Claes Westerlind
executiveGood morning, everyone, and thank you for being on NKT's conference call about the interim report covering the first three quarters of 2026. I'm Claes Westerlind, CEO, and our CFO, Michael Yong, is alongside me today. I'll start by covering the main developments and business highlights for the quarter and the year to date, and then Michael will walk you through the financial review. Following that, we'll finish with the outlook for the year and then open the line for your questions. Please turn to slide number 3. Before we begin, as usual, I'd like to direct your attention to the disclaimer on this slide. Forward-looking statements are included in today's presentation and in the comments we make alongside it, and because uncertainties and risks exist—some of which lie beyond NKT's control—actual outcomes might differ from what we expect. With that, let's move to the key messages for the quarter on slide 4. We continued to execute solidly during the third quarter. Activity stayed high in every one of our units, and we kept moving our priorities forward under the Charging Forward strategy; organic growth for the quarter was negative, in line with what we had expected, with the decline coming from the Transmission and Grid Solutions & Accessories business lines. On the Transmission side, revenue from the Champlain project—including subcontracted work—came in below last year's fairly strong level. We also experienced some effect from project phasing and mix, along with somewhat lower revenue from NKT Victoria, since that vessel was in dock for scheduled routine maintenance throughout the quarter. For Grid Solutions & Accessories, the comparison with last year is tough, as Q3 of last year contained a larger offshore repair project. Operational EBITDA came to €111 million, versus €119 million a year before, while the margin rose slightly to 16.6%. At the close of Q3, the Transmission order backlog stood at €12.4 billion, lower than the €13 billion recorded at the end of Q2 — which reflects how projects moved forward during the quarter. That is still a strong backlog and keeps giving us solid visibility into the years ahead. Our capacity expansion work also progressed according to schedule in the quarter. As we communicated at the Capital Markets Day, commercial operations at the new Karlskrona factory are expected to begin ramping up in Q2 2027, and in Portugal we have inaugurated the added medium-voltage capacity, which will be brought into operation gradually over the final months of the year. Just over a month ago, it was wonderful to have so many of you with us in Karlskrona for our Capital Markets Day. There, we examined the Charging Forward strategy in greater depth, with contributions from our business lines, and attendees could view the production site for themselves, with group revenue for the year now expected at EUR 2.65 billion to EUR 2.75 billion and operational EBITDA at EUR 400 million to EUR 430 million. In that context, we restated both our strategic direction and the medium-term financial targets for 2030. We also went through how we think about capital allocation, laying out the approach we plan to take in deploying capital to support corporate development while keeping financial flexibility and building long-term shareholder value; that day's conversation mattered greatly to us, and so did the many questions and the engagement with the NKT story. Finally, our financial outlook for 2026 is unchanged, although we now expect to close the year at the upper end of the previously communicated range for operational EBITDA of €400 million to €430 million. The revenue outlook at standard metal prices is still €2.65 billion to €2.75 billion. Please turn to slide number 6, where we look at overall financial performance for the quarter. Revenue at standard metal prices came to €673 million, down from €726 million in Q3 2025, which is organic growth of -7%. That stemmed from the Transmission and Grid Solutions & Accessories business lines. At market prices, revenue increased to €966 million from €936 million, aided by higher metal prices. Operational EBITDA was €111 million versus €119 million a year earlier. The margin was nevertheless slightly higher, at 16.6% compared with 16.4% in Q3 2025, driven by Transmission. Across the business lines, Transmission delivered organic growth of -17% and operational EBITDA of €70 million. Grid Solutions & Accessories posted organic growth of -7% and operational EBITDA of €21 million, against last year's tough comparison base from the larger offshore repair project. Distribution grew 9% organically, with operational EBITDA of €24 million, as strong demand in the power distribution grid segment and the additional medium-voltage capacity were partly offset by ramp-up costs. Let's examine each business line more closely, starting with Transmission. Transmission remained busy, and we executed well. The top line came in below a year ago, a period when Champlain work was unusually heavy. At standard metal prices, revenue reached €357 million against €430 million in Q3 2025, which works out to organic growth of -17%. Aside from the reduced Champlain revenue, subcontracted work included, the change reflects project timing and mix, together with somewhat softer installation revenue because NKT Victoria was in dock for scheduled routine maintenance during the quarter. Operational EBITDA came in at €70 million, in line with last year's €71 million, while margin rose to 19.5% from 16.5%. We performed strongly this quarter, though I'd repeat my usual caution: for a company built around projects like ours, margins in any given quarter can fluctuate, since they depend on how projects are phased and mixed during execution, as well as on how well we actually deliver. During the quarter we moved a number of projects forward, including Biscay Gulf, NeuConnect, Spittal to Peterhead, SuedLink, and SuedOstLink. Our investment plans to expand production capacity in Transmission also advanced according to plan, and as mentioned earlier, commercial operation ramp-up at the new Karlskrona factory is expected to start in Q2 2027. Turning to slide 8, covering the Transmission market and order backlog: activity in the Transmission market stayed high throughout the first nine months of the year. We estimate that projects valued at roughly €12 billion were awarded in the transmission power cable market we can serve during Q1 through Q3, which is higher than the approximately €10 billion seen at the midyear mark. Most of those awards rely on DC technology, and NKT holds a strong position there as a market leader. When the quarter ended, our Transmission order backlog stood at €12.4 billion, versus €13 billion at the close of Q2 and €10.2 billion at the end of 2025. That sequential decline is a result of executing projects. Beyond the backlog, we continue to hold booking commitments of about €2.5 billion. The backlog remains at a high level, giving us solid visibility for upcoming years. Its makeup is unchanged: more than 95% comes from European transmission system operators, and by application, interconnectors represent roughly 70% while offshore wind represents about 30%. Our view of the market has not changed, and we continue to expect the average addressable transmission market to exceed €10 billion per year over 2024 to 2030, as we reiterated at the Capital Markets Day. Near-term swings are possible given the volatile geopolitical and economic environment, but we expect the supply-demand balance to remain healthy throughout the decade.
Claes Westerlind
executiveIf we try to look beyond the coming ten years, clarity naturally diminishes, yet considering what governments aim to achieve, the big megatrends, and the long-range plans of our customers, we still foresee a healthy supply-demand balance, though one that is more even. Kindly go to slide 9, Grid Solutions & Accessories. As anticipated, Grid Solutions & Accessories posted reduced revenue and operational EBITDA for the quarter, following an exceptionally strong Q3 a year earlier. Revenue at standard metal prices came in at €122 million versus €130 million, which equates to an organic drop of 7%. That decrease mirrors the tough comparison created by last year's bigger offshore repair project. Even so, the underlying level of activity stayed elevated during the quarter. Grid Solutions was occupied with offshore repair work, and Accessories paired a strong activity level with order execution that was satisfactory. Operational EBITDA reached €21 million, down from €26 million, with a margin of 17.4% versus 20.0% a year ago, a figure that ought to be viewed against that elevated base. Moving on to slide 10 and Distribution. Distribution kept gaining from strong demand within the power distribution grid segment. Revenue at standard metal prices totaled €226 million, rising from €208 million in Q3 of last year, which equals organic growth of 9%. That growth came from demand for medium-voltage cables used in distribution grids, aided by greater volumes after our medium-voltage capacity expansion. Operational EBITDA rose to €24 million from €22 million. The margin stood at 10.6%, nearly flat against 10.7% a year earlier, since ramp-up costs constrained the margin benefit of the increased revenue. With that, the business line kept its double-digit margin. In Denmark, the extra medium-voltage capacity carried on ramping up through the quarter, even though that ramp-up proved more gradual and was somewhat stretched out relative to what we expected. The cause was a delayed commissioning of certain machinery plus adverse conditions in the local labor market. In Portugal, progress came in as anticipated, and the new capacity will steadily come online over the months ahead. Please go to the following slide for an update on our investments. Here we provide a quarterly update on how the various projects currently underway are developing, and as a headline, I can report that every one of our major capacity projects stayed on track versus expected commercial operation dates throughout the third quarter. Our second cable-laying vessel, NKT Eleonora, has arrived in Norway for installation of technical equipment. As we have said before, she is still on schedule to enter operation in 2027. In connection with Eleonora and as part of the Karlskrona project, we are enlarging the harbor. That portion advanced according to plan during the third quarter, and the piling work is finished. As the picture shows, we are now moving ahead with building the quay and the loading area for the vessel. Regarding the factory, machine installation and testing moved forward, and as mentioned, we expect commercial operation ramp-up to begin no later than Q2 2027. Through our investments we are also boosting our installation capabilities, and in the picture at the bottom right you can see our new subsea trencher coming alive. The NKT T3600 is going to be the most powerful subsea trencher anywhere in the world, capable of burying cables to depths reaching 5.5 meters beneath the seabed. That bolsters our capacity to safeguard critical power cable infrastructure. In Portugal as well, our investments aimed at expanding capacity advanced according to plan, and in late October we inaugurated the factory expansion. Over the months ahead, the added production capacity will gradually become operational. That brings my portion of the presentation to a close, and I will now pass things to Michael, who will walk us through the financials. Slide number 12, please.
Michael Lyng
executiveThanks, Claes, and good morning everyone from my side too. Now I'll take you through the financial highlights for Q3, starting on slide 13 with the income statement. Even though revenue came in lower as anticipated, the operational EBITDA margin did improve during the quarter. Revenue at standard metal prices came to €673 million, versus €726 million in Q3 2025, which is organic growth of -7%. As Claes noted, a negative development had been expected, and it largely mirrors the tough comparison base created by the Champlain Hudson Power Express project along with the bigger offshore repair project in Q3 of last year. At market prices, revenue climbed to €966 million, helped by higher metal prices. Operational EBITDA reached €111 million, which is €8 million below last year, while the margin rose 0.2 percentage points to 16.6%, with Transmission as the primary driver. Depreciation and amortization came in at €37 million, mirroring the larger asset base resulting from our investments, and EBIT was €74 million, versus €87 million last year. Financial items, net, showed an income of €13 million. Tax was a cost of €13 million, against €21 million in Q3 last year, which works out to an effective tax rate of 15% for the quarter, a bit below the expected full-year level. That brings us to a net result of €74 million, versus €67 million in Q3 2025. Our workforce kept expanding. The average number of employees stood more than 580 above Q3 last year, mirroring the high activity levels and the investments we continue to make. Let's move to slide 14 and look at cash flow. Cash flow from operating activities was €27 million, down from €68 million in Q3 last year, since operational EBITDA was offset by an outflow of €112 million from changes in working capital. That working capital movement stemmed from the phasing between milestone payments and project execution in Transmission, and it will keep fluctuating quarter to quarter depending on when customer payments arrive. Cash flow from investing activities was -€154 million, against -€170 million last year, mirroring the ongoing investments to boost capacity and capabilities in Transmission and Distribution. That left us with free cash flow of -€127 million for the quarter, versus -€102 million last year, as EBITDA was more than offset by the working capital movement and the continued high level of investments; for the first nine months, free cash flow was -€468 million, against -€585 million in the same period last year, mainly mirroring a somewhat lower level of investments. Please turn to slide 15 for a look at the balance sheet. Moving to the balance sheet, it stayed robust at the end of Q3, working capital was negative at roughly €1.1 billion, versus €1.2 billion at the end of Q2. Return on capital employed was 17%, down from 20% at the end of Q2, as capital employed grew in line with expectations. Net cash fell by €120 million, driven primarily by negative free cash flow, and finished at €471 million versus €591 million at the close of Q2; that works out to financial leverage of -1.2 times operational EBITDA. Liquidity reserves available came to €1.124 billion. As our investment programs move ahead, that strong cash position has been gradually drawn down, yet we remain focused on keeping a position of financial strength as we continue along our growth journey. Kindly turn to slide 16, which covers the outlook for 2026. Given how the year has gone so far and what we expect for the rest of it, we are keeping the financial outlook for 2026 unchanged. That said, we now anticipate operational EBITDA finishing the year at the upper end of the range we previously communicated, €400 to €430 million. Revenue at standard metal prices stays the same, projected at €2.65 to €2.75 billion. The underlying revenue assumptions are essentially unchanged as well. Because the ramp-up of the added medium-voltage capacity in Denmark has been extended somewhat, the revenue contribution to the Distribution business line from the Danish and Portuguese capacity expansions should come in somewhat below the up to 10% we guided earlier. Beyond that, we still anticipate a mid-single-digit revenue decline in Transmission. The outlook also captures the elevated cost level tied to ramping up the new capacity, which temporarily dilutes the group margin until that new capacity is fully operational. This is expected, unchanged, to dilute the operational EBITDA margin by up to 2 percentage points across the full year. As always, the outlook depends on a set of assumptions, among them satisfactory execution of high-voltage investments and projects to deliver the expected profitability margins, satisfactory operational execution across business lines, stable market conditions across business lines, a stable supply chain with limited disruptions, and access to the necessary labor, materials, and services. Let's proceed to slide 17. Before we take questions, allow me to summarize the quarter's key messages. Q3 delivered solid financial performance and continued execution of our strategic priorities. Organic growth was negative, in line with expectations, while operational EBITDA of €111 million produced a slightly higher margin of 16.6%. The Transmission order backlog came to €12.4 billion at quarter end, and market activity stayed high. Demand for high-voltage cable solutions remains healthy in our view. On investments, the capacity expansions advanced as planned. Karlskrona should begin commercial operation ramp-up in Q2 2027 at the latest, and capacity in Portugal is starting to come online during Q4 2026. At September's Capital Markets Day, we reaffirmed our strategic direction and medium-term financial ambitions and laid out our capital allocation priorities. As I just described, the financial outlook is maintained, though we now expect to finish the year at the upper end of the range for operational EBITDA. That concludes the presentation. I'll pass things over now to the operator, who will walk us through the Q&A portion. Operator, go ahead?
Christian Tornøe
executiveYes, thanks. I have a few questions, and I'll go through them one at a time. The first one concerns your soft guidance for Transmission revenue and that mid-single-digit decline. Through the first nine months of the year, revenue is down more than 16%, so for that mid-single decline to hold, your Q4 revenue would have to come in roughly 30% to 40% above what you just reported for Q3. Could you elaborate on where that substantial pickup in activity would come from, given that the new Karlskrona capacity won't be ready until Q2 next year?
Claes Westerlind
executiveHi Christian, this is Claes. Good morning, and thanks for the question. No, I believe that's reasonable. I won't weigh in on the math you've done, but without a doubt it suggests we need fairly high revenues in Q4, and that's the expectation as well. I think many of the mechanics we've observed throughout the year will carry over into Q4 too. Naturally, installation is also a part that matters quite a bit, and this is an area that could move around considerably from quarter to quarter, depending on how projects are phased, the mix, and the plans for each individual project.
Christian Tornøe
executiveOkay, so what really separates Q3 from Q4 comes down mostly to how much installation work is going on, if that's the way we...
Claes Westerlind
executiveThat's one piece of it, I'd say, and beyond that, more broadly you could describe it as timing effects between Q3 and Q4, and I think those will produce a positive balance on Q4. As I mentioned, the biggest swings that could happen, particularly in Q4, have to do with installation activities.
Christian Tornøe
executiveAll right, I understand. For my second question, I’d like to ask about the ramp-up at the Asnæs factory, since you’re saying it’s been somewhat more difficult than what you had planned for. Clearly, you didn’t call this out at the Capital Markets Day. I’m just wondering whether this is something that came up more recently, and also, where do you stand today? Is the ramp-up complete as of today, or is more of it still ahead of you?
Claes Westerlind
executiveThanks. Looking back at Capital Markets Day, I'd describe the longer ramp-up at Asnæs as, from a big-picture standpoint, not material for us as a company, and the company's overall plan remains well on track. I'd say it isn't significant enough that it would have required addressing at that event; it does affect the third quarter. As the release notes, the extended ramp-up stems from two issues. One involves a longer stretch needed for certain machines to reach full production volumes, or to produce fully as intended. Part of this comes from certain machines tied to one particular supplier. A second factor involves conditions in the nearby labor market — we've had some staff leave. Rehiring is, naturally, an option we kept open at the time, and it also calls for training workers, something already carried out and still underway; all of that factored in means the actual ramp-up is taking somewhat more time. Our expectation is that we're now in the ramp-up phase, moving along our internally revised plans during it, and that will keep going over the coming couple of months. After that, as we move into the stronger stretch of next year and reach the first quarter, our expectation is that we'll be producing at full volume.
Christian Tornøe
executiveGot it. Then one final question, if I can — regarding that €2.5 billion in booking commitments, has there been any update on it?
Claes Westerlind
executiveThanks. No, there isn’t anything we’re ready to announce at this point. I believe everyone knows that when those booking commitments came in a couple of years back, some of them were supposed to have been converted already during last year; because of that, there’s a delay that can be attributed to permits as well as to some wind auctions that are missing. Naturally, as you can imagine, we’re talking with the customers involved here, and once there’s something to share, we’ll do that.
Christian Tornøe
executiveThank you.
Claes Westerlind
executiveThank you.
Uma Samlin
analystHello, good morning to all of you, and thanks so much for taking my question. I'd like to start with a follow-up regarding tendering activities looking ahead to 2027. Could you share a bit about what you expect there? The reason I ask is that we hosted an expert call recently, and it appears a great many projects were pushed back over the past few years and might now be anticipated in the first half of next year. I'd really like to hear how you see it.
Claes Westerlind
executiveThank you, and it's nice to hear your voice in this setting, welcome aboard. When it comes to tender activities, we seldom comment on particular projects, naturally; we've also stepped back from saying too much about annual volumes year by year, both regarding tender activities and awarded volumes. The rationale is that we've observed, as we all know well, if you set last year against this year, volumes swing dramatically upward and downward. Instead we prefer to consider a kind of average volume, where we have stated and keep stating that from 2024 to 2030, we anticipate an average awarded market volume exceeding €10 billion annually. That being said, activity persists in the market along with tender activities for it. I believe the markets we've previously described as active remain active, with the UK as one instance, Central Europe as another instance, and the Med market as a third instance.
Uma Samlin
analystThat's really useful, thanks a lot. My next question concerns Transmission margins. Clearly this is the second quarter running with very strong margins in Transmission. Could you speak a little to how margins will trend into Q4, particularly since you're expecting revenue delivery to be much higher, and how should we view whether these margins can be sustained?
Michael Yong
analystI'll handle that one, and hello from me as well. I think it's fair to say the third quarter margin in Transmission is a very strong one, as we remarked regarding the second quarter. We warned that we don't regard this as a new normal; we said at the close of the second quarter that taking the first quarter's average is where we expect to land by the end of the year. I think that holds, perhaps with a very slight uptick thanks to the strong third quarter. We still hold that Transmission's marginality is also sensitive to the timing of the projects we have. I think the third quarter ought to be viewed as supporting what we previously said about the year.
Uma Samlin
analystThat's very clear. Thank you very much.
Lars Topholm
analystYes. Congratulations on another good quarter. I have a couple of questions. The first is really a follow-up to the earlier question about what's implied for the remainder of the year. Because if I look at, let's say, the midpoint of your revenue guidance and the top end of your EBITDA guidance, it still seems to me that you are implicitly assuming an EBITDA margin of 15% or even below that. Of course, I fully understand that the top line is hard to predict, but beyond that uncertainty, are there any particular factors we should bear in mind that might pull the margin down in Q4 relative to Q1, 2, and 3?
Claes Westerlind
executiveNo, I think, Lars, thanks for your question, and good morning; also, I think, since we don't guide on a specific quarter. Of course, full-year guidance minus the first three quarters, we respect the calculations you make; beyond that, I think, to your question, there are no other particular aspects we would call attention to. I think in connection with this question, but also with Michael's answer earlier, and we do respect the focus on margins as well. I think at least for Transmission, very much so, we would call attention to nominal value creation as well, and less so to the discussion of margin.
Lars Topholm
analystFair enough, Claes. So here's another question on Transmission. Regarding that €73 million drop in revenue year on year, could you give us a rough figure and perhaps indicate how much of it comes from Champlain?
Claes Westerlind
executiveI think I could, but I don't think I will. What I can say is that I believe most of the decline stems from Champlain. The vast majority is from Champlain. Two additional factors are at play: project timing and composition, depending on how you look at it, plus a minor contribution from Victoria, which spent just under a month in its scheduled dry docking for work on both ROVs, planned maintenance, and class recertification, so to speak. Those are, I believe, the three elements behind the revenue drop, though Champlain accounts for the vast bulk of it.
Lars Topholm
analystGot it. So one last question about your new trencher, which is a beautiful piece of kit. I'm curious whether you could say something about the specific capex involved for a unit like that? And perhaps also address how far you're able to monetize this capability to bury cables deeper, in terms of both revenue and margins? Is the revenue contribution meaningful? Does it enhance margins, or dilute them? Will this capex investment generate a return on invested capital consistent with your overall ambitions?
Claes Westerlind
executiveThanks. Michael, you can address the financial side. All I'll say is that we won't be commenting on the trencher's specific capex as such. Much of the financial effect here has formed part of our strategic plan for a good while now, and so it is likewise a core element of both the guidance to come for next year and the '28 and the '30 2030 ambitions. Where I think I'll leave an opportunity, at least unspoken, is the fact that security and simply resilience are becoming ever more central to the discussion in Europe and also among the TSOs. I'll stop there, on the question of how large the requirements will become for deeper trenching of our subsea assets down the road. Maybe I'll leave the comment at that opportunity.
Michael Yong
analystRight, I’d just add that this fits among the projects supporting our ambition of more than 22% return on capital. As you mentioned, it brings us flexibility in what we offer. I’d also say it aligns with our discipline of ensuring she will be utilized once she comes online. We essentially sold it, and then built it again once more. There are already projects for her that are relevant.
Claes Westerlind
executiveI completely agree, Lars, she really is a beauty.
Lars Topholm
analystI realize that's what you believe, Claes. I appreciate you taking my questions.
Claes Westerlind
executiveThanks.
Claus Almer
analystThanks. I have a few questions of my own as well. First, regarding the revenue guidance: would it be reasonable to think that the gap between the bottom and top of the range comes mostly from Transmission and the timing of the backlog? That's my first one.
Michael Yong
analystThe line seems to have some noise on it. As Claes mentioned, and to respond to that, I believe you noticed that we haven't made any comment on the revenue range. It really comes down to how projects are phased. Naturally, with projects there's still a certain amount of uncertainty, especially around weather, which we need to allow for. There's also some impact from the Distribution side related to this longer ramp-up curve we're seeing on the new capacity. It's still contributing to the fourth quarter, just as it did to the third quarter. Both of those effects are baked into the guidance we're providing.
Claus Almer
analystFair enough. Then going back, I think Claes brought up this installation work you need to carry out in Q4. Would that be based on Victoria, or would it involve more third-party supplier work?
Claes Westerlind
executiveI don't believe we'd offer specific comments on which assets we use to generate which revenue, Claus. What I will say is that even though that is, let's say, the main swing factor or source of variability, there are of course also production differences and so on; it isn't only that, but I gave it as the clearest example, and it also ties back to Michael's answer that this is what also makes it possible for the full revenue guidance to be in place, so to speak.
Claus Almer
analystAll right, that's fair. So let me try putting it another way: when you look at the projects, is the mix in Q4 roughly the same as it was in Q3, say?
Claes Westerlind
executiveI don't believe we give commentary on an exact quarter-by-quarter basis. As Claus said, bit by bit, quarter after quarter, we're moving from where we've been toward where we're headed — very philosophical. And as we've mentioned too, this can swing from one quarter to the next depending on where we stand. I wouldn't necessarily expect a significant difference. That said, naturally, the mix might shift if less installation or more installation is completed within a single quarter for a particular project; that would likewise mean the mix differs.
Claus Almer
analystAll right, that's clear. So my last question concerns the pipeline. Claes, you brought up a few of those conditional orders that could slip. In the past you've said there might be an order announcement, maybe more than one, during this year. We're still waiting on that. If things work out, is there still a chance an order gets announced in Q4?
Claes Westerlind
executiveI can't quite recall that, but if you say so, I'm certain I said it, though it escapes me. As for how likely an order announcement in Q4 is, I wouldn't call that material.
Claus Almer
analystThat's fine. Congratulations on the strong results; that was all from me. Thank you.
Claes Westerlind
executiveThank you. Thank you, Claus.
Lucas Ferhani
analystHi there, good morning. Appreciate you making time. I've got a couple. First, regarding Transmission, specifically the Champlain Hudson impact. For Q4 of this year, should we figure there wasn't much remaining? Did you book meaningful revenue in last year's Q4 tied to that, just thinking about the comps? Thanks.
Claes Westerlind
executiveThanks, Lucas. That's a very pertinent question, and plainly put, no, we didn't. With that said, we anticipate Transmission getting back to growth in Q4.
Lucas Ferhani
analystGreat. So the second question concerns Distribution and the ramp-up. Are those problems now behind you when it comes to getting the machines commissioned and the labor situation — I believe you lost some people and brought others in? Is that all in the past now, or are you still dealing with it?
Claes Westerlind
executiveI suppose it hinges on what you mean by that. Measured against what we originally anticipated, we remain, naturally, at lower volumes than we had expected to reach by this stage. Seen that way, we're still at work on it. On the machine side of things, we're largely past that. As for the fallout from conditions in the local labor market — losing some people, hiring again, and then the training — that remains a work in progress.
Lucas Ferhani
analystThat's quite clear. I suppose the key thing is that next year you're carrying out yet another ramp-up, and it's on a considerably larger scale. Of course, you've begun hiring, which explains why you faced that 200 bps headwind quite a while back. Is there anything we should read into or take away regarding the Transmission and Karlskrona ramp-up in the coming year when it comes to staffing and machine commissioning, that sort of thing, so that a similar problem doesn't arise there? Thank you.
Claes Westerlind
executiveThank you. I'm also glad you raised that question. My answer overall would be no, though I say so while staying humble, since we attempt to learn from each experience. When it comes to the Karlskrona ramp-up, we follow the usual project mindset of waking up concerned and spending the day working so we can go to bed calm. On the specifics, the machine supplier with whom we went through a somewhat extended ramp-up at Asnæs is not one we have used or are using at Karlskrona. That's the first point. Regarding local labor market conditions, the reason we included the local element is precisely to signal that we see very limited risk of anything like that occurring at Karlskrona. Karlskrona is also a different scale, given the different base body we have there, so to speak.
Lucas Ferhani
analystGreat. One final thing on the Distribution changes. You clearly meant as many as 10, spread across six months. My guess is that across a full year the total increase might have amounted to roughly 20. So now that Portugal is included too, does that mean Distribution's 2027 growth outlook could hit figures of that kind — assuming everything goes well, demand holds up, and the ramp-up is complete — so that you might grow around 20%-plus next year?
Michael Yong
analystLucas, that's a good question. Let me address the premise behind your question, and note that on the Distribution side there are two capacity additions. The first is in Asnæs, Denmark, where local labor has been an issue, and it began operating in June — from a half-year perspective, your reasoning does hold up. As for the Esposende addition, though, it is only now starting operations, so I wouldn't include it in the half-year calculation you're describing. As to how much growth there will be next year, we won't comment on that; naturally we'll cover it in detail when the '27 guidance comes out in February. One thing I'd like to flag is that beyond the longer ramp-up period specific to Asnæs, you also need to factor in a sequential component.
Lucas Ferhani
analystGreat, understood. Thanks.
Jeremy Gaspard
analystHello, good morning. Appreciate you taking my questions. I have two, if that's all right. My first is a follow-up on Distribution. Could you share some detail on what growth level you expect in Q4, considering the capacity ramp-up on one hand and seasonality on the other, since Q4 tends to be a softer quarter?
Claes Westerlind
executiveThanks. I'll begin, and Michael can add as well. As I mentioned before, we generally avoid giving quarterly guidance. That said, as Michael just noted, we initially projected that these two investments could drive up to 10% growth for the business line over the course of this year. Given the longer ramp-up period we've examined and are still examining for Asnæs, we now expect that figure to be lower—for lack of a better proxy, somewhere between 5 million and 10 million. That's the number I'd suggest you hold onto for the full year, and from there I think you can extrapolate or interpolate toward Q4.
Jeremy Gaspard
analystOkay, thanks. Now moving to the second point, which concerns cash flow and changes in working capital. I'm just trying to see whether any significant down payment or payments tied to milestones are anticipated in Q4, and some insight on Q4 capex would also be useful.
Michael Yong
analystI'll handle that question; regarding milestone payments, we won't get into specifics. As you can imagine, we have very large projects with some fairly sizeable ones, so that would mean revealing a bit of competitive intelligence. We've said before that we expect to finish the year in a range of €1.2 billion to €1.3 billion on working capital. My sense is we will probably end up at roughly €1.2 billion by year-end. That, of course, is on a group basis; as for capex, I believe you've observed how spending has gone quarter-over-quarter this year. My view is that the fourth quarter will be in line with that order of magnitude, though I won't give a specific figure here for how we'll close out the year.
Jeremy Gaspard
analystOkay, that's clear. Many thanks.
Claes Westerlind
executiveThanks.
Claes Westerlind
executiveThank you, everyone. I appreciate you being on the call and for taking part in what we see as another successful quarter for NKT, as well as on the path toward next year and on toward '28 and 2030. So with that, thanks again, and we wish all of you a good week.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete NKT A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to NKT A/S earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in NKT A/S or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.