Operator
operatorGood day, and welcome to the conference call covering NKT's interim report for the first half of 2026. During this first portion of the call, everyone will be in listen-only mode. After that, we'll open things up for a question-and-answer session. If you'd like to ask something during the Q&A, just press 5* on your telephone keypad. This call is being recorded today. At this point I'll turn it over to our speakers, CEO Claes Westerlind and CFO Michael Yong. Please go ahead.
Claes Westerlind
executiveGood morning, everyone, and welcome to NKT's presentation of the interim report for the first half of 2026. I'm Claes Westerlind, the CEO, and here in the room with me I also have our CFO, Michael Yong. As usual, I'll take you through the key developments, business highlights, and performance for the second quarter and first half of the year, then I'll hand over to Michael, who will walk you through the financials, and we'll wrap up the call by looking at the updated outlook for the year and open up for Q&A. Please turn to slide number 3. Before we begin, please take a moment to study this disclaimer concerning that the presentation and our related comments contain forward-looking statements, and actual developments and results may differ from expectations? expectations due to uncertainties and risks, including factors which are beyond our control. Now let's move on to the key messages for the quarter on slide 4. Let me start with the key messages for the second quarter of 2026. Overall, Q2 was another quarter with solid financial and operational execution. Activity remained high across the business, and we continued the diligent execution of our strategic priorities under our new strategy, Charging Forward.
Claes Westerlind
executiveThat covers carrying out the project portfolio as well as the continuing investment projects aimed at expanding capacity and capabilities. Organic growth came in negative, as we had anticipated, and the transmission business line was the driver. The reason was lower revenue on the Champlain Hudson Power Express project, where in the second quarter of last year we had a high level of activity on that project, including subcontracted work. Even with that revenue development, the operational EBITDA level held at €104 million, and the operational EBITDA margin rose to 15.7%. One major milestone during the quarter was that the Champlain Hudson Power Express project achieved commercial operation. That is an important achievement for NKT and for the energy transition in New York City. The cable system makes it possible to transmit hydropower from Canada to New York City and can supply electricity equivalent to approximately 1 million households. We also kept a high transmission order backlog, which came in at €13 billion at the close of Q2, only slightly below the record high level at the close of Q1, as a result of project execution during the quarter. At the same time, the high-voltage expansions in transmission stayed on track to become operational in 2027, while the additional medium-voltage capacity in Denmark was finished towards the end of the quarter.
Claes Westerlind
executiveTaking into account how things have gone in 2026 so far and what we expect for the rest of the year, we've revised our financial outlook. Revenue at standard metal prices is now projected to land between €2.65 and €2.75 billion, while operational EBITDA should come in somewhere between €400 and €430 million. Both the revenue and operational EBITDA ranges are being narrowed, and on top of that we're raising the EBITDA range. If you go to slide number 6, you can see how overall financial performance looked in the quarter. Revenue at standard metal prices fell to €657 million, down from €723 million in the same quarter a year earlier, which works out to organic growth of -9%. That decline was anticipated and came from transmission, where revenues dropped because of lower revenue from the Champlain Hudson Power Express project, since it achieved commercial operation during the quarter. Operational EBITDA held steady at €104 million, versus €105 million in Q2 2025. Given the lower revenue level, that was a solid result, and the operational EBITDA margin rose to 15.7% from 14.5% in Q2 2025, helped by solid execution and a favorable project mix in transmission and Grid Solutions and Accessories. Within transmission, organic growth was -20%, even as operational EBITDA climbed to €67 million.
Claes Westerlind
executiveGrid Solutions and Accessories posted robust organic growth of 15% along with operational EBITDA of €20 million, powered by elevated activity levels and solid execution. Distribution achieved organic growth of 1% and operational EBITDA of €27 million, backed by sustained healthy demand within the power distribution grid segment, though profitability took a hit from increased material costs and ramp-up costs tied to the capacity expansion in Denmark. Next, I'll examine each business line more closely, beginning with transmission on slide number 7. Turning to transmission, this business line sustained a high activity level and delivered solid execution in Q2. Just like Q1, revenue came in below the prior year, when we enjoyed a high activity level on the Champlain project. Revenue at standard metal prices reached €334 million, a decrease from €419 million in Q2 2025. That equates to organic growth of -20%. As I noted, the drop stemmed from lower revenue in Champlain, including a reduced amount of subcontracted work relative to the comparatively high level in Q2 last year, entirely consistent with what we expected. Operational EBITDA rose to €67 million from €64 million in Q2 2025, equal to an operational EBITDA margin of 20.2%, a record-high margin for this business line.
Claes Westerlind
executiveMargin gains came from strong execution throughout the portfolio, a somewhat better project mix, and effective use of our assets, NKT Victoria among them. I want to remind everyone that in a project-driven business such as transmission, profitability on a quarterly basis will fluctuate with the projects and how they are executed, and this quarter we saw a positive benefit from that. Throughout the quarter, we kept advancing and carrying out work on a number of large projects, among them Biscay Gulf, Hornsea 3, IJmuiden Ver, Spittal to Peterhead, SuedLink, and SuedOstLink. Beyond that, Champlain Hudson Power Express achieved commercial operation, a major milestone following substantial engineering, manufacturing, and installation efforts in both onshore and offshore settings. Let's move to the next slide, covering the transmission market and order backlog. Transmission market activity stayed at an elevated level through the first half of 2026. Our estimate is that roughly €10 billion in projects were awarded within our addressable transmission power cable market in H1, most of them using DC technology. That highlights the ongoing robust demand for high-voltage production and installation capacity, a space where NKT is well positioned. As Q2 ended, the transmission order backlog stood at €13 billion, versus €13.5 billion reported when Q1 closed, the change reflecting project execution over the quarter.
Claes Westerlind
executiveThe backlog is still at a high level—notably higher than what we saw in prior years—and it keeps giving the business strong visibility for the years ahead. If you look at it by customer, over 95% of the backlog comes from European transmission system operators, and the rest is made up of other customer types. By application, the backlog is still balanced across the market's long-term priorities, with roughly 70% tied to interconnectors and roughly 30% to offshore wind projects. Going forward, we still expect our average addressable transmission market to be above €10 billion annually from '24 through 2030. We continue to anticipate short-term fluctuations because of the volatile geopolitical and macroeconomic backdrop, but supply and demand overall should stay healthy across the decade. As the market moves toward the 2030s, we expect—everything else equal—the high-voltage market to be more balanced. Kindly go to slide 9 for Grid Solutions and Accessories. Now on Grid Solutions and Accessories: this business line had a good quarter, with revenue growth and better profitability. Revenue at standard metal prices came to €129 million, up from €112 million in Q2 2025, which works out to 15% organic growth.
Claes Westerlind
executiveHigher revenue in both Grid Solutions and Accessories drove that growth. Activity in Grid Solutions stayed at a high level, helped along by offshore repair projects, installation work, and deliveries of high-voltage AC onshore cable projects. On the Accessories side, revenue rose in both high-voltage and medium-voltage accessories, backed by solid order execution and the ongoing ramp-up of additional production capacity. Operational EBITDA climbed to €20 million from €16 million in Q2 2025, and the operational EBITDA margin went from 15.0% last year to 15.6% — 15.6%. That mirrors higher activity levels and good execution, with profitability improving in both parts of the business line. Another point worth flagging: our power cable accessories site in Nordenham became our first zero-carbon factory in the quarter. That's a significant milestone for our sustainability agenda and it supports our goal of zero-emission operations at all our sites. Moving to slide number 10 and Distribution. Turning to Distribution, this business line kept benefiting from strong demand in the power distribution grid segment. At standard metal prices, revenue came to €239 million in Q2 2026, versus €234 million in Q2 2025, which works out to organic growth of 1%. The main driver was sustained robust demand for medium-voltage cables in the power distribution grid segment, where both volumes and revenues were up compared with the same quarter last year.
Claes Westerlind
executiveCapacity constraints, though, held back revenue growth during the quarter. Within the construction-exposed segment, developments differed across segments and local markets, and that resulted in revenue slipping slightly versus Q2 2025. Operational EBITDA came in at €27 million, compared with €31 million in the strong Q2 of last year. Higher materials costs, which were only partly offset during the quarter, were the main driver of the decrease, along with costs tied to ramping up the extra capacity in Denmark. Even with those effects, the business line maintained a double-digit operational EBITDA margin of 11%, which marks a sequential improvement from Q1. Construction of the additional medium-voltage capacity in Denmark wrapped up toward the end of the second quarter. That covers a new production hall, production machines, and test facilities, plus enhancements to the overall production flow. These assets will keep ramping up through Q3 and will add to organic growth over the coming quarters. The capacity expansion in Portugal likewise moved ahead as planned and is still anticipated to become operational at the end of 2026. Kindly move to the next slide. Among the major capacity investment projects, execution carried on as planned in Q2. On the transmission side, the new high-voltage capacity in Karlskrona stays on track to become operational in 2027.
Claes Westerlind
executiveThis quarter saw us ramp up machinery installation and testing at the new extrusion tower as well as in the buildings around it. We also hit a significant milestone with NKT Eleonora during the quarter, since that vessel was launched into the water in Romania, and in July she set off for Norway — the trip actually finished yesterday — where the remaining equipment work, technical installation, and onshore commissioning are going to take place. That ship is going to boost what we can install and should also be in operation in 2027. In Cologne, our investment in extra high-voltage capacity and capabilities moved forward as planned too, and we kept installing and testing production machinery and test equipment there throughout the quarter. On the Distribution side, the medium-voltage expansion in Denmark wrapped up near the close of Q2, as I mentioned, and the Portugal expansion is still on schedule to be up and running at the end of 2026. All in all, we're pleased with how our big investment projects keep moving forward, since they're crucial for supporting growth down the road and for making NKT's market position stronger. That wraps up what I wanted to cover, so I'll pass things over to Michael now, and he'll take you through the financials. Operator, could you switch to slide 12, and Michael, please go ahead.
Michael Yong
executiveThanks, Claes, and good morning from my side too. Over the next couple of slides, we'll dig a bit deeper into how the finances developed during the quarter. Starting on slide 13, with the income statement. Profitability came in higher this quarter even though revenue was lower, as we had anticipated. Revenue at standard metal prices came to €657 million in Q2 2026, versus €723 million in Q2 2025. That works out to negative organic growth of -9%. As Claes explained, this was the expected outcome, driven by the Champlain Hudson Power Express project having reached commercial operation, against a high level of activity in the comparison quarter. Operational EBITDA was stable versus Q2 2025 at €104 million. Even with the anticipated revenue decline, the operational EBITDA margin rose to 15.7%, up from 14.5% in Q2 last year. That margin gain came mainly from transmission and Grid Solutions and Accessories, helped by solid execution and a somewhat more favorable mix of projects and activities. Depreciation and amortization were essentially unchanged from last year, so EBIT landed at €69 million, compared with €71 million in Q2 2025. Net financial items were a cost of €3 million, largely due to non-cash exchange rate fluctuations, and as a result the net result was €52 million versus €54 million last year, with tax also a little lower than last year.
Michael Yong
executiveThe average headcount is up by over 650 compared with the Q2 2025 average, and that reflects strong activity levels plus the investments we continue to make throughout the business. If you go to slide 14, we'll look at cash flow development. Cash flow from operating activities came in at -€145 million in Q2 2026, versus -€1 million in Q2 2025. The positive EBITDA contribution was outweighed by an outflow from working capital changes, which totaled -€225 million for the quarter. That working capital movement reflected phasing between milestone payments and project execution in transmission, along with higher inventories and trade receivables. Inventories increased somewhat because of the strategic stock build-up of materials in response to the conflict in the Middle East, while trade receivables went up as a result of the higher activity level. As we've said before, working capital will fluctuate quarter to quarter depending on when customers pay and on project execution across the high-voltage portfolio. Cash flow from investing activities was -€104 million in Q2 2026, compared with -€174 million in the same quarter a year earlier. The investments were driven by our ongoing efforts to expand capacity and capabilities in transmission and distribution. Activity levels across the investment programs stayed high and continued to progress according to plan.
Michael Yong
executiveSpending in the quarter came in a bit below prior quarters, though that stemmed from payment timing. Consequently, free cash flow stood at -€249 million in Q2 2026 versus -€175 million in Q2 2025. That mirrors both the sustained elevated investment level and how working capital moved over the quarter. Kindly turn to the following slide, where we'll examine the balance sheet. Turning to the balance sheet, NKT held a sturdy financial position as Q2 2026 closed. Working capital stayed negative, at €1.2 billion, when the quarter ended. That figure was below where it stood three months earlier, chiefly because of the phasing between milestone payments and project execution in transmission, yet it was better than the working capital balance twelve months prior. Capital employed rose to nearly €1.7 billion as Q2 2026 ended, climbing from €1.4 billion when Q1 closed. The drivers were the working capital movement and ongoing investments in capacity and capabilities. Return on capital employed reached 20% at the close of Q2, slipping from 22% at the close of Q1. Net cash fell by €251 million over the quarter, largely a reflection of the negative free cash flow movement.
Michael Yong
executiveClosing Q2, we had net cash of €591 million, versus €842 million when Q1 ended. On a last-12-month basis, financial leverage stood at -1.5 times operational EBITDA. Liquidity reserves available totaled over €1.3 billion by quarter end. That gives NKT a solid financial base as we keep executing our growth journey and put capital to work in the announced investment programs across the quarters ahead. Moving to slide 16, let's look at the revised 2026 outlook. Given the strong financial performance delivered so far in 2026 and what we expect for the rest of the year, we've updated the full-year outlook. Revenue at standard metal prices is now seen at roughly €2.65 to €2.75 billion, against €2.63 to €2.78 billion before, while operational EBITDA is now anticipated at around €400 to €430 million, up from €360 to €410 million previously. Through this update, we're tightening the spans for both revenue and operational EBITDA. The revenue span now sits near the prior midpoint, and we're raising the EBITDA span, with the new top end €20 million higher than the earlier range. Solid project execution — what we've delivered and what we expect over the rest of the year — is what drives this update.
Michael Yong
executiveThat pattern holds throughout our business lines, with transmission plus Grid Solutions and Accessories providing most of it. Our underlying revenue expectations have not changed. For transmission, we continue to anticipate slightly lower revenue, with an organic decline expected in the mid-single-digit percentage range. That reflects two things: a reduced level of subcontracted revenue relative to 2025, and an anticipated normal level of variation orders, since production and installation capacity available in 2026 is unchanged from 2025. Grid Solutions and Accessories should still gain from the generally high activity level in the market, though as always, how much offshore repair work comes in is hard to predict. During the second half of the year, Distribution should gain from extra capacity coming online, mainly in Denmark, and also in Portugal toward the end of the year. Overall, they are still expected to add up to 10% growth to the business line, and Distribution is likewise expected, unchanged, to contribute positively to EBITDA development in 2026. The anticipated margin dilution of up to 2 percentage points stemming from higher costs needed to support the ongoing investments and production ramp-up is unchanged as well.
Michael Yong
executiveThe forecast still rests on a number of key assumptions, which you can find listed on the right-hand side of the slide. If you could turn to slide number 17 at this point. Just before we wrap up the call, let me quickly go over the main messages from the quarter. Q2 2026 was marked by solid financial performance and ongoing diligent execution of our strategic priorities. Organic growth came in negative, which was expected, driven by lower revenue in transmission after the commercial operation of Champlain Hudson Power Express, while operational EBITDA held steady at €104 million. The transmission order backlog stayed at a high level, at €13 billion at the close of Q2, giving strong long-term visibility. Market activity was also high through the first half of the year, and we keep seeing a healthy demand environment for high-voltage power cable solutions. In transmission, the Champlain Hudson Power Express project reaching commercial operation was a major milestone for NKT and for the energy transition. The project shows the role NKT plays in enabling renewable energy to be transported across regions and into major consumption centers, such as New York City. Our major capacity expansion projects keep progressing according to plan. The high-voltage expansions in transmission remain on track to become operational in 2027, and NKT Eleonora is now arriving in Norway for final installation.
Michael Yong
executiveWork on the medium-voltage buildout in Denmark wrapped up near the close of Q2, and the Portuguese expansion is still expected to finish by the end of this year. Last, as I just outlined, we've revised the outlook for the year. For both revenue and operational EBITDA, we are narrowing the ranges. Revenue guidance is now tightened around the prior midpoint, and at the same time we are raising the EBITDA range. Moving on to the next slide. Ahead of Q&A, let me take a moment to flag our upcoming Capital Markets Day, scheduled for 29 September in Karlskrona, Sweden. There we'll lay out our Charging Forward strategy in greater detail, share more insight into the new business line structure that took effect on 1 January 2026, and you'll also get the chance to meet NKT's group leadership team. The day will feature a tour of our Karlskrona production facilities as well, where attendees can view the progress on our high-voltage subsea cable expansion and come away with a deeper grasp of the capabilities we are developing for the future. If this interests you and you haven't signed up yet, more details can be found on our investor relations website.
Michael Yong
executiveThat brings today's presentation to an end, and at this point I'll turn things over to the operator, who will lead us through the Q&A session. Operator, please go ahead.
Operator
operatorThanks. We're moving into the Q&A portion now. If you'd like to pose a question, hit 5* on your phone's keypad. Should you want to take your question back, just press 5* once more. We'll pause for a moment as questions come in. The first one comes from Kristian Tornøe at SEB. Go right ahead — your line is unmuted now.
Kristian Tornøe
analystYes, thanks. I’ve got three questions, and I’ll take them one at a time. The first is about the transmission margin in the quarter, which came in above 20%. I realize that figure can move around from one quarter to another, but clearly, given your guidance upgrade, it also turned out better than you had anticipated. So maybe you could say a little more about what specifically performed better than expected, and whether the higher guidance for the transmission part mainly reflects what occurred in Q2 or whether it also captures what you’re seeing for the second half of the year.
Claes Westerlind
executiveGood morning, Kristian. This is Claes speaking. Thanks for raising that question. It certainly wasn't a surprise, naturally. I believe you're identifying one piece of what explains it. Transmission delivered strong execution and performance during the second quarter. Let me remind everyone that profitability in the transmission business line depends on a few different elements. One, naturally, is how well we absorb our assets and our personnel. Another element is the margin mix present in the incumbent quarter. A third piece is our execution — specifically how we handle both risks and opportunities. At the moment, temporarily, there's a fourth element as well: the OpEx drag stemming from the ramp-up that Michael mentioned earlier. Setting that final element aside, it's a favorable combination in which all three previously mentioned elements added positively to the margin during that quarter. That, in turn, produces the overperformance relative to what we expected, which further gives us a degree of confidence when upgrading the guidance. It also explains why we state that profitability will fluctuate, and why we prefer to discuss nominal earnings rather than the margin as such. It truly was a strong quarter.
Kristian Tornøe
analystGot it. The second question concerns Champlain Hudson. You've mentioned repeatedly that commercial operation has been reached. That doesn't automatically mean the project is entirely finished on your end. So a few comments, please, on the exposure that remains for you on this project, whether provisions are still carried for it, and roughly when you'd expect full completion from your side.
Claes Westerlind
executiveRight. Of course, we've physically finished most of the work, to the point where the product could enter commercial operation. The reason we draw that distinction is that, let's say, there's also a formal closing out of all our projects. Some physical work can remain between COD and the actual project close. Certain matters can also need resolving between us and our subcontractors, as well as between us and the customer. That usually takes a while once the project has hit COD. On how much is left or whether provisions remain and so on, I don't think I can comment on a specific project, which I'm sure you understand.
Kristian Tornøe
analystOkay, that makes sense. As for the timeline, when do you expect the deal to be completely finalized?
Claes Westerlind
executiveI wouldn't risk pinning down a specific timeline, though what we're discussing is a matter of months rather than years.
Kristian Tornøe
analystGot it. Excellent. For the third and final question, it's simply about the €2.5 billion in booking commitments — is there any update on when you expect those to turn into firm orders? Thank you.
Claes Westerlind
executiveNothing fundamental or major has changed since the previous quarter. As you know, there were plans when we booked these back in 2023. We've noted before that a few of these projects have been sliding in terms of timing, and beyond that the boundary conditions aren't in place, plus there are still discussions underway in Germany about when and what will get built. We don't have any significant update to offer. We've mentioned that a portion of it could be converted this year and might also slip into next year. No major news since last quarter.
Kristian Tornøe
analystGot it. That covers everything from my side. Thanks.
Operator
operatorThank you, Kristian. Next up, we have a question from Claus Almer at Nordea, who is calling in. Your line is unmuted now — please proceed.
Claus Almer
analystHello there. I have a handful of questions too. My first one is for the transmission division. Regarding that 20% EBITDA margin in Q2, how does it stack up against the projects in the backlog that you'll be delivering over the next few quarters? That's my first one.
Claes Westerlind
executiveThanks, Claus, and good morning. We said before that across a couple of years and quarters, we'd see the project mix get gradually better. That remains the expectation. That's what we observed, and I believe we also put it in writing in the report. That's what we saw starting a couple of quarters back and now into Q2. We can expect that journey to keep going. Then you need to view it across a couple of quarters. It's harder to promise anything quarter by quarter, since things can also shift in and out of the incumbent execution. Viewed over many quarters, the mix has gotten better since a couple of quarters ago and will keep getting better a couple of quarters from now. As for the more radical change in mix, we stay with our earlier communication that this will happen during 2027.
Claus Almer
analystRight, though I just realized a few of the projects you're handling this quarter are among the earliest ones in Germany, and from what I gather, those didn't arrive with the most impressive margins. That should give you a very good lead going into the coming quarters as the mix improves.
Claes Westerlind
executiveOn one hand, sure, I get the remark and what’s being asked underneath it. On the other hand, bear in mind too that we don’t disclose, shall we say, how large those specific projects are compared with the overall mix we carry out. I’d also point back to my earlier remarks on what actually drives profitability for the whole business line. Cost absorption matters. Margin mix matters, and a third element — not a minor one — is how effectively we execute. Naturally, some level of performance is assumed from execution, and expectations may then land beneath that, or the result may fall short, though it can also exceed them. I’d say in the second quarter we had a blend of robust performance, or a robust starting position, across all 3 of those buckets, but particularly the last one.
Claus Almer
analystThat makes sense, thank you. So with the Karlskrona factory getting close to completion, would you say your confidence in capacity for the remainder of the decade has grown? Put another way, is your willingness to take on additional projects perhaps somewhat greater now than it was around a year back? Is that a reasonable way to see it?
Claes Westerlind
executiveConfidence tends to build, I'd say, the further along we get toward finishing the project. That's the right lens to use here. Naturally, we rely on, say, deterministic planning — either the capacity exists or it doesn't — and after that, some cases come down to how much risk you're willing to take, though we wouldn't go in for, say, overbooking on the comfortable assumption that we can sort it out down the road. When we can see the capacity is there — and of course we don't count float in that — we take on a project. If it isn't there, we pass on it. And the nearer we get, I think, to the point you're raising, clearly, once we've also finally settled on when these assets will enter operation, at that stage we'll need to calibrate what capacity is available at that moment.
Claus Almer
analystThat’s very clear. So my last question concerns the raised guidance. Again, it’s quite an impressive and lengthy record of increases to guidance. For the latter half of this year, have you kept in some caution in case matters don’t turn out as you’d hoped? If you execute as smoothly as you did in the first half, might there be further upside for 2026?
Michael Yong
executiveI'll take a shot at answering that, Claus, and good morning. Michael here. Yes, I believe our guidance should be read as reflecting, clearly, the confidence we hold given the way the year has unfolded and how operational performance plus the elevated activity level in both transmission and grid solutions are anticipated to evolve. Our outlook will stay grounded in the same caution, diligence, and handling of our risks and opportunities, and that forms part of the guidance.
Claus Almer
analystTo make sure I have this right — you're giving guidance the way you normally do, and if execution goes smoothly, the result could come in above even the top of the range, correct? That's how I should read your answer.
Claes Westerlind
executiveI also want to back up what Michael said there. Of course, there’s always room for performance to vary within the guidance as well. We have an expectation on our side for how we’ll finish, and that’s clearly inside the guidance. Performance can also vary, both upward and downward, and we still land within the guidance, so to speak. Then it becomes a matter of magnitude. Can we rule out that we might do even better and come in above the guidance? I don’t think we can say there’s no chance of that. With the best visibility we have on our performance and on the outlook for the rest of the year, we estimate that from an EBITDA perspective, it’s €400 to €430 that we believe will be the range where NKT ends up.
Claus Almer
analystGot it, that's clear. Thanks a lot, and nice work.
Claes Westerlind
executiveThanks, Claus.
Operator
operatorThanks, Claus. We’ll take the next question from Daniela Costa at Goldman Sachs. Your line is unmuted now — please go ahead.
Daniela Costa
analystGood morning, and thanks for taking my questions. I have a couple of things to ask, but I'll go one at a time. The first is really just a follow-up on this topic of clarifying the guidance, and just asking you about it. I believe last quarter you said that transmission for the year, if I'm not mistaken, you saw it down mid-single digits, and obviously it's declined a bit more now. I just wanted to clarify, within your revenue guidance, that expectation is still a mid-single-digit decline in transmission, and so a stronger pickup in the second half. Is that what then drives your higher confidence on margin, or should we ascribe the higher confidence on margin to the other divisions as well?
Michael Yong
executiveGood morning, Daniela. Let me take a shot at that question. I believe you're already moving toward the answer yourself. For the transmission business, the revenue profile hasn't changed at all, so that year-over-year decline in the mid-single digits stays the same. It also signals that nothing material has shifted in the mix of projects that were planned and formed part of this year's execution profile. What I think you should take from it is that, with seven months now behind us, both the activity level and the execution level are very high, which gives us a lower risk and contingency profile on the projects as we look toward the end of the year. Compared with what you saw at the start of the year, as you move through the projects and hit certain milestones and reach a certain amount of completion, that risk is then behind you. That, I think, is how our indication here should be read.
Daniela Costa
analystThanks, that's quite clear. So I have a question that's sort of in two parts: do you expect backlog to increase in '26 and '27? What's your read on the tendering pipeline at the moment? A few of your competitors mention a second wave of contracts restarting in '27 on the HVDC side. And separately, yesterday we saw another player — not one of the usual three — pick up a sizable HVDC contract. If these additional waves come through, is the competitive environment different from what it was perhaps previously? How do you see this shifting in the environment?
Claes Westerlind
executiveThanks, Daniela. Claes here, and good morning from me as well. Market activity is still running high, and I'd say the first half bears that out too. As I mentioned before, with roughly €10 billion in orders awarded, tender activity is holding at a satisfactory level as well, and we can see solid prospects for the years ahead too. I might not go so far as to claim there's another round or another major uptick in activity, and that's not because I doubt it — it's simply caution about timing effects. That's partly why we began referring to average market volumes rather than individual years. Our expectations for the market going forward are strong, and in essence we stand by the statements and views we put out with the first quarter as well. Some short-term volatility is also showing up in certain markets — some of it positive, and some discussions that may be a bit more constructive. On your point about yesterday's award, we of course note the same thing, and I'd say it hasn't caught us by surprise, to put it that way.
Claes Westerlind
executiveOver the years, the market has expanded considerably, as measured across a span of more than 10 10-year periods. Capacity has been added by the established players, and we have also had some established players on the AC, with yesterday's announcement meaning they are now taking a step into the DC territory as well. That aligns well with expectations, and it does not materially alter our view regarding the supply-demand balance situation in the market.
Daniela Costa
analystThat's very clear, thank you. You're welcome.
Claes Westerlind
executiveThanks, Daniela.
Operator
operatorOur next question comes from Lars Topholm at DNB Carnegie. Your line is now unmuted, so please proceed.
Lars Topholm
analystThanks, and congratulations from my side too on a really spectacular quarter. First, a household question on slide 9 for Grid Solutions and Accessories. You said you had a 15.0% margin in Q2 last year. If I take €16 million on €112 million of revenue, I get 14.3%, so I wonder how you arrived at 15. A related question, of course, is whether my math is correct, and if you have a 130-bp margin expansion despite start-up costs, then okay, that's of course not here, but a 130-bp margin expansion, is that sustainable or just a quarterly blip?
Claes Westerlind
executiveLars, I haven’t run the numbers the way you did, at least not right now — I’m glancing at my CFO, who I believe is also taking a look at that at the moment. What I can tell you is that Grid Solutions and Accessories had a strong quarter. It was a solid quarter with high activity levels across, let’s say, the running business — the expected business — both in HVAC onshore products and the delivery of those, in the planned maintenance engagements we have, but also in the accessories business, across HVDC, HVAC, and the medium-voltage plant in Nordenham as well. Another thing that contributed to the good progression was the mix of repairs we were able to achieve during the quarter, and that added some uplift to profitability. I think that’s what you need to keep in mind — this last component — as you think about profitability in the coming quarters. That is something that isn’t a given every quarter.
Lars Topholm
analystThank you. And then a follow-up on what was asked earlier regarding the contract that Hellenic Cables won yesterday — they also received a 525 kV HVDC certification a couple of weeks back. Why don't you expect that to alter the competitive landscape? Is that because you saw it coming, or because you're confident that the TSOs who make up your core customer base would continue to prioritize track record and still choose you, Prysmian, and Nexans?
Claes Westerlind
executiveThat's a very good and pertinent question, Lars. I'd say the answer has two parts. First, you can take from it that this wasn't unexpected — that's the initial part of my response. Second, you should take from it our confidence in our own capacity to land orders and in our own capacity to compete effectively. Those two things together leave us comfortable that, where NKT is concerned, this won't alter the supply-demand balance to any major extent.
Lars Topholm
analystThat's very clear, Claes. Now, on the shift in project mix: looking from Q1 to Q2, the notable point, I think, is that Spittal-Peterhead comes in as a project you execute on. When we consider the contract value relative to cable length, this one carries by far the highest value among any project you've won. So how much of the margin expansion stems from that particular project coming in?
Claes Westerlind
executiveThat's a fair question, and I suspect you can already predict how much detail you'll actually get from me here. Giving you the precise breakdown for any single project is tough for us. Two points I can make. First, when a project gets underway, expect that revenues will be modest at the outset. Typically, at the start of something, what you're really talking about is engineering work in the early phase and people's hours, rather than manufacturing, installation, or the other elements. I'd also like to say something about value, say on a per-kilometer basis, and point out — as you're well aware, Lars — that a great deal hinges, naturally, on which conductor material is used, and also on how complex the installation is: landfalls, burial methods, and so on. We shouldn't conclude that pricing, so to speak, is the sole metric driving how value shifts between one project and another. I realize that, but I wanted to bring it up regardless.
Lars Topholm
analystThat's a reasonable point. I have one last question, which concerns the tender activity happening right now and how likely it is that major projects get awarded next year. Do you know about, or are you able to confirm, that tenders are currently underway for EGL 6 and 7 as well as LionLink?
Claes Westerlind
executiveActually, I’m not really in a position to confirm that, since many of the tenders we take part in are also covered by NDAs. It’s no secret, I think, that projects such as LionLink and EGL 5 and 6 exist. I’d rather not confirm whether they are active or non-active, and so on.
Lars Topholm
analystFrom where you sit, Claes, how realistic is it that those projects turn into contracts — whether for you or for somebody else — in 2027?
Claes Westerlind
executiveYes, I'd say that's realistic, with market activity running high and peaking in large orders during 2027.
Lars Topholm
analystThat’s amazing. Thanks a lot, everyone — and congratulations once more.
Claes Westerlind
executiveThanks, Lars.
Operator
operatorThanks, Lars. We'll take our next question from Chris Leonard at UBS. Your line is now unmuted, so please go ahead.
Chris Leonard
analystHey, everyone. I hope you're able to hear me. I'd like to ask a follow-up about the transmission segment and perhaps walk through Q2 regarding the negative impacts you mentioned for Champlain Hudson and during the quarter, and whether there was any additional negative effect at all from variation orders, since I believe there was a tougher comparison coming in from last year. If there wasn't, should we be expecting variation orders to act more as a headwind going into the second half of the year? That's my first question. My second question would be to expand on the ramp-up costs that you saw for the Karlskrona expansion — whether those were visible and material in Q2 at roughly the average you've cited of 200 basis points for the year, or whether we should actually expect them to accelerate into the second half. Thank you.
Claes Westerlind
executiveThanks. I'll give it a shot, and of course I'll also let the CFO add anything further. Starting with transmission revenue, just to walk you through a couple of the moving pieces — and you basically have the answer yourself already. In the second quarter, if you look at last year's comparison period, we had significant volume on top of what I'd call the steady-state normal volume from the Champlain project, and that wasn't there in the second quarter of this year. Beyond that, we all recall that we were also discussing extraordinary variation orders during the first half of last year, if my memory serves me right. That contributed to the comparison period as well. For the second quarter, you can see in our revenue guidance that it's been narrowed rather than raised, which also implies a more normalized level of variation orders and that, from a revenue standpoint, we're essentially executing as planned. Those are, I think, the two pieces when it comes to how revenue is shifting and how organic growth played out in the second quarter for transmission. On your second question, about ramp-up costs: last year we spoke about roughly 1 percentage point of OpEx drag at group level, and we've said that for this year it will keep ramping up as the year goes on, culminating at around 2 percentage points for the full year.
Claes Westerlind
executiveWe haven't provided the components, the discrete components, how much in which quarter, and also not precisely how much per business line. I believe all of you know where we're carrying out the expansions. The main portion of the expansion is in transmission, and then a smaller portion of expansion is being done in distribution. We exited last year with a 1 percentage point drag, and we will finish this year with a drag of around 2 percentage points. I think from these data points, you should be able to estimate a bit or make reasonable estimates for your analysis.
Michael Yong
executiveI'd just add that we're on that journey between the 1 and the 2. And I think it's still a relevant data point given that the revenue guidance has been narrowed, but around the same midpoint. The frame of reference remains unchanged.
Claes Westerlind
executiveYeah.
Chris Leonard
analystThanks, and if I may, I’d like to ask one more question about distribution. As we look at the second half of the year, with Portugal coming online, should we expect that to help margins, or will you see what happened in Q2, where you have to absorb some of those ramp-up costs, but hopefully at the same time some of the raw material inflation is being passed through? Could you talk about the drivers you’re seeing in the distribution segment for the second half of this year? That would be really helpful.
Michael Yong
executiveAbsolutely. I'll handle that one, Chris. When you consider the expansion expected during the second half in the distribution segment, most of it is set to come from the Asnæs capacity, and that project was just finished in the second quarter. The Esposende project, meanwhile, will wrap up and begin operating near the end of the year, though clearly in terms of volume it will matter considerably less to the overall picture than the capacity starting up right now. Regarding ramp-up costs for these two projects, they overlap. We've been ramping up in Denmark, and we're ramping up those operations as well at present. We're roughly at the highest point of that combined ramp-up expense. As volume starts flowing, the contribution from those volumes will naturally begin to lift the margin. That said, I think it's worth adding some context: right now there's a bit of additional cost in the distribution segment stemming from certain Middle East supply chain expenses we've had to absorb, and that will be largely offset in the second half of the year by also passing this along toward the customers.
Michael Yong
executiveI'd be careful about picking one quarter's specific margin and extrapolating from it, since it will be recovering and absorbing the costs. Given those data points, that's how I'd characterize how distribution evolves in the second half of the year.
Chris Leonard
analystAppreciate that response. Thanks, everyone.
Operator
operatorThanks, Chris. Up next, we have a question from Lucas Ferhani, who is calling in from Jefferies. Your line is now unmuted, so please proceed.
Lucas Ferhani
analystMorning, and thanks for making time for this. I’ve got a few questions too, so let’s take them one at a time if that works. First, on free cash flow and the transmission side: I just want to confirm whether you received down payments this year tied to the EGL and SSE orders, and whether those down payments are sizable enough that they’ve helped drive the improvement in performance. More broadly on working capital, where do you expect that to land by year end? Thank you.
Michael Yong
executiveHi, Lucas. Good morning. That's a solid question about the prepayments, and I believe last quarter we also had a question specifically concerning the awards received in the first quarter. We're able to confirm that a prepayment has been received on EGL 3. Naturally, I won't comment — and we never will comment — on any specific amounts tied to contracts. There is a prepayment that has come into the planned flow of working capital development for the transmission line during the second quarter. Having said that, it stayed within plan, and how working capital has evolved is likewise as expected. What's really behind the negative working capital movement this quarter relates to the phasing — it's a timing matter — the phasing of cost milestones and of incoming cash on receivables. I'd call it nominal. If your question is also seeking some indication for the end of the year, I think given where we're finishing the first half in the quarter, we are on our operational plan, and I would expect us to land at a similar level toward year-end. That's the indication we can give today. And that indication applies not only to the transmission line but to the company overall.
Lucas Ferhani
analystComparable to what we saw in Q2?
Michael Yong
executiveComparable to Q2. Better balanced than Q2.
Lucas Ferhani
analystYeah. Yeah. Perfect. Then the second question was only about distribution. I just wanted to check whether there was any change in language. I think now it was up to 10% growth in distribution. I think earlier I had something more like around. It's minor, but the point is just this: was this very kind of H2-weighted ramp-up expected, or maybe slightly more delayed in seeing the volumes come through?
Claes Westerlind
executiveYes, thanks, Lucas. And good morning from me as well. No, I’m not aware of any different tone — if you picked one up, it wasn’t deliberate on our part. Our view is the same as before, and it’s simply that any estimate of revenue growth for a year is always going to be approximate. On top of that, when you consider the in-operation taking of a plant and of an asset that has had investment put into it, there are plenty of moving parts, so natural variance is always going to exist. Looking at a plant such as Asnæs, for instance, machinery installation is a factor, along with capabilities build-up, product qualification, output optimization, planning of the commercial volumes into the factory, and so on. There is some variability there, and although we might have hoped for even more volumes in Q2, from a full-year perspective we stay with the expectation that organic growth in the business line will be 10% or up to 10%, depending, of course, on the uncertainties that always exist.
Lucas Ferhani
analystPerfect. The final item was just returning to Hellenic Cables and possible shifts in the competitive landscape. My initial question was more about whether, if you carry out a project at 320 or 400 kV, say, XLPE HVDC rather than moving to 525 kV, in your view there is some meaningful jump in complexity or differences in how you tackle the project that would sort of hold a player back from climbing that value chain. And perhaps also how you think about owning the vessel? How does that, along with performing more scope internally, installation and at sea, how does that kind of deliver an advantage or not for you compared with a player that perhaps lacks those capabilities in-sourced?
Claes Westerlind
executiveThanks. That observation and question are both very pertinent. If we consider the technology at the outset and set it against NKT's history, we invented HVDC XLPE cables back in the '90s, beginning at 80 kV and raising that level step by step. I recall the EirGrid link connecting Ireland and the UK at 200 kV, then progressing through the 320 kV projects in German territorial waters. Now we find ourselves around 2014 or so. We then introduced 525 kV in '14 and brought it to market on land initially in 2020. As you can see, this has been a lengthy process of incremental technological advances, and I would say we have gained a great deal along that journey, where each increase in voltage, each change in conductor material and size, and every particular product situation yields lessons, caution, and reflections for what lies ahead. There is a substantial jump both from 150 to 320 and likewise from 320 to 525, in terms of dielectric performance, material compatibility, production cleanliness, and numerous other dimensions. I believe our hope is — and Michael was doing some promotion for our Investor Day — to also walk you through that journey of a large factory in terms of QA/QC, why that matters, and why it matters to have a diligent and lengthy track record of carrying out this kind of work in order to manufacture and deliver these projects successfully.
Claes Westerlind
executiveA significant portion of how these projects get delivered also involves the EPCI model, which ties into the second part of your question. Here, I suppose there are different angles to consider. In my view, the path I just walked through—one that actually stretches back to the '50s when you count MI cables—has shown us that the sound approach, whether you're looking at creating value or managing risk, is to have that EPCI breadth, with full command of your own vessels as well, both from a technical compatibility standpoint, let's say, and from the standpoint of execution certainty. That view still holds for us, though naturally we respect other perspectives on how this ought to be handled. Our position and our setup exist for solid reasons, and that's where we'll stay. I hope that offered a bit of clarity, Lucas.
Lucas Ferhani
analystYes, that's great. Thanks very much.
Operator
operatorAppreciate that, Lucas. At this point I’ll return things to the speakers in case they have any final comments.
Claes Westerlind
executiveThanks, and thanks to all of you for dialing in and taking an interest in what we delivered for the second quarter. Needless to say, these are results we take pride in, and I believe this outcome stands as one more piece of evidence of the company we have become and the direction we are moving in — both for next year, but above all as we work toward our guidance in '28 and 2030 as well. With that, I appreciate your attention, and I hope everyone has a good weekend once you get there.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete NKT A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to NKT A/S earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in NKT A/S or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.