Good day, everyone, and welcome to the Power Mech Project Limited earnings conference call, brought to you by Nirmal Bang Equities Private Limited. <<operator_script>> Kindly be aware that this conference is being recorded. At this point, I'll turn the conference over to Mr. Prasheel Gandhi of Nirmal Bang Equities. Thank you, and the floor is yours.

Speaker

unknown
#2

Thanks, Deeksha. Nirmal Bang Equities is glad to have you on this Q4 FY'22 Results Conference Call for Power Mech Projects Limited. Joining us from management today are Mr. S. Kodandaramaiah, Director, Business Development, and Mr. J. Satish, Chief Financial Officer. I'll now pass the call to management for their opening remarks, and after that we can take questions from the participants. Over to you, sir.

Jami Satish

executive
#3

Yes. Thank you. Satish speaking. Good afternoon, everyone, and thanks for being on the call covering our earnings for the quarter and 12 months that closed on 31st March 2022. Joining me is Mr. S. K. Ramaiah, Director, Business Development. Power Mech finished both the quarter and the year on a strongly positive footing. We witnessed a range of developments on the execution front, on collections, and in business development as well. Power Mech has now moved into a bigger league, having shown our education capabilities across every segment. The years ahead for Power Mech will be a phase of consolidation and growth. A decade of effort by Power Mech in building credentials and competency began producing results across all our business segments. To bring you up to date on this quarter's developments before we open the floor for your question and answer session: reported total income for quarter 4 FY '22 stands at INR 905 crores, EBITDA at INR 98 crores, and reported PAT at INR 48 crores. In quarter 4 of the prior financial year, by comparison, total income was INR 760 crores, reported EBITDA was INR 79 crores, and PAT was INR 36 crores. The revenue mix for quarter 4 breaks down as follows: erection contributed around INR 152 crores; civil, including railways and water, around INR 516 crores; operation and maintenance, around INR 217 crores; electrical close to INR 17 crores; and other income close to INR 3 crores.

Jami Satish

executive
#4

During the same quarter last year, mechanical brought in INR 166 crores; civil was about INR 329 crores; O&M came to INR 223 crores; electrical stood at INR 36 crores; and other income was near INR 6 crores. Likewise, looking at year-to-date figures, total income reported for 12 months of FY '22 reached INR 2,728 crores, EBITDA came in at INR 303 crores, and reported PAT was INR 139 crores. In contrast, over the comparable stretch in the prior financial year, total income stood at INR 1,900 crores — a 44% increase in revenue — while reported EBITDA was INR 58 crores and PAT was negative at INR 46 crores that year. As for the 12-month revenue mix, here is how it breaks down: erection contributed INR 521 crores; civil, which includes railway and water, contributed close to INR 1290 crores; operation and maintenance added close to INR 805 crores; the electrical business gave INR 93 crores; and other income accounted for INR 18 crores. In that same period a year earlier, mechanical contributed INR 446 crores; civil, INR 687 crores; O&M, INR 661 crores; electrical, INR 86 crores; and other income was roughly INR 20 crores. Both quarterly and yearly performance hit all-time highs for Power Mech, driven by its robust order book and strong execution capabilities across the vertical.

Jami Satish

executive
#5

We expect further improvement from stronger engineering capabilities, better construction management, and reinforced second-level leadership, along with a solid order book. In the midterm, margins should rise to the peak level we reported. We have incurred extra costs related to COVID protocols, royalty costs for sharing JV credentials in certain new initiatives, and also from price increases in some raw materials we consume. Depreciation for the 12 months was flat because of controlled CapEx spending. Over the 12 months, finance cost stayed flat versus the prior year, even with substantial growth in business and execution. Looking ahead, finance cost is expected to decline further, both as a percentage and in absolute terms. The overall working capital cycle improved significantly for the period. Average monthly collections now range from INR 250 crores to INR 300 crores per month, and this is expected to improve further soon. Net current days, excluding cash and cash equivalents, fell to 145 days during the year from 194 days in FY '21 and 180 days in FY '20. So we have seen a substantial improvement in our working capital cycle thanks to the business mix.

Jami Satish

executive
#6

So this has led to us generating surplus operating cash flow of INR 170 crores — INR 177 crores — along with free cash flow of INR 135 crores for the year. That's a solid achievement for Power Mech in the recent past, driven by improvement in the working capital cycle. Gross debt stayed flat even though the business grew and the order book expanded, and net debt has dropped considerably to INR 319 crores, compared with INR 379 crores in the last financial year. The company's order book stands at INR 8,855 crores as of — as on 31st March 2022. And that excludes the MDO order. If we include the MDO contract, the order book comes to INR 18,149 crores. Given the size of the market opportunity we see today, the company has set a fresh target of winning INR 6,000 crores this year. We're very confident of converting close to INR 3,600 crores plus from order booking into revenue during this financial year. Now I'd like to request Mr. S. K. Ramaiah to add some more developments. Thank you very much.

Sudha Kodandaramaiah

executive
#7

Yes. Thank you, Satish, and thanks to Nirmal Bang for hosting this call. Let me touch briefly on what is happening on the business side, along with order growth and the new opportunities. As you correctly mentioned, total backlog has risen 21%, from INR 7,333 crores to INR 8,855 crores. That is a very encouraging sign. It is being strongly propelled by new investments under the national infrastructure pipeline. We have all witnessed that those are now bearing fruit, with COVID behind us, hopefully. Things have normalized, and that is how opportunities are emerging in a big way. And we have performed extremely well on the fuel and infrastructure side with EPC projects and new engineering projects. In fact, the backlog in this segment of <<inaudible>> we have done exceedingly well with many new initiatives. And our backlog there has climbed from INR 1,158 crores to INR 1,244 crores, which is a 17% increase. Of course, in the ETC segment, the electrical segment, we are not witnessing much growth as of today, given the opportunities and -- of course, in electrical, it is more because of the -- a lot of competition and pricing issues, and we are waiting and watching, and we want to finish the ongoing jobs.

Sudha Kodandaramaiah

executive
#8

Compared with the prior year, total order booking stood at INR 4,638 crores, while this year it reached INR 4,231 crores. If you look at how the business has trended, we've moved past the <<inaudible>> segment that we had between '18 and '20. And at this point we've surpassed the INR 4,000 crores capability in order booking — in fact, in order booking. As Satish rightly put it, we're preparing to reach roughly INR 6,000 crores, with plenty of opportunities, and that's an encouraging sign. In fact, it will assist us in building a reasonably solid order backlog, a good backdrop for margin availability, and a broader customer base. In fact, during the first quarter so far, we've secured 2 major projects worth about INR 297 crores — one with THDC coal handling work, which is an engineering and construction job, and the Noida boiler job. That was a job which another agency could not carry out, and they had given a good account of ourselves owing to our expertise in this area. Together, both of these jobs amount to around INR 300 crores. Now turning to the — the domestic segment keeps playing a major role.

Sudha Kodandaramaiah

executive
#9

And obviously, when we look at the opportunities under NIP and Gati Shakti Yojana, there are huge investments coming up across all segments of the business. On the domestic side, we see something positive. The <<inaudible>> backlog has risen from INR 6,357 crores to INR 8,212 crores, which is a positive of 29%. And we continue to watch the international segment and wait. It has come down, the backlog, by some INR 176 crores. The present backlog stands at INR 634 crores. It has come down by 35%. But in the power sector, in fact, we held a dominant position with O&M and installation business in the coal segment and all the associated jobs in civil and O&M and installation. There is a downward trend there, from INR 3,940 crores to INR 3,678 crores, minus 6.6%. But in non-power, obviously, growth has picked up — what was 46% of the total business segment in the order backlog. From INR 3,393 crores, it has gone up to INR 5,177 crores, almost a 52% jump. So that's a very positive sign, and we continue to look at those opportunities that are available. And coming to the O&M story, it has been a very good year — an extremely good year, with major orders backed at Singareni, 2 x 600 megawatt, INR 343 crores; Tuticorin, 2 x 600 megawatt, INR 391 crores; IL&FS in Tamil Nadu, INR 51 crores.

Sudha Kodandaramaiah

executive
#10

We’ve also achieved penetration into JSPL, Angul, with an O&M job worth INR 56 crores in <<inaudible>> nickel handling work. Another encouraging point is that opportunities are improving for shutdowns, maintenance, and capital overhauls in the export sector. Roughly INR 80 crores of orders have been secured in exports, mainly in the Middle East, and that is where you might see future opportunities. The non-power sector is also an initiative for us in O&M. We had earlier taken Tata Angul, and now we have taken up JSPL Angul. Another favorable aspect of O&M is that PSUs are showing greater interest in getting O&M approval and contracting handled through a specialized agency. We have seen that success in Singareni, and then KPCL and NTPC; all these jobs make a substantial contribution to our O&M backlog as well. The major orders we won in the current year are Adani coal handling EPC of INR 80 crores <<inaudible>>; then NTPC Kahalgaon, an NTPC civil and structural job, INR 112 crores; NMDC civil works, INR 57 crores; the Adani Khammam-Kodad road project of INR 645 crores; and Udangudi civil and structural work of INR 345 crores; then we took another North Chennai <<inaudible>> job in civil and structural of INR 120 crores; and a railway job, RVNL in Baroda, for <<inaudible>> basic structure, INR 127 crores; then I told you about the Singareni O&M and the Tuticorin O&M, INR 343 crores and INR 391 crores.

Sudha Kodandaramaiah

executive
#11

The big leap forward came from the substantial investments flowing into drinking water projects. As you're aware, in the prior year we made a start on the drinking water <<inaudible>>, and a great deal has since turned into fresh opportunities and order wins in <<inaudible>>. That's how these orders came in across the various segments. And the major jobs are moving along quite nicely. The Udangudi job, INR 345 crores, NMDC, and then they're still awarding EPC jobs worth roughly INR 500 crores, which we secured for the first time — it gives us a footprint in engineering capabilities for building up the company. At ArcelorMittal we've finished about 20% of the work on INR 200 crores. And the jobs we had picked up <<inaudible>>. The Buxar job is taking shape well, INR 176 crores, 13% done. Then Dolvi is nearing completion. Dangote is nearing completion, 90% of the work finished on $76 million. Maitree and Yadadri are coming along very well. INR 855 crores, Maitree, 65% complete. Yadadri, INR 813 crores, 35% complete. The Ramayampet canal, worth INR 373 crores, 85% complete. And at Sadalpur, we're commissioning the railway electrification job segment by segment, roughly 70% finished out of INR 350 crores.

Sudha Kodandaramaiah

executive
#12

Turning to water projects, we only began these during the past year, and roughly 128 works were completed — that's a solid start. Those represent all the significant projects currently underway that we've finished. Regarding development and <<inaudible>>, which was undertaken last year: development activity is moving ahead at full pace, with land having been acquired for the 5 million-tonne capacity mining operation from the Central Coal Fields, and there the consortium — PMPL and AMR consortium, 74-26 — has set up a special purpose vehicle, KBP Private Limited. That remains on track. The following step is to finish the various formalities concerning forest clearance and environmental clearance, and then proceed to equipment ordering and infrastructure development valued at approximately INR 280 crores. Actually, one notable factor behind growth on the revenue side stems from the manpower advantage that emerged following the post-COVID situation. The roughly 28,000 manpower we had as of April '21 has risen by nearly 15% to 38,000. Along with the greater manpower needs from the expanded O&M business, the construction business, and installation fuel across various areas — that's how the positive momentum in manpower deployment is coming about.

Sudha Kodandaramaiah

executive
#13

When it comes to the opportunities out there, we're chasing roughly INR 18,000 crores worth across a range of areas — power sector, non-power sector, electrical, O&M, then the water business and non-power sector, et cetera. One thing I'd perhaps like to highlight is the implementation we're carrying out on a drinking water project <<inaudible>> — around 828 villages have been completed, the <<inaudible>>, and this is valued at INR 660 crores. The key point is that the order value is set on a specified item rate, but once <<inaudible>> is done, that value can rise. So there's a 50% increase in the value of the village-wise working. Then, out of INR 660 crores, we did approximately INR 120 crores last year, and the remaining INR 498 crores — village survey and DPR preparation — is currently in progress. We're working alongside a high power partner, BRCCPL. And for the 18-month contracts, we have a price variation clause covering the pipeline. The percentage of work involved here is 50% — almost the cost of the pipeline work — 35% is field work, and 15% is the electromechanical jobs. Total villages, as I mentioned, is 898. And with the new order we took prior <<inaudible>>, taken together, the company today sits on a backlog of INR 2,700 crores of orders and 2,752 number of villages.

Sudha Kodandaramaiah

executive
#14

So as the DPRs get updated and order values get updated, implementation will take effect, and that's the way we'll capture more opportunities. Another development area we're focused on is the FGD opportunity. In fact, of the 1,69,000 megawatts of installed base that CCL has earmarked for FGD conversion, ordering has been done — <<inaudible>> only 40,000 megawatts have been ordered by developers, largely in the public sector. Private sector <<inaudible>>. And there are 448 plants — 149 plants in the central sector, 166 plants in the state sector, and private plus ISP is roughly 133 plants. And we're examining some of the key opportunities that could be available in the private sector, and we're in discussions with them and also tying up for a technology partner and doing substantial business. And the main business thrust areas will be — we continue to focus on the national infrastructure pipeline, which is also transforming it as part of Gati Shakti, the integrated project management model, which fast tracks progress <<inaudible>>, and that's where a substantial part of our order book is also complete with new investment coming. And with new investments coming in minerals, coal and steel plants, with the experience that we gained in steel plant construction at JSPL and JSW, perhaps we can continue to foray into the new opportunities coming up with ArcelorMittal and other investments.

Sudha Kodandaramaiah

executive
#15

On top of that, in minerals and metals, there's substantial investment flowing into mineral processing and material handling. We've now seen success from securing a handful of jobs with the Adani group, and we anticipate further opportunities ahead. Beyond that, we're submitting bids on numerous projects within that segment. Moving into EPC represents a solid start, since the company has the engineering capabilities to support it, and that's precisely where we can boost the value we add to turnover as well as margins. With that, I'd like to hand things over and open the floor for any questions. Thank you very much.

Operator

operator
#16

<<operator_script>> Our first question comes from Aditya Sen, who is calling in from RoboCapital.

Aditya Sen

analyst
#17

Could you go over again the order receipts you're expecting for this year and how the execution on that is going? You did mention it, I believe, but I didn't catch it properly, I suppose. So would you mind repeating that?

Jami Satish

executive
#18

Could you say that once more?

Aditya Sen

analyst
#19

Right, I was hoping to get a sense of the order receipts we expect to see this year, along with how execution on those is going.

Sudha Kodandaramaiah

executive
#20

I believe execution is on track. We've seen INR 2,720 crores, with initial out of backlogs of INR 7,333 crores, and the addition of INR 4,251 crores — so we've achieved reasonable growth in execution. Now, the balance order backlog as of today stands at INR 8,855 crores. And on new opportunities, as I said, two orders have been booked so far: the THDC coal handling plant along with Thyssenkrupp <<inaudible>>. And as I mentioned, during this year, our <<inaudible>> increased opportunities available across various segments. Based on what we achieved last year, we feel confident that we can achieve around INR 3,000 crores in the first quarter -- first half, and another INR 3,000 crores in the second quarter (sic) second half. The opportunities lie in the work available in the power sector, <<inaudible>> electrical business, over INR 450 crores; then O&M, where the target is about INR 1,400 crores; <<inaudible>> and then non-power jobs, around another INR 6,000 crores. And many opportunities are being tracked in electricity, railways and material handling and O&M as well. So with these things happening, perhaps over the next 2, 3 months, a lot of order flow is expected.

Sudha Kodandaramaiah

executive
#21

And we expect that, by year-end, provided we can pull this off, the backlog will rise to INR 11,000 crores. With that in place, growth would move onto a new trajectory over the next 2, 3 years.

Aditya Sen

analyst
#22

Right, sir, one more thing. You said margins should rise from here. So what might be driving that? And how much of an increase should we be looking for?

Jami Satish

executive
#23

Yes. Look, on margins, we were running at 12% to 13%, right? And in the recent past, for a range of reasons, that number has declined. The biggest cost is the royalty we pay our JV partners for selling the credentials. Now that we've developed those credentials in-house, we can quote on our own. So that's going to be a meaningful amount, okay. That's the first thing that will help us improve margins. Second, there's some impact from nickel costs due to the price increase, which should normalize, along with the new fresh orders we have in-build, right? So we'll see improvement beginning in the second half. As a result, over the midterm, we expect to get back to a normal peak reported margin.

Aditya Sen

analyst
#24

All right, all right, sir. So by the middle of FY '23, should we be looking at roughly 13% moving forward?

Jami Satish

executive
#25

Yeah. It should climb steadily over time.

Operator

operator
#26

<<operator_script>> Our following question comes from Pratiksha Daftari with Aequitas Investment Consultant.

Pratiksha Daftari

analyst
#27

Just to ask one thing about the order book: how many of those contracts carry fixed-price remuneration, and how many include a price escalation clause?

Sudha Kodandaramaiah

executive
#28

Yeah, I believe we can take — since every one of these water projects carries escalation, the road projects carry escalation, and a few of the other jobs also include escalation, perhaps 60% to 65% would be the escalation clause, with the remainder tied to prices.

Pratiksha Daftari

analyst
#29

All right. And these escalation clauses — they're tied to WPI, is that right?

Sudha Kodandaramaiah

executive
#30

Yes, it’s tied to several factors. There’s labor wages, then commodity prices, and the steel index as well — the steel price index is in there too. We’re taking all of those into account, and based on that <<inaudible>>.

Pratiksha Daftari

analyst
#31

And regarding receivables, what portion of those will come from BHEL — if, say, we measure it in days? And what would the other segment account for?

Sudha Kodandaramaiah

executive
#32

Satish?

Jami Satish

executive
#33

Yeah, yeah. On receivable days, BHEL is still running at roughly 80 to 90 days, though on the whole that figure has come down, all right? So BHEL was previously at 90 days plus, but at present there's an improvement of 10 days, bringing it lower. If you look at absolute numbers, it would be close to INR 130 crores, INR 140 crores.

Pratiksha Daftari

analyst
#34

Okay. For BHEL, that's INR 130 crores to INR 140 crores, correct?

Jami Satish

executive
#35

Yeah, that's right.

Operator

operator
#36

Our following question comes from Abhishek Poddar, who is on the line from HDFC Mutual Fund.

Abhishek Poddar

analyst
#37

And well done on a solid set of numbers, sir. Sir, about that expectation of INR 6,000 crores in orders for this year — does it also take in the FGD order expectation? And could you give us some sense of whether you're bidding for private <<inaudible>>.

Sudha Kodandaramaiah

executive
#38

Yes. Look, we’re in — you know, on IPP — so that’s what we’re discussing. And depending on the tie-ups, we’ll bring in the partner — technology partners. At this point, all I can say is that we’re seeing positive signals. And then on the private side, beyond the participation, we now need to look into discussions and negotiations that we’ll have to handle within project execution as well. Those acknowledgments will be sorted out over the next 1 or 2 months. After that we’ll have more clarity, but there could be substantial room for FGD orders this year.

Abhishek Poddar

analyst
#39

All right, so would that INR 6,000 crores expectation take FGD into account? Or if FGD does come in, would that be an added benefit for us?

Sudha Kodandaramaiah

executive
#40

No, FGD will be part of it as well.

Jami Satish

executive
#41

Yes, sir. Look at INR 6,000 crores — a number of developments are underway. So to some degree, we've already picked up a portion of those contracts. Beyond that, should a few additional orders come through, that would likely sit on top of this INR 6,000 crores. That's why we've kept two targets in mind. So in a few, this will arrive with a revision number. And this INR 6,000 crores, we've taken into account O&M, electrical, water and mechanical, domestic and international all together. The FGD pie — a smaller component of it we've also taken. But beyond that, some other discussions are in progress. If those bear fruit, that would probably be added on top of INR 6,000 crores.

Abhishek Poddar

analyst
#42

All right, got it. And on this O&M — would the operating margins there come in significantly above what the other EPC business delivers? If you could give us a feel for how the O&M margins look. And with O&M becoming a bigger part of the mix, should we take it that this will also give you a lift on operating margins over the next 1, 2 years?

Jami Satish

executive
#43

Yes. You've made the right observation, sir. Look, at present — right now the profit margins sit in the 17% to 18% range, okay, within the O&M pie. Beyond that, what we're lacking is the international pie, which is where we also wanted to expand in the O&M space. But the last 2 years have been somewhat slow owing to COVID and all that. Now for 4 to 5 months, we've been traveling extensively in the international market. That should help us push the O&M pie. Now one development is Dangote, in Nigeria, where we've been carrying out the mechanical work. That contract is now coming to an end, and the customer has expressed interest in an O&M contract. That single contract alone will be close to INR 200 crores to INR 300 crores. So this O&M pie may rise with the international development as well. Besides that — some of the developments in the non-power tool, we're working on the petrochemical, steel and electrical side. And of course, in India, the public sector too, like Singareni, the Karnataka government in the public sector, they've begun initiating discussions, so we got 2 contracts. That may add to a larger extent as well.

Jami Satish

executive
#44

So all in all, that's going to assist us in driving the margins higher, you're right.

Abhishek Poddar

analyst
#45

Okay. And O&M represents roughly 25%, 30% of revenue. So where would we land on any target in that area over the next 2 years?

Jami Satish

executive
#46

Look, over the next 2.5 years, we wanted to — frankly, to be honest, our aim was to double. So we're pushing on every front: backward integration, international, domestic, all of it. At minimum over the next 2 years — this year we closed at roughly INR 800 crores. Perhaps next year we may reach close to INR 1,000 crores, and maybe by '24, '25 that figure ought to be double. That's the plan.

Sudha Kodandaramaiah

executive
#47

Satish, one more point here is that every one of these O&M contracts gets renewed as well. You see, when we bring in additional new opportunities to the basket, what happens is that a growing number of contracts will enter the renewal pool with escalation too, and at minimum one-third of the contracts can come up for renewal each year. And then there's the backing of the domestic balance in non-power as well as in the government sector and the private and other sectors. And then the international O&M business, because in the Middle East there is a 120 gigawatt install base opportunity for O&M, where we now have many projects and those projects are nearing completion, and that should help us with their market approach. That means we'll be able to <<inaudible>> — that is how, last year, we took roughly INR 80 crores of mainly shutdown jobs. But over the long term, of course, we are trying, as we have rightly said. Nigeria, where we have a $76 million job to be completed over the next couple of months, but that is <<inaudible>>. And projects of that type will represent a huge opportunity. And that will add up to the domestic O&M, where we are one of the leaders -- a leading service provider.

Jami Satish

executive
#48

And going from not having that competency to having it fully in place, debt cooperation included — we've now developed that expertise, and Singareni coal is the current live example. That credential is going to help us get through to the customers we already have and widen this scope. So to some degree, it will also help make the current business better from the orders we already hold.

Sudha Kodandaramaiah

executive
#49

Yes, and one more point. The drinking water side of the water business has now kicked in. When a project wraps up, there's a 10-year O&M contract attached. For every one of these water projects — the drinking water ones — as soon as we finish construction, they become eligible for O&M under the contract that gets signed for 10 years. So that will contribute as well to the O&M profile, alongside what we're already doing in power and non-power. Infrastructure and drinking water could also turn into a meaningful O&M contributor after, say, 1 or 2 years.

Abhishek Poddar

analyst
#50

Got it, sir. And sir, is there any news regarding that Coal India contract? Are things running according to schedule? And when do you expect it to begin now?

Sudha Kodandaramaiah

executive
#51

Yes, Satish, could you say a bit more on that?

Jami Satish

executive
#52

Yeah, yeah, absolutely. So with regard to Coal India, the MDO on this KBP Mining project: under the original schedule, we were supposed to receive FC stage 1 forest clearance in November. But from how things are progressing, we now expect to wrap that up by August itself. If that holds, environmental clearance will likely come through by December. Ground activity, then, ought to begin 4 or 5 months after that. So we'll begin placing orders, all right, and get going on the equipment side and the infrastructure portion. So compared with the schedule, we're 3 months ahead at this point. Things are going well.

Abhishek Poddar

analyst
#53

Got it. One final item — for this year’s capital expenditures, what amount should we be planning for?

Jami Satish

executive
#54

Sir, for this year we have maintained a target of INR 55 crores.

Abhishek Poddar

analyst
#55

Does that leave out any contribution from Coal India, or is it in there?

Jami Satish

executive
#56

No, sir. This year, we won't spend anything apart from, say, all the clearances and plans and so on, okay? At most, it'll be hardly INR 7 crores or INR 8 crores. So overall, we're talking about INR 55 crores this year.

Operator

operator
#57

Our following question comes from Deepak Poddar, who is calling in from Sapphire Capital.

Deepak Poddar

analyst
#58

Sir, I just wanted to get a handle on this top line — the INR 3,600 crores we're aiming at. Are we building in any revenue from MDO during this year as well, or does that only kick off starting FY '24?

Jami Satish

executive
#59

So FY '24 is when we'll begin building that revenue. That means FY '23 is entirely the existing cash contract. MDO will start contributing from '24.

Deepak Poddar

analyst
#60

So essentially, it's INR 8,900 crores without MDO, so we've assumed roughly 40% conversion, correct?

Jami Satish

executive
#61

Right. And we've maintained an INR 6,000 crores target for this year. So we've assumed a softer conversion. So a substantial amount should come out of the existing order book itself.

Deepak Poddar

analyst
#62

Right, right. And next year, as we approach INR 11,000 crores — and even if you take a similar 40%, that's INR 4,400 crores, plus INR 400 crores of yearly revenue from MDO, giving INR 4,800 crores for FY '24...

Jami Satish

executive
#63

Right. So if you look at the current backlog, plus 40% or more, the MDO is going to contribute roughly INR 120 crores to INR 150 crores. That uprate will therefore build up step by step until it reaches INR 600 crores.

Deepak Poddar

analyst
#64

So would it be a gradual increase to INR 600 crores, or INR 400 crores? My sense is that the MDO provides annual...

Jami Satish

executive
#65

The figure is climbing at this point, since with the price escalation and everything, diesel carries a high weighting of 55%, so that INR 886 per tonne we quoted now sits at INR 1,350 to INR 1,400. Prices, therefore, have risen considerably. That INR 400 crores could consequently rise to INR 600 crores.

Deepak Poddar

analyst
#66

The figure could be INR 400 crores, possibly reaching INR 600 crores. So that essentially works out to an annual run rate of INR 5,000 crores, and perhaps 2 years from now that is fairly achievable for us, right, under the present circumstances. Maybe it will begin -- and we will begin at roughly INR 150 crores, INR 200 crores, but it will steadily ramp up, right, in our case.

Jami Satish

executive
#67

That's correct — you've got it right.

Deepak Poddar

analyst
#68

Got it. That makes sense. That's a pretty reasonable way to see it. Then when it comes to margins, we're now discussing 12%, 13%, FY '23 — is that the right way to look at it?

Jami Satish

executive
#69

Regarding margins, look, at this point our order book combines newer and older business. On the older orders, any royalty arrangements we have in place will stay as they are. So for the first half, margins will probably track what we're showing right now. After that, if we start to see things improve bit by bit, then over the medium term we'd expect margins to return to the peak levels we've previously reported.

Deepak Poddar

analyst
#70

That comes to between 12% and 13%.

Jami Satish

executive
#71

Yes.

Deepak Poddar

analyst
#72

And when you say by midterm, do you mean roughly 6 months to 1 year?

Jami Satish

executive
#73

No — a bit longer than that. The first 6 months will show it, as the water ramps up along with all the new projects, since right now we're operating in a situation where prices have gone up abnormally, okay? So we've factored in that cost and everything, but there's also a view that prices could come down, okay? So we'll take a view after the second half. So probably, if this continues, this year we'll be in the change of the reported — okay, maybe quarter 3, quarter 4, we may see some improvement, okay? But surely, in '24 and '25, there will be significant improvement.

Operator

operator
#74

Our following question comes from Akshay Kothari, who is on the line with Envision Capital.

Akshay Kothari

analyst
#75

On the royalty, I'd like to get some clarity. So who exactly is receiving this royalty payment from us?

Jami Satish

executive
#76

So look, we've taken the technical qualification from a number of companies in the industry. As a result, we're making royalty payments for it. Usually, that falls between 2.5% and 4%. That hits the EBITDA margin directly, okay, and we share that with the other companies because of the JVs we have together.

Akshay Kothari

analyst
#77

All right. And now that we've built these out, what we can say is that the technical know-how is in-house, so they won't run into any problem, and there's nothing on the legal front, correct?

Jami Satish

executive
#78

No. At this point we qualify on our own merits. What that means is we’ve developed our credentials internally, and now we’re able to cite them directly—we didn’t rely on borrowed credentials. We’ve been working toward this for 7 years, all right? Certain projects began at INR 250 crores to INR 300 crores. Today—some projects, including drinking water and railway, can reach as much as INR 800 crores to INR 1,000 crores for a single bid. That’s the credential base we’re bidding on.

Akshay Kothari

analyst
#79

And could you give a bit more detail on how the order execution cycle works for the top 4 to 5 projects — what does that process look like?

Sudha Kodandaramaiah

executive
#80

On the drinking water projects, I believe the DPR is done. The DPR <<inaudible>> 16 months, since that's where the main intake sits. <<inaudible>> 18 months. That's for the drinking water projects at roughly INR 2,700-and-odd crores. And that figure could rise from the actual number as well <<inaudible>>. Dangote, a major job at $76 million — as I said, 90% is nearly finished; Maitree, INR 855 crores, 65% done; Yadadri, INR 813 crores, 35% of the work finished. Then the Sadalpur electrification job, INR 350 crores, 70% finished. And on drinking water, we've executed around INR 120 crores in the last — so far. Those are all the major works.

Operator

operator
#81

<<operator_script>> Our next question comes from Mohit Kumar at DAM Capital. Please proceed.

Mohit Kumar

analyst
#82

Starting with the total capex needed for CCL MDO, and what kind of EBITDA margin could this business achieve? Tied to that, what opportunity in MDO are you aiming at over the medium term? Is this the sole project you intend to pursue, or would you consider taking on additional projects? And if you could share some of the opportunities available for FY '23.

Sudha Kodandaramaiah

executive
#83

So, the government has a liberalization policy when it comes to minerals, metals, and then coal. Of course, the first batch of opportunities on the coal side comes to roughly INR 15,000 crores. That was on the execution front. We had <<inaudible>>, but with MDO — for mines opening up on the coal side and the non-coal side <<inaudible>> — and there too, we need to seek out some form of partnership across various aspects. So it's on a selective basis that we move ahead.

Jami Satish

executive
#84

Yes. And just to build on what Mr. Ramaiah said, we've taken on a mid-sized project, alright, where the investment is slow. Over the next 2-1/2 years, we need to develop the infrastructure in full. So once that's developed, we'll begin generating revenue of INR 150 crores, and we'll scale that up to INR 650 crores plus escalation. So the strategy is that once this mine is operationalized, after that, we'll take a view, okay? As of now, we're not very serious about adding any more projects. We want to be very selective. And yes, the CapEx — this comes to close to INR 364 crores. And we'll follow a model of equity and debt. So we may need to put in INR 95 crores of equity, and it's a combination of us putting in around 74% and 26% from our JV partners. And the rest will go toward a project-specific term loan, okay, that's the plan. And we quoted this project assuming an IRR of almost like 22% plus, okay? And with the new revised price, the margins are going up significantly, okay? Let's see how things are moving. So far, it's a very good development. Margins are absolutely under control.

Jami Satish

executive
#85

So we expect that to head in an upward direction.

Mohit Kumar

analyst
#86

Got it. So should I expect a comparable margin to the one we have in our EPC business?

Jami Satish

executive
#87

Sir, EPC is a bit — there are new projects now. Whenever we quote, we're not quoting below 14% to 14.5%, because our tummy is full. So we've issued a clear-cut instruction to business development to work only at 14%, 14.5% plus minimum at the EBITDA level. Margins of this kind in EPC contracts may not be practical, maybe not possible right now, okay? But this is a specialized contract that we were able to crack, and the per-tonne price has gone up, okay, because of escalation and all. So this — but what will happen is that at a consolidated level, once the mine starts, our EBITDA margins will improve a lot, because we're thinking that next, in the midterm, we're trying to come back to our normal reported margins of 13% plus. If it comes, there's a high probability that the blended EBITDA may go up.

Mohit Kumar

analyst
#88

Got it, sir. And regarding the Uttar Pradesh Jal Jeevan Mission project, what sort of execution run rate do we anticipate? Should we expect that in FY '23, FY '24?

Sudha Kodandaramaiah

executive
#89

So I believe today we've got <<inaudible>> revised to INR 666 crores. And with that, maybe we'll be in a position to <<inaudible>> INR 200 crores.

Mohit Kumar

analyst
#90

What would that amount be, sir?

Sudha Kodandaramaiah

executive
#91

INR 200 crores.

Jami Satish

executive
#92

We have to get this done within 2 years, all right. So at the floor, for this year, we need to go past INR 850 crores to INR 900 crores. That is the minimum bar we have set, okay? There's a chance that could also get better. So over the next 2 years, we need to finish it.

Sudha Kodandaramaiah

executive
#93

We need additional villages and DPRs to be prepared, since in the other sequence — the one I mentioned, INR 1,854 crores <<inaudible>> — we haven't begun the DPRs yet. That could take 6 months, and implementation would only follow after that. The ordering on that also has to be updated by us.

Mohit Kumar

analyst
#94

What sorts of opportunities are you going after on the water side? Are there chances to bid for more projects similar to Jal Jeevan Mission nationwide?

Sudha Kodandaramaiah

executive
#95

Yes, certainly. Today our order bookings stand at roughly INR 2,750 crores, and we've begun execution on 2 or 3 projects, where we're building up the expertise. There's nothing out of the ordinary here. This isn't a high-end undertaking. It's simply a question of placing different groups across different villages and then running the operations from a control center <<inaudible>> deployed, so that we can get it done without difficulty. As for investment, we've observed that the total investment is <<inaudible>>. The overall Jal Jeevan Mission that the Government of India has launched falls under the national infrastructure pipeline. The current norm is that for every village, the average cost comes to approximately INR 1 crore per you, right? In practice, though, that figure will rise by 50%, since the items counted for a village — the number of households, and then how many <<inaudible>> — 50% it will go up. So even with this present order that we've taken, the likelihood of it growing by 50% is very much there. And I told you about the O&M opportunity once we finish <<inaudible>>, but having taken a major portion of the job, we have <<inaudible>> in this year as well. Still, we don't want to expect too much, because a lot of spreading is required in that, and we're quite satisfied with what we have.

Mohit Kumar

analyst
#96

Got it. And over the next 2 years or so, how do you expect the O&M opportunities to play out? Do you think we'll be able to aim for something substantial on the domestic side? Do you see the opportunities in the domestic markets as very, very limited?

Sudha Kodandaramaiah

executive
#97

I believe that's a really significant question you raised, that is <<inaudible>>. O&M has a few work segments within the power sector where we've built our leadership around <<inaudible>> there are more than 80,000 megawatts, but penetration there hasn't been much because they still follow the entire approach of doing <<inaudible>> That opportunity is out there. With NTPC, we're handling roughly <<inaudible>>. And we've picked up Singareni, which is 2 x 600 megawatts. And in the private sector, in any case, we established <<inaudible>>. And the other thing we've observed is that the projects where we've finished <<inaudible>> have done around 7,000 megawatts of captive power plants plus utilities and all. We're going to these customers with an O&M opportunity. And there are two kinds of opportunity in that when they shut down for breakdown maintenance. I mentioned to you about INR 80 crores, we've completed the job <<inaudible>> and that segment will grow, and then the long-term O&M contracts, like what we're doing on an AMC basis, we need to work out more of that in the international segment too, drawing on the experience we've gained. And plenty of inquiries are coming in, and that's another area.

Sudha Kodandaramaiah

executive
#98

Third, I mentioned drinking water to you. Once the contract period ends on the projects we've finished, O&M turns into part of the contract for 10 years. That's going to be a separate project. And with certain EPC jobs that we're going to finish, there may be O&M chances in minerals and material for some EPC jobs, plus coal handling, material handling and other areas, and the non-power sector. So those are the opportunities <<inaudible>> a figure was given. Maybe this year, we'd like to aim at roughly INR 1,200 crore. And we definitely want to double up the O&M segment. And all these O&M jobs are repetitive and are up for renewal, and that's where we don't need to spend again on the same job, since we're already established there. And the customer doesn't want the existing manpower and is also inducted by a contractor, and they would like to extend it <<inaudible>> opportunities may be many, and we're quite hopeful about that.

Mohit Kumar

analyst
#99

Regarding NCLT — and I believe the reference here is <<inaudible>> at NCLT, where the lenders are restarting the project together with NTPC's assistance — does that widen the set of opportunities available to you? That question comes to mind because, if my memory serves me right, a couple of power plants <<inaudible>> are expected to begin operations in Andhra Pradesh.

Sudha Kodandaramaiah

executive
#100

Absolutely. I believe that's quite significant. Every one of the NCLT projects — wherever they've reached the point of being <<inaudible>> shut down owing to various factors. The government at present is sensing the shortage from the current run over the last 2, 3 months. And they're collaborating with banks as well to finance these projects and figure out how it might be utilized and so forth. Plus we're likewise capping coal imports for <<inaudible>> too. And all of this taken together ought to unlock these NCLT projects as well, and we're present. We're very much present.

Operator

operator
#101

Our next question comes from Dixit Doshi, who is calling in from Whitestone Financial.

Dixit Doshi

analyst
#102

Just a couple of things I want to ask. First, on that royalty payment you brought up — what was the amount of royalty payment we would have had to pay in FY '22?

Jami Satish

executive
#103

Sir, for FY '22, that figure could come in at roughly 1.5%, sir.

Dixit Doshi

analyst
#104

One point five percent of the royalty.

Jami Satish

executive
#105

Right. It used to sit at 2%, 2.5%. Over time, it's fallen since the pie itself keeps shrinking.

Dixit Doshi

analyst
#106

All right, and my second question concerns the MDO project — the MDO from CCL. You said that this INR 400 crores annual top line could reach INR 600 crores. So just to clarify, is that because the cost of doing the job has risen? Or is it because coal prices have risen? I just want to understand whether our revenues are tied to volume, or also to coal prices?

Jami Satish

executive
#107

No, sir. Look, our pricing isn’t tied to coal prices. What it’s tied to is the cost per tonne that CCL will pay us. Under the contract, Power Mech gets INR 886 per tonne, and that INR 886 has an escalation clause, so it’s subject to escalation. There’s also a WIP formula in which they’ve assigned a 55% weighting to diesel. As a result, that INR 886 that CCL is meant to pay Power Mech now stands at INR 1,400 today.

Operator

operator
#108

Since there are no more questions, I'd like to turn the conference back over to management for some closing remarks.

Jami Satish

executive
#109

Yes. Thanks to all of you for being on this call and for the confidence you’ve placed in Power Mech. Should anyone need further clarification, they are welcome to contact the management directly at any time. Thank you very much.

Operator

operator
#110

Thanks. This is Nirmal Bang Equities signing off — that brings the conference to a close. We appreciate your participation, and you're free to hang up at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Power Mech Projects Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Power Mech Projects Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Power Mech Projects Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.