NexGen Energy Ltd. (NXE) Earnings Call Transcript & Summary
March 11, 2024
Earnings Call Speaker Segments
Operator
operatorGood morning, everyone, and thanks for joining the NexGen Energy Year-End and Q4 2023 Conference Call. Please be aware that every line has been muted so that background noise doesn't interfere. Once the speakers have finished their remarks, a question-and-answer session will follow at the end. <<operator_script>> Please also be aware that this call is being recorded. Mr. Leigh Curyer, CEO and Director for NexGen Energy, the floor is yours to begin the conference.
Leigh Curyer
executiveThanks, Sylvie, and thanks to all of you for being on NexGen's conference call covering year-end and Q4 2023 financial results. I'm Leigh Curyer, the Chief Executive Officer of NexGen Energy, and with me today are Travis McPherson, our Chief Commercial Officer, and Benjamin Salter, our Chief Financial Officer. I'll give you an update on the exciting progress we made this quarter and restate the key accomplishments of the past year when it comes to the rainy market, permitting, project development, and financing, and — for those of you who saw this morning's news release — a very exciting discovery of new intense mineralization in a greenfield find just 3.5 kilometers from Arrow. Following that, we'll go to the Q&A portion of the call. Forward-looking statements will be made throughout the call. So please visit our website for the relevant disclaimers. As we all navigate the global energy transition together, nuclear power has come forward as a pivotal force. Right now it makes up approximately 10% of the global electricity mix, with targets set to raise that to 20% to 25% in the coming decades so as to meet three generational goals: first, the provision of power for an increasingly energy intensive world; second, decarbonization; and third, providing access to power to those who currently do not have it.
Leigh Curyer
executiveAt COP28, the push to grow nuclear capacity worldwide was front and center, and NexGen took part in a panel alongside Saskatchewan's Premier about that province's pledge to produce uranium sustainably in order to satisfy global nuclear demand. That same message came through at COP28, where nations promised to triple nuclear capacity by 2050, recognizing nuclear's vital part in reaching carbon neutrality, keeping energy reliable, and strengthening national security. India said not long ago that it will build another 18 civil nuclear reactors by 2032, with the goal of lifting its nuclear generation to 2.42 gigawatts — a tripling of the capacity it has today. Canada backs these efforts, as shown as recently as two weeks ago when it issued its second green bond for nuclear development, raising $4 billion US, which secures cost effective financing for nuclear projects in Canada and shows broad federal government support for nuclear energy both in Canada and around the world. On top of that, Natural Resources Minister Jonathan Wilkinson announced that the Governor of Canada would speed up approval processes for new nuclear projects inside the country. In a similar vein, the EU has formally designated nuclear power as strategic for its decarbonization agenda, recognizing its cost competitiveness and its potential to attract investment. In November 2023, EDF successfully raised EUR1 billion for nuclear energy through a green bond issuance — the first of its kind in Europe.
Leigh Curyer
executiveJapan has also shown what its strategy can achieve: 12 nuclear reactors have come back online, and because of that the country has cut its reliance on fossil fuels by 15%, which shows how quickly nuclear energy can deliver positive results. As new technologies emerge and the need for cleaner energy becomes more urgent, uranium demand is expected to grow by 127% by 2030 and by 200% by 2040. The supply side, however, looks very different and is fragile because of several factors coming together — chiefly more than a decade of insufficient investment in exploration and development, geopolitical tensions and supply chain difficulties, hard mine restarts and overall resource depletion have all weighed on today's supply levels and on the longer-term forecast of how much supply can actually come online. A potential ban on Russian uranium imports by the US Senate makes this precarious situation even worse, prompting many market participants to rethink their future strategies and to seek sustainable, new, diversified primary uranium sources in sound jurisdictions. With these inventory shortages and the trend toward more contracting, we expect sustained upward pressure on uranium spot and term prices for a long period. This highlights a critical moment for the nuclear sector. Although nuclear power is embraced as a strategic part of the global decarbonization effort, a stable and sufficient uranium supply chain is essential to meeting growing energy needs.
Leigh Curyer
executiveWe’re looking at what is likely to be a long-term supply deficit, with an anticipated cumulative shortfall of more than 1.5 billion pounds through 2040, which underscores the role of NexGen (ph) and the value NexGen brings in global energy markets. More uranium is urgently needed from sources of supply that are technically, environmentally, and jurisdictionally sound, and that is exactly the profile of NexGen’s Rook I project. We have just passed the 10-year anniversary of the discovery of Arrow, and the importance of the deposit and the project cannot be overstated. Once it is operational, it will dramatically reshape the Western supply landscape. As per the NI 43 to 101 feasibility study of February 2021, it is forecasted to deliver up to 30 million pounds of uranium to the market annually. This represents over 20% of current uranium fuel production and over 50% of Western supply. This will not only reestablish Canada as a preeminent uranium producer in the globally recognized province of Saskatchewan, but will also emphasize NexGen’s unique position to meet the world’s increasing uranium requirements. Over the past 12 months, NexGen has successfully and safely executed the strategy to advance the Rook I project. Our commitment to the company’s values and dedication to excellence in everything we do has resulted in a world-class organization leading positive necessary change in the sector and setting new standards for sustainable responsible resource development.
Leigh Curyer
executiveOur industry ESG standards approach, historic benefits agreements, and optimal permitting progress all highlight this. From the outside — outset, we've concentrated on innovation and peak performance so that Rook I reaches production within this decade. As both our actions and our track record show, we are dedicated to fulfilling our part successfully in bringing nuclear's enormous advantages to bear in raising living standards around the world. We're making solid headway. In November, we obtained the Provincial Environmental Assessment approval for the Rook I project — the first uranium project in Canada to secure that approval in more than 20 years, and the first ever in Canada from a non-government organization. With that approval in hand, we have filed the initial applications for approvals covering site earthworks, shaft sinking infrastructure, site water, mine waste management facilities, and the associated ancillary infrastructure and services. We remain in ongoing communication with the relevant Saskatchewan ministries about these development phases, so we can keep advancing the Rook I site and stand ready for full construction once all federal permits are in hand. Recently, on February 12th, we received the Canadian Nuclear Safety Commission's results from its thorough review of NexGen's responses to the federal technical comments that came in on the environmental impact statement.
Leigh Curyer
executiveOur team is prioritizing work on the small number of outstanding technical review comments, and as soon as those are finished, we will file them with the CNSC together with a revised federal EIS. Working alongside our indigenous community partners, we anticipate obtaining a commission hearing date from the CNSC in the near term, so that the advantages of this generational project can be delivered as a priority for the region and its community. As noted earlier, we commend the federal government of Canada for its dedication to nuclear energy, as shown by the resource minister, Jonathan Wilkinson, announcing the intent to speed up approval processes for new nuclear projects domestically. During 2023, NexGen achieved substantial progress on its site confirmation works, with completion expected by the end of this quarter. The site confirmation program has been extremely effective in supplying the data needed to validate and guide the future design of the production shaft and exhaust shaft for the Rook I project, which sits on the critical path. At the same time, we are completing detailed engineering and are well along in purchasing long lead items. And the award of the shaft sinking contract is imminent, which, subject to federal approval, signals the project's readiness for construction.
Leigh Curyer
executiveEven as NexGen’s attention stays on moving Rook I forward, we’ve also launched an ambitious exploration effort across this very promising land package in the southwestern Athabasca Basin. Our 2024 program, spanning 30,000 metres, builds on the success we had last year, when we pinpointed strongly anomalous zones worth following up and generated fresh targets from earlier drilling and geophysical work. The whole effort aims at delivering new material discoveries beyond the Tier 1 Arrow deposit — value created through the drill bit. This morning we’re glad to report a discovery of new, intense uranium mineralization on the SW2 Property, which we own 100%, at Rook I, roughly 3.5 kilometers east of NexGen’s world-class Arrow deposit, shown as Figure 1 in the news release. This new mineralized occurrence in RK-24 to 183 sits along a conductor segment of the Patterson Corridor East that had never been tested before. We cut localized uranium mineralization across 19.8 meters, from 347 meters to 367.5 meters below surface, with peaks reaching and exceeding 61,000 counts per second. For context on that intercept: it included 3 meters above 61,000 counts per second, which on every metric is well above RK-14 to 21, the Arrow discovery hole, where the intersection above 9,999 cps measured under 0.5 of a meter.
Leigh Curyer
executiveExploration remains largely unrestricted in every direction, covering more than 1.5 kilometers of strike within a setting that includes numerous geological features observed in and around Arrow — see figures 2 and 3 in today's new release. I want to use this moment to acknowledge and congratulate the NexGen geological team for their excellent, devoted efforts. With each drill hole and geophysical survey, our grasp of the region's mineralization markers got better. And NexGen's exploration programs over recent years have contributed enormous value toward today's result. A highly prospective land position in the southwestern part of the Athabasca Basin is still at an early stage, and considerable exploration lies ahead of us to fully establish the extent of mineralization at this location and across the rest of the Rook I SW2 property. As a result, drilling will keep focusing on this area and, later this year, run in parallel at SW1. As development moves forward, community initiatives sit at the forefront of our approach and our planning for the project's long-term success. I'm proud to report that in 2023, more than 300 community members from the local priority area took part in our education, training and certification programs, 39% of whom were indigenous women, and we expect that figure to rise to approximately 400 in 2024.
Leigh Curyer
executiveWe're helping to build a strong, thriving local workforce, and that's always been a key part of how we develop and succeed. We'll keep growing these efforts so we contribute to the local economy while creating a highly qualified talent pool based within the local project area, and that adds to the world-class team we already have. Over the past year, we have been and remain highly engaged with investors, industry members and those playing a key role in the nuclear fuel cycle. Several themes have come out of those conversations. First and foremost, there's a great deal of interest in NexGen, and the company has been raised to the position of a key supplier for global utilities as they look for future material sources of sustainable uranium. It is well understood and accepted that the project is vital to support the growing demand. Our spot contracting strategy is being well recognized because it provides transparency, price (ph) discovery and promotes the resiliency of uranium miners and the nuclear industry. To be clear, we will only produce uranium that is needed and that will optimize the market dynamics. We are taking a leadership role in the sector given the unparalleled flexibility, scale and cost structure of the project, due to the technical nature of the project and the natural hedge through the low all-in sustaining cost of approximately $10 US per pound as per the 43 to 101 feasibility study.
Leigh Curyer
executiveThroughout the project's lifespan, our contracts are going to be mostly volume-based, tied straight to spot prices at delivery time, which lets us fully benefit from future uranium prices and capture the economics. We recognize this method marks a shift away from traditional practices, yet it's one already observed in other valued commodities globally and one that serves the beneficial interest of every stakeholder in the industry, securing a sustainable and successful energy transition. On top of that, mounting interest from global lenders strengthens our confidence that our strategy is sound, with expressions of interest now amounting to more than $1.25 billion US. We've begun the final confirmatory technical due diligence and are targeting a decision point regarding the project's total funding mix in the second half of this year. Lastly, it's evident that our focused, disciplined approach is establishing new standards across every facet of responsible mine development. The team we have is concentrated on bringing the Rook I project into production in an optimal way, consistently delivering industry-leading economic, social and environmental performance. Now, an overview of our financial position as of December 31, 2023. At year end, NexGen held a working capital balance of $279 million.
Leigh Curyer
executiveAfter December 31, we brought in another $100 million US through the ATM from one Australian-domiciled investor who has grown their stake. So as things stand right now, NexGen holds roughly CAD410 million in treasury funds to cover every program, permitting and operating cost. Through the end of 2023, since incorporation, NexGen has put about $451 million toward successfully developing the Rook I project and other exploration properties, versus a current market capitalization of CAD5.4 billion Canadian, and all the while keeping general and administrative expenses at an industry-leading low ratio against development and market cap in any given year. We're also pleased to report that NexGen will be added to the FTSE Global Index and the ASX 300 Index, both effective mid-March 2024. That speaks to our continued growth and the strength of our results in the global market, and particularly in Australia. Our ASX listing keeps expanding in CDI market capitalization and daily liquidity, and this index inclusion will build further on that. With big capital market dynamics at play plus a strong resource market focus in Australia, ASX ownership of NexGen should keep rising. In 2024, we're focused on moving the Rook I project through the last stage of the permitting process, detailed engineering and procurement, while aggressively chasing new material discoveries.
Leigh Curyer
executiveSo with that said, what we're focused on this year is finishing the site confirmation program safely, getting a Federal Commission hearing date set and securing approval, keeping detailed engineering and procurement on the critical path moving forward, putting together a finance package, and marketing our product. This is looking like a historic year for the company, as we keep seeing strong and vocal backing from local and indigenous communities who want NexGen to steward this opportunity through to fruition. We've had ongoing collaboration from government partners, rising interest from shareholders and investors — particularly large generalists around the world — and a surge in demand for uranium-neutron energy. I'm incredibly proud of the focus and discipline the whole NexGen team shows. We are ready. Now let's move into Q&A, and we encourage questions from all of you. I'll hand it over to the moderator to begin.
Operator
operatorThanks, sir. <<operator_script>> The first question comes from Katie Lachapelle of Canaccord. Go right ahead.
Katie Lachapelle
analystMorning, everyone — thanks for taking my question. And congratulations on the discovery you announced this morning. I was just wondering whether you could — sorry, Leigh, go ahead.
Leigh Curyer
executiveNo, I was merely expressing my thanks. Yeah, this has us really thrilled.
Katie Lachapelle
analystIt was great to see that, particularly since you've now shifted your focus back toward regional exploration, which highlights how prospective the ground you hold beyond Arrow really is. On Arrow itself, though, I was hoping you could offer a bit more detail on where things currently stand with the federal regulators — specifically regarding what some of those outstanding technical questions actually involve. And on top of that, when do you anticipate being able to respond to them?
Leigh Curyer
executiveYes, thanks, Katie. We're quite happy with the scorecard the CNSC sent us on February the 12th. It was basically an A+. We now have roughly 48 items left that need a response to the CNSC, and we're working through sorting those 48 remaining items. We expect to return our answers to those questions, along with a blackline of the EIS, over the next few weeks. So, given how quickly they replied, it really shows how material those questions are overall. While each question matters a great deal, we judge their materiality to be low, and they'll be cleared up and closed out without much difficulty. So when you think about starting this process, you've got thousands upon thousands of questions — if not easily around 20,000 aspects to address. We're now in the final phases of the process, and we also have full community backing for our EIS as it currently stands, and we expect a fairly efficient process from here on out when it comes to the federal approval.
Katie Lachapelle
analystGreat, perhaps just a single additional question. Clearly you have achieved fairly substantial headway with advanced engineering, and procurement is now in progress too. At what point, if ever, do you plan to bring the market up to date on revised capital costs along with operating cost figures? And from your perspective, do those need to be in place before the debt can be triggered, or before a long-term contract might be signed during this year?
Leigh Curyer
executiveRight, absolutely. So that process is underway right now. Inflation hits us just as it does everybody else in this sector. The February 2021 feasibility study — inflation has had an effect on it, and we're nailing down the precise design scope for the project. Costs are higher, but at this moment I don't think they've hurt the project's overall after-tax economics. Actually, with where commodity prices have moved, I'd go so far as to say the payback period has been shortened compared with what we showed back in February 2021. We'll update the market on those points during this year's second half, once that process wraps up.
Katie Lachapelle
analystGreat, thank you everyone. Those are all the questions I had.
Operator
operatorThanks. Our following question comes from Alexander Pearce with the Bank of Montreal. You have the floor.
Alexander Pearce
analystThanks a lot. Good morning, Leigh. My question is really about permitting and the mention of aiming for a decision point, perhaps in H2 of this year. I was just wondering, given the climate up in Saskatchewan, how much of an effect — if it does come a bit later in the year, how much of an effect might that have on your critical path timing for first production, since it obviously gets extremely cold up there?
Leigh Curyer
executiveYes, absolutely. And listen, we're really looking forward to this federal permitting process wrapping up, but, listen, it's ideal to begin work during the dry months, though that isn't a hard-and-fast requirement. We're able to kick off full-scale construction at any point in the year. So yeah, it — it certainly won't be a huge determining factor or have much impact regarding when we get started, but in the end, yeah, we'd love to be beginning full-scale construction as early as possible. We're prepared. We know precisely what we're building. Both we and the local community understand it well. And we simply look forward to this federal permitting process coming to a close.
Alexander Pearce
analystThat’s great—thanks so much.
Operator
operatorThanks. Our following question comes from Craig Hutchison of TD. Go right ahead.
Craig Hutchison
analystMorning, everyone. Thanks for taking my question. Just on setting up the hearing for the federal government, do they need every response to the information requests to be complete, or could that hearing be arranged before that point? And then could you give us some sense of the timing once they've set up that hearing to potentially reach a final decision? Thanks.
Leigh Curyer
executiveSure, it seems reasonable to us that we’d get a Commission Hearing Date. We believe — actually, we know — that although each of the remaining 48 questions matters within the broader picture, they’ve been judged to be fairly immaterial. Whether the CNSC decides to give a commission hearing date before those 48 are concluded or not, only time will tell. But we aren’t looking for a shortcut or any kind of favor. We respect the process, and we respect that the CNSC has its protocols and procedures in place. What we’re saying, I suppose, is that we feel they’re in the final stages of completing the EIS review, and we’re in a position to see that commission hearing date as soon as possible. Based on previous companies in this position, the Commission hearing date comes with a notice period of three to six months. But every case is different, and look, we’ve met all requirements with respect to the EIS approval process, so the document has been well understood and has been in the public forum since November of 2023 — sorry, November 2022, when it concluded the 120 day public comment period.
Leigh Curyer
executiveSo look, this is extremely clear-cut. Everything is available publicly for anybody to evaluate. And so, once the date for the commission hearing has been announced, we would anticipate being at the shorter end of that notice period.
Craig Hutchison
analystAll right, thank you for that. And could you just help us understand what you have in mind regarding the exploration budget, and perhaps some of the early work that you have lined up for this year?
Leigh Curyer
executiveRight, the 30,000 meters came with a $12 million budget. Clearly, given what we announced this morning — this new discovery — we're going to be putting a lot of focus on that area. So you can safely expect the drilling budget to rise beyond that $12 million in 2024, and obviously it depends on results, but since we've hit an intercept that on every measure looks considerably more exciting than the Arrow discovery hole, we suspect we'll be working there for a good while. So Craig, count on that budget going up from $12 million.
Craig Hutchison
analystIt functions, and I figured the math too.
Leigh Curyer
executiveApologies — my line cut out for a second there, Craig.
Craig Hutchison
analystApologies, I was just curious about the early works and pre-construction work you had planned. Is there still some balance remaining on that, regarding the spending plans here in 2024?
Leigh Curyer
executiveRight. So every one of the early confirmation works is within budget. We'll have those wrapped up imminently (ph) — either close to the finish of the first quarter or at the start of the second. But on the whole, as we speak right now, all of it is on budget, and for 2024 we expect it to stay on budget. Plenty of the long lead time items are already ordered, and yes, we've got it well in hand. Like I said, once the federal approvals come through, everything is ready to step up quite significantly.
Craig Hutchison
analystThanks a lot — that’s great, everyone.
Operator
operatorThanks. Our following question comes from Graham Tanaka of Tanaka Capital Management. Go right ahead.
Graham Tanaka
analystNice work, congratulations to you and your team. My questions are about the Patterson East Corridor discovery. Can you share more detail on the geologic structure and what that might mean for how easy or hard it would be to replicate an Arrow Rook I development, in terms of timing and cost? And then, a bit separately, how would you plan to fit a Patterson Quarter East development together with the Arrow mine development production? Do you expect them to overlap, so that production rises at some point within the next six to eight years? Thank you.
Leigh Curyer
executiveYeah, thanks, Graham. All of those are absolutely central priorities as we get a clearer picture of what sits at this new occurrence, 3.5 kilometers almost due east of Arrow, but also at a depth comparable to the Arrow mineralization. Look, I believe we — it remains very early in the process. I’d point everyone back to Figure 3 in the news release. This hole, as I mentioned, is considerably stronger than the discovery hole at Arrow. What we know right now is that a strike target of 1.5 kilometers lies ahead of us to explore. We are noticing many parallels between the holes in and around Arrow and the holes completed so far here. Clearly, further drilling will determine exactly what we are dealing with. What we can say, though, is that today’s result has verified that the Patterson Corridor East is a mineralized corridor resembling the Patterson Corridor, which contains Arrow, Cannon, Bow, Harpoon, and also RRR held by Fission to the southwest. So we understand we are situated in a strongly mineralized region. And to offer some scale relative to Arrow, as I noted, we have 3 meters of greater than 61,000 counts per second. That represents exceptionally intense mineralization.
Leigh Curyer
executiveThat is much greater than the Arrow discovery hole. We are aware that we are in the correct environment, we have encountered some extremely strong mineralization, and what Arrow has taught us is that when you hit that kind of intense mineralization, you know you are close to a source and typically, depending on additional drilling, a very, very substantial source of uranium mineralization. Therefore, any discovery of this kind will clearly be enormously accretive to the long-term mine plan at Arrow. Regarding CapEx and OpEx and so on, once more, it is far too early to establish that until we have completed a number of programs that you have watched us carry out in the past since 2014 at Arrow. However, the Arrow Rook I feasibility study was always intended on the basis of facilitating additional uranium deposits in the area. We have always also been building that into the final design and scope of the project, all inside the federal permitting parameters of course, and any new occurrence like that Patterson Corridor East we have found today, if it is proven to be economic, would likewise be subject to permitting. But look, I think the main point for everyone today is that we expect to be producing at Rook I for considerably longer than what the current feasibility studies suggest.
Leigh Curyer
executiveThat has been clear to us from the start. Beyond that, we have mineralization at depth beneath Arrow. And although that mineralization has not yet been fully defined or economically assessed, it is plainly a fair expectation that you will see it processed through the mill at Rook I too. So it is tremendously exciting. In fact, it could be a major game changer on top of what we already have at Arrow, which is world class. So, Graham, give us some time, and we look forward to responding on all of those points that you have raised.
Graham Tanaka
analystYeah, I would just — if I could, sorry, there's a lot here to try to digest, I'm sure even for you. But could you just give us a hint about the geologic structure and whether the potential mine at PCE, Patterson Corridor East, would be similar to Arrow and therefore, given your applications for approvals for the Arrow Rook I project, can you accelerate the timeline for developing a second major corridor? Or would it take 10 to 12 years?
Leigh Curyer
executiveOkay, Graham — from what we currently know, I can only speak to that, and the holes in and around this new intercept are showing metrics and a style comparable to the setting over at Arrow. I can't yet put an exact number on what's there or on the potential economics. It sits 3.5 k's away, on land. So any economically assessed deposition near Arrow could be accommodated, though obviously that's subject to permitting of those subsequent deposits. That remains to be determined. What I think you can take away from what we know today is that any economic mineralization in the vicinity of Arrow would, practically and environmentally, obviously go through the mine. That said, it's far too early, after so few holes, to be talking about speeding up development of any new occurrence.
Graham Tanaka
analystYeah, thanks a lot. Best of luck.
Leigh Curyer
executiveI appreciate it.
Operator
operatorOur next question comes from Brian MacArthur of Raymond James. The line is yours.
Brian MacArthur
analystMorning, and thanks for taking my questions. If I could just build on the previous question — you brought up material at depth too. Suppose that proved more economic, which would clearly have to be potentially quite good, compared with the new Patterson East — could you do that under the permit you currently hold? What I'm really driving at is this: what exactly is being permitted right now for flexibility, meaning what else might you bring in during the later years without having to go through an entire process again?
Leigh Curyer
executiveOkay, and sorry — thanks, Brian. Anything directly beneath (ph) Arrow clearly falls inside the zone affected by the permits we're in the middle of securing. The practical reality, though, is that every mine extension has to follow a set procedure. Still, anything located under Arrow, I think, and anything found later in and around Arrow, I think, can safely be assumed to be covered by the approval we're currently seeking. A new occurrence like that one 3.5 kilometers along the Patterson Corridor East — potentially that's unknown at this point. We have to run a great many assessments covering the environmental side of it and make sure what we're proposing lines up with what we've already been permitted for. Should it not line up, we'd begin that work very early, on the assumption that further drilling shows it to be economic. So to sum up, from what we know today, and or even prior to today's discovery, anything sitting within an economic distance of Arrow, we would aim to add into the Rook I mill as proposed under the federal approval process we're going through.
Brian MacArthur
analystThanks, that's helpful. One more follow-up, if I may: I believe you brought up a small scope change while responding to Katie's question on the new CapEx and OpEx — is that right? Is anything significant shifting on that front, such as throughput going from 1,300 to 1,400 tons a day? Does anything of that sort feature there, or is it merely, so to speak, minor tweaks to the construction and similar items?
Leigh Curyer
executiveYeah, Brian, that's a fair question. From the very first preliminary economic assessment all the way through the pre-feasibility study and the feasibility study, the mining and milling method has stayed the same. We're talking about exactly the same mining and milling method, with a few slight design improvements to boost environmental performance over the mine's life. So nothing material, nothing dramatic — just some improvements around the edges that serve the project's long-term interest. That's all.
Brian MacArthur
analystThanks, that's helpful. Perhaps I can squeeze in one more quick question. It's encouraging that you've now secured $1.25 billion compared with $1.1 billion in commitments. Could you walk us through once more what remains to be done? I understand documentation is required, but how much contracting, if any, might be necessary to complete it? You mentioned it would be finished by the back half of the year, and also perhaps whether any new participants have joined — are they still the same international institutions, as I'd describe them? In fact, utilities and customers are among those coming in with that latest $250 million.
Leigh Curyer
executiveOkay, let me take the first part of that response, and then I'll pass things to Travis. The level of interest coming our way each day keeps growing. From an economic standpoint, as well as an ESG and green one, the project's profile is widening the range of avenues—or sources—for potential debt and equity funding. Regarding the percentage needed when it comes to contracting and offtake, I'll turn it over to Travis shortly. What we do know from the process so far, though, is that lenders feel quite comfortable with us signing volume-based contracts tied to spot at delivery time in order to service that debt. Travis?
Travis McPherson
executiveRight, absolutely. That really is the crux of it, Leigh. As for the size and the quantity involved, it's clearly going to be fairly immaterial relative to total production volumes, considering the economics and how fast it pays back. Of course, the precise percentage is going to be set mainly by the agreed forecast long-term uranium price. But then again, we're talking about a very immaterial quantity of output being contracted on a volume basis — or sorry, what I mean is, a requirement from the lenders to do that in any case will represent a very small percentage covering a few years of the initial production period, and after that, everything else is ours to optimize and decide what's best for us in the market.
Brian MacArthur
analystExcellent — I appreciate the two of you taking the time to address every one of my questions.
Leigh Curyer
executiveThanks, Brian.
Operator
operatorWe'll take our next question from Andrew Wong with RBC Capital Markets. Please go ahead.
Andrew Wong
analystMorning, and thanks for the chance to ask a few things. My questions concern the contract talks. First, I suppose, can you describe the types of customers involved? Are utilities the main group? Do intermediaries play a part? Which countries or regions do these customers come from? Then my second question concerns how you would — how do you intend to build in some flexibility regarding when the mine starts up? My assumption is there would be some volume flexibility, whether pulling forward or pushing out, since uncertainty about mine startup and timing is always present. Could you speak to that? Thank you.
Leigh Curyer
executiveSure, I'll begin with that, and then pass things over to Travis as well. On the question of delivery timing, it hinges heavily on the moment the federal permit comes through, and we've made it very clear to the utilities throughout our negotiations that as soon as that schedule is locked in, we can be highly precise about volumes for specific dates. The key element of this entire process is that we're moving it toward a pricing market that's more transparent, much like what happened with iron ore back in the 2000s, and that has served the interests of both the producers and the buyers of the commodity. And the region we're focused on, or the utilities we're in advanced discussions with, are based in the US, Europe and Japan at this moment. We also have additional talks going on in other regions of the world, but the US, Europe, and Japan represent the more advanced negotiations right now. Travis?
Travis McPherson
executiveRight, and I might just add — yeah, exactly, Leigh. And in those regions, we're only talking with the biggest nuclear fuel consumers globally. And what we can tell you is that these counterparties we're in discussions with very much understand and accept the company's approach and philosophy when it comes to these volume-based contracts. Again, given the fact that it not only benefits us as producers and future producers, but the utilities themselves too, in the changing dynamic as we look ahead in the uranium markets.
Andrew Wong
analystAll right, so I suppose — let's just say the permit comes through, possibly as soon as this year, and you're able to begin construction with everything running smoothly. Production starts in 2028, so you sign contracts for delivery beginning in 2028, but nobody can predict what will happen and anything might come up, like, let's say things slip to 2029, 2030 — I'm simply trying to get a handle on the NexGen side of this: these contracts, is there some flexibility in how that works? For instance, would you find yourself in a position where delivery by 2028 is mandatory? Just sort of thinking through that.
Leigh Curyer
executiveYeah, well, that's not something we're going to—sorry about that, Travis.
Travis McPherson
executiveNo, please, you go ahead.
Leigh Curyer
executiveYeah, Andrew, we’re not going to get into a position where we needlessly hold back optimizing or maximizing the returns on every pound produced. We’ll approach this very conservatively, and as we have with everything since the company incorporated, our use of capital is extremely efficient. And we always include a very healthy dose of conservatism in the expectations we set. And we deliver against those with respect to the contracting — that approach will incorporate all of those disciplines and approaches. So while we — I can’t tell you today specifically what the terms and conditions of those contracts are, you can take away that we’re going to do it in our traditional, conservative, very careful and disciplined manner.
Andrew Wong
analystAll right, that's excellent. Thanks a lot.
Operator
operatorThanks. Our following question comes from Chris Thompson with PI Financial. The line is yours.
Chris Thompson
analystMorning, Leigh and everyone. Nice work on what came out this morning. About that find, I was going through the descriptions — it looks like it's mostly hosted in the basement. Is that right, for the mineralization?
Leigh Curyer
executiveYes, it’s entirely hosted in our basement. That’s right.
Chris Thompson
analystThanks. And sorry — I may have missed this in an earlier answer to a question, but could you give us some sense of what's left in the budget for this year, or what the budget is for this year excluding exploration?
Leigh Curyer
executiveSo, if we leave out exploration, this year's budget comes to roughly $170 million, though that obviously depends on when the federal approvals come through.
Chris Thompson
analystYeah, fantastic. All right, that's all. Thanks so much, everyone. Congrats once more. Thank you.
Leigh Curyer
executiveI appreciate that.
Operator
operatorThat appears to be all the questions for now, Mr. Curyer, so please go ahead.
Leigh Curyer
executiveThank you, everyone. We really appreciate all of your interest in NexGen, and this is a hugely exciting moment as we concentrate on what remains in the federal approval process. As we discussed on this call, we're waiting eagerly for that process to wrap up, with respect shown and full consideration given to engaging every stakeholder. We have an outstanding project that's right at the edge of entering construction to serve global energy demand, and at today's spot price, it would place us among the top nine or top 10 mining companies in the world on an after-tax cash flow basis. So adding a new discovery to the story today is tremendously exciting for all involved, and it truly demonstrates how prospective that dominant land package is that we hold in the mighty southwestern part of the basin. We therefore have plenty of work in front of us to completely establish how far uranium mineralization truly extends across our properties. But yes, regarding the feasibility study on NexGen, I believe everyone can safely regard it as a base case that this will be a generational mine of enormous scale, one that will affect the local communities, Saskatchewan, Canada and the entire world given the impact of the fuel it will generate.
Leigh Curyer
executiveWith that said, we’re eager to move into Q2 and the rest of this year, and to truly execute on several initiatives that we’ve been developing for more than 10 years now. With that, thank you all for tuning in and for your ongoing support.
Operator
operatorAppreciate that, sir. Everyone, that really does bring today's conference call to a close. Thanks again for joining us. And right now, we'd ask that you kindly disconnect your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete NexGen Energy Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to NexGen Energy Ltd. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in NexGen Energy Ltd. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.