Earnings Call Speaker Segments

Neil Doshi

executive
#1

Thanks for joining us, and welcome to the Nebius Group earnings call for the fourth quarter of 2025. I'm Neil Doshi, and I serve as Vice President of Investor Relations. With me on the call today is Arkady Volozh, our Founder and CEO, along with the rest of our management team. Statements we make today will contain forward-looking projections, which rest on assumptions held as of today. Because of a range of factors — among them those described in the earnings press release issued today and in our annual report on Form 20-F that we filed with the SEC — actual outcomes could differ materially; we take — we undertake no obligation to update any forward-looking statements. On this call, we'll present certain non-GAAP financial measures alongside GAAP ones. A reconciliation between GAAP and non-GAAP measures appears in today's earnings press release. You can find the earnings press release and the shareholder letter on our website at nebius.com; and with that, I'd like to turn things over to Arkady.

Arkady Volozh

executive
#2

Thank you, Neil, and I appreciate all of you being on this call. So, 2025 proved to be an exceptionally strong year for our company. The team performed remarkably well when it came to expanding capacity and getting it into customers' hands quickly and dependably. We likewise achieved significant strides in building out our very own hyperscale AI cloud. However, prior to diving deeper into what we accomplished in 2025, let me pull back for a moment. It's remarkable to think this business was started merely 1.5 years back. Back then, we established the groundwork for a worldwide AI cloud operation expanding at an exponential rate. And we've been running at extremely high intensity, constructing and growing at remarkable velocity. At present, we already rank among the globe's foremost and most dependable providers of AI cloud compute; we've drawn in a varied set of clients who appreciate the quality, performance and adaptability of the platform we created entirely from scratch. And we have a fantastic team that appears to accomplish the impossible on a daily basis. And I'm certain they'll keep doing this — keep it up. With that groundwork in place, we take pride in what we've accomplished and feel assured about what we're going to deliver; so now, returning to 2025. As I mentioned, it was a superb year. We surpassed our financial objectives, and we dramatically beat our capacity projections, which sets us up for the following stage of expansion. Demand stays strong, and our pipeline keeps expanding considerably. We completely sold out our capacity during Q3 and Q4 of last year, and at this point in Q1 of 2026 we are likewise fully sold out. Even prior to making capacity available, it frequently gets sold out. Consequently, the typical contract length for new cloud customers increased by 50%, and GPU pricing did not decline even for older generations of GPUs the way the industry might have anticipated. Clients are seeking greater compute along with increasingly advanced solutions for running their AI workloads. AI start-ups are rapidly transforming into genuine enterprise-scale customers, with revenue from their products striking a chord with actual customers. Their requirements swiftly escalate from hundreds of GPUs to tens of thousands. That's already a scale the market witnessed from its largest customers during the previous year. We're observing identical patterns among Enterprise customers, who are applying AI to more and more mission-critical business processes. In the meantime, obtaining compute stays limited. This mismatch produces a beneficial situation for us as we lock in and roll out additional capacity into a strong demand landscape. To seize this chance, we're speeding up our capacity roadmap. Only today, we revealed 9 new data centers around the world. During the prior quarter, we stated we'd lock in 2.5 gigawatts of contracted power before the year ended; we've already surpassed 2 gigawatts as of February, which explains why we're lifting our 2026 projection to over 3 gigawatts. And we're right on course to provide 800 megawatts up to 1 gigawatt of that as data center capacity that's available, exactly as we discussed during the prior quarter. There are 2 dimensions to our growth, and capacity is 1 of them. Product is the other. Scaling our core AI cloud business — that's our multi-tenant AI cloud — is where our primary strategic attention goes. We'll grow the platform organically as well as via targeted acquisitions capable of strengthening and speeding up this platform's development. Token Factory came out not long ago, and that stands as an illustration — proof, in fact, of what we can do in-house. We're also quite thrilled about the Tavily acquisition we just made, which brings agentic search capabilities to our customers and likewise adds nearly 700,000 developers into our ecosystem. Given how strong demand is and how well we've executed, our confidence in the coming year's plans holds firm; we are restating our annualized run rate revenue target of $7 billion to $9 billion by the close of 2026. At the time we shared this goal 3 months back, people raised doubts about whether we could reach that range. Our conviction regarding this range has only grown over these past few months. What's the reason? We surpassed the top end of our 2025 ARR guidance, posting over $1.2 billion in ARR; we've already signed contracts for more than 2 gigawatts of capacity and are on pace to go beyond 3 gigawatts within this year; we've already handed over the entirety of the capacity for the Meta contract; we remain on schedule to deliver Microsoft's capacity across 2026, precisely as intended. And finally, demand keeps being robust for our AI cloud. Pricing remains robust. More and more customers keep arriving on the platform, committing to bigger and bigger and longer-lasting contracts. Whatever we build, we sell. We're at the earliest stages of one of the largest industrial and technological revolutions ever. That's our belief. And Nebius is fast turning into the AI cloud provider of choice. Once more I'd like to thank each of our employees for their commitment and hard work, and our shareholders for your confidence and backing, and we'll keep delivering. Now I'd like to pass the call to our CFO, Dado Alonso. Dado, go ahead.

Dado Alonso

executive
#3

Thanks, Arkady. Truly, 2025 turned out to be an outstanding year, marked by excellent execution and delivery. We went past the goals we'd established, beat our ARR guidance, and reached positive EBITDA at the group level. On top of that, we brought in substantial capital during the year to support our growth. Let me now give you some detail on the results, walk through our financing plans, and then wrap up with 2026 guidance. During Q4, group revenue came in at $228 million, which works out to 547% growth compared with the same period last year. From Q3 to Q4, revenue rose 56%. For the core business, annualized run rate revenue reached $1.2 billion at December's close, surpassing the top end of the $1.1 billion range we had guided for Q3. Our core AI cloud business put up results that were even stronger. That revenue climbed 830% year-over-year and 63% quarter-over-quarter, powered by high utilization, solid pricing, and disciplined execution. As Arkady pointed out, our capacity sold out yet again in Q4, since demand kept substantially outstripping what we could supply. Even while posting that kind of growth, operating leverage and cost discipline let us make meaningful headway on the bottom line. Group adjusted EBITDA turned positive in Q4, in line with our guidance, fueled by the strength of our core cloud business, where adjusted EBITDA margin went from 19% in Q3 up to 24%. Let's move to the balance sheet. We closed out the year holding $3.7 billion in cash and cash equivalents, and Q4 operating cash flow came to $834 million, mostly made up of upfront payments tied to our long-term agreements. These early cash inflows will keep coming through the year as we perform against those commitments, giving us considerable visibility into future cash flow. With our cash on hand, anticipated operating cash flow, and a strong balance sheet, we're well positioned to finance our 2026 capacity buildout plans. I'll go into more depth on our capital plans shortly. Now, on to 2026 guidance. As Arkady said, we stay confident in our capacity to produce annualized run rate revenue somewhere between $7 billion and $9 billion by the close of 2026. Across the full year, we anticipate revenue landing between $3 billion and $3.4 billion. Beginning in Q4 — Q2, we expect to start bringing some of the new sites we announced today online, with most of the planned capacity set to be deployed during the second half of the year. As of early February, Meta's capacity was completely deployed, and we are now fully servicing their contract. Having delivered the first tranche of our Microsoft commitment on schedule, we anticipate continuing to deliver the remaining tranches across the year, with most of them expected in the second half. We expect Microsoft to start contributing to revenue at the full annual run rate in 2027, once all of these tranches have been deployed. On adjusted EBITDA, we anticipate group adjusted EBITDA margin of roughly 40% for 2026. Looking ahead to 2026, we anticipate EBIT staying in loss territory while we move forward with expanding capacity, bring GPUs online, and put money into R&D — efforts that should meaningfully upgrade both our technology stack and the AI products we bring to market down the road. We see the returns from these investments as compelling, and we're staying dedicated to our medium-term EBIT goal of 20% to 30%, with room to potentially exceed that. Beginning in Q1 2026, our depreciation schedule is being changed from 4 years to 5 years, which mirrors what the market is showing us along with our present utilization commitments; this method follows accounting-based practices, and we're keeping a conservative stance here. Moving now to CapEx: to seize the sizable and expanding opportunity ahead of us, we intend to spend on CapEx somewhere between $16 billion and $20 billion during 2026. Roughly 60% of the funding required for that range is already available through our balance sheet, ongoing operations, and commitments. We consistently review multiple financing avenues open to us, and we apply 2 guardrails whenever considering capital alternatives. First, our debt raising will be tied to business requirements, and we'll stay prudent regarding the cost of capital. Second, we'll keep shareholder dilution in mind should we decide to issue equity. Thanks to our balance sheet and limited debt, we're in the fortunate position of having plenty of extra ways to fund our expanding business. For instance, we're presently looking into incorporating corporate debt and asset-backed financing onto our balance sheet. Our at-the-market equity program — unused entirely so far — stays an extra option for opportunistic capital. Beyond that, our equity stakes in ClickHouse and other companies like Avride could serve as future capital sources too. These holdings excite us, particularly as the market starts to appreciate their considerable worth. As one illustration, recent reports put ClickHouse's valuation at roughly $15 billion during its latest funding round; so the broad set of financing choices before us lets us support growth in a manner that's balanced, disciplined, and tied to returns, instead of locking into a single set path. To wrap up, 2025 marked a year of strategic advancement for Nebius, and we carried out our work with focus and discipline throughout the business, building strong momentum as we head into 2026; over the coming year, we'll keep scaling quickly to grab the significant market opportunity at this once-in-a-generation moment for our sector; and with that, I'll hand the call back to Arkady.

Arkady Volozh

executive
#4

Just before opening the floor for questions, there's one additional item I'd like to share. Following today's earnings call, our VP of Investor Relations, Neil Doshi, will be stepping into a new role focused on strategy. We want to express our appreciation to Neil for everything he has accomplished in establishing our IR function up to this point. I'm also delighted to announce that Gili Naftalovich is joining us as the new VP of Investor Relations. She comes to us with extensive experience in research and strategic finance gained at Goldman Sachs, UBS and monday.com, and we couldn't be happier to welcome her. With that said, let's begin the Q&A.

Neil Doshi

executive
#5

Okay, we're pulling in a few questions from the portal right now, and then we'll kick off the Q&A shortly. All right, then. The initial one that came in from our investors through the portal asks this: Nebius has been moving fast on two fronts — getting demand up and running while also laying a solid groundwork for capacity down the road. What is it that you're observing in the market that makes you confident AI demand will keep on warranting this level of spending? We'll hand that over to Arkady.

Arkady Volozh

executive
#6

Okay, so to start with, all of us can look around and notice what's happening almost everywhere — how our routines shift in day-to-day personal life, what goes on inside our organizations, at our own company for instance, how much of the workload now leans on AI tools while writing code. And in fact, at this point we observe the entire — every industry is genuinely transforming. Take that recent case once more, software development, or take the film business, take scientific research, anything you do today, you do alongside AI. Yet once again, those are only broad impressions, while our confidence rests largely on what we witness firsthand inside our own operations. We're picking up quite distinct indicators across every segment of our operations. To begin with, among the big accounts, every major client is speaking with us — meaning not just with us, but with the entire market regarding growth, leasing additional capacity, additional GPUs, since their AI operations keep expanding. Talks are underway, and in fact they will result in additional deals across the board. However, as you're aware, we're far more concentrated on our AI cloud division. And within AI cloud, we've got these two primary segments, AI start-ups plus enterprise, and consider AI native clients, what became of them during 2025. A number of start-ups vanished, yet a number among them are turning into genuine firms, genuine enterprises of tomorrow. And they began gaining momentum. Their offerings became increasingly — they're increasingly adopted by their own customers, and they're expanding fast, expanding on genuine income, genuine need. And what — we encounter such clients, such firms that previously bought hundreds of GPUs, thousands of GPUs, and today they're purchasing tens of thousands of GPUs. And this truly represents a magnitude of what we witnessed among the biggest consumers the prior year. Frontier models were purchasing tens of thousands of GPUs merely a year, 2 years back. Today that's yesterday's start-ups operating at this scale. Once more, this is genuine commerce; these are genuine clients of theirs paying genuine income. So AI momentum is apparent. I can — there are plenty of clients from this segment, beginning with Cuckoo, Cursor, Rodo, Higgsfield, Photoroom, Genesis Molecula, various segments, and each of them has its initial momentum and they're turning — right now, turning into genuine, genuine firms. In fact, they're tomorrow's enterprises. Meanwhile, there are enterprise clients who engage more — who in fact shift the bulk of their routine business operations toward AI and produce fresh profits via those AI deployments. We observe a rising count of such clients, rising deals from every one of such a client, the quantity of GPUs keeps rising, the length of the deals keeps rising. As I mentioned, the typical length for new clients climbed 50% during the prior year. Based on the signals coming in from every part of the market — large customers, hyperscalers, AI startups that are turning into enterprise clients — for enterprise AI expanding everywhere, the signs look good. We simply have to construct additional capacity on their behalf: additional data centers, additional tooling. And should we be able to construct more quickly and at a greater scale than is currently the case, that's what we'll do; the reason we're building is that growth is unmistakable.

Neil Doshi

executive
#7

Okay, thanks Arkady. Our next question comes from Josh Baer at Morgan Stanley. He's asking about how we plan to finance CapEx, particularly given that we've put out guidance of $16 billion to $20 billion for CapEx. What's our thinking on how we'll meet those CapEx expectations? Ophir?

Ophir Nave

executive
#8

This is Ophir Nave, and I hold the positions of COO and Board member at Nebius. Usually I don't participate in these calls, but since this question carries so much weight — both for our business and for the investor community — I'll take it on. Basically, this question breaks down into two pieces. First: what is the appropriate amount of capital expenditure for our business in 2026? Second: in what manner will that CapEx be financed? These two questions are, of course, connected and intertwined. So let's start with the latter one, the second component. In what manner will we finance the CapEx? Obviously, our cash flows will be the primary source. We have cash available on hand. We have cash generated by our core business; but even more importantly, I would say, we hold a considerable quantity of cash that we've already collected and will continue collecting throughout 2026 owing to the advantageous terms of our long-term contracts; we're talking about a considerable quantity of cash. These cash flows will actually cover the majority — about 60%, maybe even more than that — of our entire CapEx needs in 2026. So in what manner will we finance the remainder, what's left over? As everybody is aware, our balance sheet is extremely strong. That isn't accidental, by the way, since we put in tremendous effort to maintain a very prudent, disciplined, strong balance sheet. Right now, we carry no corporate level debt. We have no asset-backed financing, even though we have multibillion dollar revenues from long-term contracts. We have no bank revolver; and by choice we haven't had one up to now. But as we head into 2026, and as everybody is aware, an optimal capital structure in our business ought to include debt as well. This clearly should change. And during 2026 we intend to employ some of the tools I referenced in order to move toward a more optimal capital structure. So having said all of that regarding the financing side, we believe the $16 billion to $20 billion CapEx makes a ton of sense, and we'll be able to fund it while maintaining a very healthy disciplined balance sheet. But let me turn to the first part, the first question: what should our optimal CapEx for 2026 be? I mentioned — in fact Arkady said it time and again — that since we are a fully vertically integrated company, our CapEx is basically divided into 3 parts. Under 1% is used for securing power. And given how important power is to our business and given how important securing power is for our future hyper growth, we are moving full force ahead in order to secure as much power as possible given its relatively low cost. And I think that on this call, it was mentioned that we already secured significant amount of power, and we will continue to do so. The second part of the CapEx are building the data center. That comes to roughly 20% of overall CapEx, and the money went toward constructing data centers. We invested that capital, and things turned out exactly as we expected — it became one of the best investments we have ever made. Why is that? Once our data centers are complete or close to complete, which lets us bring GPUs online in a very short span, we can sell that capacity on extremely attractive and favorable terms. That is what we have done so far, and we plan to continue doing so moving forward. We can see the demand. We can see the interest. Across the back half of 2026 and on into 2027, we have clear visibility into demand, coming both from our cloud customers and from AI labs and hyperscalers; and given the interest we are getting from all of those parties, we are confident these investments will again prove very rewarding for our company, exactly as happened in 2025. The remaining CapEx, obviously, goes to deploying GPUs. Again, that accounts for a substantial share of CapEx, and less than 10% is used for securing power. The great part is that we bring GPUs online in a short span at a moment when we have superb visibility into demand, into pricing, into our margins, and into — and we are quite happy. We don't view it as an especially risky place to be. So with all of that said, we believe the $16 billion to $20 billion CapEx figure for 2026 is what makes the most sense for us. First, it is grounded in our visibility into demand for 2026 and 2027. It is grounded in the interest we are getting from various parties, both on our cloud platform and from the AI labs and the hyperscalers. It will allow us to reach our $7 billion to $9 billion ARR in 2026. But even more importantly, it will set the foundation for our hyper growth in 2027 and beyond. Still, when talking about CapEx and investments, I think it is also worth addressing two more items. The first is the ATM. As all of you know, we introduced our ATM program last quarter. As of today, we have not drawn on it at all. In fact, we have no specific plans to draw on it in the near future either; even so, it is another tool in our toolkit that will let us use it at the point when doing so makes the most sense for our business and for our shareholders. And that is one more tool that will let us keep a prudent, balanced, disciplined balance sheet; and one more item I think deserves a mention is, obviously, our noncore businesses; we are fortunate enough to hold our 25% stake in ClickHouse along with our ownership in Avride. As of today, those noncore businesses, those stakes, are worth many billions of dollars. That is great, but on its own it is less interesting; and above all, we truly believe those stakes will climb substantially over the midterm. When they follow through on that, it will allow us to keep growing our operations in a hyper-based way as we set our sights on 2027 and the years after, all while deploying this capital and still keeping a very disciplined balance sheet; we're truly happy about these potential capital injections further out. Under 1% goes toward securing power. I think I've addressed the CapEx, what we require and the way we plan to finance it.

Neil Doshi

executive
#9

Thanks, Ophir — that really clarified things. All right, moving on, our next question is from Alex Platt at D.A. Davidson. Could you walk us through how we get from the guidance of 800 megawatts to 1 gigawatt of connected power, and then all the way to the 3 gigawatts of contracted power guidance by year-end? Andrey?

Andrey Korolenko

executive
#10

Yes. Thank you, Neil. Hi, everybody. So at this point, what we're seeing is that we're significantly speeding up how quickly we build out and bring capacity online during 2026. And we anticipate that this faster pace will keep going in 2027 and further out. So the thing we're doing is — like Arkady said, we're making the investments to lay the groundwork for 2027 and for the years after. We're right on schedule to hit the targets we talked about for 2026, that 800 megawatts to 1 gigawatt objective, near the close of the year; and we get there by bringing up many sites, a blend of smaller and bigger projects, with a few of our larger ones beginning to come online toward the end of this year. And on top of that, beyond the sites we talked about today, we've got several projects in progress. And we think a number of these extra sites could come to fruition this year. So in essence, we believe the calculations will enable us to expand more quickly beginning in Q2 of this year and building up across the year. And our own projects, which are sizable, will truly begin to scale up in 2027 and past that; and that ties straight to the contracted power.

Neil Doshi

executive
#11

Okay, thanks, Andrey. Andrey, let's just keep it with you for a moment. Andrew Beale over at Arete has a question regarding an update on that New Jersey data center site.

Andrey Korolenko

executive
#12

Sure. Regarding New Jersey, we're quite happy with how things are going. We got the initial tranche over to Microsoft when we said we would, and we're also fully on schedule to meet the rest of what we've committed to. Our partners, we think, locked down the parts they need in the supply chain, and they're putting in a huge amount of effort to bring everything online. Also, we've got some buffer time set aside as a safety margin within our projects; and although any project may see some variation, our plans were put together with a substantial safety cushion, so we feel very confident about pulling this off.

Neil Doshi

executive
#13

Okay, thank you, Andre. So it seems Alex Duval from Goldman Sachs has a question for us; it appears Nebius fell short on revenue compared with consensus for Q4, yet ARR exceeded what was expected. So which metric carries more significance? And should timing be taken into account? Then, more generally, combining that with the ARR question, could you clarify for us how the ARR guidance of $7 billion to $9 billion differs from the revenue guide for 2026? So Dado, perhaps you can address that.

Dado Alonso

executive
#14

Thank you. I'll address these one at a time. Regarding your first question, naturally, we felt quite good about hitting $1.2 billion in ARR, which came in above the guidance we'd given for that metric. On the revenue side, we landed right in the middle of our guidance range, and that was honestly what we expected. Given that we're in a hypergrowth phase, ARR serves as the stronger measure. Turning to your next question about why the ARR and revenue guidance differ, I'd start by saying that at Nebius, we've deliberately chosen a cautious stance on the revenue guidance, just as we've communicated. For 2026, we're guiding to between $3 billion and $3.4 billion in revenue. It makes sense that ARR and revenue would diverge. Both our revenues and our ARR track how our capacity gets deployed across the year, and as Andrey noted, most of that capacity will be brought online during the second half. We should also keep in mind that our biggest enterprise partnerships remain in their ramp-up phase. So the revenue guidance really just captures the capacity ramp as it comes online.

Neil Doshi

executive
#15

Alright, thank you, Dado. We’ve got a question coming from Alex Platt at D.A. Davidson. Could you walk us through how you’re tracking relative to that $7 billion to $9 billion ARR target? And do you truly need the big hyperscalers to reach that figure? Marc, would you like to address that?

Marc Boroditsky

executive
#16

Thanks, Alex. Let me make one thing clear right off the bat. No new mega deals are required for us to hit the 2026 ARR target we've set. With the added capacity we've planned coming online, alongside the robust pipeline we already have and our go-to-market strategy, our confidence is high that we can reach that '26 ARR goal. The momentum we keep building with AI natives, plus the encouraging early results among ISVs and enterprises, gives us the groundwork to seize the market in this year. Given the traction we're seeing and the deep research we've done into our total addressable market, we're pushing harder into the verticals already named — health care, life sciences, media and entertainment, physical AI and retail — since these offer us plenty of room to take share and expand the business. We're glad to serve big strategic customers such as hyperscalers, but when it comes to deals of that size, we'll stay opportunistic, because we want to weigh the upside against the long-term position we intend to build with our AI cloud.

Neil Doshi

executive
#17

Alright, thanks Marc. We’re going to move on to a question that came in through the portal. Could you give us the latest on where things stand regarding the delivery timeline with Microsoft and Meta? And also walk us through once more how those 2 contracts layer in across the year? For the first part, maybe Andrey can start, and then Dado, you can handle the second part about how the contracts layer.

Andrey Korolenko

executive
#18

Right. Thank you, Neil. Like I said before, the initial tranche went out to Microsoft in November, exactly as scheduled, and the rest of the capacity remains on track and is moving forward. Every one of those remaining tranches is going to be delivered across the entirety of 2026, and over 50% of them are going to arrive in the back half of that year. Turning to Meta, we got both of the contracted tranches to them on time earlier this month, and at this point we've moved fully into the servicing phase; and Dado, would you walk us through the financials?

Dado Alonso

executive
#19

Absolutely, Andrey — appreciate it. Those Meta deployments that Andrey referenced went live in early February. Because of that, our expectation is that we'll book 12 months of revenue on tranche one, and approximately 11 months on tranche two. Turning to the Microsoft arrangement, we anticipate revenue building gradually across the year, consistent with our intent to hand over the capacity tranches — which, again as Andrey noted, are scheduled to occur at points throughout the year, with most of them landing in the back half. That means the full-year revenue contribution from the Microsoft deal starts in 2027. And as we fulfill these obligations, we anticipate a favorable effect on our medium-term EBIT margin goal of 20% to 30%.

Neil Doshi

executive
#20

Okay, thank you, Dado. We have one more question coming in through the portal. What was behind the better-than-expected December 2025 ARR? And looking ahead to Q1, what demand trends are you observing in the market right now? Marc, would you like to handle that one?

Marc Boroditsky

executive
#21

Sure. December ARR got a lift thanks to dependable execution along with robust pricing and utilization. We keep making excellent headway when it comes to bringing in new logos and growing alongside our current customers. Regarding that second item, pricing is very strong across every GPU family, and utilization is maxed out since we keep selling every bit of capacity we have; as for Q1 demand, it's still incredibly robust, and the very same patterns we described for 2H '25 are persisting into '26. Three factors give me enormous confidence and enthusiasm as we head into '26: ongoing pipeline growth, favorable deal trends, and the strides we're making with our vertical strategy. The trajectory for pipeline creation in Q1 is set to surpass $4 billion. And as we bring more capacity online and broaden sales coverage, we anticipate that figure will keep climbing. When it comes to deal trends, everything is heading the right way. Contract terms are lengthening and typical deal sizes are growing. During Q4, we closed almost double the number of transactions lasting longer than 12 months compared with what we achieved in Q3, while average selling prices rose by over 50%. To illustrate, Hoppers are entirely sold out, and those nearing renewal — frequently coming off short reserve agreements — are being renewed for 12 months or more, and in fact we're seeing pricing edge higher. Finally, we're zeroing in on customers whose workloads and use cases are premium, which yields better terms, among them a growing number who will prepay to lock in future capacity.

Neil Doshi

executive
#22

Okay, thank you, Marc. A further question has come in through the portal. The market is seeing headlines about shortages of data center equipment. In what way is Nebius managing this, making sure it can obtain these products? Also, do you anticipate any effect on your deployment? Andrey, I believe this one is directed at you.

Andrey Korolenko

executive
#23

Absolutely, Neil. Regarding the delays in data centers — well, constructing these facilities is generally a very intricate undertaking, and nobody is immune to every risk involved, yet I believe we're handling this risk rather effectively. As you witnessed today, we're significantly ahead on our contracted power, and we're building out 9 contracted sites that we announced today. And the core concept and core approach is having a portfolio of sites. That way, we don't rely on any particular individual data center project in order to hit our guidances and execute our plan. And it's quite crucial to grasp what sets us apart. We're a full stack cloud, which lets us take advantage of the adaptability it offers — we aren't tied to any particular size, we can shift the loads, and in between we can deliver it from various locations. We simply operate to make sure we have sufficient capacity. And the second thing is we've already locked in most of our long lead items tied to our own sites to be certain — to guarantee capacity deployment past 2026 too; and the other part of the shortages involves memory storage. The first key thing is our biggest deals with Microsoft and Meta. We managed to obtain the required components last year for the entire scope of those contracts. And we secured them in the second half of 2025 prior to any price increase; and as for the rest, we have confidence in our supply chain to obtain the parts we require to keep delivering the capacity.

Neil Doshi

executive
#24

Andrey, I'll stay with you for this one — a number of our analysts have a question. You've announced 9 new data center sites, and those will be a combination of owned and colocation. How do you think about deciding whether to purchase or lease? And over the longer term, how do you see that mix changing?

Andrey Korolenko

executive
#25

This topic has come up on several occasions, I believe. Broadly speaking, our aim is for the majority of our biggest projects to be built in-house. There are 3 primary reasons for that. To start with, ownership ends up far stronger this way. Since we possess the know-how and background from constructing our own sites, our grip on how a project is carried out is considerably tighter. On top of that, scaling gives us the chance to reach higher efficiency, as we typically design things precisely around our own needs and the technical specs we work with. That said, it isn't quick, and until our own efforts are running at full speed, we rely on leases and partnerships to bridge the gap. So, to put it briefly, doing the infrastructure ourselves is what we favor; even so, partners and leases are still needed from time to time to back our growth.

Neil Doshi

executive
#26

Thanks, Andrey. We'll go now to Josh Baer from Morgan Stanley. His question concerns the software stack. Which software tools show up most often among your wider set of customers — both start-ups and big enterprises — as things they use and pay for through your AI cloud? Also, what share of your customer base takes advantage of your software and services alongside your compute capacity? Beyond that, can you offer any detail on the amount of ARR the software stack contributes right now? Marc, perhaps you'd like to handle this one?

Marc Boroditsky

executive
#27

Sure thing, and thanks for that, Josh. As you're probably aware, the AI cloud we offer was designed specifically for artificial intelligence workloads and has been proven in practice across our AI client roster. Right now, every single one of our AI cloud clients — 100% — is making use of our AI cloud software, clearly, so the attach rate stands at 100%. Incidentally, we're quite enthusiastic regarding the fresh offerings we've brought to market, such as Token Factory along with the Aether releases, since these have broadened the TAM and provided a chance for us to move into enterprise. Additionally, our recent purchase of Tavily expands what our platform can do by delivering agentic search to AI developers, which opens up additional paths into accounts. It's worth noting too that we keep witnessing interest in embedded storage among clients spanning important verticals such as physical AI, media and entertainment, and health care and life sciences. Consequently, we're building solutions tailored to each vertical so as to satisfy what these clients need. Honestly, we're only at the beginning of our monetization efforts, yet our software and services give our platform stickiness, letting us command a higher relative price per GPU hour. We're looking into additional ways to monetize, among them consumption-based approaches like per token pricing through Token Factory. So Josh, keep watching for further updates on monetization down the road.

Neil Doshi

executive
#28

Okay, thank you, Marc. We have another question, this time from Alex Duval at Goldman Sachs. It concerns the 40% EBITDA margin target that we provided. What makes us confident about it? Dado, could you handle that one?

Dado Alonso

executive
#29

Absolutely. I appreciate that question, Alex. Let me lay out the broader context here. Nebius is growing, and as that growth continues, our margins will grow too. Turning now to the guidance for adjusted EBITDA margin: during Q4, the group posted an adjusted EBITDA margin of 7%. And looking ahead to 2026, our expectation is that we'll hit 40%. Demand for our AI cloud business is enormous, and we're putting capital to work in the right amounts to meet it. As we've already reported, the margin for the core AI cloud business is in fact much greater than what the group shows. And as we expand the AI business, the core AI business will keep generating the bulk of our revenue and margin. Naturally, then, we anticipate that the other businesses will continue running at an EBITDA loss in 2026, though their share of EBITDA will keep getting smaller. So that 40% adjusted EBITDA margin guidance captures where the business stands today in its expansion phase.

Neil Doshi

executive
#30

Okay, thanks, Dado. Several of the analysts we have on the line — James Kisner with Water Tower Research among them — are asking about Tavily. What's the strategic reasoning for Tavily? In what way does it complement what you already provide? And honestly, are your cloud customers showing substantial demand for this product? Roman, why don't you handle that one?

Roman Chernin

executive
#31

Absolutely, and thanks for bringing that up. I was worried we wouldn't get to it. This is a pretty thrilling moment for us, and we're extremely happy to share news of our very first M&A transaction — the purchase of Tavily — and to extend a welcome to the Tavily team along with Tavily's customers into the Nebius family. Tavily operates as an agentic search business. It links AI agents with the web, and that aligns very well with our plan to become, and to remain, the platform where every AI developer — from startups to enterprises — creates their AI applications and agents. Tavily has achieved fairly substantial momentum. They currently support numerous Fortune 500 clients, and they've seen excellent uptake among the developer community and are adored by developers. We'll keep assessing possible acquisitions of businesses capable of deepening customer engagement, stickiness, and boosting our lifetime value, while reinforcing our standing as a full stack AI cloud provider. This market is so vast that clearly we won't build every piece on our own; we'll pursue strategic opportunities and strategic partnerships going forward, seeking out companies and partners possessing a fantastic product, a fantastic developer experience, and a DNA like ours, to create a platform that AI developers will cherish over the long term.

Neil Doshi

executive
#32

Alright, thanks Roman. We’ve got one more question here about how we deploy capital and handle M&A — specifically build versus buy. Nehal Chokshi from Northland is asking. Arkady, when it comes to allocating capital, particularly choosing between putting money into capacity or pursuing acquisitions, what’s your framework?

Arkady Volozh

executive
#33

Right. So, in terms of what we're putting together here, we're creating one of the biggest platforms out there for AI developers to create their applications on. When I say biggest platform, there are two dimensions to that: scale, and the functionality of the product. And we split our capital across those two dimensions. Building scale is necessary. That's the reason we have to construct all of these data centers and purchase all of those hundreds of thousand GPUs; and the product has to be built too, and we're going to build it in two ways — organically, in-house, through our own developers, and we'll handle all of it. So we also turn to acquisitions, and we've put some capital into acquisitions as well, in order to strengthen our product, bring in more talent, and in the end develop more, and faster. Tavily is a great illustration of an acquisition like that. With luck, it won't be the final one.

Neil Doshi

executive
#34

Okay, thanks, Arkady. I believe we've reached the hour now. So I appreciate all of you being here on this call about our Q4 2025 results. When the following quarter comes around, Gili is going to take charge of the earnings process. Thanks to each of you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Nebius Group N.V. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Nebius Group N.V. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Nebius Group N.V. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.