Power Mech Projects Limited (POWERMECH) Earnings Call Transcript & Summary

November 13, 2024

National Stock Exchange of India IN Industrials Construction and Engineering earnings 59 min

Earnings Call Speaker Segments

Operator

operator
#1

Good day, ladies and gentlemen, and welcome to the Q2 FY ’25 earnings conference call for Power Mech Projects Limited, hosted by Nirmal Bang Equities Private Limited. Just a reminder that every participant line will be in listen-only mode, and once the presentation wraps up, you’ll have a chance to ask questions. <<operator_script>> Kindly be aware that this conference is being recorded. I’ll now turn the conference over to Ms. Natasha Jain of Nirmal Bang Institutional Equities. Thank you, and over to you, ma’am.

Natasha Jain

analyst
#2

Thanks, Davin, and good afternoon, everyone joining us. Nirmal Bang Institutional Equities is glad to welcome all of you to the earnings conference call for the second quarter of FY ’25 for Power Mech Projects Limited. Joining us from management today are Mr. N Aravind, Chief Financial Officer, and Mr. S Kodandaramaiah, Director Business Development. At this point I’ll hand things over to management for their opening remarks, and after that we’ll open the floor for Q&A. Thanks, and over to you, sir.

Nani Aravind

executive
#3

Thanks, Natasha. Joining me are Mr. Ramaiah, our Director of Business Development, along with Mr. Rohit Sajja, President of BD and Operations. I’ll ask Mr. Rohit to kick off the opening remarks, and after that I’ll begin the presentation.

Rohit Sajja

executive
#4

Good afternoon, everyone, and thanks for joining the investor call. So I'd like to begin with a quick overview of the order book, and also give you a picture of the new order inflows we expect for the remainder of the year. Then I'd like to briefly touch on the mining operations, and after that I'll hand the call over to Aravind to speak about the numbers. So this year, we're targeting order intake of around INR12,000 crores across various sectors, namely power, non-power, civil infrastructure, and water. And as of 30th September 2024, we've secured orders worth INR3,100 crores, which takes the total order backlog to INR58,000 crores, or a little over INR58,000 crores. And excluding both the MDOs, our unexecuted order book stands at INR18,402 crores. There are INR8,900 crores worth of projects in the pipeline that we have bid for, and the results of these projects are expected to be announced in the next three to four weeks. And apart from this, over the last one, one and a half year, we've also been seeing a considerable amount of growth in the power sector, with close to 80 gigawatts of capacity addition planned by 2032.

Rohit Sajja

executive
#5

From that, about 37 gigawatts has gone out for tender, while roughly 43 gigawatts is still left to be tendered. For Power Mech, that works out to a potential opportunity of INR86,000 crores in the civil and mechanical workspace — and that's construction only. It covers both the boiler turbine generator areas as well as the BOP civil and mechanical areas. We're also going after the BOP EPC space, which would translate into an opportunity size of INR2.1 lakh crores over the next four to five years. Beyond that, we are actively exploring a few opportunities in the green hydrogen space as well, particularly the SECI tenders that have come up for green hydrogen derivatives. So here again, we have tied up with a few electrolyzer manufacturers, and we are in advanced stages of forming partnerships with them. So looking ahead, we expect to expand our order book in line with our growth plans over the next five years, focusing on our core sectors like power and infrastructure, while also diversifying into green energy. And speaking a little bit about the MDO business, we have made significant progress over the last one year in both MDO projects. And this year, we have the Tasra mine, we have secured.

Rohit Sajja

executive
#6

At the first Kotre Basantpur mine, all permissions are in hand, and we expect to break ground in roughly the next three to four days. We've also obtained the forest clearance needed to begin the tree-felling work. So we anticipate the first coal output to come in January or February of this year. Kalyaneswari Tasra is picking up momentum as well. Equipment mobilization for the initial mining operations is complete, and we've received environmental clearance to build a washery with a capacity of 3.5 metric tonnes per annum. And as of today, we've carried out overburden removal and coal production of approximately — overburden removal work is underway. We've produced around 382 tonnes of coal. I'd now like to ask Mr. Aravind to give an update on the Q2 and half-yearly figures.

Nani Aravind

executive
#7

Thank you. Good afternoon, everyone. Our results for the second quarter and the first six months of this financial year stayed in line with the targets we set for the whole year. Reported total income for Q2 of financial year ’24-’25 came in at INR1,035 crore, versus INR937 crore in Q2 FY ’24 — a rise of 12% year-on-year. EBITDA stood at INR134 crores, compared with INR118 crore, which is growth of 13%, and PAT was INR67 crore, up by 31% from INR51 crore in Q2 FY ’24. So, on a quarter-to-quarter basis, Power Mech has shown improvement in its overall margin profile. EBITDA margin climbed from 12.57% in Q2 FY ’24 to 12.78% in Q3 FY ’25. PAT margin rose from 5.47% to 6.43%. In the revenue mix for quarter two FY ’25, the mechanical business contributed INR229 crores, against INR148 crore in Q2 FY ’24, an increase showing 10% growth. The civil business, including railway and water distribution, contributed INR395 crores, against INR496 crore in Q2 FY ’24, a decrease of 20%. O&M revenues were INR391 crore, against INR272 crores in the corresponding period last year, reaching 44% growth. The electrical business posted INR9 crore, against INR17 crores, a decrease of 47% year-on-year. Mining business came in at INR12 crore, against zero in Q2 FY ’24.

Nani Aravind

executive
#8

On the other income side, it was INR10 crore versus INR5 crore in Q2 FY ’24. So in quarter two of FY ’25, domestic business and international business split 95% and 5%, respectively. Power sector contribution was unchanged at 66%, while non-power accounted for 34%. In the same way, total reported income for the six months of FY ’25 comes to INR2,062 crores, compared with INR1,808 crore in half year FY ’24 — that's a 14% year-on-year increase. EBITDA is INR257 crore versus INR223 crore, up 15%. PAT stands at INR127 crore against INR102 crore in half year one FY ’24, a 24% year-on-year growth. So, on a half-year-to-half-year basis, Power Mech has shown improvement in its overall margin profile. EBITDA margin rose from 12.31% in FY ’24 to 12.45% in half year FY ’25. PAT margin rose from 5.66% to 6.17%. On the revenue mix for the six months, the mechanical business contributed INR331 crore versus INR258 crore in half year FY ’24, an increase of 14%. The civil business, including railway and water distribution, contributed INR937 crore against INR989 crore, a shortfall of 5%. O&M revenues came in at INR732 crores versus INR524 crores in the corresponding previous period, registering 40% growth.

Nani Aravind

executive
#9

On the electrical side, we saw INR17 crore versus INR25 crore—that's a 32% decline. For mining, we had INR26 crores compared with zero in the prior year. Other income came in at INR19 crore, up against INR10 crore last year. So in the first half of FY ’25, domestic operations accounted for 94% and international for 6%. Power contributed 60% as mentioned, while non-power made up 40%. Turning to the financial metrics, net current days excluding cash and cash equivalents rose from 142 days in Q1 to 147 days in Q2, driven by certification delays on works and slower collection of receivables in the water division, which led to a modest rise in the company's current assets. Debt levels remain under control. As of 30th September, gross debt is roughly INR611 crore, with net debt at INR64 crore. The debt-to-equity ratio as of 30th September ’24 is 0.34 times. With that, I'll hand it over to Mr. Ramaiah for an update on the development side.

Sudha Kodandaramaiah

executive
#10

Good afternoon, everyone. Good afternoon to Rohit and Aravind, and to my other colleagues who are here. Thank you for joining today's call. I believe Rohit has laid out the big picture of where this company is headed — the growth patterns, the revenue side, and the opportunity side going forward — and Aravind has walked through the financial numbers. We should stay bullish on the market opportunity, on the availability of opportunities, and on the bidding opportunities that are out there. At the start of the year, total order backlog stood at INR17,362 crores. That figure has risen to INR18,402 crores, a jump of nearly 6%, and most of the booking came from the O&M side. That is a very encouraging sign. Order backlog in O&M, which was INR2,197 crores at the beginning of the year, has climbed to INR3,326 crores — almost 51%. O&M, I would say, is one of the key areas where we are strong in operations for topline — and not just topline, but even more importantly, the bottom line. That is a very positive sign. Of course, in mechanical and civil, their overall backlog remains the same. And overall order booking came to about INR3,055 crores across the first two quarters.

Sudha Kodandaramaiah

executive
#11

Our domestic backlog accounts for roughly 98.7%. International business makes up 1.3%, largely tied to numerous O&M jobs we're chasing across the Middle East as well as West Africa. Power sector backlog stands at approximately 68%, while non-power comes in near 32%. This clearly demonstrates that growth is being propelled by the power sector and that opportunities exist. The power sector, naturally, is the more comfortable one. The non-power sector represents opportunities we entered on a large scale over the past seven, eight years, and it remains important to our growth strategy. Regarding key development areas, beginning with power, I believe we all recognize the market has turned very bullish given the surge of orders flowing in. Obviously, this ties to the enormous demand gap that could emerge between coal-based power and non-coal power — that is, renewable power — which is expected to widen the gap by 1930 to 32, resulting in grid instability and numerous outages as well. As a precaution, the government has undertaken many proactive measures, including ramping up capacity of coal-based plants to serve as backup for base load operation, which explains why this flood of orders is arriving.

Sudha Kodandaramaiah

executive
#12

And what we've observed over roughly the past eight to 10 months, maybe stretching to a year — it possibly started with Lara, where BHEL secured the NTPC order, and after that came Talcher, then Singrauli, followed by Talabira from NLC, Neyveli Lignite Corporation, and Yamuna Nagar from HPCL, and then a surge of orders from the Adani side. In total, Adani has placed orders for roughly 10,920 megawatt over the last couple of months, mostly with BHEL, and NTPC has ordered around 11,580 megawatts. I'm giving you this one-year background, and beyond that, quite a lot has happened during the last couple of months and so on. Then there's HPCL with one unit of 800 megawatt, DVC at Koderma with two units of 1,600 megawatt, and then NLC's Talabira — that project, of course, is moving somewhat slowly. So this demonstrates that in the power sector, the ordering position has climbed to nearly INR1,28,000 crores for BHL itself. As a result, BHEL is inundated with orders. And a recent development concerns the bulk quarters they have already invited for Nabinagar, Gadarwara and Telangana, so eight units in total. L&T was L1 there, but under the tender conditions, an opportunity existed for BHEL to bid on one of the projects, and we have captured the L1, which has now been confirmed.

Sudha Kodandaramaiah

executive
#13

So that's roughly INR1,600 crores for the Telangana project. So when you look at the total ordering that all these customers have placed — Adani, HPGCL, DVC, NLC, NTPC — for something like 35 sets, which works out to 27,300 megawatts, it adds up to close to INR1,55,000 crores, since about INR27,523 crores of that is for L&T, and that will be confirmed because they've been told to proceed with the work, and then BHEL at INR1,28,000. Indirectly, that means a very large opportunity base for us when it comes to the ETC business, steel work, structural works, how the balance of plant works in terms of coal handling facilities, and civil works for the balance of plant. And then, as more and more sets get operated and everything reaches commissioning, our O&M opportunities rise as well. On a ballpark basis, from a rough calculation, what we've worked out is that the future opportunity size in the power sector could reach up to INR30,000 crores, or beyond INR30,000 crores, across various areas — installation, civil, structural, mechanical work, and other areas too. Beyond that, there are BOP opportunities coming up because NTPC has taken a principal stance to split the EPC — the overall, bulky EPC of the entire plant — into two areas: the main plant with the civil structures in that area, and the balance of plant.

Sudha Kodandaramaiah

executive
#14

Also, balance of plant opportunities are going to arise, and right now we're examining chances in a few of those projects, such as Singareni, which is being developed in Telangana. And later, once NTPC comes forward, we'll need to partner with certain players on how to bid for all of that. Naturally, in Telangana we are chasing that opportunity hard, and it has to come with BHEL, since BHEL has been negotiated from the Telangana side — we'll have to watch how it takes shape. And there are additional tenders that have been issued too for the new EPC, plus other tenders such as OPGCL in Orissa, then Ukai in Gujarat, then MPGCL Amarkantak, MPGCL Sarni, and Singareni in Telangana, which I mentioned to you. That's because NTPC has received a mandate to finish its share of ordering as well as capacity addition to satisfy the requirement by 2030–'32, by the close of this decade. So that will mean another 11,440 megawatt entering the tendering process. Apart from 4,800 megawatt, most of the remaining tenders ought to be finalized by year-end, it should be. Another six months should be feasible.

Sudha Kodandaramaiah

executive
#15

That adds roughly another INR20,000 crores of opportunities within the power sector segment itself. Right now, on the table, we have approximately INR24,000 crores worth of various opportunities at the bidding stage, and also after submission on the power plant side, in the drinking water schemes, and then across various other non-power segments — that is where Rohit had confidence about the future, that around INR3,500 crores of things could materialize within the next couple of months, two, three months at most. And then we remain bullish about hitting the targets given the size of the opportunity available, with so many tenders under bidding at around INR24,000 crores, which is on our radar. So those are the major things we have to say. And then O&M — we have witnessed a significant improvement. In fact, the better order backlog of O&M, up 50% from the start of the year to the midpoint, will bode well for improving the topline and, more importantly, for the bottom line. And some of the key things that have happened: the major project at Talwandi we have taken for three into 660 megawatt, which is about INR951 crores. This ranks among the largest O&M orders we have ever taken in the market.

Sudha Kodandaramaiah

executive
#16

That contract ran for five years. So that's the reason, this year, total O&M order bookings came in at roughly INR1,860 crores, almost, and that's a good sign for what lies ahead for us in this growth and for profitability as well. A few more O&M projects should also come through this year in the other segments too — in railways, and then I mentioned the power sector to you, and then the other infrastructure side. And a few other fairly significant investments I can quickly run through. In steel, a great deal of investment is on the way. ISCO Burnpur is coming in with INR30,000 crores of investment for a 4.5 million tonne capacity, and there can be opportunities on our side of the work in civil structural and installation business. Then Bokaro is also expected to come up with investments, and then at Rourkela there is a plan for expansion and investments as well, and opportunities exist in the Middle East too. JSPL is planning to put INR30,000 crores into a 5 million tonne capacity in Oman. We already have a presence in the Middle East as well, and Rohit is rigorously pursuing those things, particularly since we also have a huge HR base in handling dozens of projects in installation and maintenance, operation maintenance, et cetera.

Sudha Kodandaramaiah

executive
#17

So we've got a base of roughly 7,000 megawatts of thermal-sector power plants spanning the spectrum throughout the Middle East. That footprint and growth ought to help us assess whether, as these investments arrive, we can also seek a way in. That's the broad picture. Then there's the balance investment that will keep flowing into railways — we anticipate another couple of years of that flow, alongside a massive investment of INR1.5 lakh crores to INR2 lakh crores in the road sector, more than INR2 lakh crores, INR2.5 lakh crores. Then drinking water: the residual orders must be finished now, or perhaps under the new AMRUT scheme or whatever form it takes, and all. Those opportunities will be there too. And at this point the company is fairly diversified, spread widely, and we've built up the organization as well. In fact, current organization strength — both direct and indirect labor — has risen by roughly 10% to handle the new businesses that have arrived, not just in the power sector but in O&M and other areas too. So that's what I wanted to say at the outset <<inaudible>>.

Sudha Kodandaramaiah

executive
#18

I appreciate it.

Operator

operator
#19

Much appreciated. At this point we'll open things up for questions. <<operator_script>> Our first question comes from Omkar Chitnis, who is on the line from Trade Brains. Go right ahead.

Omkar Chitnis

analyst
#20

Good afternoon. For my first question, I'd like to ask about the MDO business, since the Geological Survey of India has identified a number of lithium oversights, and the Indian government intends to call a tender for lithium oversights over the coming years. So, are we working on building additional mining expertise compared with the traditional mining operations in India and globally?

Rohit Sajja

executive
#21

Yeah. Appreciate the question. So at this point, what we're really concentrating on is getting both of those mines up to steady state operations, or peak rated capacity — that's 9 million metric tonnes per annum — and we're expecting to hit that in 2028. And we aren't considering any other mines right now, no other MDOs, no other coal blocks, no mining of any other kind. As for lithium, we did do some work on that, and the thing is, lithium calls for a different skill set and different expertise when it comes to mining and extraction.

Omkar Chitnis

analyst
#22

Right, sir, got it. My next question concerns growing in the global market, the U.S. especially. During the first term of the Trump administration, he placed greater emphasis on infrastructure development and energy. Should we expect the same kind of infrastructure development in the second term in the U.S., which could give us more chances to enter the U.S. market? And are you planning any partnerships around U.S.-based reforms?

Rohit Sajja

executive
#23

No, sir. At this moment, the U.S. isn't something we're considering as an expansion strategy, particularly when it comes to our infra business.

Omkar Chitnis

analyst
#24

All right, all right, sir — for my final question: previously you gave guidance of 25% to 30% revenue growth for FY ’25. Which particular strategies have been put in place to hit that target, especially given where the market stands today and the competitive landscape?

Nani Aravind

executive
#25

We’re starting with an opening order book of roughly INR17,000 crore, and for this year our plan is to bring in around INR12,000 crore of order inflow, not counting the MDO business. Historically, we’ve converted 35% to 40% of that opening order book into turnover. On that basis, we’ve projected revenue growth of 30% for the current year. In ’23 as well, we hit that 30% target from ’22 to ’23. So it’s a target that’s easily doable. We projected that 25%. We’re confident we’ll achieve this number during the current FY ’25.

Omkar Chitnis

analyst
#26

Alright, sir, thank you, sir. Best wishes for the quarter ahead.

Nani Aravind

executive
#27

Thank you.

Rohit Sajja

executive
#28

I appreciate that.

Operator

operator
#29

Thanks. Our next question comes from Pritesh Chheda at Lucky Investments. Pritesh, the line is yours.

Pritesh Chheda

analyst
#30

Sir, regarding coal MDO, I keep seeing ongoing slippage on the execution front for that project. So with those two projects, where do things actually stand right now, and as far as your peak run rates go — how near are you at this point to hitting those peak run rates, or what revenue and PAT would the two projects together deliver in FY ’25 and ’26?

Rohit Sajja

executive
#31

Yeah. The first mine with Central Coal Fields Limited — that's a 5 million metric tonnes per annum mine, the one we named Kotre Basantpur — there's a slight delay. We had a four-month delay, I think, because of — at first there were central elections, and now state elections. But as things stand right now, we're in a position where, this week, our resources have been mobilized, and we expect to begin work any moment. All we're waiting on is the final clearance, which should come through anytime soon. And with this mine, at the outset we expect roughly INR50 crores of revenue this year, sir. So even if we begin supplying the first batch of coal in January — if we begin extracting overburden in December, which we expect to do by the first or second week of December, once the tree-felling activity is finished — we are on track to do INR50 crores at this mine. So the plan for next year is to raise capacity to 400,000, and this is contractual capacity as well. And once we do 400,000 metric tonnes, we'll bring in revenue of INR300 crores to INR310 crores, depending on price variation.

Rohit Sajja

executive
#32

And we expect this mine to hit PRC — peak rated capacity — by 2028. So revenues will peak in 2028. As for the second mine, called Kalyaneswari Tasra, which belongs to SAIL, we've already begun extracting coal, and from February 2024 through October 31 we've pulled out 380,000 metric tonnes to date. That trend will only rise going forward, and again — on washing capacity, we're running a bit short, because SAIL doesn't take the full offtake of this resource we're able to extract. But things should improve starting January, February onward, and we managed only INR30 crores through Q2, while over the next two quarters there will be a substantial jump in revenue from this mine. It could reach INR150 crores to INR160 crores. And this too should reach PRC, peak rated capacity, around mid-2027 to 2028 — that's when our washery will be built as well and we'll begin getting the full mining fee. That INR160 crores you mentioned — is it for the full year or H2 for SAIL? So, ex of H2.

Rohit Sajja

executive
#33

We had already reached 28 by the time H2 came around.

Pritesh Chheda

analyst
#34

So that's 160 plus 28. For the full year, that gives us 188?

Rohit Sajja

executive
#35

Yes, sir, yes.

Pritesh Chheda

analyst
#36

All right. Could you share what the PAT figure would be for the Coal India mine in the coming year, assuming INR300 crore in revenue?

Rohit Sajja

executive
#37

Sir, at first, next year, since PAT is going to be a little lower until we get to PRC, it's more that we have to bring in investments from our side. So it will stay around the 6% to 7% range. But once PRC is achieved, PAT will improve a great deal, substantially, all the way up to 12% to 13%.

Pritesh Chheda

analyst
#38

So the peak you're talking about, that gets reached at the Coal India mine in FY ’28, correct?

Rohit Sajja

executive
#39

Right.

Pritesh Chheda

analyst
#40

And you'll hit the peak rating at the SAIL mine in FY ’27?

Rohit Sajja

executive
#41

In the middle, yeah, middle — either toward the end of FY ’27 or the middle of FY ’28.

Pritesh Chheda

analyst
#42

Okay. And regarding that 25% revenue guidance you provided — was that given with FY ’25 excluding all numbers, or including the coal — MDO numbers?

Nani Aravind

executive
#43

This includes the coal MDO figures as well.

Pritesh Chheda

analyst
#44

Including?

Nani Aravind

executive
#45

Yeah. INR5,500 crores, coal figures included.

Pritesh Chheda

analyst
#46

Alright, thank you, sir.

Operator

operator
#47

Thanks. Our next question comes from Sandeep Dixit at Arjav Partners. You have the floor.

Sandeep Dixit

analyst
#48

Thanks very much, sir. I have just a couple of questions. On that guidance of INR5,500 crores for the current year — if I just look at the figures, that implies 40% revenue growth in the second half. Is my math correct?

Rohit Sajja

executive
#49

Yes, sir.

Sandeep Dixit

analyst
#50

What's driving that growth?

Rohit Sajja

executive
#51

On FGD, we did roughly INR52 crore in Q2, and the rest came from new orders we received from Mahan and from our new projects. On O&M, the new projects we received during Q1 of last year, and the new orders we received from the various projects. <<inaudible>>.

Sandeep Dixit

analyst
#52

So really, the main point I’m drawing from this is that you’ve got much greater clarity on that INR5,500 crores figure, right? The odds of a disappointment are very slim. Is that correct?

Rohit Sajja

executive
#53

Yes.

Sandeep Dixit

analyst
#54

All right, sir, the second question concerned the mining operations. In your earlier response, you said margins would be 6% to 7% until peak rated capacity margin is reached. Is that a PAT margin rather than an EBITDA margin?

Rohit Sajja

executive
#55

That's not EBITDA — that's PAT.

Sandeep Dixit

analyst
#56

All right, great. Thanks. In that scenario, what would the EBITDA margin be?

Rohit Sajja

executive
#57

On a blended basis, EBITDA is going to be PRC. Once we get to PRC, the combined EBITDA from both mines should land somewhere in the 20% to 22% range.

Sandeep Dixit

analyst
#58

Okay. I believe you brought that up on previous calls. Thanks so much.

Rohit Sajja

executive
#59

Appreciate it.

Operator

operator
#60

Thanks. <<operator_script>> We now have a question from Anant at Mount Intra Finance, who is on the line. Please proceed.

Anant

analyst
#61

I only have a single question. Inflows stand at INR3,055 crores. That said, I notice a revised order that you've carried out for. Is my calculation correct, or?

Nani Aravind

executive
#62

We can’t hear you on your end. Could you…

Anant

analyst
#63

Hello there, is my voice coming through at this point?

Nani Aravind

executive
#64

Yes, that's a bit better. Yes.

Anant

analyst
#65

Yes. So order inflows came in at INR3,055 crores for H1 ’25. That said, I notice there’s a revised order worth INR593.99 crores from Uttarakhand Pey Jal Nigam Limited. Is that one also part of the current order book?

Nani Aravind

executive
#66

Sir, which order are you referring to, and which project?

Anant

analyst
#67

Specifically, the order worth INR594 crores that came from Uttarakhand Pey Jal Nigam Limited — you disclosed it on 22nd July ’24. So this looks like a revised version of that order. And based on my calculation, this is…

Nani Aravind

executive
#68

Yes. The revised figure of INR230 crore is in there too, so that's included as well. Right.

Anant

analyst
#69

Right, so really you've got double counting there, since that order came in during April ’23.

Nani Aravind

executive
#70

No, to clarify my opening remark — what I’ve taken is just the INR230 crores difference value. In the current status, I’ve considered only the change of scope value.

Anant

analyst
#71

All right, thanks.

Operator

operator
#72

Thanks. <<operator_script>> The next question comes from Prateek Shah of Nirmal Bang Equities on the line. Please go ahead.

Prateek Shah

analyst
#73

Thank you, sir. I appreciate the chance to be here. Can you hear me okay?

Nani Aravind

executive
#74

Yes, sir.

Prateek Shah

analyst
#75

Sir, my first question concerned the recent softening in the steel sector over the past three to six months. Have we gotten any order booking from JSPL that you had been anticipating, or do we expect any delays on the capex?

Sudha Kodandaramaiah

executive
#76

I'd say IISCO Burnpur is really coming together. In fact, their initial emphasis is on the supply orders, since supply — we did have some conversations with a few Russian companies as well. Naturally, there are qualification concerns on their side. However, the construction contracts and those with construction partners will come along in another four to five months. Perhaps it will move forward, and there could be substantial opportunities, roughly INR4,000 crores to INR5,000 crores. Naturally, we need to determine which projects — which packages matter most to us in that context. Still, these investments rest on a solid footing. I believe IISCO has established a firm footing, and then Rourkela will also emerge. At Rourkela, they plan to expand in material handling as well as at other sites. After that, Bokaro — we'll have to wait and see. Naturally, the broader picture is that SAIL aims to double capacity from 25 million tonne to 50 million tonne, roughly along those lines. That's the situation. And then JSPL — what I mentioned regarding Oman is a committed, firm investment under Vulcan Steel, with JSPL fully invested in completing it. We can make a decision based on the opportunity and also on what kind of work becomes available that we're capable of doing.

Sudha Kodandaramaiah

executive
#77

Naturally, we already have a reference base from the work we've completed at the steel plants in Dolvi, Bellary, and JSPL Angul. And using those references, we can give it a try.

Prateek Shah

analyst
#78

Understood. My follow-up question concerned capital expenditure for Power Mech in ’25 and ’26. Is there any guidance you can provide on that?

Nani Aravind

executive
#79

So to hit the revenue growth targets we normally aim for, we're raising capex on normal assets by roughly INR100 crore — that's the increase we're looking at, sir. Beyond that, the environmental clearance approval for the washery has come through. That means the Tasra project's washery setup calls for an overall capex plan of INR690 crore. So across the next two to 2.5 years — two years' time — we'll be incurring this INR690 crore of total capex in Power Mech's books.

Prateek Shah

analyst
#80

All right, that was useful, sir. That's all I have to say.

Operator

operator
#81

Thanks. <<operator_script>> Our following question comes from Manthan Jhaveri at Nexus Securities. Go right ahead.

Manthan Jhaveri

analyst
#82

Can everyone hear me?

Operator

operator
#83

Yes, we can hear you, sir.

Manthan Jhaveri

analyst
#84

My question was about order inflow. Right now we're guiding for somewhere between INR11,000 crores and INR12,000 crore of order inflow. And to date, we've gotten only INR3,000 crores of order inflow. So what's giving us confidence that we can achieve that in H2, or over the remaining seven months of this calendar year? Have any large orders come in?

Sudha Kodandaramaiah

executive
#85

So yes, INR24,000 crore worth of these opportunities is currently on track. That figure combines work on the power plant side with the non-power sector — the infrastructure side — plus the metro side, drinking water schemes, and so on. Roughly 3,500 tonnes sit on the firm side and ought to materialize within the coming one or two months. Beyond that, the other items should also move forward. And in the power sector as well, a fresh wave of orders should arrive, since all of this ordering that Adani has placed is generating a great many inquiries. They are keen on a partnership with us, and we are engaged at Mahan along with the new projects at Raipur, Raigarh, Mirzapur, and Kawai too. Every one of these projects will certainly move ahead before long, given that they will make decisions more quickly — and then BHEL, with total order booking in the power sector alone of approximately INR1,28,000 crores, must also accelerate its ordering considerably. So growth is anticipated there as well. That explains what happened across the first two quarters, when there was a certain slackness driven largely by the elections — the main elections and then the state elections and all.

Sudha Kodandaramaiah

executive
#86

The same kind of pattern occurred last year during Q3 and Q4 as well. Orders picked up in the third and fourth quarters, and when we look at the size of the opportunity alone, we remain confident about those figures.

Manthan Jhaveri

analyst
#87

Okay, that’s fair, sir. And sir, regarding the MDO side, what revenues could be expected at peak capacity in FY ’28 from both mines?

Rohit Sajja

executive
#88

Sir, that comes to INR2,100 crores.

Manthan Jhaveri

analyst
#89

And is it possible to get there in FY ’28 from both of those mines?

Rohit Sajja

executive
#90

Yes.

Manthan Jhaveri

analyst
#91

Okay. And another thing was about the Adani FGD orders. So are those FGD orders still moving slowly, or is there some traction <<inaudible>>?

Sudha Kodandaramaiah

executive
#92

No. As of today, it's still ongoing — nothing further, because we're all aware the matter is sub-judice. It is sub-judice. Certain news items have been expressed by various people, and segments of the government as well. Ultimately, the call has to be taken by the Supreme Court. But what we can say is that NTPC, like, has taken a firm decision to implement 58,000 megawatts of FGD implementation. So there is a background of that, and we are doing the Udupi project of INR963 crores, and some INR300 crores of conversion should happen in this year. So anything has to come very firmly from the judicial side — no — we will take it that these things will stand, and I think there is a lot of sensitivity attached to this aspect of the environmental issues. Therefore, the Supreme Court also will take a very measured discussion on that. I think till then we don't want to make any news; we'll be proceeding with whatever things are available.

Manthan Jhaveri

analyst
#93

All right. Can anyone hear me?

Sudha Kodandaramaiah

executive
#94

It is, to a certain extent, yes, and the reason it's moving slowly is the uncertainty surrounding the Supreme Court judgment that we're waiting on, along with a few of the recommendations that certain government agencies have put forward.

Manthan Jhaveri

analyst
#95

And so, with that Adani FGD order worth INR6,000 crores — roughly INR6,000 crores — how much of it has actually been executed so far?

Nani Aravind

executive
#96

At the moment, sir, just the Udupi project is in operation for us. We've executed work valued at approximately INR180 crores, and to date the works we've carried out come to roughly INR200 crores in worth.

Manthan Jhaveri

analyst
#97

All right, regarding this order book that stands at INR17,000 crores right now, what portion of it would be the FGD of this component?

Nani Aravind

executive
#98

If you set the Udupi project aside, since that one is running, then the remaining INR4,200 crore consists of the other orders — Kawai, Tiroda, and the rest of the projects.

Rohit Sajja

executive
#99

Of that INR18,000 crores, INR4,200 crores consists of all those other projects that are moving slowly.

Nani Aravind

executive
#100

If we set FGD aside, we have roughly INR14,000 crore in orders on hand.

Manthan Jhaveri

analyst
#101

Right. And with INR14,000 crores — say we close FY ’25 at roughly INR15,000 crores to INR16,000 crores, excluding slow-moving items — and we're expecting 30% or 40% of those orders to convert in FY ’25. Is that right?

Nani Aravind

executive
#102

And on top of that, the new year brings a target of 11,000 additions, which will be in place for the current year.

Manthan Jhaveri

analyst
#103

Alright.

Nani Aravind

executive
#104

We got just 3,000 out of 3,000 — only 3,000 came in. So for the remaining 9,000, we're projecting receipts for the current year.

Manthan Jhaveri

analyst
#105

All right, that's fair. Thank you. Many thanks, sir.

Operator

operator
#106

Thanks. Our following question comes from Tanay Rasal at Nomura. The floor is yours.

Tanay Rasal

analyst
#107

Hello, sir. Can you hear me okay?

Operator

operator
#108

We can hear you now. Go ahead.

Tanay Rasal

analyst
#109

Yeah. Sir, thanks for the chance. Sir, my question concerned the thermal power plant that NTPC put out to tender yesterday. So, those three plants come to roughly INR80,000 crores. So, what would our scope of work be, and what size of opportunity do those projects represent?

Sudha Kodandaramaiah

executive
#110

To go over again what I may have mentioned at the outset, and to keep it brief on that point: the order flow that has come in on BHEL and L&T combined is roughly INR1,55,000 crores over the last one year. And L&T, they were asked to proceed with about 4,000 megawatts for Nabinagar and Gadawara at INR27,523 crores. And BHEL as well — today a news headline has also come about the Telangana job of INR16,000 crores. Because they had an opportunity to match the L1 price, even though across all three areas plants L&T was the L1 based on the tender commission, BHEL is getting that other order of INR16,000 crores on Telangana, and this is boosting things up for this one. For this, there are segments of opportunities in the ETC business — that is the installation business of the main plant equipment — and then the civil and structural works. And then some of the balance of plant works in terms of wherever you can take coal handling and other ideas and balance of plant civil works, and apart from that, that itself comes to about INR30,000 crores of opportunities. Apart from that, what BHEL and this Adani is — that Adani has only placed an order on the main plant, that is the BTG, for about 14, let's say 10,900 megawatts.

Sudha Kodandaramaiah

executive
#111

No, every one of these plants that helps get the main plant finished has to place orders for the balance of plant works. There's a great deal of other miscellaneous work involved — coal handling, material handling, then ash handling, then water systems, and so on. So those will go out for tendering too, and we'll need to figure out where we can fit in. But NTPC, specifically as well, for this 6,400 megawatts, where they now have just about everything in the pipeline for both BHL and L&T — those are balance of plant as well, and they have to tender them out. That — they can't put it off, so that will come as an opportunity too. That's why, and beyond that, as I told you, another 14,000 megawatts — sorry, 11,440 megawatts of tendering is in the pipeline and has to happen. So over the next two to three years — two years at minimum — a lot of flow is expected in the power sector business.

Tanay Rasal

analyst
#112

All right, thank you for that. But when does BTG get tendered out — what's the timeline there? And when does the balance of plant typically come to you as a tender? Is there any timeline on that?

Sudha Kodandaramaiah

executive
#113

On the balance of plant, they ought to be moving forward since postponing it isn't an option for them. Within a couple of months, that work should get underway, because by then the documentation would already be complete — though they may still need to issue the tenders, and the packaging approach, whether it's one single package or several packages, still has to be reviewed by NTPC. With Adani, on the other hand, they already possess in-house capabilities to tender package by package across different areas, such as the mechanical, electrical, and then civil packages along with structural packages. They'll be getting started on that as well across all of those areas.

Tanay Rasal

analyst
#114

All right, thank you, sir. Yeah, that's all I had to say.

Operator

operator
#115

Thanks. Our next question comes from Sunil Kothari at Unique PMS. Please go ahead.

Sunil Kothari

analyst
#116

Thanks, sir, for the opportunity. I'm fairly new to the company. So, sir, would you mind sharing a bit more about — it seems like the opportunity is very huge; maybe in a year or two, it will accelerate over the next four, five years. So which are the areas where you feel you need to strengthen your internal capability in terms of management, team, equipment, capex? Where do you feel you need to create more capability?

Rohit Sajja

executive
#117

Yes. Thank you. Thanks for asking. I think we need to — we're focused on building up our capabilities in the civil segment, particularly since, relative to our main activities in the power sector, above all the mechanical works this company was founded on, that's an area we feel we must develop, and we're actively doing so. We've been strengthening our teams, at the leadership level in particular, and also on the ground, the execution teams. And we're also getting ourselves ready to add further engineering capability inside the organization, so that we can take on more engineering, procurement and construction contracts — not a whole power plant, as Ramaiah mentioned and as I referred to earlier. Portions of a power plant where we believe we can draw on our 25 years of experience — BOP is one we thought we could handle. So we're attempting to develop some engineering expertise over the coming five to 10 years, so we can serve a decent volume of BOP PC jobs. And of course, on O&M, I think we're making solid progress in that area — operational maintenance of power plants — but we still feel a great deal remains to be done when it comes to enhancing skills and the type of power plants, thermal plants in particular, that will be coming up over the next five years to 10 years.

Rohit Sajja

executive
#118

We have to have the numbers ready in that regard—more so than quality or skills, we need the headcount ready, because over the last 10 years a lot of people have not joined this sector. There is a dearth of talent.

Sunil Kothari

analyst
#119

And sir, you could speak to how your extensive experience over the years, and the industry that made plenty of errors and landed in so much difficulty, applies here. So what is different now? What safeguards do we have so that we don't repeat errors, or so that — even if something goes wrong, we can exit perhaps with only minor damage, because ultimately infrastructure and all the related things, sometimes over a period, produce a very demanding environment when it comes to competition and when it comes to payment, when it comes to projects stalling and all of that. So how prepared and ready are we, given our past experience, that we won't repeat errors and will look after the future.

Sudha Kodandaramaiah

executive
#120

So, as Rohit mentioned, we’re a company that’s 25 years old, and a great deal of learning has been absorbed into the system, and maybe in the O&M sector we are — we’re at the front. We lead in getting things done, and we’re not staying put with that. We’re working to reinforce the organization setup around quality and the skills of our people. That’s where the value addition comes in. But looking at the overall picture, especially in the ordinary installation work, there’s routine work, yet a lot of bull work is needed when it comes to proper resource planning. Our planning and project management systems must always stay on track. Of course, we have a very robust system for that. Maybe it’s led from the front by Mr. Kishore Babu himself many times — he goes to the sites and looks at the problem-solving approach — and Rohit is doing the same thing too, and we have plenty of leaders across different segments. We have 10 SBOs, for instance, which are various segments, and all of them specialize in various areas, and that specialization is being strengthened in terms of engineering procurement as well, with some of the new blood we’ve taken on who bring a lot of experience.

Sudha Kodandaramaiah

executive
#121

Yet looking at it from the customer’s perspective, the key problems involve nailing down the project’s overall scope definition. That’s an enormous undertaking—especially for the standard packages of a power plant, nothing poses a greater challenge. Take Adani: they handle it almost as routine, since they’re very accustomed to this work. NTPC is likewise well accustomed to it. With BHEL, the difficulty may lie in working capital troubles. Apart from that, they possess enormous capacity—15,000 megawatt of capacity. They have plenty of high-quality personnel; everything is in place. The sole exception is the supply chain, and then working capital—that’s where projects of this kind can run into problems here and there. Broadly speaking, at most of these sites, what we have observed is that many projects fall behind schedule because of access problems, since the land isn’t fully available. Other statutory clearances haven’t been obtained, forest clearances are absent, right of the way is missing. And so these are the factors where, if your interface—if the project begins with a clean slate—then the budget will move ahead faster. But if the project is taken up and 50% land and 50% of the progress is acquired, that’s when trouble begins.

Sudha Kodandaramaiah

executive
#122

After that, the entire process runs into a bit of trouble — delays and that sort of thing. You need proper integration across engineering, supply chain, manufacturing and, even more crucially, construction, which happens to be our specialty — all of it has to come together. In the end, it falls to the customer to make that happen, and each party has to play its part in it. Still, we perform considerably better when we go about things the right way. I don't believe the days are behind us when projects will face how much delay — power plants are now being built in 3 years. It isn't quite that — they're being delivered in 3 to 4 years. And beyond that, railway jobs and road projects are also arriving at a much quicker pace. We're seeing that too. We've completed plenty of road projects and railway jobs. We're handling 24 railway jobs, there's a great deal of learning involved, and it is achievable. So the difficulty arises on the engineering and supply chain side — that's exactly where a lot of care is needed, a lot of working capital management is needed, and a lot of pushing across engineering, supply, procurement and execution has to be properly interfaced. The very same thing applies on the customer side as well.

Sudha Kodandaramaiah

executive
#123

They need to handle scheduling in time, secure site access, and then locate their engineering specs and general specs on time. All of that is standard practice that has to be followed, though at times delays come up and we have to make them up in some way.

Sunil Kothari

analyst
#124

Thank you, sir. This is just one final question. How do you view the competitive landscape unfolding or shifting at this point?

Sudha Kodandaramaiah

executive
#125

Are you referring to our business segment?

Sunil Kothari

analyst
#126

Yes, sir.

Sudha Kodandaramaiah

executive
#127

Let me give you two or three areas. In power, we're among the peers now. I can say that boldly, given the strength we've built. In fact, the capacities we've set up today in supervision, engineering, engineering personnel, site execution, and then the supply chain in terms of labor and piece-rate workers — we can say roughly 15,000 to 16,000 people are deployed across the various sites just for the labor itself. That demonstrates the organization's strength. Very few organizations, perhaps, possess those capabilities. So that pushes us to the front relative to the others, especially with private customers like Adani. Even BHEL doesn't feel it faces such big competition, because so much tendering now has to be done — nearly about 23,000 megawatts sits on their plate, while their capacity is 15,000 megawatts on paper. Of course, over the years, owing to the lack of interest in the power sector, annual capacity has dropped to 3,200 megawatts per year. Now they must ramp up to 8,000 megawatts to 10,000 megawatts, then 12,000 megawatts to 14,000 megawatts over the next three, four years. Generally, this 80,000 megawatts can be achieved by the end of the decade.

Sudha Kodandaramaiah

executive
#128

So those are the areas they need to — everyone has to jump in and get their act together.

Sunil Kothari

analyst
#129

Yes, sir. Thank you very much for such a thorough response. I really appreciate it.

Operator

operator
#130

Thanks. Our next question comes from Manthan Jhaveri at Nexus Securities. The line is yours — go ahead.

Manthan Jhaveri

analyst
#131

Hello?

Operator

operator
#132

We can hear you now, sir. Please continue.

Manthan Jhaveri

analyst
#133

Yeah, um, so about that MDO order — you mentioned INR2,100 crore would be the peak revenue in FY '28. So starting FY '28, does that INR2,100 crores become recurring revenue each year, or is there some different calculation from FY '28 onward?

Rohit Sajja

executive
#134

Yes, sir. That's going to be annual recurring revenue across the next 25 years, leaving out the price variation. So you'd include — yeah, leaving that out…

Manthan Jhaveri

analyst
#135

So roughly INR2,000 crore would come in as recurring revenue across those 25 years from this particular mine? And that wouldn't have anything to do with offtake or…

Rohit Sajja

executive
#136

It’s not going to be 25 years — sorry, it will be 23 years, since we need two years for development.

Manthan Jhaveri

analyst
#137

And sir, given that our order book is picking up on the O&M side, and you also noted that O&M carries margins that are relatively higher than those of our other segments, is there any room for margins to improve further? We have stayed consistently in this 11% to 12% band. So, since our O&M order book is improving, is there any further scope for improvement?

Nani Aravind

executive
#138

Yes, sir. That possibility exists, because as soon as we expand the O&M segment and bring the MDO segment into the portfolio, one would expect EBITDA margin to improve by 1% to 1.5% over the coming three to four years.

Rohit Sajja

executive
#139

Overseas operations are also adding a substantial amount to our O&M revenues. In the last year, we handled roughly INR200 crores of overseas O&M. For this year, we expect that figure to land between INR235 crores and INR240 crores. So you should anticipate the same pattern continuing across the coming seven to eight years, with overseas O&M expanding at a 30%, 35% CAGR, and EBITDA margins in the overseas business sitting in the 17% to 19% range.

Manthan Jhaveri

analyst
#140

So you're saying overseas O&M comes in at 17% to 19%?

Rohit Sajja

executive
#141

Yes.

Manthan Jhaveri

analyst
#142

So is it fair to expect EBITDA margins to improve in the second half of FY ’25?

Nani Aravind

executive
#143

Right, sir, since turnover is going to be higher in H2 — and with the O&M from the new projects we brought in during Q2 — there's a chance we'll see better margins on the O&M side. So we might get further margin improvement there as well.

Sudha Kodandaramaiah

executive
#144

Also, regarding the new installation work that’s coming through in the boiler and turbine packages — the rate per tonne we’re realizing is stronger compared with prior years. That should help bring somewhat better margins as well.

Manthan Jhaveri

analyst
#145

All right. And sir, given that we’re running those two sizable MD orders, when it comes to capability and operational capabilities, is this in any way holding back our bidding in other lines of business, or is it not affected when it comes to manpower and everything?

Nani Aravind

executive
#146

These two MDOs, sir, were each running under their own SPV. That means manpower is separate. A different team handles them. Power Mech's team is only overseeing things in a promoter capacity. We keep an eye on how the SPAs are operating. So the mining operations at the existing end see no impact.

Manthan Jhaveri

analyst
#147

Thank you very much. Thank you very much, sir.

Operator

operator
#148

Thank you. Ladies and gentlemen, we'll treat that as the final question for today. At this point, I'd like to pass the conference to Ms. Natasha Jain for closing remarks. Over to you, ma'am. Ms. Natasha Jain, we can't hear you.

Natasha Jain

analyst
#149

Can everyone hear me at this point?

Operator

operator
#150

Yes, we can hear you, ma'am. Please continue.

Natasha Jain

analyst
#151

All right, thanks. At this point, I'd like to ask the management team to offer any closing remarks if they have them.

Sudha Kodandaramaiah

executive
#152

Yes. I think we've covered quite a few areas — the business growth, how big the opportunity is, revenue growth and EBITDA margins, and how those margins should be strengthened further over the coming months, and so on. What I can say is that the investment climate looks pretty good, both in the power sector and in the non-power sector, in railways, infrastructure, and other segments as well. So the company remains bullish on its growth path: INR4,200 crores last year, and we should reach INR5,000 crores, around that figure or a little more. Revenues will always be higher in the last two quarters. And Rohit has laid out a broad spectrum of the expected order flow and the figures, and given the opportunities available, we should try to get to whatever is possible. The opportunities available will be greater in the years ahead, with the government fully committed to more and more investments in the energy sector, the infrastructure sector, and so many other sectors, and the steel sector too. So we have to see where all the green hydrogen fits in, which Rohit touched upon. So new segments are also emerging, and we'll keep our focus on new segments.

Sudha Kodandaramaiah

executive
#153

That's one of Power Mech's USPs. We'll always be looking for fresh opportunities, and that's how our growth should be sustained. Thank you very much.

Operator

operator
#154

Appreciate that, sir. That brings the conference to a close. Attendees may now disconnect their lines.

Rohit Sajja

executive
#155

Thank you.

Operator

operator
#156

<<operator_signoff>>

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Power Mech Projects Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Power Mech Projects Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Power Mech Projects Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.