Ørsted A/S (ORSTED) Earnings Call Transcript & Summary

August 11, 2022

Nasdaq Copenhagen DK Utilities Independent Power and Renewable Electricity Producers earnings 94 min

Earnings Call Speaker Segments

Operator

operator
#1

Thanks for joining us on the Ørsted Q2 2022 earnings call. During the first half of today's call, everyone will be in listen-only mode, and after that we'll open it up for a question-and-answer session. Our speakers today are CEO Mads Nipper and CFO Daniel Lerup. Gentlemen, please go ahead.

Mads Nipper

executive
#2

Thanks so much, and good afternoon to all of you. I hope you've had a pleasant break. And to anyone who's still enjoying vacation, we appreciate you joining us today. The first half of 2022 has been solid on both the operational and financial fronts for us, with EBITDA excluding new partnerships coming in at DKK 11.4 billion, which is up 48% compared with last year. Higher earnings from ramp-up generation at our offshore and onshore assets, along with wind speeds that were stronger than last year, have more than made up for the negative effect of ineffective hedges tied to the delayed commissioning of Hornsea 2. Higher power prices have given our combined heat and power plants a boost, and in our gas business we've been able to make the most of the offtake flexibility available across our northwestern European gas activities. Market conditions remain highly volatile, and the strong results our business delivered in the first half of the year have once again underscored the strengths and advantages of our diversified portfolio. On top of that, this strong performance has prompted us to raise our full year 2022 EBITDA guidance by DKK 1 billion, bringing it to a range of DKK 20 billion-DKK 22 billion, with the anticipated outperformance coming from higher earnings in bioenergy and other, as well as onshore.

Mads Nipper

executive
#3

Daniel is going to go into more detail on our guidance later in this presentation. With that said, let me walk you through the strategic highlights for Q2, a quarter that has been very eventful and extremely important for Ørsted and for our ambition of a world that runs entirely on green energy. Well, on the very day I went to spend some time with my family, it was announced that Ørsted had been awarded a contract for difference for our 2.9 GW Hornsea 3 project in the UK. That award is another important win and a significant step towards our 2030 ambition of 30 GW installed capacity in offshore, and the project is going to be the world's single biggest offshore wind farm. Hornsea 3 will provide power to more than 3.2 million households in the UK and is expected to be operational by 2027. I will go into the details of the award on the next slide. In the Netherlands, we partnered up with TotalEnergies to jointly submit bids for the 1.5 GW Dutch offshore wind tenders, Holland Coast West. Together with TotalEnergies, we will leverage our strengths as a world-class leaders in renewable energy and offshore wind to support the Netherlands in its acceleration of offshore wind build-out towards 2030 and beyond in a state-of-the-art, ecologically friendly manner and as part of an integrated energy system.

Mads Nipper

executive
#4

The way wind farms interact with ecology would be transformed by our ecological innovation tender proposal, thanks to its measures, a monitoring program unlike anything seen before, and close collaboration with companies, institutes, universities, and NGOs. At the heart of our proposal is engagement with every party involved, international and local alike, to develop the expertise required so that wind farms enhance nature by default. With our system integration proposal, we would draw on our expanding green hydrogen experience to bring online 600 MW of electrolysis capacity. By 2027 this will rank as the biggest green hydrogen cluster anywhere in the world, running exclusively on power from Holland Coast West to decarbonize industrial activities in Zeeland, and we will add batteries, electric transport, and direct electrification on top to optimize how offshore wind power is integrated into the energy system. The Dutch government is expected to announce the tender winners during second half of 2022. During 2021, we made our entry into the European onshore market through the acquisition of Brookfield Renewable Ireland's onshore wind platform, and from it Ørsted is developing high-potential projects that will feed the group's growth ambitions toward 17.5 gigawatt of onshore renewable capacity by 2030. With our onshore platform performing well, and consistent with our strategy of further expanding our European footprint, we have moved into the Spanish onshore renewables market through several strong solar and wind partnerships and have signed an agreement to acquire Ostwind, the German and French onshore developer.

Mads Nipper

executive
#5

I'll go into more detail on the Ostwind acquisition in a few minutes. Four partnerships—with Glide Energy, Volkswind, ARBA Energías Renovables, and Irradia Energía—make up our onshore entry into Spain, and those partners will back the project development. Each partner brings broad greenfield development experience, and combined they create a complementary geographic footprint. In the near term, the partnership's aim is to develop onshore wind and solar PV projects in Spain that let Ørsted take part in the Spanish grid auctions slated for inspection in 2022 and submit bids for the rights to develop a multi-gigawatt pipeline of solar and wind energy. Over the longer term, the goal is to develop large-scale onshore wind, solar PV, and storage projects that can be commercialized either through government auctions or through the expanding market for corporate power purchase agreements. Spain ranks among Europe's largest renewables markets, and the Spanish government has committed to reaching 70% renewable generation by 2030, and then 100% renewable generation by 2050, which makes Spain an absolute front-runner in the green energy transition. These onshore partnerships complement our work exploring floating offshore wind opportunities in Spain alongside Repsol, as announced earlier this year. Having a presence across technologies will let us offer a full suite of solutions that help our corporate and government partners decarbonize and that complement the ambition of Ørsted's offshore business in a key market.

Mads Nipper

executive
#6

Alongside all our partners, we possess substantial development know-how and deep local understanding of the Spanish market, which means we are able to deliver green energy solutions at scale that support the country's green transformation while generating value for our stakeholders. Within our U.S. onshore operations, we have commissioned the 268 MW wind portion of Helena Energy Center, a combined solar PV and wind project. In Europe, our 62 MW onshore wind farm in Scotland, Kennoxhead phase I, was successfully commissioned in June. We also acquired Ford County Wind in Illinois, U.S. That 121 MW onshore wind farm bolsters our presence in the MISO region, where last year we acquired Lincoln Land Wind. I am very excited to share that Green Fuels for Denmark, our Danish flagship Power-to-X project, has been granted IPCEI status by the European Commission. IPCEI stands for Important Project of Common European Interest and describes a project that contributes to sustainable economic growth, job creation, and the competitiveness of the EU economy. This IPCEI status matters because the Danish government shortlisted Green Fuels for Denmark as one of just two Danish Power-to-X projects eligible for public funding, on the condition that the European Commission identified it as being of common European interest.

Mads Nipper

executive
#7

Denmark's government has allocated DKK 850 million in total as funding for the 2 projects that made the shortlist. IPCEI plays a crucial role in enabling the creation of a green and energy independent Europe, since it will free up considerable funding to bring Power-to-X to maturity so that it becomes a cornerstone technology in combating climate change within hard-to-abate sectors, and as a clear European industrial strength that is homegrown. We have set ourselves the ambition of becoming a leading global leader in renewable hydrogen and green fuels, and we are assembling a strong and diverse portfolio of Power-to-X projects spanning industries and geographies. The European Commission's choice to grant IPCEI status to the flagship project Green Fuels for Denmark stands as a testimony to the strength and maturity of our Power-to-X pipeline, which rests on concrete, feasible, and scalable projects in partnership with key off-takers. Green Fuels for Denmark is being developed together with leading off-takers in heavy road transport, shipping, and aviation. Once fully developed, it aims to reach a total electrolysis capacity of 1,300 MW, capable of producing 275,000 tons of renewable e-fuels per year. Besides Green Fuels for Denmark, 3 other Ørsted projects have been shortlisted in the IPCEI process, and the European Commission is expected to finalize its IPCEI notification process by the end of this year.

Mads Nipper

executive
#8

Most of you likely know this already, but to recap: in May, Gazprom Export insisted that Ørsted make gas payments in rubles. We declined, since the contract places no such requirement on Ørsted. Because of that, Gazprom Export cut off gas deliveries to Ørsted on June 1. That outcome was one we had planned for, so as of June 1, 2022, we carried no financial exposure under the Gazprom Export contract. Talks with the authorities continue, and we have confidence that the authorities—who hold the full picture of Denmark's supply situation—are ready for it. To close this overview, I want to point to our achievement of being included among TIME's 100 most influential companies for a second consecutive year. TIME credits Ørsted with growing offshore wind energy in the United States. This year we moved from the innovators category into the leaders category, which recognizes our ambitious renewable build-out efforts and the numerous projects now planned along the East Coast. Now to Slide 4 and our record-breaking win in the UK. On July 7, the UK Department for Business, Energy, and Industrial Strategy, or BEIS, granted Ørsted a contract for difference for our 2,852-MW Hornsea 3 offshore wind farm, at an inflation index strike price of GBP 37.35 per MWh in 2012 prices.

Mads Nipper

executive
#9

This contract includes some flexibility for the merchant, since the CFD lets us cut contracted capacity by roughly 25%, which means we could potentially keep approximately 700 MW outside of the CFD framework. The CFD term is as long as 15 years, beginning once the wind farm is commissioned, and commissioning is scheduled for 2027. We anticipate making a final investment decision in the coming 1.5 years, possibly as early as year-end. This award stands as further evidence that offshore wind is a homegrown source of clean energy at large scale, one that will assist the UK in meeting its climate targets and boosting energy independence, while also generating local jobs and industrial development. There is now a greater need than ever to keep developing renewable energy, both to tackle the growing threats posed by climate change and to strengthen the stability and resilience of energy supply. We are eager to collaborate with government and industry colleagues in order to speed up offshore wind deployment, in the UK and around the world too. Near the close of this decade, we plan to invest a further roughly GBP 14 billion in the UK, and the 2.9 GW Hornsea 3 project will be central to the continued building of a larger, sustainably competitive UK supply chain that supports the next chapter of the UK's offshore wind success story.

Mads Nipper

executive
#10

For approximately two-thirds of Hornsea 3's CapEx, we've already locked in capacity with key suppliers, and we've announced a multimillion-pound agreement that makes Hornsea 3 the first and leading customer at SeAH Wind's monopile factory in Teesside. Thanks to the Hornsea 3 win, awarded capacity in the Hornsea zone now tops 3 to 5 GW. By viewing procurement through a global portfolio lens and by leveraging Hornsea 3's size and its location next to our existing UK East Coast wind farms—with close to 4 GW in operation—we can unlock significant synergies. Hornsea 3 will make a significant contribution to Ørsted's ambition of installing 30 gigawatts of offshore wind globally by 2030, and the project on its own effectively met our annual build-out ambition of around 3 gigawatts. Beyond the already awarded Hornsea zone, we are developing Hornsea 4, which could have a capacity of approximately 2.6 gigawatts. Hornsea 4 is currently in the planning process, with a decision expected in early 2023. Turning to Slide 5 and our acquisition of the German and French onshore renewable platform, Ostwind. I'm very excited to welcome the Ostwind team into the Ørsted family, since the company has an impressive and proven track record of developing high-quality projects, along with a strong cultural alignment.

Mads Nipper

executive
#11

This talented group has a meaningful presence in the local community, and it gives us a strong, fully integrated platform for creating value. Ostwind handles development, construction, and operation of onshore wind farms and solar PV projects. The company has worked in onshore wind development for more than 20 years, with a track record of over 1 gigawatt of energized projects across the two countries. As of today, Ostwind holds an attractive portfolio of 152 megawatts in operation and under construction, roughly 526 megawatts in advanced development, and approximately another 1 gigawatt in its development pipeline. Beyond that 1.5 gigawatt development pipeline, Ørsted has identified additional targeted pipeline growth of approximately 900 megawatts toward the beginning of the 2030s. Our successful experience with the Lincoln Clean Energy acquisition and the portfolio execution that followed gives us comfort that we can deliver on the additional capacity beyond the named pipeline. For reference, Lincoln Clean Energy's pipeline at the time of acquisition in 2022 was 2.5 gigawatts, compared with our actual U.S. operational portfolio of almost 4 gigawatts. The onshore team did not only significantly outperform in terms of capacity — we have also seen business cases with higher value creation than the original expectations.

Mads Nipper

executive
#12

The existing management team at Ostwind is going to keep running the company, and over time that business will be folded into Ørsted's onshore unit. We anticipate substantial synergies linking our onshore and offshore operations in Germany — both when it comes to offtake solutions for customers and to combined renewable power capacity for future renewable hydrogen production — and I'm looking forward to welcoming the Ostwind team to Ørsted. Ørsted's onshore renewables platform now spans four of Europe's largest growth markets at scale. Across these key onshore markets, expected build-out comes to roughly 300 GW of renewable capacity from 2021 through 2030, which works out to yearly growth rates of around 10% in every market. This European portfolio will complement our primary growth market in the U.S., where approximately 400 GW of onshore renewable capacity is forecasted over that same period. Moving now to Slide 6, I'll provide an update on our construction projects and pipeline, beginning with the projects under construction. Construction of Hornsea 2 and Greater Changhua 1 and 2a is still ongoing. At Hornsea 2, we've made good progress in the final construction phase, with commissioning work picking up after it moved more slowly than expected at the start of the quarter. As of now, all turbines are fully commissioned and commercially operational.

Mads Nipper

executive
#13

The last reliability tests, along with the related paperwork, should wrap up soon, and we expect formal commissioning of the park in August. Over at Greater Changhua 1 and 2a, 95 jacket foundations and 48 wind turbines have now been successfully installed. Progress across every part of construction remains solid. First power came in April, and installation will keep going over the months ahead. As we said before, the timeline was vulnerable to COVID-19 effects, and COVID-19 restrictions plus a surge in positive COVID cases have made it difficult to build up the resources needed to hit the planned pace of production and installation work, so we now expect the final turbines to be commissioned in 2023. South Fork Wind, our 130 MW offshore wind farm in the U.S., has moved into the construction phase, and with our partner Eversource we are advancing the onshore construction work, including the substation through which the project will connect. The offshore portion of South Fork Wind is expected to be built in 2023. Both of our German wind farms, Borkum Riffgrund 3 and Gode Wind 3, are on track per plan. Moving to the onshore renewable projects we have under construction, we are currently building around 1 GW.

Mads Nipper

executive
#14

Over in Europe, both of our onshore wind builds — Lisheen 3 and Ballykeel — are moving forward on schedule, and as we noted, we commissioned the wind portion of Helena Energy Center. In April, we reached FID on Sunflower Wind, a 201 MW project in Kansas in the U.S., and kicked off construction. That project is tracking to plan, and commissioning is still anticipated in Q4 of 2023. On the U.S. solar side, we're building Old 300 right now along with Helena Energy Center, our first project combining onshore wind and solar PV. We're collaborating with suppliers to make sure we meet the Uyghur Forced Labor Prevention Act requirements and to lock in delivery toward target commissioning in first half of 2023 and 2023, respectively. Turning to offshore, our U.S. development projects are moving ahead. In June, Ocean Wind 1, our offshore wind farm, hit a major milestone when BOEM published the draft environmental impact statement for it one week early. That statement confirms no alternative exists with materially less environmental impact than the design we've put forward. The project's next step is securing the final environmental impact statement, anticipated in 2023, and at the close of that process a record of decision gets issued.

Mads Nipper

executive
#15

The wind farm is still anticipated to be commissioned before 2025 comes to an end. For Ocean Wind One, our project, a GE Haliade-X turbine has been contracted. We know about the dispute that is ongoing between GE and Siemens Gamesa, and our understanding is that workable solutions exist for projects that are well advanced, like Ocean Wind One, so they can proceed without being affected. Both companies, we are confident, are committed to helping the United States reach its offshore wind energy ambitions and to unlock the climate and economic benefits that this industry holds for the country and for the world. At Sunrise Wind and Revolution Wind, we are continuing to develop the two projects alongside Eversource, our JV partner. Full permitting for the projects is expected in 2023, with commissioning by 2025. Thanks to strong development and execution efforts, we remain well on track toward our strategic ambition of roughly 50 GW of renewable capacity installed by 2030. Moving to Slide 7, an update on our offshore wind outlook. Through the CFD Round 4 award, the UK allocated the largest offshore wind capacity ever in a single auction. In our core markets, we continue to see a significant number of auctions and tenders taking place globally during 2022 and 2023.

Mads Nipper

executive
#16

We're waiting on the results of the New Jersey offshore wind transmission auction, and also on the Holland Coast West tender in the second half of 2022. Beyond the auctions and tenders planned for the near term, we keep seeing stronger political backing for expanding renewables. In March, the European Commission put forward an initial communication on cutting imports of Russian gas and on tackling the high energy prices in Europe. In May, the Commission came out with a more concrete plan containing several supportive measures, among them a proposal to raise the EU's renewable energy target for 2030 to 45%. That will require member states to set aside areas for renewable energy development consistent with the 2030 renewable energy target, grant all renewable energy projects overriding principle status, and set a goal that 75% of hydrogen used in industry be green by 2030. The world and Europe must deploy renewable energy far faster than we are doing today in order to secure energy independence and combat climate change. Closer cooperation among the North Sea countries is an excellent way to better realize the vast offshore potential of this region. In May, I personally was privileged to take part in the North Sea Summit in Esbjerg, where heads of government from Denmark, Germany, Belgium, and the Netherlands took a huge step toward the EU's climate neutrality goal by co-signing a joint declaration that will turn the North Sea into a green powerhouse for Europe.

Mads Nipper

executive
#17

Taken together, those 4 nations aim to gather no less than 150 GW of offshore wind by 2050, which would let the declaration supply green electricity to 230 million households across Europe. And lastly, we take encouragement from the fact that the U.S. Senate has passed the Inflation Reduction Act, or IRA, and that a vote has been scheduled by the U.S. House for tomorrow, Friday. For clean energy in the US, the IRA represents an investment of historic scale. Hundreds of billions of dollars will be allocated by it to help smooth the way for a clean energy transition. It does more than extend and improve the existing tax credits for solar PV, onshore wind, and offshore wind — it also introduces new ones covering critical clean energy technologies like energy storage and green hydrogen. On top of that, tax credits are aligned by it with incentives aimed at creating well-paying jobs and broadening the domestic supply chain for clean energy technology. Ørsted is well positioned to benefit from this legislation and to build on its existing commitment to labor and the local supply chain. We are in the process of assessing the impact of the recently passed IRA, and early indicators project a meaningful double-digit basis point IRR uplift on the cases. Subsequent guidance from the Department of the Treasury and Department of Labor is the next step in the process, and we will stay very close to that process.

Mads Nipper

executive
#18

During earlier earnings calls, we noted that favorable clean energy policy served as a major tool for offsetting the inflation we've been experiencing, and the IRA is going to be crucial for maintaining the offshore wind sector's ongoing momentum in the U.S. With that said, I'll now pass things to Daniel Lerup, our CFO.

Daniel Lerup

executive
#19

Thanks, Mads, and good afternoon, everyone. I'll begin on Slide 8 with the EBITDA for Q2 2022. At the group level, we posted total EBITDA of DKK 3.6 billion, which is 27% higher than last year's EBITDA when new partnerships are excluded. Earnings from our offshore business came to DKK 1.9 billion, a touch below last year once the new partnership effects from 2021 are excluded. In Q2 2022, wind speeds came in above last year's level, contributing a positive impact of roughly DKK 800 million, even though wind speeds were marginally under normal wind for the quarter. Higher generation from ramp-up at Hornsea 2 was partly offset by reduced generation capacity at Borssele 1 & 2 after the 50% farm down in May 2021. Offshore power generation for the quarter is up 32%. Given tough market conditions with high prices and considerable volatility during Q2, we saw negative effects from higher balancing costs and price-ineffective hedges. We also incurred increased costs from expanding our operating portfolio, owing to higher OpEx, businesses, and tenure costs. Overhedging had a negative impact of 400 million DKK, mainly tied to Hornsea 2, since commissioning work advanced more slowly than anticipated through the quarter, though it has picked up significantly in July.

Daniel Lerup

executive
#20

Along with wind speeds that were below normal, which led to production that came in lower than expected and hedged. Regarding Hornsea 2, I want to point out that the negative DKK 2 billion effect from overhedging will be offset across the asset's lifetime by the gain from the CFD's inflation indexation over the CFD period. In our existing partnerships, we posted earnings of DKK 600 million, coming mainly from construction work carried out for our partners at the Greater Changhua 1 project in Q2 2022. Lastly, in offshore, our project development cost rose by 0.2 billion DKK, pushed by the ongoing expansion of our footprint. Earnings in our onshore business rose six-fold, reaching DKK 1.1 billion, lifted by the substantial growth in generation from newly commissioned assets as well as a boost from higher power prices in the U.S. and Europe. In the U.S., we gained from higher power prices during the ramp-up phase on assets still under construction, where PPAs only began at commissioning. In addition, several of our newer PPAs carry upside share structures that let us capture extra revenue when pricing is high. In bioenergy and others, earnings climbed 29%, lifted by markedly higher earnings from our CHP plants thanks to high power prices.

Daniel Lerup

executive
#21

Part of that rise got offset by a negative hit from price-ineffective hedges in the quarter. A year ago, we swapped the business performance principle format for IFRS 9, since applying IFRS 9 hedging accounting to our energy hedges had become simpler. That said, because we hedge across a 5-year horizon and in markets where liquidity is low, we rely on proxy hedges — things like location, commodity, and time spreads — alongside hedges that presently align with our exposures. We have done this for many years, and it is entirely normal. Given the extremely high energy prices and volatility in 2022, a bigger share of our trades has been judged ineffective under IFRS 9, which occurs when the proxy hedge's value exceeds the change in the underlying exposure. As a result, in Q2 2022 we recorded a negative market value from those ineffective hedges in EBITDA within our offshore and bioenergy segments. What we have booked in our accounts is purely a timing matter, since the negative EBITDA impact in this quarter would otherwise have been recognized in later periods. Our overall value from proxy hedging is positive — which is what we typically see — and volatility is fairly low given our conservative VaR limits.

Daniel Lerup

executive
#22

In our gas markets and infrastructure segment, storage operations delivered weaker earnings. Moving on to Slide 9, which addresses net profit, ROCE, and equity. Net profit for the period came to 0.3 billion DKK, matching last year once you adjust for the farm-down gain tied to Borssele 1 & 2. Keep in mind that Q2 and Q3 are typically the weakest quarters because of seasonality. Return on capital employed was 15%, and the gain versus last year stems from higher EBIT across the 12-month period. Equity stood at DKK 61.3 billion at the close of June 2022, versus DKK 96.9 billion a year earlier. That decline came from unrealized losses in the hedge reserve on power hedges and, to some degree, gas hedges, as prices rose significantly. At June 2022's end, the post-tax hedging and currency translation reserve was DKK 49.2 billion. Higher future revenue from the underlying assets will match this reserve once the contracts reach delivery. Roughly 60% of the reserve will materialize before December 31, 2023, gradually lifting our equity back up. Now to Slide 10, covering cash flow, net debt, and credit metric.

Daniel Lerup

executive
#23

Net debt came in at DKK 41.4 billion, up DKK 11.4 billion over the quarter. Cash flow from operating activities shows EBITDA being offset by a net cash outflow from work in progress plus a temporary collateral posting of DKK 4.8 billion, which stems from higher power and gas prices. By the end of June, we had DKK 12.9 billion in total posted as collateral payments; these weigh on net debt but will unwind over time. Gross investments reached DKK 6.4 billion, reflecting our ongoing investments in offshore and onshore wind and solar PV farms. On top of that, we paid dividends to shareholders in April and recorded a negative exchange rate adjustment effect as the British pound strengthened. FFO to adjusted net debt, our key credit metric, was 18% for the 12-month period ending in June 2022 — significantly under last year's level, caused by the sizable temporary collateral posting I just mentioned. To strengthen our financial resources, we have taken several actions, among them a EUR 1 billion parent company guarantee issuance in Q2 2022 aimed at lowering initial margin and, to some extent, variation margin payments.

Daniel Lerup

executive
#24

If you adjust for those collateral postings across the last 12-month period, the FFO to adjusted net debt credit metric comes out at 46%. Our target for FFO to adjusted net debt stands at 25%, and we are fully committed to it; we expect to be around that level by year-end provided no additional collateral has to be posted. Moving to Slide 11 and our financial ratios: in Q2 2022, the taxonomy-eligible share of our revenue was 68%, the share of OpEx was 80%, EBITDA was 91%, and the share of gross investments was at 98%. The portion of revenue that is non-eligible mainly comes from our long-term gas legacy activities and from non-eligible power sales. By the close of Q2, the green share of energy reached 92%, versus 89% in the same period a year earlier. That change was mainly driven by more wind and solar farms being in operation, along with higher wind speeds, and was partly offset by reduced biomass-based heat and power generation. On safety, the year has started encouragingly, with the total recordable injury rate improving to 2.8 in H1 2022 from 3.1 in H1 2021. Now let's go to Slide 12, where I'll walk through the key drivers we expect for full-year earnings across our portfolio.

Daniel Lerup

executive
#25

Like Mads said when he introduced things, the strength of our financial results means we're raising guidance for the full year by 1 billion, taking it to a range of 20 to 22 billion DKK, and that excludes new partnerships. Over the first two quarters of this year, as you'll have noticed, high prices and market volatility across our portfolio have produced significant earnings effects, and those effects pull in contrasting directions. In offshore, regrettably, we took a negative impact of roughly DKK 2.5 billion during H1 2022, driven mainly by overhedging on Hornsea 2 and also by negative price-driven effects in Q2. Those offshore negatives should be more than offset across 2022 by positives from onshore, from our combined heat and power plants, and from gas. Onshore earnings in the first half, as I said, gained from high power prices in Ireland, the U.K., and the U.S. In bioenergy and other, we anticipate greater earnings from our combined heat and power plants thanks to higher power prices in Denmark. Since we mostly hedge the power that we co-generate alongside heat, we expect the benefit of those higher power prices to continue.

Daniel Lerup

executive
#26

Beyond that, for the gas markets and infrastructure segment we now anticipate greater earnings for the full year. In a highly volatile market, we have managed to optimize our gas operations in Northwestern Europe and secure gains from offtake flexibility within certain sourcing contracts and gas storages, which produces earnings for 2022 above what we had expected. Apart from the net loss we booked in the first half, we presently do not anticipate any additional effect during the rest of the year from the Gazprom Export contract. When these price and volatility effects are summed across the portfolio, the result is a net positive impact of roughly DKK 0.5 billion. That net positive figure shows how we, via our merchant exposure, gain from elevated energy prices, which have offset the negative consequences of the overhedging. Across our assets during the first half of the year, operational performance has been excellent, and wind speeds came in slightly above the norm. Without the overhedging effect brought about by the Hornsea 2 delay, together with extremely high power prices, EBITDA from our operational offshore and onshore assets would have risen 28% versus the first half of 2021.

Daniel Lerup

executive
#27

Beyond those effects, we anticipate greater earnings from current partnerships because of the reversal of the cable protection system provision in Q1 2022, along with increased earnings on construction work for partners. Regarding earnings at our offshore sites, we do anticipate a negative impact from the delayed ramp-up of Hornsea 2 and Greater Changhua 1 and 2a. And finally, we expect the acquisition of Ostwind and Ford County Wind to add higher earnings during the last half of the year. Taking all of this together, these effects leave us with the DKK 1 billion outperformance relative to our initial full-year EBITDA guidance. Given the unprecedented market volatility, the continued and prolonged COVID challenges affecting our construction projects, and the unexpected developments with our Gazprom contract, this guidance upgrade reflects continued strong operational performance and demonstrates the robustness of our business model. Finally, let's turn to Slide 13 and our outlook for 2022. As explained, we raised our full-year 2022 EBITDA guidance to a range of DKK 20 to 22 billion, driven by higher expected earnings in bioenergy and other, as well as onshore. For the bioenergy and other business, we have changed the directional guidance to significantly higher, from previously lower.

Daniel Lerup

executive
#28

Guidance by direction for both the offshore and onshore operations stays as it was. Our gross investment guidance has been raised by DKK 5 billion, bringing it to a range of DKK 43 billion-DKK 47 billion, and that reflects the purchase price tied to the Ostwind transaction. We continue to feel comfortable with our long-term financial targets, which include EBITDA growth, return on capital employed and the contracted share of profits.

Mads Nipper

executive
#29

Thank you very much, Daniel. Before we get to your questions, I'd like to do something maybe a little unusual and offer a few concluding remarks. Although we aren't pleased with the financial results of our core offshore business during the first two quarters of the year, we fundamentally view our offshore business as being on a very positive track. Our assets continue to perform strongly operationally, and energy production in offshore is up 30%+ compared with last year's Q2. The winds in the first half, related to these, have returned to normal. Installations are complete, and we now have Hornsea 2, the world's biggest wind farm, fully producing. Ambitions for renewables build-out in our core offshore markets are higher than ever and growing. Our Ørsted competitiveness remains strong, as shown by an awarded capacity of 4.5 gigawatts in 2021 and almost 3 gigawatts so far this year, with potential for more. Our recent Hornsea 3 win and regulatory developments like the IRA in the U.S. give us confidence that, despite some inflationary and supply chain headwinds, we can keep creating value in offshore. All in all, on top of record results and strong traction in our onshore and bioenergy businesses, we remain optimistic and bullish about our offshore momentum.

Mads Nipper

executive
#30

So with that, we'll open it up for your questions. Operator, go ahead please.

Operator

operator
#31

Thank you. That brings our presentation to a close. We're now glad to take your questions. This call must wrap up by no later than 4:30 P.M. CEST. We ask that each participant limit themselves to one question, after which you're welcome to rejoin the queue for a second one if you'd like. Should you want to pose a question right now, dial zero one on your telephone keypad to enter the queue, and if your question gets answered before your turn arrives, you can dial zero two to cancel it. Casper Blom of Danske Bank is our first questioner. Please go ahead. Your line is open.

Casper Blom

analyst
#32

Thanks so much, and congratulations on the guidance upgrade. My first question has to do with the balancing costs, or expenditures, that you've been dealing with in the offshore business. I apologize if this comes across as too simple-minded, but from what I understand, you must inform the regulator a day ahead of time how much production you plan to deliver, and then if there's any variation, you have to purchase that electricity on the market. Since that's how the setup works, why not simply tell the regulator you expect to produce slightly less than you actually will, and in that way sidestep these extra balancing costs? Thank you.

Mads Nipper

executive
#33

Yes, thanks. Thanks for asking, Casper. This does have a skew to it. It's true that we nominate price and volume a day in advance, and then within the day we have to make adjustments based on things like how the wind is blowing. The way it works is that when there's plenty of wind in the system and we've generated more wind power, then generally there will be a lot of production in the system, and so prices will be low. If we come in under the expected production, that situation will likely involve low wind, and you'll need to bring in backup production, which can be very costly. We'd need to go into the market and purchase it somewhere else at higher prices. There's a negative skew in how that setup operates. It's a market that's very large and liquid, so it's something we're accustomed to handling. Naturally, when you're seeing very high prices, the absolute balancing cost goes up. In many cases, the relative balancing cost does not increase.

Casper Blom

analyst
#34

Okay, so I want to be sure I've got this right. If that nomination is made a day ahead, then because of the skewness you mentioned, wouldn't that give you a reason to lean somewhat conservative?

Mads Nipper

executive
#35

Nope.

Casper Blom

analyst
#36

I mean, what's the point of claiming you can make 100 when you could simply say 95 and sidestep the penalty?

Mads Nipper

executive
#37

Since, as time goes on, the strongest economics will come from us placing bids based on our own expectations.

Casper Blom

analyst
#38

All right, thanks. Goodbye.

Operator

operator
#39

Deepa, if your line is muted, please unmute it. I can see that Deepa has joined on 2 lines, so I’ll now try the second one she’s connected on. The earlier line wasn’t working. Deepa, I’m attempting your second line at this moment. Can you talk on this line?

Deepa Venkateswaran

analyst
#40

Hello there. My apologies — are you able to hear me at this point?

Operator

operator
#41

Yes, we can hear you.

Mads Nipper

executive
#42

We hear you.

Deepa Venkateswaran

analyst
#43

Apologies — right, I hadn’t listened in to the call. My question concerns the proxy hedges, and also, just observing how the market has responded to your results today. I’d like to grasp what you’ve recognized. Is this an economic cash loss that you recognized early, or a mark-to-market loss that reverses once you deliver? So, I mean, the market doesn’t appear to be believing your upgrade given the reaction, or perhaps the market is assuming there are further cash losses. Could you just clarify that — you know, what exactly is this proxy hedge effect, and to what extent is it cash versus non-cash?

Daniel Lerup

executive
#44

I'll do my best to address that on a deeper level. Naturally, I'm not in a position to say how the market is interpreting this. The loss recorded in our P&L is a mark-to-market figure, so in that sense it isn't cash or a realized cash amount. It's a timing impact that will reverse later on. This is somewhat of a special situation, given the asymmetry in how IFRS 9 handles these proxy hedges. In certain cases, we're required to book the negative M2M loss, even though we also hold a M2M gain on other proxy hedges. On a net basis, our proxy hedges are actually positive, which is typically the case across the year. Given the volatility we've witnessed here, the negative portion, we'd say, has grown significant enough that we're mentioning it here.

Mads Nipper

executive
#45

Yeah. Maybe I don't want-

Deepa Venkateswaran

analyst
#46

Alright.

Mads Nipper

executive
#47

Stepping into Daniel's role is significant. Given how IFRS handles hedge accounting, with that asymmetry, it matters a great deal that this proxy hedging produces no net negative effect. In fact, the outcome is a net gain of a few hundred million DKK. So from that angle, we aren't worried about the genuine economic consequences of those proxy hedging effects stemming from IFRS 9.

Deepa Venkateswaran

analyst
#48

All right, that's very clear. Thanks a lot.

Operator

operator
#49

Thanks. We move to our next question, which is from Alberto Gandolfi at Goldman Sachs. The line is yours — go ahead.

Alberto Gandolfi

analyst
#50

Thank you. Good afternoon. Before I pose my question, I hope you'll permit me an impromptu remark. I have to say, I find it rather surprising that IFRS 9 accounting lands at the EBITDA line. The majority of your competitors handle it within financial expenses, or else they show an adjusted EBITDA figure, since in my view it introduces a fair amount of volatility. It probably does you less than full justice. That was roughly the point I was driving at. In any case, that's unsolicited feedback, and I do apologize for it. Here is my question. As I see it, given today's extremely elevated commodity and power prices, the liquidity you require for margin calls keeps increasing. You appear to be succeeding at a far greater rate than your business plan assumed. As you know, Mads just mentioned 4.5 GW last year. You've already secured 3 GW at this point — essentially the sole really large auction you've had thus far. There are more auctions ahead. You're working on expanding so as to obtain pipelines. So my question, I suppose, is this: at what point do you believe you might in fact require additional funding for that? In thinking about it, I see nothing objectionable about issuing some equity, provided you continue punching above your weight and keep winning more projects.

Alberto Gandolfi

analyst
#51

Could you give us some insight into how you're approaching the challenge of balancing liquidity requirements, improved success rates, and funding requirements? Thank you very much.

Mads Nipper

executive
#52

I'll start us off, and then Daniel can add to it. Alberto, thank you. And thanks as well for what you said at the beginning. What I mean is, we can't say anything about the specifics of timing for an equity raise coming from the ABB. Clearly, we're watching it closely. At the moment, we're actually moving along pretty much according to plan. Yes, the Ostwind acquisition came on top of that, but that isn't enough to trigger it. Obviously, as we go along, if we keep up the high win rates and these opportunities keep showing up, then that could trigger it. It's just not possible for us right now to be more specific about when we're actually going to pull that trigger. Unfortunately, it's not a subject where we can share any further details at this stage.

Alberto Gandolfi

analyst
#53

I really appreciate it.

Operator

operator
#54

Thanks. We move on to our next question, which comes from Kristian Tornøe Johansen at SEB, calling in. The line is yours — please proceed.

Kristian Johansen

analyst
#55

Yes, thanks. I wanted to ask about what the IRA means for the U.S. First, just to be clear, Mads, I believe you mentioned a meaningful double-digit improvement in IRR. Is that about your current offshore projects? My assumption is that when you say double digit, you mean basis points. But I'd also like your view on what this means for the onshore business, and whether, if it gets signed into law, it would accelerate your build-out, plus your U.S. P2X project — what does the clarity from the IRA mean for the FID on that project?

Mads Nipper

executive
#56

Yes, of course. Thanks, Kristian. And yes, you've got it right. Apologies if I neglected to mention basis points and simply referred to double digits. That's right, this applies to the portfolio we've already been awarded. What we're stating is that we estimate a meaningful double-digit uplift. Some variation is to be expected, and it remains not particularly clear just how large a share we'll qualify for, given local content requirements and other criteria. In our view, we're extremely well-positioned — better than anyone else — because of the deep engagement we already have in building a U.S. supply chain. That should deliver a noticeable lift to those cases. Naturally, given how long-term the IRA is, we also imagine this can and will benefit future projects past that point. Onshore gains as well. Whether it will accelerate us further, I can't say, but it certainly gives us comfort that continuing to invest in the U.S. — our key growth market in onshore, notwithstanding our European expansion — is very attractive. Lastly, I'm sure you've seen the same analysis, but at least some claim that with the up to $3 tax credit for green hydrogen, if one qualifies for that full amount, the U.S.

Mads Nipper

executive
#57

It might genuinely be the lowest-cost location for making green hydrogen, and that strikes us as really promising—both for certain plants we already operate, such as the letter of intent with Maersk covering green methanol for their vessels, and for possibly expanding Power-to-X further down the road. We do still require greater clarity regarding the specifics of the hydrogen portion of the IRA, yet we view it as something that renders the U.S. a comparatively very, very appealing prospective market for such expansion.

Daniel Lerup

executive
#58

Perhaps I could add a bit more regarding the onshore side. On the surface, the IRA appears quite favorable, and its direct effects might actually show up as greater IRR uplift benefits relative to offshore. That said, because you'll also need to go out and secure corporate PPAs, there is naturally an offsetting factor at play, where we could end up in a situation in which customers would want part of that returned. It looks very good for the offshore portion, and the onshore portion is also moving to 100% PTC.

Kristian Johansen

analyst
#59

If I could just ask a quick follow-up about your offshore portfolio. You mentioned before that inflation has somewhat diluted the IRR on that portfolio. Would it be fair to say this uplift from the IRA fully offsets that dilution?

Mads Nipper

executive
#60

No, Kristian, we’re not able to comment on that. Generally speaking, we try not to get into the habit of commenting on specific projects or near-term portfolios. This is clearly something that helps.

Kristian Johansen

analyst
#61

That's fair—completely fair. I really appreciate it.

Operator

operator
#62

Thanks. The next question is from Peter Bisztyga at Bank of America. You can go ahead, your line is open.

Peter Bisztyga

analyst
#63

Yeah, hi. I just have a question about Hornsea 3, please. You mentioned that you've locked in two-thirds of the capacity for it. I was wondering whether you've secured equipment at fixed prices, or whether your suppliers — whether for the turbines or anything else — have built in things like logistics and other cost pass-through clauses? Some insight into that would be helpful. Thank you.

Mads Nipper

executive
#64

As we mentioned, Peter, we can confirm that the capacity has been secured. With certain of these, the pricing has been agreed. With certain others, we have framework agreements in place that cover this, so we know essentially what it will cost — or at least something very close to it. For certain of them, negotiations will still need to be outstanding, though within limits. This isn't a situation that can fundamentally change. It's a combination of prices already fixed alongside items where the negotiations for fixed prices still need finalizing.

Peter Bisztyga

analyst
#65

So just to clarify, then — you aren't expecting to accept any kind of cost pass-throughs on logistics or anything like that?

Mads Nipper

executive
#66

No, I think that's.

Peter Bisztyga

analyst
#67

Alright.

Mads Nipper

executive
#68

That would be too specific. Typically, I mean, take some projects where we'd hedge the steel commodity exposure inside certain contracts. That's likely another item we would be, or probably would be, something we'd examine in this case. That's also an area where we're encouraged by what we see, and I'm sure you follow it as closely as we do. We're beginning to observe that following a few of those extreme peaks. For instance, heavy steel plates in recent weeks have begun to decline considerably below the peak. We consider this a manageable exposure, even if any commodity risk would still remain with us. As we've mentioned previously, at times we also opt to lock those in when opportunities arise, as we did with a substantial portion of the U.S. nearer-term East Coast projects through the steel pre-buying we undertook there.

Peter Bisztyga

analyst
#69

Understood, and thanks. That's useful.

Operator

operator
#70

Thanks. We’ll take our next question from Rob Pulleyn at Morgan Stanley. Go ahead—your line is open.

Rob Pulleyn

analyst
#71

Hello, and thank you. If I could pick up where we left off on the funding topic — my apologies, this one has several parts. First, we did take note of the collateral posting you brought up, and it would be useful to learn what portion of it represented an additional step during this year. Considering where the credit metrics stand, does that bring forward the need for more debt, since those collateral postings have left you with less cash? And because of the credit metrics, does it follow that the cost of debt tied to this is higher? Tying that together with the earlier question, does it speed up the requirement for fresh equity capital — to put it plainly, to speed up growth and raise the capacity targets? I'm just curious how these various funding dynamics fit together, and what the picture looks like at present compared with how it might have appeared roughly six to 12 months ago. Thank you.

Daniel Lerup

executive
#72

Yes, thank you. And the position we're in is one with a solid liquidity reserve, and in Q2 we actually didn't experience a net drag on liquidity from collateral posting, since we also issued this PCG worth EUR 1 billion. On our credit metric, though, it does create a drag, because we did see movements in the collateral — but that was on the variation margin, and the PCG only covers the initial margin, while the variation portion flows into the FFO of the metric. As for funding need, this isn't something that drives a future funding need. Naturally, if we keep delivering above expectations on the auctions we're participating in, that could certainly act as a trigger for one.

Rob Pulleyn

analyst
#73

All right, thanks. If I could just put forward something I believe a lot of people are curious about regarding the timing — and even with the respect I have for what Mads said earlier about precisely when that is — would you at minimum take an equity raise off the table for this year? Thank you.

Mads Nipper

executive
#74

Honestly, Rob, I really don't think so. I mean, sure, we would love to do it, but nothing is off the table as far as I'm concerned. That doesn't mean there are any imminent plans whatsoever, but ruling anything out at this point would be a mistake on our part.

Rob Pulleyn

analyst
#75

That's reasonable. I'll hand it back and perhaps get in line at the rear. Thanks. Goodbye.

Operator

operator
#76

Thanks. The next question is from Mark Freshney of Credit Suisse. Go ahead, your line is open.

Mark Freshney

analyst
#77

Hello, and thanks for taking my question. I was quite interested when you brought up Hornsea 3. Obviously, you've secured a CFD on a portion of it, but you also referred to the merchant part. It sounds like you're still figuring out the business case there. Would it be fair to say that 3.5 gigawatts represents the largest possible size? And could you describe the steps you would go through to decide whether to take on that extra merchant capacity, whether you'd require corporate PPAs before FID, and how that might connect with the remainder of the project in terms of possible synergies and bringing down the CapEx per unit? Thank you.

Mads Nipper

executive
#78

Much appreciated, Mark. No — apologies if that piece wasn't clear. The project's total capacity stands at 2.9, and that's what we hold — more precisely, 2.852. That's the figure for which we've been granted a CFD; what we do have is merchant flexibility of as much as 25%, which means that, should we decide to, as we approach project completion, we can make that choice. Let's simply imagine a case in which, if prices remain — if the energy price remains very elevated, we have the flexibility for as much as 25%, so roughly 700 MW within the 2.9 to go merchant. That's an option available to us at that point, depending on how the opportunities appear regarding the power market, regarding PPA attractiveness, and so forth. The baseline is that we'll take the full CFD across the entire capacity. We're flagging this to you because, I mean, clearly, the energy markets are pretty extreme, and I'd say every one of us reckons it's probably fairly uncertain. We actually regard it as excellent flexibility to hold, should we opt to use it.

Mads Nipper

executive
#79

As we move forward with the project — through FID, into construction, and while we keep watching the markets — we'd assess and begin examining which alternatives to a CFD contracted offtake might create more value and would be the right move. That's a process we'd undertake. It's something that would get underway nearer to COD in 2027.

Mark Freshney

analyst
#80

The way I understand it, your business case centers on the CFD sitting at 38 to 39.

Mads Nipper

executive
#81

That's right.

Mark Freshney

analyst
#82

At 2012 prices, you effectively hold a free option to boost the IRR by — you know — taking 700 MW as merchant, and you'll head to market examining a range of alternatives for that, and so on.

Mads Nipper

executive
#83

Right.

Mark Freshney

analyst
#84

Can you share anything at all about the IRRs, or should we just go by our own private spreadsheets?

Mads Nipper

executive
#85

No, we can simply state that this project—although its price is clearly competitive enough to put us among the winners—falls inside the range we guided. We feel comfortable with the project.

Mark Freshney

analyst
#86

Alright, thanks a lot.

Mads Nipper

executive
#87

Exactly. On the first part of your conclusion, our business case rests on the CFD, which we're confident we can secure, and if merchant flexibility creates a chance to do better, that would be upside.

Mark Freshney

analyst
#88

Thanks.

Operator

operator
#89

Thanks. We’ll take the next question from Vincent Ayral at J.P. Morgan. Go ahead—your line is open.

Vincent Ayral

analyst
#90

Yes, thanks for taking my question. To go back to the earlier remark: if that first line refers purely to non-cash items, and not to what we have observed at certain other operators that used proxy hedging and lost money on it — I am thinking of Engie, essentially selling forward in France, for Belgian generation, or Uniper, in Germany for Nord Pool — then if the economic value really is zero, I believe an adjusted figure would clearly have been helpful to the market today. Let me ask about Hornsea 2. The ramp-up has been delayed, but at this point you will be up and running. As I understand it, you may have some flexibility around when the CFD starts, and you could potentially push that back. It would be key to understand, if that is the case, how much potential upside there could be for the remainder of the year, how long it could last, and whether it is included in the guidance, please? Thank you.

Mads Nipper

executive
#91

Yes, thanks. We've already deferred two of the phases, and next year we have the option to defer a phase as well. Keep in mind that this year we aren't receiving any CFD income from Hornsea 2. It's merchant, but as you're aware, we've fully hedged our offshore output, which means there are no upsides this year or in the guidance from higher prices.

Vincent Ayral

analyst
#92

Regarding the coming year, you wouldn't be fully hedged, correct? That's a reasonable assumption to make.

Mads Nipper

executive
#93

On the offshore side, we're also nearly fully hedged for next year.

Vincent Ayral

analyst
#94

Alright.

Mads Nipper

executive
#95

We are available in onshore and bioenergy.

Vincent Ayral

analyst
#96

Thanks so much. That's very clear.

Operator

operator
#97

Thanks. We’ll take the next question from Sam Arie at UBS. You’re live — go ahead.

Sam Arie

analyst
#98

Hello there, and good afternoon to all of you. Is the audio coming through clearly for you?

Mads Nipper

executive
#99

Yes.

Sam Arie

analyst
#100

Alright, thank you for the presentation and for walking us through the hedging issue — I think we've all made notes on that. I'd like to return to a different topic: the broadly high power prices in Europe and the UK, and what policymakers are able to do about it. With that in mind, I want to raise something I also asked RWE this morning — if you focus on the UK, the question, I suppose, is this: what can a new prime minister do about high energy costs, including power prices? Assuming some form of intervention will happen, what would the industry be willing to support voluntarily, so that something less palatable isn't imposed on it involuntarily? The specific idea I'm hearing about in industry discussions and so forth is whether you could take existing built assets with merchant power price exposure and offer them a voluntary CFD, perhaps capped at the level of the new asset CFD. In that case, I suppose the thinking is that you'd take the couple of gigawatts of assets you have in the UK under the ROC scheme, and you'd bid them in for a CFD, knowing that in the short run you'd receive lower prices than on the merchant element of the ROC assets.

Sam Arie

analyst
#101

So in return, you might receive perhaps an additional 10, 15 years of inflation index, fixed strike prices, which are somewhat higher multiple, more transactable, able to carry more leverage, and so forth. In that scenario, it seems to me like a solution that industry might, you know, which industry might voluntarily sign up for. I was just wondering, I suppose the question is, do you think this is a good sort of idea? Do you think that could form part of the solution in the UK or other markets? Are you hearing anything from government that points concretely in that kind of direction? If there were CFD auctions for your existing assets, is that something you would consider bidding into? Thank you.

Mads Nipper

executive
#102

Yeah. Thanks a lot, Sam. To be very transparent, that particular idea is not something we've discussed a whole lot. Obviously, we're in very close dialogue about what the risks are and what options exist to contribute to this. Given that we also have such a large contract to share in the UK, we actually see it as being part of securing price stability, which is super difficult and not many are doing. I think it's just an immediate reaction. Rather than something that wouldn't be thought through as a windfall tax, having something like this would certainly be an option. It would be something we would engage constructively in. I think also that as long as any consideration is considering what is the real net upside that companies have so that neither CFD volume nor the hedged volumes end up being taxed in a way, as long as that is the case, we will be open to discussing different solutions because, of course, it's a more challenged situation for the consumers.

Sam Arie

analyst
#103

Thank you for that comment. If you'll allow me a brief remark, since my friend Alberto raised an accounting point earlier. To my mind, in the UK especially, there is a quite narrow window during which certain decisions will be taken, and it looks to me as though there would be an enormous gain from having some sort of solutions that cut bills and power prices in the near term, which industry could sign up to on a voluntary basis. It would. I believe it would send a very strong message to the market if some kind of interventions were agreed, and industry could say, "Yes, we back that, and we don't have to go along with that, but we do because it's good for us." The existing asset CFD strikes me as at least one of a few different candidates. I hope we can keep an eye on that and keep discussing on future calls.

Mads Nipper

executive
#104

Yes, of course. Thanks for raising that. We’ll definitely keep an eye on it and take it up with our U.K. colleagues right away.

Sam Arie

analyst
#105

That’s good. Thank you.

Operator

operator
#106

Thanks. We’ll take the next question from John Musk at Royal Bank of Canada. Your line is open — please go ahead.

John Musk

analyst
#107

Good afternoon, everyone. Coming back to the balance sheet — sorry, again — and specifically to the collateral question. Could you perhaps give an update on where that DKK 12.9 billion has gone since the half year? And while you're at it, maybe just indicate what's behind that move. Should we simply be watching, you know, headline levels or power prices, or is it somewhat more involved given, obviously, the hedges you may hold in other commodities?

Mads Nipper

executive
#108

Yes, this is largely being pushed by the power and gas prices we see in the headlines. Over the course of the half year, net collateral has stayed pretty much level, and that's because we drew down collateral through that EUR 1 billion PCG. If that step hadn't been taken, we'd have faced a further drag of DKK 7.5 billion.

John Musk

analyst
#109

So the DKK 12.9 billion, that's still roughly the same figure, and it really hasn't shifted much since June 30th?

Mads Nipper

executive
#110

From June 30 onward, prices have naturally risen in July, and that is of course affecting the collateral as well. That latest figure isn't available to me.

John Musk

analyst
#111

Alright, thanks.

Operator

operator
#112

Thanks. We have a follow-up now from Casper Blom at Danske. Your line is open — go ahead, please.

Casper Blom

analyst
#113

Thank you very much. I have a question about Slide 12, which I found quite interesting. I’d just like to get a sense of the sort of dynamic if we look a little bit ahead. Let’s assume that in 2023, we also see the same kind of pricing and volatility across your portfolio as you’ve seen this year. Removing the overhedging at Hornsea 2, would it then be fair to assume that the onshore and Danish power plants would give you an upside of, let’s say, DKK 2 billion-DKK 2.5 billion compared to a, let’s call it normalized situation? Would that be a fair assumption to have for next year?

Mads Nipper

executive
#114

Yeah. I think I can start us off, and once again, we'd welcome Daniel to weigh in, Casper. You're definitely right that obviously not the entire amount of the upside we're seeing has been offset, which is why we have the DKK 1 billion upgrade in our full year guidance. The vast bulk of that comes from the overhedging tied to the delayed ramp of Hornsea 2. There are a few other effects as well, and also. Even though balancing costs are higher when power prices are higher, this is on a completely different scale. I mean, it's a far smaller figure. And that's the piece that would probably remain. You're correct, a meaningful portion of that CHP and onshore upside would be there, and it would be pure upside, since we'd only experience a lesser portion of the drag on our offshore. Unless something else comes along, such as an unusually low wind year or another factor, in which case it would be an upside like the one you described.

Casper Blom

analyst
#115

Thanks — that's great.

Operator

operator
#116

Thanks. We move to our next question, which is from Deepa Venkateswaran at Bernstein. Your line is open, so please go ahead.

Deepa Venkateswaran

analyst
#117

Thanks a lot. Turning to my second question, I'd like to zero in on collateral posting and the FFO-to-net-debt ratio. A few companies treat collateral margin as receivables too and net it out, and it appears credit rating agencies factor that in. I'm simply curious whether those agencies actually work on the assumption that this collateral will never come back to you, or have you had any conversations along those lines? Because once more it strikes me as absurd, given that this is something that unwinds over time and really shouldn't count toward your fundamental debt position. Could you clarify how the agency views this, especially if there's no counterparty risk on that co-collateral? Thank you.

Daniel Lerup

executive
#118

Yes, I agree. We're holding an ongoing conversation with the rating agencies to make sure they stay informed on this, obviously. Because it's a timing effect, we feel reasonably confident it won't end up hurting us. Once more, we expect that metric to return to the level we're targeting. In addition, the Hornsea 2 divestment is set to close later in the year, and that will bring in a substantial capital inflow as well. You're right that there are some odd effects stemming from these margins, since they land in different spots across the P&L and the balance sheet. Naturally, we're talking with the rating agencies so they grasp what these effects involve.

Deepa Venkateswaran

analyst
#119

All right, thanks a lot.

Operator

operator
#120

Thanks. We’ll take the next question from Jenny Ping at Citi. Your line is open—please go ahead.

Jenny Ping

analyst
#121

Hello, and thank you. Following up on that previous question about FFO net debt, I wanted to ask: your assumptions clearly reflect no additional collateral for the remainder of the year. But what happens if more is required — if conditions worsen from this point? Which levers are available to you? Could you provide further company guarantees? The Hornsea capital inflow will obviously be a help, but what options do you have available? Thank you.

Daniel Lerup

executive
#122

Yes. The PCG route exists. Bilateral agreements such as RCFs are an option. That means more short-term debt. I believe we already have a fairly robust liquidity reserve at this point. I think there are plenty of possibilities for us to work with if we were to see a larger draw on the collateral.

Jenny Ping

analyst
#123

Thanks. Apologies — just a single follow-up since we’re now in the second round of questions. Regarding your Taiwan assets, obviously the political risks appear to be rising between China and Taiwan. As we approach the next round of auctions, and as you make FIDs for the contracts you’ve already won, I assume the risk premium attached to this is higher now. Could you just walk us through how you view future investments in the Taiwan projects, please?

Mads Nipper

executive
#124

Sure, I can start us off. As it happens, I was personally in Taiwan last week. I mean, we're clearly stepping up our conversations with geopolitical advisors and watching the political landscape very closely. As of late today, we've heard that the vice president of the Taiwanese government is traveling to Beijing for 10 days. What we keep hearing is that the clear expectation is that even though this was a spike, we're actually of the view that structurally this is not increasing the risk. We've obviously done a very fast-track evaluation — both of the risk for our people, for our existing assets, and so on — due to the military drills from Beijing. Right now, we're actually not seeing that the risk is, structurally and on an ongoing basis, substantially increasing. It's not something that leads us to question whether we should support Taiwan's continued build-out of renewable energy, nor fundamentally, or at least to any sort of significant extent, increase in the risk premium.

Jenny Ping

analyst
#125

Appreciate it.

Operator

operator
#126

Thanks. The next question we have is from David Paz of Wolfe Research. Go ahead, please. Your line is open.

David Paz

analyst
#127

Hi there. How are you doing?

Mads Nipper

executive
#128

Hi there.

David Paz

analyst
#129

Okay, I just wanted to confirm you can hear me. My question goes back to the IRA—could you expand on that a bit? I believe you mentioned a double-digit basis point range, which obviously is quite broad. Does that cover every project that has contracts—for instance, the Mid-Atlantic cluster, Ocean Wind, and Skipjack Wind, you know, 1 and 2? Is that wide range of possible uplift because certain projects are further along than others, and as a result some, you know, might simply fail to reach that domestic content threshold?

Mads Nipper

executive
#130

Thank you, David. That's exactly the reason we describe it as a meaningful double-digit uplift. You're correct that there's a spread, though based on our current calculations right now, it isn't something like 10 or 12 basis points. Still, variation exists depending on how far along a project is, what our preliminary evaluation shows, and how much of the existing projects we'd qualify for. But clearly, whatever is within our power, we'll do everything we can to push that as high as possible. I also can't share more because those numbers still need to be qualified. We were in a hurry to try to calculate at least something that gives you an indication of the impact, and this is as close as we can get. It varies from project to project depending on how much we believe we can qualify for, and also depending on whether the OREC contains any conditions requiring some or all of that to be passed back to the rate payers, which is something we'll obviously negotiate with the states.

David Paz

analyst
#131

Right, okay. Just to follow up on that point. Could you talk about how the transferability provision affects, you know, the contracts you already have and any possible future transactions, such as farm downs and so forth? Thank you. In the US.

Mads Nipper

executive
#132

Right. As for transferability, the language isn't yet at a point where it's fully clear exactly how we can make use of that, so we'll be looking for additional guidance from the Treasury so we can understand it better. It's probably not as good as direct pay, but at least we believe it can reduce the risk in how you utilize the ITCs, and there may be some additional upside in there. In the numbers we're mentioning here, the first calculations we've done, we haven't added any value for transferability yet, even though we think there's value there as well.

David Paz

analyst
#133

That’s great—thanks a lot.

Operator

operator
#134

Thanks. We’ll take the next question from Alberto Gandolfi at Goldman Sachs. Please go ahead—your line is open.

Alberto Gandolfi

analyst
#135

Hey there, and thanks for letting me come back with a follow-up. This one's pretty simple. Can you share any particular guidance regarding net debt at year-end — specifically, which margin calls you'd view as perhaps temporary and expect to get back, as opposed to what the true underlying net debt actually is? Thanks a lot.

Mads Nipper

executive
#136

No, I’m not able to provide a figure for net debt. But as we mentioned earlier too, assuming we don’t witness any weakening on the collateral side caused by elevated power and gas prices, we anticipate FFO to net debt of roughly 25% at year-end.

Alberto Gandolfi

analyst
#137

All right, thanks.

Operator

operator
#138

Thanks. Our following question is from Rob Pulleyn of Morgan Stanley. Your line is open — go right ahead.

Rob Pulleyn

analyst
#139

Yes, hello, and thanks for the follow-ups as well. Since time is limited, I have two brief questions. First, your partner Eversource has disclosed that it is looking into divesting its interest in the JV. A question we often receive is whether Ørsted would have any interest in buying that stake, and it would be great to hear the company's official position on the matter. Second, purely as a point of process, could you tell me whether the implied guidance for the second half includes anything for balancing costs and charges tied to proxy hedges? I just want to confirm expectations are aligned with what you have guided. Thank you very much.

Mads Nipper

executive
#140

Yes. Thanks so much, Rob. I can say that, I mean, when it comes to Eversource's share, we are—or they are—involved in the projects and the seabed that we have. Nothing is being ruled out, but I'd also say that we are not. I mean, I can't give any kind of specifics on that, but we're evaluating whether taking over some of that would really be meaningful for us. Still, it's not something we can rule out—that we'd have interest in it. Could you perhaps repeat the other question?

Rob Pulleyn

analyst
#141

Okay, absolutely. Thanks, Mads, regarding that first item. On the second question: since expectations and quarterly reality have diverged, let's say, across many quarters, could we get complete clarity on what your 2022 guidance — specifically for the back half of the year — incorporates for balancing costs and any potential future charges related to proxy hedges, if any at all? Presumably, this volatile commodities market persists, so balancing costs will arise, and additional charges to your proxy hedges could likewise occur. I'm simply asking what that guidance accounts for, so we're all aligned. Thank you.

Mads Nipper

executive
#142

Yes. For the rest of the year, we've assumed a level that's close to normal—we don't really know exactly how this will affect our earnings as we move forward, since it hinges on how volatility and correlations develop. That's something we expect to be able to capture within our guidance range. To add to that, again, repeating, without being able to give you very exact numbers, even if balancing costs remain at the current high levels and potentially even rise somewhat compared with where we are now, this is not something that puts our guidance at risk. Just to be specific about that. Because balancing costs may. It may sound quite dramatic, but it is still a relatively small part of that total deviation for the quarter. Even if it persists, it's not something that makes us concerned about the validity of the updated guidance.

Rob Pulleyn

analyst
#143

That’s wonderful to hear. That gives me a lot of reassurance. Thanks. I’ll stop there.

Operator

operator
#144

Thanks. We’ve got another question waiting in the queue. It comes from Mark Freshney at Credit Suisse. Your line is open, so please go ahead.

Mark Freshney

analyst
#145

Thank you. I just wanted to ask a follow-up about the local partners over in North America, since we have obviously all seen what Eversource has said, and PSEG has made remarks along the lines of "returns are staying under review," and I note that they paid you EUR 30 million during this quarter. My question is this: when you move into new markets like the U.S. or Taiwan, your previous management was clear that local partners are needed, especially in certain territories. The number one partner anyone could hope for, could dream of, PSEG, might be interested in selling. Eversource is in the middle of making its decision. How much of a concern is it for you that local content, so to speak, on the capital side is not something you can secure? What sort of say would you have over the partners involved in those projects? In other words, do you hold preemption rights and can you pick your own partner, or are you at the mercy of financial funds that may lack the political relationships you genuinely need in those states?

Mads Nipper

executive
#146

Mark, there are two primary reasons we aren't worried about that — more exist, but two main ones. First, we plainly don't share the view that PSEG is looking to sell. PSEG is involved quite intensively; we're also collaborating with them on the sizable transmission bid we have in New Jersey. That fear isn't something we hold. Beyond that, I'd note it matters a great deal for us when we state that partners are essential. Often we ask ourselves what a local partner can offer — political leverage? Local content? Market access? Access to projects? So now, for instance, with Eversource's decision as well, Eversource was a tremendous partner in getting us into the market. We also think we're now positioned with the largest pipeline by far and already a substantial political voice in Washington and in the states where we operate. That leverage is now ours on our own. Sure, we would have liked to keep working with Eversource, but this isn't in any way harmful to our path forward. Similarly, we're in Poland, where market entry came with our partner PGE, yet we already know we won't be working with PGE on the second round.

Mads Nipper

executive
#147

This is entirely natural, since PGE helps us secure market access, reach the right stakeholders, and so forth. Partners staying together forever and ever isn't a typical situation. That's the reason for combining with PSEG as well — we don't see them going anywhere — and also the reality that partners are sometimes present for a stretch of time and then we part ways amicably, and that's fine.

Mark Freshney

analyst
#148

Thanks a lot. That's very clear. Thank you.

Operator

operator
#149

Thanks. Since no one else has a question right now, I'll return things to our presenters so they can offer their closing remarks.

Mads Nipper

executive
#150

Yes. I just want to express my thanks to everyone. As usual, excellent questions. If anything else comes up, Rasmus, Sabine, and the remaining members of the IR team will be glad to help. Many thanks. Take care and enjoy your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ørsted A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ørsted A/S earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ørsted A/S or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.