paid for themselves over 5x, demonstrating solid ROI returns. On a unit basis, upgrading the M31S to the new T21 miners will deliver a 2x improvement in energy efficiency, driving a 50% reduction in our operating cost per terahash. They will also generate a nearly threefold increase in hashrate and mining revenue. All other things remaining constant, the relative improvements from upgrading these M31S miners will more than offset the impact of the upcoming halving on a per unit basis. Turning to Slide 7. Approximately, 68% of our T21 on order will be installed in our existing farms with the lion's share going to our Quebec farms. By utilizing our existing infrastructure, the upgrade is effectively a plug-and-play operation, significantly reducing CapEx requirements, risk and complexity. This low-risk and low-cost growth strategy provides immediate and tangible benefits to Bitfarms and our investors. With the first minor set to be upgraded this month, we are pleased to report that our transformative fleet upgrade is well underway, on time and on budget. Turning to Slide 8. I'll touch upon our progress in Paraguay, where most of our new site development is happening and where we will plan to deploy over 26,000 new miners this year. In Paraguay, we have 2 new farms under development and on track for energization this year. The first miners at our Paso Pe facility are scheduled to go online this month with more miners coming online in April. Paraguay is an important area of growth for us. Our 2 farms under development will generate many value-added corporate benefits, including favorable fixed power contracts at $0.039 per kilowatt hour before that. Power contracts with ANDE that are not subject to inflation. No requirements for power curtailment providing up to 100% uptime, 100% renewable energy, fast development, construction and deployment times, exceptionally low cost for construction and skilled labor; and lastly, first-mover advantage, securing Bitfarms with a meaningful amount of electricity allocated to the cryptocurrency sector, putting us on track to be the largest miner in Paraguay by year-end. My recent visit reinforced the merits of our decision to invest further in this country. There is abundant and low-priced hydro power, a skilled labor pool, supportive cryptocurrency and bitcoin mining from the public, and most importantly, from the primary electricity utility ANDE, and they understand how bitcoin mining functions as a digital electricity line for exporting their excess hydropower to a global marketplace. By signing power contracts with Bitfarms, they are able to monetize and make better use of their existing infrastructure assets. Additionally, they are able to use revenues from bitcoin miners to finance the rebuilding and expansion of a significant portion of their domestic power infrastructure, which will bring benefits for generations to come and aligns the interest of Bitfarms, ANDE, and Paraguay. Turning to Slide 9. With minor upgrades underway and the near completion of the initial phase of development at Paso Pe, we are on track and on schedule to deliver 12 exahash by the end of June 2024. Importantly, with bitcoin price and spot miner prices rising, the 28,000 minor option that we purchased in November is in the money. Exercising this option is a key element towards achieving 17 exahash per second. And through this exercise, we plan to take delivery of T21 miners in the third and fourth quarters of this year, in line with the construction schedule at Yguazú. While these carefully constructed plans increase our hashrate to 17 exahash per second, we are targeting more than a threefold growth this year to 21 exahash per second. Should market conditions continue to be favorable, we are actively considering additional farm expansions, new developments, acquisitions, and further minor redeployments to achieve this 21x to hash target by the end of 2024. With numerous actionable opportunities in our pipeline, we are well prepared to seize upon accretive growth opportunities to fill the remaining 4 exahash this year. Turning to Slide 10. Let's take a look at our pro forma portfolio based on the plans that I just discussed. After having successfully deployed 63,888 T20 among miners through the transformative fleet upgrade plan and the new farm developments at Paso Pe and Yguazú, we will have completely rebalanced our portfolio, both geographically and economically. The expected result is, one, higher operating efficiencies with 79% of our miners operating at 22 watts per terahash, and no miners operating above 30 watts per terahash. Two, a competitive blend of low-cost electricity with high uptime. Three, achieving greater geo-diversification with no single country contributing more than 50% of our hashrate and revenue. And four, benefit from predominantly stable hydro power rates, which represent about 85% of our portfolio. If you take away nothing else from this update, our transformative fleet upgrade is unique, both in terms of its scope and its ability to drive meaningful improvements across 3 key performance indicators: hashrate, energy efficiency, and our direct cost of mine, also known as hashcost. These improvements will take place across all existing farms and farms under construction, ensuring we are ready for the halving, and the widely anticipated subsequent bull market. I will now turn the call over to Ben Gagnon, our Chief Mining Officer, to talk about our operating and financial metrics and the various assumptions post halving.

Ben Gagnon

executive
#4

Thanks, Geoff. I'm really happy to be here with all of you today. Well, this will be my third halving event and the company's second. For many investors listening in on today's call, it is likely going to be there first. Accordingly, I think it's important to spend a few minutes discussing the halving, mining economics, and how we think about them. Put simply, halving events as originally envisioned by the clinch creator and how they have functioned historically, our catalyst for creating greater economic value. On the mining side, the 50% reduction in the block reward results in fewer bitcoins mined, which setters incentivizes miners to cut costs. Concurrently, this also means that the daily supply of new big clients that would otherwise be liquidated to pay operating expenses is also cut in half, restricting supply relative to demand, and in turn, driving prices higher. Turning to Slide 12. Historically, each halving epoch follows a similar pattern. One of frequent prices rising faster than network cash rate can grow in the 3 to 18 months following a halving, resulting in quickly expanding mining revenue and margins, incentivizing further network growth. Being on the right side of the cycle is crucial for miners to optimize returns and is a key part of our 2024 growth strategy. Despite each cycle producing 50% fewer bitcoins in revenue than the cycle before it due to rising BTC prices, the economic value of all mining revenue in dollar terms increases dramatically with every halving epoch, resulting in a materially larger industry with more economic activity despite the reduction in BTC terms. Notably, this cycle is marked by 3 very unique features not keen in previous halving. The China mining ban in 2021, the emergence of ETFs in January, and the fact that bitcoin has just hit a new all-time high, leading into the halving. This has never happened before. And with only 450 new bitcoins expected to be mined per day after the halving, relative to current ETF demand of up to 10,000 bitcoin a day, it may mean that this next cycle will be unprecedented in terms of its scale. But this is all revenue. And outside of hedging activities, miners has very limited control over revenue. However, we do have full control over our costs, which is why at Bitfarms, we take a hashcost first approach to mining. Turning to Slide 13. Energy efficiency is meaningless without also considering electricity costs. That's why we look at the blended figure, hashcost. Calculating hashcost is easy and can be done by simply multiplying energy efficiency with energy price over 24 hours. This will calculate the direct energy cost to operate per unit of compute per day in dollar terms. As we execute on our upgrade and deployment plans throughout 2024, we expect to improve efficiency, 11% from 35 watts per trash today to 31 watts per terahash by the end of Q1, 29% to 25 watts per terahash by the end of Q2, and 34% to 23 watts per terahash by year-end, driving our hashcosts down by similar amounts. Importantly, as Geoff mentioned earlier, we believe these will be the most significant improvements across energy efficiency and hashcost in our industry this year. When comparing that to the most efficient miner on the market and S21, you can see that our anticipated hashcost will be lower than an S21 operating at $0.06 by the end of Q2, and virtually on par with an S21 operating at $0.05 by year-end, making our hashcost is highly competitive. When compared to the sensitivity table for hashprice post halving, it is hard to imagine a scenario where our hashcosts would operate at a loss. On the contrary, it is very easy to see how our low cash cost relative to hashprice scenarios positions us to capture the upside of rising bitcoin prices with quickly expanding mining margins. In summary, the upcoming halving is not something to be afraid of. Our growth plan in 2024 is positioned to make us a leader in low-cost production that at every stage in the deployment plan results in anticipated direct cost to produce a bitcoin, well below current prices. And with the relative growth that is anticipated to outpace the network, rapidly increasing our market share and revenues, all else remaining constant. With that, I will now hand the call over to Jeff Lucas for the financial review.

Jeffrey Lucas

executive
#5

Thank you, Ben. This is indeed one of the most exciting times in our company's history as we aggressively pursue our growth plans and make great strides toward 12 exahash per second in the second quarter and our 21 exahash per second target by year-end, more than a tripling of our hashrate. Turning now to Slide 15. Fourth quarter total revenue was $46 million, up 34% over the third quarter, and up 71% over the prior year. The quarter-over-quarter comparison reflects 30% higher average bitcoin price and 5% more bitcoin earned during the quarter. In the fourth quarter, we earned 1,236 bitcoin compared to 1,172 in the third quarter. Our hashrate, which does not yet include the impact of our upgrade program with 6.5% higher sequentially, offsetting an increase in average network difficulty of 9% -- excuse me, 19% over the third quarter 2023. The Fourth quarter gross mining profit was $23 million or 52% of mining revenue compared to $13 million or 38% of mining revenue in the third quarter. The gross mining profit reflects investment in advance of our growth to 21 exahash per second and other costs reflective of a larger product production operation as well as nonrecurring expenses. G&A expenses for the quarter was $13.4 million comparison to $8.4 million in the third quarter. This includes $4 million of noncash compensation versus $2 million in the previous quarter. The increase also includes higher incentive compensation payments associated with the achievement of annual performance targets, noncapitalizable professional service fees that are associated with corporate development to advance our growth initiatives for the second half of 2024 and 2025, and other recurring and nonrecurring expenses. For the fourth quarter, our operating loss was $13 million, including noncash depreciation expense of $22 million in comparison to a third quarter operating loss of $19 million, also including depreciation expense of $22 million. Our net loss for the fourth quarter was $57 million or $0.19 per basic and fully-diluted share came to a net loss for the third quarter of $17 million or $0.06 per basic and fully-diluted share. Included in net loss, our net financial expenses of $45 million, that includes a $38 million noncash charge for the revaluation of financial liability for warrants issued in earlier financings. For a background about these warrants. During the preparation of our annual financial statements, we reassessed the application of IFRS accounting standards when the accounting of private placement financing is closed in the first 6 months of 2021, almost 3 years ago. In complication with our corporate counsel and accountants, it was a terming that the warrants associated with the financing should be treated as a financial liability rather than as equity. Accordingly, the financial statements for 2022 were restated to reflect this accounting. It's important to bear in mind that these are noncash adjustments and do not have any impact on our reported adjusted EBITDA. More information details can be found in our 2023 financial statements and MD&A, which were filed today. Turning our attention now to bitcoin production cost and profitability. In the fourth quarter, Bitfarms' direct cost of production per bitcoin, which is the overall electricity cost of mine bitcoin was $16,200 down from $15,900 per bitcoin in the third quarter of 2023. The approximately 4% lower cost of bitcoin primarily reflects a reduction in the overall cost of electricity from $0.045 per kilowatt hour to $0.42 per kilowatt hour. This in turn was driven by a 6-month contract with Argentina's power producer entered into November that lowered our electricity costs at $0.021 per kilowatt hour, the lowest in our network. This gave Argentina a direct mining cost of less than $7,700 per bitcoin. With Argentina representing about 22% of our overall bitcoin production to benefit their corporate electricity rate and the direct cost of production will be even greater in the first quarter of 2024, as we have had the lower rate in effect for the full quarter. Our direct cost since February of 2022 includes a 15% value-added tax in Canadian energy costs as a result of legislation enacted last year. We firmly believe that we are exempting this incremental tax, and are pursuing a revenue ruling with the Canadian and Quebec tax authorities to formalize our exempt status. With Canada representing about 2/3 of our productive capacity, our corporate electricity rate during the quarter without this tax would have been $0.037 per kilowatt hour in comparison to our reported rate of $0.42 per kilowatt hour. And our direct cost at BTC would have been approximately $14,600, $1,600 lower than that we reported. Now, on to adjusted EBITDA on Slide 16. Adjusted EBITDA for the fourth quarter effectively doubled over the third quarter to $40 million or a 30% adjusted EBITDA margin in comparison to 9% in the previous quarter. The adjusted EBITDA equates to cash profitability per bitcoin in the fourth quarter of $11,200 more than double the $5,400 profitability for bitcoin in the third quarter. I would like now to take a minute here to discuss how our adjusted EBITDA reporting is different than that of our peers. As a Canadian company, we follow international financial reporting standards, otherwise known as IFRS. Under IFRS, we do not mark to market our bitcoin holdings, and accordingly, we do not reflect the unrealized gains and losses from our bitcoin holdings in our income statement and our profitability. Similarly, we do not include these unrealized gains and losses in our adjusted EBITDA. Adjusted EBITDA for us is purely and consistently a measure of the cash profitability of our operations, and does not reflect the change in value of our assets and liabilities. It's a very straightforward and transparent calculation. They simply on our cash profit of $11,200 for each of the 1,256 bitcoin earned, plus roughly $200,000 profits generated at our bulk subsidiaries. That's it. It is that straightforward. We believe, by the way, that the exclusion of balance sheet changes in our adjusted EBITDA, including our bitcoin treasury is a truer measure of the financial performance and the cash-generating capability of our operating activities. Turning now to Slide 17 and our liquidity. At December 31, we held cash of $84 million and bitcoin valued at $34 million for total liquidity of $118 million. This compares to $47 million of cash and $56 million of liquidity at September 30. During the fourth quarter of 2023, of the 1,236 bitcoin earned, we sold 1,135 to generate $42 million of proceeds to fund our operating and debt requirements. In the fourth quarter of '23, we raised a total of $52 million in net proceeds from finance activities, $41 million through a private placement completed in November, and an additional $11 million in December from the exercise of warrants related to the private placement. These funds were specifically earmarked for our growth initiatives and our fleet upgrade plan. During the quarter, we paid down $6 million in debt, leaving us with the remaining balance of $4 million at December 31. In the current quarter, we paid down the remaining balance, and I am very pleased to say, in February, we met our stated target of having no debt in our balance sheet in advance of halving Lastly, I want to speak of the accretive nature of our mining upgrade program. The 36,000 mine of purchase we announced in November represents a very accretive application of our invested capital. For an incremental capital deployment of about $100 million, we plan to increase our hashrate from 6.5 exahash per second to 12 exahash per second. This represents a marginal cost of about $18,000 per petahash. I'll note that a common lease valuation metrics, public miners is enterprise value for petahash. While this metric can vary among miners, the average for our sector overall is about $66,000 for petahash. By extension of its industry metric, we are redeploying -- we are deploying about $100 million of capital to create $360 million of incremental shareholder value. Looking ahead, we expect to achieve a similar return on our invested capital with our purchase option for 28,000 additional T21 miners. With that, I will now hand the call over to Geoff for concluding remarks.

L. Morphy

executive
#6

Thank you, Jeff. Let's turn to Slide 18. In summary, Bitfarms is a prominent player in the bitcoin mining sector, offering investors high-quality leverage exposure to bitcoin by our advanced operational capabilities and mining infrastructure. With an industry-leading yield per exahash, Bitfarm distinguished itself through exceptional margin performance, demonstrating operational efficiency and profitability in a highly competitive industry. And we are well prepared to navigate the upcoming bitcoin halving. This preparation is underpinned by our robust balance sheet and strong liquidity, which are crucial for sustaining growth and capitalizing on new opportunities in this volatile market. Led by a strong leadership team with a proven track record of driving profitable growth, our expertise and strategic vision have been instrumental in our success over the past 6 years, including a previous halving event. Furthermore, Bitfarms commitment to ESG reflects our dedication to sustainable and responsible mining practices. It's gratifying that our largest projects now under development will draw power from the Itaipu Dam, the third largest hydropower facility in the world. Overall, our strategic positioning, operational excellence, and commitment to sustainability positions us for continued growth and success in 2024 and beyond. With that, I'll turn the call over to the operator to begin the question-and-answer session.

Operator

operator
#7

We will now begin the question-and-answer session. [Operator Instructions]. The first question comes from Bill Papanastasiou with Stifel.

Bill Papanastasiou

analyst
#8

Yeah, good morning, everyone. Thank you for taking my questions. I just wanted to dial in on the salaries expense line. Obviously, it's increased this quarter. But from my understanding, a large portion of this headcount is obviously coming from Latin America, where expansion plans are happening in Paraguay. Can you speak to the cost of labor in the region? And how should we be forecasting this expense line item going forward?

L. Morphy

executive
#9

Good morning, Bill. Let's move that over to Jeff Lucas, our CFO, to take that question. Thank you.

Jeffrey Lucas

executive
#10

Sure. So, good morning as well, Bill. A couple of comments keep in mind here. Actually, one of the benefits of being in Latin America is that the compensation costs relative to North America are dramatically lower. So, we are certainly experiencing and to expect to get a bit of an increase there as we're building on our team, and our professional staff down there as well. Not overly material, I think going forward here. I think what's more important to understand that in the quarter that just ended, we actually had about $2.1 million of compensation associated with achieving goals and targets that were set actually in 2023, much of which is realized actually in the fourth quarter here. So, I think what's important here is that we actually showed cash compensation around $5.1 million in the quarter that just ended. To normalize this going forward, it'd be more like around $3.1 million, reflecting merit increases that we have in place for this year versus in the fourth quarter, and also the build-out of our organization overall.

Bill Papanastasiou

analyst
#11

Great. Thank you. And then how is the team -- how is the team kind of positioning? And how is the decision-making changing given the spot price depreciation and transaction fees moving higher in the market? How do you forecast incremental market opportunities following to halving at this point?

L. Morphy

executive
#12

There's a few things there. Ben, why don't you jump in and talk about the transaction fees and sort of how we account for those and how we plan for them.

Ben Gagnon

executive
#13

Sure. I have to take that question. We take a conservative approach when it comes to modeling transaction fees and potential revenue, which is why we take a look at our hashcost first. By positioning ourselves on that lower end of the operating cost curve, we basically, make ourselves in a position where irregardless of what happens with mining revenues or transaction fees, we're going to be in a position that's going to be profitable. For modeling purposes, we look at a hashcost of $0.06 per terahash. And that's something that we've had in place for the halving, for about 18 months now in our models. As we are at around $67,000 now, where the halving to happen tomorrow, we'd be at roughly $5.6 per terahash. So right about on the money for where we anticipated us to be. As we're looking forward, we're going to continue to evaluate where hashprice is, where mining prices are, and try and look at opportunities in that framework. But certainly, we're always open to accretive opportunities for us to increase our footprint and increase our hashrate in cost-effective ways.

L. Morphy

executive
#14

Bill, was that sufficient for your question or was there a little more to it?

Bill Papanastasiou

analyst
#15

Yes. I mean, maybe you can just provide a little bit more color, Geoff, in terms of how you think market opportunities looking at potential M&A in the space, following the halving, just given the better favorable market outlook?

L. Morphy

executive
#16

Happy to do that. Well, I think I've been asked a similar question, I think, quarterly for the last 1.5 years, and my answer really hasn't changed. We are excited about continuing to grow Bitfarms. We're in it for the long-term. We have a corporate development team that specializes in looking for organic and inorganic opportunities for us. We have quite a system for evaluating these opportunities. We are out there and looking for good assets, good people and opportunities to grow, whether that's in the United States, whether it's in Canada, whether it's in Latin America or elsewhere. We believe that finding surplus low-cost electricity, preferably renewable is the long-term benefit to the company. So, if somebody else has developed something that makes sense to us, and we can get it at the right price, strategically, then we're happy to layer it in. And frankly, we're looking at -- we've looked at a number of opportunities, but we remain disciplined. We do not want to overpay. There's probably opportunities very much so in the United States right now, in some of the demand response areas. They are attractive. But it has to fit within our regime. It needs to be at the right cost, and it needs to add strategic value. So, we continue to look, to halving. Everybody says there's going to be consolidation. We expect there probably will be too. We have our eyes wide open. And this company, this time around in the 4-year epoch is so much stronger and more able to react to these type of good opportunities than we were 4 years ago. So, this is an exciting time, not just for our growth this year, but to the opportunities that might present themselves.

Bill Papanastasiou

analyst
#17

Okay. Great. I appreciate the color. That's all the questions I have now.

L. Morphy

executive
#18

Thanks, Bill.

Operator

operator
#19

The next question comes from Kevin Dede with H.C. Wainright.

Kevin Dede

analyst
#20

Good morning, gentlemen. Thanks for having me on the call. I appreciate the presentation, Ben, on hashcost. I think it's only you and Harry that look at things that way. So I appreciate you peeling the onion back there on that. Geoff, would you mind talking a little about Argentina. I think Mr. Lucas mentioned a $0.021 cost there on a 6-month contract. Are you sort of scratching your head and thinking about executing on taking your 54 megawatts to 200 there, and maybe add your perception of what you've seen of the government -- drastic change in government in Argentina and how that might lead you one way or the other?

L. Morphy

executive
#21

Thanks, Kevin. Lots of good content there. So Argentina. Argentina has turned out to be quite an opportunity for us, like that $0.021 contract that we fixed for 6 months in November, which represents the summertime in Argentina was certainly a coup for us and really illustrates the exciting potential for Argentina in terms of low cost. They have all this shut-in natural gas and to be able to monetize it because it's not really able to push it into a pipeline and send it to other countries. They don't have an LNG port. So, it's there. And we've now got a government there, the Malay government -- that is pro-business that wants to reduce government bureaucracy and really transform the country. And it's exactly what is really frankly needed there. They've been plagued with high inflation for a lot of years, and it needs this type of corrective action. So about a year ago, we made the strategic decision to take our Río Cuarto place and stop at one warehouse, at least for the time being. We've got that 210-megawatt contract. It's there. And we think that things are starting to settle out in Argentina and give us the confidence that we might be able to invest again. So, there's that location. And frankly, there's other locations in Argentina too, that are very attractive and might actually offer a lower cost solution than what we have in Río Cuarto. But Río Cuarto is one that we've developed it. We've got a substation that's able to basically supply at least one more warehouse. We've got government approvals that could allow us for one more warehouse. So, that's some of the dry powder we have. But as stewards of capital, we need to be prudent. And when we went through that government change, we just didn't know. So we decided to take our foot off the pedal, relax. We found alternative opportunities in Paraguay that are completely green, and we're building that out. But certainly, Argentina represents a very attractive opportunity, especially at these prices for later this year, next year and beyond. So very exciting.

Kevin Dede

analyst
#22

Can we talk a little bit about your commentary regarding Paraguay. I understood your comments to, I guess, imply that you are not subject to curtailment restrictions. And I'm wondering how you think about that longer-term and any recourse you might have in dealing with ANDE, should they decide that they're going to need that power that they've allocated to you?

L. Morphy

executive
#23

Okay. ANDE, we've got a very open dialogue on the go with. And our first contract for the 10-megawatt facility was with a private company on a private franchise called CLYFSA. And there is some curtailment there because of infrastructure issues. And we get an adjustment to our power rate there. With ANDE though, we have -- it's more robust contracts. They're bigger. We've located very close to their high-voltage substations, and they have carefully allocated megawatts to the crypto mining sector. They haven't overdone it. They haven't put themselves into a position where they're going to be short on power. They've been very conservative. So the ANDE contracts are not subject to curtailment, unless there's an emergency situation, but these guys have these 2 large hydro power projects, including the Itaipu dam, that is producing a lot of power. And Paraguay gets a significant amount of that power, and a significant amount of that power then gets sold back to Brazil, or at least sold to Brazil on a wholesale basis because they have no place to put it. I have never heard of ANDE not having enough power, but they have had infrastructure constraints, which they are solving through upgrading their high-voltage lines, their high-voltage corridors, or substations. And the one in Paso Pe in Villarrica is strong. It's been there for a few years, and there's a blended power there. The one in Yguazu is recently constructed. It's 1.2 gigawatts. They've got 500 kV high-voltage lines leading into it. And we don't expect -- it's also closer to the Itaipu dam. So the electrons have shorter distance to go, but we just don't expect the curtailment to be there unless there's really these emergency conditions, which are -- would be highly unusual. So, it's one of the things we very much like about Paraguay is being able to operate our miners 24/7 around the clock. There's heat there, and we figure -- and since we've operated there for a couple of years, we know how to deal with that heat. So, I expect that the exahash that we'll be adding this year in Paraguay, especially with the T21 and the hydros, we're going to get a lot of active ongoing production coming out of that country. It's a solid place to do business.

Kevin Dede

analyst
#24

Just a couple of detailed infrastructure questions. One, Paso Pe, 70 megawatts. I understand that you have all the heavy-duty equipment, the substations. I'm just wondering if you have anything running there. What's actually on site now?

L. Morphy

executive
#25

I can add to this, but Ben, why don't you -- as Chief Mining, why don't you answer this question.

Ben Gagnon

executive
#26

Sure. Thanks to take that question, Kevin. Right now, what we have is we've got basically 3 buildings, which are up, and we are deploying our first MicroBT hydro miners. So those hydro miners are going to be online this month. And next month, with these buildings and the T21s, we are going to be deploying T21 in April. So, a little bit of a phased deployment, first miners coming online this month are going to be the MicroBT hydros. And next month, we are going to be the T21.

Kevin Dede

analyst
#27

So Ben, are any of the hydros running now? What sort of your immediate takeaway? And how do you see operating -- the operating requirements there versus air-cooled? I'm wondering, there's been a lot of chatter in the industry about using Immersion to defray operating costs. And I'm wondering if you've had any touch on that with this deployment so far?

Ben Gagnon

executive
#28

Sure. Well, we don't have any MicroBT hydros up and running in Paraguay right now, but we do have quite a bit of experience with immersion. Personally, I founded an immersion technology company back in 2018, where I was doing immersion with 3M and U.S. manufacturing for bitcoin mining purposes. Realistically, when we look at immersion versus air-cooled, I'm sure there are some benefits from using immersion from an efficiency perspective, but the capital expense required to set up that infrastructure versus the air-cooled infrastructure, really, we just feel is unjustified. The MicroBT hydro units are pretty different. The way that they've designed those hydro units makes it a lot more analogous to how we operate our air-cooled facilities. We have miners that are physically sitting in some sort of a server rack that can be pulled in, can be plugged back in, they can be hot swapped. When you're doing immersion technology, you've got to deal with all this fluid. You've got to deal with cleaning the miners, preparing the miners, every single time you interact with the miner. It's quite a laborious process. With the hydro miners, we expect them to be operating relatively similar way that we operate our air-cooled miners. The only thing that's really different is how that heat is pulled out of the miner itself, which from everything that we've seen so far in the test on the tours of the hydro sites that we've seen is done in a very, very clean, efficient and stable manner.

Kevin Dede

analyst
#29

Last question for me. What's on site and what's contracted for Yguazu, Geoff. I understand you have the site, not clear if you've got transformers lined up. Give us your take on meeting your timeline objectives there?

L. Morphy

executive
#30

Sure. The timeline there is we will have production by the end of the year, full production there at the end of the year. We secured the land in January, which you needed the physical address to be able to start the other studies. So there's an environmental and electrical study on the go with ANDE right now. We have hired a third-party company to -- which is an EPC contract to construct the connect at the ANDE substation, which is right across the road from us. So that's specked out. That's underway. There's approximately 7-month line of sight from when they will get that done, 7- 8- months there. There's the time line for transformers and cabling is about 7 months. It's pretty much exactly the same as what we went through at the Paso Pe site. So we expect that those orders will be going in now so that we can get the important connection points, the primary connection points in place later this year, probably fourth quarter. And we've already had the scheduling done with the T21 for going into there. So, things are coming together nicely. Kevin, the site is quite exceptional. As I mentioned, it's right across the street from the ANDE substation, which is brand new. And we will do an underground cable. It will leave the substation that will go under the road, and basically right into the field where we are now, which is nice, high ground. It's not subject to water. It's nice and firm and solid. We've got enough land to fully develop the 100-megawatt power purchase agreement there, and in fact, a bit more. So it really is a superior site.

Kevin Dede

analyst
#31

Thank you very much, gentlemen. Appreciate it. I'll turn over the floor.

Operator

operator
#32

The next question comes from Josh Siegler with Cantor Fitzgerald.

William Carlson

analyst
#33

Hey, team. This is Will Carlson on for Josh. First question, do you have any foresight into additional PPA opportunities in Paraguay?

L. Morphy

executive
#34

Good morning, Will. Yes, we do. As I mentioned earlier, they've taken a very conservative approach to bringing in bitcoin and crypto mining into the country. They've allocated megawatts, some at high voltage, some at medium voltage, sort of in the order of about 650 megawatts in total because they do not want to run out of power in the country. They wanted to go it slow, but they also want to do it in a meaningful way so that the sector has -- can go into production there and generate revenues for the company. But I do not expect any new power purchase agreements there to be let over the next couple of years, maybe just a year. It's tough to say for sure. But for the time being, they're wanting to make sure that the power purchase agreements they've signed will actually be developed. We are well on our way with ours. There are some others that are well underway. There's others that are going a little more slowly. So, I expect that if in the short term, we are to pick up a contract. It probably will not be a new contract, but one that's already been exiting. There will be an existing contract that we might be able to buy or joint venture or do something with that's already out there. But I think as we as a company and as a sector continue to develop there, I think ANDE will get more confidence. I think the government and the people will get more confidence in what we can bring to the whole country. It really is a partnership and it's still fairly early stages of that partnership. So, I think there's more there. But for the time being, we're just going to focus on developing our 170 megawatts that we already have, that we've already acquired, that were already in place, and we'll go from there.

William Carlson

analyst
#35

Great. Really appreciate that cover. And the second question. You guys have done a phenomenal job in your international expansion by all measures. I'm just curious, how are you guys thinking about future expansion opportunities within the United States?

L. Morphy

executive
#36

Well, as I commented earlier, and on earlier quarterly calls too, we think there's areas in the United States that represent really neat strategic opportunities to us. We do -- as we said in the script, we do want a balanced portfolio. And the United States is an area that we are lower than we'd like to be there. We continue to look for good opportunities there. We're looking at a couple right now, but it's early stage. We looked at many, many opportunities over the last year, 1.5 years. And for whatever reason, they just -- they haven't come together. But this year might be different, and we will continue to look. We look with a very open mind and open eyes to trying to do something very interesting there. Hopefully, something will materialize.

William Carlson

analyst
#37

Thanks for the color.

Operator

operator
#38

The next question comes from Lucas Pipes with B. Riley.

Unknown Analyst

analyst
#39

Hi. This is actually [ Frederick Chaplin ] asking questions on behalf of Lucas Pipes. Congratulations on paying down debt. And my first one, maybe for Ben, as it's more technical. I want to talk more a little bit about outperformance of T21. So, you said when they outperformed the manufacturer specifications in both normal and high-energy mode. Can you talk more a little bit how high you will castrate readings? And what about power consumption? And I mean, how economical is to run them on -- I mean, higher-than-stated characteristics?

Ben Gagnon

executive
#40

Yes. Great question. Happy to answer it. So we have our first 12 T21 miners. And we've been -- in our tests, we've been seeing in the normal energy mode performance anywhere between 193 versus -- 193 to 195 terahash per miner at the same exact energy efficiency that is specified by the manufacturer of that 19 watts per terahash level. In a high energy mode, most of our miners are operating between 235 and 238, but we see miners go up to 241, and that's actually better than the energy efficiency mode that was promised by Bitmain. So, that's just under the 22 watts per terahash that they advertise. If you go back and you take a look at that hashcost table that I showed you, you can see that, that 22 watts per terahash efficiency, especially with our really low cost of power around $0.04 is incredibly attractive and incredibly profitable. And so, by squeezing more units more harshly out of the unit, effectively, what we could get is a cheaper miner, both in terms of absolute costs because it's less than -- it's a lower price than AS-21. And we also get a significantly lower effective cost per carcass that we purchase. So, when we bought these miners at $14 a terahash, that's at a 190 spec. But when we operate them at the 233 or this kind of 235 range, that number goes down significantly below 14%, down into, I think, around 1,130 or 1,140 if my memory is correct for terahash. So, we get a lot more out of the miners. They generate greater levels of profitability and a faster payback.

Unknown Analyst

analyst
#41

I appreciate a color, Ben. That's very interesting and exciting here. And my second one, maybe about the cadence of additional capital rights in 2024 to finding your stated growth, and maybe potential M&A opportunities. How you were going to raise funds for this, if it's the case? Thank you.

L. Morphy

executive
#42

Over to you, Jeff Lucas.

Jeffrey Lucas

executive
#43

Great, thank you. Good morning, Frederick. So, a couple of comments there. First of all, our liquidity still continues to be very strong comparable to the level that we reported in December. And this is actually after having made substantial payments towards the 36,000 miner that were part of the upgrade that we announced in November 28 here. So when you think about the numbers overall, that liquidity level that we had in mind, as we're going forward here and we're bringing the operations in line, particularly done in Paraguay here, the business overall has the capability really to be generating about $7 billion of cash flow above operating expenses per month. And bear in mind that the fact that we've actually paid down our debt in February in full, except for lease obligations, which are small. That brings additional $2 million as part of that $7 million here. So, we're in pretty good shape overall here. We do have further expenditures involved here in the CapEx side as we're continuing to build out of Yguazu and Paso Pe, and what's happening by Como here. And that's roughly around maybe the $40 million level. And then we have a continued payments on the 36,000 miners. And if we were to exercise the option coming to play as well as well. So generally, in the cash position, we're pretty good. But all that being said, we are considering and intend getting attention to additional potential rates in the marketplace. And I do really want to underscore here that any capital raise that we do, we always do with an eye was what is going to be the accretive element that's going to benefit our shareholders. An example I gave here in my script here, we were spending about $95 million on the 36,000 miners here, yielding about $350 million of incremental value to our shareholders. That is a key element and a key metric that we look at as we consider whatever fundraising we're going to be doing going forward.

Unknown Analyst

analyst
#44

I appreciate all the color here, Jeff. And my last one, just trying to squeeze in, high level one. We know we already talked about M&A opportunities and industry consolidation potential for halving. But in your opinion, at the current economic environment, the current B2C pricing, less efficient miners, but we're still efficient. And don't you think it could be less M&A for halving if these conditions persist? Thank you.

L. Morphy

executive
#45

I think you're right. Originally, with the halving coming up, we thought probably 25%, maybe even 30% of the network hashrate would come off from the less efficient miners. That's what's happened in the past. But this time with the ETFs, the demand, the price going up to an all-time high, effectively like 5 weeks ahead of the halving, these are different market conditions that are prevailing right now. We are in a transitionary market, a paradigm shift, as I said in my script, and things at this point are different this time. And as a result, I think it's probably going to give a longer life span of some of those less efficient miners. It's going to make some of the miners that maybe have been struggling because of older machines, not getting the same type of margins, maybe not the same type of access to capital. it allowed them to continue to carry on as opposed to either going out of business or seeking somebody larger, can come and upgrade their operations. So I think you're right there. It may not have the same level of M&A activity and consolidation as we probably thought even a few months ago.

Unknown Analyst

analyst
#46

I appreciate all the color and details around here. Thank you very much, guys, and continue. Best of luck. Thank you.

L. Morphy

executive
#47

Thank you.

Ben Gagnon

executive
#48

Thank you.

Operator

operator
#49

And we have a follow-up from Kevin Dede from H.C. Wainwright.

Kevin Dede

analyst
#50

Well, thanks for staying on gentlemen. Appreciate it. Ben, you showed a shot of the T21 racked up in location in Quebec. But what wasn't clear was whether or not you're intending to run them in 3 phase or 2 phase, if you're using the same PDUs that you were using for the M30s. And what kind of CapEx requirement or any change you need to make in those legacy facilities?

Ben Gagnon

executive
#51

Yes. Great question. One of the advantages of the T21 is kind of the robust design of it, and that includes a pretty powerful power supply unit that operates at 3 phase. So, in order to support that, we are upgrading all of our PDUs to smart PDUs that supply the power in 3 phases. So, if you look back on that photo, what you can see, as you can see, the PDU that's above the T21 looks pretty different than the PDU that's below. The upgrade process there is incredibly simple. Basically, the panel goes right up to the rack, and then you've got a one plug from the PDU directly into the panel and the breaker there. We don't even need to change the cable. We just need to change the PDU that's plugged into the cable. So, that plug-and-play nature of the PDU upgrade makes it really, really cost-effective and really, really quick. That is the only infrastructure upgrade that we need to make at basically every single site that we operate at. And Jeff Lucas could probably speak better to the CapEx costs associated with that.

Jeffrey Lucas

executive
#52

Actually, the CapEx cost associated with it is pretty modest, particularly very modest relative to what's involved with the mines themselves.

L. Morphy

executive
#53

But I think just -- Kevin, just to punctuate a little more with what we were seeing there. Keep in mind, 68% of these T21 are going into existing facilities in a plug-and-play installation. And when Ben said it was pretty straightforward, yes, we are upgrading the racks modestly, but we're ready to go. It really is a straightforward and certainly less complex build-out with substantial gains than building new infrastructure. So this -- when we said this is going to be the fastest, most thematic increase expansion in our company history, it's true. And this is why, and fortunately, it's so cost-effective, and frankly, simple in comparison to building new facilities. We have our hands full with the two big installations in Paraguay that are going to take the other miners, but this is going to be a big year for us. And fortunately, most of it is fairly straightforward. So, I just wanted to add that. Thanks, Jeff. Thank you very much, gentlemen. Appreciate you following up with me. Thank you.

Kevin Dede

analyst
#54

Thanks Geoff. Thank you very much, gentlemen. Appreciate you following up with me. Thank you.

Jeffrey Lucas

executive
#55

Thank you, Kevin.

Operator

operator
#56

This concludes our question-and-answer session. I would like to turn the conference back over to Geoff Morphy, CEO, for any closing remarks.

L. Morphy

executive
#57

Thank you all for attending today's conference call. We look forward to updating you with our monthly reports, other developments, and on our Q1 2024 conference call in May. Thank you for attending.

Operator

operator
#58

The conference has now concluded. Thank you for attending today's presentation. You may now disconnect.

For developers and AI pipelines

Programmatic access to Keel Infrastructure Corp. earnings transcripts and 32,000+ others is available through the EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.