Power Mech Projects Limited (POWERMECH) Earnings Call Transcript & Summary
February 20, 2024
Earnings Call Speaker Segments
Operator
operatorJust a note that this call is being recorded. At this point I'll pass things over to Ms. Natasha Jain of Nirmal Bang Equities. Thanks, and the floor is yours.
Natasha Jain
analystThank you, Rishastri, and a good afternoon to everyone joining us. Nirmal Bang Institutional Equities is glad to have you all on this conference call covering Power Mech Projects Limited's third quarter FY 2024 earnings. Joining us from the management side this afternoon are Mr. S.K. Ramaiah, who serves as Director of Business Development, Mr. Rohit Sajja, President of Business Development and Operations, and Mr. N. Aravind, our Chief Financial Officer. At this point I'll pass the call along to the management team for their opening remarks, and after that we'll open things up for questions from the participants. Thank you, and the floor is yours, sir.
Nani Aravind
executiveThanks, Natasha. Good afternoon, everyone. I'm Arvind — N. Aravind — and I serve as CFO of Power Mech. Joining me are Mr. S.K. Ramaiah, our Director of Business Development, along with Mr. Rohit Sajja, President, Operations and Business Development and Operations. Welcome, all of you, to this earnings call covering quarter three and the nine months of financial year 2024. Results for Q3 and the nine-month period of this financial year stayed in line with the full-year targets we had set. Total income as reported for quarter three of financial year 2024 came in at INR 1,115 crore, EBITDA stood at INR 141 crore, and PAT was INR 61 crore. In quarter three of the prior financial year, FY 2023, total income as reported was INR 912 crore, EBITDA was INR 106 crore, and PAT was INR 51 crore. Measured quarter to quarter, Power Mech showed top-line growth of almost 22%, and alongside that top-line expansion, EBITDA rose by almost 34% while PAT increased by 21%. Q3 financial year 2024 performance was satisfactory and in line with expectations, notwithstanding a slight slowdown attributable to elections in five states. The revenue mix for quarter three breaks down as follows: our mechanical business contributed roughly INR 231 crore; civil business, including railways and water distribution, INR 596 crore; O&M, INR 260 crore; the electrical business close to INR 21 crore; and other income close to INR 7 crore.
Nani Aravind
executiveNow, in the previous year — FY 2023, quarter three — the erection business contributed INR 144 crore; civil, INR 492 crore; O&M, INR 260 crore; the electrical business, INR 12 crore; and other income, INR 3 crore. Mechanical and civil each posted growth of roughly 60% and 21%. Electrical grew by 71%. O&M stayed more or less flat, though this figure will again rise substantially going forward. In quarter three of financial 2024, domestic business accounted for almost 94%, with the remaining 6% coming from the international market. In the same way, the power sector contributed 47%, while the non-power sector was almost 53%. Likewise, total reported income for the nine months of financial year 2024 stands at INR 2,923 crore, EBITDA is INR 364 crore, and PAT is almost INR 164 crore. In the nine months of the prior financial year, by comparison, reported total income was INR 2,435 crore, EBITDA was INR 281 crore, and PAT was INR 134 crore. On a year-on-year basis across the nine months, revenue grew almost 20% versus last year, and alongside that top-line growth, EBITDA rose substantially, by almost 30%, while PAT increased by almost 22%.
Nani Aravind
executiveOn the revenue mix for the nine months, mechanical business contributed INR 518 crore; civil business, which includes railway and water distribution, came in around INR 1,585 crore; O&M was INR 756 crore; electrical business was close to INR 47 crore; and other was close to INR 17 crore. In the nine months of the prior financial year, by contrast, erection business contributed INR 458 crore, civil business INR 1,235 crore, O&M around INR 682 crore, electrical business INR 52 crore, and other income INR 8 crore. Likewise, erection, O&M and civil business each rose, by 13%, 11% and 28% respectively. Electrical business fell 10%, since not much order booking is taking place in that segment. On the international versus domestic split, domestic business contributed around 92% in the nine months of FY 2024, with the remainder from overseas business, around 8%. Power versus non-power stood at 52% and 48% in the nine months of this financial year. In FY 2024, thanks to the healthy order book, water business will keep contributing close to 23%, 23% of total business. Other civil works across both power and non-power contribute close to 34%, and O&M will remain around 23%.
Nani Aravind
executiveMechanical will keep contributing, domestically as well as internationally, at almost like 18%+, and transmission distribution will add 2%. So we'll see that in FY 2025 there's going to be a significant shift in the business mix thanks to a healthy order book. Contribution from O&M is going to be almost like 18%, and the erection business is expected to rise almost by 27%. And railway is expected to go up by, go up to 1%, and MDO, this year, will start with a small number, and this is expected to rise significantly over the next two years. It is expected to be almost like 7%. So there will be a significant change in the business mix because of the increase in the O&M pie and the MDO business. Improvement is also seen in overall margin profile, and the same is further expected to improve gradually. And on reaching MDO to peak during FY 2026, the margin profile will improve to a greater extent. So depreciation cost as a percentage remains on the lower side on account of control of CapEx spending, and the finance cost, keeping aside interest on tax impact, as a percentage to revenue, remained on the lower side and continues to be controlled on account of improved working capital and cash flow.
Nani Aravind
executiveRegarding the income tax raid that took place in July 2022, as all of you know, search operations were carried out together with the Income Tax Department, and the company was issued notices under Section 148 of the Income Tax Act. Responding to those notices, the company submitted a return of income covering assessment year 2016 to 2017 through assessment year 2021 to 2022. As a prudent step toward cooperating with the department and steering clear of further prolonged litigation, the company offered an additional liability of INR 26.21 crore on account of income tax along with INR 11.91 crore on account of interest on income tax, and the full amount was paid during financial year 2024. On the income tax matter, we do not anticipate any requirement for additional provisioning. Thanks to better deployment of our capital and improved margins, we have also witnessed a rise in return on capital employed, and this is expected to climb substantially once again. Among other developments, operating cash flow for the period stands at nearly positive INR 21 crore, which is quite healthy. We are working on this to enhance it further. In addition, average monthly collection for the company has remained healthy.
Nani Aravind
executiveSo net current days — that's excluding cash and cash equivalents — have improved quite a bit, thanks to a better working capital cycle, a shift in the business mix, and a change in customer concentration. Net current days are down to 125 days from 131 days, and as the MDO business stabilizes from financial year 2025 and 2026 onward, we can expect meaningful improvement in net working capital days, and that can help the system generate larger and larger operating and free cash flow. We can see a quantum jump in free cash flow. More importantly, gross debt and net debt stayed controlled despite growth in the business and the order book. As of 31st December 2023, gross debt is close to around INR 499 crore, and net debt stands at -INR 23 crore. But as you can see, as of today, we can probably say Power Mech is a net debt-free company, and the debt-to-equity ratio as of 31st December stands at 0.28x, which has come down significantly because of the improvement in cash flow. But if you look, net debt today is nil because net debt is almost zero. The status of the two MDO operations. Coming to the two MDO projects, a lot of developments and ground activities are happening in both projects.
Nani Aravind
executiveFor the first project, Kotre Basantpur Stage I, we received Forest Clearance from the government in November 2023, and we applied for Stage II clearance. That report is moving through various levels to the Additional Chief Secretary, Jharkhand, and they forwarded the file to MoEF&CC on 13th February. Consent to operate applications have also been filed, and we are awaiting approvals from Jharkhand State Pollution Control Board so we can begin the works. We expect those approvals within the next two months. As a result, ground activity for OB removal can start in May, and coal mining will begin in July 2024. Moving to the second project, Kalyaneswari Tasra, mobilization of the major equipment needed for initial mining activities has been completed. Environment clearance for establishing a washery with 3.5 MTPA capacity is in progress, and approval is expected by July 2024. Construction of R&R colony buildings — 190 units across 4 hectares of land — is underway. Mining works have already begun, and OB removal along with coal production have been progressing since January 2024. Roughly around 80,000 tons of coal has been excavated, and we are targeting 300,000 tons by the end of this year. Now, on order book status, the order book backlog as of 31st December is around INR 55,858 crore including both the MDO, and excluding the MDO, the backlog is almost INR 16,125 crore.
Nani Aravind
executiveIn a similar way, the backlog of orders as of today comes to roughly INR 57,328 crore when both MDOs are included, and if you leave out the MDO, that figure is INR 17,595 crore. The company has set a target of INR 10,000 crore in order inflow for the whole year, 2023 to 2024, and that target stays unchanged. As of today we have taken in orders valued at INR 6,768 crore, and on top of that, three projects valued at INR 1,780 crore sit in L1 status, along with a project valued at INR 5,500 crore that has been bid and is awaiting results. The remaining order additions will likely come through in Q4. In FY 2024, a big rise in orders is anticipated from the power sector, in O&M as well as mechanical and civil construction. Industrial plant, O&M, railway, water and MDO projects will remain our focus. Every one of the existing projects is on track and progressing according to schedule. This financial year, revenues should land somewhere between INR 4,500 crore and INR 4,700 crore, subject to how FGD and MDO business traction plays out. EBITDA margins stay at the same level as Q3. In FY 2025, we ought to deliver 30%-35% year-on-year growth. Margins will hold steady. We'll see some upside, depending on the mix coming from FGD and mining.
Nani Aravind
executiveWe don't expect the margin to decline at all. In the same way, the order book target for this financial year and the next one appears comfortable. Power Mech is well positioned to show execution and conversion of 32%-33% of its opening order book within a year. Beyond that, revenue from the MDO business is also ramping up at the coke coal production plant. Looking ahead, the O&M and MDO businesses will drive substantial growth in a significant way, and we have some further development on the business side. I'd request Mr. Ramaiah to add, please.
S.K. Ramaiah
executiveYes. Thank you, Arvind. Thank you, Rohit, Rohit, and the team here, and thank you to the participants. I believe Arvind has covered the overall figures and the different aspects of the business, both financially and otherwise. But what we are seeing in the market is a substantially bullish stance when it comes to investments coming forward and opportunities opening up. We can also observe a shift in the product mix for the better. What had been a weak spot in the power sector is now improving considerably. That has shown up markedly in the mechanical business. The order backlog has risen from INR 6,878 crore to INR 7,034 crore, an increase of 22%. The civil side has increased by 27% to INR 7,800 crore. O&M is playing a big part, because a lot of new projects are being commissioned from the backlog available with various private players, and then NTPC and the other players as well. That is where we have achieved a great deal, significantly, in terms of a substantial rise in order booking there during the current year. So then, electrical, of course, will have a subdued part to play there, given the current situation as well as the competition and other factors.
S.K. Ramaiah
executiveLooking at it broadly, what we're seeing is continued investment across all sectors. That's what's driving our business. And in the power sector, there are three segments driving things. First, new unit capacity — the projects already identified are 19,000 MW from NTPC, <<inaudible>>, plus roughly another 13,000 MW from the utilities, and the private players are there too, with Adani coming up at Mahan. Then if you add the stressed projects — about 5,750 MW and 6,700 MW from the first and second stages — all of these are under resolution, and many of the orders, many of these opportunities, are getting converted, and we've taken the benefit of that in JSPL Angul and then in Vedanta, Singhitarai. And then recently, in Meenakshi's case as well, both the revamping and the O&M job have come up. So that's a positive for the mechanical business. Installation — traditionally we're very strong there. On O&M, the order backlog has risen by 66%. There's one more development on the O&M side: the conversion that will also come up for O&M in the drinking water scheme, where we're doing about INR 2,725 crore of job.
S.K. Ramaiah
executiveThe shift is taking place at a quicker pace. The order status now is such that, for whatever orders get released, 3% of that will come through as an O&M contract spanning the next 10 years. That amount, in other words, gets added as part of the order, and right now it works out to INR 681 crore. So if you total up the entire O&M profile across power, non-power, and drinking water as well, order booking will climb to nearly INR 2,500 crore by the close of the year. That ought to deliver meaningful growth for the O&M progress along with improved margins in the year ahead. Beyond that, the new units business is likewise picking up, with orders secured from Mahan at INR 825 crore; BHEL Talcher at INR 354 crore as well; and then Vedanta for the special project at Singhitarai, INR 396 crore. To us, that counts as a positive development. This will keep happening. Railways have been another big focus area, in addition to the roads. On railways, we have made considerable strides. Just recently, we were awarded the Yavatmal-Nanded job, roughly INR 375 crore. Taking all of this together, what we can say is that the current opportunities, combined with the L1 position on the pending FGD orders with the Goenka Group, plus one in the micro irrigation project and the railway project, you know, leave us poised to hold around INR 1,500 crore-INR 1,600 crore of L1 position.
S.K. Ramaiah
executiveShould that come to pass, it would give the overall order backlog a substantial boost. Beyond that, roughly INR 15,000 crore worth of order follow-up is currently in progress across various segments for the different opportunities. Now, returning to the overall picture in the power sector as such, BHEL has secured orders amounting to INR 55,000 crore. If you also consider the previous year's orders that are moving toward conversion — Lara, Yamunanagar, which was awarded to BHEL not long ago, Mahan, which the Adani Group has ordered, then Talcher, already ordered, and more recently Talabira, 3 into 800 MW — taken all together, BHEL's order book has expanded enormously, by almost an additional INR 55,000 crore. And we are hopeful that conversions will take place more quickly in the year ahead, and to some extent in the last quarter as well. Across all these cases, the total projects awarded by NTPC and Mahan come to 7,720 MW. That leaves us with greater room for conversion of power, the power mechanism contractor and the subcontractor. Our estimate on that is that something in the region of INR 12,000 crore to INR 15,000 crore of order booking and order opportunities will also arise next year.
S.K. Ramaiah
executiveThere are certain projects where we can see how much activity is taking place during the current year as well. Now, to return to capacity addition across the power sector as a whole, the situation at present is that coal and lignite capacity amounts to 214 GW. That figure will rise to 280 GW. Within that, roughly 27,000 GW are in implementation. A further 30,000 MW will be at the ordering and execution stage, which has already begun. As I mentioned, approximately 7,720 has already been awarded to various players, and the remainder will follow too. That ought to help us. That ought to generate overall supply and EPC contracts for the — principally, it may go to BHEL, unless L&T takes a significant decision or a few of the Chinese players, outside players, step in. The projected opportunity for the next year across all of this, for overall supply, exceeds INR 2 lakh crore. So our own estimate is that no less than INR 15,000 to 20,000 crore of opportunity ought to arise in the power sector overall in the coming year as well. Then there is railways — as you know, we have observed that annual investment is projected at INR 2.5 lakh crore under the National Infrastructure Pipeline, and that will keep going.
S.K. Ramaiah
executiveSo, looking at the metro projects, the current mileage stands at 870 km, and that's going to double — the track and the metro stations will reach almost 1,700 km. Then there are the big investments that really benefit us, coming into railway maintenance shops, workshops, and also maintenance depots for metros, and we've already got a foothold there. That will open up plenty of opportunities, which will be our focus, since in the privatization process railways offer favorable payment terms plus advances, and that's a key area of opportunity for us. Then there's roads. We've already been finishing a major project for Adani on KK Road, on Kodad Road in Andhra Pradesh, Telangana. That should give us a lot of traction when it comes to bidding for solid projects going forward as well, and the road sector offers unlimited opportunities too, and railways should pick up as well. So our assessment is that right now we're closely tracking INR 50,000 crore worth of opportunities. Some of them may even close during the current year. We'll have to see how much of that actually happens, given the election cycles, and also once the Election Commission announces a date for this election, the ordering will depend on that to some extent too.
S.K. Ramaiah
executiveWhat I can say, though, is this: looking ahead to next year, when we consider every opportunity across the power sector, O&M, and then the non-power side — especially railways, then metro projects, then irrigation, and of course the road projects — for us it's easy to target INR 40,000-INR 50,000 crore, and we should see the growth potential along with an increasing order backlog. That's what I can tell you. So, on the further matter of MDO and other things, the international operations, and the many, many other developments of the company, Rohit will bring out the facts.
Rohit Sajja
executiveGood afternoon, everyone, and thanks for having us on the call. This is Rohit speaking. Since Arvind has already briefly covered our mining operations, I'll walk you through the remaining data in detail. Mining has already begun at the recent MDO we won, and we've mined roughly 85,000 tons of coal — coking coal — over the past one and a half months. By the end of this financial year, which is one and a half months away, we expect that capacity to reach 2.5 lakh-2.8 lakh. So we'll be booking significant revenues from Tasra. Turning to the first mine, I think all of you know about the political situation in Jharkhand. At Forest Clearance Stage I, the authority raised some compliance points, so we had to refile it. After the refiling, the secretary — and given the political disturbance happening in the state — it got, there's a slight delay, I think a month's delay, but we expect to break ground in May, as Arvind said, and by July we'll be starting mining here as well. So that's the picture for the MDOs. Coming to overseas operations, we're making significant strides there too, and we've added a couple of new clients this year.
Rohit Sajja
executiveWe also secured a modest maintenance project in Qatar. Qatar is now a new geography for us, and we're progressing meaningfully while putting effort into Saudi Arabia. Substantial spending is taking place in the power sector. Broadly, Saudi Arabia intends to bring on more than 25 GW of capacity during the coming year. That is largely combined cycle capacity, and Power Mech does have prior experience carrying out combined cycle power plant work in that region. As a result, we're among the leading contenders. We've held discussions with EPC companies, and they have already gathered pricing from us. On the maintenance side, I believe we won a maintenance project in Bangladesh this year, and you will see this going forward — you'll soon see these long-term maintenance contracts and this pattern of Power Mech securing an increasing number of long-term maintenance contracts in the years ahead. And since a great many public sector utilities — they had always been awarding contracts, but they've begun awarding long-term contracts. So the trend is gradually shifting, and you'll see Power Mech winning additional contracts over the next 1 to 2 years in the maintenance area with the various power utilities.
Rohit Sajja
executiveWe’re already working with organizations such as DEWA, Dubai Electricity and Water Authority, SEWA, Sharjah Electricity and Water Authority, and ADNOC, Abu Dhabi National Oil Company. We’re carrying out some work for the refinery and for the power plant there as well. We’re also running a long-term maintenance project in Nigeria with the Dangote Group, where we built the power plant and were subsequently awarded the O&M model too. So that’s the update on MDO and the overseas business.
S.K. Ramaiah
executiveWe can now move on to the question-and-answer portion.
Operator
operatorThanks a lot. We're moving into the Q&A portion now. If you'd like to pose a question, just hit star and one on your touchtone phone. Should you want to drop out of the queue, press star and two. We ask that participants use their handsets when asking a question. Ladies and gentlemen, we'll pause briefly while the queue fills up.
S.K. Ramaiah
executiveAlright, absolutely.
Operator
operatorOur first question comes from Nirav Vasa at ASK Investment Managers, on the line. Go ahead, please.
Nirav Vasa
analystHi there, sir. I really appreciate the chance to speak with you. Can you hear me clearly?
S.K. Ramaiah
executiveYes, sir.
Nirav Vasa
analystYes. So, sir, the first thing I wanted to find out is this: of the backlog of pending orders we have, which comes to almost INR 17,596 crore, what share of that backlog would come from BHEL? Sir, even a rough number is fine.
S.K. Ramaiah
executiveNo, BHEL — that sits separately, yes, but we need to calculate it and then provide that information.
Nirav Vasa
analystAbsolutely.
S.K. Ramaiah
executiveIt's something that exists.
Nirav Vasa
analystThank you. Next, I'd like to get a handle on the competition picture. What we've observed is that within thermal power there was essentially a standstill for quite a long stretch. As a result, many EPC contractors and supply-chain participants that had been working in the thermal power system are not in the strongest financial or technical condition. So, based on how you see things, as this situation opens up over the coming years, how do you expect the competitive landscape to develop? Would you anticipate these smaller players coming back strongly, or do you foresee a situation where you, together with a few of the other smaller players, end up as the main beneficiaries of that consolidation?
S.K. Ramaiah
executiveYeah. So there are a couple of things here — a couple of aspects to this. Let's start by getting a handle on how that ordering is going to work.
Nirav Vasa
analystMm-hmm.
S.K. Ramaiah
executiveRegarding the main competitors among EPC players, BHEL is now clearly standing out. We've observed that they've secured over 5,500 MW in orders recently during the current year, bringing in close to INR 55,000 crore across the past one and a half years. L&T is also in the picture, though we've noticed a certain shift — perhaps they're carrying a heavy load of orders in the Middle East along with domestic infrastructure work, and they might be taking a second look. Then there's another angle: from the EPC standpoint, the third player who could potentially have a role is General Electric. Naturally, as an MNC, they have their own considerations when it comes to bidding structure and risk management. They need to work out their approach for the Indian market, since being an MNC makes them more risk-averse. Even so, they continue to explore it, but they would require some form of partnership given the many optimization changes underway, as well as certain developments involving mergers and amalgamations with various power sector players in the international market too.
S.K. Ramaiah
executiveTo make that happen, they also require certain inputs. That’s now in place. First, unless the Chinese players return as a backup at a later stage — if our Chinese players came into the market in the early 20 years back or 15 years back, unless that comes back — I, we, we believe BHEL will keep playing a role, and they have a manufacturing capacity of 14,000 MW-15,000 MW across all the manufacturing engineering. They could readily serve 5,000 MW-7,000 MW with no difficulty, provided their working capital gets better. Now, turning to contracting and subcontracting, if you look at it, you know, there are two, three segments. One is the main plant equipment and the balance of plant equipment, and then the civil works. Now, in both of those cases, we have a significant presence as Power Mech, or not, we are perhaps, you know, we are the leading player with a substantial market share in the main plant, boiler, turbine, and ETC. And then the civil, also the main plant with the balance of plant, apart from the cooling towers and even chimney we have completed in our own project. Most of the civil works in a plant we are able to do.
S.K. Ramaiah
executiveSo there are a lot of players in the civil package — at minimum 7 to 8 players are present. In mechanical as well, players exist. What has happened across the years, because of the market's downward trend, in power sector investment and their inability to — the competitor's inability to seize the opportunities with the market balance outside power, not the power sector, appetite among many private players has trended down, and that remains to be seen. Since recently we have seen — Mahan, we took a major job, and then even with BHEL, we took a job at Talcher, and then with Vedanta too, we have taken, and then Meenakshi as well, recently we have taken up. So that demonstrates the trend — at least 50%-60% of the market share in the power sector business, we should keep getting it, or if not more. That is chiefly because Power Mech has built a strong presence and execution capability which, we can say proudly, not many can match when it comes to resources management, equipment resources, construction management, and then construction support services. What our team can gather and provide, with our huge head count, both in the installation business and other sectors too.
S.K. Ramaiah
executiveWhen it comes to that synergy, we're among the handful of companies — maybe only L&T besides us — capable of taking on end-to-end solutions across construction, then operation and maintenance, and then civil work, structural work, mechanical work. With that kind of synergy, there aren't many players around. You've got a Simplex or a JMC for the civil work, or you could have Indwell and Texcel for the mechanical work. A combination — a player who can handle civil, structural, and mechanical — they may not have that, and that's exactly where the advantage shows up, as we saw recently in Mahan with the Adani, and we've also seen it with BHEL as well, and then the Vedanta group too. So competition can be subdued in the sense that there is appetite for so much. Suppose BHEL gets more orders. Suppose next year they get 78,000 MW, then that will add up to another INR 60,000 crore-INR 70,000 crore. So this will continue for another two to three years at the rate of INR 50,000 crore-INR 70,000 crore per BHEL. So, accordingly, there's further scope for us to enhance our potential in the power sector. That's what our assessment is.
Nirav Vasa
analystThank you very much. That really does help. So, sir, could you help me get a sense of this—for each megawatt, what would your scope of offering come to, in crore? I’m trying to work out your scope of work per megawatt in crore.
S.K. Ramaiah
executiveNo, I'm telling you, at the current rate — the present market rate — it's INR 8 crore to INR 8.5 crore. That's naturally a comprehensive EPC job. It's an end-to-end solution, a total solution. That covers engineering, procurement, and construction. Within that, you know, 55% goes to the main product equipment — 55%. So that's roughly INR 4.5 crore to INR 5 crore, and balance of plant would be about INR 3.5 crore to INR 4 crore. Typically, the, the construction portion of the business — the mechanical equipment for the customer, for the EPC contractor — comes to roughly 10% to 12%. We can put that at around INR 80 lakh to INR 90 lakh, or INR 1 crore per megawatt. Now, if it goes further down, to the base level of a subcontractor, it could be something like, you know, 5% to 8%, 6% to 8%. So I'd say roughly, suppose the customer figure is INR 80 lakh to 90 lakh per BHEL, per megawatt for the services portion, and the main part — just the equipment — our portion could be something like INR 40 lakh to 50 lakh per megawatt. Naturally, in the case of civil, that adds another 10% to 15%, depending on the scope of material available. That means when the customer supplies the material, like cement and steel, then, you know, the, the overall contract value goes to almost INR 10 lakh to 12 lakh per megawatt — 10% to 12% of the per megawatt.
S.K. Ramaiah
executiveSo that's yet another 80 lakh to 90 lakh, then. I'd say if you combine the two, it could reach close to covering equipment, erection, installation, plus civil and structural work. When you total all of that up — you know, for the on-site service portion — from INR 8 crore, you can figure INR 1.5 crore to INR 2 crore for each megawatt. That's what applies regarding a new installation. Then where the O&M side is concerned, once the plant goes into operation — since these days the customer outsources all of this too — and we've noticed lately that many of the upcoming projects will mostly be outsourced as well — for that we can take roughly INR 10 lakh to INR 15 lakh per megawatt. So that's how it works. Which means opportunities exist in government installation, civil work, and structural work, and once commissioned, as an O&M service.
Nirav Vasa
analystThat's great, and this is genuinely quite useful. So my next question concerns how much debt you're able to take on in order to finance your growth? At the close of FY 2023, the company's net worth stood at INR 1,277 crore. So if you could share with us the banking limits that are available, for pursuing this growth.
Nani Aravind
executiveSir, as things stand today, our debt is approximately INR 499 crore, and we hold fund limits of roughly INR 400 crore to INR 500 crore with our working capital lenders. Our achievement loans come to about INR 50 crore. So, more or less, we're staying within the limits we already have, and recently we raised those fund limits from INR 450 crore up to INR 500 crore, sir. Of that, we're using only 75%-80% — that's the extent of our working capital utilization. We're receiving mobilization advances from the new works, and that's how we're managing working capital. So, up to now, we haven't taken — we aren't pushing for any increase in the fund limits. We're getting by on the advances coming in from customers.
Nirav Vasa
analystNo, what I was asking is this: since growth has the potential to be extremely strong, and the sector is undergoing significant consolidation, the likelihood of your company receiving order inflows could rise exponentially. So I wanted to get a sense of the maximum capital employed that might come in. Your net worth, then, stands at INR 1,277 crore. So what is the largest amount of debt that banks are presently prepared to extend to you, on both a fund and a non-fund basis?
Nani Aravind
executiveNo, they’re fine—as long as the rating stays solid and my projections hold up, they’ll fund up to 25% of what I project, sir. And with my top line at INR 4,000 crore, if I’m doing business, they can fund as much as 25% of that turnover.
Nirav Vasa
analyst25%?
Nani Aravind
executiveYeah.
S.K. Ramaiah
executiveSomewhere in the range of INR 500 crore to INR 600 crore.
Nani Aravind
executiveWe have the capacity to draw an additional INR 500 crore to INR 600 crore, and that will hinge on what my top line turns out to be. There is no debt raise in our plans; we're handling things through mobilization.
Nirav Vasa
analystThanks. Sir, another thing is that besides power, what people expect is that CapEx tied to hydrogen could rise exponentially too. Is there any update at all? Are we pursuing that opportunity? How do we plan to enter that whole ecosystem? Could you share any updates?
S.K. Ramaiah
executiveRight. So the government's target is to complete the CapEx by about 2030. Some pilot projects, or experimental ones, have already been launched by private companies such as Adani. Reliance is putting in a huge amount, INR 75,000 crore. Adani is putting in INR 75,000 crore. A lot of players are now entering. As far as we're concerned, this falls under the service business. Say the annual investment reaches 5 million tons — I can't, I don't have those numbers, but the rough estimate of what private players have already invested, Adani, Reliance and others, you know, it could be substantial, it could be lakh of crore. So again, what I can say is that when it comes to executing the work — civil, structural, mechanical, and piping — there's not, no, no big deal there. We can do it easily. It involves vessels, piping systems, civil work, structural work. Some inquiries have begun to come in, but we have to take, we have to see it arrive on a substantial scale. That means pilot projects are coming up, not on a big mass scale. I think that will take another, maybe one, one year or one and half year.
S.K. Ramaiah
executiveWhen that finally arrives, it may well contribute the extra increment to the opportunity. Still, we need to figure out the actual specifics there, since the market picture isn't especially clear.
Nirav Vasa
analystThanks, sir. That’s all I needed to ask.
Operator
operatorThank you, sir.
S.K. Ramaiah
executiveI appreciate that.
Operator
operatorThanks. Our following question comes from Mohit Bhansali of Aryan Group, on the line. Go ahead, please.
Mohit Bhansali
analystSir, is it possible for you to hear me?
Operator
operatorMr. Bhansali, we’re not able to hear you clearly. Please switch to your handset mode.
Mohit Bhansali
analystYes.
Operator
operatorNope.
Mohit Bhansali
analystYes. Are you able to hear me at this point?
Operator
operatorNo, sir, that volume is really low.
Mohit Bhansali
analystHi there, is this coming through clearly now?
Operator
operatorCorrect.
Mohit Bhansali
analystIs anyone there?
Operator
operatorYes, please, go right ahead.
Mohit Bhansali
analystRight, thanks for the chance to ask. My question concerns your MDO. The first one is Kalyaneswari Tasra, which you mentioned. Have you begun mining there, and when will billing get underway? And what type of coal are you producing — is it coking, that is, metallurgical coal, or is it ordinary coal? Please, sir.
Rohit Sajja
executiveAppreciate the question, Mr. Bhansali. Now, about KTM — yes, Kalyaneswari Tasra, or KTMPL for short, that's what the abbreviation stands for.
Mohit Bhansali
analystAlright.
Rohit Sajja
executiveKTMPL has begun mining operations, and to date we've extracted 80,000 metric tons of coking coal. That coking coal serves as a raw material for steel plants, and it's washery grade coal. KBP — that's the second MDO.
Mohit Bhansali
analystAlright.
Rohit Sajja
executiveWe intend to begin mining during May. So likely by the fiscal year, yeah.
Mohit Bhansali
analystSo my question is this: you've already mined 80,000, and what's the plan going forward? So you'll keep raising it to what level, sir? I hope that you — you mentioned raising it to 300,000 by the end of this year, 300,000 tons per month.
Rohit Sajja
executiveBy March 31st, 2024, we'll have mined 3 lakh in total quantity — 2.8 lakh to 3 lakh in total quantity. But, you know, there's a — we're planning to ramp up production too slowly by next financial year; we plan to do two and then 3.5, because the mine's peak rated capacity is 4 million metric tons per annum. And we're also awaiting the environmental clearance for the washery, for which the terms of reference have been obtained and submitted. So once the washery is up and running, we — that's when we want to achieve our peak, which is 4 million metric tons per annum, by end of, by end of FY 2026.
Mohit Bhansali
analystSo you're saying that roughly 2 million tons is what you'll be mining next year?
Rohit Sajja
executiveYeah. And then, for the next financial year, we'll be mining approximately one.
Mohit Bhansali
analystOne and a half million.
Rohit Sajja
executiveOne and a half million metric tons.
Mohit Bhansali
analystSo at that point it gets washed, right? Because there's no washery at the moment — so what happens to it after that?
Rohit Sajja
executiveWe’re still billing at this point. Until the washery is commissioned, we have different prices in place.
Mohit Bhansali
analystAlright.
Rohit Sajja
executiveOur first bill is expected to go out during February.
Mohit Bhansali
analystAlright. Alright, that's fair, sir. Fair enough. Thanks. Thanks for sharing that.
Operator
operatorThanks. Our following question comes from Riya of Aequitas Investments, who is on the line. Go right ahead.
Riya Mehta
analystThanks for the chance to ask. My first question concerns the water project under the Jal Jeevan Mission. Where do we stand on that at present? After the election, how do we expect the momentum to carry forward?
Nani Aravind
executiveThe water, water, water project — that's what it comes down to.
Riya Mehta
analystJal Jeevan Mission.
Nani Aravind
executiveJal Jeevan Mission. Could you ask your question again now?
Riya Mehta
analystSure, I did want to include water projects, yes.
S.K. Ramaiah
executiveYes, madam. Still, you see, of course, the overall tenure looks like that — INR 3.6 lakh crore of current government investment that began in 2019. It could extend to 2025 or 2026 as well. And as of today, roughly 14 crore households have been hooked up, and we do have a presence. In UP we're handling three major projects worth about INR 2,729 crore, covering around 1,950 villages. Now, additional projects are at the bidding stage, and that brings, you know, investment is coming. We'll stay involved because our focus right now is converting those orders on hand. Beyond that, plenty of other water projects in urban infrastructure, sewage treatment plants, and now micro irrigation and similar things. Because we have one project — we've already bid, we hold a stand-alone micro irrigation project in Madhya Pradesh worth INR 600 crore. So we see drinking water as a very good market for us. As tenders arrive in various states — Maharashtra, Madhya Pradesh, Tamil Nadu, and Karnataka, plus other projects too — we will certainly pursue them. We'll look at what more we can do beyond that.
Riya Mehta
analystUnderstood. What I was really asking about is the period after the election. Are you seeing any slowdown in ordering?
S.K. Ramaiah
executiveNo, I don't follow what you're asking.
Rohit Sajja
executiveRiya, would you mind asking that again?
Riya Mehta
analystMy question is about the period after the election — are we noticing any slowdown, or is one happening at the moment in terms of ordering? I'm sure the pace of execution has picked up.
S.K. Ramaiah
executiveNo, I don't believe any of the projects — you know, with the backlog of more than 17,000 orders that we have — all of them are moving forward. We aren't dealing with any stoppage of work, any slowdown in progress, any funding problems, or any local issues. As of today, none of that exists. Customers everywhere are pushing the projects aggressively. That kind of major hiccup, we haven't seen.
Riya Mehta
analystUnderstood.
S.K. Ramaiah
executiveEvery one of the projects is going to come up.
Riya Mehta
analystAnd at this moment, how does the pipeline stand?
S.K. Ramaiah
executiveSo yes, there's an L1 position worth approximately INR 1,500 crore. Then, naturally, the older FGD project where we hold L1 status for the Goenka Group's projects — roughly 1,750 MW — comes to about INR 870 crore. We're still pursuing that one. We're asking for an extension. And then, as you know, there's an irrigation project worth INR 600 crore located in Madhya Pradesh, plus a railway project as well. The one thing is, we're hoping that if elections don't interfere, maybe we can achieve some additional penetration there. Beyond that, in the ongoing process, we've submitted offers totaling about INR 5,500 crore out of the INR 15,000 crore in immediate opportunities across infrastructure, railways, and power, et cetera. However, we'll have to see how much of that converts right away. But next year, as I mentioned before, we can comfortably track opportunities for projects worth INR 40,000 crore–50,000 crore, and possibly even more.
Riya Mehta
analystUnderstood — that’s really encouraging. That’s all from my side. I’ll get in line for any additional questions.
Operator
operatorThanks. Our following question comes from Anupam Gupta at IIFL Securities, who is on the line. Please proceed.
Anupam Gupta
analystYeah, good evening, sir. I have a couple of questions. First, regarding the guidance you mentioned — that next year you're looking at 30%-35% growth — that applies basically just to the EPC business, correct? And it doesn't include any mining revenue for the next one.
Operator
operatorApologies — you sound a bit muffled to me. Would you mind asking that question again?
S.K. Ramaiah
executiveYes, Anupam, sir — go ahead. Could you repeat that, please? I believe there's some interference on the line.
Anupam Gupta
analystRight, so to clarify what I was saying: that 30%-35% growth guidance you mentioned for FY 2025 — does it include mining revenue, or was it set before mining revenues were factored in?
Nani Aravind
executiveThat covers all of it, every bit, sir. So on margins, look, it comes down to the mix between FGD and mining. That's exactly what I said before. It should be.
Anupam Gupta
analystMm.
Nani Aravind
executiveIt should land somewhere in the 30%–35% range, and that accounts for the difference between FGD and mining. It should, based on what the mix looks like coming from FGD versus mining.
Anupam Gupta
analystTo be clear, margin isn't what I'm referring to. What I mean is revenue growth — the figure you cited as 30%-35%.
Nani Aravind
executiveOn the standard side of the business — yes, the standard business — 30%, and for this year we're already near 20% growth year over year. We'll reach 25% this year, and that's because we took in a larger order book during the current year, plus additional new works also came in during the current year. So we're aiming for 30%–35%, plus anything extra — yeah, FGD, if there's anything additional, then it could go past that. Yeah.
S.K. Ramaiah
executiveOut of that INR 17,000 crore backlog, if you're able to take 40% conversion.
Anupam Gupta
analystGot it.
S.K. Ramaiah
executiveBetween 35% and 40% — that comes to INR 66,000 crore.
Anupam Gupta
analystGot it. Yes, got it. If possible, could you give us an update on where the FGD project at Adani stands — that's roughly INR 8,000 crore out of the total INR 17,000 crore. What's the position right now?
S.K. Ramaiah
executiveYeah, regarding the Udupi project order, there's now another INR 250 crore, so I believe we've placed close to INR 1080 crore in orders. An additional INR 200 crore to INR 250 crore of ordering should take place this month — it ought to be doable. So that will lead to some conversion, a modest amount of conversion, in the current year.
Nani Aravind
executiveDuring Q3, we booked approximately INR 117 crore, sir. Regarding the orders we've put through with the customer, there's a chance we'll book a few FGD orders prior to March.
Anupam Gupta
analystSo essentially, when it comes to this portion of the Adani order book, will it be fully executed by 2025 and 2026, or what timeline are you looking at?
S.K. Ramaiah
executiveThe Udupi project is progressing well — 2 into 525 MW. Now, of the overall 8,460 MW, the remaining projects still need review. There's <<inaudible>>, and then we have a great many other projects as well. Beyond that, plenty of other matters arise around the environment, plus local clearances and PPAs too. I think this is among the key points, since they need a delta PPA for the power purchase agreements already in place, and.
Anupam Gupta
analystMm.
S.K. Ramaiah
executiveThat ought to weigh into it somewhat, and that's the point where, you know, FGD comes in to some degree. Yeah, and then there's the engineering integration side, since this is retrofitting work, and that has to happen within a confined space.
Anupam Gupta
analystMm.
S.K. Ramaiah
executiveIt's taking a little more time.
Anupam Gupta
analystRight. Well, ideally you'd want to consider roughly a 3-year execution period starting now. That feels like a sensible timeline, doesn't it?
S.K. Ramaiah
executiveSo yes, for Udupi, we can say things are going strongly. We’ll need to see how the other projects take shape as well. There are plenty of other factors involved. And then, beyond that — not just with Adani; the same situation carries on with the other customers too. They’re in a bit of a holding pattern, waiting on numerous things: clearances, engineering, retrofit issues, and then, you know, PPA issues. With so many items like that in play, that’s why there can be a slight slowdown here.
Anupam Gupta
analystGot it. Now, regarding the mining side of things — Rohit mentioned the target output for the Tasra mine, which is 1.5 for next year and potentially getting to 3.5 within the coming six months. So what should we expect — what are you aiming for at the CCL mine when it comes to ramping up production across the next two to three years?
Rohit Sajja
executiveHey Anupam. On CCL, we're planning to break ground in May, and the contracted quantity for that first year is roughly 400,000 metric tons. In FY 2025, we'll hit 400,000 to 450,000 metric tons.
Anupam Gupta
analystMm.
Rohit Sajja
executiveFor the following year, FY 2026, contracted volumes sit at 1.5, and our plan is to land somewhere around 1.6 to 1.7. So a ramp-up schedule is in place for that.
Anupam Gupta
analystAlright.
Rohit Sajja
executiveWe will increase capacity step by step. In the following year, that figure comes to approximately 3, and the maximum derivative capacity stands at 5 — something we intend to achieve over 2.5 to 3 financial years starting now, meaning by FY 2027.
Anupam Gupta
analystAlright.
Rohit Sajja
executiveOnce we hit 5 million metric tons per annum — but yeah, CCL is progressing. The first batch of coking coal will begin production, and from July onward we'll be selling it to CCL.
Anupam Gupta
analystGot it — that's helpful. One question about the international projects you're pursuing: you mentioned you've added them, and you're also looking to take mix in Saudi and Saudi as well. So those will follow the same approach as what you did in Australia, right? In essence, it's an ETC contract you're aiming to do, and not material risk sitting on your books, correct?
Rohit Sajja
executiveNo, no, no. That's just ETC. Right now we have no plans to move into civil or any other transmission and distribution area. Our entire focus is on ETC plus O&M. ETC plus O&M, across every sector where we operate. That's mainly it.
Anupam Gupta
analystGot it.
Rohit Sajja
executivePower, along with oil and gas.
Anupam Gupta
analystAll right. All right, got it. That's everything I had to ask. Thanks.
Rohit Sajja
executiveI appreciate it.
Operator
operatorThanks. Our following question comes from Mohit Bhansali of Aryan Group, who is on the line. Go right ahead.
Mohit Bhansali
analystYes. Yes, thank you, and thanks once more for the chance to speak. Sir, I just wanted to ask — you, you know, you mentioned that at KTR you're planning to mine on a large scale over the coming one or two years, but your washery still hasn't received approval, correct? I've heard that BCCL has recently opened one large washery quite close to your mine, which goes by the name Madhuban Washery. So does management have any plan to, you know, send its coal out, say, on an outsourcing basis for washing and then have it brought back to the principal?
Rohit Sajja
executiveYes, Mr. Bhansali. Under our contract, no third-party washeries may be used for washing the coal until we build a washery of our own. There is a washery at Chasnalla, and we know about this Madhuban. How SAIL handles this coal is, I believe, an internal matter for them. At present, what we're doing is piling it up at a stockyard, and we now need to deliver it to the Chasnalla washery. At the outset, if some other washery is involved, then until our washery gets constructed, a decision will have to be taken — SAIL will have to settle it internally and inform us. Should it be at a distance from Chasnalla, the extra kilometers will be compensated too.
Mohit Bhansali
analystAll right, sir, just to go back over something — you mentioned that from Talabira next year, roughly 1.5 million to 2 million tons of coal will be mined. Is that right, sir?
Rohit Sajja
executiveSomewhere between 1.5 and 1.6.
Mohit Bhansali
analystA million tons next year. So we're looking at roughly 1 to 1.5 tons each month, per month.
Rohit Sajja
executiveOne to one and a half?
Mohit Bhansali
analystYeah, lakh.
Rohit Sajja
executiveYeah, yeah, yeah.
Mohit Bhansali
analystLakh.
Rohit Sajja
executiveThat's roughly 1.5 lakh, or 150,000 metric tons each month. Right. 150,000 metric tons per month. Million metric tons per month.
Mohit Bhansali
analystAlright. Alright, sir. Thanks. I appreciate you taking my questions. Thank you.
Rohit Sajja
executiveI appreciate that.
Operator
operatorThanks. Our following question comes from Subrata Sarkar with Mount Everest Finance, who is on the line. Go right ahead.
Subrata Sarkar
analystNo, thanks. That covers what I needed, so I appreciate it.
Operator
operatorThank you. Ladies and gentlemen, if you'd like to pose a question, simply press star and one on your telephone. Our next question comes from Sabyasachi Mukerji of Bajaj Finserv AMC, on the line. Please proceed.
Sabyasachi Mukerji
analystHi, thanks for taking my question. First off, in the civil business you currently hold an order book of roughly INR 8,500 crore. And in a similar way, looking at the erection segment, there's again a backlog of about INR 7,500 crore. Over what timeline do you expect this to be executed, and does your capacity allow you to deliver at that kind of pace?
S.K. Ramaiah
executiveYeah, I think we can get this done with the resources we've got. Headcount stands at 32,000. Out of that, naturally, 10,000 can come from the O&M side. The remaining 20,000, assuming they're mostly working on civil, structural, mechanical, ETC jobs. And the cycle time across these projects, depending on the ordering, what they've done is, it ranges anywhere from 30 to 42 months, 40 months, something along those lines. On average, let's say roughly three years. So if you take the order backlog as of today, for civil and mechanical works combined, it's about INR 16,000 crore. So what we did was peak in a lot of the large ETC business and civil work, sometime between 2012 and 2015, when many orders came in and a lot of capacity for it, each year, capacity went up from 15,000 MW to 20,000 MW. So at that point, Power Mech was playing a big role. In fact, as of today, the biggest number of ultra-critical projects, we've installed roughly 27 units across the country. And also, like I mentioned earlier, we have an integrated approach covering civil, structural, mechanical, ETC, and post-commissioning O&M as well.
S.K. Ramaiah
executiveThere's a great deal of synergy on the resource side, and then with capital, and then with the cost of establishment, and on those we're able to outperform quite a few other players, and for us this is entirely achievable.
Sabyasachi Mukerji
analystSo you mentioned nearly three years—that's basically 36 months, or 12 quarters. If I just run a quick calculation on what our quarterly run rate would need to be, then across those 12 quarters you'd likely have to deliver INR 16,000 crore to 17,000 crore, which works out to roughly INR 1,300 crore to 1,400 crore per quarter. Have I got that right?
S.K. Ramaiah
executiveYes, you're absolutely right about that, since during the last month we hit INR 1,100?
Nani Aravind
executiveWe recorded INR 1,100.
S.K. Ramaiah
executiveAt INR 1,100 crore. And this month, this quarter, it may reach INR 1,400 crore to INR 1,600 crore. Of course, during the last two quarters you always get improved output and better results, thanks to all the ideal conditions. So a figure of INR 1,200 crore to INR 1,300 crore is entirely achievable, given the larger order backlog; it will rise by 20%-25% annually, and along with that, conversion will get better too. In fact, this will contribute to improved use of our assets, manpower, and equipment as well. That is a plus for us in this kind of conversion.
Sabyasachi Mukerji
analystUnderstood, sir. Moving to the guidance: to confirm, you provided revenue guidance of INR 4,500 crore for FY 2024, plus 30%-35% growth in FY 2025. Was that stated correctly?
S.K. Ramaiah
executiveYes, sir. Yeah, yeah. Yes.
Sabyasachi Mukerji
analystOkay, so the next part of this is that right now you've got roughly INR 17,000 crore in the order book, if I leave out the MDO contract, and suppose you finish at about the same figure, INR 17,000 crore to INR 18,000 crore of order book in FY 2024, that turns into the opening order book for FY 2025. If I assume something like a 40% conversion, that works out to roughly INR 6,800 crore, or something near INR 7,000 crore, which again is, I mean, the growth number is then really large, if I look from FY 2024 to 2025. What am I missing here?
S.K. Ramaiah
executiveYes, yes. I think, you know, there are a lot of large orders out there — railway orders, perhaps, rather than, say, orders in the road sector. Even the capacity, the order size in the installation business has increased. Take Adani, for instance, with this INR 825 crore, and BHEL with INR 354 crore. What we used to see were INR 100 crore orders, then INR 150 crore orders — now that has doubled up, tripled up. So that gives you, on the shorter cycle time, more packages within the same period — civil, structural, mechanical — and then, with the common establishment, it is doable.
Nani Aravind
executiveSir, taking INR 4,500 crore as my turnover for FY 2024, adding 30% to that brings it to roughly just under INR 6,000 crore. As things stand today, my order book is approximately INR 17,000 crore, even after you take out INR 6,000 crore for FGD. Beyond that, I might need to add another INR 2,000 crore to INR 3,000 crore in orders that I expect to receive. Around INR 12,000 crore — as I mentioned in my opening remarks as well — we typically turn over one third of my order book each year as we execute. It's easy; we can reach this number, and on top of that, MDO operations will also contribute to this number.
S.K. Ramaiah
executiveOrder booking will also come next year. In the first two quarters, any orders that get booked will convert in the second and fourth quarters.
Sabyasachi Mukerji
analystSo roughly INR 6,000 crore is achievable in FY 2025 — is that a fair ballpark?
Nani Aravind
executiveCorrect, sir, that's our target. It's 30% of whatever turnover we achieve in FY 2024. So even taking INR 4,500 crore as the minimum, that gives me INR 5,850 crore as my top-line figure for next year.
Sabyasachi Mukerji
analystUnderstood. Final question from me. With all these revenue figures, what sort of effect will that have on margins? Will there be some operating leverage — how should the margin trend?
Nani Aravind
executiveIf you look at my Q, we've stayed roughly flat, holding at the same level as Q2 and Q3. Versus the prior year, there's an upside — a margin increase of 30%. Depending on the mix of FGD and mining, margins will probably rise, or otherwise we don't see any decline from where margins currently sit. They'll carry on at that same level, at the same level.
Sabyasachi Mukerji
analystAlright, that covers everything I had. Thanks, and best of luck.
Operator
operatorThank you. The operator request has now been started. Should you wish to cancel it, just press star zero once more. One moment, please. Mr. Gupta?
Anupam Gupta
analystRight.
Operator
operatorYes, please go right ahead.
Anupam Gupta
analystYeah, I just wanted a bit of clarity on the CapEx. What's the CapEx you'll be doing for the EPC business, and what portion of it goes toward the mining business in FY 2024-FY 2026?
Nani Aravind
executiveOn the washery side, the capex we projected comes to roughly INR 690 crore in total, and of that, INR 240 crore was raised through the QIP. The remaining INR 450 crore is being raised as a loan at the government level. So at the SPV level, by 2026 — over that period, by 2026 — the capex needed for the washery itself will be about INR 690 crore. Beyond that, at the SPV level, we're raising money for the HEMM requirement as well as other plant needs. We've already acquired the bare minimum machinery, and mining activity is underway. Depending on what the site requires, we may bring in additional equipment at the SPV level.
Anupam Gupta
analystAll right, then — if we consider things on a consolidated basis, what would the annual CapEx figure be, roughly the amount you're budgeting for overall, factoring in both the SPVs and the EPC business?
Nani Aravind
executiveAt the EPC business level, the figure is probably around INR 450 crore — and the CapEx requirement stands at INR 690 crore.
Anupam Gupta
analystMm.
Nani Aravind
executiveSo at the SPV level, it really comes down to whether land is available and other considerations. Then we need to make sure that most of the money can be funded for those equipment items through internal approvals. There's no difficulty on that front. We aren't taking out any significant loans at the SPV level. Depending on what's needed, that's the only basis on which we'll raise the CapEx.
Anupam Gupta
analystAlright. Alright, alright. That's everything I had to ask. Thanks.
Operator
operatorThanks. Our following question comes from Riya at Equitas Investments, who is on the line. Go right ahead.
Riya Mehta
analystHi there. Thanks for the follow-up. I’d like to ask, what share of our orders currently comes from international?
Nani Aravind
executiveInternational segment: INR 113 crore.
Riya Mehta
analystPardon me?
S.K. Ramaiah
executiveThe backlog right now stands at INR 113 crore.
Riya Mehta
analystWas it INR 130 crore?
S.K. Ramaiah
executive113. 1, 1, 3.
Riya Mehta
analystA backlog of INR 113 crore. All right. And right now, during this quarter, you're seeing order intake in O&M go up quite a bit. So which were the largest orders we booked in that quarter?
S.K. Ramaiah
executiveYes, a lot of orders have come in.
Riya Mehta
analystAnything major, or just the one?
Nani Aravind
executiveYes, we got one — the Ghatampur Thermal Power project — for roughly INR 263.57 crore.
Riya Mehta
analystAlright.
Nani Aravind
executiveThe other one is Meenakshi Energy — roughly INR 675 crore — and we got an order from them.
Riya Mehta
analystYeah. Mm.
Nani Aravind
executiveMeenakshi Energy, based in Andhra. And there's another one — Dariba, Rajasthan — we got 2 into 91.5 MW, Dariba, Udaipur, Rajasthan, Hindustan Zinc, roughly INR 229.2 crore from them as well. And.
Riya Mehta
analystMm-hmm.
Nani Aravind
executiveYeah.
Riya Mehta
analystAs we move ahead, with O&M contributing more and a bigger portion of mining MDO orders flowing into our figures, what margins should we expect for the quarters ahead and for next year?
Nani Aravind
executiveAs far as MDO operations go, revenue will be low at the start, and costs will be lower too. So we're expecting <<inaudible>>, there's a shift in the mix over the coming year. That hinges on the mix, perhaps, between FGD and mining. Maybe we can tell you in the next quarter after we get proper information from the site — we can explain it to you then, in the next quarter.
Riya Mehta
analystUnderstood. And.
Nani Aravind
executiveOnly we can able.
Riya Mehta
analystUnderstood — many thanks. I believe the questions have now been addressed.
Operator
operatorThanks. Everyone, that brings us to the final question for today. At this point, I'd like to pass the conference back to management so they can offer some closing remarks. The floor is yours, sir.
S.K. Ramaiah
executiveThanks for joining and for the really interesting questions. I think we remain bullish on growth — what I mean is, there is growth, and there are many developments. Rohit covered the MDO as well as international operations. I think the NIP, the National Infrastructure Pipeline, is contributing enormously to opportunities across infrastructure, the power sector, and the energy sector, and that is getting converted. And perhaps most customers and even investors are very bullish on all these investments, with aggressive projects being pursued and implemented. We feel this profitability growth, EBITDA enhancement, and order backlog enhancement will keep playing into our operations. One advantage for us, obviously, is that the more projects get commissioned in the power sector — for example, 27,000 MW of power projects are under implementation — that will come as some sort of wind down opportunity next year as well. That is why we have seen close to INR 2,000 crore of wind down orders come in as of today, which is a huge, huge jump in our order booking in wind down. And also the spot in the orders that we got in the installation business and the civil works as well for the Mahan power plant too.
S.K. Ramaiah
executiveSo for that segment, that’s what we anticipate will keep being present in the years ahead—at minimum, 2 to 3 years.
Operator
operatorThank you, sir. This wraps up the conference on behalf of Nirmal Bang Equities. We appreciate your participation, and you're welcome to disconnect your lines at this point.
S.K. Ramaiah
executiveI appreciate it.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Power Mech Projects Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Power Mech Projects Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Power Mech Projects Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.