Keel Infrastructure Corp. (KEEL) Earnings Call Transcript & Summary

May 15, 2024

NASDAQ CA Information Technology Software earnings 59 min

Earnings Call Speaker Segments

Tracy Krumme

executive
#1

Thanks. Morning, everyone, and thanks for joining the Bitfarms Q1 2024 earnings call. Joining me today are Nico Bonta, our Interim Chief Executive Officer; Jeff Lucas, our Chief Financial Officer; and Ben Gagnon, our Chief Mining Officer. Before we get started, I want to point out that there's a webcast of this call along with a presentation. You can find today's press release and the presentation on our site, bitfarms.com, under the investor section. If you go to slide two, I'll remind you that we'll be making certain forward-looking statements on this call, and actual future results might differ from what those statements imply. Those forward-looking statements rest on certain assumptions and carry risks and uncertainties, and I'd encourage you to look at Bitfarms' MD&A for the full list. Also note that we'll reference certain measures that aren't recognized under IFRS, so they may not line up with similar measures other companies present. Listeners should check today's press release and our MD&A for definitions of those non-IFRS measures and how they reconcile to IFRS measures. Keep in mind that all financial figures are in U.S. dollars unless we say otherwise. I'd also like to mention that we'll be at a couple of upcoming equity conferences. There's the B. Riley Securities Institutional Investor conference in Beverly Hills, California on May 22 and May 23, plus the Northland Growth Conference, which is virtual, on June 25. If you'd like to meet with us on those dates, just reach out to me or a sales rep from those firms. Now I'm happy to hand things over to Nico Bonta, Chairman, cofounder, and interim CEO. Nico, go ahead.

Nico Bonta

executive
#2

Thanks, Tracy, and thanks to all of you for being with us today. If some of you don't recognize me, I started this company together with Board Director Emiliano Grodzki back in 2017, and I've held the chairman role on the Board ever since. You'll remember that on March 25, we put out word of a CEO transition under which Jeff Murphy would stay on as CEO until our executive search wrapped up. That said, his exit has now been moved up because of a legal claim Jeff filed against the company on Friday, May 10. That also forced us to push back our earning calls so we'd have time to fold the necessary subsequent events into our filings. Among the things Jeff claimed were damages tied to breach of contract, wrong dismissal, and aggregated and punitive damages totaling $27 million. It's the company's position that these claims have no merit, and we plan to defend ourselves vigorously. Because of this, Jeff's termination was sped up, and I took on the interim CEO role until our CEO search finishes, which we anticipate happening within the next several weeks. More than anything, I want to stress how much faith I have in the strong leadership team we've assembled, the major opportunities in front of us, and our employees' commitment to hitting our growth target decision; we foresee only minimal disruption stemming from the CEO transition. Nothing will get in the way of our 2024 growth plans, we're pushing full steam ahead, and we expect to hit the guidance we previously stated of 12 exahash in Q2 and 21 exahash in Q4; let's now move to slide four. It's my pleasure to hand the call to Ben, our chief mining officer, who'll go over our Q1 results, updates, our growth plan, and the exciting outlooks for the year to come.

Ben Gagnon

executive
#3

Appreciate that, Nico. Moving on to slide five. Ever since we made public our game-changing fleet upgrade back in November, along with some smaller acquisitions in March, the investment community has shown growing interest. Before we get into our Q1 numbers, I'd like to spend a moment giving a quick overview of the company for anyone who's new here. Bitfarms operates as a vertically integrated Bitcoin mining business on a global scale, offering investors top-tier exposure to Bitcoin. We gauge our performance using three key metrics: hash rate, energy efficiency, and the direct cost to mine, which we call hash cost. This year, Bitfarms is set to achieve the largest hash rate expansion and cost enhancement in our company's history, with benchmarks that lead the industry; we anticipate hitting 21 exahash, which would almost triple our present hash rate and almost double our operating capacity within this year; thanks to building our new PASO PE site, we currently operate 12 farms throughout North and South America, plus one more farm and development underway in Paraguay. We'll keep evaluating new geographies, new markets, and new opportunities as they arise; during Q1, 2024. Our revenue and margins kept climbing as Bitcoin's price rose. Total revenue reached $50 million, up 67% year-over-year and 9% compared to Q4, while our adjusted EBITDA rose 50% to $21 million versus Q4 last year. Also, because we successfully recovered our Canadian VAT, we're about to get a $24 million cash refund, which will go toward funding our expansion. Now on to slide six. We remain on track to meet our 2024 guidance of 21 exahash, a 223% increase, and 21 watts per terahash, a 40% improvement, all while expanding our operational infrastructure by almost 80% to 428 megawatts. We're loading most of the energy efficiency gains and growth into the first half of this year, with 70% of our new miners going toward upgrading our existing mining farms. That approach guarantees the quickest fleetwide energy efficiency gains by swapping out the least efficient miners first. The other 30% of miners will be powered up at new sites, mainly in Paraguay. Drawing on what we learned from the last halving over the past two years, we intentionally reduced leverage on our balance sheet and pursued a strategy focused on low cost and vertically integrated operations. Now, with zero debt, a hash rate climbing quickly, better energy efficiency, and lower per-unit costs, we're charging aggressively into this new era to grab as much upside as we can while maximizing returns and creating long-term value for shareholders. On to slide seven. Our expansion this year marks a major inflection point for the business and offers a golden opportunity for both current and prospective investors. The strategic timing behind this inflection point shouldn't be missed; so why are we expanding so aggressively at this moment? In 2023. We reviewed more than six years of purchase history for each miner, assessing the following: the price we paid, when we plugged them in, how much revenue was generated, the cost and profit, what the payback period was, and how cost-effective each purchase turned out to be. Based on our analysis, the single biggest thing that decides whether a miner investment works out is timing. Because at the end of the day, timing is what sets your costs. The machines we bought in the months before and after the 2020 halving turned out to be extremely cost efficient, earning back five to eight times what we paid, which made them easily our strongest returning investments. With the data giving us confidence, we rolled out our transformative fleet upgrade, deliberately aligned with those cycles. Step one, we locked in cheap, steady power totaling 170 megawatts in an area where we could expand fast, getting the rest of the miners installed quickly and on schedule. Step two, we put together a blueprint to rapidly and affordably upgrade each of our current farms by swapping out our older, less efficient miners. Step three, in November 2023, with Bitcoin trading near $37,000 and the halving only months off, we acted on a Bitmain announcement about a new line of miners that were more powerful and more productive. We locked in some of the lowest pricing in years and worked out a miner option, something no one in the industry had done before. We acted fast and kicked off our fleet upgrade plan, then in March came back with additional miner buys, picking up close to another 24,000 of the top-performing machines available, at competitive prices. Finally, in January 2024, we bought land for Yguazu Paraguay Farm. That property sits strategically across the road from a recently built ANDE substation, which gets fed by a 500-kilovolt line running straight from the Itaipu hydro dam, and it comes with extra acreage for future buildout. To sum up, this transformative plan reflects our discipline, since we first secure megawatts with a plan for every miner we buy, and we time these investments strategically by acquiring miners at attractive prices. Moving to slide eight. Through execution of our growth plan, we're positioned well to capture market share, and we think the growth we've planned toward our year end portfolio is the strongest opportunity out there. By the close of 2024, we will have raised our hash rate 223%, from 6.5 to 21 exahash. Second, grow our energy capacity almost 80%, from 240 megawatts to 428 megawatts. Third, boost our energy efficiency 40%, from 35 to 21 watts per terahash. Fourth, raise total miners deployed by 48%, and fifth, grow our total farms under management by 18%. Taken together, we think these numbers add up to the most substantial and concrete growth plan any publicly traded miner has put forward. Consequently, we'll finish the year with a geographically well-balanced portfolio of close to 100,000 highly efficient and competitive miners, bought at some of the lowest cost in years, running at 13 farms throughout North and South America, and mostly powered by reliable, sustainably low cost hydropower. Moving to slide nine. Given our 2024 growth, we'll be expanding and improving more quickly than the Bitcoin network, as these two sensitivity tables show. On the left side, we illustrate our growth measured against the network hash rate. Outpacing the network's expansion means we'll take share of the market and boost the quantity of Bitcoins we mine each day. A 223% rise in hash rate, reaching 21 exahash, is set to become a major revenue engine and will let us allocate our G&A across a bigger base of Bitcoins. Over on the right, you can see that our gains in energy efficiency are likewise projected to outpace the network's growth; when you pair that with energy rates that are mostly steady and competitive, thanks to roughly 80% surplus hydropower, the direct energy cost for each Bitcoin mined should keep dropping throughout the year. Worth noting: these outcomes hinge on our ongoing progress in the key performance indicators of hash rate and energy efficiency when measured against network hash rate. Bitcoin's price has no bearing on them. With the bull market everyone expects arriving in 2024, these gains mean we're set up well to seize the upside as mining margins widen quickly. That's our approach for beating the industry this year. Moving to slide 10. In Quebec, we're getting it done. Our sweeping fleet upgrade creates a pathway for growth that's stable and low-risk. Quebec offers competitive hydropower rates and economical expansion as we bring our cutting-edge facilities up to date with the new T21 miners.

Ben Gagnon

executive
#4

We've already finished upgrades at two farms, which delivered an impressive 51% gain in energy efficiency and show how much our fleet upgrade can change things. Three additional farm upgrades are in progress, so our overall hash rate and energy efficiency in Quebec are set to rise substantially across Q2. On top of that, we've started testing recycled heat from hydro mining technology, using 153s plus miners. The possibilities of this technology for capturing and reusing heat have us very enthusiastic. Residential, commercial and industrial heat needs in the province of Quebec are enormous, and in our view the hydro miners may be the strongest technology out there for growing our business within the province, lowering costs, and supporting the province's climate goals through recycling heat, which is our main waste product. Moving to slide 11. Argentina continues to be a jurisdiction with low costs and plenty of room to expand. Come September, we'll be putting as many as 6400 new T21 miners into service, which will take our site's energy efficiency from 32 watts per terahash to 23 watts per terahash and lift the site hash rate by roughly 850 petahash. Moving to slide 12. Let's now focus on Washington, which is presently our sole US location. It ranks among our most productive sites, with zero curtailment and extremely high uptimes. Right now we're expanding and modifying the site so it can take additional T21 miners scheduled for deployment in October of this year. This deployment will raise site efficiency by roughly 27%, going from 30 watts per terahash to 22 watts per terahash, and boost total hash rate by roughly 46% to 910 petahash. It's worth noting that the US is the smallest region in our portfolio, and we're actively reviewing many opportunities to grow our US exposure in both 2024 and 2025. Moving to slide 13. Let's discuss our Paraguay expansion, which is the biggest growth component of our plan for this year. With 170 megawatts of megawatt expansion and 9.2 exahash of growth from our two new farms, we've already installed thousands of miners in PASO PE and are wrapping up work on the substation. Once finished, PASO PE will contribute more than 3 exahash and 70 megawatts to our portfolio, lifting our megawatts under management by 29% to 310. At Yguazu, our third Paraguay site, construction is progressing well and remains on schedule to be energized in Q4, adding roughly 5 exahash and 100 megawatts with energy efficiency of 20 watts per terahash in 2024. Paraguay's economic and political conditions make it very appealing. Most of its political leaders along with the senior leadership of ANDE, the state-owned power distribution company, understand the huge economic advantages Bitcoin mining operations deliver and strongly back legal Bitcoin mining ventures. Many senators and public officials have signed letters and spoken publicly about the beneficial results of Bitcoin mining; these include more employment opportunities, capital spending, greater revenues from energy sales for legal Bitcoin mining operations and more electrical infrastructure investments. Importantly, Paraguay has an enormous surplus of energy compared with local demand. More than half of the electricity generated there gets sold to nations nearby at a price far below what licensed Bitcoin mining businesses are charged. For moving surplus renewable power into an international market, Bitcoin mining serves as a substantial channel, and it fuels considerable economic expansion. On our side, this gives us low-cost, dependable, sustainable green electricity that comes with virtually no curtailment, plus a workforce that is both skilled and inexpensive, faster build timelines, and a regulatory climate that welcomes our sector. Following the achievements we've had in Paraguay, an agreement was signed not long ago with ANDE, the utility owned by the state, which doubles the energy capacity at our Yguazu location by adding 100 megawatts in 2025. Expanding Yguazu to 200 megawatts lifts our 2025 megawatts under management by 23%, moving from 428 megawatts to 528 megawatts. Crucially, this growth leverages the construction plan we already have, spreading expenses across a larger base of infrastructure and lowering the total cost per megawatt. Adjustments to construction plans and equipment orders are already underway, and right now we're evaluating possible deployment plans. To put the effect of this in context, if we assume a comparable miner model and the same 20 watts per terahash efficiency that's already slated for Yguazu, this extra 100 megawatts might enable another 5 exahash in 2025. Moving to slide 14. At this point I'll pass the call to Jeff Lucas so he can discuss our financial performance.

Jeff Lucas

executive
#5

Thanks, Ben. Moving on to slide 15 now. The industry is in a fantastic spot right now, and we've positioned ourselves for what comes after the halving through a strategic growth plan, an accretive financing strategy, and a balance sheet with no debt. Using our funds from operations, together with a possible tax refund and careful utilization of our ATM financing facility, we're set up well to expand capacity from 240 megawatts to 420 megawatts in 2024 and reach our target of 21 exahash per second by year-end. Let me share some first-quarter highlights, which are substantial relative to the fourth quarter of 2023. Revenue came in at $50 million, representing a 9% increase from the fourth quarter and a 67% rise year-over-year. The sequential comparison shows a 44% greater average Bitcoin price, which was offset by 24% pure Bitcoin earned during the first quarter. During the quarter we earned 943 Bitcoin, while in the prior quarter we earned 1236 Bitcoin. This was mostly driven by a 21% rise in average network difficulty. Mining revenue reached $49 million, versus $45 million in the prior quarter. Gross mining profit totaled $29 million, which equals 59% of mining revenue, compared with $23 million, or 52% of mining revenue, in the fourth quarter. General and administrative, or G&A, expense came to $13.2 million, which included $3.1 million of noncash compensation expense and roughly $1.6 million of nonrecurring severance charges tied to the management change announced in March. Excluding those items, cash G&A expense for the first quarter was $8.5 million, an 11% decrease from the previous quarter. Our operating loss was $24 million, versus a $13 million loss in the fourth quarter. The first quarter operating loss included $39 million of depreciation expense, compared with $22 million in the prior quarter. First quarter depreciation expense included $18.5 million of accelerated depreciation expense related to the older miners we replaced with new T21 miners in Quebec. Under the Farnham program, the existing miners are depreciated on an accelerated basis over the remainder of their expected operating life. Consequently, a higher level of depreciation expense is expected across the remaining quarters of 2024 as the new miners are brought online. In the first quarter, we recorded a $9 million noncash gain for the revaluation of financial liability for warrants issued in earlier finances, versus a $38 million noncash charge for the revaluation of this financial liability in the fourth quarter. IFRS requires us to recognize the liability for these warrants, even though they cannot be settled for cash. First quarter net loss was $6 million, a loss of $0.02 per share, compared with a net loss in the fourth quarter 2023 of $57.2 million, or a loss per share of $0.19. Now let's turn our attention to operating performance in per Bitcoin metrics. Our corporate cost of electricity during the quarter was $0.41 per kilowatt hour. Substantially unchanged from the prior quarter. Because of Canadian tax rules put forward in February of 2022, our direct production cost from that point on has included a 15% value-added tax, or VAT, applied to Canadian energy expenses. Although this kept affecting our direct cost throughout the first quarter, I am very pleased to share that we won approval from the Canadian Tax Authority regarding the VAT regulations. From here on, we can reclaim the VAT and no longer need to show the tax on electricity costs. That marks a major decrease in our operating cost. Had we excluded the VAT from our first quarter electricity rate, our corporate cost for electricity would have come to $0.37 per kilowatt hour. On top of that, this VAT recovery gives us the right to a $24 million refund covering tax amounts paid from February 2022 onward, and that money will go toward funding our 2024 growth initiatives. During the first quarter, our direct cost of production for Bitcoin was $20,500. Taking the Canadian VAT out of the picture, our corporate direct cost would have come to $18,400, which is $2,100 below our actual corporate direct cost. Now moving to slide 16. Adjusted EBITDA rose to $21 million, up 50% from the fourth quarter. That works out to cash profitability per Bitcoin of $22,700, roughly twice the $11,200 per Bitcoin seen in the fourth quarter. Adjusted EBITDA margin climbed to 42%, compared with 30% in the prior quarter. I want to highlight that our adjusted EBITDA is a very simple metric, made up only of our cash profit per Bitcoin multiplied by the number of Bitcoin miners, plus a profit generated by a Volta subsidiary. As an IFRS filer, we do not mark our Bitcoin holdings to market, and we leave this and any other balance sheet valuation changes out of our adjusted EBITDA. For us, adjusted EBITDA is strictly a gauge of the cash profitability of our mining operations and the modest profit contribution from the Volta Electric subsidiary. Now turning to slide 17. As of March 31, we held cash of $66 million in Bitcoin, valued at $58 million, for total liquidity of $124 million. That is compared with $118 million of total liquidity at December 31. On March 11, we launched our ATM program and brought in $38 million in net proceeds over the quarter, which are designated to fund our growth initiatives in our fleet upgrade. Beyond that, we received $1.7 million in net proceeds from the sale-leaseback of our Garlock facility. Between March 31 and May 14, we raised another $83 million under the ATM program to further fund our growth. Over the quarter, we repaid the remaining equipment financing debt, which left us debt-free at March 31. I should note, though, that we report $1.6 million of long-term debt on our March 31 balance sheet to reflect the IFRS accounting tied to the Garlock sale-leaseback. More importantly, I want to stress that we have enough liquidity to cover all the miners required to hit 21 exahash per second this year. Now moving to slide 18. Before we start taking questions, let me wrap things up. Through the upgrade and expansion program we have underway, we're significantly transforming our operating profile. The miner upgrades we've recently completed are already producing substantial efficiency improvements, and additional gains expected across the year ought to help drive better margins after the halving. As we pursue growth and enhance our portfolio, we remain on track to reach 21 exahash per second alongside 21 watts per terahash efficiency during 2024. With the best Bitcoin mined per exahash in the industry, Bitfarms stands apart thanks to outstanding margin results that showcase both operational efficiency and profitability in a fiercely competitive sector. This groundwork rests on our solid balance sheet and ample liquidity, both essential for maintaining growth and seizing fresh opportunities. Backed by a capable leadership group with a demonstrated history of generating profitable growth, our operational strength and strategic direction have played a key role in our achievements across the last six years, spanning two halving events. On top of that, Bitfarms' focus on ESG demonstrates how committed we are to mining that is sustainable and responsible. It's a pleasure that the largest projects we currently have in development will source electricity from the Itaipu dam, which ranks as the third biggest hydropower facility globally. All things considered, we're positioned extremely well to keep growing and succeeding in 2024 and afterward. With that said, I'll hand the call back to the operator so we can begin taking questions.

Lucas Pipes

analyst
#6

Thanks a lot, operator. Morning to all of you.

Ben Gagnon

executive
#7

Morning, Lucas.

Lucas Pipes

analyst
#8

Jeff, in your comments you said the liquidity on hand essentially takes care of all the miner costs. Given that, what should we expect regarding ATM usage for the rest of this year? Should we anticipate you'll raise capital for infrastructure or for other purposes? I'm just wondering how you're looking at it. Thanks so much.

Jeff Lucas

executive
#9

Absolutely. Happy to take that question. To start, we've actually been utilizing the ATM since March 31, and our current liquidity stands above what we disclosed on March 31. Another thing to remember, as Ben and I both highlighted during this call, is that a tax refund is coming our way, and we anticipate receiving it by the end of June, amounting to approximately $24 million; that largely handles both the needs we have for our miners and the infrastructure we're pursuing going forward. With all of that said, we intend to keep using the ATM prudently as we move ahead. And frankly, our estimate for the remainder of the year is that we could see ourselves drawing $50 million, perhaps a bit more than that. That said, we're exercising a great deal of caution regarding how we handle our ATM moving forward. There's one more thing I'd like to share: when we look at our projections, which include our expected ATM usage going forward, something we haven't incorporated into our figures is our expectation that excess cash flow from operations will run on a monthly basis somewhere between roughly $6 million and $10 million across the coming months. Naturally, that depends heavily on where the price of BTC goes. So while that's available to us, we'll certainly take advantage of it, especially via our Synthetic HODL program. Apart from that, we haven't built any of that into the numbers I just referenced regarding our ATM plans. If I may, Lucas, one additional point about how the ATM benefits us. When you consider our growth efforts, each unit of hash rate we bring on costs us somewhere between $21 million and $23 million in total. That covers infrastructure, miners, and certain logistical expenses tied to getting those miners operational at the different sites in Canada and South America too. If you look at how mining companies are valued, you're generally seeing roughly $45 million per exahash. So from where we sit, even though we're handling the ATM with a lot of caution and consideration, we're definitely managing our cash and our resources quite prudently. We really do view its deployment as clear confirmation of the value-enhancing character of what we're up to.

Lucas Pipes

analyst
#10

Thanks. I appreciate those remarks; regarding what we pay for power, you're bringing additional power capacity online, so I was hoping you might sort of take us through what that means as your mix shifts somewhat. Many thanks.

Jeff Lucas

executive
#11

Ben, would you like to address that, or would you prefer to simply discuss a few of the economic effects we expect down the road?

Ben Gagnon

executive
#12

Yes, I can address that. On a broad level, Lucas, the expense Jeff mentioned earlier for Q1 came in around $0.41. For the extra power we're building in Paraguay, our contract sits at $0.39, and that rate is locked with no yearly inflation-related adjustments over the years ahead. Once you factor in VAT, the total lands at roughly $0.42, I believe. So when we look at what we paid for power last quarter alongside the full cost of power in Paraguay, the typical price we pay across our whole portfolio barely shifts in any real way. What it does do is give us far more power within that portfolio at roughly the same expense.

Lucas Pipes

analyst
#13

Understood. All right. No, that's really useful. Thanks for all the detail, and keep it up. Wishing you the best. Thanks.

Ben Gagnon

executive
#14

Thanks.

Jeff Lucas

executive
#15

Thank you, Lucas.

Jeff Lucas

executive
#16

Hello, Joe.

Joe Flynn

analyst
#17

Hey everyone, thanks for taking the question. I wanted to ask about the potential expansion opportunities you both brought up in the US. If you could give us a bit more detail on how that possible deal pipeline is shaping up, that would be great. And I'm also kind of interested in hearing your take on this: as you're fighting for power against in-demand HPC, do you ultimately believe Bitcoin mining is shifting more toward international markets? Thanks.

Ben Gagnon

executive
#18

Thanks, Joe. At the moment we're reviewing several deals. Our perspective on power is global — securing cost-effective megawatts at scale across different jurisdictions where the economics make sense. In our view, the US holds plenty of strong opportunities for expansion in 2024 and 2025, and those are the ones we're assessing right now. What's great, and an extra upside to the growth plan we already have in place, is that we hold a lot of extra built-in capacity through the miners we've bought. Reaching 21 exahash essentially relies on a much lower configuration for those machines, and they can be pushed further; so should we secure additional megawatts — ideally inside the United States or elsewhere — with attractive economics, we'd be in a position to expand our hash rate using the miners already in our possession, which we already have the liquidity to pay for, to reset 21 exahash. That means acquiring additional miners, or extracting more hash rate from the ones we have, and generating even bigger hash rate growth. So that's the sort of thing we're reviewing at present. Are there solid opportunities for us to act on, perhaps some extra megawatts, that would let us achieve even higher utilization from our miners and our growth plan for this year? Going forward, we'll of course be sharing those deals publicly; however, we currently have quite a few different deals in our pipeline, both in the United States and beyond.

Joe Flynn

analyst
#19

Thanks, that's great. Now, regarding the Bitcoin treasury management aspect, moving forward, should we anticipate that you'll keep selling off most of what you produce? And could you perhaps elaborate a bit more on your option exposure and the mechanics of it, given how much Bitcoin has climbed since the start of the year?

Ben Gagnon

executive
#20

Absolutely, happy to address that. We are expecting some growth in our HODL. It might not cover every expense. That's mainly because we've implemented something we've mentioned before, referred to as the Synthetic HODL, which in our view offers the advantages of both approaches. To clarify how we handle this: typically, when we generate surplus cash flow from operations, we'll sell that Bitcoin; for instance, we might allocate 90% of the proceeds from that Bitcoin toward funding our capex moving forward, which naturally reduces how much we need to draw from the ATM, and the remaining 10% or 15% of the Bitcoin proceeds goes toward purchasing long-dated call options; so essentially, even though the actual HODL will grow only slightly, our exposure to Bitcoin's potential gains will be significantly larger thanks to the Synthetic HODL; and let me share a few figures that show how well this has performed for us. We don't usually disclose the specific results of the gain share we've achieved with our Synthetic HODL, but during the fourth quarter of last year, we realized a gain of around $1.6 million, representing roughly a 119% return. In the first quarter of this year, we had an unrealized gain of about $3 million, with a return of over 500%; so this has truly been very beneficial for us. Once more, it's given us what's likely the most affordable capital source available, compared to tapping into the capital markets, and it still allows us to retain the upside potential of Bitcoin. Does that fully address your question, Joe?

Joe Flynn

analyst
#21

Yes, it does. Thank you. I appreciate all the detail; that's everything from my side.

Ben Gagnon

executive
#22

Of course.

Josh Siegler

analyst
#23

Hello everyone. Thanks for letting me ask something this morning. To start, I'd like to build on what Joe asked earlier — now that the halving has happened, is there anything different you're noticing when it comes to deal terms getting sweeter from competitors who may be under more pressure? I'm basically wondering whether the kinds of deals landing on your desk look any different than they did a month or so back.

Ben Gagnon

executive
#24

Sure, appreciate that. By and large, I'd say we have not yet witnessed the complete effect of the halving, since it occurred less than a whole month back counting from today; plus it typically takes people in mining a span of several weeks, maybe several months, before that gap closes between a shift in market conditions and actually sensing any kind of pressure to adjust how they run things or how they're structured. So in my view the deals are unchanged across the recent couple of months — pretty much the same as before. A hash price at $0.05 is the threshold we figured would trigger some kind of market reaction, whether that means expansion slowing down, machines being under clocked, or older rigs getting pulled from their racks. We anticipated that sort of strain would begin emerging once we hit $0.05. Given that hash price is essentially sitting there now, I don't believe much is shifting on the internal operations side; however, once hash price settles and it becomes clear which direction things are going, that will matter enormously — should it fall or should it rise, the opportunities available out there will definitely look different.

Josh Siegler

analyst
#25

Alright, understood. That clarifies things. Now for my next question, I was hoping you might expand a bit further specifically on how much it costs to build out infrastructure in Paraguay compared with your other locations.

Ben Gagnon

executive
#26

Absolutely. Jeff, would you like to take that one?

Jeff Lucas

executive
#27

Okay, I'll begin, and then Ben, feel free to jump in with any additional detail you think is useful. In Paraguay, our costs tend to be somewhat more appealing than what we see elsewhere around the globe. Our goal there is to build out at below $350,000 for each megawatt, and the prices we're actually seeing — the expenses we're genuinely taking on in Paraguay — come in under that figure, closer to roughly $300,000 per megawatt. So for us, that's quite favorable, and we're constantly on the lookout for ways to do better. Still, it definitely sits inside our parameters for ROI and for our payback estimates.

Ben Gagnon

executive
#28

Perhaps I could just toss in a brief note on that. Everything happening over in Paraguay involves greenfield projects; these are entirely new locations that we are building up from scratch, covering the substation, every interconnection, the facilities as such, and naturally the construction of mining infrastructure plus the supporting systems needed to keep the whole operation running. And we're pulling all of this off on a fairly compressed schedule. The PASO PE location will be finished in considerably less than 12 months, and the Yguazu location is the same story from beginning to end; so our construction timelines are extremely tight and we're tapping a highly skilled workforce locally, which assists in ensuring that rollouts happen very quickly and that we capitalize fully on an unforeseen bull run afterward in 2024. Plus it assists in pushing costs lower whenever tasks simply don't consume as much time.

Jeff Lucas

executive
#29

Also, let me throw in one more point, since our financial statements actually include this disclosure. As a subsequent event, we ought to discuss the extra 100 megawatts we're acquiring in Yguazu and Paraguay, and to be crystal clear, that applies to 2025. We estimate the real infrastructure spend required to develop it at approximately $23 to $25 million. What you should take away from this is that although we're seeing figures of about 300,000, or slightly more than 300,000, per megawatt for Paraguay, the incremental expense of adding capacity at those current sites is in fact less. And here, for the coming year, for that additional 100, we believe it comes to somewhere near $230,000 to $250,000 per megawatt.

Josh Siegler

analyst
#30

All right, excellent. Thank you. Glad to be on the call.

Mike Grondahl

analyst
#31

Hi everyone, thanks. Would you mind discussing Argentina a bit and where it ranks on your priorities when it comes to growing into new markets down the road?

Jeff Lucas

executive
#32

So, what we're doing is…

Ben Gagnon

executive
#33

Do you want me to jump in?

Jeff Lucas

executive
#34

Yes, why don't you go ahead and I'll follow-up?

Ben Gagnon

executive
#35

Go ahead.

Jeff Lucas

executive
#36

All right. So to start, Argentina really appeals to us. As we noted here, we actually signed a 6-month agreement at $0.21 per kilowatt hour during the summer months when energy costs in Argentina are lower. That rate will be higher across the 5 months after winter, which start soon; and we expect energy costs in Argentina to rise over roughly the next 5 months. But as we've said before, and we're sticking with it, energy in Argentina averages about 3 to 3.5 cents year round. Currently we have roughly 54 megawatts in place. As you might remember, there's a chance to expand to 210 megawatts. We are in fact examining that closely. It's good to see economic and political conditions in Argentina starting to stabilize, but we had been paused for some time. During that unsettled period, compared with other options open to us, Paraguay included, those alternatives simply looked better on a risk-adjusted rate of return basis, which is the lens we use for our projects generally. So although we're hopeful and see more upside in Argentina, we're proceeding carefully there. At present our attention is really on other opportunities, especially Paraguay. Ben, would you like to chime in?

Ben Gagnon

executive
#37

Not at all — in my view you managed that nicely, Jeff. That really gets to the heart of it. At this moment we'll simply capitalize on the strongest openings available to us involving Paraguay, and when it comes to Argentina we retain a great deal of flexibility as things settle down, plus we hold an improved view of what lies ahead, or at least a clearer one.

Mike Grondahl

analyst
#38

Understood, that's useful. Then, second, could you both share a bit about the profile you want in the next CEO, and why you feel confident an announcement could come — I believe someone mentioned, Nicolas, perhaps within a few weeks.

Jeff Lucas

executive
#39

Nicolas, would you like to take that, or should we jump in for you? I realize you're a long distance away. I'll jump in, since we might be having connection problems with Nico here. So, Jeff proved extremely valuable in helping move our business up a level as we grew up; at the start we were a highly entrepreneurial, highly creative outfit. He was instrumental in establishing the kinds of organizational and professional foundations that genuinely let us operate as a scalable company worldwide. At the time Jeff joined, we operated in 1 nation, Canada; today we're in 4, and above all we're set up to examine possibilities across both the Northern and Southern hemispheres. So our positioning is strong, and with that scalable organizational effect now in place, management and the board are sharply concentrated on the locations of future growth. In what way do we make the most of this administrative and organizational framework we now have? That's precisely how we intend to leverage it; and there's an abundance of prospects in mining and, to some extent, beyond mining that we now wish to start chasing far more vigorously; we have an excellent team, including Ben and others, who truly contribute to spotting outstanding opportunities for us that can genuinely lift shareholder value. And at this point we're looking for a CEO who can truly come in and assist in propelling that effort ahead.

Mike Grondahl

analyst
#40

Understood. And then, hey, just one more thing before we finish, Jeff. Has the team shared any fresh perspective on the way Bitfarm is looking at the HPC AI chance? I'd just like to hear whatever new thinking you might have on that.

Jeff Lucas

executive
#41

Sure — apart from the financial side of things, I'll hand that question to Ben.

Ben Gagnon

executive
#42

Absolutely, glad to take that one. So, yes, we've certainly examined the HPC and AI possibilities, but if you consider our company and the areas where we truly excel, it really comes down to constructing and running the finest Bitcoin mining infrastructure anywhere in the world. And if you compare what Bitcoin mining infrastructure involves with HBC and AI infrastructure, honestly there aren't many commonalities beyond the reality that both require substantial amounts of power; in our case, our costs are extremely competitive as we build out Bitcoin mining infrastructure, running just a few hundreds of thousands of dollars for each megawatt; by contrast, doing HPC or AI infrastructure is really measured in millions of dollars for each megawatt. Those figures swing pretty dramatically based on quality, location, and all sorts of data center details. But what you're seeing, frankly, is a range from roughly $4 million up to $12 million for each megawatt; on the infrastructure side, the larger capex amounts are likewise comparable when it comes to the computation equipment itself. So if you examine the relative expense of GPUs for each megawatt plus other supporting gear compared with, say, Bitcoin mining equipment for each megawatt, the costs share a quite similar sort of outsized component, where we're discussing tens of millions of dollars for each megawatt rather than just a few million. So the costs differ greatly. The businesses differ greatly, and my view is that for investors seeking HPC and AI exposure, it's likely preferable from their standpoint to handle that within their portfolio on their own. Should they desire high quality Bitcoin mining infrastructure exposure, that's precisely what we offer via our Bitfarm shares. And if they're after that HPC AI, it's probably wiser to route it through a separate vehicle and simply manage that allocation inside their portfolio themselves. I believe that's closer to what investors and the market are actually looking for; so that's sort of a big-picture answer on the matter.

Mike Grondahl

analyst
#43

Sure. No, hey…

Jeff Lucas

executive
#44

Mike, Ben gave you a pretty solid answer on that. I'd just like to tack on a few additional things. Being the top operators in this industry is something we're extremely proud of, and we have full confidence that running a high-performance computing center is something we could do very, very well. That said, let's be really blunt and totally straightforward right off the bat: our cost of capital—even though we handle it with a lot of care and it's favorable—simply isn't favorable when you stack it against certain bigger players in the market. And as Ben mentioned, for us to sink the investment required to be effective in high-performance computing just doesn't make the most sense for our shareholders, especially when weighed against what we genuinely excel at, which is running mining operations here extremely efficiently. The third thing I want to flag for you is this: whenever we're hunting for the cheapest cost structure available, we always examine power opportunities, and those opportunities are of a different character when it comes to high-performance computing. Our situation lets us capitalize on lower-cost power, with the understanding that some curtailment or interruptability may come with it. High-performance computing simply can't tolerate that. So given who we are and what we do so well here, it really makes far more sense—on many counts—for us to keep our focus squarely on mining rather than, at this point, letting high-performance computing pull us off track.

Mike Grondahl

analyst
#45

That's reasonable. It's been great hearing how you see things; best of luck through the remainder of '24.

Jeff Lucas

executive
#46

Appreciate it, Mike.

Martin Toner

analyst
#47

Morning, and thanks for fielding my question. I believe it would help investors to get a bit more granularity around how capex is timed between now and the close of 2024. Could you walk us through that a little, and perhaps also tell us what portion of the gap in exahash between today and 21 by the end of 2024 has already been funded.

Jeff Lucas

executive
#48

Absolutely, happy to discuss. So to start, and this matters, as we mentioned earlier in another segment of this call, we've actually already handled the cost — the outstanding cost tied to the miners needed to reach 21 exahash from here on out. Naturally we still have extra outlays we must make on the infrastructure side. That ties back to the first question Lucas raised at the start of this call; so to give you a very specific figure for your first point, if you look at our financial statements, there's a section labeled commitments. Within it, a particular subsection lays out what remains owed on those miners. It shows $156 million, broken down roughly as $40 million in the second quarter, $85 million in the third quarter, and approximately $30 million in the fourth quarter. The encouraging part is that of that $40 million sitting in the second quarter, nearly all of it has already been paid; so we're sitting in a solid position. The place where we expect the bulk of our outlays to land going forward, as that commitment schedule makes clear, is really the third quarter. That's when we foresee roughly $86 million coming due, and the infrastructure expenses — especially what's happening at Yguazu — will really hit during that same quarter. So we've got — we expect approximately $50 million of build-out still ahead on infrastructure, and my sense is most of that will likely occur in the third quarter, Martin.

Martin Toner

analyst
#49

That sounds great. In terms of philosophy—and I realize it hinges on what kind of infrastructure is involved—where do expenses actually get incurred from beginning to end, and across how long? Could you offer folks something like a rough guideline for the sorts of mines you're constructing?

Jeff Lucas

executive
#50

My apologies. I don't think I quite grasp what you're asking, as a…

Martin Toner

analyst
#51

From beginning to end, suppose the whole thing runs 18 months, with a quarter of the capex used in the first half — then what share gets used at the end? I'm just curious whether there's a basic rule of thumb you folks rely on that investors could apply to gauge what sort of capex you're probably going to spend moving forward.

Jeff Lucas

executive
#52

Absolutely; so the bulk of the — go ahead, Ben. Please take this one.

Ben Gagnon

executive
#53

Sure — I can offer some top-level numbers that should assist with your modeling estimates. Generally speaking, you ought to treat miners as representing roughly 80% to 90% of the overall capex required to build a new mine. That assumes, naturally, that you're acquiring more modern miners with greater efficiency rather than hunting for a bargain on used equipment at much cheaper prices. So, roughly 80% to 90% goes to the miners. An easy approach for modeling would be dividing that into something like a 50/50 split. Cost structures and payment timelines differ across miners and manufacturers, yet something that holds true across every miner purchase agreement is that securing the purchase typically involves a cost in the form of a non-refundable deposit; afterward, there's a settlement balance payment that must be made before pickup. Those costs have to be paid upfront; next, regarding the infrastructure accounting for the remaining 10% to 20%, I'd treat that as roughly a 50/50 split too, just as a rule of thumb. You can assume about 50% of the cost relates to the substation and longer lead time items, while roughly 50% of that cost ties to labor and other component pieces that aren't long lead time items over the course of the build. That way, you can apply those percentages as an approximate rule of thumb when examining how capex spreads over time, though every project and every purchase will carry its own unique variable; so giving a specific answer is rather difficult.

Jeff Lucas

executive
#54

Yeah, Ben laid that out pretty clearly.

Martin Toner

analyst
#55

Excellent. That’s really helpful context, thanks a lot. What kind of balance sheet levels would you — is Bitfarm at ease keeping?

Jeff Lucas

executive
#56

Balance sheet levels of what?

Martin Toner

analyst
#57

Just the level of liquidity sitting on the balance sheet. Since you're spending on some of that capex — my assumption is that the more bullish someone feels about this company, the more they believe it's undervalued, and the more they'd be ready to bring liquidity levels down and lean on the ATM less often. I'm simply curious about what kind — are there particular liquidity thresholds you're looking to hold onto?

Jeff Lucas

executive
#58

Sure. The truth is it varies, and the main reason it varies in this case is that while we're chasing additional opportunities, which includes ones in the United States, we need to be certain we've got the liquidity and the funds available to genuinely capitalize on them whenever those chances come up. That means we end up keeping somewhat more cash on the balance sheet than would typically be the case. Still, I'd put our comfortable baseline liquidity at somewhere around $30 million to $50 million. That's $30 million or $50 million, to be precise. Yet when we step back and consider the bigger picture, we also account for the fact that we hold our Bitcoin HODL — not that we're really looking to tap it for liquidity purposes, obviously, but it's sitting there; and that provides a bit of extra cushion, letting us be more caution — conscientious, rather, about the way we deploy capital and about ensuring we get the most out of our assets, our liquidity assets included.

Martin Toner

analyst
#59

That's excellent. Thank you, Jeff. One final question from my side — it appears the Synthetic HODL is performing well, and there's interest in being able to grow its size.

Jeff Lucas

executive
#60

So, what sets the size of it comes down to essentially a pair of factors. The first is the extremely strict governance procedure we follow regarding what takes place; there's a risk committee made up of the top five managers who exercise great caution, Ben included in that group. They're very careful about how we think through our upcoming moves. The second thing is that whenever we pursue any strategy involving derivative activity, it must be brought before the Board so they can approve it and confirm they're at ease with it. So we've got fairly solid controls established. That genuinely acts as a guardrail limiting how far we go with the Synthetic HODL. Yet the most significant piece, Martin, in relation to your question — what really determines how much we engage in with that Synthetic HODL — comes down to our capex and cash requirements ahead, since our strong preference is to finance our capex using cash flow from operations. From a cost of capital perspective, that's obviously far less expensive than approaching the street; so a direct answer isn't something I can provide, though I can offer a sense that those two factors are what essentially shape the way we consider our Synthetic HODL. Incidentally, we expect to grow our Synthetic HODL ahead, given that we expect our cash flow from operations to grow ahead. And while we're working to tackle the substantial cap needs we've pinpointed for this year, we'll be better positioned to truly capitalize on both the Synthetic HODL and our traditional HODL too.

Martin Toner

analyst
#61

That's wonderful. I appreciate the openness; that concludes my questions.

Jeff Lucas

executive
#62

We'd like to express our gratitude to everyone for being with us on today's call. This has been an intriguing period, and we're at a tremendously thrilling moment for the business as we move ahead. I believe we're quite enthusiastic. We're deeply thankful for and truly appreciate Nico, and you're coming aboard at a critical juncture for us. The advice you provide, the expertise you bring, and the background you possess in both the mining sector and with this organization, have been essential in steering us forward, and we urge everyone to remain in contact; as you're aware, we're genuinely experiencing a remarkable phase of expansion. To restate a few of the main points, roughly a 223% rise in our exahash across the year. Remarkable not just for our team, but for the entire sector; plus an impressive 45% gain, nearly, in how efficient we are; therefore we're incredibly eager about what lies before us and truly focused on the big picture. Thanks to each of you for being here.

Ben Gagnon

executive
#63

Thank you.

Operator

operator
#64

That wraps up the call for today, so you're free to hang up your phones now. We appreciate you taking part.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Keel Infrastructure Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Keel Infrastructure Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Keel Infrastructure Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.