Appreciate that, Darwin. Morning, everyone, and thanks for joining the line as we go over NextEra Energy's results for the first quarter of 2025. With me on this call are John Ketchum, our Chairman, President and Chief Executive Officer; Brian Bolster, Executive Vice President and Chief Financial Officer; Armando Pimentel, who leads Florida Power & Light Company as President and Chief Executive Officer; Rebecca Kujawa, President and Chief Executive Officer of NextEra Energy Resources; Mark Hickson, Executive Vice President; and Mike Dunne, our Treasurer. John is going to begin with some opening comments, after which Mike will walk through an overview of the results for our first quarter. Following that, our executive team will be on hand to take your questions. During this call, we'll be making forward-looking statements that reflect current expectations and assumptions, and those are subject to risks and uncertainties. If any of our main assumptions turn out to be wrong, or if other things come into play that we discuss in the earnings news release issued today, in what we say on this conference call, in the Risk Factors portion of the presentation that goes with it, or in our latest reports and filings with the Securities and Exchange Commission — you can find all of those on our site, www.nexteraenergy.com — then what actually happens could end up being significantly different from the forward-looking statements we've made. We're not committing to revise any forward-looking statements. This presentation also brings up non-GAAP financial measures. If you want to know how those are defined, or see how historical non-GAAP measures reconcile to the closest GAAP financial measure, check the information in the slides for today's presentation. With that, I'll hand things over to John.

John Ketchum

executive
#2

Thank you, Mark, and good morning to all of you. Once again, NextEra Energy has gotten off to a robust beginning this year, posting strong results for the first quarter. On an adjusted basis, earnings per share rose almost 9% compared with the same period a year earlier, which speaks to healthy financial and operational execution at both FPL and Energy Resources. At FPL, we brought 894 megawatts of fresh solar capacity into service, while Energy Resources developed roughly 3.2 gigawatts of new renewable and storage projects. Demand for additional generation remains vigorous throughout every sector of the U.S. economy. To put things in perspective, we foresee cumulative need exceeding 450 gigawatts for new generation in the United States from now through 2030. In order to satisfy that need, we think it matters to apply what I call energy realism and energy pragmatism. Allow me to elaborate. Energy realism means accepting every kind of energy solution and grasping that the need for electricity in the United States exists right now, and it isn't easing up. Honestly, it's like nothing we've witnessed since World War II came to an end. Energy pragmatism means acknowledging that certain technologies are deployable at scale at present, while others require additional time to reach that point. Moreover, meaningful trade-offs will arise concerning both the timing and the expense of each. Right now, renewables paired with battery storage represent the cheapest option for power generation and capacity. Since we can construct these projects and deliver new electrons onto the grid within 12 to 18 months, we ought to view renewables and battery storage as an essential bridge until other technologies, such as new gas-fired plants, become ready at scale. We anticipate 75 gigawatts of new gas capacity entering service between now and 2030; that's certainly substantial, yet it falls far short of the more than 450 gigawatts of total generation we think will be required; it's likewise crucial to grasp that gas-fired plants will enter service at a greater expense than renewables and storage. The reason is that gas turbines remain scarce while demand for them runs high. Rebuilding the extremely skilled labor force needed to construct these complicated power plants is also proving challenging. Gas-fired combined cycle plants depend on roughly 1,000 workers spanning dozens of specialized trades; we've discovered that EPCs are bringing on thousands of additional personnel to cope with elevated washout rates, as some employees depart sooner for better-paying positions, constructing things such as LNG terminals, data centers, semiconductor chip fabrication sites and other industrial facilities. Still other employees arrive at job sites lacking the skills they need. All of this drives prices upward and lengthens the timeline for building gas plants. That explains why the expense of constructing a gas-fired plant has tripled over the past few years and stands ready to climb still higher because of tariff exposure. We think nuclear will keep playing a significant role in satisfying demand. Yet once more, we must stay practical regarding when that occurs. Opportunities to restart shuttered nuclear units are limited. Two are already in progress within our industry, and we keep assessing the possibility of restarting our Duane Arnold site in Iowa. Outside of those few chances, small modular reactor technology remains a decade off from being deployed at scale even under the most favorable conditions, and it would come with a far steeper cost than power produced from natural gas. Another possibility involves postponing coal plant shutdowns to satisfy demand; yet suppose we held open every single coal facility in the United States that is scheduled to close — that would contribute only about 40 gigawatts to the grid. Moreover, plenty of them are just months from closing or have already been designated for conversion to gas, which again falls well beneath the more than 450 gigawatts required from now through 2030. The key point is, please don't interpret this as choosing sides. That isn't the case, and it cannot be. To satisfy this massive demand, America will require every kind of energy, yet we must remain realistic regarding the timeline for these technologies to arrive at scale and their eventual cost, all of which influence what Americans are charged — the amount Americans shell out for electricity every month. That's precisely why energy policy in Washington matters so greatly, and why we can't confine ourselves to merely a few technologies such as gas and nuclear, both of which now cost far more than at any prior point and require considerably longer to construct. We make these statements as a company in our industry that covers everything. NextEra Energy is the definitive all-of-the-above energy business. We understand renewables and storage since we're a global leader in that area. We understand gas since we run the biggest gas-fired fleet in America and have constructed more gas-fired generation than anybody else across the past 20 years. We understand nuclear since we run one of the biggest fleets in the United States, and we understand how to support growth since we've done so for decades throughout the United States and in Florida, which leads me to Florida Power & Light Company. FPL demonstrates that utilizing every kind of energy delivers results, particularly amid growth periods. Florida ranks as the country's third largest state, and newcomers keep arriving. Indeed, over the past 20 years we've gained more than 1.3 million new customer accounts, which makes us about 30% bigger than we were in 2005. In spite of that astounding growth, FPL reliably provides strong dependability while keeping customer bills well under the national average, and we keep providing what we consider the finest customer value proposition. As we mark our 100-year anniversary at FPL, our vision stays unchanged: to keep making wise capital investments for our customers' benefit, to lead the industry on cost, and to provide strong dependability and exceptional customer service, all while holding bills down for our customers. To keep generating customer value and to fuel Florida's growth, we've been rolling out the most economical choice for customers — solar and storage — and we now have roughly 8.4 gigawatts of solar and batteries installed throughout Florida. Overall, the approach we've taken for generation has delivered over $16 billion in customer savings and prevented fuel expenses since 2001. As we look forward at FPL, growth continues to appear on the horizon, and we project adding approximately 335,000 customer accounts by 2029. To keep pace with that growth and serve customers dependably, FPL intends to put nearly $50 billion into investments between 2025 and 2029, plus bring on over 25 gigawatts of additional generation from battery storage by 2034. We filed testimony along with detailed information for FPL's 2025 base rate proceeding on February 28. Our overall proposal under the 2026 through 2029 base rate plan aligns with the test year letter submitted in December. Because multiyear plans stay stable, FPL has been able to concentrate on business efficiency — something essential for holding customer bills down — and that has let FPL keep a strong balance sheet, which supports steady access to capital markets; we're eager for the chance to demonstrate our long-term record of delivering low bills and high reliability for Floridians, along with our plans to create an even more resilient energy future for Florida. In our view, FPL holds a strategic position as Florida continues to rank among the fastest-growing states in the U.S.

John Ketchum

executive
#3

Additionally, our strategy involves addressing Florida's anticipated growth over the long haul by putting money into infrastructure for generation, transmission, and distribution, which we think will make our already top-tier customer value offering even better. Energy Resources experienced a robust quarter, bringing about roughly 3.2 gigawatts of fresh renewable and battery storage projects. Over the last 7 quarters, this is the fifth instance where Energy Resources has increased its backlog by over 3 gigawatts, indicating ongoing robust need for additional generation. Energy Resources also recorded its biggest quarter ever for solar origination and its biggest ever for combined solar and battery storage origination, once more showing the robust need for renewables and storage since they are inexpensive and can be implemented immediately. If we hit the middle point of our development expectations range, Energy Resources will be running a generation storage portfolio exceeding 70 gigawatts by the close of 2027. When you combine FPL and Energy Resources, we think NextEra Energy possesses the most all-encompassing power generation operation globally and is ideally suited to take advantage of long-term growth possibilities. There's been plenty of talk regarding tariffs in recent weeks. Although for certain businesses this means examining their supply chains for the initial time, we've dedicated the past 3 years to diversifying and bringing ours closer to home in order to strategically align our supplier connections to handle possible interruptions. To give you an idea, we've greatly diversified the places we get our solar panels from. Consequently, we don't obtain solar panels from nations affected by anti-dumping and countervailing duty tariff rates revealed earlier this week. Moreover, we get our wind turbines from the U.S., with production happening in Florida. And thanks to our purchasing strength, we've managed to move tariff risk substantially onto suppliers. Following talks with our suppliers, we now estimate Energy Resources faces under $150 million in tariff exposure through 2028 on more than $75 billion in anticipated capital expenditure. That amounts to under 0.2% of possible effect on our capital spend prior to using contractual trade measure safeguards in our agreements with customers. Size and scale are more crucial than ever in the current landscape. Suppliers desire us as repeat clientele; and our clientele desire assurance, the kind of assurance that results from partnering with a sector pioneer such as NextEra Energy that boasts a lengthy history of fulfilling its promises. After we collaborate with our clientele, we anticipate our $150 million tariff exposure will be greatly diminished, possibly to 0. Even so, we keep seeking methods to further lessen trade risk and leverage our supply chain management skills to generate fresh possibilities. Our group had the insight last year to arrange deals to buy U.S.-manufactured batteries for a large share of our backlog, with the rest of the battery obtained from outside China where tariff exposure is contractually assigned to the supplier. Batteries are already over 2x less expensive than gas-fired facilities, ready today and far more adaptable to connect to the grid. Removing the bulk of tariff exposure for customers who need battery storage solutions represents a major victory and a means for us to satisfy demand, all while holding customer bills down. Through our approach to procuring batteries, we gain flexibility and advantageous pricing thanks to domestic battery supply contracts we've already locked in. Essentially, we anticipate that tariff exposure on batteries will be minimal. Moreover, we anticipate that our domestic sourcing alternatives will generate substantial competitive benefits for both us and our customers moving forward as we develop new battery storage projects. Lastly, we currently have close to $37 billion in interest rate hedges established, which lets us nimbly control interest rate exposure across the years ahead, encompassing interest rate hedges covering 100% of our backlog along with a sizable share of our forthcoming maturities; as a matter of fact, we executed swaps under our programmatic hedging strategy at the point interest rates dropped sharply in early April following the announcement of reciprocal tariffs, which set our hedge risk-free rate at approximately 3.9%. Details on our interest rate sensitivity appear in the appendix of today's presentation. Before passing things to Mike, I'd like to say a few words about the planned leadership transition announcement from last month. As we shared in March, following 18 years of service to NextEra Energy, Rebecca Kujawa is going to retire. Rebecca's career at our company has been remarkable, and she has delivered a robust strategic outlook and leadership style to all she has achieved. Brian Bolster is set to take over from Rebecca as President and CEO of NextEra Energy Resources. In his role as our CFO, Brian has performed wonderfully and possesses the perfect blend of skills, expertise, and customer connections to steer one of America's biggest energy infrastructure development companies. Mike Dunne has earned a promotion and will step into Brian's role as CFO of NextEra Energy. Mike brings profound financial expertise and extensive understanding of the energy sector, having devoted his whole career to it. Brian and Mike are both transitioning effectively into their new positions; we think we have the finest team in the industry, one with a record of producing results consistently. No team is better prepared or better situated to assist in meeting this singular moment. That isn't to suggest it will be simple. The tremendous electricity demand across the United States brings difficulties, and failing to get this right puts us at risk of higher power prices. Yet this is the arena where NextEra Energy excels; we flourish when the stakes are elevated. We embrace complexity. That's what sets us apart. Numerous companies are tackling this moment starting from zero. We've been competing in this marathon for many years, and I could not feel more hopeful about our ability to deliver for our customers alongside the exceptional team we have assembled; with that, I'll hand things over to Mike, who will walk through first quarter results in greater detail.

Mike Dunne

executive
#4

Thanks, John. During 2025's first quarter, FPL recorded a $0.07 rise in earnings per share compared with the same period last year. The main factor behind that result was growth of roughly 8.1% year-over-year in FPL's regulatory capital employed. Our expectation remains that FPL will deliver average annual growth above 10% in regulatory capital employed across the 4-year term of the current rate agreement, which extends through 2025. Capital expenditures at FPL came to about $2.4 billion during the quarter, and for the full year we anticipate capital investments at FPL of between $8 billion and $8.8 billion; for the 12 months ending March 2025, FPL's reported return on equity for regulatory purposes will be approximately 11.6%. In the first quarter, we drew down roughly $622 million of reserve amortization, which left FPL with a balance of about $274 million. As discussed previously, FPL has historically drawn more heavily on reserve amortization during the first half of the year; we expect that pattern to hold again this year; in this quarter, FPL brought into service 894 megawatts of new, cost-effective solar, which raised FPL's owned and operated solar portfolio above 7.9 gigawatts, the biggest utility-owned solar portfolio anywhere in the country. In April, FPL submitted its annual 10-year site plan, which again shows that solar and storage represent the most cost-effective choices for customers seeking to add reliable grid energy and capacity over the coming decade. The 2025 plan forecasts a need for more than 17 gigawatts of cost-effective solar generation throughout our service territory during the next 10 years; and to complement the solar additions FPL has planned, FPL intends to deploy more than 7.6 gigawatts of battery storage, which delivers cost-effective capacity. Under this plan, we expect FPL's solar mix to rise from roughly 9% of our total generation in 2024 to roughly 35% in 2034, while we keep providing customers with low-cost and reliable energy. As John noted, on February 28, we filed testimony along with detailed supporting information for FPL's 2025 base rate proceeding. Our request is for a base rate adjustment of approximately $1.5 billion beginning in January 2026, $927 million in January 2027, and a solar and base rate adjustment, or SoBRA mechanism, to recover revenue requirements for solar and battery storage projects in 2028 and 2029. Taking into account the proposed base rate adjustments and current projections for fuel and other costs, we believe FPL's typical residential customer bill will rise at an average rate of about 2.5% from January in 2025 through the end of 2029, which should leave FPL's typical residential bill approximately 25% below the projected national average and more than 20% lower than our typical bills 20 years ago when adjusted for inflation. The Florida Public Service Commission has set a schedule for this proceeding, starting with quality of service hearings in May and technical hearings in mid-August. The proceedings would likely wrap up in the fourth quarter, with staff recommendation and commission rulings on revenue requirements and rates. We're eager for the chance to bring our argument before the commission during the summer months, and our attention is fixed on reaching an equitable result that backs ongoing prudent investments to serve our customers well. Important metrics indicate that Florida's economy is still in good shape. The state remains among those expanding most quickly across the country, and between 2023 and 2024 it was home to 3 of the 5 U.S. metro areas with the fastest growth. FPL enjoyed a robust quarter for adding customers, as the average customer count rose by almost 108,000 compared with the same period a year earlier. At FPL, retail sales for the first quarter climbed about 1.8% versus the prior-year period. Once weather is factored in, first quarter retail sales rose around 0.6% on a weather-normalized basis compared with the same period a year earlier, mostly because of ongoing favorable growth in the underlying population. Let's now shift to Energy Resources, which posted adjusted earnings growth of close to 10% versus a year earlier. New investments contributed an additional $0.12 per share year-over-year, largely reflecting ongoing expansion in our power generation portfolio. Our existing clean energy portfolio fell $0.03 per share during the quarter, tied to assorted puts and takes in the business, and the comparative contribution from our customer supply business dropped by $0.01 per share. NextEra Energy Transmission's contribution rose $0.01 per share versus a year earlier. All other impacts fell by $0.05 per share, pushed by greater interest costs of $0.06 per share, with half of that stemming from new borrowing costs needed to fund our new investments. As previously disclosed, and as we pull back from the business, we have reclassified gas infrastructure so that it now includes gas pipelines along with existing clean energy and upstream gas infrastructure within customer supply. Gas pipelines and upstream gas infrastructure each saw a $0.01 decrease during the quarter. Energy Resources brought roughly 3.2 gigawatts of new renewables and storage into the backlog; counting these additions, our backlog now stands at about 28 gigawatts, after accounting for 0.7 gigawatts of new projects that entered service since our last earnings call. That underscores the ongoing robust expansion for renewables and storage. We're also pleased to announce our first solar repowering project, which should be finished in 2026. Moving forward, we intend to count both wind and solar repowering megawatts within the newly updated repowering line of our development expectations. Our backlog additions reflect the varied power demand we observe across industries. About 40% of our backlog additions come from commercial and industrial customer demand, whereas 60% come from demand by power companies. As shown by our additions of nearly 1 gigawatt, our customers keep selecting battery storage as the lowest cost, ready-now answer for their capacity needs. Now turning to our first quarter 2025 consolidated results. Adjusted earnings from Corporate and Other dropped by $0.03 per share versus a year earlier. Our long-term financial expectations are unchanged; we will be disappointed if we cannot deliver financial results at or near the top end of our adjusted EPS expectation ranges in 2025, 2026 and 2027. Looking at the period spanning 2023 through 2027, it's our expectation that operating cash flow will grow each year, on average, at a rate equal to or exceeding the compound annual growth rate range we've given for adjusted EPS. On top of that, our outlook still calls for dividends per share to rise by approximately 10% annually, continuing at least through 2026, measured from a 2024 base. Naturally, all of these expectations come with our usual caveats attached. That brings our prepared remarks to a close. With that done, we're ready to take your questions.

Steve Fleishman

analyst
#5

Yes. So to begin with, regarding the tariff information you gave, which sounded quite favorable. The battery segment, where you're shifting a great deal to domestic sources, I presume that also means you're sourcing battery cells made in the country. Correct?

John Ketchum

executive
#6

Under the terms of the agreement, we receive specific components — Steve, my apologies. I stopped speaking there for a moment. Let me begin again. So regarding the battery — the domestic battery agreement we've signed, it gets put together right here in the United States. Some parts are brought in from beyond the United States, yet since assembly happens here and there's sufficient U.S. concentration, it meets the criteria for domestic content. And within the contract, we've secured contractual safeguards concerning eligibility for domestic content. And additionally, should there be any tariff risk tied to imported parts or components for those batteries, those are safeguarded too and supported by considerable credit; so that's a domestic agreement, and that's how investors ought to view it.

Steve Fleishman

analyst
#7

Understood. All right, so regarding the exposure on — the tariff exposure, which you've discussed for quite a while about ensuring you're shielded there with your suppliers. Clearly, one of the concerns can be ensuring that suppliers continue to supply while absorbing tariffs. How do you feel about supplier health in terms of meeting the commitments as well?

John Ketchum

executive
#8

I feel good. I feel very good for 2 reasons. First, because of the buying power that NextEra has, suppliers don't want to let you down, and they want to ensure they deliver. They see this as a long game for their business. Second, the way our contracts are structured with our credit protections in the agreement, there's a very strong incentive to honor those commitments. And then the third point I would make is that the U.S. still remains an extremely attractive market to suppliers across the globe, since they have a lot of margin when they deliver into the U.S. And when we put those 3 things together, I lose no sleep over whether or not our suppliers will fail on their commitments and deliver into the U.S.

Steve Fleishman

analyst
#9

Right, understood, that tracks. Moving on — these days there's clearly a big emphasis on IRA, naturally, plus the changes, and in particular transferability. So perhaps a single point of clarity regarding transferability. Say, hypothetically, that it disappeared down the road through some bill — would it remain valid for assets already existing that had been done under transferability, along with safe harbor assets under transferability?

John Ketchum

executive
#10

Yeah, so, I mean, legislation came up not long ago that essentially — the Fedorchak bill, I'll point to that as my illustration for answering this. So under the Fedorchak bill, as it was put together, tech neutral would be removed via a phase down, yet transferability would ultimately get phased out as well in that case. But within the nontech neutral section, there'd be a way to keep the safe harbor going for 4 years, and transferability stays intact there; so ultimately it's all about how it's drafted, Steve, when you get right down to it. That's how that particular bill was written; the final result and the drafting of bills down the road would determine things. But allow me a few remarks regarding transferability; we've devoted considerable time, clearly, to pushing for tax credits and transferability, and for sound reasons. Those reasons, I believe, are familiar to investors. Gas comes with constraints regarding availability, for the reasons I covered during the prepared remarks. They cost considerably more. On top of that, gas turbines have taken tariff hits, and plenty of people will bring that up, which in fact will — I think at our development day we'd put the proxy at $2,400 a kW. Today it's likely nearer $2,600 to $2,800. Once tariffs enter the picture, gas turbines have in fact been struck harder than, in my view, solar or wind or storage on that front. And so a bridge is needed, and that bridge must come from renewables and storage. Since all this demand exists right now, something has to serve it. And being able to transfer credits goes hand in glove with the credit itself. You must be able to monetize the credit so the benefit can get back to the customer. Let me offer a few examples. Take utilities, for instance, right, and this is among the points we keep emphasizing in Washington. Utilities have historically had difficulty using tax equity financing. Commissions want proof of it. It's — you need to sell half the plant to be eligible for tax equity financing. So how do you capture the benefit, which by our calculation amounts to a 12% increase in household income for the ultimate utility customer, absent the ability to transfer the credit? Nuclear, I'll use as an example. When it comes to nuclear, a tax equity structure simply won't function, correct? No bank out there will accept a 50% ownership stake in a nuclear facility. That means transferability is necessary for nuclear too. Nuclear will be a key component of what lies ahead for us; this administration has clearly made it a priority. Same goes for 45x. Without the ability to transfer credits for wind, solar, storage, and nuclear, 45x turns into a real problem, doesn't it? How else do you drive all those investments? 80% of them are landing in Republican districts, and you're asking a CEO to put up a manufacturing facility under 45x, but when the credit isn't available with the option to transfer it afterward for wind, solar, battery storage, then there's no demand for the product either. So what reason is there to pour billions of dollars into that manufacturing facility under a 45x credit? When you consider all of this together, credits and transferability are linked. You can't separate them — having one without the other is impossible. That's what we're telling Washington. And it's landing well. The proof, I'd say, comes from the fact that 21 House representatives — Republican House representatives — just put their names on a letter stating don't touch the credits, don't touch transferability. We've got 4 Senators who signed onto a very similar letter. They understand. They understand that the 2 are connected. Things may get a bit rocky as we possibly see some proposed bill. Absolutely; still, I believe ultimately folks in Washington recognize that transferability and tax credits fit together like a glove and belong together. You need the capacity to monetize that tax credit.

Julien Dumoulin-Smith

analyst
#11

Congratulations once more on every one of these new positions. It's thoroughly earned. John, perhaps to kick things off with something a bit more routine. You've mentioned moving toward the upper portion of the guidance range at NEER. Could you say a bit about which factors are driving that for '25? After that, I have a quick follow-up regarding what you just mentioned.

John Ketchum

executive
#12

Yeah. So in terms of the upper portion of the range, the place I'd begin is our first quarter results, correct? I mean, we've already come out of the gate sitting at 9%. Plus we have a business plan we're confident about delivering on; and beyond that, I don't believe there's much else to add.

Julien Dumoulin-Smith

analyst
#13

Great. And honestly, the specifics about transferability are much appreciated. I realize people have been eager to get your take on this topic. On a related note, could you share some thoughts regarding the timing — when this will happen and the way it will ultimately play out? In your comments, you mention once we collaborate with our customers. How are you viewing the effect, that $150 million, in terms of timing for '25, or is it actually going to reach that 0 in '26? It sounds as though this is basically a premise that mainly, the tariff effect will hit customers who have higher PPAs, and you'll approach them now, maybe similar to what happened previously with some of the COVID consequences.

John Ketchum

executive
#14

So Julien, you're asking about tariffs, correct, not transferability.

Julien Dumoulin-Smith

analyst
#15

Yeah, my apologies. Yeah, my apologies. I expressed gratitude regarding the transferability aspect.

John Ketchum

executive
#16

Let me verify that I stayed on transferability. You shifted over to tariffs. Could you make your inquiry about tariffs clearer, simply so I follow — respond to everything you're asking?

Julien Dumoulin-Smith

analyst
#17

Yeah. What about when that happens, then? You brought up the supply chain. You mentioned that after collaborating with your clients, how are you viewing the schedule for that collaboration? And is the main reason your tariff exposure stays pretty small that you're shifting those expenses onto your clients through amended PPAs? Or do you already have contractual provisions in place?

John Ketchum

executive
#18

Yeah, let me address those one at a time. Let's begin with the supplier. When we examine our full backlog, and we consider the Q2 originations we're projecting, plus the development expectations we've shared with investors, we figure we're facing roughly $150 million in tariff exposure. That figure reflects the contractual safeguards contained in our current supplier agreements and the conversations we've held with those suppliers ever since April 2, which was Liberation Day. That covers the first item. That brings you down to $150 million. The next thing we highlighted during the prepared remarks is that beyond our capacity to move tariff risk onto suppliers and supply contracts, which I just described, we also hold trade measure protection clauses within our customer contracts. So we think there's a strong possibility that, by partnering with our customers, we can shrink that $150 million exposure considerably — maybe even all the way to 0 — drawing on our prior experience with circumvention. We picked up plenty of lessons there, and these are rights already written into our agreements. Given all that, I feel quite confident about tariffs. The effect on our business is simply going to be minimal.

Julien Dumoulin-Smith

analyst
#19

To quickly make this clear — the $150 million figure exists since you must revisit and spell out what the contracts say.

John Ketchum

executive
#20

That $150 million comes from risk-sharing provisions embedded in those contracts. Under the majority of them, the supplier carries the entire risk. With a few others, they bear nearly all of it, aside from a tiny portion we resolve together with them; and Julien, one additional thing I'd like to note, and I want to ensure everyone picks this up from the remarks; that amount is $150 million against $75 billion of CapEx. That works out to under 0.2%, and we believe we have a solid chance of bringing it down to 0. The last thing I'll add is — and Steve raised this with me somewhat, but plenty has been written regarding battery exposure; battery exposure is not something we have, period. Battery exposure is simply not ours; our position is genuinely strong. We signed a domestic contract; in fact, with batteries we face a genuine opportunity rather than any risk.

Nick Campanella

analyst
#21

So, to wrap up what we were saying about tariffs. From an IRR or ROE standpoint, where do you see returns landing? Those protections you've got compared with your rivals would seemingly give you an edge, I'd imagine. Does that lift your returns? Or do you expect them to stay about the same once tariffs are in effect? Perhaps you could speak to that.

John Ketchum

executive
#22

Yeah. Well — that's a terrific question, Nick. I view it in a few different ways. First off, our returns look strong for every reason we already went through, so I doubt I need to devote time to that. To me this represents a massive opportunity, since we're competing — once again — with plenty of smaller developers, and they lack the purchasing strength, the contractual leverage needed to move risk the way we're able to. We began examining this 3 years back. We've been working on it. We didn't simply wake up on November 6 and ask, "Oh my God. How do we handle our supply chain?" I mean, this has been on our minds for years. So we implemented the right measures. This will generate plenty of opportunity for us; so if circumvention serves as any illustration, what occurred there was that many small developers destroyed themselves, couldn't meet their obligations to their customers, and a great deal of demand shifted toward us. And so I'd anticipate — that's the crux of my point about opportunity. But considering where we stand on tariffs, I anticipate plenty of opportunity heading our way, because small developers simply aren't positioned as we are. They're attempting to take on a substantial amount of risk, especially those that are — that have signed contracts for batteries, since they're likely purchasing from Chinese manufacturers and lack domestic contracts and lack the standing that we enjoy.

Nick Campanella

analyst
#23

Perhaps you could also give us a brief status report regarding the contracting chance at Duane Arnold. My understanding is that an engineering study was being handled by your team earlier. What kind of headway is being made on that front? And what has been the nature of the talks around securing an agreement for that site?

John Ketchum

executive
#24

Things are moving along nicely. Progress at Duane Arnold keeps coming in large amounts. Nothing has emerged that would block us, and demand for power produced by this project remains strong. As I see it, this remains an exciting prospect for our company. And frankly, we keep pushing it forward as time goes on.

Jeremy Tonet

analyst
#25

I'd like to check in, if I may, regarding the GEV partnership. And whether you have any news you could share with us. Sure, it's only been a short while since you discussed the Developer Day, but I'm curious if there are any fresh thoughts on that.

John Ketchum

executive
#26

Yes. What I'd say is that matters tied to our framework agreement keep moving forward. On the customer origination side, we've been collaborating. In fact, last week we put on an event called Deploy, which came after Development Day, and Scott and I co-hosted it with quite a few businesses spanning different sectors. It was very productive, and we keep working to push opportunities ahead on that front, especially when it comes to large-scale load.

Jeremy Tonet

analyst
#27

All right. Great. And perhaps we can pick up on this a bit further. I just wanted to check — I suppose you covered quite a bit regarding the timeline for gas development tied to new turbines; but when we look out to the later years, I'm curious how you believe, I guess, gas — power factors in, particularly for hyperscalers, and I guess how those discussions are progressing, keeping in mind decarbonization targets, along with the benefits gas is able to deliver. Any fresh perspective on that would be welcome.

John Ketchum

executive
#28

Yeah. What's interesting is we discussed this extensively at Development Day. I mean, there are 3 things we aim for, correct? To start, there's the basic matter of hitting our development targets. I'd call that pretty much business as usual — a straightforward, no-frills operation we keep advancing quarter after quarter. Then there's the large load category, which really falls into two groups. The first covers behind the meter conversations, while the second deals with front of the meter conversations. Among hyperscalers, we continue to observe a decided lean toward front of the meter options, and that in the end translates into a three-party dialogue involving us, the investor, and utilities alongside the hyperscaler, because what the hyperscaler is after comes down to two things, correct? The first is the dependability that comes from a grid interconnection, something behind the meter simply cannot deliver. Additionally, they’re seeking the flexibility to sell electricity if that becomes necessary, and that’s another benefit of having a grid connection. That’s more or less my view of where the market is headed; we’re also still having conversations about behind-the-meter arrangements. Clearly, a higher price must be paid because of the extra backup capacity you’d need to add on the generation side. Still, some consider that worthwhile, since connecting to the grid can be hard in certain regions of the United States—it may require 5 or 7 years. The real question is whether paying more for redundant generation makes sense compared with the expense you avoid by not having to pursue interconnection. Yet in those cases as well, what they ultimately want is a route that eventually links them up with the grid. On the gas side — since that's what you're asking about — it's certainly one piece of the puzzle they're evaluating. At the same time, they're keeping a careful eye on things and want clarity around how much carbon offset would be needed for what the plant puts out. That's really where we shine, I think, since by structuring PPAs and similar agreements, we're able to bundle gas-fired power with renewable options, delivering a big-picture solution that gets the facility to roughly carbon neutral — or very near it — once all is said and done. That's something these customers find highly appealing. And that's the reason I believe we're in a one-of-a-kind spot to go after that market, working alongside the excellent ties we've established with investor on utilities across the past 20 or 30 years, plus the solid connections we hold within the hyperscale market. So expect further updates on that.

David Arcaro

analyst
#29

I just wanted to circle back on transferability for a quick follow-up. I'm curious about what the backup plan would be in the event that rules or limits were placed on tax credit transfers. How would you fund things instead, when you consider your broader, holistic financing strategy?

John Ketchum

executive
#30

Yes. That's a great question. So from our vantage point, if you look at our company across 2 decades prior to 2022, we had — we relied on tax equity to finance our tax credits, and we could do so on a very programmatic basis and a good one. Looking at things now, we see a flight to quality among tax equity providers approaching us, and the reason they're interested is that our projects are completed on schedule and because they perform; what we've observed over the last 2 years is basically a doubling of tax equity providers wanting to work with us. Another important element of our transfer program is that it lets us choose the best project returns as between transferability and tax equity. On PTC projects, returns can be higher during periods with transferability. Yet from a credit standpoint, the outcome is essentially the same; so as we work through this, we've been doing it for 20 years. We're seeing tax equity come our way. And we're — and so we aren't claiming there will be zero impacts; we feel very good about our position from a financing standpoint for transferability.

David Arcaro

analyst
#31

Understood. All right, that's useful. And I appreciate what you said in response to Jeremy's question. I was curious, perhaps at a somewhat broader level, what kinds of trends in renewable demand are you observing from technology customers, particularly when it comes to data center possibilities? Has there been, I suppose, any shift in the level of interest, or in the load growth or demand growth, that you're witnessing from the data center angle?

John Ketchum

executive
#32

The brief response is nothing has changed. We keep seeing substantial appetite for renewables. And that aligns perfectly with what we keep discussing on the GE Vernova side regarding supplying gas-fired generation as a possible solution too. But they stay very concentrated as well on renewables, correct? They're available immediately; their cost is low. They serve as an offset for gas should they eventually choose that path in a region of the country lacking surplus grid capacity where the load study is taking an excessive amount of time to finish. And when I examine the demand and the outlook for the renewable sector ahead, and we are always looking roughly a quarter out, I mean, we could — we just keep seeing robust demand in every area, with hyperscalers constituting a good-sized portion of that.

Carly Davenport

analyst
#33

Perhaps a more strategic question. When you consider the additions to backlog, could you discuss how the 2024 to 2027 plan compares with the additions meant for delivery after 2027? Given the greater macroeconomic uncertainty and possibly more complicated contract negotiations, do you perceive any danger of projects slipping past the existing plan into 2028 or later? Or does your confidence in executing remain intact?

John Ketchum

executive
#34

Yes. Carly, that's a fair question; perhaps I'll begin with circumvention and remind everyone that when circumvention appeared, we indeed observed some demand being deferred, correct, and I believe that affected some of our near-term development expectations, with us projected to land at the low end of the range for the '24, '25 figures. That's visible in the development forecast write-up. Yet we subsequently managed to move those projects into '26, '27, '28 and certain later years. I believe that situation was tied more closely to circumvention than what we face now. I think currently, demand is simply so great and the need for electrons so immediate that customers cannot afford to delay. And gas represents such a long-term answer. I mean, building the combined cycle unit has stretched from 4.5 years to 6 or more. Thus, requiring electrons immediately, I think, is driving greater near-term demand. Clearly, part of the effect, as well, will ultimately hinge on what we conclude with Washington. But you've already heard my remarks on that.

Bill Appicelli

analyst
#35

A few things about the utility, if I could. Regarding that 10-year site plan you filed — what's the right way to view its effect on the capital expenditure program versus the $34 billion to $37 billion range? Does it change that figure at all? Or does it come after it? And should we be modeling a higher run rate than the 8.8% to 8.9% you laid out for '26 and '27?

Armando Pimentel

executive
#36

Bill, it's Armando. My view is you shouldn't look at it any differently. In the rate case we filed, the CapEx plan covering the coming 4 years comes to approximately $50 billion, correct — across those next 4 years. The 8.8% or thereabouts you just mentioned is about what we'd expect across that same 4-year stretch, and what's behind it is our commitment to always doing right by our customers; within the FPL territory, we're looking at 335,000 additional customers over the next 4 years, and that alone fuels a great deal of investment, first of all, and then the rest of that $50 billion goes toward ensuring we keep enhancing the value proposition for our customers; so to me, it's largely more of the same.

Bill Appicelli

analyst
#37

All right. Next, on the rate case — does a settlement remain the preferred result? And does that window sit before the technical hearings in August?

Armando Pimentel

executive
#38

Settlement, in my view, is never off the table. Naturally, reaching one requires 2 parties — with us, given how many intervenors there are, it takes more than 2 parties to align on a result we'd consider favorable for our customers, correct? Everything here centers on our customers, and on securing the strongest long-term result for them. Looking back at the times we've settled, those typically landed somewhere between 6 weeks prior to the scheduled start of the rate case — which here means mid-August — and just before or just after the rate case itself. So should a settlement materialize, that's probably how it plays out. Of course, it might occur beyond that period. It might occur whenever. Still, what we're concentrated on at present is assembling the strongest possible case for our customers beginning mid-August.

Bill Appicelli

analyst
#39

All right. And one final question, and I'll keep it brief. With that 11.6% ROE, considering how much surplus amortization was used, should we expect that to drift somewhat downward across the rest of the year? Or do you think it can hold at that level?

Armando Pimentel

executive
#40

At the start of each year, we're obligated to submit a filing to our commission telling them what we anticipate for the year. Naturally, those expectations can shift. You witnessed that shift in the prior year when we brought it down. But as we see it, 11.6% is roughly correct given what we're projecting for normal weather conditions this year. We'll clearly revisit that each quarter, though at this moment, 11.6% is what we expect for the year.

Operator

operator
#41

That wraps up both the Q&A portion and today's conference. We appreciate you joining the presentation. You're free to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete NextEra Energy, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to NextEra Energy, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in NextEra Energy, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.