Keel Infrastructure Corp. (KEEL) Earnings Call Transcript & Summary
March 7, 2024
Earnings Call Speaker Segments
Tracy Krumme
executiveThanks, and good morning to all of you for joining us on this conference call covering Bitfarms' results for the fourth quarter and the full 2023 year-end. Joining me today are Geoff Morphy, who serves as President and Chief Executive Officer; Jeff Lucas, our Chief Financial Officer; and Ben Gagnon, our Chief Mining Officer. Prior to getting started, I want to point out that a webcast of this call is being held alongside a presentation that goes with it. You can find today's press release along with our presentation on our site, bitfarms.com, in the Investor section. Moving to slide two. I'd like to remind all of you that during this call, we will be making certain forward-looking statements, and results in the future might differ from what those statements imply. These forward-looking statements rest on certain assumptions and carry risks and uncertainties, and I'd encourage you to look at Bitfarms' MD&A as well for a full listing of them. Be aware that we will reference certain measures that are not recognized under IFRS, which means they might not be comparable to similar measures that other companies present. We ask listeners to check today's press release and our MD&A for the definitions of those non-IFRS measures along with their reconciliations to IFRS measures. Also note that unless stated otherwise, all financial references are given in U.S. dollars. Moving to slide three. At this point, I'm happy to hand the call over to Geoff Morphy. Jeff, please go ahead.
Geoff Morphy
executiveThanks, Tracy, and thanks to all of you for being with us today. It's a pleasure to present and talk through our Q4 and full year results at what is such an exciting moment for the industry. Several converging catalysts are driving very bullish sentiment, and that is pushing the Bitcoin price sharply higher and lifting Bitcoin's market cap past $1.3 trillion. Several industry factors are working in our favor right now. First, the regulatory and macroeconomic picture continues to get better. Second, the SEC recently gave the green light to Bitcoin ETFs, and that's bringing in retail and institutional money fast. Third, there's the Halving coming up, and Ben will go into more detail on that in a moment. Fourth, Bitcoin's limited supply is having a real impact — daily demand right now is more than five to 10 times what's being produced by newly mined coins each day. And fifth, we may soon see interest rates come down around the world, which in the past has been a big positive for the Bitcoin space. All of these catalysts together have produced a sharp jump over the past two months in both interest in and money flowing toward publicly traded Bitcoin miners and Bitcoin ETFs. Exchange-traded funds have seen growth unlike anything before, pulling in more than $8 billion on a net basis. That isn't simply a one-off quirk — it represents a fundamental reshaping of how this sector operates. In part because appetite has been so relentless, Bitcoin hit a fresh record price earlier this week, a notable milestone since never before had the cryptocurrency set a new peak on the way into a halving; given that balance of demand and supply, Bitfarms appears poised for an outstanding 2024. Let's move to slide four. Before diving into today's discussion, I'd like to briefly revisit what Bitcoin actually is, the reasons we mine it, and the ways Bitfarms executes that better than others. Bitcoin boils down to a straightforward concept: code that works perfectly, embraced naturally by millions globally on an enormous scale. Through this potent technology, individuals, business builders, companies, and even nations and their governments gain the ability to take part in the most accessible, equitable, and protected financial framework anywhere in the world. The chart on the left illustrates how Bitcoin's continued uptake and natural expansion turned it into the top-performing financial asset both across the previous year and throughout the past ten years, beating the S&P 500, NASDAQ 100, MSCI World Index, and gold. We believe — and plenty of others agree — that no monetary asset on earth is harder than Bitcoin. OK, so first, a quick bit of context on who we are. Bitfarms is a global Bitcoin mining operation, and we handle everything ourselves, from top to bottom. What that means for investors is a clean, high-quality way to get exposure to Bitcoin. Because our stock trades publicly, we're opening the door for everyday investors to tap into some of the finest-run, most efficiently built, and cheapest-to-operate mining sites anywhere in the world — along with the cash flow those sites kick off. Here's the piece that gives our investment its leverage: from the day Bitfarms started back in 2017, every single day, we've mined Bitcoin for a cost that's meaningfully below what individuals, institutions, or ETFs would have to pay for it on the open market. Since we began, we've mined more than 24,000 Bitcoin. I'm happy to share that Bitfarms ranked as the top performer on the Toronto Stock Exchange for 2023, and came in eighth among NASDAQ stocks. A short while ago, I noted that our shares offer considerable leverage tied to Bitcoin's price fluctuations. Looking at the chart on your right, you'll see that across 2023, Bitfarms outperformed Bitcoin by 286%, and also beat the mining sector — as measured by the Valkyrie Bitcoin Miners ETF — by 95%. Over that year, our share price climbed 592%, compared with Bitcoin's 155% gain, which works out to a beta of about 3x. So, what allowed us to outperform Bitcoin in 2023? Let's turn to slide five. In 2023, we stayed very disciplined and made dramatic changes to our balance sheet. We increased the company's hash rate by 44% and improved our energy efficiency by 12.5%, which brought down our operating cost per terahash. We also retired 85% of our debt, grew our Bitcoin held in Treasury by 99%, and closed out the year with $118 million in liquidity. In November, we unveiled a fleet upgrade that changes the game, through a contract to acquire as many as 63,888 Bitmain T21 miners. So these powerful new rigs, along with the new sites we're in the process of constructing, mark a significant transformation and put Bitfarms in position to increase our hash rate threefold, reaching 21 exahash before 2024 ends, while improving energy efficiency by up to 34%, getting us to 23 watts per terahash. That's not just the biggest expansion we've seen in six years of operating — equally important, the integrated strategic growth plan we've put together should deliver what we anticipate will be the sector's largest relative improvement in energy efficiency during this year. Moving on to slide six, I want to go deeper into how this transformative, accretive fleet upgrade initiative will impact us, and also talk about our approach to financial discipline and keeping costs under control. Starting this month up in Quebec, we're kicking off a fleet refresh, and the first step is pulling about 11,000 M31S and M31S+ units and putting in the first wave of T21 machines. That really highlights how lean our operations are — those M31S rigs happen to be both the oldest and the least efficient ones we own, picked up back around the 2020 halving, yet they're still turning a profit, which comes down to our low power costs and the strength of our operational efficiency. Across that four-year stretch, this group of miners has earned back more than five times what they originally cost, which speaks to some very solid ROI. Looking at each individual machine, when we swap out an M31S and bring in one of the new T21 miners, the energy efficiency improves by two times, which brings our operating cost per terahash down by half. Hash rate and mining revenue from each unit will climb by nearly three times as well. That holds true if all other conditions remain unchanged. On a per-unit level, the gains we get from replacing those M31S machines will be more than enough to offset whatever the coming halving does. Moving on to slide seven. Roughly 68% of the T21s we've ordered are destined for farms we already operate, and most of those are going to our Quebec sites. By leveraging our current infrastructure, the upgrade essentially works as a plug-and-play process, greatly cutting CapEx needs, risks, and complexity; this low-risk, low-cost growth approach delivers immediate and concrete advantages to Bitfarms and our investors. Since the initial group of miners is scheduled for an upgrade during this month, we're happy to share that our major fleet modernization program is progressing nicely, staying on schedule and within the planned budget. Moving on to slide eight. I'd like to discuss what we've accomplished in Paraguay, the location where the bulk of our new site construction is taking place and where we intend to bring more than 26,000 additional miners into operation during this year. Within Paraguay, we currently have two new farms being built, and both remain on course to be energized before this year ends. At our Paso Pe location, the earliest miners are expected to begin operating this month, followed by additional ones in April. For our company, Paraguay represents a key growth market. The two farms we're building are going to deliver numerous corporate advantages that add value, among them: advantageous locked-in electricity agreements priced at $0.039 per kWh prior to VAT; contracts for power with ANDE that aren't tied to inflation; zero mandatory curtailment obligations, which allows as much as 100% uptime; fully renewable power; rapid timelines for development, building, and installation; remarkably cheap construction expenses and skilled labor; and finally, being an early entrant, which gives Bitfarms a substantial share of electricity capacity dedicated to the crypto mining industry, positioning us to become Paraguay's biggest miner by the close of the year.
Geoff Morphy
executiveMy trip there not long ago confirmed why putting more money into that nation makes sense. Hydropower is plentiful and cheap, there's a capable workforce, public backing for cryptocurrency and Bitcoin mining, and above all, support from ANDE, the main power company. ANDE gets how Bitcoin mining serves as a digital electricity line, sending their surplus hydropower out to a worldwide market. Through power contracts signed with Bitfarms, they can monetize and get better use out of the infrastructure assets they already have. On top of that, money earned from Bitcoin miners lets them fund rebuilding and growth of a large share of their home power infrastructure, which helps generations ahead and lines up the interests of Bitfarms, ANDE, and Paraguay. Moving to slide nine; with small upgrades in progress and the first development phase at Paso Pe almost finished, we remain on track and on schedule to deliver 12 exa hash by the end of June 2024. Notably, since Bitcoin's price and spot miner prices have climbed, the 28,000 miner option we bought in November sits in the money. Exercising that option matters greatly for reaching 17 exahash per second, and via this exercise, we intend to take delivery of T21 miners during this year's third and fourth quarters, matching the construction schedule at Yguazu. Although these carefully built plans lift our hash rate to 17 exahash per second, we aim for over a threefold increase this year, reaching 21 exahash per second. If market conditions stay favorable, we are actively weighing more farm expansions, new developments, acquisitions, and additional miner redeployments to hit this 21 exahash target by the end of 2024. Given the many actionable opportunities in our pipeline, we are well positioned to grab accretive growth opportunities to fill the remaining 4 exahash this year. Moving to slide 10. Let's examine our pro forma portfolio, built on the plans I just described. Once we have successfully deployed 63,888 T21 miners via the transformative fleet upgrade plan and the new farm developments at Paso Pe and Yguazú, our portfolio will be fully rebalanced geographically and economically. The expected result is: One. Greater operating efficiencies, with 79% of our miners running at 22 watts per terahash and none running above 30 watts per terahash. Two. A competitive mix of low-cost electricity and high uptime. Three. Greater geodiversification, with no single country providing more than 50% of our hash rate and revenue. Four. Gains from mostly stable hydro power rates, making up roughly 85% of our portfolio. If nothing else sticks from this update, our transformative fleet upgrade stands out, both in scope and in its capacity to drive meaningful gains across three key performance indicators: hash rate, energy efficiency, and our direct cost to mine, also known as hash cost. Every one of our current sites, plus those still being built out, is going to receive these upgrades, so that we're positioned for the halving as well as the bull market that so many expect to follow it. At this point I'll hand things over to Ben Gagnon, who serves as our Chief Mining Officer, so he can walk through how our operations and finances are performing along with the different assumptions we're using once the halving has occurred.
Ben Gagnon
executiveThanks, Geoff. It's a genuine pleasure to be on this call with everyone. This halving will be my third, and it's the company's second, but for a lot of investors joining today, it's probably their first. So I believe it's worth taking a few minutes to go over the halving, the economics of mining, and our thinking on both. To put it plainly, halvings — the way Bitcoin's founder originally designed them and the way they've played out over time — act as catalysts that generate greater economic value. On the mining side, when the block reward drops by 50%, fewer Bitcoins get mined, and that, all else being equal, gives miners an incentive to reduce costs. At the same time, it means the daily supply of new Bitcoins that would otherwise be sold off to cover operating expenses is likewise halved, tightening supply against demand and, as a result, pushing prices up. Let's move to slide 12. Looking back, every halving epoch tends to follow a comparable pattern: Bitcoin's price climbs faster than the network hash rate is able to expand during the three to 18 months after a halving, which causes mining revenue and margins to grow rapidly and encourages additional network growth. For miners, being positioned on the right side of the cycle matters greatly for maximizing returns, and it's a central element of our 2024 growth strategy. Even though every cycle yields 50% fewer Bitcoins in revenue than the one before, because BTC prices rise, the economic value of total mining revenue measured in dollars grows dramatically with each halving epoch, producing a substantially bigger industry with more economic activity even with the decline in BTC terms. Notably, three very distinctive features set this cycle apart from prior halvings: the China mining ban in 2021, the arrival of ETFs in January, and the fact that Bitcoin has just reached a new all-time high as the halving approaches. That's never occurred before, and with only 450 new Bitcoins projected to be mined each day post-halving, versus current ETF demand of as much as 10,000 Bitcoins per day, it could mean the scale of this next cycle will be unprecedented. But all of that is revenue, and apart from hedging activities, miners have very little control over revenue. Our costs, though, are fully within our control, which is why at Bitfarms we approach mining with a hash cost-first mindset. Let's turn to slide 13. Energy efficiency on its own means nothing if electricity costs aren't factored in. That's the reason we focus on the blended number, hash cost. Hash cost is simple to calculate — just multiply energy efficiency by energy price across 24 hours. That gives you the direct energy cost of operating per unit of compute per day, expressed in dollars. Through 2024, as we carry out the upgrades and build-outs we have planned, we anticipate an 11% gain in efficiency, moving from 35 watts per terahash at present to 31 watts per terahash once Q1 wraps up, then 29% to 25 watts per terahash when Q2 closes, and 34% to 23 watts per terahash at the finish of the year, pushing our hash cost lower by comparable margins. As Geoff said before, we think these gains in energy efficiency and hash cost will stand as the largest our sector sees during this year. Put that next to the S21, the most efficient machine available today, and it becomes clear that by the close of Q2 our projected hash cost will sit beneath what an S21 running at $0.06 can achieve, and by the finish of the year it will be essentially level with an S21 running at $0.05, which makes our hash cost extremely competitive. Looking at the sensitivity table for hash price once the halving occurs, imagining a case in which our hash cost would mean running at a loss is difficult. Conversely, it is quite simple to see how our modest hash cost against those hash price scenarios puts us in position to benefit from climbing Bitcoin prices through mining margins that widen quickly. To sum up, there is no reason to fear the halving ahead. Our 2024 growth plan should establish us as a leader in low-cost production, one where each phase of the deployment plan yields projected direct costs for producing Bitcoin far under present prices, alongside relative growth expected to exceed the network's pace, lifting our market share and revenues fast, with all else held constant. I will now pass the call to Jeff Lucas for the financial review.
Jeff Lucas
executiveThanks, Ben. This is genuinely one of the most exciting points in our company's history, since we're pressing ahead aggressively with our growth plans and getting much nearer to 12x exahash per second in the second quarter, and to our target of 21x exahash per second by year-end — a greater than threefold increase in our hash rate. Let's turn now to slide 15. Fourth quarter total revenue was $46 million, 34% higher than the third quarter and 71% above the prior-year period. That quarter-over-quarter comparison reflects a 30% gain in the average Bitcoin price and a 5% rise in Bitcoin earned during the quarter. In Q4 we earned 1,236 Bitcoin, compared with 1,172 in Q3. Our hash rate, which doesn't yet capture the impact of our upgrade program, was up 6.5% quarter over quarter, offsetting a 19% increase in average network difficulty versus the third quarter of 2023. Gross mining profit in Q4 was $23 million, or 52% of mining revenue, compared with $13 million, or 38% of mining revenue, in Q3. That gross mining profit number reflects investment in advancing our growth toward 21 exahash per second, plus other costs related to a bigger product production operation and non-recurring expenses. G&A expenses totaled $13.4 million for the quarter, versus $8.4 million in Q3. That includes $4 million of non-cash compensation, compared with $2 million in the prior quarter. The increase also reflects higher incentive compensation payments tied to achieving annual performance targets, non-capitalizable professional service fees related to corporate development work supporting our growth initiatives for the second half of 2024 and 2025, and other recurring and non-recurring expenses. For Q4, our operating loss was $13 million, which included $22 million of non-cash depreciation expense, versus a Q3 operating loss of $19 million, which also included $22 million of depreciation expense. Our Q4 net loss was $57 million, or $0.19 per basic and fully diluted share, compared with a Q3 net loss of $17 million, or $0.06 per basic and fully diluted share. Within that net loss are $45 million of net financial expenses, including a $38 million non-cash charge for the revaluation of financial liability for warrants issued in earlier financings. For background on those warrants: while preparing our annual financial statements, we revisited how IFRS accounting standards should apply to the accounting of private placement financings that closed in the first six months of 2021, almost three years ago. After consulting with our corporate counsel and accountants, it was concluded that the warrants tied to those financings ought to be treated as a financial liability rather than as equity. As a result, the financial statements for 2022 were restated to reflect this accounting. Our power cost came in at $0.037 per kilowatt hour, and we ended the period with $66 million of liquidity. It's worth remembering these adjustments don't involve actual cash and therefore don't change our reported adjusted EBITDA at all. More information and specifics can be found in our 2023 financial statements and MD&A, both of which were filed today. Now let's turn to our cost of producing each Bitcoin and the profitability that comes with it. In Q4, Bitfarms' direct production cost per Bitcoin — that is, the full electricity expense of mining one — was $16,200, versus $16,900 per Bitcoin in Q3 of 2023. That decline of roughly 4% in cost per Bitcoin is mainly attributable to cheaper electricity overall, falling from $0.045 per kWh to $0.042 per kWh. That reduction, in turn, came from a six-month agreement signed in November with Argentina's power producer, which lowered our electricity price to $0.021 per kWh — the lowest anywhere on our network. Consequently, Argentina's direct mining cost came in below $7,700 per Bitcoin. Because Argentina represents about 22% of the Bitcoin we produce in total, the improvement to our company-wide electricity rate and to direct production cost ought to be even greater in Q1 of 2024, since the lower rate will have been in effect for the whole quarter. Our direct cost in February of 2022 includes a 15% value-added tax on Canadian energy costs, under legislation passed last year. Our position is firm that this added tax shouldn't apply to us, and we're pursuing a revenue ruling with the Canadian and Quebec tax authorities to formalize our exempt status. With Canada representing approximately two-thirds of our productive capacity, without this tax our corporate electricity rate for the quarter would have been $0.37 per kWh rather than the $0.42 per kWh we reported, and our direct cost to BTC would have been about $14,600 — $1,600 below what we reported. Turning to adjusted EBITDA on slide 16. Adjusted EBITDA for Q4 nearly doubled versus Q3, hitting $14 million, equal to a 30% adjusted EBITDA margin compared with 9% in the previous quarter. That adjusted EBITDA equates to cash profitability per Bitcoin of $11,200 in Q4, over twice the $5,400 per Bitcoin profitability recorded in Q3. Let me take a moment here to clarify how our adjusted EBITDA reporting differs from that of our peers. As a Canadian company, we report under international financial reporting standards, or IFRS. IFRS doesn't oblige us to mark our Bitcoin holdings to market, so unrealized gains and losses on those holdings never appear in our income statement or our profitability. Likewise, those unrealized gains and losses form no part of our Adjusted EBITDA either. For us, Adjusted EBITDA serves strictly and consistently as a measure of the cash profitability of our operations, and it reveals nothing about shifts in the value of our assets and liabilities. The calculation is fairly simple and transparent. The way I see it, we earned 1,236 Bitcoin, and each one delivered $11,200 in cash profit, and on top of that our Volta subsidiaries kicked in roughly $200,000 of profit — that's the whole story. There's nothing more to it. While we're on the subject, excluding balance sheet moves from our Adjusted EBITDA—including our Bitcoin treasury—strikes us as giving a truer read on both the financial results and how well our operating activities turn cash. Turning now to slide 17, let's look at liquidity. Our cash position on December 31st was $84 million, and with $34 million of Bitcoin on hand, total liquidity reached $118 million. Compare that with September 30th, when we had $47 million of cash and $56 million of liquidity. During 2023's fourth quarter, of the 1,236 Bitcoin we earned, we sold 1,135, which brought in $42 million of proceeds to meet our operating needs and debt service obligations; in that same 2023 quarter, financing activities delivered $52 million in net proceeds overall—$41 million came from a private placement we closed in November, and $11 million more arrived in December through warrant exercises connected to that placement. We directed those funds squarely at our growth initiatives and fleet upgrade plans. Debt went down by $6 million across the quarter, leaving $4 million outstanding as of December 31st. In the current quarter, I'm happy to say, we retired the remainder; by February we had achieved the no-debt balance sheet goal we'd set out ahead of the halving. Last, I want to talk about how accretive our mining upgrade program is. Buying 36,000 miners, which we announced in November, puts the capital we've invested to highly accretive use. Deploying roughly $100 million of incremental capital, we plan to raise our hash rate from 6.5 exahash per second to 12 exahash per second. That comes to a marginal cost of about $18,000 per petahash. Worth noting: enterprise value per petahash is a valuation metric public miners commonly use. It varies from miner to miner, but across the sector the average is roughly $66,000 per petahash. Applying that industry metric, we're deploying about $100 million of capital to create $360 million in incremental shareholder value. Looking ahead, via our purchase option for 28,000 additional T21 miners, we expect to earn a similar return on invested capital. With that, I'll hand the call to Geoff for his closing remarks.
Geoff Morphy
executiveThanks, Jeff. Moving on to slide 18. To sum up, Bitfarms holds a leading position within Bitcoin mining, giving investors leveraged exposure of high quality to Bitcoin through our sophisticated operations and mining infrastructure; thanks to an industry-best yield per Exahash, Bitfarms stands apart by way of outstanding margin performance, showing operational efficiency and profitability within a fiercely competitive industry, and we are ready to handle the coming Bitcoin halving. That readiness rests on our solid balance sheet and strong liquidity, both essential for maintaining growth and seizing fresh opportunities in this volatile market. Guided by a capable leadership team with a demonstrated history of generating profitable growth, our expertise and strategic vision have played a key role in our achievements across the last six years, encompassing a prior halving event. In addition, Bitfarms's commitment to ESG mirrors our dedication to sustainable and responsible mining practices. It's pleasing that our biggest projects, currently being developed, will source power from the Itaipu Dam, the world's third-largest hydropower facility. All in all, our strategic positioning, operational excellence, and commitment to sustainability set us up for continued growth and success in 2024 and beyond. With that, I'll hand the call to the operator to start the question-and-answer session.
Bill Papanastasiou
analystHello everybody, and thanks for letting me ask a few things. I'd like to focus on that salaries expense line. It clearly went up during this quarter, but as I understand it, a big chunk of that added headcount is coming out of Latin America, where Paraguay is part of the expansion push. Could you talk about what labor costs look like in that region, and what should we assume for that expense line item in future periods?
Geoff Morphy
executiveMorning, Bill. I'll hand that one to Jeff Lucas, our CFO, to answer. Thanks.
Jeff Lucas
executiveAlright, and good morning to you too, Bill. There are a few points I want to flag here. In fact, one advantage of having operations in Latin America is that what we pay in compensation is far less than what it costs in North America. So we're definitely seeing, and we anticipate seeing, some increase as we expand our team and our professional staff in that region. I don't think it will be too significant as we move forward. What matters more, I believe, is recognizing that during the quarter we just closed, we had roughly $2.1 million in compensation tied to hitting goals and targets that were established back in 2023, a good portion of which actually came through in the fourth quarter. So the key takeaway, I think, is that we reported cash compensation of approximately $5.1 million for the quarter that just ended. If we normalize that going forward, it would be closer to about $3.1 million, which accounts for the merit increases we've implemented for this year compared with the fourth quarter, along with the overall expansion of our organization.
Bill Papanastasiou
analystThanks, that's helpful. So how is the team positioning itself, and in what ways is decision-making shifting now that spot prices have risen and transaction fees are climbing across the market? At this point, how are you projecting additional market opportunities in the wake of the halving?
Geoff Morphy
executiveSeveral points come to mind there. Ben, why don't you take that one and cover transaction fees — how we account for them, and the way we plan around them?
Ben Gagnon
executiveAbsolutely, that one falls to me. When we model out transaction fees and the revenue they might bring, we deliberately stay cautious, and that's the reason we start by examining our hash cost. Putting ourselves down at the cheaper end of the operating cost curve essentially means that no matter how mining revenues or transaction fees turn out, we'll still land in a profitable spot. In our models, we assume a hash cost of $0.06 per terahash, and that figure has been sitting in our models for roughly 18 months now, in place for the halving. With us at approximately $67,000 right now, if the halving were to occur tomorrow, we'd come in at about $0.056 per terahash, so almost exactly where we expected to land. Looking ahead, we'll keep assessing where hash price stands and where mining prices stand, and try to spot opportunities within that framework; though of course, we're always willing to consider creative possibilities that let us grow our footprint and lift our hash rate in ways that are cost-effective.
Geoff Morphy
executiveBill, did that answer what you were asking, or did you have something further on your mind?
Bill Papanastasiou
analystYeah, so perhaps you could give us a bit more detail there, Jeff, on how you're viewing market opportunities and possible M&A in the sector after the Halving, especially with the improved, more favorable market backdrop.
Jeff Lucas
executiveGlad to. Well, I think I've gotten a comparable question pretty much every quarter over the past 18 months, and my response has stayed essentially the same. We're thrilled about keeping Bitfarms growing. We're here for the long haul. We've got a corporate development group whose focus is identifying organic and inorganic chances for us. We have a fairly robust process for assessing those chances. We're actively out there seeking solid assets, solid people, and ways to expand, whether that's in the United States, whether that's in Canada, whether that's in Latin America, or elsewhere. In our view, securing surplus, low-cost electricity, ideally renewable, delivers the long-term advantage to the company. So if another party has built something that works for us and we're able to acquire it at a sensible strategic price, then we're glad to fold it in; and honestly, we've reviewed quite a few opportunities, but we stay disciplined; we don't want to pay too much. There are likely opportunities, quite a lot actually, in the United States right now in certain demand response segments. They're appealing, but it must align with our framework. It has to come at the right cost, and it has to bring strategic value; so we keep looking. With the halving, everyone claims consolidation is coming. Our expectation is that there probably will be, as well. We're keeping our eyes wide open, and this company this time around in the four-year epoch is far stronger and much better positioned to respond to these kinds of good opportunities than we were four years ago; so it's an exciting period, not only for our growth this year, but for the opportunities that could emerge.
Bill Papanastasiou
analystAll right, that's excellent. Thanks for the additional detail. Those are the only things I wanted to ask about at this point.
Jeff Lucas
executiveAppreciate it, Bill.
Kevin Dede
analystMorning, everyone. I appreciate you including me today. Ben, your presentation on hash cost was great to hear. It seems like only you and Harry approach things from that angle, so I was glad you broke it down for us. Jeff, could you spend a bit of time on Argentina? Mr. Lucas, I believe, brought up a $0.021 cost tied to a six-month contract. Are you mulling over how to move forward with expanding your 54 MW to 200 MW there, and could you also share your take on the dramatic shift in Argentina's government and whether that pushes you toward or away from that plan?
Jeff Lucas
executiveThanks, Kevin. There's a lot to unpack in what you said. Argentina has proven to be a real opportunity for us. That $0.021 contract we locked in for six months back in November, covering Argentina's summer period, was definitely a win for us, and it really shows how exciting the potential is there when it comes to low cost; they're sitting on all this shut-in natural gas, and being able to monetize it matters because they can't really get it into a pipeline and ship it to other countries, since they lack an LNG port. So the resource is right there; we now have a government in place, the Milei government, that's pro-business, that aims to cut government bureaucracy and genuinely reshape the country. Honestly, that's precisely what's needed there. They've struggled with high inflation for many years, and this kind of corrective action is necessary. Roughly a year ago, we made the strategic call to take our Río Cuarto site and halt at one warehouse, at least for now. We hold that 210 MW contract; it's in place. We believe things are beginning to stabilize in Argentina, which gives us confidence that we could invest once more. That location exists. Honestly, there are other spots in Argentina as well that look very appealing and could even provide a cheaper option than what we have at Río Cuarto. But Río Cuarto is one we've already developed. We have a substation capable of essentially supporting at least one additional warehouse. We have government approvals that would permit us one more warehouse. So that's part of the dry powder available to us. But as stewards of capital, we have to be prudent. And when that government transition happened, we simply didn't know. So we chose to ease off the accelerator and take it easy. We identified alternative opportunities in Paraguay that are entirely green, and we're developing those. But without question, Argentina offers a very appealing opportunity, particularly at these prices for later this year, next year, and beyond. So it's very exciting.
Kevin Dede
analystCould we spend a moment on what you said about Paraguay? From your remarks, I took it that, as I understand it, you're not exposed to curtailment limits. How do you view that over the longer haul, and what options would you have for handling ANDE if they were to conclude that they need the power they've set aside for you?
Jeff Lucas
executiveAll right. So with ANDE, we maintain a highly transparent, ongoing conversation; and the initial agreement we signed, covering the 10-MW site, was actually with a private firm operating under a private franchise named CLYFSA; and curtailment does occur there owing to infrastructure problems. In that case, our power rate gets adjusted. When it comes to ANDE, however, the contracts carry more strength. They're larger in size. We've situated ourselves extremely near their high-voltage substations, and they've methodically set aside MW for the crypto mining industry. They haven't gone overboard; they haven't placed themselves in a situation of being short on power; their approach has been quite conservative. As a result, curtailment doesn't apply to the ANDE contracts, except under an emergency. Yet these folks have two sizable hydro power projects, one being the Itaipu Dam, which generates a great deal of power. A substantial share of that power goes to Paraguay, and a substantial share of it is then resold to Brazil, or at minimum sold to Brazil wholesale, since they have nowhere to put it. I've never once heard of ANDE lacking sufficient power, though infrastructure bottlenecks have existed, and they're fixing those by upgrading their high-voltage lines, their high-voltage corridors, their substations; and the facility in Paso Pe in Villarrica is robust. It has stood there for several years, and power is plentiful at that location. The one in Yguazu was built recently. It's 1.2 GW; 500 kV high-voltage lines feed into it. We don't anticipate — it's likewise nearer to the Itaipu Dam, meaning electrons travel a shorter distance. But curtailment simply isn't something we expect to see there, barring genuinely emergency conditions, which would be extremely rare. So one aspect of Paraguay we greatly appreciate is the ability to run our miners 24/7, all the way around the clock. Heat is present there, and given that we've run operations there for a couple of years, we understand how to manage that heat. So I anticipate that the exahash we'll be bringing online this year in Paraguay, particularly with the T21 and the hydros, will yield a great deal of active, continuous production from that country. It's a dependable location for business.
Kevin Dede
analystI've got a few specific questions about infrastructure. First, regarding Paso Pe and its 70 MW — my understanding is that the heavy-duty equipment is all there, along with the substations. What I'd like to know is whether anything is currently operating at that site. What exactly exists there today?
Geoff Morphy
executiveI can chime in on that, but Ben, since you're our chief of mining, how about you take this one?
Ben Gagnon
executiveAbsolutely. I appreciate you asking that, Kevin. At present, the situation is that we essentially have 3 buildings that have been erected, and we're in the process of putting our initial MicroBT hydro miners into service. As a result, those hydro miners will be up and running during this month. Then in the following month, using these buildings along with the T21s, we will be bringing T21s into deployment in April. So it's somewhat of a staged rollout. The earliest miners to go live this month will be the MicroBT hydros, and during the next month, we will be putting T21s into service.
Kevin Dede
analystSo, Ben, are any of the hydro units currently in operation? What would you say your quick impression is, and how do you view the demands of running those compared with air-cooled setups? I'm curious because there's been considerable discussion across the sector regarding immersion as a way to reduce operating expenses. And I'd like to know whether you've encountered any of that with this deployment up to this point.
Ben Gagnon
executiveAbsolutely. Currently, in Paraguay, we don't have any MicroBT hydro machines online, though we possess a fair amount of hands-on familiarity with immersion. On a personal level, back in 2018 I started an immersion tech firm, and there I was working on immersion alongside 3M and U.S. Manufacturing for the sake of Bitcoin mining. Practically speaking, when comparing immersion with air cooling, certainly immersion offers certain advantages where efficiency is concerned, yet the capital outlay needed to build out that kind of infrastructure, set against air-cooled infrastructure, is something we simply regard as not justified. The MicroBT hydro units function rather differently. Their design approach to those hydro units renders them much more comparable to the way we run our air-cooled sites. We've got miners physically placed in a sort of server rack that can be slid out, can be reconnected, and can be hot-swapped. With immersion technology, you're forced to handle all that fluid. You're forced to handle cleaning the miners and getting the miners ready. Each time you work with a miner, it's a rather laborious affair. As for the hydro miners, we anticipate they'll run in a fairly similar fashion to how our air-cooled miners run. The sole aspect that's genuinely distinct is the method by which heat gets extracted from the miner itself, which, based on everything we've observed thus far in the tests and the tours of hydro sites we've visited, is accomplished in an extremely clean, efficient, and stable way.
Kevin Dede
analystKevin, last one from me. Regarding Yguazú, Jeff — what do we have on site, and what's under contract? My understanding is the land is yours, but I'm not certain whether transformers are secured. Also, share your view on hitting the timeline targets there.
Jeff Lucas
executiveAbsolutely. On timing, production should begin before the year is out, with full output reached by year-end. We locked in the land back in January, since you needed the physical address before the other studies could get underway. At present, an environmental study and an electrical study are both in progress with ANDE. For building the interconnection at the ANDE substation — located directly across the road from us — we've brought on a third-party firm under an EPC contract. That piece is handled and moving forward. From the point they finish, there's roughly a 7-to-8-month line of sight. Transformers and cabling run about 7 months on their own timeline. This mirrors almost precisely what we experienced at the Paso Pe site. So those orders should be placed shortly, allowing us to have the key connection points — the primary ones — ready later in the year, likely Q4. Scheduling with the T21s for entry there is already complete. Everything is falling into place well. Kevin, this site is truly outstanding. As I said, it sits directly across the street from the ANDE substation, a brand-new facility, and we'll run an underground cable. That cable will exit the substation, pass beneath the road, and run essentially straight into the field where we stand now — good high ground. Water doesn't affect it. The ground is firm and solid. We have sufficient land to develop the full 100-MW power purchase agreement and actually somewhat beyond that. So it genuinely is a superior site.
Kevin Dede
analystThanks a lot, guys. I really appreciate it. I'll hand things over now.
Will Carlson
analystHi, everyone; Will Carlson here, filling in for Josh. To start off, can you give us any sense of what further PPA chances might exist in Paraguay?
Geoff Morphy
executiveMorning, Will. We do, yes. Like I said before, their strategy for letting Bitcoin and crypto mining into the nation has been quite cautious. They've set aside megawatts — a portion at high voltage, a portion at medium voltage — totaling roughly 650 MW, since they don't want the country to face a power shortage; their preference is to move slowly, yet still make it significant enough that the sector can begin operating there and bring in revenue for the company. That said, I don't anticipate any fresh power purchase agreements being granted there within the next couple of years — perhaps only a year. Hard to predict with certainty. For now, though, they want to confirm that the power purchase agreements already signed will genuinely get built out. Ours is progressing nicely. A few others are also moving along well. Some are advancing at a slower pace. So my expectation is that if we manage to secure a contract soon, it likely won't be a brand-new one, but rather one that already exists; an existing contract that we could potentially acquire, enter a joint venture on, or otherwise arrange something around, one that's already out there. Still, I believe that as we — both as a company and as a sector — keep growing there, ANDE will grow more confident. I think the government and the public will grow more confident about what we can deliver for the entire country; it truly is a partnership, and that partnership remains at a relatively early point; so I think there's more opportunity ahead. For the moment, though, our focus is simply on building out our 170 MW that we already possess, that we've already secured, that we already have operational, and we'll take it from there.
Will Carlson
analystGreat. I truly appreciate that response. Now for my second question — by every metric, you folks have performed amazingly well when it comes to growing internationally. I'm just wondering, how are you thinking about possibilities for expanding going forward inside the United States?
Geoff Morphy
executiveWell, like I mentioned before, and on previous quarterly calls as well, we believe there are regions in the U.S. that offer genuinely attractive strategic prospects for us. As we noted in the script, a balanced portfolio is what we're after, and the U.S. is a market where our presence is smaller than we'd prefer. We keep searching for solid opportunities there; a couple are being examined at this moment, though it's still early days. Over the past 12 months to 18 months, we've reviewed a great many opportunities, and for one reason or another, they haven't worked out. That said, this year could be different, and we'll keep looking. Our approach is very open-minded and open-eyed as we try to pursue something quite compelling there, and hopefully something will come to fruition.
Will Carlson
analystAppreciate the cover. Our following question is from Lucas Pipes at B. Riley. Please proceed.
Fedor Shabalin
analystHello. Fedor Shabalin here, posing questions for Lucas Pipes. Congrats on the painting work down there; my initial one might be directed at Ben since it leans technical. I'd like to dig a bit further into how the T21s are exceeding expectations. You mentioned that during your testing, they beat the manufacturer's specs in both standard and high-energy settings. Could you elaborate a bit on what hash rate figures you observed, plus what happened with power usage and, I mean, how viable is it to operate them, I mean, beyond the advertised specs?
Ben Gagnon
executiveYeah. Excellent question. Glad to address it; so we possess our initial 12 T21 miners, and through our testing, we've observed in the standard energy setting output ranging from 193 up to 195 terahash for each miner while achieving the identical energy efficiency the manufacturer lists at that 19 W per terahash mark. Under a high-energy setting, the majority of our miners run somewhere between 235 and 238, though we've witnessed units reaching as high as 241. And that actually surpasses the efficiency mode Bitmain had pledged. So it lands just beneath the 22 W per terahash they promoted. Should you revisit and examine that hash cost table I presented to you, you'll notice that 22 watts per terahash efficiency, particularly given our extremely cheap power near $0.04, is remarkably appealing and remarkably lucrative; and thus by extracting additional units, additional hash rate from each unit, essentially, what we stand to achieve is a more affordable miner, both regarding outright cost since it's below the it's a reduced price compared to the S21. Plus we obtain a notably cheaper effective cost for each terahash we acquire; so at the time we purchased these miners for $14 a terahash, that reflects the 190 spec. However, when we run them at 233 or that roughly 235 level, that figure drops considerably under 14, falling to, I believe, approximately $11.30 or $11.40, assuming my recollection is right, for each terahash; so we extract far more value from the miners. They deliver higher profitability and quicker payback.
Fedor Shabalin
analystThanks for all the detail, Ben. That is really intriguing and thrilling information. And the second item from me might concern the timing of further capital raises during 2024 to finance the growth you've outlined and perhaps possible M&A chances — how would we go about securing money for those, should that scenario arise? Thank you.
Ben Gagnon
executiveI'll pass it to you, Jeff Lucas.
Jeff Lucas
executiveAlright, thanks. Morning, Fedor. A few things I want to mention. To start, our liquidity remains really solid, basically in line with what we told you back in December. And that's even after we've made significant payments on those 36,000 miners tied to the upgrade we told you about on November 28th. So if you look at the whole picture, with that kind of liquidity in mind, as we move ahead and get operations running, especially there in Paraguay, the company as a whole can really produce roughly $7 billion in cash flow above operating costs each month. Also keep in mind that since we've already paid down our debt in February and fall—aside from lease obligations, which are quite minor—that adds another $2 million on top of that $7 million. So overall, we're in a fairly strong position. There are more expenditures coming on the CapEx side as we keep building out Yguazú and Paso Pe, plus what's going on at Baie-Comeau. That's approximately in the $40 million range. Then there are ongoing payments for the 36,000 miners. If we end up exercising the option as well; so generally speaking, from a cash standpoint, we're in good shape; but having said all that, we are looking at and definitely paying attention to possible additional raises in the market; and I really want to emphasize that whenever we do any capital raise, we always keep in mind what equity development will ultimately benefit our shareholders. One example I mentioned in my script: we're spending around $95 million on the 36,000 miners, which generates roughly $350 million in incremental value for our shareholders. That's a crucial factor and a key metric we consider whenever we think about any fundraising we might do down the road.
Fedor Shabalin
analystThanks for all that detail, Jeff. For my final question, I'll try to fit in something big-picture. We've already covered M&A possibilities, the potential for industry consolidation, and the portfolio. But from your perspective, given today's economic climate, the current BTC price, and less efficient miners — though they're still efficient — don't you think there might be fewer M&A deals and less portfolio activity if these conditions stick around? Thank you.
Geoff Morphy
executiveI'd say you're correct. At first, as the halving approached, our expectation was that roughly 20%, 25%, or possibly even 30% of the network hash rate would drop off from miners that are less efficient. That's what happened previously; however, this time, because of the ETFs and that demand, with the price climbing to an all-time high, essentially about five weeks before the halving, we're seeing a different set of market conditions right now; we're in a transitionary market, a paradigm shift, as I mentioned in my script. What's happening now is different this time. Consequently, I believe it will likely extend the lifespan of a number of those less efficient miners. It will let some miners who perhaps have been struggling due to older machines, not achieving the same margins, maybe lacking the same access to capital, keep operating rather than either shutting down or looking for a bigger player to come in and upgrade their operations; so I think your point is correct. We may not see the same amount of M&A activity and consolidation that we expected even a few months back.
Fedor Shabalin
analystI really appreciate all the color and details you've provided here. Thanks so much, everyone, and keep up the great work. Thank you.
Geoff Morphy
executiveThank you.
Jeff Lucas
executiveThank you.
Kevin Dede
analystWell, I appreciate you gentlemen sticking around. Thanks for that. Ben, you had a slide showing T21s installed in Quebec. What wasn't made clear, though, was whether you plan to operate those in three-phase or two-phase mode, whether the PDUs in use are the same ones deployed for the M30s, and what sort of CapEx would be needed, or what modifications those older facilities might require.
Ben Gagnon
executiveYeah. That's a really good question. The T21's robust design is one of its key benefits. That design includes a fairly strong power supply unit running at three-phase. To make that work, every PDU we have is being replaced with a smart PDU delivering three-phase power. Looking at that image again, you'll notice the PDU positioned above the T21s appears quite distinct from the one beneath them. That upgrade is extremely straightforward. Essentially, the panel is mounted directly onto the rack, after which a single plug runs from the PDU into the panel and its breaker; the cable itself doesn't need replacing at all. All that's required is swapping out the PDU connected to that cable; because of this plug-and-play aspect, the PDU upgrade ends up being very, very inexpensive and very, very fast. That represents the sole infrastructure improvement necessary at essentially each and every site in our portfolio. Jeff Lucas is probably in a better position to discuss the CapEx figure tied to it.
Jeff Lucas
executiveTo be honest, the capital expenditure tied to what Ben mentioned was fairly small—especially quite small compared with what the mining rigs themselves entail.
Kevin Dede
analystThanks, Jeff Lucas.
Jeff Lucas
executiveKevin, I want to add a bit more emphasis to what we've been observing there — bear in mind that 68% of these T21s get deployed into already-existing facilities as plug-and-play installations. And when Ben described it as pretty straightforward, yes, we are modestly upgrading the racks, but we're ready to go. Compared with constructing new infrastructure, it truly is a straightforward buildout, and certainly less complex, yet with substantial gains. So when we claimed this would be the fastest, most dramatic increase expansion in our company history, that's accurate. And here's the reason. And luckily, it's so cost-effective and, frankly, simple in comparison to building new facilities. The two big installations in Paraguay that are going to take the other miners have us with our hands full, but this is going to be a big year for us. Fortunately, most of it's fairly straightforward. I just wanted to add that.
Kevin Dede
analystKevin, thanks. I really appreciate it, guys. Thanks for getting back to me on this. I appreciate it.
Jeff Lucas
executiveKevin, thank you.
Geoff Morphy
executiveWe appreciate everyone joining this conference call today. We're eager to share our monthly updates, additional news, and details during our Q1 2024 call coming up in May. Thanks for being here.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Keel Infrastructure Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Keel Infrastructure Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Keel Infrastructure Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.