Operator
operatorGood day, everyone, and thank you for joining us for the Orsted Q3 earnings call. During this opening portion of today's call, everyone will be in listen-only mode, and following that, we'll open things up for a question-and-answer session. I'm happy to introduce our CEO, Henrik Poulsen, who will get us started. Please go ahead.
Henrik Poulsen
executiveThanks, and good afternoon, everyone, and welcome to this earnings call. Orsted kept up a strong financial and operational showing in this year's third quarter, even with the COVID-19 challenges that have persisted. Every part of our asset base is still fully operational, and across the various regions we've made good progress on our construction projects. EBITDA for Q3 came to DKK3.4 billion, which is 18% lower than the third quarter of last year. As you know, though, Q3 last year took a significant hit from partnership income related to Hornsea 1. If you adjust for partnership effects, EBITDA rose by 6%. EBITDA from offshore and onshore wind farms in operation climbed 13% to DKK3.4 billion, powered by ramp-up at Hornsea 1, Borssele 1 & 2, Sage Draw, and Plum Creek. As we expected, we've kept seeing some adverse COVID-19 related profit impacts in the UK, amounting to DKK100 million in Q3. Given the very solid performance year to date, we remain comfortable with our full-year EBITDA guidance of DKK16 billion to DKK17 billion and gross investments of DKK28 billion to DKK30 billion. In August, we hit an important strategic milestone when we completed the divestment of our Danish power distribution, residential customer, and city light businesses.
Henrik Poulsen
executiveThis divestment basically wraps up our shift into a worldwide renewable energy firm. Along those lines, the green portion of our generation hit 90% during this year's third quarter, rising from 87% in Q3 of last year. Early in September, we put in place the final turbine at the 752-megawatt Borssele 1 & 2 offshore wind farm located in the Netherlands. Given that the initial turbine went in during April, the whole installation effort for the turbines happened throughout the pandemic — a fairly impressive feat showing how robust our EPC capabilities are and how committed we are to high safety standards. Once running at full capacity in the fourth quarter, Borssele 1 & 2 is going to rank as the second biggest offshore wind farm globally and the biggest one in the Netherlands. We've been gauging investor appetite for a possible farm-down of the Borssele 1 & 2 wind farm. Demand for partnering on our offshore wind assets remains strong in our view, so we have launched a structured farm-down of Borssele 1 & 2, with signing anticipated in the first half of next year. Farming down Borssele will lock in value upfront and let us put capital into further green growth opportunities.
Henrik Poulsen
executiveOur onshore business keeps up its strong momentum as well. In September, we commissioned the 103-megawatt Willow Creek onshore wind farm ahead of schedule and on budget — and just like Borssele 1 & 2, it was successfully constructed during the pandemic. Since March, it's the third onshore wind farm we've commissioned. Willow Creek is our second project in the SPP area, and it further diversifies our operational portfolio. Also in September, we took the final investment decision on the 367-megawatt Western Trail project, our largest onshore wind project to-date. That greenfield project will further strengthen our ERCOT West asset base. The wind farm is eligible for 100% PTC, and we expect commissioning in third quarter 2021. In October, we acquired the 298-megawatt Haystack onshore wind development project in Nebraska and took the final investment decision on it. This late-stage project sits adjacent to our operational Plum Creek wind farm and further expands our portfolio in the SPP area. Haystack is expected to be commissioned during fourth quarter next year and is also eligible for 100% PTC. With Willow Creek, Western Trail and Haystack added, we now have 3-gigawatt of combined onshore wind and solar PV in operation or under construction.
Henrik Poulsen
executiveWe’re still very pleased with how Orsted Onshore is expanding. In the middle of October, the Renescience facility in Northwich, UK, was successfully commissioned once operations at the plant met a set of pre-defined commissioning criteria. By commissioning Renescience, we hit a significant milestone, and now we’ll keep watching how the plant performs while we look into the wider commercial potential of this innovative waste treatment technology. Turning to hydrogen, we’ve gained a foothold in a market we think will give us substantial growth opportunities over the decades ahead. In October, we teamed up with Yara, the world’s leading fertilizer company, to develop a 100-megawatt offshore wind power electrolyzer for renewable hydrogen production. The plant’s purpose is to replace fossil-based hydrogen with renewable hydrogen for ammonia production at Yara’s Sluiskil plant in the Netherlands. And it could potentially abate more than 100,000 tons of CO2 each year. The renewable hydrogen would produce roughly 75,000 tons of green ammonia annually, based on dedicated renewable energy supply from Orsted’s nearby Borssele 1 & 2 offshore wind farm. If the business case is confirmed, a final investment decision might be made in late 2021 or early 2022.
Henrik Poulsen
executiveThe renewable hydrogen side of our business platform and project pipeline keeps developing, and Sluiskil is now the fifth renewable hydrogen development project we have, since the other four are the greenfields partnership for Denmark and the H2RES project, both located in Copenhagen, plus the WESTKUSTE 100 project in Northern Germany and Gigastack in the UK. Valuable insights and experience will come out of these pilot projects. The goal ought to be maturing the renewable hydrogen industry, and within a decade it may deliver a competitive alternative source to fossil-based fuels. As we see it, renewable hydrogen could potentially turn into a cornerstone of the energy supply of the future. It will give a further boost to the need for offshore wind and assist in decarbonizing hard-to-abate sectors such as heavy transport and heavy industry. Finally, I want to point out that the Board of Directors has appointed Mads Nipper to succeed me as CEO of Orsted. As you know, Mads is a highly accomplished leader, and given his visionary thinking, strategic skills and dedication to helping build a sustainable future for our planet, Orsted's continued global expansion is in very good hands. I very much look forward to welcoming Mads on January 1st. Let's move to slide four, where I'd like to provide an update on our US offshore wind portfolio.
Henrik Poulsen
executiveAfter the Bureau of Ocean Energy Management released a supplement in June of this year to the Draft Environmental Impact Statement for Vineyard Wind, we've been waiting for more clarity regarding the federal permitting process for our projects. At this point, we had anticipated receiving Notices of Intent from BOEM for our advanced stage development projects. An NOI means that BOEM has received our construction and operations plan and has judged the application complete, which starts the two-year regulatory clock for BOEM's ultimate approval of the construction and operations plan. We expected our NOIs to be back on track after the Vineyard Wind Supplemental Environmental Impact Statement, given the positive signals from the Department of Interior earlier this summer. Since that time, we haven't seen the anticipated progress, and we've now been guided that NOIs are being put on hold until Vineyard Wind's Final Environmental Impact Statement is published. That will expectedly happen within the next few weeks. BOEM has set a deadline of November 13 for itself. As a result, we must foresee additional permitting progress slipping into early 2021, and this does represent a significant delay. Beyond the uncertainty surrounding the permitting process, we're also awaiting confirmation on whether BOEM will pursue the consensus developer turbine layout in the Northeast of 1 nautical mile by 1 nautical mile.
Henrik Poulsen
executiveAlthough we’re hoping things become clearer sooner, it’s looking more and more probable that we won’t have the final word on the project layout until November 13. After that, BOEM is anticipated to release its record of decision for Vineyard Wind on December 18. Even if we assume permitting begins to move in the first quarter of next year, it seems very likely that Revolution Wind, Ocean Wind, Skipjack and Sunrise Wind will slip past the 2023 and 2024 construction years that were previously expected. Across all four projects, we do have some timeline flexibility, and in the interim we’ve managed to make solid progress on certain other project milestones, which I’ll return to. That said, we can’t re-baseline our construction schedules until BOEM provides a clear timeline. On South Fork, BOEM restarted the permitting process in August, and the project received a permitting schedule aimed at a record of decision in October 2021, which makes it the only project besides Vineyard Wind to formally move forward in the federal permitting process before the Vineyard Wind Final Environmental Impact Statement. Given the revised permitting schedule, we now expect South Fork to be commissioned by the end of 2023.
Henrik Poulsen
executiveEven with the permitting uncertainty, we used that extra time well and moved our US offshore wind portfolio forward on several fronts. Our state permits are at an advanced stage, including decisive backing from 5 New York state agencies to site the transmission cable in East Hampton that will link the South Fork Wind project to the onshore grid. On Long Island, we locked in a solid site for our O&M center in Port Jefferson. We also brought our supply chain and logistics solutions further along, including announcing the service and operations vessel contract that Orsted and Eversource signed with Edison Chouest Offshore — the first new-build Jones Act qualified vessel of its kind in the US. In addition, component upgrades will help project economics, which matters a great deal since permitting delays inevitably hurt our project economics. Notwithstanding those permitting delays, we have achieved solid progress across numerous other critical parts of the portfolio, as I noted. With that in mind, we stay confident in delivering our US project portfolio with satisfactory value creation. And we keep seeing robust long-term growth and value creation potential in US offshore wind.
Henrik Poulsen
executiveMoving on to slide five, I'll bring you up to speed on where things stand with our offshore construction efforts. At the Dutch Borssele 1 & 2 wind farm, as I noted earlier, the final unit among the 94 turbines has now been installed. Those turbines are currently going through their last round of testing ahead of commissioning the wind farm. When it becomes fully operational in the course of this quarter, the site will deliver renewable power to one million households in the Netherlands. At the close of September, the 12-megawatt Virginia EPC demo project produced its first power, and by mid-October that project had been finished and handed over to Dominion Energy. It is the first project completed in federal waters, and both the US team and the contractors have put in tremendous effort to make sure construction was safe and efficient. Work at Hornsea 2 and Greater Changhua 1 & 2a is proceeding according to schedule. At Hornsea 2, installation of the export cables and the foundations has begun. Altogether, 165 foundations are to be put in place at sea ahead of the site's 8.4-megawatt Siemens Gamesa turbines, and once commissioned it will rank as the largest offshore wind farm anywhere in the world. Of all our construction projects, Hornsea 2 is still the one hit hardest by COVID-19. Because of the pandemic, the Singapore shipyard building the topside for the offshore substation was shut down.
Henrik Poulsen
executiveThe yard is operational once more, and we don't anticipate that the postponement will impact the wind farm's commissioning date, nor cause any additional damage <<inaudible>> the project's economics as a whole. Moving to slide 6 for a status report on our onshore and bioenergy construction efforts. Onshore, our construction projects keep showing really solid progress. At Permian Energy Center, over 50% of the module installations are finished, and at Muscle Shoals, 50% of the pilots are in place. For our 2 onshore wind projects, Western Trail and Haystack, the key contracts are signed and notice to proceed is issued. As noted before, we've commissioned our Renescience plant now, having successfully wrapped up the final performance test. The plant's commissioning was substantially delayed, mainly because of the mechanical sorting process, and that has now been fixed through facility upgrades. While the modifications and upgrades were carried out, the plant was downsized. That means its maximum capacity stands at 80,000 tons of waste annually rather than the 120,000 tons per year initially planned. On to slide 7 for a look at forthcoming auctions and market trends in offshore.
Henrik Poulsen
executiveGlobal offshore wind expansion still shows really strong momentum, driven by developments across Europe, the US and Asia-Pacific. In 2019, more than 10-gigawatt was awarded for the first time ever, and since then we've seen fewer auctions and awards in 2020. That said, across the next 15 months, awards worldwide could total as much as 30-gigawatt, and 2021 is set to hit a fresh all-time high. Three auctions should happen in the fourth quarter of 2020, and all three are in the US — Maryland, New York and New Jersey. New York State issued its second RFP earlier this year, with bids due on October 20th, and alongside our partner Eversource we submitted bids in that up to 2.5-gigawatt auction. We now await the auction result, which is expected in December 2020. Maryland's second procurement window is open, and bids have to be in by year-end. Cumulatively, across this round and later ones, Maryland can procure roughly 1.2-gigawatt. Results typically become known about one year after bids are submitted. New Jersey will also run its second offshore wind auction in the fourth quarter of this year. For that up to 2.4-gigawatt procurement, the bid deadline is set for December 2020, with awards anticipated in the first half of 2021.
Henrik Poulsen
executiveBeyond those 3 US auctions scheduled for this year, we anticipate additional auctions taking place in 2021 across Rhode Island, Massachusetts, Connecticut, and Maryland. Prior to discussing the remaining regions, I'd like to respond to the recent criticism raised in New Jersey concerning our commitment to local jobs and the local supply chain. I want to emphasize that our commitment to investing $695 million in New Jersey remains fully intact. That said, a major project such as Ocean Wind is a five-year to seven-year process once the auction has been awarded. Federal consenting delays, which I mentioned earlier, inevitably postpone that investment. We need BOEM to confirm our NOIs, along with the turbine layout, before we gain the visibility required to complete our investments in the local supply chain. Notwithstanding the delays affecting our Ocean Wind project, we are continuing to make progress on a state-of-the-art monopile manufacturing facility in South Jersey, and we recently signed our preliminary joint development agreement with EEW, our supply chain partner. That agreement establishes the high-level terms and conditions for developing this factory. Construction commencement will hinge on certain condition precedents that have yet to be satisfied. Alongside our supply chain partner and key New Jersey stakeholders, we are working diligently to keep this on track to become the first offshore wind monopile facility in the US.
Henrik Poulsen
executiveTurning to Asia-Pacific: draft auction rules have now been released for Japan's first round covering the Choshi, Noshiro, and Yurihonjo zones. Bidding is slated to begin in November of this year, with submissions due in the first half of next year and winners announced in the fourth quarter of next year. The auction should involve roughly 1.5-gigawatt of capacity. In South Korea, our efforts center on early markets and pre-assess development, chiefly via early-stage greenfield offshore wind work like data measurement and permitting. On recent European developments: consent for our Hornsea 3 site slipped to December 31st so that additional information on bird impacts could be examined. After that delay, we collaborated closely with key stakeholders to craft a robust, evidence-based Kittiwake Compensation Plan for Hornsea 3. That plan centers on installing onshore artificial nesting structures built specifically for Kittiwake, which should boost breeding productivity. Climate change remains the foremost threat to biodiversity and habitats. We are glad the Secretary of State acknowledges the major contribution Hornsea 3 would make toward the national need for renewable energy. With potential capacity of at least 2.4-gigawatt, Hornsea 3 could deliver clean power to more than two million UK homes and offset more than 128 million tons of CO2 across its lifetime.
Henrik Poulsen
executiveOur optimism about securing that consent has not changed. Early this month, Prime Minister Boris Johnson unveiled fresh proposals aimed at building back greener, with the goal of positioning the UK as the global leader in clean wind energy. That government announcement is one we welcome, since it underscores the enormous opportunity open to world-class UK supply chain firms — at home and abroad — to market the skills and innovative technologies that have been forged within the UK offshore wind industry. Achieving the UK's net-zero ambitions is most cost-effectively done through offshore wind, and in our view, delivering 40-gigawatt of offshore wind by 2030 forms an essential piece of this roadmap. It is a demanding target, yet one that can be reached provided government and industry keep collaborating to speed up deployment of the UK project pipeline. Growth and jobs in coastal communities and beyond will be fueled by it, while progress toward a more sustainable low carbon future is expedited. Poland's offshore wind back is in the final stages of being finalized and should win parliament's approval in November, then be implemented into law in December this year. Under the draft legislation, 10.9-gigawatt of offshore wind is to be awarded by 2027. As much as 5.9-gigawatt will be chosen by the Polish energy regulator from the most advanced projects in the country's pipeline.
Henrik Poulsen
executiveAmong these advanced ventures are the pair of projects amounting to 2.5 gigawatts that our non-binding term sheet with PGE covers. Submissions for each individual project have to be filed no later than the close of March 2021, and awards from the Polish government are anticipated in June 2021. Negotiations on the binding agreements with PGE for the Baltica 2 and Baltica 3 offshore wind farms remain underway, and we anticipate closing the transaction before this year ends. Beyond the fourth UK CfD round and the initial Polish awards, we also foresee tenders taking place in 2021 in the Netherlands, Denmark, Germany and France. That said, I will pass things over to Marianne now, please.
Marianne Wiinholt
executiveThanks, Henrik, and good afternoon from my side as well. Let's begin on slide eight, where I'll walk through the EBITDA for Q3 2020. We posted an EBITDA of DKK3.4 billion, which is a rise <<inaudible>> of DKK0.8 billion versus the third quarter of last year. That decline had been anticipated and stemmed chiefly from the heavy construction work at Hornsea 1 throughout Q3 of last year. EBITDA when excluding the construction agreements went up by DKK0.2 billion. Within offshore, EBITDA for the quarter came to DKK2.6 billion, which is DKK0.6 billion lower. Earnings from operating wind farms came in 15% higher than a year earlier, powered by the ramp-up of Hornsea 1 and Borssele 1 & 2. That gain was partly counterbalanced by the negative COVID-19 related effects. Offshore power generation rose 14% in Q3 thanks to the ramp-up I just mentioned, and availability stood at 94%, which is one percentage points higher than availability in Q3 '19. Wind speeds came in slightly under Q3 of last year, averaging across the portfolio 2. — 8.2 meter per second, above the normal wind speeds for the third quarter of 8.0 meter per second. We recorded adverse COVID-19 related impacts of roughly DKK100 million on our operational earnings, particularly in connection with the UK power market because of weaker electricity demand.
Marianne Wiinholt
executiveThat has resulted in increased balancing tariffs from National Grid, certain hours where power prices went negative, and ROC recycle prices coming in below what we had expected. Partnership earnings reached DKK0.2 billion, versus DKK1.2 billion in Q3 '19. The construction agreements during Q3 '20 concerned the building of Virginia Coastal Wind plus minor updates on construction projects that had been finalized. Back in Q3 '19, construction agreement earnings were mainly tied to Hornsea 1. Turning to onshore, EBITDA came to DKK0.3 billion, matching last year. Earnings from ramping up generation at Sage Draw, Plum Creek and Willow Creek were offset by the extremely high peak power prices in Texas during August 2019, which produced unusually strong earnings at Willow Springs, Tahoka, and Lockett in Q3 2019. Portfolio wind speeds in Q3 were 6.7 meter per second, a bit above the same period a year earlier and above a normal Q3 reading of 6.6 meter per second. Availability for the portfolio was 97%, which is one percentage points lower than last year. EBITDA in markets and bioenergy was DKK0.4 billion, in line with Q3 '19. EBITDA from the CHP plants fell by DKK0.3 billion to DKK0.1 billion, chiefly because of the reversal of a provision after the acquittal in the Elsam case in Q3 '19.
Marianne Wiinholt
executiveLower realized power prices for our generation were offset by increased sales of auxiliary services and reduced fixed costs, largely because of timing. Gas markets and infrastructure rose DKK0.2 billion versus Q3 of last year, driven by a smaller negative effect from revaluation of gas in storage, which was partly counterbalanced by weaker gas margins stemming from the Tyra field shutdown. Moving on to slide nine, covering our financial performance and net interest-bearing debt: net profit came to DKK12 billion, up DKK10.6 billion compared with last year. That gain was mainly attributable to the DKK11.1 billion profit on the divestment of our Danish power distribution, residential customer and city light businesses to SEAS-NVE. Partly offsetting this were the lower EBITDA and higher depreciations resulting from a larger number of operational wind farms. Free cash flow from continuing operations reached DKK13.2 billion for the quarter. Cash flow from operating activities was DKK1.9 billion in the quarter, supported by EBITDA and the tax equity contribution from our partners at Willow Creek. Proceeds from the sale of the Danish power distribution, residential customer and city light businesses totaled DKK20.5 billion. Gross investments for the quarter amounted to DKK9.3 billion, chiefly tied to our offshore projects Borssele 1 & 2, Hornsea 2, Greater Changhua 1 & 2a and Ocean Wind in the US, along with our onshore projects Permian Energy Center, Muscle Shoals, Western Trail and Willow Creek.
Marianne Wiinholt
executiveAt the close of Q3 2020, our net debt came to DKK8.2 billion, and the reduction during the quarter was mainly a reflection of the healthy cash flow I described earlier. On top of that, we've received deferred proceeds totaling $150 million from INEOS related to the O&G divestment back in 2017. If you'll move with me to slide 10, that lays out our financial and non-financial ratios. FFO to adjusted net debt, our key credit metric, was 36% for the 12 months ending in September. That figure got a positive lift from the proceeds of the power distribution and customer business divestment. Return on capital employed landed at 9%. The drop versus the same period a year ago stemmed from lower EBIT across the 12 months, which in Q3 '19 took a significant hit from the farm-down gain on Hornsea 1 in Q4 '18. Greenhouse gas emission intensity kept falling through the first nine months of 2020, thanks to our ongoing build-out of offshore and onshore wind. And we're still well on track to hit our scope 1 and 2 target of under 10 grams CO2 equivalents per kilowatt hour in 2025. Our aim is to be carbon-neutral in 2025 by neutralizing whatever minor emissions remain through carbon offsets.
Marianne Wiinholt
executiveSafety remains a top priority for us, as always, and we work as hard as we can to avoid accidents and injuries. Across the first nine months of 2020, our total recordable injury rate came in at 3.8, an encouraging trend relative to '19. For this year we are aiming for a rate of 4.2 or lower, and 2.9 in 2025. On slide 11 you'll find a recap of our 2020 guidance for EBITDA and gross investment, along with our long-term financial estimates and policies. We are reaffirming that full-year 2020 EBITDA and gross investment guidance. Gross investments should come in at DKK28 billion to DKK30 billion in 2020, and they totaled DKK18.3 billion for the first nine months. Q4 2020 should be a heavy investment quarter for us, driven in particular by Borssele 1 & 2, Changhua 1 & 2a, Hornsea 2, and US offshore and onshore projects. And we stay comfortable with our long-term financial targets, including EBITDA growth, return on capital employed and contracted share of profits. With that, let's open up for questions. Operator, please.
Operator
operatorThat wraps up our presentation, and now we're glad to take your questions. We need to be finished by 3:30 at the latest. Kindly limit yourself to a single question per participant, after which you may rejoin the queue if you'd like to ask a second one. <<operator_script>> Our first question is from Kristian Johansen of Danske Bank. Please go ahead.
Kristian Johansen
analystYeah, thanks. So my question has to do with the US projects and the possible ways to offset a delay there. If you do hit a delay that basically makes the return worse, what can you do to mitigate that, and in particular, are there any options to switch on your equipment, specifically for some of your projects where I recall you picked an 8-megawatt turbine? Could you do a substantial upgrade on those?
Henrik Poulsen
executiveThank you, Kristian. Clearly, we're using this additional time we've been handed, so to speak, to fine-tune every element of the supply chain packages and the overall supply chain solution — that covers our logistics solutions, our harbor solutions, et cetera. So we're putting that time in, and we're starting to see some benefits come through. On turbines specifically, we're also at work upgrading them. As you know, we've already upgraded the turbine in the Mid-Atlantic, moving to the 12-megawatt turbine, and we're also working on an upgrade for the turbine in the Northeast, where up to now we've been running on the D8 turbine from Siemens Gamesa — we've been developing a solution to upgrade that one too. So that represents a meaningful opportunity to offset the financial impact of the permitting delays.
Kristian Johansen
analystDo you think you'll be able to offset those impacts 100%?
Henrik Poulsen
executiveLook, there are a lot of moving pieces here in this, Kristian, so I'd hesitate a bit before claiming we can offset the whole thing. Part of it depends on when we finally receive those permits. As things stand, our assumption is that permits will begin coming through near the end of the first quarter of next year. That's the planning assumption we're using right now, and with that in place, we still view the economics as meaningful and the value spreads as acceptable to us. So —
Kristian Johansen
analystAlright, that's very clear. Thanks.
Henrik Poulsen
executiveThanks.
Operator
operatorOur following question is from Peter Bisztyga at BoA Securities. Your line is open.
Peter Bisztyga
analystYeah, hi, thanks for taking my question. So about the upcoming set of auctions in the US, and I suppose New York, which I know you've already taken part in. Could you tell us which of those you think will be decided purely on price and which ones, if any, will still involve the sort of qualitative elements in the award process?
Henrik Poulsen
executivePeter, is your question focused specifically on the US projects, or are you asking about the whole global portfolio more broadly?
Peter Bisztyga
analystMy question was specifically about the US, though I suppose you could also comment on Poland and Japan, particularly in that context?
Henrik Poulsen
executiveSure, happy to address that. In the US, to put it simply, New England auctions tend to lean more heavily on price, whereas in New York, New Jersey, and Maryland the auctions take a broader, more holistic approach—placing additional emphasis on local content, local investment, job creation, those kinds of parameters, along with track record and credibility. That's roughly how the US market breaks down. Turning to Japan, the auction guidelines have now been issued, and it will be 50 to 50—so 50% price and 50% non-price. They've also laid out at a high level what the non-price parameters will be, and these are more or less what you'd expect: experience and reliability, project feasibility, and so on. Stakeholder management is a criterion as well, plus local economic impact. In Poland, the model will differ somewhat, since the government will award the initial up to 5.9 gigawatts directly, without a competitive allocation mechanism. So those projects will be awarded more through a beauty contest among the most mature Polish offshore wind projects. We'd count Baltica 2 and Baltica 3 as being among them.
Peter Bisztyga
analystGreat, thanks. That’s really useful.
Operator
operatorOur following question is from Bernstein's Deepa Venkateswaran. You have the floor.
Deepa Venkateswaran
analystThanks. I had a few questions about the UK. Could you clarify the type of auction mechanism you're expecting for '21? Some rumors surfaced earlier about pursuing a negative bid and similar ideas, so perhaps you could share your latest expectation? And then, more broadly, do you back the integrated offshore transmission approach, or would you rather stay with the present model — a single transmission line running to each project? Thank you.
Henrik Poulsen
executiveThanks, Deepa. Regarding how CfD Round 4 will be structured, our expectation is that it mirrors the format used in the last round, Round 3. At least as far as I know, it isn't anticipated that we'd see — and I take it from your question that you're asking whether there could even be a concession payment type of structure built into the format — that is definitely not what I expect. On integrated offshore transmission, I can absolutely see a rationale for optimizing and thinking through the wider transmission build-out as the UK keeps accelerating its offshore wind build-out. That said, it matters that this transmission forms part of the assets that are exposed to competition, and we do see significant benefits when offshore wind developers are in charge of constructing these transmission assets as an integral part of building out the generation assets, so that you don't begin separating the two. So in some cases I still believe single-line transmission will make sense, but in other cases it will make sense to start thinking about integrating some of these transmission infrastructures, while still keeping them exposed to the competition that we know from the CfD rounds.
Deepa Venkateswaran
analystI appreciate that.
Operator
operatorMarcus Bellander from Nordea has the next question. The line is yours — go ahead.
Marcus Bellander
analystYes, thanks. I have a question about the US. On that slide, you showed that 7 of the upcoming auctions are in the US. I'm just wondering how many of those you can realistically take part in, given that we have 2 seabed leases left? And could you also elaborate on what you're doing to build your pipeline in the US? Thank you.
Henrik Poulsen
executiveThanks, Marcus. Yes, you're absolutely right — it really comes down to how much capacity we can win. Clearly, there's a scenario where, if we're very successful and secure a number of awards early on across these seven auctions, we could over time fill up the lease areas, but we still have meaningful amounts of lease capacity left. So we're talking several gigawatts of offshore wind awards before we'd start filling up. So I'd expect us to participate in the vast majority of these auctions. If we ultimately sell out, I'd obviously view that as a positive challenge for us. There will be lease rounds coming up in the US. As you know, they have been delayed, but over time, there will be more lease rounds. And, of course, we're constantly keeping an eye on our inventory of lease capacity. Today in the US, we still have by a wide margin the most advantageous position when it comes to lease capacity. We are the only player that basically can join all of these auctions over the next 15 months to 18 months. So we have a pretty strong position in the US as a starting point.
Henrik Poulsen
executiveNaturally, though, we’re watching how we replenish lease capacity as time goes on—not just within the US, but across a wider footprint.
Marcus Bellander
analystAlright, thanks.
Operator
operatorOur following question is from Alberto Gandolfi of Goldman Sachs, and I'll hand it over to you now.
Alberto Gandolfi
analystGood afternoon, and thanks for taking my call. My question also refers back to your very useful slide seven. There are 25-gigawatt to 30-gigawatt of auctions coming up in just over a year and a bit. Could you tell us how many gigawatts you will actually attempt to bid for, and where you hold a seabed that permits you to bid within that 25-gigawatt to 30-gigawatt range? And perhaps you could remind us whether your strategy is to secure as much as possible given your return threshold, or whether you will run into, say, some balance sheet headroom constraints. So I'm trying to grasp whether your logic is to maximize the awards if returns are attractive and maybe you would even be open to rotating further toward issuing equity, so I'm trying to think about your mindset here in the bidding? Thank you.
Henrik Poulsen
executiveThanks a lot, Alberto. On your first question about where we can actually bid: we're in a position to bid for all of these US projects unless — to go back to what Marcus asked — unless we sell out, so to speak, but that doesn't look like the most likely scenario. So we could participate in all of these US auctions from the lease areas we currently hold. Assuming we get the expected consent for Hornsea 3, we would be bidding off Hornsea 3 in the UK at Round 4. We have Changhua 3 to enter in a potential — what we call a transition auction — in Taiwan toward the end of 2021, which hasn't been confirmed yet, but it's our hope and expectation that this may happen by end of '21. The Polish award, of course, goes back to the agreement with PGE and Baltica 2 and 3, so we'll be participating through those projects. And then Japan: we would be participating in the JV with TEPCO for the Choshi and so on. And then the remainder are centralized tenders. So Germany, the Netherlands and France — all sites that are being offered by the local government, so that's not really — we don't really have to — have a site, obviously.
Henrik Poulsen
executivePut another way, we can participate in every one of these auctions. Our expectation is that we'll take part in the vast majority of them. I won't claim we'll be in each and every one. There may be times when we choose to put our bidding efforts here first, but you should count on us covering a very substantial portion of this auction list. As for our capacity, we do have the balance sheet room to pursue this and go after them, so it comes back to the return threshold. So, to answer your question: will we maximize our awards provided we can achieve a satisfactory value spread above cost of capital? Then the answer is yes — we are going to pursue this opportunity over the next 15 months.
Alberto Gandolfi
analystI appreciate it.
Operator
operatorOur following question is from Casper Blom at ABG. Go right ahead.
Casper Blom
analystThanks a lot. I have a question about your guidance for 2020, or really the final 2 months of 2020, so to speak. DKK16 billion to DKK17 billion — you've delivered DKK13.1 billion year-to-date. That means, in effect, you're guiding DKK2.9 billion to DKK3.9 billion for the last quarter of 2020. In Q4 '19 last year, you delivered DKK4.6 billion, and then you've divested the distribution business, but on the other hand, the negative LNG won't have an impact on Q4 either. So what exactly is going to drive your earnings down to the guidance level? Thank you.
Marianne Wiinholt
executiveYes, the…
Henrik Poulsen
executiveThanks, Casper. I believe Marianne is going to handle that question.
Marianne Wiinholt
executiveYeah, thanks for that question. Yeah, you’re right to flag a few things. There’s the RBC divestment, and then we’ve also got a fair amount of project development costs landing in Q4 — we have activity in the US as well as in the other markets. On top of that, we won’t see construction gains in the fourth quarter, since we don’t have any construction project for partners. We had pretty meaningful construction gains last year. And then there’s the usual cushion, in a sense, for uncertainty around production, plus those storage impacts we have. So what we’re putting forward is a bottom-up, solid estimate.
Casper Blom
analystSorry to keep pressing on this, Marianne, but there really wasn't much of a construction agreement, was there?
Marianne Wiinholt
executiveYeah, it came in at roughly DKK100 million, that's right.
Casper Blom
analystYes. But then…
Marianne Wiinholt
executiveRight, so — yes, but we won't have any — yes.
Casper Blom
analystSo then, are you essentially saying that in Q4, within the offshore business, you'll be putting more than DKK1 billion toward developing new projects?
Marianne Wiinholt
executiveI won't provide the precise figure, but you're not far off. We're going to have a fairly significant amount of spending on project development in Q4. Yes, that's correct.
Casper Blom
analystAlright, thanks.
Operator
operatorMoving on to the following question…
Henrik Poulsen
executiveThat's a reasonable question, Casper. Still, as Marianne mentioned, we do anticipate substantial DEVEX, and you need to keep in mind that at present we're pursuing a very wide range of opportunities globally. So our development work is rather extensive at the moment, particularly as we examine the market opportunity we just talked about.
Casper Blom
analystThat's completely fair, which just means we need to move past the DKK2 billion level, then?
Marianne Wiinholt
executiveYes, that applies to this year.
Casper Blom
analystYeah, great. Thanks so much.
Henrik Poulsen
executiveAppreciate it.
Operator
operatorOur following question is from Sam Arie at UBS. You have the floor.
Sam Arie
analystHi everyone, and thanks, as usual, for the presentation. Henrik, I've realized I'm not certain whether you'll be the one presenting full-year results again next year — I rather suspect you won't be — and if that's the case, this may have been your final presentation. So special thanks this time around, and special thanks for all the earlier ones too.
Henrik Poulsen
executiveThanks, Sam. You've got it right. This is going to be the final one. Appreciate it.
Sam Arie
analystOkay, so we've gained quite a bit from the presentations you've given us over the years, and thank you very much for those. That said, I should apologize, because I'm about to pose a question that I believe Alberto more or less raised already. Still, I don't think we really received the response that perhaps some of us were hoping for. So let me attempt to frame it another way, returning to your market sizing of 25 gigawatts to 30 gigawatts for the coming year and a bit. What I think we're perhaps trying to work out is this: if you captured everything within that 25-gigawatt to 30-gigawatt range that you were capable of capturing, and factoring in that a number of those could be 50-50 stakes, and that in certain cases you might lack sufficient leases to carry out the larger portion, or enough pre-qualified leases at the appropriate moment — what, in theory, would be the largest amount in gigawatts you could capture over the coming year and a bit from that 25-gigawatt to 30-gigawatt total? Could you perhaps offer us some view on that? Thank you.
Henrik Poulsen
executiveYes, that's a fair question, Sam. I'm not certain we've even calculated those figures on our own. But if you were after the maximum figure, you'd have to assume we fully utilize our existing lease capacity in the US, which alone would contribute a few gigawatts, and from there you could begin adding contributions from Poland, Japan, potentially additional capacity in Taiwan, UK Round 4, which clearly could be substantial, and then there are the centralized tenders. So I could come up with a figure under a highly unrealistic scenario, and it would naturally turn into a very large number. That's not a probable result, though. But you should keep in mind, when you look at slide seven, that we're likely the sole developer globally capable of participating in each of these opportunities and holding a fairly solid foundation for doing so. So I think, once again, I simply want to emphasize this as evidence of the scalability and the scope of our worldwide business platform — that our position is unique when it comes to chasing this opportunity. And as I mentioned in response to Alberto's question, we are certainly going to pursue it, but we'll remain disciplined.
Henrik Poulsen
executiveWe won’t be doing anything wild. So anything we’re able to acquire will be capacity that creates solid value. I’m not sure whether that addressed what you asked, Sam—perhaps I didn’t quite give you the reply you were hoping for. So please ask a follow-up.
Sam Arie
analystNo, no, no, that's fine. I get that hitting it exactly is hard. And maybe just one quick follow-up, then. I suppose out of that 8-gigawatts to 12-gigawatts in the UK, which is a big number, your total pre-qualified capacity that you can take for that '21 event, including the next relative Hornsea 3 <<inaudible>> is — can you remind us how many gigawatts that is?
Henrik Poulsen
executiveHornsea 3 would come in at 2.4 gigawatts.
Sam Arie
analystBut that 8-gigawatt to 12-gigawatt figure for the UK — when it comes to the UK, the best you could achieve is the 2.4 gigawatts for Hornsea 3, correct?
Henrik Poulsen
executiveThat’s right.
Marianne Wiinholt
executiveYes.
Sam Arie
analystCorrect, precisely. All right, that is quite useful. I will stop at that point. Many thanks.
Henrik Poulsen
executiveI appreciate that.
Operator
operatorAnd our following question is from Rob Pulleyn of Morgan Stanley. You have the floor.
Rob Pulleyn
analystHello, thanks, and good afternoon. Going back to the US project delays, maybe, and to what you said about the construction window of '23 to '24: could I just ask, first, whether this might have an impact on your 2025 guidance of 15 gigawatts of installed offshore capacity, and second, would this affect scheduling as your company tries to balance building the projects you already have against perhaps some others that you hope to win, following on from the earlier questions? Thank you.
Henrik Poulsen
executiveThanks, Rob. So, when we consider those possible delays — construction timelines moving from '23 and '24 into '24 and '25 — there's of course always a chance that a portion of that work could slide into early '26. That isn't really what we expect, but at the same time, I can't exclude it, since our visibility on permitting is still not complete. Even so, this doesn't alter how committed we are to the 15-gigawatt target, which still strikes us as exactly the right goal, and we remain very much on track toward it. On scheduling, clearly, since we're now bidding into new auctions in the US, those bids have to include an anticipated timeline, and we need to factor in some flexibility there because we lack full visibility into the current project portfolio. So naturally we're making certain that the new bids we submit carry sufficient flexibility to optimize the overall schedule across both the current portfolio and possible new wins in the coming few quarters. I'm not sure whether that addresses your question, Rob, or whether that's what you were after.
Rob Pulleyn
analystNo, it does. Actually, that's quite interesting. Thanks a lot for the reassurance on the target. If I could just try the follow-up — the obvious one to what you just said about scheduling — would that therefore leave you at a disadvantage compared with bidders who don't have the same, let's say, construction congestion in the US portfolio, in your view? Thank you.
Henrik Poulsen
executiveI wouldn’t really view it as a disadvantage. If you look at the bids we’re putting in at the moment, they’re going to be evaluated against a wide set of criteria, and I don’t believe our rivals will necessarily propose a timeline that’s very different from the one we’re able to deliver. Had we finished building the current portfolio by the end of ’25, we could then, fairly soon after that, essentially kick off the next train and begin construction on the projects that follow. So in that respect, I think we’re in good shape.
Rob Pulleyn
analystGreat. That's really good to hear. Thank you so much, and I'll hand it over.
Henrik Poulsen
executiveThanks.
Operator
operatorAnd our following question is from John Musk with RBC. Go ahead, please.
John Musk
analystYeah, hi everybody. Honestly, this is kind of like the question we just got, in a sense. I just wanted to get some clarity on the permitting problems in the US that are still going on. <<inaudible>>?
Henrik Poulsen
executiveJohn, you’re cutting out on us—I can hardly make out what you’re saying. I’m not sure.
John Musk
analystSorry about that. Is it any better now, even if not entirely? I think I'll probably —
Henrik Poulsen
executiveIt’s improved. No, it’s improved. Yes.
John Musk
analystYeah, just to confirm — do you see the permitting problems in the US as a one-off, given that there's no danger of it recurring with the bids that will come out over the next 12 months to 15 months? And second, are you factoring any risk into the bids you're currently submitting because of what we've witnessed over the last few months?
Henrik Poulsen
executiveYes, thanks, John. No, I really do think this is a one-off, in the sense that what this is really about is the federal permitting processes getting firmed up and carefully thought through and designed. And of course, BOEM felt what I believe is a legitimate need to understand the broader long-term impact of building out 25-plus gigawatt of offshore wind along the East Coast. So this whole environmental impact statement process, I think, has been warranted, and obviously, once they've concluded on that — hopefully relatively soon — and they've made a number of key decisions regarding wind farm layouts, et cetera, and the format of the permitting process, I would expect everything to start running much more smoothly for subsequent projects. So it's not beyond the norms for a new market to go through this process of maturing the whole regulatory framework and the permitting process. We've seen that also happening in other markets in the early stages. So our experience is that once you're past that, things start to run much more smoothly. And yes, we do take this into account in the bids that we submitted, as to the answer I gave earlier — we have to make sure we have sufficient flexibility in the bids that we submit that we can deliver on the timelines that we commit to.
Operator
operatorKlaus Kehl from Nykredit Markets has the next question. The line is yours — please proceed.
Klaus Kehl
analystHi there. Yes, hello — this is Klaus Kehl calling from Nykredit. Going back to your Capital Markets Day in 2018, that was when you announced the 30-gigawatts addition for 2030. To be honest, at the time I figured it seemed a little crazy, but the market has grown a great deal since then. So could you say a little more about how you view that addition as things stand today?
Henrik Poulsen
executiveNo, that's a fair question, Klaus. In the roughly 2 years since that Capital Markets Day, the projected growth for offshore wind has essentially doubled compared with what we saw then — 78 gigawatts by 2030 back in those days, and today we're looking at 150 gigawatts to 160 gigawatts by 2030. So clearly, this market is growing far faster than any of us expected at that point. And on top of that, we're quite happy with how our onshore business has performed across those 2 years. So I'd say there's a solid case for revisiting it, and that's something we intend to do — it will sit in the very capable hands of Mads Nipper, who'll work alongside the team to examine what the appropriate long-term ambition for Orsted should be. My sense is that the early portion of 2021, or the first half of 2021, is probably a sensible moment to look into that. So that's the timeline, I'd say. But once more, this is a process that Mads clearly has to lead and take ownership of, though naturally it's very much on our agenda to check whether our 2030 ambition still matches the pipeline.
Klaus Kehl
analystAll right, many thanks.
Operator
operatorAnd our next question is from James Brand at Deutsche Bank. Please go ahead.
James Brand
analystHello there, good afternoon. I appreciate the presentation. My question is really about green hydrogen. I realize this isn’t necessarily your field of expertise, but since you’re beginning to take part in certain green hydrogen projects, I wanted to ask whether you have any perspective on the various electrolyzer technologies, alkaline compared with PEM, which appears to be a growing debate regarding which of those two is preferable, considering, I suppose, the additional flexibility that PEM technology offers, while alkaline is becoming somewhat cheaper <<inaudible>>. I’m curious whether you have any views on that? Thank you.
Henrik Poulsen
executiveJames, it's really too soon for us to say much about that. Right now we're developing four projects—actually, five as of now. Procurement decisions will likely be made during the coming year, so at that point we'll begin examining more detailed procurement choices. Until that happens, though, it would be premature for me to comment on which of the two alternatives we'd pick technology-wise.
James Brand
analystAlright, thank you.
Operator
operatorOur following question is from Elchin Mammadov, who is on the line with Bloomberg Intelligence. Elchin, you may proceed.
Elchin Mammadov
analystHello there. I’d like to ask about asset rotation, if I may. First, now that you’ve finally completed the Renescience project, would you think about selling it, given that the SSG <<inaudible>> impairment received fairly good multiples for their project, and waste-to-energy really isn’t — I mean, it isn’t truly your core business right now. Then, regarding asset rotation, have you thought about acquiring a renewable pipeline in new geographies or technologies, particularly onshore? Thank you.
Henrik Poulsen
executiveThank you. On Renescience, over the coming couple of quarters we'll be putting <<inaudible>> toward simply validating the commercial formula that underpins this waste technology, and essentially mapping out what its longer-term potential looks like; once that assessment is finished, we'll begin considering how to move it forward from that point. So a solid answer isn't something I can give you right now. We're going to need a few more months — or probably closer to a couple of quarters — before we truly have our arms around what Renescience can do commercially. I fully recognize that waste-to-energy isn't necessarily a core business for us. That said, it's a technology that could be very interesting. So naturally we want to be sure we get the most out of it. Turning to asset rotation, we're quite pleased with the onshore expansion in the US. And it's no secret that, strategically, taking the onshore business into other regions over time — Europe and/or Asia included — could be of interest to us. We have no specific plans to do so, but then again, I don't want to rule anything out. I think we want to keep our options open here. If a good way of entering these markets could be found, we would certainly take a close look at it.
Henrik Poulsen
executiveStill, it's worth stressing that we feel no urgency here. Our onshore business is in a really strong position, and plenty of growth opportunities remain for us in the US. Down the road, though, should the right opportunity present itself, then yes, we'd certainly take a look at it.
Elchin Mammadov
analystThanks.
Operator
operatorNext, we have a follow-up from Deepa Venkateswaran at Bernstein on the line. Go ahead, please.
Deepa Venkateswaran
analystThanks for letting me ask a follow-up. This one's about the US. I'm just trying to get a handle on how the delay actually works and what it does to the project economics, especially since you haven't put any CapEx in yet. So specifically, does it affect the tax credits, or do you owe anybody anything for as long as the delay lasts? And on top of that, I wanted to ask whether the current administration has put any political pressure on BOEM, and whether that could shift if a different administration and power come in next year — would that alter anything from where you sit? Thank you.
Henrik Poulsen
executiveThank you, Deepa. Even through this turbine upgrade, we've managed to keep and maximize our tax credit eligibility — that holds for the Mid-Atlantic portfolio as well, which is going with the GE Turbine. And, as I said at the start of this call, we'll also be able to preserve and maximize tax credit qualification in the Northeast now that we've made the decision to upgrade the turbine there too. As far as these delays go, we haven't encountered any liabilities of that kind on the supply chain side. Naturally, things get harder when the permitting schedule isn't firm, because then you can't lock in precise timeline commitments, and our suppliers clearly want confirmed timelines as well. Even so, up to now we've kept flexibility, working alongside our suppliers, so that no penalties or liabilities get incurred. So to this point, we're still in a good position. On the question of pressure from the administration — it's what everyone is being asked right now: which administration do you prefer, this one or that one. CEOs have a tendency to be somewhat vague about their expectations and about whether one is better than the other, and I'll be vague too. My view is that US offshore wind has a great future ahead of it under any administration.
Henrik Poulsen
executiveThis is an enormous opportunity to fuel local economic growth in coastal communities that genuinely need this economic lift, and they will require it more than ever as they emerge from the COVID-19 crisis. So whether a Trump administration or a Biden administration is in place, there's no question that, given the tremendous backing and enthusiasm from the states and the governors, we'll witness a very substantial build-out of offshore wind under either scenario.
Deepa Venkateswaran
analystOkay, Henrik, let me just make sure I understand this. If it isn't the tax credit and there aren't any liabilities, where exactly are your economics taking a hit because of the delay? Is the main impact simply the NPV moving out a year, or a couple of years? Or is there something I'm missing?
Henrik Poulsen
executiveNPV shifting has an effect, time shifting has an effect, and there's also an effect from continuing to run the projects — that's an underlying burn rate involved in keeping those projects running.
Deepa Venkateswaran
analystRight, I see it — all right, the DEVEX folks along with the project teams and the rest. Okay, got it, yes, okay.
Henrik Poulsen
executiveThat's right, that's right.
Deepa Venkateswaran
analystAlright, thank you.
Henrik Poulsen
executiveYeah, thanks — appreciate it.
Operator
operatorAnd our next question is another follow-up, this time from Marcus Bellander at Nordea. Go ahead, please.
Marcus Bellander
analystYes, thanks. I was just hoping to ask whether anything has become clearer to you on floating wind, or whether you've noticed anything new on that front recently? Thank you.
Henrik Poulsen
executiveThanks, Marcus. I can't claim some kind of epiphany here, but what I can say is that this is getting attention from us, and it's getting more attention now than it did before — though we aren't actively working on any project, that's not the case. Still, we want to be sure we're watching all the various foundation technologies under development very closely. We're also tracking the worldwide pipeline of projects closely. And we keep roughly estimating, within the 150-gigawatt to 160-gigawatt figure we currently project for 2030 excluding Mainland China, how much of that will actually be floating. By 2030 it will remain a fairly small technology. Beyond 2030, though, we genuinely believe there is — there is a role for floating. And any time the technology presents an appealing opportunity to us, we will definitely go after it.
Marcus Bellander
analystGot it. Thanks.
Operator
operatorAnd our final question is another follow-up, this time from Sam Arie at UBS. Go right ahead.
Sam Arie
analystThanks. Hi again, Henrik — I remember one other subject I wanted to raise with you, and it's why we still can <<inaudible>>, and that's the discussion about the political agreement in Denmark under which the government agreed to keep its majority stake in the company. My expectation has been that the government's position won't change, but I recall, I think, that there was a written agreement with a fairly specific end date, perhaps at the end of 2020. I just wanted to check with you: what's the latest on that agreement? Has it now lapsed, or has it been extended? And would there be any constraints on the government changing its position now, from 2021 onwards? Thank you.
Henrik Poulsen
executiveThanks, Sam. As a matter of fact, the political agreement was established with 2020 as the timeline for possibly revisiting it. My clear impression is that the political parties backing the agreement remain committed to it. I'd — I sense there's no political appetite for opening a discussion about the state majority ownership; I think they feel quite good about the 50.1% stake. So, whether you hope for one of the other, my personal take on it — and I could certainly be wrong here — but my personal take right now is that you shouldn't expect any change to the state majority ownership anytime soon. I think it's going to stay for a number of years to come.
Marianne Wiinholt
executiveAnd that wasn’t an end date of 2020. That year was simply referenced in the agreement, but from there it just keeps going until a different decision gets made.
Sam Arie
analystUnderstood, that's very clear. All right then, thanks — and thanks once more — plus congratulations to you, Henrik. We also want to wish you the best of luck in whatever you take on next.
Henrik Poulsen
executiveThanks a lot, Sam. Let me check with the operator — do we have any other questions, so we can go ahead and wrap this up?
Operator
operatorThat brings us to the end of the Q&A. I'll return the floor to you for any closing comments.
Henrik Poulsen
executiveAlright, thank you. So thank you all so much for joining. I appreciate all the excellent questions. And as usual, if you have further questions, please don't hesitate to reach out to the IR team, who would be able to answer them. Since this was indeed my final earnings call as CEO of Orsted, I'll wrap up by offering my deepest thanks to the Board of Directors, the management team, not least the employees at Orsted and, of course, all of you, analysts and shareholders. It has been a genuine privilege, and I truly appreciate your confidence and support throughout my tenure, and also for always keeping me and the rest of the team on our toes. Being part of the Orsted team over the past eight years has been an exceptional privilege. Thank you all very much, stay safe, and have a continued great day.
Operator
operatorThat brings us to the end of today's conference call. Thanks to everyone for joining. You can go ahead and disconnect your lines now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ørsted A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Ørsted A/S earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ørsted A/S or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.