Thank you, and good afternoon to all of you. This is the QumulusAI conference call covering third quarter 2026 earnings, and we're glad to have you join. Joining me to walk through the results are our CEO Mike Maniscalco and our CFO Scott Krosnowski. Ahead of getting started, please be aware that remarks made today include forward-looking statements. Such statements address our strategy, plans for capacity and deployment, what customer agreements are worth along with associated expectations, the market we operate in, and how we expect to perform financially and operationally going forward. Be advised that these forward-looking statements are covered by the safe harbor protections established in the Private Securities Litigation Reform Act of 1995, and QumulusAI elects to take advantage of those safe harbor protections for them. These remarks are based on what we currently expect and assume, and they carry risks and uncertainties. Our actual outcomes might vary significantly from what is stated or suggested here. Today's earnings press release and our SEC filings describe those risks, including our registration statement on Form S-1, as amended, and our quarterly reports on Form 10-Q. What we say today reflects our views as of now, and we assume no duty to revise these statements because of new information or later events. On this call, we might mention non-GAAP financial measures. Today's earnings press release contains reconciliations to the comparable GAAP measures. You can find the press release and an accompanying investor presentation on our website at investors.qumulusai.com. You can also find a recording of this call at that same location. Having said that, I'll now hand things over to Mike.

Mike Maniscalco

executive
#2

Thanks, Zachary, and I appreciate everyone being here. I'm happy to share that third-quarter revenue rose to $14.8 million, more than twice the prior quarter. Adjusted EBITDA turned positive for the first time, and signed customer contracts exceeded half a billion dollars. The easiest way to understand this quarter is this: first-quarter revenue came in at $3.4 million; we doubled it to $6.7 million in the second; then doubled once more to $14.8 million in the third. On top of that, the remaining performance obligations shown in our Q3 10-Q already point to yet another doubling in the fourth quarter. That reflects our business model performing exactly as intended. We can quickly tap into smaller power sources and get them operational within months instead of years, and that helps us shorten the time between signing a deal and starting to bill compared with most others. Our most recent big deployment went into full production in less than 3 months after the contract was signed. At any given time, we are securing the next block, activating the one before it, and invoicing the ones ahead of it—all at once and continuously. Today I'll cover three things: what our business does, the current state of capacity and demand, and how we are structured for the market we operate in. If you're new to the story, let me take a moment to explain our business. Our business is deploying GPUs, not developing models—what we construct is the compute behind them. In my view, as models get less expensive, the value shifts toward the infrastructure that runs them. Open models represent close to one-fifth of enterprise tokens now, at a small fraction of the cost, and customers want those running on dedicated capacity they control. We find pockets of available power—typically 2 to 50 megawatts—mostly in colocation, and we get the AI compute in those facilities online within months rather than years. The capacity we have today handles today's demand, while we build the pipeline for what lies ahead. The people we serve today are AI inference platforms along with the teams that build on top of them, and each discussion begins with a single question: how soon can I be up and running? In a market where compute is scarce, ranging from the largest providers down to startups, the deciding factor is speed. What comes next is AI agents doing actual work. Per task, an agent uses considerably more compute than a chat query does. Amazon, for example, reported that in the third quarter its customers deployed two times as many agents as they had across the three quarters before, and beyond that lies physical AI. Today we're built for speed and ready for inference next, delivering what customers require right now as we move toward the distributed platform that upcoming workloads will call for. That's the reason we started this company centered on hyperspeed instead of hyperscale. Here's how we'll present capacity from now on: active, contracted, and powered land. Active capacity — energized and billing — comes to 8 megawatts spread over five colocation sites, and the last deployments we mentioned in August are now complete and billing. When it comes to contracted capacity that is secured but not yet billing, that totals 5.45 megawatts. Of that, 3.75 megawatts is in metro Atlanta and should be ready for service in the second quarter of 2027. Half a megawatt is in Columbia, South Carolina, ready for service in December. And 1.2 megawatts is in Denver, Colorado, which we just signed, ready for service in Q1. Our final takedowns for the year are in late-stage negotiation, and beyond that, we're already working toward next-generation expansions at a site we're at today. We hold a right of first offer on 7 megawatts in Atlanta, which could bring that site up to 10.75 megawatts. That's 7 megawatts of expansion rights on top of the 13.45 that is active or contracted today. This is growth we've already secured at a location that's familiar to us. We're picky about the places we enter, and when a site demonstrates it works, we aim to get the first opportunity on the adjacent parcel. Those are rights rather than obligations, and we'll use them at the moment that suits the business, but the capacity exists and it's available for us to capture. On the powered land side, our long-term lease optionality centers on the Oklahoma site, where 10 megawatts are currently live for our legacy mining operation, plus as much as 7 megawatts of extra grid power on hand. That covers the supply side. During the quarter, we booked $352 million in fresh direct contracts, which is over twice what we signed in Q2. That lifts our 2026 signings to $529 million, and that figure includes several smaller deals that we don't disclose one by one. The agreements are growing in size, customer deposits are coming in before we deliver, and prices for next-generation capacity are climbing rather than declining. Our latest three-year deals are now landing at roughly $19 to $21 million in annualized revenue per megawatt, compared with the $18 to $20 range we cited in August. The broader market is trending the same way. Three-generation-old H100 rental rates have risen by more than 40% since December. We keep selling capacity more quickly than we can bring it online. Our limitation isn't demand—it's capacity. Now let me move to our sector, where two developments were notable this earnings season. The first is that capacity issue I just mentioned. Earnings from Microsoft, Amazon, and Google came out two weeks ago. Altogether, they reported roughly $1.8 trillion in contracted backlog. According to Microsoft, customer demand keeps outpacing what supply can provide. Google stated it has begun utilizing third-party compute since its own resources are stretched. The world's biggest purchasers of compute simply can't construct capacity quickly enough, and we're still at an early stage. The Census Bureau estimates that around 1 in 5 US businesses currently use AI. That's the market we operate in, and it explains why two of our customers returned this quarter to sign an additional $241 million in total contract value. The second is what the market has been asking over the past several weeks — something investors have put to us since the day we listed: how is the growth financed? The entire sector and its largest players are facing this question now. For weeks the market was repricing AI infrastructure companies, beginning with their credit and then moving to their equity. Beneath all of it, the worry is simple: who is paying for the GPUs, and what happens to the debt if the customer never shows up? What people ask has moved away from the size of the customer contract and toward whether we can deliver, finance, and run it profitably. On all three, we gave an answer this quarter: 8 megawatts completed and billing; each deployment financed against its own contract; and adjusted EBITDA turned positive. Our method works like this: a customer signs a term, take-or-pay contract and puts down a deposit; that deposit covers the portion of the GPU cost that isn't financed, and equipment financing tied to that contract covers the rest. The contract revenue services the financing behind it. Depending on the terms and overall cost of capital, we use a mix of loans and leases. Once a loan reaches its end, that equipment is fully paid off with no liens remaining, and it becomes our property to retain.

Mike Maniscalco

executive
#3

When a lease wraps up, we keep the option to buy the equipment at fair market value, and for most of it that price is capped at a fairly modest percentage of what it originally cost, which protects a lot of residual asset value and upside, or we can just hand the equipment back with nothing further owed. Every financing arrangement maps to a deployment, and every deployment maps to a contract. We carry no unsecured bonds. The customer's commitment is what funds the hardware, and the hardware then earns back that commitment. That's how the model works. On the customer side, most of them are AI-native inference platforms that are growing fast, and payment comes before delivery. Every contract is structured around the credit risk we assume—take-or-pay terms, upfront deposits, and remedies if a customer doesn't perform. We're deliberately shifting toward a mix where a meaningful share of capacity is anchored by creditworthy enterprise customers alongside the AI natives. That work is underway, and we'll share more as it develops. To sum up: three months ago we said 8 megawatts were sold with final deployments in process—those deployments are now finished and billing. Our top line grew twofold, adjusted EBITDA became positive for the first time ever, and the remaining performance obligations we disclosed in the Q3 10-Q already lay out a further doubling as we move into Q4. As of today, 8 megawatts are live and generating bills, close to 5.5 additional megawatts are under contract, expansion rights totaling 7 megawatts exist at a location where we already operate, with 17 megawatts of powered land in Oklahoma sitting behind those rights, and each megawatt we energized was sold prior to being switched on. Signed contracts worth five hundred million dollars represent a foundation rather than an upper limit; within a sector that is reassessing the value of scale, our approach rests on capacity that is sold, financed, and delivered within months instead of years: lock in the following block, bring the previous one online, construct the ones preceding it, and then repeat the process. Each of the three advanced during this quarter; they are progressing once more right now, and our confidence in this approach has never been greater. On that note, I will hand things over to Scott, who will review our financial results in more detail. Scott?

Scott Krosnowski

executive
#4

Thanks, Mike. Good afternoon, everyone. I'll begin with revenue, then work my way down the income statement, then go over cash and the balance sheet, and finish with our outlook. So, revenue first. For the third quarter, revenue was $14.8 million, which is up 376% versus the prior-year period and more than double what we saw in the second quarter of 2026. That growth came from capacity we energized during the quarter, and a lot of it billed for just part of the period. Compute accounted for 96% of revenue, compared with 47% in the prior-year period. Now, remaining performance obligations. Remaining performance obligations — that is, direct customer compute deals inked by the close of the quarter — ended Q3 at $515 million. That's close to triple the $173.1 million recorded on June 30th, and the weighted average term runs about two and a half years. This figure reflects contracted revenue still ahead of us. Under the contract terms, $29.1 million gets recognized during the fourth quarter, while the other $486 million is spread from 2027 through 2030. Now on to the operating line. We posted an operating loss of $41.6 million. Within that number sits a $26.4 million non-cash charge related to shares we issued as a professional services fee connected with going public — a one-time item that gets added back in adjusted EBITDA. Setting that charge aside, the loss grew compared with the second quarter, and for a good reason: depreciation and amortization reached $14.9 million, an $8 million increase quarter-over-quarter, as the capacity Mike talked about came online. That captures the cost of the capacity that doubled revenue. Adjusted EBITDA came in at $3.7 million — a 25% margin and our first positive quarter — against a loss of $0.8 million in the second quarter and a loss of $0.6 million in the year-ago period. Fourth-quarter depreciation and interest ought to rise once more, given that we will record a complete period for equipment that went into service during the quarter. Stock-based compensation will return to a normal level moving forward, because the first issuance of RSUs to employees and directors—among them one-time grants vesting upon issuance—was booked in September. Turning to below the operating line: our net loss in Q3 came to $14.4 million, equal to 43 cents per share. That figure reflects $32.3 million in non-cash gains from marking convertible notes, the associated option, and our warrants to fair value—gains that move in the opposite direction from our share price—along with the $26.4 million non-cash charge tied to shares issued as a professional services fee in connection with our public listing. Interest expense, net, came in at $5.4 million, which is $3.3 million higher than the prior quarter, and the increase stems from equipment financing tied to deployments that went into service. Now on cash. The build is being funded through customer prepayments. In Q3, signed contracts brought in $71 million of customer deposits, which is more than double the level from Q2, and deferred revenue rose to $79 million versus $30.5 million on June 30th. For our large multi-year contracts, we typically require prepayments of 15% to 20% of total contract value. Those funds are applied to the deployment they are tied to and reduce how much we need to borrow. As a result, operating cash flow was positive $32 million for the quarter. CapEx was approximately $100 million in the quarter, primarily for GPU servers, and we added about $94 million of equipment and facilities via new leases, with roughly $194 million placed into service, which drove depreciation upward. Financing activities provided $44.6 million in Q3, and we ended the quarter with $31.1 million in cash and restricted cash, of which $9.2 million is restricted under our loan agreements. Turning to the balance sheet: total assets were $394.1 million as of September 30th, up from $215 million on June 30th, as equipment went into service. Debt and finance lease obligations totaled $248 million. The majority of that is tied to equipment financing for a specific deployment and amortizes alongside the related contract. During the quarter, we closed a $51.5 million loan and made a third draw under a USD.ai facility. Subsequent to quarter end, we upsized our lease financing with TFC to $123.6 million, with no new equity involved. Stockholders' equity stood at $25.3 million as of September 30th, compared with a deficit of $0.8 million as of June 30th. Third quarter net loss was $14.4 million, or $0.43 per share. Lastly, on outlook: we are reaffirming the July guidance of 18 megawatts of contracted capacity by year-end and $300 million in year-end forward ARR. Of that, 8 megawatts are active today, and another 5.45 megawatts are under executed agreements, bringing our total footprint to 13.45 megawatts, with the remainder in late-stage negotiation. Currently, roughly $209 million of forward ARR is under signed contracts, and we have started marketing our newest capacity. Beyond that, we are reviewing our guidance approach, and when we report the fourth quarter, with an eye toward 2027, we expect to update how we provide forward guidance; with that, I will hand it back to Mike.

Mike Maniscalco

executive
#5

Thanks, Scott. I'll pick up from where I left off. In our sector, the question has turned into whether capacity can actually be delivered, financed, and operated at a profit. At this point we have 8 megawatts that are fully active and billing, plus another 5.5 under contract. Each deployment was financed against its own contract. Q3 adjusted EBITDA came in positive for the first time, and the remaining performance obligations in our 10-Q already lay out another sequential doubling of quarterly revenue for the fourth quarter. Take a step back for a moment. This company listed in July. It weathered the toughest stretch the sector has experienced in years, and it emerged on the other side with revenue doubled, contracted revenue tripled, and adjusted EBITDA turned positive. For a company our size, those are genuine accomplishments, and the team here earned every single one of them. We're still early: early in AI adoption and early in this company's growth. Customer demand and the AI use cases behind it remain extremely strong, and we believe we're incredibly positioned for significant growth ahead; we're just getting started. Moderator, we're ready for questions.

Michael Donovan

analyst
#6

Thanks, operator. Hey everyone. Great job on the execution, and I appreciate you taking my questions. Regarding those two B300 agreements that were signed in September, how much capital is still required, and how much of that is covered by customer prepayments and committed financing, and how do you plan to fund the remainder?

Mike Maniscalco

executive
#7

Thanks, Michael. I appreciate that. I'll let Scott jump in on that one.

Scott Krosnowski

executive
#8

Hi Michael. One of those orders has been paid in full. As for the other one, we received a 20% prepayment.

Mike Maniscalco

executive
#9

The RFS date slipped.

Scott Krosnowski

executive
#10

We

Mike Maniscalco

executive
#11

We haven’t finished the financing yet.

Scott Krosnowski

executive
#12

There’s a 20% prepay in place, and the remaining balance is being processed.

Mike Maniscalco

executive
#13

On that point, as we mentioned, the RFS moved a bit later, and we are lining up the timing of that final financing with where the RFS actually falls as that data center capacity comes online.

Michael Donovan

analyst
#14

Thanks for that, it's useful. Regarding the extra 1.2 megawatts in Denver that should be available in the first quarter, does that capacity connect to contracts we already have with customers, or is it for new demand?

Scott Krosnowski

executive
#15

The added capacity we just signed is being marketed right now. It hasn't been sold yet.

Mike Maniscalco

executive
#16

My understanding is that everything except Columbia is currently being marketed. Columbia, correct. That one had already been sold.

Michael Donovan

analyst
#17

Thanks for that. You said there's interest coming from potential customers outside the AI-native platforms. Could you give us more detail about what kinds of customers you're seeing and which workloads they intend to run?

Mike Maniscalco

executive
#18

I believe it matters to highlight the existing pockets of power we're expanding into and how those align with the different customers we sell and market to. Since some of the bigger customers are after bigger footprints, looking ahead at our pipeline of larger sites, that begins to shift the shape of those customers and what they look and feel like. At present, with the smaller pockets where we've had success finding and acquiring that capacity and then marketing it to our customer base, much of that activity is within the AI natives. There's still plenty of healthy demand in that area, but at the same time we're working the enterprise pipeline. Enterprises tend to decide on different timelines, and we're trying to work with and align those timelines properly. As an example, financial services remains a pretty hot sector for us, as we announced the DRW announcement in the last few months here, and I think that's a good example of those types of customers. General enterprise runs the gamut in terms of whom we're targeting within those segments.

Michael Donovan

analyst
#19

Thanks. Wishing you the best going forward.

Mike Maniscalco

executive
#20

Thanks.

Fedor Shabalin

analyst
#21

Thanks so much, operator. Good afternoon, all. Congratulations on the quarter — solid and clean progress. My first question is probably a bit research-flavored. Since that neocloud and related infrastructure stock sell-off that came several weeks after CoreWeave, have you noticed any shift in the cadence or perhaps even the quality of inbound demand for new capacity — maybe just the number of RFPs, deal size, or any deferral in contract terms? On pricing, are new B300 inquiries still clearing around the $4.30 per GPU hour level of your recent contracts, or is the market softening? Thank you.

Mike Maniscalco

executive
#22

I'll take the first part of your question first, and thanks for the questions. We keep seeing a very healthy amount of demand and really haven't seen a big shift since last month in either direction. What we are seeing is — I think, trying to think of the right way to explain it — a somewhat higher sense of urgency among our existing customers in their desire to lock down capacity, because I believe they know about the scarcity of that capacity in the market. I would also say that points toward stability or even an increase in GPU-per-hour pricing and GPU prepayment terms. Generally speaking, that's what we're seeing in the market right now: pricing on the B300s continues to pinch up as pricing of everything continues to increase slightly. Demand is remaining strong, and terms are improving in our favor currently.

Fedor Shabalin

analyst
#23

Thanks for that. I just want to ask a quick follow-up about the Atlanta contract. What was it that pushed it from early '27 into the second quarter of 2027? Is it power, is it the colocation provider, or could it be hardware delivery? And does that customer's contract start date shift along with it?

Mike Maniscalco

executive
#24

Maybe I've misunderstood your question, so please ask again if I get this wrong, but my sense is that the scarcity we're dealing with at the moment is really the data center capacity itself. That's genuinely the main thing driving the growth and potential we see in early 2027. On the supply chain side, for the GPUs and the related equipment, we've done well with logistics, planning in advance, and securing that supply and lining it up ahead of time, with those orders placed early. That part is moving somewhat quicker at present. That's how we're handling the placements. Did that answer your question

Fedor Shabalin

analyst
#25

Okay? Partly, perhaps. Just to put it briefly, what caused this change in timing?

Mike Maniscalco

executive
#26

I can address that. When timing moves, there are typically several factors involved, and speaking broadly about all the capacity available in the market, sometimes it comes down to the supply chain on the side of the data center owner-operator, where they estimated a rollout of cooling or electrical equipment and perhaps we were simply a bit too aggressive; we are attempting to do a better job of providing buffers there, as you have heard on these. We are also focusing a bit more on quarters instead of months, so that we have that flexibility given how dynamic the supply chain is right now. Then, as I believe I mentioned on some of these calls and in conversations with the market, the way we have been locating this data center capacity has generally involved returning to existing data centers, and frequently those are legacy data centers, and frequently those legacy data centers already have tenants. A few things must occur: the existing tenant must have a proper vacation date and move out on schedule. Then the data center owner-operator needs sufficient time within that window to retrofit and renovate so as to accommodate the GPU servers rather than some of the legacy equipment that was there with the tenant that is vacating. Then they must arrange the financing and carry that through. Several different levers have to move in order to hit these dates, and what you are seeing with some of these delays is simply slight shifts in some of those levers.

Fedor Shabalin

analyst
#27

I really appreciate all that detail. I'll hand things over at this point, and keep wishing you the best of luck.

Mike Maniscalco

executive
#28

Thanks.

Bill Papanastasiou

analyst
#29

Good evening, gentlemen. Nice work on a strong quarter, and I appreciate you taking my questions. First off, I'd like to get your on-the-ground perspective on supply and demand for data center colo capacity, and where you think that's headed. What I'm really wondering is whether you're seeing the same level of availability for sub-5-megawatt colo opportunities, or if that picture is changing at all because of the regulatory headwinds currently weighing on larger sites. So, to put my long-winded question simply: given what's happening on the regulatory front, do you expect new entrants to go after smaller-scale deployments? Thank you.

Mike Maniscalco

executive
#30

No, that's a really good question, and I appreciate you asking it, Bill. What I would tell you is that things aren't necessarily getting more competitive in that area, and a lot of these smaller pockets we've been entering, because they already exist, haven't really felt the effects of some of the headwinds the data center market is facing. I will say that certain of the larger sites we're looking at for the future could be affected somewhat more strongly by that, but that is already baked into later in '28 and the back half of '27 as things stand, and that's something we're taking into account as we consider our growth options. Let me lay out a few separate things on this. Searching out even smaller concentrations of power has worked well for us, and the Columbia, South Carolina location illustrates that nicely. We remain highly adaptable and ready to seize chances when it comes to locating those concentrations of power, since a site of 500 kW can house about 32 GPU nodes — a solid, sellable size for many of our inference customers. There's still a very sellable chunk of compute and power for our customer base. It also remains fairly meaningful to our revenue — if we can monetize it at that $20 million round figure, that's still $10 million in potential revenue, and we can repeat that across several sites and get it online fast. It suits our model really well. That's one thing we're doing. On the other side, the credit crunch has definitely squeezed data center capacity at the smaller-scale facilities. I'd say that's had more of an impact than, say, a shortage of supply. At the moment, it seems as though some of those data center owner-operators and investors went too far with a broad-brush reaction, and we're monitoring the situation closely to see whether it eases. For a bit more detail, a number of the smaller colocation pockets adjusted quite quickly, stating they weren't interested in selling to non-IG in those cases. Since the majority of IG customers want considerably larger pockets than a megawatt or two here and there, I believe they'll recognize that issue quite soon. That's been one element influencing our ability to secure particular data center supply. We have additionally been looking into inventive ways to address this—among them, bigger advance payments from customers applied to upfront deposits required by our agreements—and we are likewise reviewing assorted market instruments that could serve as a credit wrapper, to offer a single concrete illustration. That is how we are navigating today's circumstances.

Bill Papanastasiou

analyst
#31

I appreciate that — that's genuinely helpful context. And then, just to follow up on the 7 megawatts at Metro Atlanta that sit under the right of first offer: could you walk through that scenario once more? At what point might it come online and be ready for service? Does that ROFO carry an expiry date? And is demand strong enough today to sign that contract, assuming it can be entered

Mike Maniscalco

executive
#32

into? Demand remains extremely strong. The pipeline the sales team holds, and the customers who keep calling them asking for updates on our capacity in '27 — that is certainly not what limits our growth right now; the real issue is lining up the right supply. On the specifics of the Atlanta property, I'll give you as much detail as I can from the top of my head, and if we need to follow up with more information, we can certainly do that; that one is an expansion the owner of that data center is planning, earmarked for 2027 delivery. It's at their discretion, so as we learn more from that owner and operator about their ability and timelines to expand it, I'll have more specifics on the actual RFS timeline.

Bill Papanastasiou

analyst
#33

Great, I appreciate that. Thanks for taking my questions, and best of luck going forward.

Mike Maniscalco

executive
#34

Thank you. I appreciate it.

Mike Maniscalco

executive
#35

I believe that in going over my remarks on the Q&A and the closing comments I made following the earnings report, the key points really came through. Demand in the market, in my view, remains quite strong. Supply keeps being constrained, and a great deal of that comes from external factors. Those factors, I think, are shifting fairly steadily, and as I said earlier, we are exploring creative approaches to get through them over the near term. What we are aiming for right now is to keep executing the way we have been and to bring that capacity online in smaller pockets of power, matching it to customer demand, and to keep growing, since that is what the customers are asking for. I am grateful for everyone's time today. I appreciate all of the questions, and have a great evening.

Operator

operator
#36

This concludes today's call. Thank you for attending. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete QumulusAI, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to QumulusAI, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in QumulusAI, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.