Ørsted A/S (ORSTED) Earnings Call Transcript & Summary

April 29, 2022

Nasdaq Copenhagen DK Utilities Independent Power and Renewable Electricity Producers earnings 85 min

Earnings Call Speaker Segments

Operator

operator
#1

Thanks for joining us for Ørsted's interim report covering Q1 2022. <<operator_script>> With us today are Mads Nipper, our CEO, and Daniel Lerup, our CFO, and I'm glad to hand things over to them. Go ahead and start the meeting.

Mads Nipper

executive
#2

Thanks a lot, and good morning, good afternoon, everyone. Welcome to the earnings call covering the first quarter of the year. Beside me is Daniel Lerup, our newly appointed Group CFO, whom most of you probably already know from his time heading the Investor Relations team a couple of years back. Daniel will walk through the Q1 financials before we take questions. Before we get into the strategic highlights for the first quarter, let me begin by addressing the terrible situation we keep witnessing in Ukraine. We, and I personally, are deeply disturbed by it, especially the human suffering. Russian aggression runs counter to everything Ørsted stands for, and as a result, we are doing everything we can to halt cooperation with Russian companies, including having stopped all biomass and coal sourcing from Russia for our power stations, while still taking the security of energy supply in Denmark and Europe into account. As you're probably aware, Ørsted has a long-term take-or-pay contract with Gazprom Export running until 2030. We have decided that under this gas purchase contract we will offtake only the minimum quantity, a yearly volume of gas. In addition, I can confirm that we have no intention of paying in rubles, and that we are in close dialogue with other energy companies and with the authorities about a common European response to Gazprom Export.

Mads Nipper

executive
#3

I want to stress that gas is not a core part of what we do, and we won't be renewing that contract. With that said, let me offer a brief remark on our headline EBITDA for Q1. Our financial start to the year has me quite pleased, with group EBITDA reported at DKK 9.4 billion, which is a DKK 4.6 billion rise versus the same period a year ago. Much like what we saw in Q4 2021, the diversification benefit across our offshore and bioenergy assets has shown itself to be highly valuable amid energy prices that remain high and volatile. In the quarter, we also gained from wind speeds that came in above normal. Moving to the strategic highlights, I'll begin with 2 major milestones in our offshore partnerships. In February, we closed the farm-down of 50% of the 900-megawatt German offshore wind farm Borkum Riffgrund 3 to Glennmont Partners. It makes us proud that Ørsted has again pioneered the way as the first developer to reach final investment decision on a merchant offshore wind project. After that, we signed an agreement to divest a 50% share of Hornsea 2 to a consortium made up of AXA and Crédit Agricole Assurances, at a transaction value of GBP 3 billion.

Mads Nipper

executive
#4

The deal’s economics point to solid NPV retention, and it again shows that financial partners remain highly interested even as interest rates rise. We expect the transaction to close in the second half of 2022, after the wind farm is fully commissioned and once certain regulatory approvals have been secured. In February, together with our 50-50 joint venture partner Eversource, we took FID on South Fork, our first U.S. offshore wind project. That 130-megawatt project would become New York’s first operational offshore wind farm. When it is completed at the end of 2023, the offshore wind farm will produce enough clean renewable power for 70,000 homes and will help move New York state’s nation-leading clean electricity goals forward. In Poland, alongside our partner ZE PAK, we have submitted seabed lease applications in the Baltic Sea. We will learn the result of the lease auction toward the end of this year. With our partner, we look forward to growing our footprint in Poland and supporting the country’s path toward climate neutrality. Poland’s first CfD auctions are scheduled for 2025 and 2027. In Taiwan, our Greater Changhua 1 & 2a offshore wind farm delivered first power successfully earlier this month.

Mads Nipper

executive
#5

For Ørsted and for the industry, reaching this milestone matters a great deal, since Greater Changhua 1 & 2a stands as Taiwan's first large-scale offshore wind farm. With 900 MW of capacity, the wind farm, when finished, will give substantial backing to Taiwan's rapid expansion of renewables and deliver the green power that export industries badly need, as well as what Taiwan requires to meet its net-zero target. Regarding the cable protection problems that we found and disclosed in our Q1 2021 results, we have now recalculated what it should cost to restore the cables' integrity. Thanks to thorough investigations, analysis and quick action, we managed to install extra engineered rock berms surrounding the cable protection system, and that has brought down the expected costs tied to this issue considerably. Daniel will go through the specifics of the financial implications. Shifting now to what we are doing in floating offshore wind: we have 2 notable strategic milestones with which to begin the year, one in Scotland and one in Spain. In Scotland, we took a majority stake in Salamander, a floating wind development project, through which we will form a joint venture alongside Simply Blue Group and Subsea 7. In our view, this 100-megawatt development project serves as a stepping stone intended to give the Scottish supply chain an early chance to build capacity ahead of when the larger ScotWind projects get underway.

Mads Nipper

executive
#6

That covers our 1-gigawatt Stroma project, which we're doing with Falck Renewables and BlueFloat Energy. We intend to move that project forward via the innovation track of Crown Estate Scotland's innovation and targeted oil and gas leasing round, which comes up later this year. It's going to use innovative, cutting-edge floating offshore wind technologies to help with the cost reduction and learning journey that commercial deployment of floating offshore wind requires. I also want to call out our entry into the Spanish market for floating offshore wind. We're pleased to have moved into one of Europe's key growth markets for renewables. And with Repsol, we want to explore and jointly develop floating offshore wind projects, with the ambition of becoming a leading developer of Spanish offshore wind. Following several years of concept development and small-scale testing, floating offshore wind is now on the brink of commercialization, and the global offshore wind market is expected to reach 21 GW of installed capacity by 2035, according to estimates from Bloomberg New Energy Finance. Spain targets 3-Gw floating offshore wind by 2030, and the Spanish supply chain is well prepared to enter floating offshore wind on the back of decades of experience from supplying to Spain's massive fleet of onshore wind farms.

Mads Nipper

executive
#7

We’re really looking forward to partnering with Repsol, which is the leading energy provider in the country, to help speed up Spain’s shift toward renewable energy while also creating jobs locally and putting money into the Spanish supply chain. We keep onshoring. During the first quarter, we commissioned the Haystack onshore wind farm in Nebraska. Haystack is our second project in operation in Nebraska and our third operational project in the SPP market. With that 298 MW added, we now have over 3 GW of onshore wind and solar capacity operating in the U.S., which is a big step up from the 1-GW operational capacity we had at this time last year. Just yesterday, we took FID on Sunflower Energy Center, a 201-MW onshore wind project in Kansas. That project was acquired alongside Lincoln Land Wind last year. And since that acquisition, key development work has been finished, and the project has been optimized so it delivers a strong business case. The project is expected to reach commercial operation in the second half of 2023 and will bring our capacity in the SPP market to 832 MW. Moving on. The global landscape for hydrogen and e-fuels is shifting quickly. As a result, we’ve decided to strengthen our hydrogen organization further and have rebranded it as Ørsted PtX, or Power-to-X.

Mads Nipper

executive
#8

Strong momentum in renewable hydrogen is still evident globally, and we have kept making meaningful headway on our renewable hydrogen and green fuels pipeline since our annual report for 2021 was published. A landmark letter of intent was signed with Maersk in March, under which Ørsted will develop a 770 — a 675-MW e-methanol facility producing roughly 300,000 tonnes of e-methanol annually, which Maersk will offtake for its newly ordered fleet of 12 methanol-powered vessels. Powering the facility will be approximately 1.2 GW of renewable energy from new U.S.-based onshore wind and solar PV farms. Development works on the project have begun, with commissioning targeted for the second half of 2025, which makes it one of the most ambitious projects globally producing e-methanol at scale and a driving force in the maritime sector's decarbonization journey. Finally, we have decided to accelerate part of our green fuels for Denmark project and to investigate production of green jet fuel for 2025, following increased Danish ambition to establish green aviation opportunities in Denmark as early as 2025. Together with our partners, we have decided to accelerate 100 MW of the original planned Phase 2 electrolyzer by 2 years and to begin capturing sustainable CO2 both by the end of 2025.

Mads Nipper

executive
#9

This 100 MW facility is capable of generating over 50,000 tonnes of sustainable fuels come 2025. Although the e-methanol output is expected mostly to serve shipping, the partnership will additionally explore if some share might also support green aviation fuels. Moving to Slide 4, where we turn our attention to the European energy crisis. Europe has for a long time been advancing on its climate change journey through renewable energy targets and incentives, a globally leading renewable value chain, and the millions of jobs generated within that industry. There remains considerable distance for Europe to travel before its renewable ambitions are met, since we are not yet as efficient as we could be regarding permitting and the awarding of seabed leases, and we continue to rely heavily on energy sources derived from fossil fuels. Russia's unjustified and appalling invasion of Ukraine has now made the situation more acute. Moscow's tendency to weaponize energy for geopolitical advantage simply highlights that reliance on imported fossil fuels can neither provide the supply security Europe requires nor assist in tackling climate change. The answers to the 2 challenges of energy dependency and climate change are identical. We must substitute renewables for fossil fuels, electrify energy use both directly and indirectly, enhance interconnection, address the intermittency problem, and employ energy with maximum efficiency.

Mads Nipper

executive
#10

We're already doing this, but the Ukraine crisis demonstrates why we need to move even faster. Ørsted has determined that an extra 30 GW of European offshore capacity could realistically be installed by 2030, and 60 GW by 2035, over and above the build-out targets that currently exist. Achieving that added capacity is no simple task. It demands an entirely new approach to developing and delivering offshore wind and Power-to-X. Rather than today's incremental build-out that centers on lowering costs, Europe has to shift toward a sustainable, accelerated build-out that centers on societal value and scale. To pull off such a feat, authorities in every country will need to speed up deployment — by fast-tracking projects already in the pipeline and streamlining permitting processes. Second, space must be allocated so that large-scale build-out toward 2030 and beyond becomes possible. Authorities have to steer clear of the mistake of monetizing offshore wind and instead give society a win, capturing the socioeconomic benefits that come with rapid build-out. When developers hand over substantial fees to obtain seabed rights through lease auctions, those costs will ultimately be shifted from taxpayers onto electricity payers. What's more, this race to cut costs risks blunting the industry's ability to effectively deliver on European policy objectives.

Mads Nipper

executive
#11

At the same time, it places additional strain on Europe’s supply chain and on that chain’s capacity to put money into expanding capacity, which is under pressure amid climbing inflation and climbing commodity prices. Thirdly, the industry must be activated to assist in resolving the challenges surrounding a faster build-out by pairing large offtakers’ demand for renewable power, renewable hydrogen and e-fuels with supply, while also mitigating possible adverse environmental and social sustainability effects of new infrastructure. And finally, hydrogen and e-fuels need a clear role assigned so that investment into a future renewable hydrogen economy can be unlocked, together with completing and fast-tracking ongoing regulatory work and crafting a robust framework to secure a further supply push and a stronger demand pull. During the recent months, we have observed a number of countries heading in the right direction by raising their renewables targets and introducing new renewable initiatives, which aligns strongly with our view on how to speed up the build-out of renewables. Germany’s recent Easter Package raised its offshore wind target by 10 GW to a total of 30 GW by 2030. In addition, renewable projects may override public interest and would receive priority over other concerns until greenhouse gas neutrality is achieved.

Mads Nipper

executive
#12

The U.K. has put forward a plan aimed at strengthening energy security, and they've raised their offshore goal by 10 GW, bringing it to 50 GW in total by 2030. New planning reforms are also coming in the U.K. to shorten approval timelines for new offshore wind farms down to 1 year, along with broader streamlining that will dramatically shrink how long new projects need before reaching construction stages. In the years ahead, the Netherlands will substantially scale up offshore wind build-out by doubling the capacity it has planned for 2030; and over in Belgium, the Minister of Energy has called for lifting the offshore wind target to 8 GW by 2030 as well. Then, most recently, Denmark declared an ambition to add 1 to 4 GW more offshore wind beyond the 7.2 GW already agreed toward 2030. We welcome the EU's focus on ending this reliance on Russian oil and gas and on accelerating the green transformation of the energy sector, as set out in the recent REPowerEU policy. And here at Ørsted, we stand ready to help drive that accelerated build-out. Moving to Slide 5, I'll update you on our construction projects and pipeline, beginning with the projects currently under construction.

Mads Nipper

executive
#13

Two of the biggest offshore wind farms anywhere in the world are being built by us — Hornsea 2 and Greater Changhua 1 & 2a — and both should come online later this year. At Hornsea 2, every foundation, array cable and turbine has now been installed. Electrification work is underway right now, and we are waiting for all turbines to pass their final tests. Commissioning of the individual turbines, though, has been moving more slowly, and the ramp-up profile has fallen behind what we expected at year-end, because February brought very strong wind — clearly excellent for our operational earnings, but it left us with very few days in which to carry out commissioning work. On top of that, commissioning progress was slow in March and April, owing to quality issues in the supply chain, which demanded a significant amount of time troubleshooting. We keep working with the supplier to make sure all the relevant learnings are captured, so that similar issues do not arise on other wind parks. As a consequence, commissioning of Hornsea 2 is now expected during summer. At Greater Changhua 1 & 2a, we achieved first power in April, and 40 jacket foundations out of 111 have been successfully installed. Good progress continues across all areas of construction, and we expect to commission the wind farm during second half of this year.

Mads Nipper

executive
#14

As we said earlier, we're still watching Taiwan's COVID-19 restrictions, and those could potentially affect the construction schedule and eventually cause possible delays. Now to our onshore renewable projects under construction, where we're currently building just over 1 GW. In Europe, the 3 onshore wind construction projects — Kennoxhead 1, Lisheen 3 and Ballykeel — are moving forward as planned. On solar in the U.S., we're currently constructing the solar PV wind farm — or solar PV farm, Old 300 — and our first combined onshore wind and solar PV project, Helena Energy Center. The wind portion of Helena Energy Center is advancing according to plan, with commissioning expected during 2022; while commissioning of Old 300 and the solar portion of Helena Energy Center will expectedly be pushed into first half 2023 and 2023, respectively, because of continued challenges in the solar panel supply chain tied to the forced labor allegations in China and potential U.S. tariffs on Chinese goods. I would, however, like to highlight that we have executed a framework agreement with First Solar to supply a total 1.7 GW of modules supporting various late-stage development projects in 2023 and 2024, to ensure we can progress our pipeline of development projects.

Mads Nipper

executive
#15

When it comes to our U.S. offshore development projects, work is proceeding, and we're handling the difficulties we encounter in a constructive manner, and our confidence in the overall commissioning dates for the U.S. projects remains intact. Having said that, it's evident that bottlenecks and inflationary pressure have affected the global supply chain and the project developers, driven by the enormous surge in demand stemming from COVID stimulus packages, the physical constraints of COVID restrictions and, most recently, the Russian invasion of Ukraine. Across the portfolio of our projects for which final investment decision has been taken and construction begun, every contract is secured. And at our early-stage awarded projects -- the development projects Revolution Wind, Sunrise Wind and Ocean Wind 1 -- under 20% of total contracted CapEx remains outstanding, and we are working continuously to lock in the remaining minor part of total construction costs. As we mentioned on the Q4 earnings call, the situation is still that the value creation we had aimed for is not being seen, but we would note that the projects remain NPV-positive. As is normal business practice, we keep looking for levers that can help improve the business case, and we constantly have a process running to find opportunities, act on them and follow-up on the progressing, meaning a program for continuous improvement exists.

Mads Nipper

executive
#16

Today, the biggest single lever remains the regulatory side. So we keep backing the clean energy legislation from the original big — Build Back Better — bill, since that will secure continued momentum for the offshore industry in the U.S. Other levers remain in progress too, like continuing to seek efficiencies and synergies at the project level and the portfolio level, plus optimizing commissioning so we can reach energization sooner. Another piece of inflation risk involves the effect on revenue. Over the next 10 years, 55% of total revenue from our operating assets, assets under construction and our awarded projects carries inflation indexation, while merchant exposure makes up 10%. The other 35% of exposure consists of fixed nominal cash flows, and we actively mitigate that exposure using a combination of duration match debt and hybrids as well as derivatives, so our total net inflation risk comes to just 20%. Having such a large share of assets currently indexed to inflation is very valuable in today's inflationary environment. Let's turn to Slide 6 for a brief update on upcoming offshore wind auctions and tenders. We still expect a significant number of auctions and tenders worldwide in our core markets during 2022 and 2023.

Mads Nipper

executive
#17

Beyond that, we’re seeing plenty of other markets that aren’t our core focus right now — France and Greece, for example — where multiple auctions are set to launch over the next few years. We’re excited about the opportunities in front of us, and we’ll keep drawing on our industry-leading pipeline and capabilities to make sure we meet our strategic ambitions of adding roughly 3 GW of value-creating offshore wind capacity on average each year. With that, I’ll pass the floor to our CFO, Daniel.

Daniel Lerup

executive
#18

Thanks, Mads, and good afternoon, everyone. It's a real thrill to join an earnings call for the first time. I'll keep backing our sharp emphasis on creating value and on financial discipline, and I'm eager to engage with all of you from here on. Let me begin on Slide 7 with the EBITDA for Q1 2022. At group level, we achieved total EBITDA, including the impact of new partnerships, of DKK 9.4 billion, which is up 94% versus last year. EBITDA excluding new partnerships came to DKK 7.8 billion, a rise of 61% against last year. Earnings in our offshore business climbed 50%, reaching DKK 5.9 billion. In Q1 2022, wind speeds averaged 11.3 meters per second across the portfolio, above both last year and the normal wind speeds expected in the first quarter of 10.9 meters per second. Those stronger winds added roughly DKK 500 million, and we also benefited from ramp-up generation at Hornsea 2. This was partly offset by weaker earnings from Borssele 1 & 2, after the 50% farm-down in May 2021, and by higher transmission tariffs following the divestment of the offshore transmission asset at Hornsea 1 in March 2021, plus generally higher TNUoS and BSUoS tariffs across our U.K.

Daniel Lerup

executive
#19

On sites, the later-than-expected commissioning of turbines at Hornsea 2, together with power prices that were very high and volatile, meant we saw a negative effect of DKK 1.6 billion in Q1 2022 from being overhedged. That negative effect also mirrors the inefficient hedges across the remaining months up until commissioning. And out of the DKK 1.6 billion, 50% is tied to exposures for Q1 2022, while the other 50% is tied to exposures in future periods up until commissioning. Looking back, hedging such a large portion of the ramp-up production on Hornsea 2 was not the right call, but our solid construction progress and the elevated power price levels at that time were the key drivers behind that decision. Turning to the problems with several of our cable protection systems, which we found in Q1 2021, our first assessment indicated a total financial impact of roughly DKK 3 billion. Since then, we have carried out thorough investigations and analysis of the issue, and we acted swiftly to restore the integrity of the cable protection systems, which has led us to reassess the expected costs significantly downwards. We now expect the total cost to come to approximately DKK 1.3 billion, of which DKK 0.3 billion covers provisions towards our partners and DKK 1 billion will be capitalized.

Daniel Lerup

executive
#20

So because of that, we reversed DKK 0.5 billion out of the original DKK 0.8 billion warranty provision that had been set aside for our partners. Also, within the partnerships we already have, we booked earnings during Q1 2022 from completed projects and construction work carried out for partners at Greater Changhua 1. Our onshore business saw earnings nearly quadruple, coming in at DKK 850 million, which was fueled by the big ramp-up in generation capacity and also by the boost from higher power prices on our European assets. In bioenergy and others, earnings rose by DKK 1.9 billion — a significant increase — thanks to the outstanding results at our CHP plants, which came from the higher — the high power prices and greater sales of ancillary services. We hedged only the power that we cogenerated alongside heat, so we got the full benefit of those higher power prices on our condensed power generation in the quarter. On top of that, earnings from our gas markets and infrastructure gained from a temporary positive effect tied to revaluing the gas we hold in storage at a higher price level. We were also able to secure gains by optimizing the offtake flexibility in certain sourcing contracts we have in Northwestern Europe. By contrast, our choice to unwind gas hedges tied to the Gazprom contract — done to balance our risk in case gas supplies from Russia stop — produced a net loss on the Gazprom sourcing contract for the quarter.

Daniel Lerup

executive
#21

Those effects take our EBITDA, when new partnerships are left out, to DKK 7.8 billion. If we add the DKK 1.6 billion farm-down gain from divesting 50% of Borkum Riffgrund 3, group EBITDA including new partnerships came in at DKK 9.4 billion. Across the markets we operate in, power prices remain very high, and that has significantly affected our financial results in both offshore and bioenergy. At portfolio level, about 90% of earnings are regulated and long-term contracted, and for the majority of the remaining 10% of exposure, we hedge in the first few years ahead. As we said on our Q4 earnings call, within offshore we had fully hedged merchant exposure, including the anticipated ramp-up of production at Hornsea 2. In bioenergy, though, we had hedged only the power we cogenerate with heat. As described, the delayed ramp-up of Hornsea 2 produced a negative impact, while high-power prices on condensing generation at our CHP plants benefited us fully. At group level, these effects have largely offset one another. I'm glad to see that portfolio effect, since it shows the benefit of diversification across our different asset types.

Daniel Lerup

executive
#22

Moving on to Slide 8, which addresses net profit, net debt, and our credit metric. For the period, net profit came to DKK 5.7 billion, well above the prior year, thanks to higher EBITDA in the quarter and only partially offset by greater depreciation as more assets entered operation. Net debt reached DKK 30 billion, rising DKK 5.7 billion over the quarter. Cash flow from operating activities shows EBITDA offset by a net cash outflow from work in progress, together with initial margin payments to clearinghouses and margin payments on unrealized hedges amounting to DKK 4.8 billion, reflecting the rising and volatile power and gas prices. Those margin payments affect our liquidity only temporarily. Gross investments came to DKK 6.8 billion, reflecting our ongoing investment in offshore and onshore wind and solar PV farms, while divestment proceeds related to the 50% farm-down of the Borkum Riffgrund 3 project. FFO to adjusted net debt, our key credit metric, was 25% for the 12-month period ending in March 2022, in line with our credit metric target. And I will note that we expect the metric to increase towards the end of the year.

Daniel Lerup

executive
#23

The decline relative to last year came primarily from reduced funds from operations, which reflected the margin payments, and from a greater net interest-bearing debt, as I described a moment ago. Moving to Slide 9, let's look at our financial and nonfinancial ratios. Return on capital employed, ROCE, stood at 19%, and the year-over-year rise stemmed from higher EBIT across the 12-month period, thanks to the farm-down gains on Greater Changhua 1 and Borkum Riffgrund 3. During Q1 2022, the taxonomy-aligned portion of our revenue was 68%, our OpEx share was 79%, EBITDA accounted for 87%, and gross investments made up 98%. Revenue outside the eligible category is chiefly tied to our long-term gas legacy activities along with noneligible power sales. We expect the taxonomy-eligible revenue share to grow over the years ahead. The green share of energy reached 92% in Q1 2022, versus 87% during the same period a year earlier. That change resulted mainly from additional wind and solar farms in operation, stronger wind speeds and warmer weather, which brought about lower CHP generation from coal. On safety, the year has started encouragingly, with injuries down 47% compared with last year.

Daniel Lerup

executive
#24

That drop, together with a 23% rise in hours — in work hours, produced a total recordable injury rate of 1.3 for Q1 2022. Last, moving to Slide 10, here is our 2022 outlook. We reaffirm full-year 2022 EBITDA guidance of DKK 19 billion to DKK 21 billion, and gross investments of DKK 38 billion to DKK 42 billion. For bioenergy and other business, we have revised directional guidance to lower, from significantly lower previously, largely because of greater earnings at our CHP plants stemming from high-power prices. Higher earnings in gas markets and infrastructure have largely come from temporary positive effects of revaluing our gas and storage amid higher gas prices, and we expect this to partly reverse later in 2022. Directional guidance for offshore and onshore businesses is unchanged. We stay comfortable with our long-term financial targets, among them EBITDA growth, ROCE and contracted share of profits. With that, we will now take questions. Operator, please?

Operator

operator
#25

<<operator_script>> Deepa Venkateswaran from Bernstein has our first question.

Deepa Venkateswaran

analyst
#26

I had a few questions. First, regarding the Gazprom contract: is it reasonable to think that you've unwound the — perhaps you had a quarterly hedge exposure and you've unwound it. And right now, if Gazprom stopped supplying, there wouldn't really be any financial consequences? Could you confirm that? And presumably, since you said you don't plan to open those ruble accounts, maybe they could halt supply the way they did in Poland. My second question is about the e-methanol project you mentioned with Maersk. Would that be sourced from some existing portfolio of wind and solar farms? Or would the renewable portion consist of separate projects that you'll identify? So how should we think about that contributing to your targets?

Mads Nipper

executive
#27

Thanks a lot. I'll offer those kinds of perspectives. Regarding the Gazprom contract, we've been working pretty hard to make our risk profile more balanced and to genuinely unwind the hedges we hold. As noted, this is a take-and-pay contract — which I'm certain you know well — and our overall annual volume comes to roughly 20 terawatt hours. We've now unwound hedges to the point where we sit well under 1 terawatt hour, which means quite limited exposure for the year should there be a full stop. And if that occurs, depending on how things develop, there would clearly be consequences for power prices more broadly. So we anticipate that exposure, net-net, will be quite limited. On the e-methanol project in the U.S., that one is clearly intended to involve new assets. So our plan is to build the approximately 1.2 GW from assets that will be constructed, not from ones that already exist.

Operator

operator
#28

Casper Blom from Danske Bank has our next question.

Casper Blom

analyst
#29

Let me ask about CapEx and offtake prices in offshore wind. For a while, it was simply the norm that offshore wind costs kept falling rapidly, year after year after year. Now input costs are beginning to rise and inflation is showing up everywhere. Are regulators in the relevant markets around the world waking up to this? In other words, could we begin to see higher offtake prices for offshore wind projects as a result? Or do governments still hold the view that prices must come down each and every year? If you could say a bit about where things stand there.

Mads Nipper

executive
#30

Yes, absolutely, Casper. That's another reason we decided to devote a portion of your time on this call to walking through our guide — not only for our investors, but importantly for the message we're sending to regulators worldwide. We're observing this. By and large, there remains a fairly strong emphasis on pushing prices lower. That said, it's very encouraging that we can also point to clear instances where regulators are bringing broader societal value creation into the criteria used to award projects. Holland is a solid illustration of that. I'd also bring up the seabed allocation example. In ScotWind, we witnessed a very, very sizable seabed allocation with a clear and entirely acceptable price cap, and that meant it genuinely relieves some of that pressure coming from the price-only focus. But frankly, this is a work in progress, because you're exactly right — for the industry as a whole and for our capacity to keep driving the green transformation, particularly offshore, with inflation on the rise, a persistent push toward ever-lower prices will not spur the investments that are needed if it carries on.

Mads Nipper

executive
#31

We’re leaning in as a clear industry leader, and that includes our white paper, Need for Speed. We’re making it available. We made that point very clear at WindEurope’s event in Bilbao. And we’ll keep pushing that. But some are getting it, and some are — if I put it positively — in the process of getting that; we need to focus broader.

Daniel Lerup

executive
#32

I might also mention that within the corporate PPA market, we're seeing prices rise as well, for both offshore and onshore. And that has in fact been a major factor behind making it possible to reach FID on the Sunflower project that we identified yesterday.

Casper Blom

analyst
#33

Interesting. To push this a bit further—we've discussed rising competition quite a lot previously, and there's the usual talk about oil majors entering the industry. Are they also, sort of—I'm sure they realize input costs are rising and construction is getting more expensive. But have you noticed any shifts in, sort of, competitive behavior as a result of this inflation?

Mads Nipper

executive
#34

There haven't been any awards this year, you know, offshore awards. But one thing we noticed was interesting: a few of the industry players that used to be really aggressive on price in our sector ended up with no seabed awards at all in the New York Bight auction. We likewise decided to step out so that, had we won, we could be sure of creating financial value. Still, it was encouraging that some players who were previously rather aggressive also opted either to stay away or to step out, and we read that as a signal that attention to value creation is clearly growing — which makes perfect sense given what we're seeing with inflation.

Casper Blom

analyst
#35

Great. And then one final item from me. Mads, you mentioned the extra build-out potential in Europe, given that European leaders are asking for a substitute for Russian energy. How soon do you expect that to turn into real auctions and projects being scaled up?

Mads Nipper

executive
#36

Sure — sticking with offshore, I’d say the targets out there are actually quite striking in that they aren’t 2050 or 2035 goals at all. They’re stepped-up near-term targets — so, 2030 targets. That means we genuinely anticipate those targets will be supported by very concrete measures in the fairly near future. Our hope is that this comes through a mix of CfD-backed auctions and, ideally, a meaningful expansion of open door opportunities. Germany, for instance, appears to be heading that way, and we expect that to unfold over a relatively short horizon. So in the next year to 18 months, we should have far greater visibility into those opportunities.

Operator

operator
#37

<<operator_script>> Next up, we have a question from Vincent Ayral with JPMorgan.

Vincent Ayral

analyst
#38

Since there's just one question, I'd like to seek a bit more clarity on the Gazprom contract. We can see that you recorded the net loss in Q1 related to that Gazprom contract. So is it 100% clear to all of us here that you've actually included every cost in your guidance, and you raised the guidance on bioenergy end markets, which has gone from significantly below to lower? So basically it's all accounted for. Is that how we should view it?

Mads Nipper

executive
#39

The question was really difficult to make out. Could you say it again so we can be fully certain we're addressing it? We couldn't tell if you meant Gazprom and gas specifically, or if you meant markets, or bioenergy and the rest of it as a whole.

Vincent Ayral

analyst
#40

I'll hand things over to the speaker. Hopefully — is this coming through more clearly for you now?

Mads Nipper

executive
#41

That's an improvement.

Vincent Ayral

analyst
#42

Alright, let me try it this way. Apologies. So, one question. I want to return to the Gazprom contract so that it's 100% clear. You recorded a net loss on that Gazprom contract in Q1 from unwinding the hedges. So what I understand is that if Gazprom halts deliveries at the next payment date — the one after the next — since you don't pay in ruble, you have zero extra cost. And what we saw today, which was a slight upgrade of the bioenergy division, already includes this.

Mads Nipper

executive
#43

Right. I’d say that, on the whole, as I noted earlier, our overall exposure — the volume — is that our hedged volume now sits at well under 1 terawatt hour, so the exposure is limited. There’s no way to claim zero risk, but whatever risk exists is quite small. And the assumptions about what will most probably occur are already reflected in the guidance we’ve set for the year.

Daniel Lerup

executive
#44

And the complete expense of repurchasing the hedges we have repurchased up to now, so as to bring it under 1 terawatt hour, is entirely captured in Q1.

Operator

operator
#45

And the next question is from Robert Pulleyn of Morgan Stanley.

Rob Pulleyn

analyst
#46

Can I change direction and talk about Hornsea 2 for a moment? It came up already, but we'd like a bit more detail. Clearly, there's been one more delay as well as additional buyback. Could we gauge the danger of any further slippage starting now? The slide continues to state 1H '22, and what about the possibility of more hedging losses? Or do you believe this matter is now behind us?

Daniel Lerup

executive
#47

Yes. So what we're looking at today is that COD should happen during the summer. That means it falls outside H1. And we've baked the entire expense of that slippage — repurchasing hedges — into Q1. As for the risk around when COD lands, we've incorporated what we consider our most likely COD estimate, though naturally there are always unknowns with major construction efforts of this kind.

Mads Nipper

executive
#48

Yes. And just to add to that, Daniel. I believe — as of today, we actually have 69 turbines that are fully operational and producing. So that also means that now, we're entering a period where the winds are lower, and we're gaining experience with our partner on how to fix the challenges that we ran into. So we are — without being able to guarantee anything, obviously — confident that the latest estimate of the schedule is something we can keep.

Rob Pulleyn

analyst
#49

Let me push my luck with one more question. You brought up the Poland seabed auction. Could you put a number on how costly that seabed is, or how the Polish seabed bids stack up against what we've been seeing broadly in the U.K. and the U.S.? I'm sure, of course, but that would be very helpful.

Daniel Lerup

executive
#50

Right, so the seabed applications in Poland don't come with any significant cost. So it really comes down to qualitative criteria, the kind of thing we're used to seeing in other markets.

Operator

operator
#51

Dominic Nash at Barclays is up next with a question.

Dominic Nash

analyst
#52

The thing I'd like to ask about is clarity regarding how much more European offshore wind can be upgraded between roughly 2030 and 2035. I believe your slide mentioned 30 GW of upgrades. When I looked at the size of it relative to the countries listed, I made it about 35. So could you disclose which countries' target upgrades are already included in that 30 GW, and which ones are not? But the real question is this: if you've decided to move toward something more — almost a war footing — to secure energy supply, and France and Germany actually decide to really go for it, what's your view? And when will we start to see dates emerge for what we could get from the growing GW of offshore wind, so that we can move away from gas-fired generation?

Mads Nipper

executive
#53

Yes. Honestly, on that clarifying question, I'm not sure we can say—yes, the 30 GW we have for 2030 and the extra capacity for the period between 2030 and 2035 reflect our view. So what we referenced with the 2030 targets is actually what has already been confirmed. And we actually believe that those 30 plus 30 that you see on Slide 4 is additional for Europe on top of that. So just to clarify, those numbers do not reconcile if you try to add up that additional. Sorry if that created a confusion. So essentially, the answer to your second question is that we believe that the green parts, so the 30 plus 30, is what can be additional, additionally realized if the government really want to go for this in terms of seabed allocation and consenting processes. So that, I guess, sort of merges your clarifying question with what we believe could actually be achieved.

Dominic Nash

analyst
#54

Let me just weigh in on that. It doesn’t seem all that ambitious to me. I mean, if ScotWind on its own can deliver 25 GW, what’s to stop France from saying, well, we’ll actually add another 25 GW together with Germany? These figures really don’t feel like they’re going to make much of a difference when it comes to substituting energy.

Mads Nipper

executive
#55

No. Clearly — and that's part of why it's a positive — honestly, we actually view this as quite ambitious relative to the traction we have at present. More speed would be very welcome to us. Still, we consider this a ambitious, a very ambitious goal, and it would require meaningful incremental volume on top of the official targets. And I'm certain governments across Europe look at it and say, particularly the 2030 targets, that these are now very ambitious. So I'd say I completely agree with you that ScotWind is very encouraging. Yet it's also quite evident that the vast bulk, if not the entirety, of that will only reach COD after 2030. Therefore we think we would maintain the view that taking the 170 plus, or the existing targets plus the 30 extra that we believe are achievable, would be something great for the industry and great for the transformation. More would be very welcome to us, but we think that probably would not be realistic.

Operator

operator
#56

The next question we have is from Alberto Gandolfi at Goldman Sachs.

Alberto Gandolfi

analyst
#57

I'll try to squeeze in 1.5 questions, if that's alright. First, on guidance: is there a specific reason you haven't offered somewhat narrower or, let's say, more granular remarks about your full-year guidance? I don't know — something like being nearer the top end, or upside risk to it — because you've already delivered DKK 9.4 billion, and you've already taken quite a lot — I mean, I know there was a reversal in provision. But you had, like, unwinding of hedges on Hornsea 2, the renegotiation of potentially — well, interruption impacts from Gazprom procurement. So I wonder what further contingencies could exist for the remainder of the year besides perhaps wind speed or load factors? You're going to get Hornsea 2. So you've been delivering DKK 11 billion to DKK 12 billion of EBITDA in 2Q, 3Q, 4Q both in 2020, '21 before gains. So shouldn't we be comfortably breathing through your guidance on the back of that? Or what am I missing? What could go wrong that stopped you from revising it? The harder question is something you've already been asked before. But can you maybe comment here on why you chose 20% for potential flexibility to raise capital and not 10% like most of the other companies do in the industry?

Alberto Gandolfi

analyst
#58

What was the reasoning behind going a different direction and building in significantly more flexibility? Is there a particular concern driving that, or is it simply flexibility for its own sake?

Daniel Lerup

executive
#59

Yes, thank you. I’ll take the first question, and then Mads can address the second one. Regarding guidance, keep in mind that this excludes new partnerships, so the figure for Q1 is DKK 7.8 billion. What we’re thinking is that as we entered 2022, we had already widened our guided range from an interval of DKK 1 billion to DKK 2 billion. And it’s still early in the year. As for some of the uncertainty, it’s of course the fact that we’re delivering 2 big projects in 2022, so both Greater Changhua 1 & 2a and also Hornsea 2. So I think there, of course, you have some uncertainty. And then, of course, the Gazprom situation and the volatile power and gas prices.

Mads Nipper

executive
#60

Yes. After that, I’ll just make a remark about the 20% ABB authorization we chose to request and that the AGM approved. Alberto, no particular opportunity is what motivates this. Still, we are observing — and here I’m also referring back to Dominic’s earlier question — that significant opportunities simply exist. And now that an emerging Power-to-X market is, in our view, genuinely beginning to take form, the point is simply to possess the capability and the agility to chase, you know, whatever opportunities may arise, be that additional offshore acceleration in Europe or globally, be that Power-to-X, or be that possible further onshore expansion within Europe too. So the point is simply to have the firepower available to accomplish that. Therefore 20 years — or rather 20% across 5 years, in our judgment, fits what we could envision absent any concrete plan at present.

Operator

operator
#61

And the next question is from Jenny Ping at Citi.

Jenny Ping

analyst
#62

I have two questions, if I may. First, one for Mads. Looking back at your remarks on input costs, you mentioned 20% outstanding for the U.S. Could you help us understand what portion of that 20% remains? Is it mainly vessel costs? Steel? Which parts of CapEx? And related to that, what percentage have you effectively hedged for the Taiwan and Poland projects as well? Then one for Daniel. You mentioned the magnitude of beginning to see some sense of corporate PPA prices rising. Can you give us a sense of how large those increases are? EDPR have mentioned increments of sort of EUR 3 to EUR 5 per MW hour. Can you give us a sense of that in equivalent terms?

Mads Nipper

executive
#63

Yes. Thank you, Jenny. I’ll note that during our previous earnings call, we indicated roughly 80% had been secured on the Northeast program and on Ocean Wind, meaning our nearer-term U.S. projects. That figure now exceeds 80%. So we’ve made further progress. And I mean, I can’t get into specifics, but regarding what remains outstanding, a significant portion is still within transport and installation. We’ve locked some of that, yet that area remains the main gap, and less so on commodities. As for Taiwan and Poland, which are among the next ones in line, those are further out. And broadly speaking, we aren’t very locked in on those—very little. So that’s something we’re working on during the time available to make sure we begin securing those contracts when the timing is right.

Daniel Lerup

executive
#64

Correct. On the corporate PPAs, there's only so much detail I can share, but I'd say it aligns closely with what Iberdrola mentioned, and beyond that level we're seeing PPA prices rise as well. Another data point we provided: for the German projects we ID-ed late last year, inflationary pressure pushed CapEx costs up by roughly 5%, and higher PPA prices allowed us to offset that.

Jenny Ping

analyst
#65

My apologies. To make sure I have it right, what exactly was said about Iberdrola?

Daniel Lerup

executive
#66

That comes to EUR 3 to EUR 4 for each MW.

Jenny Ping

analyst
#67

Oh, I see. Okay, understood. Yes, understood. Yes, regarding the EDP, I did mention that, correct.

Daniel Lerup

executive
#68

Apologies, yes.

Operator

operator
#69

Kristian Johansen from SEB has our next question.

Kristian Johansen

analyst
#70

Circling back to the Hornsea 2 delay — you brought up supply chain quality problems affecting installation or commissioning during March and April. Is that connected to the turbines? Or could you go into more detail on what's behind it?

Mads Nipper

executive
#71

Yes, I can do that, Kristian. Basically, it comes down to Hornsea 2. That's the most recent one facing difficulties. We've encountered a handful of issues. First, there was what you might call an engine failure on a vessel carrying our substation out of Asia, and that resulted in a delay before it could reach Europe. After that, the Omicron wave hit around Christmas, and that made crewing the vessels extremely hard. Then we got something very favorable for the business — a record February with unusually strong winds, which was excellent for our operational earnings, but the flip side was that we were left with only 4 working days available for commissioning. And most recently, we've had these problems. And yes, they involve the turbines. It's an inverter module that has to be retrofitted, and that takes more time. So that's essentially the whole picture of what's going on. The encouraging part is that we're gaining momentum quickly and heading toward — broadly speaking — calmer waters, and we understand how to resolve the problem. So, as I said, we stay reasonably confident that our newest schedule estimate will hold.

Operator

operator
#72

And the next person to ask a question is Sam Arie from UBS.

Sam Arie

analyst
#73

I'm sort of far down the queue for questions, so I'll disappoint you by returning to a subject you're likely sick of after the last 12 months. May I pose one more inflation question? You gave some quite useful remarks on the sort of indexation that applies to the existing assets. But what I think I want to ask, I just want to try asking it in a different way. With reference to the existing asset portfolio — so I'm not talking about new projects, just existing assets — do you think that at the bottom line, you are actually short inflation, or possibly long inflation overall? And the reason I ask is that, I mean, everyone seems to think you're actually a little bit short inflation and that it's a big negative. But I'm thinking that if you have, like, a 7% inflation level coming into revenue, even if it's only for the sort of 60% of assets which are mechanically indexed, actually, if your own inflation level, in your own kind of operating cost, is less than 60% of what inflation is in the rest of the economy, then you might actually be long inflation on the existing assets.

Sam Arie

analyst
#74

I'd really like to get your thoughts on that, and on whether it's actually somewhat better than what people had anticipated for this topic.

Mads Nipper

executive
#75

Okay. I'm certain Daniel can do mental arithmetic faster than I can, but I'll weigh in by noting that at least on the inflation index revenue we have — so that 55% of our existing fleet — if you apply roughly 2 percentage points of inflation, that produces somewhere between DKK 200 million and DKK 300 million in extra revenue annually. So this is something that persists. You can run the calculation yourself and ask what other operational inflation we'd need in order to offset that. But broadly speaking, this isn't a topic we've discussed much in the past. Still, in an inflationary climate like the one we're in right now, it matters, and it's something that would — that definitely counts, particularly if it lasts over a longer stretch. But I don't know whether you'd like to add anything further on operational inflation, Daniel?

Daniel Lerup

executive
#76

Yeah. Having those inflation-linked contracts over in the U.K. really does help quite a bit, and that gives us solid exposure on the projects we already have. So of course, that's a long position. But of course, it's hard to predict how the cost side on CapEx is going to look down the road. We don't know that yet. Still, on the existing project — the operational projects — it's a positive.

Sam Arie

analyst
#77

So you figure you'll keep having...

Mads Nipper

executive
#78

And what we'd see is...

Sam Arie

analyst
#79

Apologies — please continue.

Mads Nipper

executive
#80

No. Sam, perhaps if I’ve got your question right — otherwise, stop us. But my understanding of what you’re asking is this: if we look only at our operational fleet, will that extra revenue actually put us ahead of inflation — for instance, the cost inflation on salaries and fuel for running the wind farms? Was that your question?

Sam Arie

analyst
#81

Right, precisely. So getting the full inflation indexation on the fleet side could actually be worth more to you than the inflation you're actually receiving across all your activities — across every one of your existing asset activities.

Mads Nipper

executive
#82

Yes. I think a reasonable estimate of that — we haven't run the numbers — but a reasonable estimate would likely land above neutral, because typically salary inflation tends to trail. So when inflation is high, net salary increases in most places would actually come in below it, while the reverse holds the other way around. Given the 55% coverage, though, I think we'd hold off on saying whether we'd be slightly long or short on inflation. Still, it isn't a massive impact if you look only at our existing fleet — that would be a rough, high-level estimate. But it's a good question. We ought to pressure test it.

Operator

operator
#83

And moving on, our next question is from Ruisi Liu at Crédit Suisse.

Ruisi Liu

analyst
#84

I’d like to add a brief follow-up on the cost inflation question raised earlier. Could you share what you’re observing in your most recent supplier negotiations when it comes to cost savings coming through? And are any unanticipated costs showing up in the pipeline? Also, if I may, a quick clarification: did you state that with respect to all the Hornsea 2 delays, there will be no additional financial impact later on in the quarters ahead for this year?

Mads Nipper

executive
#85

Yes. I don’t think it’s possible for us to speak to the pass-through in detail. But what I’d say is that, well, what we’ve said before is now fixed, and no pass-throughs are anticipated on any of those contracts. So our exposure remains in what is still pending and in contracts that have not yet been signed. It varies quite a bit by category—some face high inflation, while others see less. But on—again, on T&I, negotiations remain difficult, and I can’t cite the specific inflation levels. I also don’t think—I’m looking at you as well, Daniel—I don’t think any cost increases have shown up because of the Hornsea 2 delay.

Daniel Lerup

executive
#86

No. Everything there is now finalized. That's where the additional upside comes from on the CfDs.

Operator

operator
#87

Moving on, our following question is from Peter Bisztyga at Bank of America.

Peter Bisztyga

analyst
#88

I'd like to circle back to those 2030 targets, if I may. There are really 7.5 years left, and honestly that feels pretty tight when you look at historical lead times. So could you give us some sense of when the first projects from this new batch could realistically come online? Are we talking 2027 here, or December 2029? And what are the main bottlenecks? What are the biggest hurdles that truly have to be cleared to get these projects across the finish line? Is it a matter of policy and planning? Or is it really supply chain and vessel availability? Any additional color would be much appreciated.

Mads Nipper

executive
#89

On timing, Peter, yes—and we all recognize this is a fairly ambitious goal. You mentioned 7.5 years, and building takes time. Even with many nations expressing a desire to accelerate consenting, that too requires time. So I wouldn't frame it as leaning more toward 2027 and 2029. Still, my expectation is a steady ramp-up followed by a hockey stick as we approach the end of the decade. As I said in response to an earlier question, we are fairly confident that the additional opportunities will become clearly visible within the next 12 to 18 months, and at that point we'd have far more clarity. The main bottlenecks—and forgive me if this echoes points from prior calls—are making affordable seabed available and ensuring consenting processes are predictable and swift. There's no question that other potential supply chain bottlenecks exist as well. However, in our view the most significant hurdle to clear is seabed and consenting, and affordable seabed in particular.

Peter Bisztyga

analyst
#90

All right. And if I may be so bold as to squeeze in one more quick question. Could you share anything further about that Anholt turbine that, well, came loose? Is this certainly an isolated issue affecting only that unit? Or might there be some kind of type here risk?

Mads Nipper

executive
#91

Yes. Thank you. Believe me, we discussed that subject extensively. And I'm glad to report that since we obtained complete access to the full operational data set covering every turbine across the fleet — the same model, the 3.6-megawatt workhorse turbine — initially we actually established a no-sail zone surrounding all of them, just to make sure there wasn't some systemic fault. But within days, we were literally able to conduct a very, very detailed and advanced analysis of the high-resolution data we received, and we could detect a very clear anomaly coming from this particular turbine. And from no one else do we see similar signs. So the no-sail zone was lifted. And our belief is that this was a manufacturing mistake on this individual turbine at the — from when we — at the shaft, so it was — or the rotor, so it was made. And we have no reason to believe this is a systemic mistake.

Operator

operator
#92

David Paz from Wolfe Research has our next question.

David Paz

analyst
#93

Thanks. I just wanted to ask about something you said regarding the Northeast — I believe it was U.S. Northeast projects, so perhaps it was really about U.S. offshore wind projects in general. You mentioned that you continue to view them as value creating. I was hoping to get a sense of whether that has changed since your previous update — have you observed additional cost pressures that have made it less value — I realize it's still value creation, but less value creating than previously? And if that's the case, what are those costs? Which specific costs are rising that you're seeing?

Mads Nipper

executive
#94

No. Thanks, David. I realize the situation is unchanged from what we described last time. What we're saying is that despite inflationary pressure, we still view these as NPV-positive projects — that covers all of the U.S. near-term projects. And the reason that remains true is that, when we performed that assessment, we had already built in what I'd call a fairly aggressive view of inflation, rather than a conservative one. So the picture we see matches what we discussed previously. Another factor is that a significant portion of steel has already been locked in, and steel is the commodity whose price has risen the most because of Russian inflation — from Russia's invasion of Ukraine. As a result, we are more or less still in line with the expectations we held when we evaluated the value creation the last time we addressed this subject.

David Paz

analyst
#95

Okay. And does that cover both the U.S. Northeast and Ocean Wind? Or are you talking specifically about the Northeast part?

Mads Nipper

executive
#96

Yeah, my apologies for that. I had both in there. With South Fork, we reached FID on it, so that one is completely locked in. So when I brought those up, I was talking about Revolution, Sunrise and Ocean Wind 1 together.

David Paz

analyst
#97

Understood. Great. And if I could slip in just one brief question about solar — the U.S. solar outlook in light of the DOC investigation. In what way is that affecting your strategic outlook? I know that relative to your target, your longer-term target, you were leaning more toward solar at CMD last year than wind. Does that remain true? Is the split unchanged? Are you perhaps now weighing more wind than solar?

Mads Nipper

executive
#98

Yes. We're continuing to evaluate that same split. The explanation is that, even prior to this most recent case arising, we were quite pleased to be able to secure this frame agreement with First Solar, a company that doesn't rely on polysilicon and as a result carries none of those human rights concerns. What that gives us is that over the coming few years — a point by which we hope and expect the remaining challenges will have been resolved — we hold 1.7 GW of capacity on which we know we can keep advancing the solar projects. So as things stand, our estimate is that the sole effect we'll experience from the issues we see today is the delay we expect on Old 300 along with the solar portion of Helena Energy Center. Beyond that, we believe we're well positioned to maintain momentum on our solar ambitions.

Operator

operator
#99

And the next question is from Vincent Ayral at JPMorgan. It appears Vincent's line has dropped, so the next in the queue is Sam Arie of UBS.

Sam Arie

analyst
#100

I had a follow-up question, and I'd like to use this chance to ask it. Mads, I think this one is likely directed at you. Looking beyond your own results for a moment and considering the broader energy market conditions we find ourselves in. Throughout Europe, there is clearly worry regarding higher prices and bills facing power users. There's clearly a theme around constructing additional renewables to reduce prices eventually, yet that will require considerable time, my hope over 5 or 10 years, but not over 5 or 6 months. So I'm curious whether you might tell us your overall view on the European energy affordability process. And which short-run measures would Ørsted support for managing bill impacts this year rather than further out?

Mads Nipper

executive
#101

Yes. So Sam, if we're focusing specifically on power prices, clearly we're seeing pretty extreme pricing at the moment. We don't believe this is the kind of thing that will hold up over the long term, but elevated power prices are definitely what we're observing. And in fact, we think LCOE will rise in the short to midterm as well. Over the long term, we still believe that curve will come down, since we don't expect cost pressure to remain at this level for the long term. We also think there's ample technological opportunity to keep pushing and break that curve over the long term. But in the short term, I think what we can do is keep leveraging scale and keep leveraging capability. And then, to a question raised earlier as well, when we discuss regulatory regimes, we need to make sure that whatever happens is financially sustainable too, even in the short term. Because given the pressures we're seeing, not only on power but broadly, it's necessary that those prices get reflected in the PPAs as well, not only with corporates but with governments too.

Mads Nipper

executive
#102

I’m not sure I’ve understood the point of what you’re asking. If that’s not it, please try putting the question another way.

Sam Arie

analyst
#103

Yes. May I take another shot at this? What I’m really getting at, I suppose, is that plenty of governments are grappling with rising household bills and rising costs for companies. And naturally, you have the key to a long-term fix when it comes to constructing additional low-cost renewables. I’m simply curious: if you were serving as the Minister of Energy in a major European country at this moment, and you had to act quickly and fast to help people through these near-term impacts, what would you do? And naturally, I would enjoy discussing windfall taxes, and caps, as in the Iberdrola and Enel and EDF letter, which makes the case for a cap on gas prices as the kind of development in Spain and Portugal regarding gas price. I’m just wondering what you would advocate. What short-term measure would you support?

Mads Nipper

executive
#104

Yes. One of the last measures we would ever push for is a windfall tax. That isn't due to our company being especially vulnerable to one. Our core view, though, is that taxing energy generation in this way could put a halt to investment in the green transformation we need. So plainly, that's not a step we'd recommend. The direction a number of governments are taking, as I see it, involves some form of support bill for energy consumers, and Denmark has made sure of that too. There's short-term assistance of some kind to help with those rather extreme energy bills. So what I'd say is that a price cap on gas is definitely one possibility. Still, the firm position we'd adopt is that we should avoid heading down the windfall tax road.

Sam Arie

analyst
#105

All right, that's intriguing. So if the idea came up to extend that Spanish gas cap across the rest of Europe, you'd be in favor of it?

Mads Nipper

executive
#106

I wouldn't get that granular. Still, I'd say it's not a bad idea to put in place institutional measures that make sure short-term extreme pricing is in some way manageable for consumers. And we don't believe taxing anyone is the way to do it. Potentially controlling prices would be better.

Operator

operator
#107

And the last question is going to come from Vincent Ayral, who's on the line from JPMorgan.

Vincent Ayral

analyst
#108

My apologies — I lost the connection a few minutes back. So a quick follow-up on the item just before, though with a long-term lens rather than a short-term one. How do you view the design of the European power market when the merit order is highly volatile, and what are the consequences we may have to handle if I use your phrase, "short-term extreme pricing"? Would a market design closer to what you're doing offshore with CfDs and so on be preferable — something that is, I would say, almost slightly more regulated? And the second point concerned gas storage. I was thinking about it a bit earlier with respect to the uncertainties for the remainder of the year. You probably booked a fair amount in Q1 on the gas storage revaluation. How much was it? And is this one of the areas where you'd rather be cautious, and why did you not raise the guidance?

Mads Nipper

executive
#109

Yes. It's — they are — the first one is a genuinely, genuinely big question. And I think, broadly speaking, with the current power market design, we are, like the other Eurelectric members, generally making the case that at bottom that design, the market design, isn't bad. So even though there will clearly come a moment to reassess, sort of, what the fundamental market design should be, we actually — our view has been, and we have stood in solidarity with Eurelectric's positions, that carrying on with implementing that design throughout Europe matters more than doing a fundamental redesign of that market dynamic. That is what we generally believe is healthiest for the power market. Could that shift over the years? Yes, it probably can as we become less reliant on fossil fuels. But sort of over the midterm, we still consider that a good design. I just don't have a view on — Daniel, do we have a view on the gas storage?

Daniel Lerup

executive
#110

Yes. Yes. So gas markets and infrastructure is up by just over DKK 700 million here in Q1 versus last year. And a big portion of that comes from revaluing the gas in storage. So that's where we have an effect that's more temporary and could decline.

Operator

operator
#111

Since nobody else has a question right now, I’ll return the floor to our presenters so they can offer their closing remarks.

Mads Nipper

executive
#112

Yes, and once more, thank you so much for those excellent questions — we really appreciate them. If anything else comes up, as always, our IR team, along with us and the team, would be glad to help. So thanks again. Stay safe, and have a great day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ørsted A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ørsted A/S earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research