executiveThanks, Cam, and good morning to all of you. Whether you're listening in on the teleconference or watching via the webcast, we're glad to have you with us this morning for our June quarterly report. <<operator_script>> Joining me here in the Pilbara boardroom are our Chief Operating Officer, Dale Henderson, and our Chief Financial Officer, Brian Lynn — both of them will be taking part directly in the call. Also with us are Alex Eastwood, our Company Secretary and General Counsel, along with David Hann, Investor Relations Specialist. As questions come up toward the end of the call, we'll do our best to address them. The best way to sum up where the market stands today is that we've had another strong quarter. We believe our position for taking part in the spodumene market is quite strong. Actually, it is exactly because the past couple of years were difficult for us as a merchant seller of spodumene that today's conditions are ideal, given that a fundamental shortage of spodumene is now emerging within the Chinese conversion market, and that is feeding through very well into price. Later in this call I'll return to describe the market situation in greater detail. But in any case, our team is making every effort to keep up with that increase in demand. That effort has yielded strong production, plus very good utilization and availability throughout the Pilgan facility. We are obviously putting significant effort into getting Ngungaju up and running again right now, and we're aiming for the first output from that site to arrive in the December quarter. Every bit of this is a reaction to those stronger demand conditions. And naturally, that is now also reflected quite well in the price our product commands. Dale will walk through what's taking place at the mine level, but it's reasonable to say we are plainly carrying out considerably more work to support production growth, and a portion of that shows up in mining. That is among the factors behind some cost increase, though Dale will cover the situation there in greater detail when he speaks. Put plainly, if our output were higher right now, we'd be moving more product—no question. This is decidedly a seller's market at present, and with spodumene sales the advantage has clearly shifted to the other side; that's creating some intriguing conditions in the spodumene market and what I'd call a gap between longer-dated offtake pricing and whatever pricing could be found in the spodumene spot market that is starting to take shape. I'll walk through that dynamic in considerably more depth, since it bears heavily on where the market heads next, so I'll cover it in greater detail later in this call. So in any case, because of that level of demand—and we're happy with where pricing is heading, as I mentioned before—it has prompted us to bring the Ngungaju Plant back online, that is the former Altura operations. And that project is now well underway. Once again, Dale will go through the details of what is taking place there. With that said, I'll pass things to Dale, who will then pass them to Brian for more on finance and cash flow. After that, we'll wrap up the call with a far more thorough look at how the market stands right now. So, Dale, the floor is yours. Thank you.
Dale Henderson
executiveThank you, Ken, and hello everyone. My remarks will be organized into three sections. First, a quick status report on operations and how they have performed. After that, I'll provide an update regarding our projects and expansion activities, and finally I'll discuss the Ngungaju restart, which is currently in full swing. So, beginning with operations: as Ken mentioned, we had a truly solid quarter. On safety, which comes before everything else, things are progressing well — there were no reportable injuries, which is always encouraging. On the production side, throughput at the plant was strong in terms of tons produced, so that is tracking nicely. Recoveries were also good, coming in at an average of 72% across the quarter. Production KPIs are all on track. In mining, things are genuinely beginning to accelerate in line with the mine plan, so we moved considerably more material during the quarter. Going forward, we intend to move even more material, and that rests on two drivers. First, it's basically about compensating for the extremely low strip ratio we carried through the market downturn. Now that the market has turned and is improving, we're aiming to move that waste. The second factor involves expanding our operational capacity. With the production increase from our improvement initiatives taking effect in the December quarter and the Ngungaju operation restarting, we need to prepare the mine for a greater volume of ore tonnes flowing from the mine to the two respective plants. All of that falls within the mine plan in that respect. Regarding operational challenges, the primary one—which affects the whole industry—is likely the constrained labor market, particularly concerning staffing for mining operations, truck operators, excavator drivers, and similar roles. For us, that hasn't caused issues so far, though we're very mindful of how heated the market is, especially when we consider increasing the mining output I described earlier. That basically covers the operations side. Turning now to projects: we have our improvement projects package — a debottlenecking effort that's well along in construction right now. Its main purpose is to deliver an incremental boost to our current Pilgan Plant, which ought to provide roughly a 10% to 15% increase. That construction work remains on schedule. It's progressing nicely. Praise goes to our construction contractor. The IronMerge SIMPEC joint venture is performing well. It's worth pointing out that IronMerge is in fact a Nyamal enterprise, and Nyamal is a traditional landowner, so it's really good to see that joint venture succeeding and to have Nyamal participating in it — everything there is progressing well, so congratulations to the group. That work should begin and be complete within the September quarter, and that produces the additional increase in sums come the December quarter. So all of that is tracking well. Beyond that increase and beyond the Ngungaju restart, we are undertaking study work regarding the next phase of incremental expansion. That would mean another 100,000 tonnes of product coming from the Pilgan operation; so at present we're in study mode, and those studies ought to finish at year-end. Of course, any FID/decision will be looked at closer to that point, consistent with the working market and customer demand. Also on the project side, we have our midstream product strategy. That relates to making green lithium cells. Where things stand is that in the quarter, the MOU was signed with Calix, our East Coast R&D partner — that got signed. The team is working through the Scoping Study for our pilot plant. The Scoping Study remains on schedule to wrap up prior to year-end, and assuming things proceed favorably, we favor advancing as swiftly as possible toward a demonstration plant at the site. Still, we'll hold off and see what direction that Scoping Study provides. So on the project side, everything is progressing as planned, which is excellent to observe. My final section covers the Ngungaju restart — which, naturally, is the plant formerly known as Altura. On that front, the Board gave the go-ahead for FID to restart the operation as of June 25, so that took place in the quarter, and the team is now fully absorbed in the work of completing engineering, handling long leads, negotiating construction contracts and similar items, all to be rolled out quickly across the weeks ahead. Our aim is for tonnes to be produced ahead of Christmas and for total throughput to ramp up so that we are essentially at nameplate by June of next year. That ramp-up, clearly, will be gradual and will depend on the work under way. But as I mentioned, we are aiming for full nameplate by June next year, which comes to 180,000 to 200,000 tonnes per annum. It feels good to get that operation running again. The other thing to cover regarding Ngungaju is the exploration work we've completed. Naturally, that's the main synergy we were after in the investment case and the deal to buy the Altura assets. During the quarter, 49 drill holes were put down, with over 8,000 meters of drilling along the boundary of what used to be the tenement line separating Altura and Pilbara. It's really pleasing to see those results come in. We've gotten some solid hits in terms of lithia grade and seam thickness, so that's great to see — it's definitely exceeded what we expected. We anticipate incorporating that into the consolidated resource estimate and issuing a report on it, scheduled for the September quarter of this year. So yes, excellent. That marks yet another accomplishment on our side. I’m truly glad to present those drilling results, and that wraps up my remarks regarding operations, projects, and the restart of Ngungaju. With that, I’ll hand things over to Brian.
Brian Lynn
executiveAlright, thank you, Dale, and good morning to everybody. What I'd like to do is walk through the costs we took on in the quarter, and then also spend a bit of time on our cash balance and the key movements within it. Probably the best place to begin is by looking back at the physicals we delivered for the quarter, since those clearly drive both cost and cash results. We turned out slightly more than 77,000 tonnes of spodumene concentrate. We managed to draw down roughly just under 19,000 tonnes from stockpiles that had been built up as of the 31st of March. That means total shipped tonnes for the quarter came in a touch below 96,000 tonnes. Last quarter, you may remember, some tonnes were loaded onto a vessel that didn't — yet that ship accounted for net sales of about 30,000 tonnes. Combine those with the 96,000 tonnes shipped this month, and quarterly sales tonnes came to 109,000 dry metric tonnes. Turning to cost per tonne — a key metric we use to gauge the business — I thought it worth reminding everyone what a unit cost per tonne actually comprises. Our definition of unit operating costs takes in mining, processing, transport, royalties, native title, port shipping and freight, certain site-level general administration costs, and we also apply a credit for any byproduct from tantalum sales. That's effectively what sits inside our cost per tonne. The thinking behind it is that once you take that cost per tonne and subtract the price you realized, what's left is really the margin your operation generates. Cost per tonne for the quarter came in above the March quarter — USD 441 per dry metric tonne versus $383 in the March quarter. That works out to a $58 increase, which at first glance looks fairly substantial. But once you dig into the drivers, a big portion of that rise stems from what's going on in the freight market right now. Of that figure, $24 is tied to higher freight rates we saw during the quarter. Suitable vessels are notably tight at present, demand is very strong across a number of commodity groups, and we're also seeing many vessels now headed for the Atlantic Basin. That leaves a limited number of ships actually available on the Far East trade route, which matters a great deal to us. All of that combined has meant we've had to contend with elevated freight rates through the quarter. And those freight rates remain elevated. So at present, when we go to charter a vessel, the rate is roughly USD 65 per tonne, while historically our freight expense has run at about USD 20 to USD 25 per tonne; on top of that, mining costs came in higher this quarter. Part of that ties back to what we flagged in the March quarter — we'd need to raise the volume of waste we mine, pushing up our strip ratio, mainly because, as you'll remember, we're in a moderated production phase and were quite constrained in the tonnes we chose to mine. So some catch-up work is required. Certain consequences of that catch-up meant we had to move more waste in the June quarter. Yet another key thing worth noting on mining cost is that we also — we incurred expenses in the June quarter that in fact position us for the greater output we anticipate from the September quarter. I believe everyone is hopefully conscious that we're putting some capital into our Pilgan Plant. Our aim is to lift that plant's output to roughly 390,000 tonnes of concentrate annually. Achieving that called for raising throughput to 2.3 million tonnes. Naturally, we must feed more tonnes into the front end of the plant. That obliges us to carry out considerably more mining. So during the June quarter we were in fact undertaking a great deal of work to prepare for feeding additional tonnes to the plant. That brings added cost for equipment mobilization, for drill and blast activity, plus other ancillary infrastructure; and finally, higher royalty costs also weighed on the overall unit cost. Of course, we've been receiving an improved price for what we sell. Obviously, that translates into higher royalty expenses for you, which then flows through to an increased cost for each tonne. We've additionally provided guidance regarding the per-unit cost we expect for FY '22; that figure spans USD 395 to USD 430. So again, it's a bit on the high side. Mostly, though, it stems from bringing the Ngungaju Plant back online, and that will bring some steep costs with it, because during the ramp-up phase your efficiency in cost-per-tonne terms isn't quite where it will be; our strip ratio is going to be elevated. So we've been pretty open about all of this. Plainly that affects unit costs next year; and we do anticipate freight costs will be elevated next year. What we're picking up is that freight rates will likely stay elevated for no less than the coming 6 months, and after that, the expectation is that during the second half of FY '22, those rates will begin returning toward a normal level of roughly USD 25 a tonne. Turning to the cash balance, at the end of June we held a touch under $116 million in cash plus letters of credit against product that had sales. That works out to an increase of about $4 million from the end of March position of $112 million. When we look at what really drove the changes in that cash balance, the biggest factor is generating positive cash flow from our operations. During the quarter, measured in tonnes, we brought in just shy of about $20 million in positive operating cash flow, which was a strong result. On top of that, we gathered another $7.5 million related to product — specifically provisional pricing adjustments on product we sold in the March quarter. We had highlighted that in the March quarterly report, and the cash benefit from it has since come into our bank accounts. As for the major spending, capital was really where it went. We invested approximately $40 million in capital, and that was largely connected to the plant improvements currently being carried out at the Pilgan Plant. As I mentioned, based on what we expected at the close of the September quarter, we should be capable of reaching throughput of roughly 2.3 million tonnes in order to generate approximately 380,000 tonnes. To accomplish that, we've been investing slightly more than $20 million. A significant portion of the quarter's spending was directed at making that happen. In addition, part of the capital went toward some TMF uplift. A modest sum—about $2.5 million—was used to wrap up the Altura acquisition. The rest of the costs were primarily related to care and maintenance on the negative pipe. We also finalized the restart plan. There's some spending involved — a little on exploration and study, plus interest on our debt, obviously — but on the positive side, we ended the quarter with $116 million in cash. It's probably also worth mentioning — I believe we noted last quarter that we adjusted certain pricing arrangements with customers, pricing cargoes provisionally and then truing up according to pricing at shipment time. So we anticipate collecting just under $2 million in favorable provisional pricing adjustments during the September quarter. That cash ought to land in our bank accounts sometime in the September quarter. On the guidance front, it's probably worth noting that we've naturally already given guidance on unit costs; our full-year FY '21 results are due out near the end of August. At that time, we expect to also give guidance covering both production sales and CapEx, so I'm looking forward to that near the end of August. I think that takes care of everything I wanted to cover, so I might just hand things back to Ken for some commentary around the market.
Kenneth Brinsden
executiveAbsolutely. Thanks, Brian. I think it's worthwhile to provide the market with additional specifics here, because some truly intriguing dynamics are in play. To understand the current situation, it's useful to review how supply and demand unfolded across the past two years; during the period when both chemicals pricing and spodumene pricing were under pressure, a certain amount of consolidation occurred on the mining side. In fact, a few mines went bankrupt. So conditions were plainly extremely difficult for the miners. Meanwhile, chemical conversion capacity continued to be added very quickly in China. That's now showing up in a substantial number for installed capacity in China — some already running, some coming online soon, and more across this year and the next. The upshot: chemical conversion capacity today is well beyond what merchant spodumene supply is able to fill. In plain terms, spodumene is in short supply. And because of that, a rather intriguing dynamic is beginning to take shape. As far as I can remember, this is the first time in the industry that a basic disconnect has emerged between the pricing that would normally have governed the spodumene world—as defined by most pricing mechanisms, including those we use in our offtake agreements—and what could potentially be obtained in the emerging spot market. With multiple buyers now present, or far more buyers than the market has historically seen, a spot market is beginning to develop in a manner that it did not operate before. Let me give you a very, very stark contrast to explain the current dynamic. Platts sets that benchmark, and we know they're pricing off what they consider a spot market level. Their current figure is USD 925 a tonne FOB Australia. The previous occasion when pricing sat around that level was roughly late 2017 into early 2018, and at that point the headline chemicals price stood at USD 22,000 to USD 24,000 a tonne. These days the headline chemical price runs about USD 12,000 to USD 14,000 a tonne; those figures are purely meant to illustrate what is occurring in today's market. Spodumene is in fundamental shortage, so chemical converters are giving up part of their margin and essentially handing it over in order to secure a spot cargo. This is a really intriguing shift, and it signals a meaningful transformation in the marketplace. Anticipating that this effect would occur—though maybe not at the speed with which it appears to have played out—we made a firm decision to step up our involvement in the spot market. Consequently, together with GLX Digital based in Perth, we have been building the Battery Material Exchange, known as the BMX platform. The purpose behind the BMX platform is deliberately to provide a vital sales route that supports greater output from Pilgangoora, allowing us to connect with the numerous buyers active in China's spot market. I'm pleased to say that it looks to be both formative for Pilbara Minerals and a major step forward for the market as a whole. The BMX platform is live now; we've vetted roughly 30 prospective buyers. That's a fairly remarkable figure compared with when we started out in this industry in 2015 — orders of magnitude above the purchaser group that existed back then — and our first option is coming up shortly. Naturally, we'll return to the market if there are developments worth sharing. So it's a genuinely interesting situation the spodumene market is in. To sum up, we believe Pilbara Minerals is extremely well positioned to take part in this next growth phase underway in the industry. We'd like to think we have the right mix of productive plant capacity and team skills to maximize performance at those facilities. That's not something to take lightly, since it's an extremely challenging task within the lithium sector and when working with spodumene, especially the flotation process. And naturally, we now have a background of considerable demand expansion, but particularly when it comes to merchant supply of spodumene; because of that, we think our position is very strong. The last point I want to mention involves our relationship with POSCO, and we continue to feel optimistic about the value of that relationship as well as the POSCO team's capabilities, their involvement in the Korean market, and our capacity to participate there together with POSCO. We have felt frustrated by the pace of progress. A portion of this has been considerably more challenging across the months, or the later stretch of June and July, owing to significant illness affecting the lithium team based in South Korea. Even so, we remain optimistic regarding how that deal is advancing and what it means for Pilbara Minerals' expansion. We therefore anticipate seeing that advancement over the coming month — apologies, I mean the following month; we aren't quite there yet. We look forward to movement on that front; that's essentially everything we have to offer as commentary. And we'd ask that everyone prepare for questions. We’re sorry ahead of time if we can’t cover every question; after the call, we’ll also let you know ways to reach us. Cam, could I turn it back to you now so we can begin the Q&A portion of the teleconference? Thanks.
Jack Gabb
analystJust a few things from me. So Ken, you mentioned, I think, the disconnect that currently exists between spot pricing and offtake pricing. Could you give us a bit more detail on how big that discount is right now? And I suppose along with that, how much of your current offtake do you figure you can renegotiate so it comes closer to spot pricing down the road?
Kenneth Brinsden
executiveYes, that's a good question, Jack. If we were signing a provisionally priced contract today, it would depend on the customer, but you'd be looking at roughly USD 650 a tonne, perhaps slightly above that. When it comes to what we now refer to as the spot market — and again, I'd stress that this is only a fairly recent development for the industry — if you accept Platts, it's USD 900 a tonne plus. Other price reporting agencies, such as FastMarkets and Asian Metals, report lower figures, though it isn't immediately clear to us what they are trying to report against. So in fact, one reason I'm flagging this issue is to make the point that as the market develops — and incidentally, it's shifting very rapidly too — it's hard to be definitive about what's going on with price. There's price acceleration, which is a fairly recent phenomenon. So even on contracting price — contracted pricing that moved from about USD 500 a tonne in April to, as I mentioned, probably above USD 650 a tonne — all of that occurred in the span of 3 months; and over that same period, we've now begun to see the spot price speed up because of the fundamental shortage I'm describing. As for the more direct question regarding our customers, well, we have mechanisms in place for review purposes. And of course, we will be starting those conversations. It's hard to be definitive about timing, but we expect that given contractual terms, there will be some flexibility there.
Jack Gabb
analystPerfect. One more thing from me, and this is about costs. Could you give a bit more detail, I suppose, on how the stripping profile looks going forward? And I suppose — I believe your life of mine is roughly 4:1. So how does that sort of shape up in FY '22 and beyond? And then I suppose, as part of that, are you fracturing some of this good exploration success you're having around the South Pit, in terms of being able to bring that strip ratio down?
Kenneth Brinsden
executiveYes, Jack, again, a really good question. The strip ratio in the June quarter came in at approximately — sorry, just under 3:1. Life of mine is actually closer to 5:1, Jack, now that the reserve has grown. So on the basis of the 106 million tonne reserve, the strip ratio is just a fraction of the 5:1. And we peaked, Dale, at about 6.5:1 in this next phase of catch-up, if you like, on waste movements.
Dale Henderson
executiveYeah, regarding that — yeah, roughly 6.2. But yes, Jack, on your question about whether we're taking another look at the new ore, absolutely, we are. Right now we're right in the middle of getting that incorporated into the resource model. But shortly after that, we'll be running those mining scenarios to check whether a smarter approach exists for the near term, and if one does, we'll go after it.
Hayden Bairstow
analystJust a few things from me. First off, Ken, regarding the market — I'd like to get a sense of this. Pilgan is, I suppose, operating with that expanded rate of 360,000 to 380,000, and you'll also get some volume from the old Altura material this year. So what amount of volume do you figure you can free up for spot sales over the coming 12 months?
Kenneth Brinsden
executiveYeah. Appreciate that, Hayden — it's a good question. All of the capacity at the Ngungaju Plant can be used for the BMX platform; and naturally, that is being ramped up during the very same period you're asking about. We move from fairly modest tonnage in the December quarter — call it nominally 15,000 tonnes — up to a run rate of 180,000 to 200,000 tonnes by June 2022; meanwhile, there are, once again, quite modest extra tonnes emerging from the Pilgan Plant. As a matter of fact, that is where a portion of the additional capacity originates thanks to this first option; so — yet it isn't a massive figure either; it's roughly in the range of 10,000 to 20,000 tonnes; so if you were — once more, we'll give more detailed guidance around the August time frame with the results, but backfilling capacity into the BMX platform, say, 100,000 to 120,000 tonnes, something of that order.
Hayden Bairstow
analystYeah, so roughly 100,000 for this fiscal year, correct, as an advance on the figure you'll have on hand?
Kenneth Brinsden
executiveYes.
Hayden Bairstow
analystYes. Alright, and have you genuinely sped things up at the site — so the restart plan with Ngungaju as it stands now? Or does that remain — the end of December is roughly what I had in mind regardless, so no change there?
Kenneth Brinsden
executiveNo, it's unchanged, but the work isn't complete — the engineering work tied to the acceleration. So our hope, Hayden, is that we can get it done faster, though we're not ready to commit to that yet.
Hayden Bairstow
analystYeah. All right. That's fine; and regarding your offtake agreements, could we — when do you have a repricing option such that, if we find ourselves at 18% of the hydroxide price on spot going forward, you'd actually be able to decouple from those legacy contract pricing methodologies? Could that happen within the next couple of years?
Kenneth Brinsden
executiveYeah. Generally put, those contracts rest on the assumption that, should a disconnect begin to appear in the market, we then have the chance to start a conversation around pricing. And we sowed those seeds within the original contracts, knowing the market was still relatively immature and that pricing developments would occur over time. Well, we're happy to report that some of that development appears to be beginning to take shape. First, there's somewhat more transparency regarding how many people are tracking the market and publishing price references. Things like our BMX platform, which are a bit more definitive when it comes to trades and pricing on trades, price discovery. So each of those elements feeds into a dialogue with our customers about the pricing mechanisms themselves. Now, as I told Jack, we can't be definitive regarding any changes at this point, because obviously it will be subject to further discussion.
Hayden Bairstow
analystAlright. One last question about this oversight behind the trading halt and the suspension — we're figuring it gets sorted in a single bright afternoon over in Perth?
Kenneth Brinsden
executiveThat's right, Hayden — that's what we expect.
Alistair Harvey
analystKen and the team, I’ve got a couple of questions. Regarding the restart CapEx at Ngungaju, how much of that $39 million has been spent so far? I realize FID approval only came at the end of June, but how much was spent in June, and when should we expect the remaining portion of that $39 million to be spent?
Brian Lynn
executiveYes. Al, Brian speaking. Well, regarding that $39 million, roughly $5 million or $6 million had been spent as of 30 June. The rest will be spent between July and February next year.
Alistair Harvey
analystRight. So with Pilgan expanding incrementally and studies arriving in the December quarter, is this mostly a refresh of the earlier studies? What kinds of updates do you plan to add in? And perhaps are you considering the later phases you mentioned in those prior studies? And when might they be reporting for the — into the plan?
Dale Henderson
executiveYes. Sure. The study we're aiming at for the end of the calendar year centers on what we previously called Stage 2 Phase 1. So yes, it's a refresh of the thinking we've done before. But the study we'll be delivering pushes it to a deeper level of design and quantities, so that it could ultimately support an FID case for the further expansion case that would also likely follow what we originally contemplated, that incremental expansion; but at this stage we're obviously focused on the first phase.
Alistair Harvey
analystAnd one last thing from me, if I may. Regarding the deferred consideration tied to Altura — that's 69 million shares, or the cash equivalent — over what period is the share price measured in order to arrive at that cash equivalent figure?
Kenneth Brinsden
executiveYes. Al, it goes back to the original — essentially, the share price as it stood when the deal was settled. So that takes us back to late October last year. All right. Thank you. Thanks, Al. Thanks, Hayden. Thanks, Jack, for your questions. And Cam, I think — well, I'll pass it back to you, but I believe we should move on to the webcast questions.
Kenneth Brinsden
executiveAll right, thanks, Cam. Nicholas, over to you — if you could just tell us what questions have come in on the webcast. Thanks.
Nicholas Read
analystThank you so much, Ken. Good morning, everybody. We've got quite a few questions that came in online. Several shareholders have raised the matter of the current suspension of the shares. So, to give you the gist of those questions: at what point will the stock actually be relisted? I know you did cover that. Does the suspension affect the business and its growth plans in any way at all? And yes, if you could perhaps say a little more on that.
Kenneth Brinsden
executiveOkay. Thanks, Nick. Well, just so we're clear, the trading hold is technical in nature — it relates to the presentation of a required prior cleansing notice. It goes back to the conversion of options into shares and then a subsequent sale in late June. The company's view is that, of course, we were cleansed at the time; we take all of this extremely seriously; and I'd like to believe we have a very strong track record when it comes to our continuous disclosure and all of those things that are required. But as I said, because the cleansing notice wasn't issued at the time, there is a technical breach that only a court order can resolve. In which case, we've done everything possible to speed up the court hearing, and we're pleased to say that it will take place on Friday afternoon. The company expects that, given the administrative nature of that bridge, the courts will deal with the issue quickly; we can't be definitive about trading as of Monday morning, but it's fair to say that would be our expectation.
Nicholas Read
analystAll right. Many thanks, Ken. At this point I'll turn to a few questions that came in from Tim Hoff at Canaccord. First off, will every waste tonne be expensed in the coming year? Or does some portion get capitalized? And second, could you give us some guidance on sustaining capital for next year, please? That one may be for you, Brian.
Brian Lynn
executiveYes. Of course. Of course. Thank you. That's — thanks, Tim. Right. So a portion of that waste movement next year will be capitalized. The way we handle waste is this: any waste up to a strip ratio of 5:1 is treated as expense, while anything past 5:1 is capitalized, since they need — so basically, the principle is that where your mining waste exceeds your strip ratio, you're allowed to capitalize that portion. Sorry, Nick, what was the second part again?
Nicholas Read
analystA bit of direction regarding sustaining capital for the coming year.
Brian Lynn
executiveRight. We'll be issuing some guidance at the close of August. The way we generally think about sustaining capital is roughly as a proportion of the initial capital outlay on the plant. So if you apply those proportions and deploy that across those plants, you're likely looking at sustaining capital for the 2 plants in the range of about $8 million to $10 million. We'll be more precise on that when guidance comes out in August.
Nicholas Read
analystThanks, Brian. Here's another one from Tim, and it's probably for you, Ken. Since historical offtake ties the SC6 pricing mechanism to chemical prices, do you feel you have sufficient leverage to begin advocating for better pricing so as to capture extra margin — in other words, to alter the SC6 pricing formula?
Kenneth Brinsden
executiveYes. Appreciate the question, Tim. It's a fair one. So the aim — going back historically, the aim was to bring the value contained in spodumene up to the headline chemicals price, and especially where the bulk of your customers operate, which means mainly in the Chinese domestic market, though usually not only there. That has been a fair and sensible way to assess price in the past. And incidentally, that still delivers some fairly meaningful price appreciation that we are — that we're benefiting from right now. This recent development and the rally in the nascent spot market is very fresh. As I mentioned, this is a phenomenon that has only come about in, quite literally, the last — I'd venture to say, the last 6 weeks, 6 to 8 weeks, in which case it's a very recent phenomenon, and that means we need to begin a fresh round of discussions. As I hinted at earlier on this call, we had purposely structured contracts so that there was a purpose of review, in fact, largely to handle situations such as this one we're describing. So our position is that we can hold a sensible discussion with our customers, but I won't be categorical about what that means in terms of timing. Clearly, we'll enter into that discussion, and we'll seek out whatever value points we can to make sure we get the right price for our spodumene.
Nicholas Read
analystThank you, Ken. I'll turn now to a question that came in from Andrew Chirnside at Canaccord (sic) RBS Global Banking & Markets. What proportion of your total production do you expect to sell through the BMX platform in terms of volume? And secondly, has there been any news regarding the Calix joint venture, please?
Kenneth Brinsden
executiveRight. So far as the BMX platform goes, it will mostly handle the Ngungaju output once that comes back online. In that case, over time, it will reach as much as 200,000 tonnes per annum, versus roughly 580,000 tonnes per annum of overall production out of Pilgangoora. And then, with time, as for the BMX platform, we're hoping the world is our oyster when it comes to contracts rolling off or what we might do with extra products — a midstream product, for instance, or a value-added lithium chemical. The engineering and lab work tied to the midstream project, which clearly takes in the Calix relationship, is carrying on. We remain very, very happy with how things are progressing there. And in the end, our aim is to reach a decision on advancing a demonstration plant by late this year. Is there anything you'd like to add to fill in the detail, Dale?
Dale Henderson
executiveNo, no. It's going well; that's all I had.
Kenneth Brinsden
executiveYes.
Nicholas Read
analystThanks, guys. I'll jump to a question now from John Rawlings. Apart from freight costs, do you expect production costs to come down once you factor in economies of scale?
Brian Lynn
executiveYes. Look, that is what we expect; so certainly, once the Ngungaju Plant and that operation is up and running, you'd anticipate efficiencies at that particular plant, but also across both operations; so that's our expectation. Again, we'll provide some guidance on this in August. But what we expect is once that operation is up and running and has reached nameplate capacity, then your unit operating cost should come down accordingly.
Nicholas Read
analystThank you, Brian. We have another follow-up from Tim Hoff at Canaccord. If we work backwards from the mill's grades, it looks like a high level — that is, there seems to be a degree of high grading taking place; is that so? And does that imply you're building a stockpile of lower-grade material? And how should we think about when that material gets fed?
Kenneth Brinsden
executiveOkay. Yes, Tim, it has always been our plan to mine a higher grade during roughly the first 3 to 4 years of the project's life. That comes from the geology, not from Pilbara doing anything that amounts to a subset of high grading; it's simply because the ore grade is higher in the central pit, in the areas opened up next to the plant. So we've been quite clear on that over the last couple of years. There is transitional and contaminated material, again, as anticipated as a consequence of reserve development. And those do get processed over time. But they're not — at least as a proportion of the total reserves, they don't make up a huge proportion of the reserve. So to be clear, yes, higher grade is mined as a consequence of the geology and how the ore presents as we begin mining. Yes, some stockpiled material exists that represents an opportunity for processing at a future date; but as I said, as a proportion of the total reserve, it's not a huge number.
Nicholas Read
analystThank you, Ken. We’ll take a couple more questions online, and then I believe there’s one additional person registered to ask by phone. This question concerns value adding. Is the company looking at any downstream processing opportunities for lithium in Australia, potentially through a joint venture with other producers? The question says, “I assume Australia would be better off with only one extra processing plant, and therefore a joint venture that takes lithium closer to battery ready.”
Kenneth Brinsden
executiveYes. Well, thank you for that question, John. Yes. I’d say the answer is yes — there is an opportunity to add more value to spodumene before it departs Australian shores. Our strategy, as envisaged in the midstream discussion and the work under way with Calix, is aimed at evaluating a product that isn’t necessarily battery grade; and the reason for taking that path is that, really, Australian miners aren’t well set up to make a battery-grade product. That kind of product is meant for people wearing lab coats in sterile, pristine environments. And unfortunately, the Pilbara and mining operations typically aren’t like that. So a degree of value adding aimed at maximizing the per revenue — the revenue per tonne — but without the combination of capital and operating environment/expertise that’s needed to create a battery-ready product. Our partnerships — well, I think we’ve already shown that we value key partnerships. And of course, we place POSCO in that category. The commercial arrangements for a final midstream product solution have yet to be developed. But of course, partnerships could very well be one of the important solutions for penetrating international markets, and in particular Europe and North America. Anything else you’d like to add, Dale?
Dale Henderson
executiveNo, no, no. I think you covered it well. I think then — I could add that the way we look at it is how do we create the most value as fast as we can; so with that in mind, a project in Australia isn't off the cards. It's just that maybe there's a better option.
Nicholas Read
analystThanks, guys. One last thing — we've fielded quite a few questions, and they've been fairly broad ones about growth strategy, so I'll do my best to sum them up. Basically, what people want to know is this: with the opportunity in lithium and battery metals being as large as it is, do you have any bigger-picture, longer-term growth ambitions or plans — beyond the current focus on the existing plants — that might put Pilbara in a position to capture that opportunity down the road?
Kenneth Brinsden
executiveYes. Thanks, Nick. Yes. Well, we really do believe Pilgangoora is a fantastic position when it comes to lithium raw materials. The resource's scale, plus its location and how close it sits to key markets — in our view, that combination is extremely powerful. We like the idea that we can position Pilgangoora production, or integrate it more deeply on the vertical axis, with other facilities; you can see that in the relationship we've built with POSCO and in what we're working toward in linking production to a joint chemical facility in South Korea. Models of that kind remain very much of value to Pilbara Minerals and, in the end, to maximizing both the value of the resource in the ground and, naturally, the value in the company; so we continue to work very hard on taking part in international markets, and we do believe that is a genuinely important part of the company's future and of our capacity to keep on growing. All right. Back to Cam. Any further questions on the phone line? Thanks, mate.
Mitch Ryan
analystI wanted to ask — you brought up the clause in your offtake agreement allowing a renegotiation that works in your favor when prices are climbing. Even though nobody is predicting spodumene prices will drop anytime soon, is that clause available to both sides if prices were to fall? Should we also be thinking about downside risk there?
Kenneth Brinsden
executiveYes, Mitch. In short, the answer is yes. That pricing mechanism can be triggered and discussed in either direction. Arguably, Mitch, we already went through that period, since we clearly had a difficult stretch in 2019 and 2020, but even so, we've come out a stronger organization because of it; so yes, the answer is yes; it operates in both directions. One key development from where we sit is the emergence of the spot market, and even today, the gap between a genuine spot sale and a contract sale really does represent a new phenomenon. That didn't occur previously, at least not to the degree that the disconnect exists now. So that's why the logic holds for launching into a conversation with our customers.
Kenneth Brinsden
executiveAlright, thank you, Cam. And thanks to everybody joining us on the teleconference as well as those with us online. Should you have missed the question or — and/or if more questions come up, we'd encourage you to get in touch through our e-mail service, shareholderservices, one word, at pilbaraminerals, one word, .com.au. So that's shareholderservices, one word, at pilbaraminerals, one word, .com.au, and we'll do our utmost to get back to you as promptly as we can. Thank you, everyone, for taking part this morning. Our thanks to the team here in Perth, and we look forward to seeing you next time. Good morning, all. Thank you. Bye.
Operator
operatorThanks to all of you. That brings today's conference to a close. You're welcome to disconnect your lines at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete PLS Group Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to PLS Group Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in PLS Group Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.