operatorGood morning. I'm Julie, and I'll be serving as your conference operator today. Right now, I'd like to extend a welcome to each of you for NexGen's Energy Q1 2024 Financial Results Conference Call. Every line has been muted so that background noise won't interfere. Following the speaker's remarks, a question-and-answer session will take place at the end. <<operator_script>>. Prior to starting, kindly take note of the caution below regarding forward-looking statements, which is provided on behalf of NexGen Energy and each of its representatives participating today. Statements during this call will include forward-looking information carrying risks and uncertainties. Outcomes that actually occur may differ materially from a conclusion, forecast or projection found in that forward-looking information. Certain material factors or assumptions were applied when producing forecasts and projections, and those are detailed in the forward-looking information. Further details concerning those material factors and assumptions appear in NexGen Energy's filings and can be accessed on the Cedarplus website at www.sedarplus.ca. Mr. Leigh Curyer, CEO and Director of NexGen Energy, you may begin your conference.
Leigh Curyer
executiveThank you, Julie. I'd like to welcome everyone and express my appreciation to shareholders and stakeholders worldwide for taking part in NexGen's Q1 2024 update and financial results call. My name is Leigh Curyer, and I serve as Founder and Chief Executive Officer of NexGen Energy. With me today are Travis McPherson, our Chief Commercial Officer, and Ben Salter, our Chief Financial Officer. Looking at both the company and the industry, the first quarter of 2024 has been excellent, and I'll begin with an update on the industry landscape and the uranium market, which is now entering an unprecedented phase — last night, President of the United States Joe Biden signed legislation into law that prohibits importing Russian uranium and frees up $2.7 billion in spending aimed at supporting the build-up of US domestic uranium supplies. This is a direct reflection of the particularly elevated risk tied to a large percentage of current mine sources and available supplies. We'll give a progress report on advancing the Rook I project, specifically federal permitting, which stands in its final stages with the CNSC project development, along with respect to front-end engineering design and detailed engineering, which are progressing; and exploration, which includes the early stage discovery of new mineralization in the first drill hole at the target on an entirely new conductor corridor located 3.5 kilometres from the corridor that hosts the mighty Arrow deposit.
Leigh Curyer
executiveOn the financing side — and this covers two deals we've done in the past two weeks — there's the AUD250 million in CDIs we raised solely on the ASX, which closed this morning before market open, plus the strategic acquisition of 2.7 million pounds of <<inaudible>>, which, with last night's ban now written into law, could hardly be better timed. Once that closes, NexGen holds roughly $930 million in cash and liquid assets as it prepares to build the Rook I project. Following these remarks, I'll open things up for a Q&A session, and I'd encourage everyone on the call to put your questions forward. Over the past six months, it's been very heartening to watch governments around the world bring in energy policies and strategies that line up closely with what NexGen saw back in 2011 — namely the part that sustainable, cost-effective nuclear energy would play across the 2020 decade and after. Nuclear is increasingly viewed as an essential piece of the global energy mix, meeting the demand for clean, efficient and secure sources of power. The world is moving aggressively to bring more nuclear generation online — a tripling by 2050 — through new builds in countries such as China, India, the UAE, UK and France, along with restarts and extensions in large, key nuclear markets like Western Europe, Japan, South Korea and the United States.
Leigh Curyer
executiveThis growth matters more and more as electrification spreads across the globe at a faster pace, particularly with artificial intelligence and electric vehicles being adopted ever more widely. Each of those requires a dependable baseload power supply, which is bringing about a paradigm shift within the energy market. That pressing demand for a nuclear renaissance keeps building, as many thought leaders have pointed out — among them tech giants like Microsoft and Amazon, plus figures such as Sam Altman, OpenAI and Brad Gerstner, the legendary venture investor. Demand is robust and sustainable, and it is rising considerably faster than anybody had forecast, so attention has turned toward whether the industry can supply this essential energy fuel. Supply, though, presents another picture — a story of fragility and decline. A combination of more than a decade of severe underinvestment, disruptions to supply, shrinking inventories, and on top of that significant geopolitical risk, is bringing about a new market reality; one that requires more dependable uranium sources, and it has pushed uranium spot during the quarter just passed to fresh 15-year highs at $107 a pound. Given these supply difficulties, fresh sources have to be located via purposeful exploration efforts and then developed, and that takes time, even for companies doing solid work such as ourselves and our Canadian development company peers, Denison, Fission, UEC and IsoEnergy in Canada.
Leigh Curyer
executiveFinding and developing a mineral project is anything but straightforward, convenient, or fast. A minimum of 15 years is needed before newly discovered sources become operational. Advancing the Rook I project into production within this decade matters more now than ever, and the NexGen team is fulfilling that goal. Within Canada, the federal government has acknowledged this significance and places strong emphasis on a commitment to growing the nuclear sector, at home and around the world. That covers measures to speed up the approval process for nuclear projects in Canada along with greater availability of funding, as underscored in the latest federal budget. NexGen is the Rook I project, and every one of its shareholders and stakeholders is extremely well positioned to benefit from this commitment by the Canadian Government. The significance and the reality of the need for allied supply chains was bluntly reflected last night with the signing of the prohibiting Russian Uranium Imports Act. This is set to take effect in 90 days, banning US imports of Russian uranium in a phased manner through 2028. This legislation launches a new, unprecedented era in the uranium market and is expected to tighten the market considerably, leading to significant and long term upward pressure on uranium prices. As a result, for all these reasons, utilities are seeking to diversify their highly concentrated nuclear fuel supply chains in allied jurisdictions.
Leigh Curyer
executiveRook I is set apart as the biggest and cheapest future producer anywhere in the world, backed by a remarkably solid technical and environmental profile — something shown by its vertically stacked ore body, which is large, high grade, and sits in our ideal hard rock conditions with clean ore, making it genuinely without equal across the global uranium sector. It's encouraging for us to learn that our government partners, whom we value, along with nearby communities, understand how important Rook I's generational profile is, and they recognize that Rook I is going to cement Canada's place as a global leader in delivering uranium as part of the green energy solution. Moving forward, NexGen feels energized about advancing the Rook I project into construction and then production, doing so through our innovative culture, deep expertise, operational excellence, and our shared commitment to being a key contributor to the essential global clean energy transition. During the first quarter, we kept executing our strategy of permitting Rook I for construction. After we received Saskatchewan Provincial Environmental Approval for the Rook I project on November 08, 2023 — the first greenfield uranium mine and mill project in Canada to gain provincial EEA approval in more than 20 years — we promptly submitted responses to the CNSC technical comments. On February 12, 2024, when the prescribed 90 days following that submission ended, NexGen had only 49 comments left to address, and once those are successfully handled, the federal environmental impact study will be concluded.
Leigh Curyer
executiveWe feel very good about this CNSC review, and we have been wrapping up our follow-up responses to the 49 comments still outstanding; those will be filed very soon, either this week or early next, and a news release will reflect that at the same time. All of this comes against a background of complete backing from our local indigenous community partners, every one of whom has signed impact benefit agreements with NexGen covering the entire lifecycle of the Rook I project. Turning to project development, the 2023 site confirmation program is helping inform and validate the final detailed design for the production exhaust shafts, water treatment, the underground tailings management facility, the mill, and the surfer surface infrastructure. That work is expected to wrap up at or around the close of Q2, and at that point we will give an updated cost summary covering CapEx, OpEx, and project economics. On procurement, we are settling the particulars of the shaft sinking contract award and moving forward with purchasing the mine hoist system, which will be awarded before long. In addition, we are awarding a range of ancillary site contracts, among them the LNG power plant, over the second half of this year. As we mentioned earlier this year, our 2024 Winter Exploration program has delivered successful results at an entirely new discovery on the Patterson Corridor East, located 3.5 kilometres east of Arrow on a separate conductor package.
Leigh Curyer
executiveThe heavy mineralization we found in RK-14 through 183 caused us to concentrate the rest of the winter exploration effort entirely on that zone, so we could begin by grasping how far the system reaches. Because Patterson Corridor East shares geological traits with Arrow, the summer schedule will keep attention on this zone for a substantial stretch of time. The first exploration holes at Arrow back in early 2014 were intersecting the upper portion of the strong, large mineralization lying beneath. That find, together with the holes drilled so far, points to a comparable setting for a broad mineralizing event nearby. We are on the verge of receiving assays from the rest of the 2023 program, and the 2024 summer drilling campaign gets underway in late May, larger than the winter effort and entirely on this new discovery. Each discovery carries its own distinct character, and this one will be no exception, yet keep in mind that the way we are carrying out this drilling campaign applies the same industry-leading technical method and rigor used at Arrow when it was found, and does so in the fashion that delivered the greatest efficiency in time and cost for each meter drilled in uncovering a deposit exceeding 100 million pounds anywhere in the world. On the contracting side, talks keep progressing favorably with reputable nuclear power utilities.
Leigh Curyer
executiveWe've been acknowledged as a major future producer, and there's a solid grasp of how NexGen is positioned as a key element in whatever supply portfolio a utility may hold going forward. Industry market commentary shows that negotiations on contracts for 2028 and later are taking place at this moment. Last week, NexGen disclosed that it had bought 2.7 million pounds of physical uranium at USD92.50 per pound, funded through issuing a 250 million convertible debenture at a 30% premium to the five-day VWAP of our share price. That debenture carries identical terms to ones we've completed successfully before — with CEF, Li Ka-shing in 2016 and '17, Queens Road Capital, and more recently Salt Pattersons in Australia — each of which includes an Investor Rights Agreement covering shareholder voting alignment, standstill, sale and transfer restriction covenants, and anti-hedging via short selling options, swaps or derivatives. Procuring uranium at this point makes sense, considering where we stand in development — nearing final permitting, then construction, and even more importantly, the contracting cycle for deliveries starting in 2028 and afterward is happening right now. That's right, right now. The Russian uranium ban signed last night, which is fully enforced by 2028, means that the significance of procurement for this period and beyond has grown even more substantially over the last 24 hours.
Leigh Curyer
executiveNuclear fuel stands apart because it's an extremely specialized production input for power utilities — one that takes many years to procure and isn't readily available if you're caught short. Inventory levels at producers and on the spot market are no longer ample enough to cover any unexpected shortfalls. In light of these fragile supply-side dynamics, utilities are rightly concentrating on supply security today. This purchase demonstrates that NexGen has their back and is a responsible, reliable supplier — a reflection of respect for and understanding of their risks and their requirements for successful operation. As for the price of $92.50 per pound, recent spot market purchases over the last six months show that 100,000 pounds has been producing upward price movement of greater than $1.50. We are confident we have bought extremely diligently while at the same time strengthening our contracting and debt financing approach. Regarding the debt package, which we'll keep advancing through due diligence and schedule, wrapping up shortly after federal approval, it encompasses many different potential avenues, and significant capacity is under evaluation while maintaining leverage to future uranium prices — as evidenced by expressions of interest from lenders now totaling approximately USD1.4 billion, which gives us substantial, excessive capacity to fund and execute the project.
Leigh Curyer
executiveWe keep seeing robust backing from institutional and retail investors across Australia and the wider Asia Pacific area, and those investors show considerable appetite for unhedged uranium development opportunities. Our listing, and then our addition to the ASX 300 index on March 18, was a major milestone, and it shows how our company keeps working to open up new shareholder markets and exposure while securing the best possible outcomes for our shareholders and stakeholders along the way. Consistent with that goal, NexGen completed a $224 million placement for ASX investors two weeks ago, and when you add the $250 million convertible we issued, our cash and liquid assets come to roughly $930 million Canadian, and that figure leaves out our investment in ISO energy. We have dealt in a substantial way with the equity portion of the funding for building Rook I, giving the market a clear view of our aim to move Rook I straight into construction once federal approval arrives, with the worth of that milestone free of encumbrance. During September of 2023, NexGen raised about $540 million, with the discount to market standing at an industry-leading 1.5% to 4%, and we still delivered <<inaudible>> sector-leading share price performance. On top of that, this happened over a stretch when CES were selling off their stake. That stake was about 18% at the start of last September, and as of just yesterday we were told they now hold under 0.1%.
Leigh Curyer
executiveWe take a lot of pride in the return on that investment in CEF going back to 2017 — more than 500% — and we're just as enthusiastic that it has been swapped out for new holders, mostly large Australian-based shareholders who feel a connection to a new world mining company that produces outstanding returns. Come the end of Q1 2024, roughly $459 million will have gone into the successful exploration and development of the Rook I project, and that has brought us to a current market capitalisation of $5.4 billion. One day before we announced the uranium purchase last week, NexGen reached a fresh all-time high market capitalisation at $12.14 per share and topped every year-to-date and one-year rolling table among its peers. That 2.7 million pound uranium purchase amounted to about 4% dilution to that market cap and puts NexGen in a much stronger position than it held before the announcement. Before we move to Q&A, I want to bring up Susannah Pierce's nomination for election to our board of directors at our upcoming AGM in June, which is covered in the NexGen management information circular issued last week. Susannah presently serves as President and Country Chair of Shell Canada. Her know-how and experience across the global energy industry, along with genuine engagement with local indigenous communities and government stakeholders, make her a natural fit for our organization.
Leigh Curyer
executiveI'd urge everyone to take a look at the NexGen management information circular — it lays out every element of how we're approaching, governing, and conducting diligence on what will be the biggest uranium development project in the world, and one that stands out environmentally, socially, and economically. What makes our team strong is how varied it is, strengthened by top-tier talent drawn from many different backgrounds, which gives us a broad perspective that improves how we operate. Looking at 2023, our workforce by gender came in at 66% male and 34% female, while the Canadian mining average for women was 16% higher — more than double. We're proud that 80% of signed Rook I employees came from the local priority area. More than 44 million was spent in 2023 on supplies from the local priority area, which drives economic development in nearby communities and creates resilience that lasts and sustains itself. As the project moves ahead, we keep growing our high-performance team, and building and investing in skilled talent is essential both to our ongoing success and to the success of local economies. To sum up, we're progressing with the backing of our valued indigenous partners, our shareholders, the regulatory and governmental authorities, and our dedicated team. Looking ahead to the remainder of 2024, our priority is pushing the Rook I project forward.
Leigh Curyer
executiveThis is a pivotal and thrilling moment for our company, and it’s always an honor to discuss our ongoing growth with you as we collaborate to secure the energy transition. Now, let’s move into the Q&A, and we welcome questions from everyone. I’ll turn it over to the moderator.
Operator
operatorOur next question is from Andrew Wong at RBC. Andrew, your line is open.
Andrew Wong
analystMorning, and thanks for the chance to ask questions. It's really encouraging to hear that the EIS will be resubmitted shortly. I just wanted a bit of clarity on the timeline. Once you've submitted it, what are the specific steps and how long does each take before a public hearing can be arranged, and what actually takes place at that public hearing? Is it possible that public commentary emerges that has to be dealt with during that process, and then after that, what's the timeline from the public hearing through to a final decision from the Minister?
Leigh Curyer
executiveYes. Thanks, Andrew. Well, we're quite happy with how the CNSC responded. To begin with having 277 questions, as our consultants put it, was unheard of at this point in a project. We're now down to 49, and although each one matters enormously and we treat them with respect, we'll be filing very soon — either at the end of this week or the start of the next. Now, under the rules and regulations, the CNSC gets another 90 days to review and resolve those 49 remaining items. Once those 49 items are resolved, the EIS will be considered final. At that stage, a commission hearing date will be set. Now, every project that has reached a commission hearing has been approved within 60 days. I think while all items are extremely important and material, this is extremely significant for wrapping up the EIS, and we're very much looking forward to the end of this next 90-day period, which from memory falls at the end of July, and we're certainly eager for those 90 days. Now, regarding other public comments that could come up, the federal government already conducted its 120-day public comment period back in 2022, and the questions we've already handled were aimed at those public and technical comments.
Leigh Curyer
executiveFrom where we sit, it has been extremely thorough and very rigorous, and it has brought in every stakeholder group, and that comes on top of having full backing from the communities within the local project area, all of which have gone through and given their approval to the EIS in the form we submitted to the CMSC.
Andrew Wong
analystAll right, that's excellent. And then, regarding the Rook I project specifically, I think you've been fairly clear about your plans to get it into production. It sounds like a construction start could potentially happen within the next six months to 12 months. So you just mentioned the technical team you already have in place. What's that team's size at present, and how much more do you need to grow it? How fast are you able to hire the workforce required to build a project?
Leigh Curyer
executiveAbsolutely. So once we get the federal approval, we'll be able to begin the following week right away. On a lot of the site infrastructure work, we've completed 100% of the engineering, and the preliminary works needed so construction can properly get underway — all those early stage items are 100% engineered. The rest of the engineered items, the mill specifics — think about the wiring and that kind of thing — so we're set, pending federal approval, to start right away. On the team side, we currently have roughly 76 people in our Saskatoon head technical office, and at NexGen our culture is absolute responsibility, so there's a dedicated NexGen person for each aspect of what we do. That covers not only building the project but also geology, the financial side, the commercial side, all of it. So we've been extremely strategic and well planned when it comes to bringing in the personnel and technical expertise we want, going all the way back to 2017. We knew back then that we had a project, and we're carrying it forward into production. That's ramping up as we speak, and just to give one example, on the safety front we're now splitting that into very specific safety areas — surface, underground, radiation experts — and given how the project looks and the culture NexGen is showing, we're extremely pleased with the quality of applicants we're getting, not only from Saskatoon and Saskatchewan but from beyond Saskatchewan too, and so Saskatchewan will see an inflow of skilled labour as a result.
Leigh Curyer
executiveOn the labour side on the ground, our community team — led by Adam Angle and Dylan Smart in Saskatoon — has already been running training programs with the various government technical colleges in Saskatchewan, and uptake of those programs has been absolutely phenomenal, so we're well prepared on both fronts, and it shows our commitment to making as many of the jobs local as achievable, and you're also going to see an inflow of population into the local community area when construction of the project commences.
Andrew Wong
analystThat's all very helpful. Thanks so much.
Operator
operatorPuneet Singh from Eight Capital has the next question in the queue. Go right ahead.
Puneet Singh
analystHello there, and good morning. I have a few questions about the convertible — specifically around strategy. Given how the uranium price has moved, why didn't you do this a couple of years back? And what exactly were you observing in the market that led you to act at this point?
Leigh Curyer
executiveYeah, look, you're absolutely right. We've consistently believed uranium prices would climb — that was true five years back too — and they will keep rising, but deciding to buy uranium pounds at this point fits perfectly with where we are in development. We're on the verge of — we're in the last phases of federal approval. Once we get that approval, we begin construction right away, and the contracting window for 2028 and afterward is happening now, so that drove the decision, given how fragile current production and available supplies are — producers have drawn down inventory on hand substantially over the past two years, and on top of that the spot market is extremely tight. And when it comes to nuclear fuel, utilities need certainty of delivery. So our purchase of 2.7 million pounds matters a great deal in our contract talks with utilities and acknowledges their concerns about supply security, so the timing of it is obvious today, and I'd say the Russian ban brought in last night has lifted that considerably into a new era that is, frankly, unprecedented.
Travis McPherson
executiveYeah. Hey, Puneet, Travis here. I'd just add as well that, yeah, regarding timing — three, four, two years back, even we hadn't reached the stage of these negotiations with the utilities. Now we have, and to Leigh's point, the world the utilities inhabit is that 2028 is tomorrow, so that's where the decision on the exact timing sits. It's not a — while we're extremely bullish on the uranium price, obviously, for all the reasons and more that Leigh laid out in the opening remarks, it wasn't purchased on the basis that we're speculating on the uranium price. It's really tied to the development of the Arrow project as it relates to contracting, which obviously feeds into the debt financing discussions that we're having as well.
Puneet Singh
analystAll right, understood. And to follow up on that point, if it ends up being linked to the utilities, should we anticipate additional buying from your side, or how ought we to think about that from a strategy standpoint—contracts as opposed to physical inventory?
Leigh Curyer
executiveWell, look, you won't really see us doing any substantial filling. Clearly, most of the output coming from Arrow and the contracts we sign will be handled by Arrow's production — the overwhelming majority of it, in fact. Again, going back to Leigh's point, that 2.7 million pounds and whether it expands beyond that, that remains to be seen, but I think we're quite pleased with the 2.7 million pounds we secured, since it gives the utilities something of a safety net, and once more, I really believe it shows that people grasp the supply difficulties — in other words, the insurance available in the market is quite constrained.
Travis McPherson
executiveAnd although this is extremely, extremely unusual in the nuclear fuel market when it comes to mining, it is something a start-up operation has to do—yet it isn’t unusual when you’d have watched other developers take a comparable step as they get close to production. Boss Energy has done this, and Denison has done it too. So in that respect it isn’t unusual, and even so it does mirror the reality of opening a uranium mine. It genuinely does mirror the fact that we are moving this project into production.
Operator
operatorKatie Lachapelle of Canaccord Genuity has the next question — go right ahead.
Katie Lachapelle
analystHey everyone, thanks for taking my question. I actually have two, but first I want to quickly follow up on what Puneet asked. Regarding the contract negotiations you have underway at the moment, what kind of volumes or tenor would you want to lock down when you go to sign contracts?
Leigh Curyer
executiveOkay, I'll begin with that question and then pass things over to Travis. Right now we're in discussions with four major utilities, and they're at differing stages. We've made it extremely clear that what we want is three-year offtake agreements priced specifically against market rates at delivery time. At present, volume figures are commercially sensitive, but considering the supply-demand shortfall that every market commentator anticipates for 2028 and later — and I noticed this morning an Australian bank issued a forecast of $150 for uranium by the close of 2025 — I have no doubt whatsoever that we will be signing contracts amounting to what Arrow can produce each year.
Travis McPherson
executiveRight, and I'd just like to say as well — there's really no rush here. Some agreements do need to be signed, or it makes the most sense to get certain contracts signed within the window we're currently in. On the question of specific volumes — take day one, when we look ahead over, let's say, the first 3 to 5 years of Arrows production, and to the degree that we take that on and fund it through the debt, which again is the route we're actively pursuing at the moment, there will be a minimum level. In rough terms, I'd say that minimum is quite small relative to Arrow's total production — enough to underpin the cash flows required to cover those debt service payments and keep utilities or the lenders comfortable — and then, moving forward from where we are now, I think you'll simply see contracts, off-take discussions and deals getting completed step by step as we go from today all the way to final start-up of production.
Katie Lachapelle
analystUnderstood — that's really useful. Perhaps just one more thing: in the prepared remarks, you said you would be giving updated figures for capital and operating costs near the close of this quarter or at the start of Q3 — could you share any detail on where the biggest cost effects are showing up for you?
Leigh Curyer
executiveOkay, I'll begin and then pass things over to Travis again, but regarding costs, and as I mentioned on a previous call, inflation's effect on the $1.3 billion figure from the 2021 feasibility study has reached roughly $320 million so far. Labor wages have likely been the largest contributor across the board on a weighted basis, though we're also seeing some declines in raw materials. The two shafts represent the biggest cost element of the construction, and we'll be signing a contract that caps further inflationary pressure on building both the production exhaust shafts, but to address your question, Katie, it's mainly labor.
Travis McPherson
executiveYeah, yeah — and regarding that inflation point, I think it matters too that this isn't something derived from market indices of any sort. For instance, we compared unit cost against unit cost, going from the feasibility site through to today, so we know precisely what that figure is, and then the other pieces beyond the inflation effects are getting finalized right now via some test work that's still underway and the wrap-up there.
Leigh Curyer
executiveIn terms of — we're sitting at just under a billion Canadian dollars in the treasury right now. And once you factor in the debt process's expressions of interest, which exceed 1.4 billion US, our capacity is more than sufficient, even when we take into account how inflation affects the feasibility study. We are extremely well financed to carry out this project using our existing cash and liquid assets, including that debt expression of interest.
Katie Lachapelle
analystGreat, thanks everyone. I really value the thorough answer.
Operator
operatorCraig Hutchison from TD Cowen has the next question. Go ahead, please.
Craig Hutchison
analystMorning, everyone. This is a bit of a follow-up on when those purchases of yours actually happened. From where I sit, I figured that with a tier one asset in a tier one jurisdiction, you folks would hold the stronger hand in off-take negotiations and wouldn't need to sign purchase agreements at this point. Could you walk us through how those talks are going? Is it that the utilities aren't in much of a hurry at the moment to lock in contracts? Are they not short on material? A little color would help, since I believe in earlier conversations you mentioned the possibility of even doing something like a forward sale of uranium. Thanks.
Leigh Curyer
executiveAlright, and good morning, Craig. Regarding the offtake description, we're collaborating with the utilities to establish contracts and arrangements that are mutually beneficial. So it's not about us flexing our muscles and creating a win-lose situation. We're building long-term relationships with these key utilities, and that uranium purchase showed that we understand their concerns regarding a start-up operation, which is something every start-up operation faces. And as we've observed, Dennison and Boss, etcetera, have taken a comparable approach, which is extremely shrewd and demonstrates their grasp of the contracting process. Without question, the emphasis on supply security is now considerably heightened and rising each week alongside these market developments—we're moving into an unprecedented phase. Yes, a forward sale of a contract is a possibility, though it might not necessarily involve a utility. We're getting expressions of interest regarding that possibility not only from utilities but also from financial players. So our approach involves understanding the utilities' particular requirements and is centered on a win-win outcome for both the producer and the utility, factoring in the risks associated with producing nuclear energy.
Travis McPherson
executiveI'd just like to add to that, Craig, that what this really comes down to is optimization and how we see the best way of achieving it. It's possible to secure contracts without having bought uranium first — that's clearly been done in the past. But the way I'd frame it is this: we're seeking to get the most value out of the more than 350 million pounds we hold in the ground, and acquiring some uranium at this point — roughly 2.7 million pounds — to help us potentially improve the sale price those contracts secure for that plus 350 million pounds strikes me as a genuinely smart and shrewd step. So, yes — you're right, and we agree. This asset is what it is, and it stands for what it stands for within the uranium market: unique, sizable, and high quality. But the whole point here is optimizing that. We aren't simply leaning back and declaring that since we hold the best, it's take it or leave it. What this is really about is collaborating with the utilities and letting the market evolve over time.
Craig Hutchison
analystAlright, thanks for that, everyone. Perhaps just to follow up. Given the interest you've received regarding debt and the financial work you've completed over the last couple of weeks, you previously mentioned possible project-level equity involving a partner outside mining. Does that remain an option, or has it been set aside in light of the recent financings?
Leigh Curyer
executiveNo, it remains a possibility, though I'd say perhaps less of one considering the latest financing and how things look. And I hear the remarks about why act now when a major milestone—federal permitting—is approaching. But much like the 2.7 million pound uranium purchase, having the treasury ready ahead of approval is essential so the CNSC and the government of Canada know the funds are there. That's a really important element, so completing it before that federal approval news arrives—and obviously subject to wrapping up the process respectfully—means we now have it ready, and once approval comes, we're well financed to build the Rook I project. So I think that's very, very clear. And we appreciate the chance to give the color behind that, because on face value, as I mentioned, we hear that it's less dilutionary after a milestone, but this way we have it ahead of one, and it reflects the practicality of constructing a mine alongside regulators, while also giving that significant milestone the company will deliver on federal approval. Absolutely clear air for it to be reflected in the organization's value at that time.
Leigh Curyer
executiveThis is genuinely, genuinely thrilling for every shareholder and every stakeholder.
Travis McPherson
executiveYes. And Craig, regarding that joint venture you brought up — and the same holds for the debt and all the rest — I'd say every one of these matters is a negotiation. When you're negotiating, showing that you have alternatives counts for a lot. So having a very strong balance sheet right now helps us get the best outcome, again, in the debt conversations we're conducting, because we're not — this isn't a — we aren't sitting in a weak spot there. We do have other choices, and much the same applies to the joint venture talks. We're then able to work on genuinely optimizing those. We demonstrate that other routes exist and that we have other opportunities for funding it, and we do. That's accurate. We have plenty. Nobody should find that surprising. Under our stewardship, there are numerous ways to finance this project.
Craig Hutchison
analystAlright, thanks for that, folks. Perhaps just a brief question, specifically about the early works — I believe your budget had spent roughly $46 million by the end of last year. Could you give us an update on where things stand with that, and then I think on the previous conference call, you mentioned your budget for this year was approximately $170, excluding expiration — is that still the case? Thanks.
Leigh Curyer
executiveSure, that depends on when the federal permit comes through. Yes. Right after we get that federal approval, capital deployment is going to rise substantially. So frankly, we're comfortably under budget for 2024, and frankly, we're extremely well funded all the way into 2027, based on the cash we're holding at just under $1 billion, as we see it.
Operator
operatorOrest Wowkodaw of Scotiabank has the next question. Go ahead. Hello.
Orest Wowkodaw
analystGood morning. I have two questions, if that's all right. On the first one, Leigh, when you talk about having financing lined up so you can demonstrate to the government, or give it confidence, that you're able to build the project — does that mean you also intend to lock in all of the debt financing before permitting?
Leigh Curyer
executiveRight, whether it happens before federal permitting or right after, the debt structure requires equity to be drawn down first. So it's not a certainty that we'll have that arranged ahead of federal permitting or immediately following it. We're actively working on it at the moment, but the debt is clearly conditioned on federal permitting approval, on entering construction, and on the equity having been spent. So I wouldn't call it contingent on that, but it is a function of it.
Orest Wowkodaw
analystAll right. And separately, regarding inventory and buying physical material, I believe that deal caught nearly everyone off guard. You mentioned you could add more — is there a sense that, when I consider what Cameco holds in inventory, roughly 10 million pounds to 12 million pounds, that equals about one-third of their yearly sales. Is that ultimately the level you think you may need to reach in terms of volume on hand, so you can sign off-take agreements later on?
Leigh Curyer
executiveNo, look, these are entirely separate operations, and the technical risks differ completely as well. So, as you know, the Cameco mines sit in sandstone, and you need freezing there to hold the cavities open. Our ground is hard rock. We bore a cavity into hard rock, and that cavity stays open for 1,000 years. That gives us the ability to increase output, and to adjust output against whatever market conditions exist at the time. We can manage with a much smaller amount of inventory held at any given moment, but while commissioning, holding 2.7 million pounds is extremely shrewd. So that is a quantity we set our sights on and obtained, with a very solid technical and economic rationale supporting it, to help propel the company into production at that point. So Cameco's inventory, until a couple of years back, was consistently above 30 million pounds, which represented a full year's production. I believe that simply demonstrates that the availability of supplies, and the fragility of mine supply, is extremely high right now, and so I think although it may have caught people off guard, it reflects a company moving into production. I think given the market conditions, which we have interpreted extremely accurately since 2011, the shrewd character and timing of that purchase will become evident in the near future.
Travis McPherson
executiveOkay, Orest, there are a couple of points here. First, I really wouldn’t draw any parallels or correlations between the percentage in someone else’s production profile and the inventory they keep, then connect that to how much we ought to keep. Like I said, having pounds isn’t necessary for securing a contract. It isn’t as though that’s a condition for getting one. What matters is making those contracts as good as they can be, and we’re quite comfortable with this insurance policy — the amount we currently have in place to provide that — so we can optimize and maximize the value that the contracts we sign now represent, again, all the pounds we have in the ground.
Orest Wowkodaw
analystStill, I wonder whether 2.7 million pounds truly matters in the end, considering that it amounts to roughly 10% of your yearly sales. Is that enough to genuinely make a difference when it comes to instilling confidence in utilities?
Leigh Curyer
executiveYes, absolutely. The worry isn’t about what happens after we’re fully ramped. Look, we have a lot of confidence in our team’s capacity to ramp our mine. This has nothing to do with how we see production or start-up risks or anything like that. It’s simply a perception utilities might hold, or do hold, regarding any new mine coming online — that risks come with it. So having 2.7 million pounds is, again, an insurance policy. When you get an insurance policy, you don’t buy it to cover the entire value of whatever you’re insuring. This is only about that brief window — let’s say three to six months — while the mine is ramping up in its first stretch, and just giving a bit of insurance around that, so that, again, we optimize the value of these contracts.
Operator
operatorGraham Tanaka with Tanaka Capital Management has the next question. Go right ahead.
Graham Tanaka
analystYeah, yeah, thanks. So I just want to get a handle on this—trying to pull it all together, the building of inventory, as I understand it, is meant to help you stage things so you've got inventory on hand and can negotiate with utilities from a stronger position, with more confidence, given that inventory in hand, even while the mines are starting up. So I'm trying to understand what your timing was around buying at today's prices and financing that with quasi equity, with a convertible—what alternatives did you have? You could have waited. You could still wait and do this 12 months from now, or you could have done it 12 months ago. I'm just curious about your timing and what the current price and your view on future prices had to do with when you moved. Thank you.
Leigh Curyer
executiveAbsolutely, Graham. As mentioned on the call, this really ties to the fact that the contracting window for 2028 and later is happening right now. That's where the utilities are putting their attention, so when you're in those off-take conversations for 2028 and beyond, it makes sense to secure the pounds today. So yes, we might have purchased earlier had we simply been trading, since we've always been highly confident the uranium price would climb much higher, and we believe it will rise considerably further going forward at $92.50. At the moment we made the purchase, spot was $93.85. Buying 100,000 pounds across the past six months has at times pushed the spot price up by more than $1.50. So had we acquired those 2.7 million pounds in the spot market, the price likely would have been driven above $120 per pound US, judging by those prior transactions over the last six months. So we executed those purchases extremely astutely. On the financing side, issuing a convertible debenture came at a 30% premium to our five day VWAP of CAD14.80. So an incredibly good use of an instrument that carries identical terms to the one we completed with CEF, very successfully, QRC, very successfully, and more recently with Sol Patterson's out of Australia.
Leigh Curyer
executiveThis isn't really a standard convertible, to be clear. It's somewhat of a hybrid structure that we put together alongside Warren Gilman, and for us it functions extremely effectively — it has performed extremely effectively historically too. When voting alignment is built in and you're dealing with a single party, we have full clarity on the situation, and it didn't take anything away from our existing cash balance. Another point worth noting is that we watch costs extremely closely. We also sidestepped the $10 billion US broker fee when putting that convertible in place. So it's a highly successful deal, and in fact — even though it carried a 30-day — sorry, a 30% premium over our five day VWAP at the time, it likewise represented a 33% premium relative to the raise we completed in Australia just seven days earlier. That tells you something on its own about how strong that financing was.
Graham Tanaka
analystOkay, I get it, and I really appreciate you walking us through that. I'm just wondering about the possibility of raising more equity down the road if you see the market as appealing compared with whatever your requirements are for expanding later on — whether that's for exploration, maybe at one or two of your other Patterson quarter assets, or if other opportunities become very ripe for development? I hope I'm not getting too far ahead of myself here, but what additional capital might you need going forward? Or does this now suffice to carry you through full production as well as ongoing exploration? Thank you.
Leigh Curyer
executiveThat cash position — just under cash and inventory, just under CAD1 billion — together with the debt expressions of interest, I think speaks for itself. It far exceeds the CapEx required to bring Group One into production and secure the federal permit. This new discovery would be an entirely separate dimension, one we're still only in the very early days of understanding. Frankly, it would be amazing to have another arrow on our hands, and if that happens, if that's what eventuates, we'll navigate that financing accordingly. I think while that may have shocked some investors, the close proximity of both of them — I hope today has explained the rationale behind it, which reflects a company that is taking a mine into production. I'd just ask everyone to look at our history of financing along the way. We've done it in the least dilutive manner every time, at a very cost efficient manner every time, in the context of the market. Very small discounts to the spot share price at the time, or at 30% premiums through the use of convertible, and whenever we do raise money — and if we do have another arrow on our hands — it'll be the same discipline and approach that we've always exhibited.
Leigh Curyer
executiveFor the near term, though, yes—our coverage is extremely strong, combining what we already hold with the financing we're arranging, which will be more than sufficient to bring Arrow into production.
Travis McPherson
executiveYes. And Graham, suppose we inhabit that scenario you describe — a really thrilling one — in which this fresh find becomes a second Arrow. Regarding what we have in terms of our plans, the CapEx and everything needed to construct, Arrow will remain as it is. Something additional that we uncover and that appears as though it could fit into our mining mindset and all of that would most likely arrive at a later stage of the mine's life. So it isn't the case, let's say, that should this prove to be another Arrow — which I wouldn't imagine it to be, or there's absolutely no chance I'm contemplating that — where suddenly the CapEx would have doubled because we made a new discovery or anything of that sort. It genuinely would arrive at a later stage of the mine's life, and clearly all the infrastructure would be constructed in order to develop Arrow.
Graham Tanaka
analystTherefore, whenever you might conduct further exploration ahead of even building a second or third mine — assuming those efforts succeed — that point would arrive at a time when surplus cash flows are already being produced by you. That's from the Rook I project. Is that right?
Leigh Curyer
executiveExactly. Graham. Look, I think the, the geological evidence indicates that back in 2014, on the very first drill hole, we didn't hit the big mother load. This new discovery would suggest that we have a lot more mineralisation on our hands. We've actually got significantly more mineralization at the bottom of Arrow and in a round Arrow that we haven't fully defined on our balance sheet. But yeah, 3.5 kilometres away will come into the probably, most likely come in during the end of the Arrow mine life will be fully funded from the cash that's generated out of Arrow. So, I think your perspective on no future equity requirements is very, very real.
Graham Tanaka
analystThat's great. Moving to a slightly different topic, I've been picking up some industry feedback suggesting that certain more traditional suppliers in the sector aren't feeling particularly confident. Should we say that pricing long-term contracts at market prices, quote unquote, would be acceptable to a lot of utilities? So I'm just curious — in your conversations with utilities, how many of them have you spoken with that leave you confident you can actually sign multi-year contracts from a new mine that will be priced at market, and what will that at-market price be a function of — one, two, or three spot market entities — or how exactly are you going to set that market price? Thanks.
Leigh Curyer
executiveSure, Grant — honestly, you've been hearing that kind of thing from others in the sector, whether it's other firms or unnamed voices on social platforms. What we're working with, and the only thing we're working with, is what our talks with utilities tell us. So everybody has an opinion. It takes me back to Fortescue Metals Group in the mid-2000s, building a mine sitting between two majors. Plenty of commentary along the lines of, well, you can't do this, you can't do that. Analysts were saying they'd lie down on the railway tracks, because nothing would ever be coming out of their mine. That sort of thing happens. And my encouragement to everyone is to concentrate on the real facts as we lay them out, and we lay out those facts in full compliance with the rules and regulations under securities legislation. So that is clear. We know about it, but we're only going to keep working with facts, and I'm telling you what our discussions are showing, and that's what we're doing. But each situation differs. Our mine is entirely unlike anything that has come before. It carries a much lower technical risk, and therefore it offers more flexibility when it comes to contracting, and the contracting will look different.
Leigh Curyer
executiveEach mine’s agreements are shaped by the technical risk it carries. The one we operate happens to carry less of that risk, and we are simply making the most of it. So if something isn’t commonplace or hasn’t previously been attempted, that’s fine with us. Our focus is on advancing toward what lies ahead, and everybody understands that what a utility pays per pound represents only a very small share of its total operating expense. Because of that, the requirement is weighted less heavily when everything stems from a venture like Rook I.
Travis McPherson
executiveYeah. And Graham, I think there are plenty of other future suppliers — the world needs many more of them reaching production — who are also pursuing this kind of strategy, and I think that helps move the market and evolve the uranium market into something with more transparency and liquidity. I think that's a good thing. And again, for us, I think we've also been clear that what we're about is maximizing the value of every pound produced, so that's our focus, and to us that means, yeah. Understanding our technical risks, understanding the cost profile that results, which is industry leading and low, and so we're able to confidently and prudently expose ourselves, our stakeholders, our shareholders, to those optimal outcomes in a rising price environment. And subsequently be completely protected in a world where uranium prices go down for whatever reason, both because of our cost structure, but also because we will hold supply back then, and we have the ability to ramp production up and down very quickly given the technical setting. So that is what we're targeting, what we're about, and I think it is undeniably in the best interest of all of our shareholders and stakeholders.
Graham Tanaka
analystOkay, switching to a totally separate topic — the debt financing. Roughly speaking, how much debt do you expect in total, how much capital raising, and what interest rate assumptions sit inside your projections? The yield curve has moved up, so I'm just curious — I'm sure you're already in talks with the debt providers. What range do you think that lands in, and how much could that affect profitability down the road? Thanks.
Leigh Curyer
executiveRight. At the moment we've got $1.4 billion in expressions of interest on the debt side, at the rates we're seeing — the standard commercial rates you're seeing, Graham — but we don't spend an extra dollar beyond what we have to, though the interest coupon on that debt, given it'll be over such a short period of time, won't be material to the company. So the debt decision is driven more by the structure, by who it's with, and by not having excessive penalties for early repayment. That's our approach and how we're thinking about it.
Graham Tanaka
analystSo basically, what you're saying is that the debt's maturity isn't extended, since the mine's cash flows—the production—will let it be repaid fairly fast.
Leigh Curyer
executiveIs that right? No, that's not right.
Graham Tanaka
analystYes, and thanks a lot. Best of luck.
Operator
operatorThe following question is from Fred Berliner, a private investor. You have the floor.
Fred Berliner
unknownGood morning. I'm troubled that the entire character of the company has shifted. You once held a huge uranium land position, and now you're moving into the mining business, which is full of cost and full of nasty surprises, and you're carrying a lot of debt at this point. What I can't grasp is why, right now, you'd be taking a gamble on uranium prices when you could simply leave the product sitting in the ground and watch its value climb. So please tell me how this move into mining makes sense — it's extraordinarily hard, and to get across that gap you need genuine expertise and experience, and I'm not sure you have it. So please explain it to me.
Leigh Curyer
executiveYeah. And good morning, Fred. Look, every one of those mining risks is legitimate. Mining isn't a simple endeavour, but everybody at this company has been in the business, from very large mining companies down to the smallest, and I'd say we faced far greater challenges earlier in our history, back in 2011 when we were incorporated and were really just trying to find a discovery in the first place, than what sits in front of us now. When we went out to the other side of the base, some industry leaders laughed at us and said you'll never find economic mineralization out there. Well, we've discovered the largest and most economic and environmentally elite mineralisation that exists on the planet. Then we were told you'll never get a permit. Well, we got the provincial permit in the quickest time ever, and the first one in the last 20 years, and the federal permit will be no different. We've assembled the best of the best into the company and will keep doing so. We have partnerships with extraordinary organizations where we're going to introduce additional innovation and optimize efficiency and safety. So, yeah, you're quite right. Mining is a challenging game, no doubt about it, but our track record has shown clearly that we understand exactly what we're doing, the risks and the opportunities, and we approach it in a manner that employs fact based objectivity from all the relevant disciplines required to be successful.
Leigh Curyer
executiveAnd so the permitting side of things — even once we’re producing down the road, if we look back, what was the greatest risk? It was always going to center on the permit, since that has the most variables and the most variability, plus the biggest number of stakeholders involved. But we already hold the provincial permit, and the federal permit is at the final stages, and we’re looking forward to receiving it and moving straight into construction. At that point we’re narrowed down to just one aspect, and nothing suits us better than having everything under our control, and construction will be predominantly 100% under our control. So it’s a very exciting time for investors. We’re at a genuine inflection point, and the moment that federal permit arrives, we’ll be building the mine and speeding toward cash flows that will take us into the top 10 mining companies worldwide. So while you may not have seen NexGen as a mine builder brand, the people inside our organization have done it in their previous roles, and so we’re very excited and energized more than ever for this next phase. A — Travis McPherson Yeah. And Fred, I might just add, I think it’s important to put it in context that this — while it all sounds big, like a big mine that will produce lots of uranium, you’re talking, if this were a gold mine, you wouldn’t even have heard about it in terms of the tons moved per day.
Leigh Curyer
executiveI mean, it's a really small physical mine, entirely conventional, and so, yeah, look, if what you're developing is a very complex mine, it's either very large or complex, as I mentioned. Yeah, on a risk-adjusted basis, you have to take those factors into account. But in our case, we're constructing a very tiny, little conventional underground gold mine in what is effectively a granite hard rock setting, using long haul stoping and conventional processing at surface, like, except the difference, obviously, being that the product we're turning out is extremely valuable and extremely strategic, since it's actually an energy metal in the green energy transition. So yeah, mining isn't easy, but the size of the prize here is enormous.
Operator
operatorThe following question is from Reed Rubin, a private investor. Go right ahead.
Reed Rubin
unknownGood morning. Regarding the mill, how much is budgeted to finish it, and what annual capacity will it have? And let me note that, to the best of my knowledge, the lower 48 contains just one mill.
Leigh Curyer
executiveRight. And regarding that 2021 feasibility study — hello, Reed, it's been some time since we last talked before COVID, so I appreciate all your support through this. Yes. So according to the 2021 feasibility study, the mill accounted for roughly one-third of their total CapEx. That's below — it will have to be adjusted for inflation, and we'll give you those figures around the close of Q2. There's one thing. Yes, and we're going to construct a mill with output capacity of 30 million pounds annually.
Reed Rubin
unknownThirty million each year.
Leigh Curyer
executiveAbsolutely.
Reed Rubin
unknownThat mill is truly impressive — many thanks.
Operator
operatorThat brings us to the end of the question-and-answer session. Leigh, our CEO, will now take over once more to offer some closing comments.
Leigh Curyer
executiveThanks, Julie. And yes — I appreciate everyone taking the time today, for your interest and for the questions you brought to this call. We couldn't be more enthusiastic about what's left of 2024, and, as we've said, about this turning point as we move toward wrapping up the federal permitting process with the CNSC. The story has never been stronger. Rook I is now in production. We'll sit at the bottom of the cost curve, fully exposed to future uranium prices. The provincial permit is already in place, federal permitting sits in its final stages, and this uranium market is heading into a new and unprecedented era — and NexGen is extremely well-positioned, ready and leveraged to all of it. So thank you for your interest, and we look forward to our next call — the Q2 call for 2024. Thank you.
Operator
operatorLadies and gentlemen, that brings us to the end of today's conference call. You can go ahead and disconnect now. Thank you.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete NexGen Energy Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to NexGen Energy Ltd. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in NexGen Energy Ltd. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.