NKT A/S (NKT) Earnings Call Transcript & Summary
February 25, 2026
Earnings Call Speaker Segments
Operator
operatorGood day, and welcome to NKT's 2025 annual report presentation. During this opening portion of the call, everyone will remain in listen-only mode, and a Q&A session will follow later. Should you wish to pose a question, simply press 5 * on your phone's keypad. Please be aware that this call is being recorded. At this point I'll pass the floor to your speakers, President and CEO Claes Westerlind along with CFO Line Andrea Fandrup. Speakers, go ahead whenever you're ready.
Claes Westerlind
executiveGood morning, everyone, and welcome to the NKT conference call held in connection with the release of our annual report for 2025. My name is Claes Westerlind, and I serve as CEO; joining me today is Line Fandrup, our CFO. As usual, I'll walk you through the strategic, operational, and market developments that shaped 2025, and then I'll hand things over to Line for the financial review. After that, we'll close with the outlook and open up the line for your questions. One thing worth noting: as of 1st of January this year, we have changed the scopes and names of our business lines — Solutions is now Transmission, Applications is now Distribution, and Service & Accessories is now Grid Solutions and Accessories. Throughout this call, we will stick with the previous structure and business lines so that everything matches the communication in our annual report. Let's turn to slide number 3. Before we begin, I'd like to point out that today's presentation contains forward-looking statements. Actual outcomes may differ from expectations, so I ask you all to pay close attention to this disclaimer. With that, let's move on to our key messages for the year. Please turn to slide number 4. 2025 was yet another defining year for NKT. It was a year in which the work we initiated several years ago — strengthening capabilities, expanding capacity, and transforming the company — started to consolidate into a stronger, more resilient NKT.
Claes Westerlind
executiveThis was a year marked by disciplined execution, financial strength, and meaningful progress on our investments. During this year, we took decisive steps toward the next phase of our journey by introducing our Charging Forward strategy. Financially speaking, NKT enjoyed yet another year of continued solid progress. We achieved record-high standard metal price revenue of €2.7 billion and operational EBITDA of €390 million, landing at the upper end of the most recent guided ranges, as expected. Organic growth came in at 6%, reflecting a healthy activity level across all business lines and continued solid execution in line with plans. We ended the year with a high-voltage order backlog of €10.2 billion, supported by robust market dynamics and several significant awards. That backlog provides visibility and predictability well into the years ahead. Beyond the firm backlog at the end of last year, we added a further €2 billion during January 2026 by converting the booking commitments with SSEN into a firm order. In November, we introduced our new corporate strategy, Charging Forward, which guides our path toward 2030 and is complemented by new medium-term financial ambitions for that same year. It draws on the foundation built through our transformation in recent years and shifts our focus toward execution and value creation, strengthening NKT's position as a leading pure-play power cable solutions provider.
Claes Westerlind
executiveOne key thing that will enable value creation going forward is the investments we're making right now to grow capacity, and during 2025 all of them moved forward as planned, the fourth quarter included. Work on installing and commissioning machinery is underway, and so is the harbor expansion in Karlskrona. We moved the Cologne capacity expansion ahead, the new medium-voltage capacity in Denmark is set to ramp up over the first half of this year, and the Portugal expansion should be operational by the end of this year. Let's now look at how we performed financially in the fourth quarter. Please go to slide 6. Revenue development in Q4 of 2025 was negative, entirely in line with expectations, with an organic decline of 8%. The explanation lies in Solutions, where execution on the Champlain project in the U.S. ramped down over the quarter, which pushed revenue lower. As a comparison, activity was relatively high in the same quarter a year earlier, subcontracted work included. Even with that negative revenue development, the operational EBITDA margin rose to 13.2%, up from 13.0% in Q4 2024. If you set aside the effect of the Champlain project, activity in Solutions stayed at a high level, and we kept executing on our high-voltage order backlog, with a number of projects active in the quarter.
Claes Westerlind
executiveMoving to Applications, activity stayed elevated, and like in earlier quarters, power distribution grid was the driver, with demand remaining strong. Helped by extra capacity that started up at the start of the year, the business line kept posting healthy organic growth and better operational EBITDA. Those high market activity levels also benefited the Service & Accessories business line, as seen all year. In Q4, that produced over 30% organic growth and an operational EBITDA improvement. Both segments of the business line drove this. Let's go to the next slide to examine each business line more closely, beginning with Solutions. Solutions revenue for the fourth quarter of 2025 was €409 million, down from the €469 million reported in the same quarter of 2024. That move was entirely as expected and came from winding down work on the Champlain Hudson Power Express project in the U.S. We are also up against a Q4 2024 base with a high execution level on that project, including subcontracted work.
Claes Westerlind
executiveAt the risk of sounding repetitive, apart from Champlain, activity remained high, and we moved forward on executing the high-voltage backlog, with project execution overall satisfactory. Once again this quarter, installation work ran at a high level, and our cable-laying vessel NKT Victoria was well utilized. Operational EBITDA for the quarter was €61 million, which is €6 million below the same quarter a year earlier, due to what I just described on the Champlain project. The margin came in at 15.2%, an improvement of almost 1 percentage point versus Q4 2024. That reflected sustained high activity and a somewhat better mix among the orders under execution. On the whole, this quarter confirms the trajectory NKT is on toward 2030, though I also want to remind everyone that in a project-based business such as ours, quarterly margins can fluctuate with the phasing and progress of individual projects. During the quarter, we made progress on a number of projects at various stages of execution. Key contributors this quarter were Champlain Hudson Power Express, Hornsea 3, Hertel, East Anglia THREE, Bay of Biscay, SuedLink, and SuedOstLink. Our investment programs to expand capacity kept developing consistently in the quarter and advanced in line with plan.
Claes Westerlind
executiveThe same applies to our production facilities in Karlskrona and Cologne, along with NKT Eleonora, our second cable-laying vessel. Each of these is expected to be operational starting in 2027, and all remain on schedule. Slide number 8, please, for an update on the market and our backlog. Activity in the high-voltage market stayed at a high level. Firm awards within our addressable market came to an estimated €4 billion in 2025. That is clearly below what prior years showed, though timing also plays a part here. In January 2026, we turned booking commitments with SSEN in Scotland into firm orders worth roughly €2 billion. We also continue to be selected as preferred supplier on Eastern Green Link 3, and we anticipate converting that into a firm order in Q1. Project sizes are plainly growing. That has an impact on every process involved, and those processes frequently hinge on permits and political decisions. As a result, the actual award can readily move between quarters or even years. At the close of 2025, our high-voltage order backlog was €10.2 billion, a modest decrease versus Q3 that mirrors the execution during the quarter. When we include the SSEN order awarded here in January, the EGL 3 preferred supplier agreement, and our booking commitments, together they give strong visibility into the years ahead and back our medium-term financial ambitions.
Claes Westerlind
executiveThis lets us concentrate on development over the long term, and although we stay very busy on the commercial side, we’re able to keep a disciplined approach and concentrate on getting the most out of utilization, risk, and profitability. Looking at how our backlog is composed, roughly 95% of it sits with European TSOs, and from an application standpoint interconnectors represent over 55%, while offshore wind makes up about 40% of our awards. There are plenty of moving parts in how the general market is developing, but our overall view hasn’t changed, and for 2024 to 2030 we still anticipate that awards in our addressable market will average more than €10 billion. We keep evaluating the situation as it unfolds and we see both positive and negative sentiment across our markets, which we monitor closely. That said, we stay confident in a healthy balance of supply and demand through this decade, and looking further into the 2030s, our expectation that the market will move into more balanced territory is likewise unchanged. Please turn to the next slide for a look at Applications. Applications kept up its positive development in the fourth quarter, when revenue came to €197 million, equal to 9% organic growth.
Claes Westerlind
executiveAs in prior quarters, continued strong demand in the power distribution grid segment drove growth, helped by extra capacity that started operating in the Czech Republic and Sweden earlier in 2025. In the segment exposed to construction, overall development stayed subdued, though it differed across markets and subsegments. Revenue there improved sequentially versus Q3 but was still below last year's level. Operational EBITDA rose to €18 million from €13 million in the same quarter a year earlier, lifted by higher demand and revenue in the power distribution grid segment. The margin improved to 9.1% from 7.8% last year. In the fourth quarter, we also managed to complete the integration of SolidAl, which we acquired in June 2024. The Portuguese business now runs as a fully integrated unit within NKT, and the business case is fully confirmed — all of which reflects work well done by the Applications team and the wider NKT team. We therefore also expect to reap the full benefit of the €7 million in synergies in 2026. As noted, demand for medium-voltage cables remains robust, driven by upgrades, enhancements, and strengthening of European power distribution grids. In 2025, we have met this demand with our added capacity, and the extra capacity we are ramping up here in Denmark during the first half of the year should also contribute positively to organic growth development.
Claes Westerlind
executiveMoving to slide 10, here's where things stand with Service & Accessories. That segment kept up its favorable momentum during Q4. Revenue came in at €79 million, which is €20 million above the prior-year quarter — that works out to 31% organic growth. Both of our business segments drove this expansion, since each saw a busy market environment in its respective region. On the Service side, we carried out repair work, largely onshore, along with installation and maintenance jobs, while the brisk pace in Accessories came from demand for high-voltage as well as medium-voltage accessories. Our Service operation gained from continuous maintenance, repair, and installation activity, and Accessories kept seeing robust demand in both the medium- and high-voltage areas. On top of that, the high-voltage projects we're currently executing also made a favorable contribution to how things developed. Throughout the business line, operational execution came in at a satisfactory level. Operational EBITDA rose to €10 million, versus €6 million in the same quarter a year earlier. Margin for the quarter reached 12.5%, against 11.1% in Q4 2024, primarily on the back of better profitability in Accessories. If you'll turn to the following slide, I'll give you a status update on the investments we have underway. We made steady headway on our capacity-expansion investment projects, and once again in Q4, every project tracked according to plan.
Claes Westerlind
executiveQ4 saw a high level of activity for us, and we reaffirm our expectation for accumulated capex of roughly €2 billion across the '25 to '28 period. At Karlskrona, machine installation carried on throughout the new buildings, and in that same quarter we kicked off the first commissioning test of new machine lines. At the same time, we made headway on building the remaining structures, along with the harbor expansion, which further enhances the site's infrastructure and layout. Taking everything together, the extra capacity should be operational starting in 2027. That also applies to the high-voltage capacity expansion in Cologne, which is likewise underway. Construction of NKT Eleonora, our second cable laying vessel, advanced according to plan in the fourth quarter as well. The hull's various sections have now been joined, as the picture on the slide shows. Given solid progress across the different work streams, NKT Eleonora is still expected to be operational from 2027. In Asnæs, here in Denmark, we finished building the additional medium-voltage capacity as planned. It will ramp up over the first half of 2026 and add to revenue development in Applications. Work at our Portugal site is advancing too, and the extra capacity should come online near the end of 2026.
Claes Westerlind
executiveIf you go to slide 12, I'll offer a few thoughts about how NKT contributes to net zero. Power cables — and NKT as a result — are essential enablers of the energy transition and of the broader electrification of societies, and our ambition is clear while also being twofold: we concentrate on maximizing what we contribute to decarbonizing societies by enabling clean electricity in the grids through our cable solutions — that's our handprint. Equally important, we're focused on cutting our own emissions and reaching net zero throughout our value chain no later than 2050 — that's our footprint. We keep evolving on these matters, and although our emissions are rising because of our growth, that is largely a result of lifetime power losses from the cables until clean energy sources are used to a larger degree. On the handprint side, we have a number of concrete examples of progress. One very strong case is the Champlain Hudson Power Express project in the U.S., which will add substantially to our handprint. Once the transmission line is in operation, it will deliver as much as 20% of New York City's electricity needs with clean and reliable energy.
Claes Westerlind
executiveIf you consider all the projects we've installed between 2019 and 2025, they will facilitate or enable 27 terawatt-hours of clean energy in 2030. That figure equals more than twice the number of households in Denmark. It's calculated using a transparent and conservative methodology that was developed and vetted externally, and it draws on internationally recognized sources. That concludes my part of the presentation, and now I will, sadly for the last time, hand things over to Line, who will walk us through the financials. Slide 13, please.
Line Andrea Fandrup
executiveThanks, Claes, and a good morning from my side too. Now I'll take you through the financial highlights for Q4 and for the full year 2025, beginning with the income statement, which is on slide 14. Fourth-quarter revenue came in at €643 million, which is €50 million below the same quarter a year earlier, corresponding to an organic decline of -6%. That was entirely in line with expectations, and the cause was the wind-down of activity on the Champlain Hudson project in the U.S., which pushed Solutions revenue down. Leaving that particular project aside, the underlying level of activity stayed high, and Applications as well as Services & Accessories both kept posting solid positive growth rates. Operational EBITDA for the quarter reached €85 million, €5 million below Q4 2024, reflecting the Solutions development just mentioned. The EBITDA margin edged up from 13.0% to 13.2%, and every business line contributed to that improvement. The margin carries a temporary dilution of roughly 1 percentage point, coming from a higher cost level tied to the capacity ramp-ups. With that, we closed the full year 2025 at revenues of €2.722 billion and an EBITDA of €390 million. Both figures came in at the upper end of our most recent financial outlook for the year.
Line Andrea Fandrup
executiveDepreciation and amortization came in higher, as has been the pattern in recent quarters, which mirrors the investments we keep making. Across the whole year, those costs reached €37 million, versus €30 million the year before. Net financial items produced income of €12 million. The main contributors there were gains on currency and interest earned on our cash position. Tax for the quarter showed income of €37 million, since we raised capitalization of our German tax asset on the back of better operational performance. Over the full year, tax costs totaled €9 million, which works out to an effective tax rate of 6%. That brings us to a net result of €97 million for the quarter, up against €56 million in Q4 2024. For the full year 2025, net result came to €275 million. Headcount kept rising, in line with the expansion and investments we continue to make. On average, NKT employed more than 6,300 people during the fourth quarter of 2025. Let's move to the next slide now and review how cash flow developed. Looking at cash flow, we closed the year strongly, with free cash flow of €341 million in the fourth quarter. That positive cash flow came from a favorable contribution from working capital changes along with EBITDA of €85 million.
Line Andrea Fandrup
executiveEven with the positive development in the fourth quarter, free cash flow for the full year came in at negative €244 million, fully as expected, since we invested almost €750 million, mainly in increased capacity. Working capital changes brought an inflow of €527 million in Q4 2025. That came about because of prepayments tied to order awards achieved mainly in Q3, along with the normal phasing between milestone payments in Solutions. The working capital position at year-end also got a positive boost from timing effects. Investments came to €232 million in the fourth quarter, reflecting the high activity level across our investment programs. For the full year, investments were €742 million. The quarterly level was slightly higher than in previous quarters, mainly due to timing, but we expect investments to remain elevated also in the coming quarters. Net cash flow for the quarter was €337 million and negative at €302 million for the full year 2025. Let's turn to the next slide for a look at the balance sheet. We ended the year with a negative working capital position of €1.5 billion. That was an improvement of €441 million compared to the position at the end of Q3.
Line Andrea Fandrup
executiveLike I said when going through the cash flow development, prepayments and the timing of milestone payments drove this, and a favorable year-end timing effect added to it. Capital employed came to €1.2 billion at year-end, which means it fell by €158 million over the fourth quarter. The reason was that working capital improvement more than offset the investments made in the quarter. RoCE dropped to 24% from 27% at the end of Q3, as EBIT for the last 12 months came in slightly lower. Going forward, RoCE will keep fluctuating from quarter to quarter, affected by operational earnings, the timing of customer payments, and a growing asset base from our investment programs, which will ramp up over the coming years. Our net cash position got better and stood at roughly €1.2 billion at year-end. That kept our financial position robust. Such a strong position matters for funding our investments and for supporting NKT's continued growth journey in the years ahead. Kindly move to the next slide, where we look at the outlook for 2026. For 2026, we expect revenue in standard metal prices of between €2.63 and €2.78 billion, and operational EBITDA of between €360 and €410 million.
Line Andrea Fandrup
executiveLooking ahead to '26, our expectation is that revenue in Solutions will be somewhat lower. As we've said before, the production and installation capacity we'll have in 2026 matches what's available in 2025. Combined with less subcontracted revenue than in 2025 and variation orders expected at a normal level, Solutions revenue may come in somewhat lower in 2026, showing a mid-single-digit percentage organic decline. That depends on how specific operations in different projects are executed and timed. During 2026 we'll keep executing our backlog, primarily projects awarded between 2020 and 2022. To support the ongoing investments, the production ramp-up, and value creation, we're currently running with a higher cost base. That diluted the group margin by roughly 1 percentage point in 2025. With the actual ramp-up getting close, this temporary dilution is expected to grow in 2026 to roughly 2 percentage points. The EBITDA outlook reflects this. Applications should contribute positively to revenue and EBITDA development in 2026. The extra medium-voltage capacity in Denmark will ramp up during the first half of the year, and in Portugal by the end of the year. Altogether, these are expected to add up to 10% growth to the business line.
Line Andrea Fandrup
executiveWhen it comes to Service & Accessories, we anticipate beneficial impacts from the overall elevated activity we're seeing in the market — though, as usual, how things actually develop hinges on the volume of offshore repair work, and that's hard to forecast. During 2026, we'll keep carrying out our investment programs, and we expect the investment level to stay high through the year, albeit below the €743 million we spent in 2025. The outlook, as ever, depends on a number of assumptions: satisfactory delivery on our high-voltage investments and projects, plus satisfactory operational execution across the business lines. For our distribution and Service & Accessories businesses, market conditions should be stable, including a normalized level of offshore power cable repair activity. We're assuming supply chain disruptions stay limited, with the labor, materials, and services we need available, and stable trends in the global economy, foreign currency, and metal prices. Moving on to the next slide. Given the financial and operational results in 2025, we've strengthened the groundwork even further for the growth journey ahead of us. Our steady progress on capacity expansion investments throughout the year is a key enabler of future development. We're clearly advancing toward the 2030 financial ambition that we set out in November.
Line Andrea Fandrup
executiveLooking at 2030, our revenue base will be significantly higher, delivering an organic revenue growth CAGR above 7% between 2024 and 2030, along with operational EBITDA exceeding €900 million. Equally important, we anticipate a RoCE of at least 22%, which mirrors the better earnings level and a healthy return on the investments we've made. On the next slide, let me run through the key highlights from 2025. Financial performance strengthened over the course of 2025, when we achieved 6% organic growth and an EBITDA of €390 million, a record high. We made good progress on the investments aimed at expanding capacity in both Solutions and Applications. Within Solutions, the extra capacity remains as previously stated, with operations expected to begin in 2027, while the added medium-voltage capacity in Denmark will ramp up over the first half of 2026. Our high-voltage order backlog stood at €10.2 billion at year-end, and that position was then bolstered in January by the €2 billion conversion of booking commitments with SSE. Finally, our new corporate strategy, Charging Forward, launched during Q4, is now up and running. Alongside the strategy, we also set out medium-term financial ambitions, which I covered on the slide just before. Let's move to the next slide.
Line Andrea Fandrup
executiveBefore we move into the Q&A, I'd like you to mark the 29th of September on your calendars — that's when we'll welcome you to an Investor Day in Karlskrona. There, we'll lay out the Charging Forward strategy in more detail, and that will include perspectives from the updated business lines. Equally important, you'll have the chance to tour the Karlskrona production site — both the areas that exist today and those we're expanding right now. Starting with Q1, our reporting will follow the new structure built around the updated business lines. Well ahead of the Q1 report coming out, we'll supply restated historical financials for those new business lines. Since this is my final call as CFO of NKT, I'd like to take the chance to thank all of you for the many great discussions and interactions we've had across the past six years. I'm looking forward to seeing many of you at the roadshows coming up. That brings the presentation to a close. I'll now pass things to the operator, who will guide us through the Q&A. Operator, please.
Operator
operatorThanks. If you'd like to ask something, just hit 5 * on your phone's keypad. To pull your question back, press 5 * once more. Claus Almer of Nordea has the first question. Go right ahead — your line is unmuted now.
Claus Almer
analystThank you. Thank you, and to begin with, congratulations on a strong Q4 and not least the 2025 performance. My first question concerns the 2026 guidance. Over the last couple of years, we have seen a number of guidance upgrades. Are the assumptions behind next year's guidance the same, or are you changing to being less or more conservative at the start of the year? That would be the first one.
Line Andrea Fandrup
executiveMorning, Claus. I’ll take that one. I believe I already walked you through part of what assumption we’ve actually built in, but let me be very specific here. For Solutions, activity was higher, and that included variation orders at an above-normal level in '25. For '26, we aren’t planning on a similar level, since that was above and beyond the normal. We also had the Champlain Hudson project in the U.S., with a high share of subcontracted work, and that is another effect we won’t see going into 2026. Those will be the '26 headwinds. Then, as we execute the portfolio through the year, the improvement in project mix will probably be smaller than you might expect. As communicated earlier, it takes time for us to work through the backlog, and what we have in execution is primarily orders won from 2020 to 2022. On Solutions, just to answer your questions about whether this feels conservative, I won’t comment on that, but in reality, this is how the outlook is constructed when we look at the Solutions division.
Line Andrea Fandrup
executiveLooking at Applications, we do anticipate strong growth in the power distribution grid continuing, and for the construction-exposed segment, we expect it to be flat or to see slightly positive, minor improvements. What we're seeing, naturally, is our medium-voltage capacity coming online — or ramping up fully — during the first half of the year in Denmark, and then, regarding timing, Portugal might also come online at the end of the year. I think this gives some fairly specific data points, let's say, into how we've built the outlook around Applications. Again, as I think we've discussed previously, the view on Applications — and we saw this early in '25 as well — can shift if sentiments shift, and that's, of course, something we're keeping in mind here. Then for Service & Accessories, it was a good year. What we're looking at in '26 is, of course, how the markets will play out, and you can predict that as well as we can — or at least regarding offshore repair works, what it ultimately amounts to by the end of the year, that would be difficult to say. Here we work with a normalized level, which is, let's say, perhaps one or two repair jobs, but at a different level than what you saw in '25.
Line Andrea Fandrup
executiveI'd say, once more, only time will tell whether this strikes you as conservative or not, but those are at least the assumptions underlying the outlook.
Claus Almer
analystThanks for that thorough explanation. What I was really asking about is the EBITDA level, which is harder for someone on the outside to assess, so to speak. In the past — or normally — you've set aside a reserve for a possible project that may go wrong, or at least won't be executed smoothly. That's simply what I'm trying to get at: are the assumptions underlying profitability the same approach you used one year ago, two years ago?
Claes Westerlind
executiveGood morning, Claus, from my side as well. This is Claes. Perhaps I can offer a comment here. Line, I think, has addressed the main cornerstones of the matter. Regarding what we expect from the project portfolio — and on that point you are entirely correct, Claus — we have the anticipated production cost and, naturally, we have risk and contingency tied to discrete risks that are expected to mature over the course of the year, plus contingency that more broadly should support the projects at their various stages. My sense is that our portfolio expectations around the use of risk and contingency resemble what we saw last year as well. I would add that, of course, and as you know well, developments can move in a positive direction and then, naturally, also the other way, depending on how successfully we manage and mitigate the risks due to mature in the year ahead.
Claus Almer
analystFair enough—I had to ask. Now for the second question, and I realize you don’t provide guidance on 2027, so I’ll apologize in advance for asking, but since the new factory may come online later in 2026 and thus be somewhat fully operational in ’27 or part of ’27, should we view ’27 as something between ’26 and ’28? That will be my last question.
Claes Westerlind
executiveLet me begin with the first part of your question. I’d say my assessment is that the chance of the new factory starting operations this year is very limited, close to nonexistent — just to be upfront about that. Our earlier discussions, where we also conveyed a positive spirit and sentiment, still stand. We hold the same sort of view this time regarding how that investment project is progressing and what it could potentially mean for the in-operation taking, but it won’t come early enough for us to see revenues already in 2026. Now, on your second question as well, Line can complement, but I think it depends, and we can’t give you a definitive guiding answer on that. Naturally, 2026, compared with ’28 and looking at ’27, falls in between, and it’s right to the extent that Solutions or Transmissions going forward will continue or begin to grow from new capacity coming online in ’27, but, naturally, will keep growing in both ’28 and ’29 as well. In that respect, it sits between those two years.
Claes Westerlind
executiveRegarding profitability, we've said before that '27 matters a great deal for two reasons. First, if you had to pick a year, that's when we anticipate a sharper change in the mix of projects when it comes to profitability — that's the first point. Second, naturally, that's also when we bring new capacity online, begin producing revenues, and earn contribution margin entirely from non-legacy projects; beyond that, we also begin to absorb the costs we're carrying, which are also finally ramping up from this year into next year. On the profitability side as well, I don't believe it's an exaggeration to say we expect more from '27 than we're seeing in '26.
Claus Almer
analystThat clears things up nicely. Claes, many thanks for explaining that. I had nothing further to ask.
Operator
operatorOur following question comes from Christopher Leonard at UBS. Go right ahead. Your line is now unmuted.
Chris Leonard
analystHello, everyone, and thanks. I’ll begin with a couple of questions, please. Regarding working capital as we look toward 2026: I believe the prior view for ’25 suggested that some working capital outflows might occur during the year. That did not materialize. Clearly, you achieved a healthy inflow. Now, as we look toward ’26, you also guide to Q1 having the National Grid contracts closed. I’m wondering whether you can offer any perspective on how we should think about working capital for the year 2026. My second question concerns the Solutions guidance, and just to be clear, the remarks there were to see a mid-single-digit organic decline, presumably mostly tied to the subcontracted work and variation orders. I wonder whether you could break down how important those two drivers each are, and likewise, I wondered whether you could provide guidance or a view on what revenue growth would be without those two negative factors in 2026 for the Solutions business. Thanks.
Line Andrea Fandrup
executiveGood morning, Chris. Let me begin with net working capital, and you're correct that back in early 2025 we made a comment about where we anticipated ending up, and the result actually came in somewhat better than that, now sitting in negative territory at €1.5 billion. That stemmed from very favorable movement during Q4 of 2025. Part of it hinges on when actual payments land, and we also had certain phasing where milestones we had expected in Q1 on our project shifted into Q4 2025. This year could play out a little differently. At present, we're eyeing a figure that might be roughly -€1.2 to -€1.3 billion for net working capital. A great deal can shift, and it depends heavily on potential awards as well as milestone movements on the projects we carry out.
Claes Westerlind
executiveMoving to your second question, thanks, Chris, and good morning. Regarding guidance, we don't provide guidance by business line, but on the directional remarks from Line, we would decline to break out how large the VOs are and how large the subcontracted portion of what occurred last year is. If I then address the second part of that question, what would growth have been without it? I think the only assistance I can offer there is the fact that, organically, our capacity to generate revenue — meaning the quantity of machines and machine hours — has remained constant: '24, '25, and also '26. That said, if you consider it with all things else equal, mix equal, margins equal, then we would have no organic growth. Of course, I will perhaps defer to commenting precisely on the mix, but we have also been consistent in stating that we have a gradual, albeit perhaps slower-paced, shift in the mix from legacy to non-legacy projects, but that, of course, is also present. There, I think you could expect perhaps a small organic growth driven by that mix shift. That is from a revenue perspective. Keep in mind, again, from a profitability perspective, that profitability is being affected by the opex drag, as Line just said, that has grown from or is expected to grow from last year into this year.
Chris Leonard
analystAppreciate that—very useful. Just one clarification, if I may. I believe in the prepared remarks, when discussing Applications, it was mentioned that the new capacity coming online in Denmark and Portugal could add 10% to revenue growth. I'm assuming I heard that right, and that it applies only to Applications—not at the group level for revenue growth in '26. Thanks.
Line Andrea Fandrup
executiveGot it, thanks.
Operator
operatorLars Topholm from DNB Carnegie has the next question. Go ahead, please. Your line is unmuted now.
Lars Topholm
analystLine, I realize you’ll really feel our absence, but that’s just how things are. I’ve also got a few questions of my own. First, regarding depreciation, for 2026 and afterward, could you comment on what we should anticipate — A, the level for the full year, and B, how it will progress quarter by quarter? My second question concerns the tax capitalization you had in Germany. Because you hadn’t flagged it, did something occur in Germany that caught you favorably by surprise? I’ll begin with those two questions.
Line Andrea Fandrup
executiveThanks, Lars, and I will definitely miss you. Regarding depreciation, I think I'll hold off on giving quarterly specifics because, as you can imagine—and to go back to what Claes said, sorry—the timing of when the factory actually comes online will also determine when depreciation steps up. What I can share is that looking ahead to 2026 at least, we'll be at a level more around €150 million, which is obviously a step-up from the investments coming online this year. Then as we move into the following years, I think we've set a landing point around '28 with everything online, where we'll come closer to €200 million—there's a step-up there. On the tax side, I think it's very positive on Q4. The way we've run the quarters, we haven't been as positive on the German tax losses carried forward in Germany during the year. Of course, we do an extra assessment in Q4, and that was very positive, which is why you see this capitalization of the deferred tax asset carried forward contributing positively. I think that's what I would keep it at.
Line Andrea Fandrup
executiveFor next year, I think you should anticipate an effective tax rate in the low 20s. That's the rate we'd expect on an effective basis, and it also takes into account any German impacts tied to this Q4 effect.
Lars Topholm
analystAppreciate it.
Operator
operatorOur next question comes from Daniela Costa at Goldman Sachs. Please go ahead. Your line is now unmuted.
Daniela Costa
analystHello, and good morning. Thanks for taking my questions. There are two of them. First, I wanted to ask whether you could round up your thinking on free cash flow for 2026, given what you said about profitability and capex. Do you think breaking even or being positive in '26 would be possible, or is that more something for later on? The second question concerns your mention of better utilization at Karlskrona in 2027, but could you walk us through, when you open a plant of this size, what type of utilization we should expect in year one and in the years after that? Thank you.
Line Andrea Fandrup
executiveDaniela, I'll handle the first question about free cash flow. And of course, as we saw in 2025, a great deal also hinges on project milestones. Given where we stand today and our view of 2026, our EBITDA guidance is €360 to €410 million. We've now put the peak investment year behind us with 2025, which means the path we laid out earlier holds: '25 was the top, '26 comes down, and '27 comes down further. Investment levels should sit lower. I also touched on working capital, which, as you may have gathered, was perhaps less favorable than how we finished out 2025. Overall, while we don't give specific guidance, when we total everything up, we still foresee negative free cash flow in 2026. We'll keep a substantial cash balance all through 2026, but I think the year also has to kind of — we'll also know more once we're halfway through the year and see how everything plays out. Then
Claes Westerlind
executiveIf I may, Daniela, offer a remark regarding your second question about bringing the Karlskrona plant into operation, I can provide a somewhat qualitative reflection on that. That factory essentially has two machine flows, and I believe our commentary has been that these will be commissioned during 2027. My first point is that there will be a gap of a couple of months between the two entering operation, and then naturally, when a machine flow is started up—and I think all of us are at least reasonably acquainted with how cable is produced—you begin feeding copper into one end, which is conductor stranding, and from there it proceeds to extrusion, heat treatment, sheeting, armoring, and then it gets loaded out and tested on turn tables, after which it is loaded onto the vessel, the vessel sails, and then, naturally, you have the burial work, the ancillary work alongside that, and finally high-voltage testing and completion. The span from the moment you start feeding the line until the cable is ultimately buried on the seabed will take time. This depends, naturally—and I am not referring specifically to the Karlskrona commissioning plan right now, but rather in general terms—it is at minimum between one and two years.
Claes Westerlind
executiveAfter that, you have to carry out that same thing twice, for two distinct flows, and that gives you at minimum a foundational sense of the steps required to reach full revenue generation from this asset—since, naturally, only once every one of these stages is entirely complete will we get to full revenue generation.
Daniela Costa
analystUnderstood — thanks a lot.
Operator
operatorWe’ll take our next question from Casper Blom at Danske Bank. Go ahead. Your line is now unmuted.
Casper Blom
analystThank you very much. I have two questions, please. Claes, in recent years—really almost from the time you became CEO—there has been ongoing debate about the overall market outlook and electrification, particularly in Europe. You have spoken about the expectation of market awards in your addressable market of €10 billion at least per year on average. Now that 2025 has passed, with continued emphasis on grids and on Europe being self-sufficient, has your confidence changed regarding how long this market can stay favorable for NKT? I realize it is hard to look 20 or 30 years ahead, but compared with 12 months ago, would you say you are more confident or less confident about the long-term outlook? My second question is a somewhat household one on Applications: since we have now had a couple of years of subdued activity in building wires, could you update us on how much of the division is now accounted for by mid-voltage and grid cables? Thank you.
Claes Westerlind
executiveThank you, Casper. Perhaps I'll begin with the second question, since that one is likely the simplest, and if we look back at the fourth quarter — which is also broadly representative — from a revenue standpoint we depend on the construction-related market for roughly 20%, and that covers the 1 kV copper cable as well as the building wires. I believe that answers that question. Naturally, this share will decline further as our investments gradually come into operation, both in Denmark and in Esposende, since those investments are made exclusively in the medium-voltage and power distribution segment space. That's for the second question. As for the first question, the answer may take a bit longer, but I believe what you're asking is whether we feel more or less confident about the long-term projections for this market. My very simple answer there is that, at least in my own view — and I think NKT shares it — we are, if anything, more confident about this market's long-term outlook. That said, I would add that when it comes to the market's short-term development, that is where we see the bigger variances. We can observe situations where offshore wind auctions fail and get reshaped, and then succeed.
Claes Westerlind
executiveTake, for instance, the French government just recently unveiled its new energy strategy, which lowers renewable targets — offshore wind, for example, dropping from 18 to 15 gigawatt. Then we have cases pointing the other way. At the North Sea Summit, the nations bordering the North Sea gathered and committed to 300 gigawatt by 2050. We're also seeing a pledge of 15 gigawatt annually through 2040, and the UK market is showing robust momentum — in AR7, the largest offshore wind volume ever awarded, plus big interconnectors either already contracted or moving through that process. My view is this brings added near-term volatility, or at minimum a mix of positive and negative sentiment, as I mentioned earlier. The reason I frame things this way for the long run too is that, when you step back and look at the big picture, Europe currently covers 40% of its energy generation through domestic production. That means 60% is imported into Europe today, and given what you alluded to — security worries and open questions on that front — how does Europe keep raising that share? Right now the debate we're having centers on affordability versus the green or clean transition, along with the grid build-outs.
Claes Westerlind
executiveNaturally, of that 60% we bring in from abroad, when it comes to oil, nearly 100% is imported. For gas, roughly 90% comes from outside. Supplies of both come from places such as the U.S., yet also to a large degree from the Middle East, in the past from Russia — less nowadays and perhaps not at all going forward — plus a few Asian nations. Clearly, if we aim to increase, or push toward, energy sovereignty, we have to begin making ourselves less dependent and construct additional generation capacity right here in Europe. So the following question becomes: which route is least costly for building generation at large scale, and in particular for doing so quickly? Number one is solar, number two is onshore wind, number three is offshore wind, and naturally other elements exist too, such as nuclear, which could also form part of the blend. My view is that solar, at least in Europe's northern regions, as you're well aware, Casper, may not serve as the baseload option at minimum. That, I believe, demonstrates that offshore wind, along with grid connections more broadly, so as to also manage the inherent intermittency of such power sources, is essential. What makes logical sense and what gets decided politically don't always line up, and I think a process may also be needed before that understanding is reached.
Claes Westerlind
executiveAt minimum, that story leaves us—and me personally—confident, in fact more confident right now than we were 2 years back regarding what this industry can achieve over the long run. That's a quite lengthy response to what you asked.
Casper Blom
analystThanks a lot, Claes. If I could just add one thing, would you be able to tie those thoughts to how you're thinking about more high-voltage capacity — say, another project along the lines of Karlskrona at some stage — and when, plus what it would take for you to feel confident making that kind of decision?
Claes Westerlind
executiveThat's a very relevant question as well, and I believe my response will closely mirror what you've already heard from us. Our position has been one of considerable discipline regarding expansions, which means we must not only observe the potential for a robust market but also have volumes confirmed and feel confident that such capacity can be fully utilized over the long run, since, as I mentioned a moment ago, this near-term volatility also generates uncertainty—which is why I'd say the North Sea Summit functioned as a helpful stabilizing factor, so to speak. As I also noted, our perspective on the market in at least the short to medium term is unchanged, and that is an average exceeding €10 billion through 2030, and after that, as we move into the 2030s, it seems to shift toward a more balanced territory. Simply on that basis, I think we'll be reluctant to bring on additional capacity organically. There may be exceptions, and one such exception might be the presence of extremely large projects that could be booked or that would be prepared to commit to capacity. And as I believe everyone on this call recognizes, a few of those exist out there that I think on their own could justify a conversation about adding capacity in the near term as well.
Claes Westerlind
executiveSo with all of that covered, at this moment we remain quite busy with the build-out in Cologne as well as in Karlskrona, and any of those decisions — if they get made and when they get made — will not be made in a way that would come even close to putting at risk the process we're in looking toward '27 and '28 as well.
Casper Blom
analystI appreciate your responses and the thoughts you shared. That means a lot.
Operator
operatorLucas Ferhani from Jefferies has the next question. Go right ahead. Your line is unmuted now.
Lucas Ferhani
analystThanks, and good morning to all of you. I’ve got a few. Perhaps we’ll go through them one at a time. The first one concerns how 2026 is shaped, H1 versus H2. Specifically on Solutions, I’m wondering whether we should expect a larger decline in the first half than in the second half. Obviously, given that Q4, and is that Q4 organic growth of roughly -13% about what we should anticipate going into the first half? That would be my first question.
Line Andrea Fandrup
executiveI think perhaps I'll begin, and then Claes can add to that. I don't think we'll go into much detail on Solution quarters at this point. As you can see from the '25 execution as well, quite a lot can happen when it comes to variation orders, but beyond that we're also optimizing the factory each day within the project so that NKT gets the best possible execution. Having said that, weather can of course actually have an impact on the installation work, and winter could be lower than the summer quarters. Then, depending a bit on the portfolio, you could also see probably a larger share toward the year — though I'll tone this down — of newer-awarded projects at different margins than earlier ones. There are these various mix components in there that I would mention, at least.
Lucas Ferhani
analystThank you, that's great. My second question concerns Applications. Clearly, within the power grid segment, we're seeing an increasing number of framework agreements announced, and those come with longer terms, plus additional extension periods on top. So I'm curious about what's happening with pricing in these new kinds of framework agreements, and also about the 10% growth you referenced in Application for that division. My assumption is that this reflects volume, with price potentially coming on top of that. Would that be fair to say? Thank you.
Claes Westerlind
executiveSo when we mention that 10% growth, that's really meant to give you guidance on what the new assets will deliver this year — I believe it accounts for the entire revenue we'd anticipate this year from those two investments we just referred to. Regarding the framework agreements, the longer-term picture, and how things generally stand in the power distribution segment, I can only back up what you're suggesting: naturally, stronger demand, plus a healthier demand outlook going forward, over a longer horizon with better visibility, all of that helps keep pricing at a sustainable level. There is competition in the market, I'd like to add that too, but as the performance in Applications shows, even with construction subdued, we can achieve sustainable pricing, while we're also constantly, of course, driving ourselves on efficiencies so we can capture better margins as well. It all ties together.
Lucas Ferhani
analystThanks. The final question was about that high-voltage tender situation. Clearly, '25 came in lower. Those extended backlogs are still there, though. How have your more recent conversations with customers been going? Might we see another '26 that sits at levels below the average, and as we move nearer to those available look slots, could customers feel somewhat more pressure to commit? How would you compare '26 against '25 when it comes to awards? Thank you.
Claes Westerlind
executiveThank you, Lucas. First, I want just to remind the reason that we are talking about these more than €10 billion in average over a period of years is to somehow try to get away from looking at just individual years because of the unpredictability, and how difficult it is also with the projects becoming larger and larger, to actually predict will it be €6 billion, will it be €10, or will it be €14 billion. I just want to put that out there in the first place and say that our comments are more directional across a couple of years. Now, with that said, there is also some projects that I think we all were originally believing that would be awarded last year that now not unlikely will be awarded this year. Of course, that could give 2026 a good start, and could also put us at or even above the average number. I think these are comments that are more just reflective comments, and that we don't want to be held to because it is difficult to predict permits and governance and other topics.
Lucas Ferhani
analystSure thing. Thanks.
Operator
operatorWe’ll take the next question from Akash Gupta at JPMorgan. Go ahead — your line is unmuted now.
Akash Gupta
analystYes, hello. Good morning, all, and thank you for making time. I’ve got a few questions too. The first concerns offshore wind, particularly the Netherlands and Germany. You have a couple of projects in each of those countries in your backlog, and looking at how these auctions have progressed, nothing has happened over the last 2 years, and we’re seeing in the press that the German offshore auction could be delayed until next year as they aim to shift toward a CFD-type structure. My question is whether there’s any risk to executing those projects, since your TSO customer might conclude that the timeline needs adjusting given that the projects aren’t arriving on the schedule agreed earlier. If that scenario plays out, do you have contractual protection, for example compensation from customers that you could receive in such a case? That’s the first one.
Claes Westerlind
executiveThank you, Akash, and good morning. I also appreciate the question, as it is pertinent. It would be naive of me to claim there is zero risk, and naturally we also lack visibility into what choices get made regarding auctions and how those might translate into actions by TSOs. What I can tell you is that instances of TSOs either pressing ahead or holding back on projects are very seldom, if ever, observed by us. And second, should that happen — and I believe we have taken a fairly resolute stance on this previously — we will not reserve or assign manufacturing capacity absent a robust commercial commitment from the customer in exchange. That applies whether the customer seeks to terminate or cancel, and it equally applies where there is a meaningful change to the delivery schedule and, as a result, to how assets are utilized. The precise shape of those arrangements, I'm sure you understand, is something we cannot disclose.
Akash Gupta
analystThanks. My next one follows up on what Daniela asked before regarding utilization in '27 and '28, and it centers more on the vessel, since you'll be receiving a new vessel next year, and I believe producing the cable will take some time before that vessel can be utilized. On vessel utilization, would it be fair to say that utilization of a new vessel would be nearly 100% in 2028, whereas for 2027 that ratio might not reach 100%, just theoretically?
Claes Westerlind
executiveI suppose in theory that's correct, assuming everything else stays the same, but I doubt we'll hand you exact vessel utilization periods. What I'd point you toward is that, historically, we've also made cables that weren't installed using our own assets. Take Champlain — there we had capacity and only one vessel. With one additional vessel now, those same mechanics would let you count utilization for Eleonora even if the factory isn't producing all the cables. Vessel utilization rises and falls too; that's normal variation, and in the end whether we choose an in-house vessel or an external one comes down to suitability, and also to NKT's ability to compete effectively. You can't just take one asset's utilization and project it straight into the financial result of the business line or of NKT. Plenty of underlying factors could affect that.
Akash Gupta
analystThanks. So I’ve got a few housekeeping questions for Line. First, on intersegment eliminations in revenues: looking at 2025, there was a large step-up of €143 million for the year versus €55 million the year before. As I understand it, your businesses are fairly independent, so I was wondering whether you could talk about and give us more color on what’s driving this, and as we look ahead to 2026, what kind of figure should we assume for this intersegment elimination revenue line?
Line Andrea Fandrup
executiveYou're absolutely right. That's a pretty big step up, and of course it tells you something about the internal sales among our business lines: Accessories and installations mainly with Solutions into, yeah, the new Transmission business line. There's also a limited impact from some sales between our new Distribution business line and what's going to become the Grid segment. This will keep going, and I don't think I'll comment on the exact level. Again, it really comes down to which projects we execute, but I think you should assume that this is a new level for the company as long as we have the large DC projects, which are closely tied to Accessories and the new Grid business lines as well.
Akash Gupta
analystThanks. The last question concerns contract balances. Looking at your net contract liability, it rose by more than €200 million during 2025, whereas backlog, frame agreement included, stayed broadly flat or perhaps edged down a bit. Could you perhaps explain what drove that favorable movement in contract balances? I believe you mentioned earlier that some milestone-based payments came in Q4 — had those originally been anticipated for Q4, or did any of those milestones get pulled forward from '26 into '25? Thank you.
Line Andrea Fandrup
executiveA few milestones got pulled forward from '26 into '25. And when I look right now at our contract assets versus contract liabilities, the assets sit substantially below the liabilities. If you go back even further into 2025, you actually saw higher levels on both of these, and that ties into how we execute projects. We can't really commit that this will be flat across quarters or down to the daily level, and it doesn't always represent, say, a logic of where the risk exposure sits. It's simply the nature of execution on the project. If we look at it at the end of Q4, and we monitor this as well, and relative to revenue, I think you'll find it's a little comparable to when we came into the year, and then expect fluctuations from quarter to quarter.
Akash Gupta
analystSo there’s no situation where a milestone gets pulled forward—say, from ’26 into ’25?
Line Andrea Fandrup
executiveA portion of that moves from the first quarter of '26 back into '25.
Akash Gupta
analystAlright. Thanks. Thanks, Line.
Operator
operatorSince we're really pressed for time, sadly we can't take any further questions, so I'll turn it back to the speakers for any closing remarks.
Claes Westerlind
executiveYeah. Thank you, on behalf of NKT, for tuning in to both the Q4 call and really 2025 overall, and I just want to repeat what I said there: it's sad to see Line leave, but we're happy for you too, and we'll be able to meet, and you'll see Line one last time during the upcoming roadshows. With that, thanks to all of you, and thanks to Line.
Line Andrea Fandrup
executiveThanks.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete NKT A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to NKT A/S earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in NKT A/S or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.