Portland General Electric Company (POR) Earnings Call Transcript & Summary

July 28, 2023

New York Stock Exchange US Utilities Electric Utilities earnings 45 min

Earnings Call Speaker Segments

Jardon Jaramillo

executive
#1

Thanks, Justin. Morning, everybody. Glad to have you with us today. Before we get started this morning, I want to point out that we've put together a presentation that goes along with what we'll be talking about, and we'll be referring to it during the call. You can find those slides on our website at investors.portlandgeneral.com. If you look at slide two, a few of the things we say this morning will be forward-looking statements. We want to warn you that these statements carry inherent risks and uncertainties. Our actual results could differ materially from what we expect. For a description of some of the factors that might cause actual results to differ materially, please see our earnings press release and our most recent periodic reports on Forms 10-K and 10-Q, which you can find on our website. Leading our discussion today are Maria Pope, President and CEO, and Joe Trpik, Senior Vice President of Finance and CFO. After they give their prepared remarks, we'll open the line for your questions. Now, I'm pleased to hand the call over to Maria.

Maria Pope

executive
#2

Thanks, Jardon, and good morning everyone. Before I get into our results, I want to introduce and welcome Joe Trpik, who came on board in June as our new CFO. Joe has deep experience in finance, risk management, and capital markets, gained across 20 years in senior finance positions at Exelon. Joe, welcome. Starting on slide four, I'll walk through our quarterly results and the main drivers. In Q2, GAAP net income came in at $39 million, or $0.39 per diluted share. Adjusting for Boardman's impact, non-GAAP net income was $44 million, or $0.44 per share. That's against second quarter results of $64 million, or $0.72 per share. What drove this quarter: regional hydro conditions — unusually high and adversely affecting power markets with severe volatility — plus load growth and greater energy usage, especially from the semiconductor and digital sectors. Also, investments in long-term capital projects, like the 2021 RFP projects, including Clearwater Wind in eastern Montana, and prioritizing system maintenance and expenses to handle ongoing reliability and resiliency. I'll go through each one. First, on a quarter-over-quarter basis, power cost changes were substantial. I want to commend our team for managing the market volatility so well. A year ago, hydro conditions in the Columbia River Basin sat at roughly 110% of normal. This year, at 80%, they're well below normal. The year-to-date effect of our power cost adjustment mechanism, or PCAM, totaled $51 million versus the same point last year, comprising $23 million in Q1 and $28 million this past quarter. Heading into Q3, we expect these big variances to moderate, given July, August, and September's seasonally low hydro generation. Second, load growth was solid. We continue to see growth in high-tech sectors, with rising demand from semiconductor manufacturing, data centers, and cloud computing. We're glad that in this past session, the Oregon Legislature passed historic investments backing the semiconductor sector. Those include $200 million for grant and loan programs, $255 million for R&D tax credits, and $73 million for an innovation complex at Oregon State University. Among other incentives, they're also backing streamlined environmental land use and permitting to help construction of new high-tech manufacturing. Lately, beyond Intel's expansion, we've seen major investments from Microchip, Lam Research, and just last week, Analog Devices announced a $1 billion investment in their Beaverton, Oregon operations. Moving to slide five: at the end of May, we announced an agreement to procure the Evergreen Battery Energy Storage System, a new 75 MW facility in Hillsboro, Oregon. With Clearwater Wind, the Seaside Battery project, and now Evergreen, the company is investing roughly $925 million in renewable and dispatchable capacity resources under the 2021 RFP. Beyond those investments, we are likewise reviewing multiple transmission initiatives located across the territory we serve and along existing rights of way, which will support robust customer expansion along with the new manufacturing activity I mentioned earlier. Alongside cash generated by operations, plus debt and equity funding and proceeds from monetizing production and investment tax credits, we are drawing on federal IRA and IIJA money together with local communities, technology companies, tribal partners, and other stakeholders. Currently, we are seeking more than $450 million in grants backing roughly $1.1 billion of overall projects tied to grid resiliency, cybersecurity, hydro project improvements, transportation electrification, transmission upgrades, and numerous other efforts. Turning toward what lies ahead, the 2024 general rate case holds our full attention. Talks regarding settlement have yielded good results, and the constructive, collaborative headway achieved so far pleases us. PGE and the parties have reached multiple agreements in principle resolving various rate case items, among them a share of PGE's transmission and distribution capital requests, a capital structure split evenly at 50% debt and 50% equity, several business matters including the transfer and sale of PTCs and ITCs, and part of 2024 net variable power costs. We anticipate submitting stipulations addressing these matters to the OPUC within the next few weeks. Our following settlement conference takes place next week, and we hold optimistic views about further progress. Considering the rest of the year, I feel thankful toward our PGE colleagues who put in tremendous daily effort to keep costs down, since we recognize how customer prices are affected. Our expectation remains that O&M will stay largely flat across the full year, once wildfire mitigation work and major deferrals are excluded. Although plenty of work remains, it deserves mention that certain costs were front-loaded by us to lower operating risks. Joe will cover this further in his comments; additionally, we are carrying out our wildfire mitigation program, encompassing long-term investments and vegetation management. We welcome the arrival of new federal legislation that would let the US Forest Service grant approval for clearing hazardous trees close to power lines on federal forest lands. The headway we are achieving in lowering wildfire risk throughout our service territory highlights why the OPUC's recent approval of an automatic adjustment clause for wildfire mitigation costs matters, since it permits quicker recovery. Going forward, execution serves as our watchword throughout 2023 and beyond, as we ready the company for a stretch of accelerated growth. Our confidence stands firm in the 2023 guidance range of $2.60-$2.75 per share, and likewise in our long-term earnings growth rate of 5%-7%. Having said that, I'll pass things to Joe, who will guide you through our financial results. Thank you.

Joe Trpik

executive
#3

Thanks, Maria, for that kind introduction, and good morning to all of you. During my first four weeks at PGE, I've jumped right in, and I'm eager about the opportunities and challenges that await; next, I'll walk through our Q2 results, then share updates on capital investments as well as our liquidity and financing outlook. Turning to slide six. Results for the second quarter show robust load growth patterns across our area, power market conditions that were less favorable, a focus on prioritizing reliability and resiliency of the system, and progress executing our long-term capital plan. Within our service territory, the economy remains stable, with June unemployment in our region at 3.4%. Industrial customers continue to show strong demand growth, and we keep seeing significant development in a robust pipeline of projects on the horizon, particularly among data center and semiconductor customers. Weather-adjusted, Q2 2023 load totals rose 3% versus 2022; without weather adjustments, total load was up 4.1% year-over-year, reflecting less cold weather early in the quarter but warmer conditions later on. Residential load climbed 0.3% year-over-year, yet fell 0.3% on a weather-adjusted basis, since we experienced warmer temperatures along with more moderate population growth plus greater energy efficiency and DER penetration relative to 2022. Residential customer count rose 0.7% compared with the second quarter of 2022. Commercial load grew 3.7% year-over-year, or 1.7% weather-adjusted, as broad economic growth carries on. Industrial load stays robust, up 9.1%, or 8.3% weather-adjusted, with semiconductor, high tech, and digital customers continuing along their growth path. We also saw power market conditions shift versus a year ago, alongside ongoing demand growth in our service territory. You might recall that last year our region enjoyed more favorable market dynamics, largely because hydro conditions were 10% above average, which allowed power and fuel cost benefits to be realized. This year brought tougher conditions, with regional hydro performance running 20% below historical averages. Those factors affected both the price and availability of market power, which made PGE's generation fleet the most economical choice through much of the quarter. As a result, our purchases from the market dropped 23%, whereas our thermal generation facilities generated 40% more electricity compared with the second quarter of 2022. Because market power was harder to come by, we also had reduced flexibility to realize gains from reselling gas and power, which was not the case in 2022. Despite market conditions shifting so sharply from one year to the next, we continue to soften the effects of turbulent energy markets through solid risk management, and we are working toward helpful regulatory fixes for evolving market dynamics. I'll now turn to our financial results on a quarter-over-quarter basis. Total revenues increased by $0.16, driven by the 4.1 rise in total deliveries, particularly among industrial customers. As I mentioned earlier, power cost conditions in Q2 2022 were more favorable, and $0.19 of the quarter-over-quarter earnings change stems from those tailwinds not repeating in 2023. During the quarter, power costs for the current year also came in above what we had projected in our Annual Update Tariff, and that pushed EPS down by $0.04. Higher operating expenses, net of items tied to deferrals, reduced EPS by $0.09. The O&M drivers for Q2 2023 are as follows: $0.03 tied to greater generation maintenance under our multi-year maintenance cycle, as we get our gas and wind portfolio ready to run reliably through summer demand peaks. $0.03 tied to higher costs for system resiliency, grid inspection, and vegetation management. $0.02 tied to greater bad debt expense, since normal credit and collection work has picked back up after the pandemic, and $0.01 from higher labor and benefit costs; we saw a $0.05 impact from, from depreciation and amortization expense because of higher plant balances year-over-year, a $0.03 decrease from the impact of greater interest expense because of higher long-term debt balances and short-term debt balances carried during the second quarter. A $0.06 decrease from the diluted impact of draws on the equity forward sale completed in the first two quarters. We also had a $0.02 increase from other items, including $0.03 from greater returns on non-qualified benefit trust thanks to better market conditions, partly offset by a $0.01 decrease from higher property taxes and other miscellaneous expenses. Lastly, we had a $0.05 decrease from the previously disclosed $6.5 million Boardman revenue requirement settlement reached in May, which resolved the last of our major deferrals. This impact is adjusted out of our non-GAAP results for the quarter. Results for 2023 keep showing the firming of our foundation for long-term growth. Depreciation from continued capital investment, interest expense to fund those investments, and near-term dilution impacts created an incremental $0.14 of impact compared to the second quarter of 2022. Turning to slide seven, you'll see our updated capital plan through 2027. It reflects a $105 million bump to our projected 2023 base capital spending, driven mostly by customer growth — things like more hookups and road widening projects. It also captures anticipated CapEx for every asset tied to the 2021 RFP: $415 million goes to the Clearwater Wind Project, $360 million to the Seaside Battery, and $150 million to the Evergreen Battery. The 786 megawatts of renewable generation and non-emitting capacity resources we locked in during the latest procurement cycle will give our system more flexibility and mark a significant advance in our decarbonization efforts. We can't wait to watch those assets begin serving customers later this year and on through the years ahead. Now that the 2021 RFP is finished, we're turning our focus toward upcoming resource chances that will support additional momentum in our clean energy transition, make customer growth possible, and get the most out of system capabilities. We recently submitted an addendum to our combined Clean Energy Plan and IRP filing with the OPUC, and it made the modeling inputs more precise so they capture the estimated needs across our service territory. Further refinement is going to keep happening over the next several years, since the assumptions behind those estimates will become clearer. Then in Q3, we anticipate the 2023 RFP will be issued, and we're tracking additional milestones throughout 2024. Like Maria said before, we're not just thinking about generation and capacity investments — transmission resources are part of the picture too. We'll be working alongside local and regional partners to assess projects that bring the best benefits to our expanding customer base and back our decarbonization plans. So because of that, you might notice how these bars get attributed shift over the next few years as resource planning work continues. If we move to Slide eight, our liquidity position and balance sheet are still solid, and so are our investment-grade credit ratings and stable credit outlook. Available liquidity totaled $651 million as of June 30, 2023. Under the equity forward sale agreement that already exists, we issued $92 million in June, and then in July we finished issuing the remaining $92 million under that facility, since we're putting equity to work supporting our investments. For the rest of 2023, we expect debt issuances of as much as $500 million later in the year to fund capital projects, and wherever we can, we intend to issue those under our Green Finance Framework. Through our ATM program that was filed recently, we still have equity market availability, and we'll time that strategically to fund capital investments when the conditions are best.

Joe Trpik

executive
#4

Keeping dilution under control stays a key priority, and we'll keep matching equity issued to the cash we pay out for capital projects. We're still confident about our access to the capital markets and remain on track toward the 50/50 capital structure we're authorized for over time. As Maria mentioned earlier, it's good to see constructive movement in the 2024 GRC proceedings, and we anticipate ongoing engagement with the parties, including the next settlement conference scheduled for early August. Second quarter results show both continuing strengths in our service territory and challenges we plan to handle carefully across the rest of 2023. We expect 2023 load growth to match our expectations, driven by strong growth in our digital and high-tech customer group, and we stay confident in our full year weather-adjusted load growth guidance of 2.5%-3%. Careful management of power costs across the second half of 2023, which includes continuing to use our risk management programs to curb the effects of volatile power markets, will matter greatly. The third quarter matters a lot for annual power cost performance overall, given the weather and markets seen through July, especially with more renewable and storage assets participating in the region, we think we're positioned well for continued solid performance across the summer. You'll recall too that the fourth quarter of 2022 proved especially difficult, caused by colder weather, national pipeline constraints, and regional gas storage below average. Today's indicators suggest a fourth quarter closer to normal, and we'll keep using every strategy available to reduce the effects of market volatility. Controlling operating costs stays a top priority, as Maria covered, and I'm eager to bring my prior experience on this subject to PGE. Thanks to these efforts and our load expectations, we are reaffirming full-year adjusted earnings guidance of $2.60-$2.75 per diluted share. For PGE's long-term trajectory, 2023 marks a significant inflection point, and we stay focused on execution that bolsters PGE's foundation for sustained growth and value. Our solid service territory fundamentals, underscored by continuing industrial demand growth, a healthy capital investment profile, including emerging transmission opportunities, and the continuation of our operating improvements, will let us achieve our long-term earnings growth guidance of 5%-7%. As we look to the rest of 2023, we stay grounded in our ongoing commitment to deliver clean, reliable, and affordable energy that supports strong financial results and value for customers. I feel optimistic about our outlook and look forward to carrying on the long-standing collaboration among our coworkers, customers, shareholders, and stakeholders to reach our goals; operator, we're now ready for questions.

Maria Pope

executive
#5

Good morning, Julien.

Julien Dumoulin-Smith

analyst
#6

Hey there, morning, and once more, congratulations to Joe. I wanted to point that out here as well. Look, Joe, I'd really like to talk for a moment about some of the financing considerations. Clearly, you're increasing CapEx once more, which is a great signal, a great signal when it comes to customers. I just wanted to dig a little deeper — how are you approaching the financing requirements here, with somewhat more specificity over the medium term? I realize you offered some commentary on nearer-term matters, you know, ATM and so forth. Just to expand on that, particularly since this CapEx budget, you know, keeps rising literally quarter over quarter in sequence. And alongside that, perhaps this one leans more toward Maria — could you discuss, in particular, how this heightened industrial and data center outlook shapes your resource procurement? Obviously, you all released that IRP previously, and, and we've been discussing procurement as a result of it, for you all. How are you thinking about simply your capacity to. Your requirements when it comes to megawatt development, and, and how that aligns with the CapEx and financing plan as well?

Maria Pope

executive
#7

Sure. Let me begin with the business and the customer side, since, since clearly that will shape our financial needs, and, and Joe will pick it up from there. We're really lucky to be located in an area that's growing. Across a lot of the counties where we do business, we continue to observe people moving in; growth in electrification is something we're seeing in particular. The biggest source of growth for us is coming from semiconductors, plus cloud computing and data centers. To meet that demand — and I should mention that a lot of those customers are focused on clean energy too — we are working to satisfy it. When it comes to sustainability and cutting carbon, their views line up with the state and with Portland General Electric's strategy. So we're looking at some extra renewable procurement, on both the energy side and the capacity side, which is about 14% higher than what we initially submitted under our Clean Energy Plan. We're also looking at improvements to transmission lines we already have, boosting them up to the highest voltage levels, and putting in new transmission alongside and tied to a few things the Bonneville Power Administration recently announced on their end. To repeat, that transmission would be located in our service area, next to it, mostly involving repowering and reconductoring, and staying inside rights of way that already exist. When it comes to load growth in general, you know, we feel genuinely good about the legislative updates that came out of Salem during the last session and the backing for semiconductors as a whole. This industry matters a great deal to Oregon — for the employment we hope to keep and grow here, for our schools, and for the funding, permits, environmental concerns, and land-use questions involved — so that was a significant move. Analog's recent announcement makes clear how vital this sector is to the broader economy. Joe, would you go into more detail about the financing piece?

Joe Trpik

executive
#8

Absolutely, Julien — and good morning to everyone. Regarding how we intend to fund things, we're definitely dedicated to progressing toward that 50/50 capitalization target. You'd raised a question about the medium term. As I've already noted, I laid out what we're looking at on the financing side for the remainder of this year. The way I approach it is this: we obviously intend to keep ourselves on a course headed toward that 50/50 framework. What I want to ensure, going forward, is that we're weighing every possibility around cash flow and financing that's available to us — the chance to securitize some of our deferrals, the capacity to turn certain ITCs and PTCs into monetized value, plus the shifting cash flows arising as our rate base has expanded. Honestly, all of that gets factored into the analysis, while making certain that ultimately we stay on that 50/50 trajectory and keep advancing in that direction. Indeed, once we get into 2024 and these matters become clearer, that's when we'll genuinely begin to determine the way we carry that course onward toward 50/50.

Julien Dumoulin-Smith

analyst
#9

Understood. If I may push just a bit further, what's the timeline for reaching 50/50? And Maria, to clarify one thing — I realize you seem to have been quite focused lately on transmission possibilities too. There was some mention of that in your comments. I'd really like to know how significant that could end up being for the company's future. Of course, you've laid out a solid number of renewables, but it sounds like the transmission piece is probably the incremental element worth paying attention to as you plan, especially over the back half of the decade.

Maria Pope

executive
#10

When we consider transmission, it's also tied to how we view the whole grid. As you're aware, Julien, by the end of the decade, 25% of our resources are expected to come from distributed energy resources. As I said in my prepared remarks, we're clearly focused on federal dollars via the IRA and IIJA flowing into company projects together with partners. We also anticipate a substantial amount of IRA dollars, particularly, going to customers — whether that's rooftop solar, battery storage, electric vehicles; we see this as a kind of continuum and a mix. There will definitely be more procurement on the resource side, but that won't necessarily mean the traditional types of projects we've seen before; it will be a mix, and transmission will be a part of that.

Joe Trpik

executive
#11

Julian, let me address what you asked about timing, and I'll push on this a bit further. Obviously, big chances will open up for us to position ourselves at 50/50 as those major projects arrive. I want to be careful in how I put this, yet I should plainly map out a route that's genuinely going to be connected to, well, the outcomes of our future RFPs, plus certain added investments we make. What I'm really getting at is a direction and an unmistakable, straightforward shift that will genuinely correspond with what becomes available in what I'd term the incremental project.

Julien Dumoulin-Smith

analyst
#12

Yes, definitely. Wishing you both the best. Once more, Joe, congratulations. We'll talk with you folks shortly.

Maria Pope

executive
#13

Thank you, Julien.

Joe Trpik

executive
#14

Hello, everyone. Morning to you.

Shahriar Pourreza

analyst
#15

Morning. Maria, could we begin with the case? Of course, we value all the detail you folks gave regarding the settlement talks, but could you share a bit more about what the Faraday recovery might look like? What's the path ahead from here for that spending, in your view? Also, could you address, perhaps at a broad level, the conversations about the PCAM changes you've proposed? Have the other parties shown at least some openness to certain of the points you've raised?

Maria Pope

executive
#16

Certainly. To begin, we're quite happy with how far things have come. Several meetings have taken place between our team and the parties, and they've resolved quite a few matters, as I described. You know, Faraday isn't any different from the rest of the capital projects we've brought forward. I'd say that from northern British Columbia down to the southernmost areas of South America, plus other projects across the United States, hydro projects are never simple. What we replaced was a facility that had served our customers and produced power for more than 100 years, and my estimate is that once Faraday's facilities are refurbished, they'll run for another 100 years; and it's consistent low cost power, it's clean and reliable as we move forward. When we consider the PCAM and the rate case matters ahead, it's clear we still have capital left to settle, as we mentioned, O&M costs. ROE is also there, and PCAM contains several significant pieces. I believe a bit of background helps too. The PCAM mechanism in place with us was established roughly 15 years ago, essentially to tackle what certain leaders back then described as skin in the game on the company's side for plant operations, especially our coal plant operations at Boardman. Nowadays, you know, a lot of those conditions look quite different. Our volatility in energy prices and in the market really arises as we shift further toward renewables, as our markets have grown far more integrated, and we're balancing more renewables throughout the entire West. So the mechanism requires an update to match today's reality, as we move to a greater share of renewables, but a more integrated West-wide set of markets. So what we're putting forward is removing the deadbands, and having 90/10 sharing sort of right away from the baseline we establish through the Annual Update Tariff, each fall; that we exclude-... what I'd describe as the market excursions that typically stem from, significant events, what, many of which aren't even tied to our own operations. Those frequently trigger energy electric alerts across the Western Interconnection. These are fairly recognizable and can be set up; in addition, our aim is to put in place a 2.5% cap on prices during any single year, meaning the remainder, if there are deviations going beyond that level, would carry over into later years, and this would apply both upward and downward. That involves considerable intricacy. What I believe the real challenges come down to is figuring out how we navigate shifting market circumstances and grasp the interplay among the parties, then reach understandings as we go along. Up to this point, the conversations have been cooperative and will definitely continue. None of these subjects is simple.

Shahriar Pourreza

analyst
#17

Understood. That's useful. Maria, there's been quite a bit of chatter lately regarding wildfires. Oregon doesn't have inverse condemnation, but one of the utilities near you has been facing negligence claims. Could you address what conditions look like throughout the territory right now, plus any other procedural or legal issues, given that your latest plan received approval?

Maria Pope

executive
#18

Of course. To start, we never discuss litigation, whether it involves us or peer utilities in this region or elsewhere. I'd note that we are extremely happy about the automatic adjustment clause approval we received this May, which lets us recover wildfire costs prudently, covering both O&M and capital. Going forward, conditions are quite dry throughout the Pacific Northwest. You've likely seen plenty of coverage of wildfires in Canada very early in the season. That's not typical; as a company, I'd describe us as being on heightened alert. When I consider wildfire, I tend to break it into a few major categories. The first is continuous prevention and mitigation of wildfire, which spans everything from vegetation management to the way we operate our distribution system and transmission system, to the way we use technologies — high definition, AI-focused cameras — that have helped a great deal, weather monitoring, all of those kinds of elements. We collaborate very closely with our local communities, first responders, and fire marshals, to ensure we have the best information; we also engage regularly with the Oregon Department of Forestry, US Forest Service, and BLM.

Shahriar Pourreza

analyst
#19

Yep.

Maria Pope

executive
#20

Detection is what the next category centers on. That is the area where speedy reaction matters most, and where those connections along with that technology truly prove their value. After that comes fast action, ensuring that should any sparks appear, we can extinguish them without delay. This demands substantial effort. It is unquestionably something done throughout all 12 months, and it represents a different operating reality that exists for us now and will continue to exist going forward.

Shahriar Pourreza

analyst
#21

Great. Thanks, everyone, for giving us plenty of time. Joe, congratulations on the role. I appreciate it.

Joe Trpik

executive
#22

Okay, thanks.

Maria Pope

executive
#23

Thanks, Shar.

Richard Sunderland

analyst
#24

Hello, good morning. Am I coming through?

Maria Pope

executive
#25

Yes, we hear you. Morning.

Richard Sunderland

analyst
#26

Thanks, that's great. I'll touch on just a handful of points here. You went over part of the CapEx increase during your prepared remarks. I'm curious whether those patterns ought to keep going compared with what you've planned for 2024 and later — does that also tilt CapEx toward the upside in future years relative to the most recent 2023 bump?

Maria Pope

executive
#27

Yes, I'll hand this one over to Joe to handle. One thing I believe we ought to keep in mind is that our CapEx mirrors what customers require; we've been struck by how many new connects have kept coming even as interest rates rose, and by the volume of municipal work especially. Road widenings — Joe brought those up in his prepared remarks — but beyond our big digital and semiconductor customers, we keep seeing growth across our region. Joe, would you like to speak to that a bit more broadly?

Joe Trpik

executive
#28

Certainly, Richard, hello. You know, looking further ahead, our long-term capital includes a figure of $800 million, which we refer to as base capital. Regarding what Maria said, we'll keep reassessing constantly, since as we observe what I'd term our customer demand or items tied to customer growth that might add to that $800 million, we'll seek to make an adjustment to our long-term plans. We wish to keep monitoring where customer growth is headed. Naturally, our forecast incorporates a number of connections, road widenings, and similar things for customers. Such items can fluctuate, and if that trend keeps holding at an elevated rate, we'll assess whether there's space in the budget to move something else aside, or whether we must examine that long-term figure of 800 to see if it ought to be higher. We'll keep doing this. We'll do so with our upcoming Annual Update, which we perform here, and then clearly, that will be something we're watching as we move ahead.

Richard Sunderland

analyst
#29

Got it. Got it. That's really useful. So now let me shift over to the NVPC forecast. The person asking earlier made their point quite clearly, but I'd like to dig a bit deeper into the comparison between what we've seen through three quarters so far and what's expected in the fourth. It, it, it does sound as though the trends across those three quarters have been significantly stronger than in the first half. And then, if you adjust the fourth quarter against the difficulties we faced a year ago, you arrive at your guidance measured against the baseline, compared with how the first six months actually played out. Is, is that, you know, is that basically the right way to think about it? I, I suppose what I'm really trying to get at is what you've observed up to this point in the third quarter and how far that carries you toward the target, versus what still has to materialize in the fourth quarter.

Maria Pope

executive
#30

This is one area where change has come quickly across the past 24 months — I'd say faster than any of us anticipated over such a brief window. Even though we had predicted the fundamental problems, they arrived at a much quicker pace. I've been genuinely impressed by how our team has adapted, and how, with every stretch of time, we're more ready, with added flexible capacity and additional tools. Obviously, the shift in hydro conditions between this point a year ago and now has made a substantial difference. As you enter the third quarter, there is almost never surplus hydro, since it all flows down through the river systems, apart from a handful of exceptions — perhaps in northern British Columbia. What I'd say is that, looking ahead to where we're headed in the third quarter, we're in a strong position. We obviously face event risk — whether that's our own plant operations, which are especially difficult to keep running under severe weather, especially heat, or more broadly the region as a whole. But we feel — and as one of our leaders said to me recently, quoting me, "We have more pep in our step" — as we head into the third quarter, and we certainly hope we won't see a repeat of the truly extraordinary, you know, $40, $50 natural gas prices and the extreme problems during the final two weeks of December in the past year.

Richard Sunderland

analyst
#31

Understood. That’s very clear. Thanks for making time today, and Joe, congratulations to you too.

Joe Trpik

executive
#32

All right. Thanks.

Anthony Crowdell

analyst
#33

Hi there, morning, Joe — congratulations on the new position. Just a few fast questions from me. I suppose to start, on earlier slides you folks pointed to an 8.5% rate base CAGR. That figure is gone from this deck. So when should we expect an update regarding rate base growth?

Joe Trpik

executive
#34

Good morning, Anthony. We provided illustrative guidance on how rate base growth might look over the long term. As we move into our next year, we'll refresh that, covering both what we refer to as our base case — which, as I recall, is what we showed with a 25% win rate on the RFP — and also a potential case tied to a more favorable outcome; we'll keep updating that, Anthony. Nothing in our thinking has shifted in a way that would lead us to lower it. As a reminder, Anthony, there's a second set of materials available where we include what I'd describe as a soft update, one that simply captures the minor changes. In what we'll call the investor presentation, which was also sent out, you'll find an update reflecting both the base and the periodic. Once more, I'd term those soft updates for the small adjustments we've made here, absent any sort of longer term assessment. With luck, you're able to view that attachment.

Anthony Crowdell

analyst
#35

Hey, sorry about that. Should we expect a fresh update at something like EEI or during the third quarter call, or is a firm update more likely to come as a year-end update?

Joe Trpik

executive
#36

Once we put out our new capital forecast for 2024, that's when we'll provide a firm update. In the past, that's been done during October.

Anthony Crowdell

analyst
#37

All right, excellent. So, I suppose moving between topics here, Maria, when you brought up the PCAM and the shifts in power markets that have affected your area — with greater renewable penetration, the Western Zone, and all of that — are the interveners essentially pointing out that the PCAM isn't as volatile as it used to be, and perhaps that's part of why it's difficult to already fold that into the partial settlement? Or instead, have the problems turned into an even bigger obstacle, maybe harder to adjust and bring into the settlement?

Maria Pope

executive
#38

Well, I'd say those discussions are still happening, and in my view it's too soon to draw any conclusions from them. Without a doubt, market volatility is greater now than previously, and definitely greater than at the time the PCAM was designed, when there was abundant surplus energy throughout the system — especially hydro power — and less dependence on renewables that swing based on wind and solar conditions. I'd say that generally, there's fairly solid awareness at a high level regarding how energy markets are transforming. They're obviously Westwide. We benefit from many offsets, because of differing temperatures and operating conditions separating us from the desert Southwest. You observe considerable effort toward markets, toward deeper market integration, whether through the California Independent System Operator or through SPP's Markets+. Above all, there's enormous agreement regarding resource adequacy requirements. The Western Power Pool's leadership on this is outstanding. One factor behind the added capacity you can see in the region as we move toward the August period is that organizations are genuinely pursuing more transparent and coordinated resource adequacy. That's producing a major impact. Undeniably, plenty of work remains with interveners; we engage in this daily. They def — they don't necessarily engage in it, and the financial matters are substantial.

Anthony Crowdell

analyst
#39

Okay, and for my final question, Joe — my understanding is that the rate case already resolved how the capital structure will look. If you get a complete settlement, or if that matter ends up being litigated, would the result speed up the company's goal of hitting a 50/50 ratio?

Joe Trpik

executive
#40

Honestly, I don't see that happening. A favorable result certainly helps us on the financial side. That said, we intend to remain on a long-term course and stay focused on steady progress toward 50/50, in line with what I'd describe as our primary capital. A near-term event, in my view, wouldn't push us off that path in either direction, because what we're aiming for is genuinely a long-term structure.

Anthony Crowdell

analyst
#41

Appreciate it once more. Nice work on the position, Joe, and I'm grateful you're fielding my questions.

Joe Trpik

executive
#42

Thanks.

Maria Pope

executive
#43

Thanks.

Maria Pope

executive
#44

I appreciate everyone being here today. We're grateful for your interest in Portland General Electric. We're eager to continue these discussions. My understanding is that quite a few of you will actually be sitting down with Joe and the rest of the team in the coming week. Many thanks, and I hope to connect with you before then, or at the very least at EEI. Thanks.

Operator

operator
#45

This concludes today's conference call. Thank you for participating. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Portland General Electric Company transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Portland General Electric Company earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research