Thanks, Jonathan. Hello, everybody, and good morning. It's great to have you with us today. Before we get started this morning, I want to point out that a presentation has been put together to go along with what we'll be discussing, and we'll be using it as a reference during this call. You can find those slides on our site, investors.portlandgeneral.com. If you look at slide 2, certain comments we make this morning will be forward-looking statements. Please be aware that statements of that kind carry risks and uncertainties that are inherent, and our actual results could end up differing materially from what we expect. To learn about some of the factors that might lead actual results to differ materially, take a look at our earnings press release along with our latest periodic reports on Forms 10-K and 10-Q, both of which you can access on our website. Now let's move to slide 3. Maria Pope, who serves as President and CEO, and Joe Trpik, Senior Vice President Finance and CFO, are the ones leading today's discussion. Once they've finished their prepared remarks, we'll open up the line so you can ask questions. At this point, I'm glad to hand the call over to Maria.

Maria Pope

executive
#2

Nick, thanks, and good morning everyone. We're glad you could join us today. Looking at our second-quarter performance, you can see we've kept our attention squarely on execution while maintaining a consistent upward growth path through 2024 and afterward. Starting with slide 4, I'll go through what mainly powered our Q2 financials. For the quarter, GAAP net income came in at $72 million, equal to $0.59 per diluted share. Set that against Q2 of 2023, when GAAP net income was $39 million, or $0.39 per diluted share, alongside non-GAAP net income of $44 million, or $0.44 per share. Joe will get into the specifics, but three areas drove these results. To begin, we saw ongoing expansion and need coming from industrial clients, mainly those in semiconductor production and data centers. Next, there was favorable weather during the second quarter along with strong power cost results. And third, we kept prioritizing cost control and reducing risk. Although these figures represent progress compared to 2023, we know additional effort is required; we stay committed to hitting this year's targets and boosting our ROE closer to approved levels. Now on slide 5, I want to begin by acknowledging my PGE teammates, who put in tremendous effort throughout the regional heat wave. During early July, we experienced record-breaking high temperatures across five straight days, which matched conditions in other parts of the west. The way we held up through that stretch of severe heat shows how much we've gained from new procedures and workforce instruction, from securing extra hydropower and a wider mix of wind generation, and from the dollars we put into capital projects and technologies that made our equipment more dependable and improved how we manage power supply. Those same deliberate investments reflect our commitment to keeping costs manageable, and they demonstrate how thoughtful preparation has cut down on the sharp price swings that used to hit customers during severe weather. I'd also like to acknowledge how much our customers contributed throughout this event. During the hottest hours, they stepped up with substantial demand response measures, cutting their power use by 109 megawatts — the biggest shifts in electricity demand we have ever recorded. Taken together, what everyone did while the weather was at its worst made an enormous difference. On top of that, through this stretch of intense heat and the parched circumstances we're encountering, reducing wildfire danger continues to be a top priority. Hardening our grid, controlling plant growth, and refining how we operate day to day — all carried out year-round — form the foundation of this strategy, which is built around assessing risk. Wildfire season got its official start in June, and since then we've put in place stronger protection and control configurations, such as reclosers, switches, and additional gear. These upgrades work alongside our monitoring resources, which feature 360-degree AI cameras plus weather stations, feeding valuable information and greater situational awareness to our crews, nearby agencies, and emergency personnel. Wildfires continue to be a major concern for our sector, and tackling this society-wide danger demands ongoing collaboration with regulators, lawmakers, insurance companies, and public sector organizations. Turning to expansion, we remain fully concentrated on our continuous request for proposals covering renewable generation and capacity, since we are striving to meet our clean energy targets. The window for submitting bids closed during April, and after assessing those bids, we submitted an initial list of shortlisted projects to the OPUC at the start of June. Yet again, we see strong interest in both generation and capacity resources, covering a mix of wind, solar, battery, and pumped hydro projects that will now move into more thorough evaluation. We expect to have the final project shortlist in August, and to select the winning bids during this winter. We want to keep the momentum going from those recent RFP wins — Clear Water Wind and three battery projects included — so that customers get the next round of clean power that's reliable, secure, and affordably priced. Beyond the RFP process, PGE is looking at ways to accelerate the shift to clean energy and to take advantage of extra low-cost renewables; on our last call, I mentioned that PGE is participating in CAISO's Extended Day-Ahead Market, or EDAM, which aims to support more renewable integration across the West. On top of that, our transmission initiatives centered on upgrades inside our service area continue advancing in order to accommodate customer growth, and we are likewise working alongside tribal partners, Bonneville Power Administration, and additional regional utilities and stakeholders to move ahead on essential transmission build-out that will unlock more economical renewable supply; as an illustration, PGE entered an MOU in May with Grid United and ALLETE covering development of the North Plains Connector, linking three regions: SPP, MISO, and WEC. Such plans underscore the significant work our industry is doing to create a cleaner, more dependable energy network that fosters economic expansion for everyone. Our resource planning efforts — particularly vital given the load growth occurring throughout the region — are advancing nicely; we continue to see stronger confirmation of our service territory's direction, highlighted by substantial industrial load growth from semiconductor fabrication and technology infrastructure clients. During the second quarter, industrial load rose 6.2% on a weather-adjusted basis versus the equivalent quarter in 2023. Oregon's leadership continues concentrating on reaping the rewards of recent legislation and industry tailwinds. Those endeavors are paying off, with extra federal and state CHIP Act money reaching local projects. Alongside Intel's recently announced $36 billion, LAM Research is putting the finishing touches on a new R&D facility in Tualatin; and Analog Devices and Siltronic are each expanding, in Beaverton and Portland respectively. We are also observing considerable expansion within our region's data center segment. These clients benefit from the transpacific subsea fiber landings along the western edge of our service territory, comparable to the transatlantic network landings in North Virginia. Expansion from these two vital sectors amounts to a thrilling prospect for our region, delivering quality jobs and infrastructure upgrades on a scale unseen for more than 50 years. I'll now briefly address our 2025 general rate case, which Joe will discuss in greater depth during his comments. Earlier this month, our teams obtained OPUC staff and intervener testimony, and we will build upon recent constructive conversations at the settlement conferences ahead. Teaming with customers, interveners, regulators, and legislators to devise imaginative answers to the opportunities and difficulties emerging across our service territory and industry is essential. We anticipate carrying these discussions forward, including a workshop taking place later today. Turning our attention toward the back portion of 2024, our approach continues to be solidly anchored in reshaping the utility we operate locally so we can meet the expanding requirements of customers, putting resources to work in a way that boosts our ability to withstand severe weather, keeping costs manageable for every customer; we stay committed to hitting our goals, carrying out our strategy, and generating worth for customers, communities, and shareholders; having said that, I'll pass things along to Joe. Joe?

Joe Trpik

executive
#3

Thanks, Maria, and good morning to all of you. If you'll turn with me to slide 6, what you see in our Q2 results is the product of our ongoing emphasis on execution and managing costs, along with additional expansion in semiconductor manufacturing and data centers, plus a solid showing on power costs. El Nino affected our region during the entire quarter, bringing somewhat warmer weather in April and then cooler weather in May and June. Overall, Q2 2024 load was down 2.2%, though on a weather-adjusted basis it rose 0.9% against Q2 2023. Residential load for Q2 2024 fell 7.1% year-over-year, or 1.1% weather adjusted. What drove that was lower consumption from each customer, since efficiency measures kept gaining traction. That was partially balanced out by residential accounts increasing 1.7%. On the commercial side, load fell 4.2%, which becomes 2% once you adjust for weather, largely attributable to efficiency initiatives among commercial users. Growth continued among industrial customers, whose load climbed 5.5%, or 6.2% on a weather-adjusted basis. Technology infrastructure and semiconductor manufacturing clients continued to show strong demand, and the project pipeline we have in that space stayed healthy. Given these patterns, our confidence in the territory we serve has only grown, which is why we are reaffirming guidance for 2024 weather-adjusted load growth of 2% to 3%, as well as our longer-term outlook for load growth of 2% through 2027. Turning to how we did financially compared with the prior quarter: revenue fell by $0.05, mainly because weather cut into deliveries; we picked up $0.09 by getting our cost structure right and through gains in wildfire mitigation, vegetation management, other O&M, and capital assets that serve customers. Where EPS is concerned, power costs added $0.16, and that figure breaks down as a $0.04 EPS bump related to power cost detriments from Q2 2023 that flipped the other way in this comparison, along with a $0.12 EPS lift from derisking moves and mild conditions across the quarter, which kept power cost below what the annual update tariff had projected. Finally, other items added $0.05, including higher AFUDC, better returns on non-qualified benefit trust assets, and lower income tax expense largely from tax credit impacts, partly offset by dilution from recent equity draws. Let's go to slide 7 for our capital forecast. Our 2024 plan keeps advancing, covering base investments, transmission projects, and incoming consumable and seaside batteries. As for the RFP, as Maria noted, work continues as expected on refining the bids from the initial shortlist filed in June. That initial shortlist contained roughly 3 gigawatts of nameplate renewable and capacity resources across 22 distinct bids, many offering multiple configuration options. Some component of build transfer ownership options appeared in about 45% of those bids. Evaluation of bids will carry on toward a final shortlist filing next month, and we'll keep you updated as we're able to share more. I'll repeat that no possible forthcoming RFP projects are included in our capital plan. Any potential updates to our capital forecast would come after bid selection and contract execution, now anticipated in Q4 2024 or Q1 2025. Now let's move to slide 8, where we sum up liquidity and financing. As of June 30, we had $990 million in total available liquidity. Our investment grade credit ratings and our solid balance sheet are the same as what we last disclosed. One item I'd like to flag: back in June, Moody's moved PGE's outlook from stable down to negative, even as it kept our credit ratings where they were. We communicate regularly with both S&P and Moody's, and we're putting in serious effort to hold onto the ratings we currently have. Our plan is still to bring as much as $300 million of debt to market during the back half of this year, with the proceeds going toward capital expenditures. On the equity side, the base capital plan we have right now lays out plainly what we'll need in the coming years. Between 2024 and 2026, we're looking at needing about $300 million each year to support our base capital investments and to keep improving our capital structure over the next several years. With our equity ratio getting stronger, we anticipate that the yearly base requirement will ease somewhat once 2026 passes; during 2024, we moved forward on that approach. To start, I want to stress that we fulfilled our equity requirements backing both our base capital plan for 2024 and our management of the capital structure. In Q1, we pulled down $78 million through the ATM, and in Q2 we entered into further forward sale agreements so that the full $300 million ATM facility would be utilized. As of the close of June, the ATM portion that had been priced during the second quarter remained unsettled. As part of getting ready for what's ahead, and in line with that strategy, we filed a new at-the-market registration earlier today. With this new shelf filing, we're able to issue incrementally over several years, and just like the program we had before, it contains a forward element. This updated ATM provides us with an additional useful instrument and the best possible flexibility while we move through our financing plan — it lets us tap the equity market when opportunities arise and match issuances closely with accretive investments. Should we take any action under this new ATM during this year, it would help us preserve our robust credit metrics, which back our 2025 base capital plan along with our long-term management of the equity ratio. As usual, our approach is to bring in capital when favorable conditions arise, helping fund investments tied to rates, and we'll look at ways to reduce risk in our financing strategy by using the forward feature. We're keeping an eye on the RFP bid selection since it's getting close, and we'll share updates with you. On the whole, if any ownership chances come from the RFP, we'd expect to fund them consistent with our approved capital structure, and we feel good about how flexible our financing can be for possible ownership choices. What we've done on the financing side this year shows how we've performed in both debt and equity markets, and our confidence in demand and what we can deliver hasn't changed. We are dedicated to carefully managing our capital structure and dilution, preserving strong credit metrics, and competitively accessing capital markets to support accretive rate-based investments that deliver strong benefits to customers. Now moving on to the 2025 general rate case, which is working its way through the middle phases; this filing continues to focus on capital projects that deliver lasting value to every one of our customers, such as battery storage initiatives that enhance power cost management and grid flexibility, distribution spending aimed at grid modernization, network reliability and system resiliency amid rising extreme weather, plus transmission investments that support customer growth and renewable resource integration. Testimony to open proceedings has already been filed, and several settlement conferences are on the calendar over the summer months, with one taking place later today; we're eager to keep working constructively with stakeholders as this case moves forward. The filing will undergo review across the remainder of the year, addressing rates that take effect when 2025 begins. Every one of these items still requires OPUC approval. Results for Q2 show us carrying on with our 2024 plan and beyond. With the progress we've made so far, we are restating our adjusted guidance range of $2.98 to $3.18 per share, along with our longer-term guidance for earnings and dividend growth of 5% to 7%. As we move into the second half of 2024, our attention stays fixed on controlling expenses, investing capital wisely, and planning carefully so that customers, shareholders, and the communities we support gain the greatest possible advantage. At this point, operator, we're prepared to take questions.

Nick Campanella

analyst
#4

Morning, and thanks for fielding my questions. Joe, you mentioned a moderate drop in equity requirements once 2026 passes. I realize you just renewed the ATM. So how are you viewing the yearly equity run rate through 2025 at this point? And it sounds as though this ATM's size covers any shortlist editions. Is that the correct conclusion? Thanks.

Joe Trpik

executive
#5

Thanks, Nick. Over the coming years, equity needs come to roughly $300 million under the base plan we've laid out, which handles both the capital plan and repairing the balance sheet. Beyond that, you'd expect a plan moderately lower than that — say around half of it — to roughly sustain our investments exceeding internal cash flows.

Nick Campanella

analyst
#6

All right, that's helpful. So, regarding how things have been running through July, I found the remarks about DER response quite interesting — how are you tracking relative to your baseline and your PCAM at this point? Also, you mentioned some derisking moves this quarter related to power costs that you capitalized on, so how are you feeling about that for the remainder of the year? Thanks.

Joe Trpik

executive
#7

When we look at our operating environment so far and consider the power markets, clearly we've discussed that load has been lower, yet we've also observed only a modest degree of volatility in those power markets. Taking that reduced load together with the power markets and the chances it has created for us, we currently sit $52 million under the baseline for the PCAM. By year-end, we do anticipate returning inside the dead band, given that the third quarter brings the greatest volatility in both market and weather conditions that we'll encounter. Still, the derisking completed so far, in our view, has genuinely produced this lower volatility, which let us move somewhat ahead on the PCAM and handle this extreme weather. So I'd say it's working well, and much of the derisking we anticipated has indeed come to pass during this year.

Shahriar Pourreza

analyst
#8

Morning, Joe, Maria and Nick. Fine. Perhaps a very broad question to kick things off — you have that 2% load growth sitting out there, and the environment clearly looks like it's running hotter than that, not like semiconductors and data center demand. What's the right way for us to think about how you'd want to bring the street up to date from here regarding earnings growth? We understand you'd rather stay cautious, that's clear, but might you reach a stage during the coming few quarters where you can at least describe, in a directional way, where you sit against the upper half or the top end of that 5% to 7%?

Maria Pope

executive
#9

Certainly. Thanks, Shah. Well, to begin with, we're experiencing solid load growth coming nearly entirely from the industrial segment, and to give some context, half of that industrial segment consists of semiconductors, whose growth rate is somewhat more modest than what data centers show, though likely extending over a longer period; we foresee expansion at several of our semiconductor businesses across the coming decade. 20% of our customers sit in the fastest expanding portion of that industrial category, our data centers. And in that area, growth is genuinely quite substantial. Beyond the infrastructure spending on new substations and transmission, we're likewise witnessing a need for larger quantities of renewable energy. We'll bring all of you up to date with our IRP results, likely in early 2025. That is probably the thing that would move our growth rate more than anything else. Above all at this moment, we're in the middle of a competitive bidding process and feel fairly encouraged by the pricing levels we're observing and the strong bids.

Shahriar Pourreza

analyst
#10

Understood. I don't want to box you in here, but might that refresh come with the year-end call, around February, or would that be premature given where the IRP stands?

Maria Pope

executive
#11

Yeah, that's typically the point when our annual guidance gets issued. I'd also like to recognize that we're juggling quite a few things; we're juggling the need for more infrastructure, clearly, wildfire spending, the affordability strain being felt everywhere, and on top of that, just how the timing works out for so many of these investments being made by our customers.

Shahriar Pourreza

analyst
#12

Right. Okay, that's useful. And I realize you both addressed this briefly, yet the settlement conference on today's schedule — clearly, the testimony so far has been rather intriguing, with some pointed remarks from <<inaudible>>. From where you sit, what's the likelihood of settlements now? Was there a moment when you were nearest versus farthest from agreement?

Maria Pope

executive
#13

Sure. And I value that a good deal of language and positioning has shown up in the rate case testimony submitted; through the years we have collaborated, and we maintain solid ties with every one of our interveners and parties. And in fact, the discussions are progressing well and are fairly productive. And we do recognize that what matters most is serving our customers, with affordability at the forefront of our thinking. Something I would mention is that Forrester recently named us the nation's leading utility for customer experience, based on our effectiveness, how easily customers can engage with us as we deliver our products and services, and genuinely how positive they feel regarding their dealings with Portland General. So all the effort that backs our customers each and every day makes us truly proud.

Richard Sunderland

analyst
#14

Hello, and good morning. Thanks for making time for us today. Let's begin with transmission — your release included some wording about what you're doing on that front. I'd like to hear you expand on it a bit. I realize this subject has come up often during the last 12 months. Does this hint at something fresh on the whole when it comes to potential capital across 5 years, 10 years? And should that be true, what portion of it sits inside your current 5-year capital plan?

Maria Pope

executive
#15

Of course. As you're aware, we started reporting transmission as its own line in our capital expenditure table, since — going back to what Shah said earlier — our customers' needs keep growing; we genuinely think about transmission through what you might call 3 circles; the initial one being existing rights of way located within and next to our service territory, and those are really places where we're facing significant customer growth in particular load areas along with particular constraint points in our region. The second is transmission, meaning throughout Oregon we're partnering with quite a few parties, above all the competitive trades of Warm Springs. They were awarded a grant of $250 million to enlarge the transmission line that we own, which runs more than 100 miles, and those kinds of projects done jointly with others, and then third, truly operating across the whole region. You've observed our efforts alongside the Bonneville Power Administration, and they've declared $2.3 billion in transmission spending. A lot of that would help our customers here, and beyond that we're examining items such as the North Plains Connector together with Grid United and ALLETE, linking 3 separate regions spanning the whole country so as to open up access not just to renewable energy and varied geographic settings and time zones, but also to places where excess renewable energy already exists in the ground. So for a business such as Portland General, we truly view this as a risk-adjusted approach to handling transmission and fast customer growth.

Richard Sunderland

analyst
#16

Got it, that helps, thanks. Moving on, I appreciate what you said a bit earlier regarding the wildfire season and those enhanced line settings. Could you give us a bit more detail on what conditions look like locally and how the relative risk stacks up this year against previous ones, and likewise I suppose I'm wondering where state and federal involvement is heading in your eyes when it comes to a framework for tackling that risk.

Maria Pope

executive
#17

Absolutely; let me start by pointing out that a large portion of Oregon sits at level five. That shift came about recently because of all the lightning storms we've had across the last week to 10 days. Right now, more than 130 fires are active in Oregon, and a good number of them lie to the east of the Cascades or well further south in the state near the California line. We treat fire as a very serious matter and are especially watching how it affects our facilities in more remote locations. At present, no wildfires are burning within our service territory; and for a long time we've concentrated on preventing wildfires, really centered on planning, investments, and hardening the system. On mitigation, we've ramped up our vegetation management substantially, acknowledging what the past three years of extreme heat have done, beginning with the heat dome in June of 2020. We've observed widespread tree mortality, which has pushed the vegetation risk up considerably; and knowing the science behind that, we've genuinely increased our spending there; and third, detection along with early mitigation; that ties back to your question about our coordination with first responders; we engage at the most local level, in each county and community, alongside firefighters, first responders, and community leaders who care deeply about wildfire danger and who bring plenty of questions and back-and-forth with us. Yet the key thing for those first responders is that they can reach the very same data we use, through the AI cameras and straight into those cloud providers, enabling a response far quicker than we could have managed on our own.

Paul Fremont

analyst
#18

Thanks. Morning, everyone. I was hoping for some additional clarity regarding the equity, that planned equity issuance. Is it right to think the $300 million gets issued evenly, so $100 million per year, ‘24 through ‘26, and with the ‘78 million already issued so far this year, does that suggest another $20 million of equity is planned for this year?

Joe Trpik

executive
#19

Morning, Paul. How are you doing? To be clear, the equity plan is $300 million per annum. This year we've already put out $78 million. Beyond that, there's still money left from the $300 million we intend to direct toward incremental debt capital financing during the current year. After that, we'll require another $300 million annually across each of the following two years, which will cover the capital plan and take care of balance sheet requirements, until our equity needs eventually shrink to a smaller amount for funding incremental capital.

Paul Fremont

analyst
#20

Alright, so that $100 million for this year, would that come on top of wrapping up the ATM that's already in place?

Joe Trpik

executive
#21

No, not exactly. On the ATM, we've issued and drawn $78 million so far this year. There's still an amount we've issued that we expect to draw during the second half of this year to support our capital plan. So in the end, draws during this year would total $300 million in 2024.

Paul Fremont

analyst
#22

Alright, so we're looking at $300 million altogether for '24, and then for '25 and '26, it's $100 million each year?

Joe Trpik

executive
#23

It's $300 million annually. Yes, when it comes to our capital plan, what we have set for '25 and '26 averages slightly above $1.2 billion, and that extra portion beyond what our operating cash flow generates would be sourced through debt and equity, along with some balance sheet measures we've prepared, all aimed at reaching our optimal capital structure.

Paul Fremont

analyst
#24

Alright, that's helpful. Now, regarding the North Plains Connector, when do you expect construction on that to wrap up?

Maria Pope

executive
#25

Absolutely — what they're aiming for is to take advantage of the expedited NEPA procedures, which take only around two years, and to break ground in 2027, with the project finishing in roughly 2029.

Paul Fremont

analyst
#26

So is any of that included in the CapEx plan you have right now?

Maria Pope

executive
#27

No, it isn't.

Paul Fremont

analyst
#28

Regarding the weather during this quarter thus far — could you provide some perspective on what conditions have looked like in July up to now?

Maria Pope

executive
#29

Absolutely. To begin, after a very gentle April-through-June stretch, record-breaking heat arrived across much of the state during the early days of July, especially within the territory we serve. Conditions have eased since that point, turning considerably chillier. On the whole, things remain rather arid, and the hydro situation we're observing has actually slipped a bit compared with the same point a year ago — the Columbia River specifically sits near 75% and 73%, whereas it was roughly 80% at this time last year. That leaves us with fairly severe circumstances through the rest of the third quarter, and ideally cooler patterns will emerge as weather shifts while we move ahead into 2025.

Paul Fremont

analyst
#30

Then, as my final question, do you have any sense of when you might file your subsequent rate case, and does that hinge on the outcome of the RFPs?

Maria Pope

executive
#31

There are definitely numerous conditions at play. The main one is the rate case we are currently involved in, and the active conversations around it are truly where our attention is. Depending on how that goes, along with several of the proposals we submitted in an effort to establish a larger interval between yearly rate cases, I believe everyone would gain if we could arrive at those kinds of resolutions.

Sophie Karp

analyst
#32

Hello, and good morning, everyone. I appreciate you taking my question. I have a few big-picture questions for you. I'm simply curious whether, given that your growth prospects are speeding up along with the need for more investment down the road, you'd continue to view ATMs as the appropriate instrument for raising equity to support that kind of growth, or whether you might ultimately shift toward alternative financing methods. For instance, what would serve as the tipping point for that decision?

Joe Trpik

executive
#33

Yeah, I do believe that yes, eventually alternative financing methods will become appropriate. The ATM is effective. It gives us a degree of flexibility when it comes to our base capital plan, when it comes to the RFP result we anticipate in either the fourth quarter or the first quarter of next year, and also any possible extra growth that emerges or gets identified via the next IRP. Assessing alternative financing methods according to how large and how scaled those are is something we will need to do in order to truly maximize our options and flexibility. So yes, I believe the ATM is effective for the base case, but we will reconsider as we discuss growth.

Maria Pope

executive
#34

Also, Sophie, I'd like to point out that we've been putting a lot of effort into getting the most out of government grants and tax equity. The projects we have underway right now come to roughly $2 billion in federal funds. Of course, there's the $1 billion hydrogen hub, where we're providing the Boardman's site, an offtake agreement, and water rights, plus the $250 million for the transmission line in the state of Oregon that I mentioned. On top of that, there's $50 million for smart grid investments, along with the PTCs and ITCs from our newest wind farm in Montana, and then some of the batteries, which adds up to more than $400 million, directly lowering, offsetting what we've invested in those, and cutting the effect on customer prices and our financing needs. So we'd also anticipate being able to make very effective use of PTCs and ITCs from upcoming RFPs.

Sophie Karp

analyst
#35

Understood, thanks — that's useful. Then I was simply wondering whether your thinking has shifted at all regarding the creation of an entire core. I realize this topic has come up before and remains relevant, but I'd like to know if you're considering the timeline involved — is this still something you view as very long term?

Joe Trpik

executive
#36

At present, nothing sits in our near-term plans when it comes to a holdco. That said, when we discuss the company's continued growth over a longer horizon and upcoming RFPs, weighing a holdco — along with what advantages one would bring to customers and to the structures — is plainly something we're evaluating. Even so, it isn't something occupying immediate consideration.

Maria Pope

executive
#37

Sophie, here's something worth noting — among utilities, it's rare to lack this kind of setup, and we happen to be in that small group. As I recall, only 3 of us remain nationwide. So naturally, we're examining ways to get the most out of inexpensive financing so that the projects we must undertake for our customers come out ahead.

Gregg Orrill

analyst
#38

Yes, thank you. Good morning, and I appreciate you taking my question. Regarding the RFP shortlist, what details become publicly available about it — specifically, what should we anticipate being included — and after that, how are you approaching the move from that shortlist to the final selection happening in December or early next year?

Joe Trpik

executive
#39

Let me take a bit of a historical approach on the shortlist. Once we reach the RFP shortlist stage, the disclosure we provide will look much like what was shared during the previous instance of this kind of disclosure. It will include technical details regarding the various sites, the megawatt capacity, the bill — whether it involves a bill transfer — and whether ownership or a PPA is involved; those are the items that will be released at the shortlist stage. Following that step, the effort will involve — and clearly the shortlist has already initiated this — evaluating from the lowest risk, lowest cost starting point for commencing contract negotiations, beginning with the highest scored and proceeding downward through that process. Then, once those contract negotiations are finalized, that's the point when we would announce whether it is a PPA or a bill transfer and incorporate that into either a capital plan or a power cost plan for the company.

Julian Dumoulin

analyst
#40

Julian Dumoulin here, thanks a lot.

Maria Pope

executive
#41

Julian, one quarter went by without you with us.

Julian Dumoulin

analyst
#42

One day got dropped, correct? Great. Honestly, it's a joy to speak with you folks. If nobody objects, I'll attempt to tidy up several items from the queue. Talking of something being missed here, that Grid United news involving Skelly, the 20% ownership stake, yes? What's your thinking on how long HashNet takes from the MOU? Since from my perspective, you mention construction kicking off in 2027; logically, that has to be settled beforehand, and possibly a holdco structure also needs to exist beforehand. What's your view on the timing for these elements to align, and when you could be ready to convert that MOU into an ownership stake, presumably within the next 2 years?

Maria Pope

executive
#43

Yes, that's precisely right; a couple of years is what it will take us. So we're eager for talks with Michael Skelly and his team, as you mention, and we're quite impressed by the progress already achieved, the easements and permits already secured, plus some of the equipment already ordered so they avoid any supply chain problems. They're also in discussions with additional partners, and I believe you'll see more announcements involving other Pacific Northwest utilities and others.

Joe Trpik

executive
#44

Also, Julian, regarding who owns what and that 20% piece, those conversations are still pretty fluid at this point. I'd agree that there are different ways everything could be set up — because nothing has been announced yet about a plant owned jointly, and that kind of arrangement wouldn't necessarily need a holding company to hold it as an investment, whereas a different setup might call for a holdco — all of that will get looked at as we move through this process and the other partners get involved.

Julian Dumoulin

analyst
#45

Right, definitely. That said, it does seem like on the holdco side, that would also have to be sorted out first, just to verify that as well, across the coming 2 years.

Maria Pope

executive
#46

That isn't always the case.

Joe Trpik

executive
#47

Just insofar as we kept it inside a holdco. Certain setups exist in which an investment like this, or an interest, might sit inside the regulated entity we have now. Whether it has to be holdco alone is something that will be settled purely by how the final ownership structure ends up taking shape.

Julian Dumoulin

analyst
#48

Alright, yeah, got it. And regarding cash, I’d like to revisit that ATM topic. I want to pose it considering I noticed the Moody’s statement in the meantime. Look at the equity ratio as it currently is. When you mention $300 million each year, what’s your thinking on setting up and adjusting against perhaps a few of the matters pointed out there regarding the credit environment? Is there some sort of reconciliation here, or do you view it as across the timeframe at that $300 per annum sort of path, where these other matters would also sort themselves out alongside?

Joe Trpik

executive
#49

Yeah, I believe if we take a holistic view, yeah, when we put the plan together and discussed $300 million per annum over the coming few years, we have something like a cautious balance sheet here, correct, among the most cautious in this industry, and we think that route to reach where we’re going ought to handle all of the sort of pushing toward the capital structure of overseeing our credit measures and making sure we possess the proper strength in our balance sheet; so it was crafted taking into account all of those throughout that 3 year span.

Julian Dumoulin

analyst
#50

All right, understood, that's great. Then a brief question regarding cash — what was the impact of that storm, I mean the heat wave, since the Q includes some language about it — if you were to securitize recovery in a deferred way, how much cash would that amount to?

Joe Trpik

executive
#51

So, we're referring to the heat wave that happened in July, following the quarter close.

Julian Dumoulin

analyst
#52

Yeah, my mistake — heat wave, not storm.

Joe Trpik

executive
#53

Right. So regarding that heat, the heat wave we just had — we haven't put a formal number on it, but it's much smaller than a January event. And we do think, at least based on an initial look, that for a few of those days it fits the definition of a reliability contingency event, though the figures are relatively minor, particularly when you compare it with the other I's event. We're still working out the quantification, so no dollar figure has been attached to it yet, but it's nowhere close to the size of those other events, and we'll disclose it in the third quarter if it even turns out to be material. So this isn't something that's driving our financing activities here; it's not something I expect to have any effect on our overall financing plan for the year.

Julian Dumoulin

analyst
#54

Alright, that's great. And one final item — regarding when the RFP will happen, what led to it being pushed back? Just briefly.

Joe Trpik

executive
#55

The reason we've shifted into August comes down to this: there's a regulatory procedure involved, along with certain administrative matters that, frankly, we're simply finishing off — putting the final touches on things as we've gone through the process. These are routine administrative matters, the kind that push timing out by roughly a couple of weeks. Nothing strange or atypical took place.

Maria Pope

executive
#56

Thanks, and I appreciate everyone taking the time to be with us today. We're grateful for the interest you've shown in Portland General Electric, and we're eager to be in touch with you before long. Thanks again, and enjoy the rest of your day.

Operator

operator
#57

We appreciate everyone joining us for the call today. That brings the session to a close. Please feel free to leave the line at this time. Have a great day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Portland General Electric Company transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Portland General Electric Company earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Portland General Electric Company or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.