This is the Orsted Q3 2022 Earnings Call. <<operator_script>> I'd like to remind everyone that this conference is being recorded. Our speakers today are Mads Nipper, CEO; and Daniel Lerup, CFO. Speakers, please go ahead.

Mads Nipper

executive
#2

Thanks a lot, and good afternoon — good morning, everyone. We keep finding the world, and Europe in particular, in a very unusual and volatile stretch, with a war still going on, political sanctions and instability, inflation that is extremely high, a recession that threatens, and interest rates climbing steeply. Europe's energy crisis goes on hitting households, companies, and countries hard. And although gas and power prices have fallen from the peaks seen at the end of August, they stay high and volatile relative to any period before 2022. On the regulatory front, uncertainty persists in both the EU and U.K. while regulators figure out how energy price caps should be structured and implemented to shield businesses and consumers from soaring energy bills. We keep backing the initiatives required to soften the societal effects of high power prices. At the same time, those initiatives create a regulatory risk for our industry when they are implemented without regard for the forward sold volumes of each individual power generator. We have also kept up close and constructive dialogue with the relevant governments and authorities on these important initiatives and remain confident that good solutions will be found. It is key that governments around the world address and help reduce the industry risks facing the renewable sector, that contracted power prices reflect the realities of our current inflationary environment, and that we see an increased focus on simplified and streamlined permitting procedures.

Mads Nipper

executive
#3

If we don't make these renewable energy investments, we risk a slowdown and a devastating loss of momentum for the green transformation. Turning to our financials, I'm pleased that our asset portfolio keeps showing the benefits of diversification. Higher earnings in Bioenergy and other drove us to raise our full year EBITDA guidance by DKK 1 billion, to an expected DKK 21 billion to DKK 23 billion — that's DKK 2 billion more than our original guidance for the year. In every market where we operate, we still see the very high power prices having a substantial impact on our financial performance and on the implications for our earnings mix, since our business units carry different merchant exposure. As you know, we have hedged almost all of our near-term merchant exposure in our offshore business, whereas onshore and Bioenergy carry more merchant exposure. At a group level, our hedge percentage for the remainder of 2022 stands at 75%. This balance of merchant exposure has produced a different earnings composition than we expected at the start of the year, but we are obviously very satisfied that we have managed to outperform our expectations despite the challenging market conditions.

Mads Nipper

executive
#4

Beyond meeting our near-term earnings guidance, another central priority for us is the long-term earnings growth that comes from our renewable investments. Our confidence stays very high that the money we are currently putting into offshore and onshore renewables will drive substantial earnings growth over the years ahead. As we have guided, from our offshore and onshore operating assets we anticipate an average yearly EBITDA increase of roughly 12% across the 2020 to 2027 period. So although our diversified portfolio and strong operational performance have proven very successful at safeguarding our earnings in the short term and even giving them an upside, our ambitious investment program, combined with our long-term inflation index contracts, will underpin significant long-term earnings growth. Like many other companies, we are confronting and working through many of the unpredictable and frequently urgent consequences of financial, geopolitical and energy-related volatility. And we will keep doing so in order to operate our business successfully and deliver results. But we will also stay strongly committed to showing the leadership required to support a healthy long-term financial, environmental and social development of Erste and our entire industry. We still see an attractive and growing pipeline of opportunities within the renewable space, and with an industry-leading pipeline, we can remain highly selective.

Mads Nipper

executive
#5

Even with the difficulties our sector is facing right now, we’re still confident we can keep putting money into projects that create value and meet our goal of a world powered entirely by green energy. That said, I’ll walk you through the strategic highlights for the third quarter on Slide 4. On the final day of August, we commissioned the 1.3 gigawatts Hornsea 2 offshore wind farm. Our whole project team makes me very proud—they installed the world’s largest offshore wind farm under extremely difficult conditions, with COVID-19 affecting a large part of the installation phase. With that in mind, a 2-month commissioning delay is very well contained. After commissioning, we completed the farm down to AXA and Credit Agricole Assurance. This transaction ranks among the largest ever in renewable energy, at a valuation that underscores how attractive our offshore wind assets are. Along with Copenhagen Infrastructure Partners, we’ve teamed up in a new partnership to develop up to 5.2 gigawatts of offshore wind in Denmark across 4 projects under the open-door scheme. The partnership covers development, construction, and operation of the offshore wind farms Speaking Bangna Basin East and usage nor as well as the related transmission assets.

Mads Nipper

executive
#6

Those big offshore wind resources across the projects could really speed up the green transformation, generate value for the offshore wind sector, and build a strong Danish business and export stronghold within Power 2x ahead of 2030. It makes me very excited that Astra now has a partnership where 2 major companies can bring together skills and knowledge to develop offshore wind resources, and that could become a key enabler for developing large-scale power 2x projects in Denmark and Europe. At the end of October, we announced a 5-year global partnership with World Wildlife Foundation, WWF, the world leader in nature conservation, to drive a fundamental change in how we approach integrating action on climate and biodiversity by advancing offshore wind that strives to achieve a net positive biodiversity impact. The planned expansion of offshore wind risks having a negative impact on biodiversity if it's done the wrong way. But if it's done right, it can support enhanced ocean biodiversity and create a net positive biodiversity impact. And that's why this type of partnership matters so much, as it can secure a sustainable build-out of the industry. Together, we will identify, develop and advocate for offshore wind deployment initiatives and approaches that are not only imbalanced with nature, but also enhanced biodiversity.

Mads Nipper

executive
#7

Back in October, we completed a farm-down deal with Energy Capital Partners, and they're picking up a 50% ownership stake in a portfolio made up of 3 onshore wind farms plus 1 solar farm located in the U.S. In just a few minutes, I'll walk you through that transaction. As a sign of our European onshore expansion, we finished acquiring the onshore renewable energy company Ostrand. That deal brings our European onshore portfolio into Germany and France, adding over 1.5 gigawatts of development pipeline projects. Early in September, we had a successful issuance of Green Senior bonds totaling almost DKK 15 billion, the purpose being to finance our 2030 ambition. Our earlier green bond issuance happened in June of this year, and since that point, market conditions have shifted considerably. Even so, the book ended up 3x oversubscribed, which shows the ongoing support for Erste and for building out renewables. In mid-October, we unveiled a new organizational structure meant to put us in a good position to capture profitable growth going forward -- but before I get into the reorganization on the next slide, I want to call attention to 2 extraordinary events from recent months that we're dealing with as a result of the present energy crisis. First, the Danish authorities have instructed 3 of our power stations that run on oil and coal to stay in operation so that electricity supply security in Denmark is ensured.

Mads Nipper

executive
#8

The facilities covered are Unit 3 at SP Power Station, Unit 4, which is the StorstoPower station, and Unit 21 at the Kunia plant. Those last 2 units have already been decommissioned and preserved, and SBI Power Station had been set to be decommissioned on 31st of March next year. We're going to follow the order from the Danish authorities, and we'll now start getting the units ready and keeping them maintained, along with securing the staffing needed to run them. Our view remains that society has to move away from gas oil and coal as quickly as we can, but right now we're in the middle of a European energy crisis, and of course we'll help make sure electricity is supplied to the best of our ability. Since the order calls on us to run the units until June 30, 2024, we stay committed to our aim of reaching carbon neutrality by 2025. Second, we've signed a short-term agreement with Equinor to offtake as much as 8 terawatt hours of Norwegian gas in order to meet demand from our business-to-business customers in Denmark and Sweden. Those volumes will replace the gas we presently buy on European markets during the period when the color field isn't delivering gas to Denmark.

Mads Nipper

executive
#9

That agreement runs from January 1, 2023, through April 1, 2024. Moving on to Slide 5, let's discuss the reorganization we recently carried out. Given a more complicated market landscape, with local requirements becoming more and more varied, fresh needs and demands coming from customers, a shift toward integrated energy systems and, not least, ongoing competition, we intend to mirror that in our organizational setup so we can be sure we're properly positioned to generate growth in these conditions. So we chose to regionalize our commercial activities further, splitting them into 3 areas: Americas, Europe, and Asia Pacific. Under this new structure, we get even nearer to our markets and customers by bringing our offshore and onshore renewables organizations together, while simultaneously capturing the synergies that come with a global organization and securing decision-making processes that are simple and quicker. In connection with that reorganization, our Chief Commercial Officer and Deputy CEO, Martin Neubert, chose to step down, departing after close to 15 years with the company. I'd like to use this moment to thank Martin for the strong contribution and commitment he gave us throughout his time with the company. He mattered greatly in building the offshore business within Orsted, taking it to its current position as a global #1, and in incubating power takes as a new growth business for Orsted.

Mads Nipper

executive
#10

Simultaneously, I'm extremely pleased that this shift allows us to elevate a number of Martin's direct reports into the fresh group executive team, and in doing so, draw on their extensive knowledge of both the company and the industry. Alongside the members already in place, the group executive team will include the 3 regional CEOs, as well as the heads of Power2X, legal, and global stakeholder relations. Even with many new faces on our group executive team, it will be a seasoned and long-serving management group, with an average of 7.5 years of industry experience, and on average they have spent 6 years with Erste. I very much look forward to collaborating within this new setup, both regarding the group executive team and equally across the whole organization. Turning to Slide 6 and our first-ever onshore farm down. In the funding plan we presented at our Capital Markets Day back in June 2021, we assumed 50% ownership of our offshore wind farms. We also stated that we would pursue onshore farm downs opportunistically as a means of recycling capital to support our growth ambition toward 2030. This transaction serves not only as the first farm-down of onshore assets but also as the first occasion on which we farmed down multiple assets within a single transaction.

Mads Nipper

executive
#11

With the Energy Capital Partners deal now closed, we've divested a 50% ownership stake in a portfolio totaling 862 megawatts of capacity, and we've secured USD 410 million in total proceeds, net of the tax equity portion. Given the attractive valuation, we'll retain around 100% of the net present value through the divestment, even in a high-interest rate environment. That project portfolio is made up of the onshore wind farms Lincoln Land wind, Plum Creek Wind, and the Willow Creek wind, along with the solar farm muscle shoals, and these are spread geographically across 4 U.S. states. Every one of the projects is operational, and power purchase agreements are in place for all or parts of the production capacity. The interest this portfolio has drawn underscores the quality of our assets and our ability to raise capital. And I see this transaction as another key milestone in our onshore journey, as well as a testament to the value our projects create. Moving to Slide 7, where I'll give an update on our construction projects and pipeline, beginning with the projects under construction. With Hornsea 2 commissioned at the end of August, we're now fully focused on completing the Taiwanese Greater Shanghai 1 and 2 way, where we continue to make progress across all areas of the construction.

Mads Nipper

executive
#12

Right now, 111 turbines are in place, and we anticipate commissioning that project during 2023. One thing to note is that the subsidy for our Taiwanese project takes the form of a feed-in tariff, and since we received that tariff on a per-turbine-commissioned basis, there is no risk of being over hedged. Our 130-megawatt South Fork offshore wind farm in the U.S. remains well on track to hit commissioning in 2023 as planned. Eversource, our partner, is moving the onshore construction work forward, including the substation where the project will connect, while we began offshore construction last month. Last, early construction at our 2 German wind farms, Bocom Rigon 3 and Godwin 3, is moving ahead according to plan on both. Shifting to the onshore renewable projects we have under construction, we are currently building roughly 1 gigawatt. In Europe, 3 onshore wind projects are currently under construction in Ireland, Northern Ireland, and France, with a combined capacity of 52 megawatts, and all 3 are progressing as planned. In the U.S., our 201-megawatt Sunflower wind project has now entered the construction phase. That project is moving forward according to plan, and we expect commissioning in the second half of 2023.

Mads Nipper

executive
#13

Right now, we're building all 300 units in the solar phase of the Lena Energy Center. Both projects have run into delays from a range of issues involving the solar module supply chain and related legislation. Even so, we've installed over 80% of the project capacity across all 300, and that portion is fully operational and delivering the full committed power under its power purchase agreement. We expect the remaining modules to be delivered during 2023, and we expect full commercial operation before the end of 2023. In the same way, for the Helena Energy Center, we're planning full commercial operation before the end of 2023 as well. As for our awarded portfolio, we're moving our U.S. development projects forward. Since our Q2 update, the U.S. District Court in Massachusetts has ruled that Ocean Wind 1, given its progressed status, is exempt from the dispute between Siemens Gamesa and General Electric. We're pleased with that ruling, since it lets us take an important step forward in advancing Ocean Wind 1 on schedule. At our Sunrise Wind and Revolution Wind projects, we're continuing to develop the 2 projects alongside our JV partner, Eversource. With almost 30 gigawatts of firm capacity — half already installed and the other half either under construction or awarded — we're well on track to meet our ambition of 50 gigawatts of installed capacity by 2030.

Mads Nipper

executive
#14

Moving to Slide 8, here's a quick update on where offshore wind stands. As you probably know, we decided to sit out Taiwan's third auction round. The combination of low prices, cost pressure from inflation, and difficult framework conditions meant we couldn't make a value-creating project work, even though many of our colleagues did fantastic work. If developers keep building projects that don't make financial sense, investment in the green transformation will ultimately come to a halt. That challenge is far larger than the fact that we missed out on a project we would have liked to build. I believe our constructive dialogue with the Taiwanese government will carry on, and that we'll find good investment opportunities in Taiwan going forward, which would let us help the country reach its net zero ambition. In the Netherlands, we're still waiting for the result of the 1.5 gigawatt Holland Coast West tender, which we entered a bit before the summer. Since the start of the year, political backing for renewables build-out has grown around the world, as shown by the U.S. target of 30 gigawatts of offshore capacity by 2030, the North Sea goal of 65 gigawatts of offshore capacity by 2030, and the 20-gigawatt offshore wind target for the Baltic Sea by 2030.

Mads Nipper

executive
#15

Efforts to genuinely make a difference toward a planet powered solely by green energy are underway across every region. And to meet all those renewable targets, we must speed up construction, concentrating on quicker and simplified permitting procedures, which remain a significant choke point for our sector today. We need greater clarity regarding when auctions and tenders will occur, along with more attention to the value renewables deliver in order to ensure the industry builds out sustainably. Upcoming auction design ought not to rely on price alone; it should consistently incorporate elements such as efficient integration into the energy system, biodiversity, and nature restoration that benefits local communities. That is no simple task, and it demands an entirely new approach to offshore wind and power to X development and delivery. As the biggest and most seasoned offshore wind developer globally, we stand ready and eager to advise, engage, and invest. With that, I'll pass the financials over to you, Daniel.

Daniel Lerup

executive
#16

Thanks, Mads, and good afternoon, everyone. I'll begin on Slide 9 with the EBITDA for Q3 2022. At group level, we achieved an EBITDA of DKK 12.3 billion, including new partnerships. New partnerships tied to the 50% farm down of '22 delivered a gain of DKK 9.3 billion. If we set aside new partnerships, our EBITDA matched Q3 of last year, coming in at DKK 3 billion. That figure, though, carries a DKK 1.2 billion negative effect from IFRS 9-related ineffective hedges, which will lift EBITDA in future periods. Once those temporary IFRS 9 adjustments are excluded, group EBITDA stood at DKK 4.2 billion, 40% ahead of last year. In offshore, wind speeds came in slightly above Q3 2021 yet were well under the normal level for the third quarter. That gave a positive impact of roughly DKK 0.2 billion versus last year, while wind speeds below expectations produced a negative impact of DKK 0.8 billion from volume-related overhedging. The negative impact stemmed from hedging our expected offshore production, which did not materialize, largely because wind speeds fell short of expectations. Since production came in below expectations, we needed to buy back the overhead volumes at notably higher market prices, which weighed negatively on our accounts.

Daniel Lerup

executive
#17

Also, as I just mentioned, we’ve recorded a negative effect of DKK 1.2 billion from IFRS 9 tied to hedges that are ineffective. I want to stress that these IFRS 9-related adjustments do not affect cash flow and concern hedges that are ineffective from an accounting standpoint under IFRS 9. At the portfolio level, the total value from trading connected with executing our hedges is still positive. To adjust to the unprecedented conditions in the energy market — with power prices extremely volatile and rising significantly — and to reflect better what our business looks like today, we are currently reviewing our hedging framework. Moving forward, we will lower hedging levels and shorten the horizon so as to minimize the risk of unintended adverse hedging effects later on. Historically, our hedging framework has served us well, since it gave us stability and earnings visibility. Yet we have seen material effects on our financials when we did not produce power at the levels we had forecast at the time we hedged production. Putting this framework in place will take time. And although we have not entered into new power hedges since late 2021, we are still close to fully hedged in offshore for 2023.

Daniel Lerup

executive
#18

If prices stay elevated, we'd anticipate that offsetting effects will keep showing up in the portfolio, and so the risk to our overall financial performance remains low. Once our updated hedging framework is finalized, we'll share the final details. At our remaining offshore sites, earnings rose DKK 0.5 billion, powered by ramp-up generation at Holse 2, higher realized power prices on one side of German CFDs, and value-creating market trading activities. Across our existing partnerships, earnings grew DKK 0.4 billion versus last year. That gain came mostly from construction work carried out for our partners at the Greater Changhua 1 project. Moving to the onshore segment, where earnings more than doubled to DKK 867 million. New assets in operation drove this substantial increase, along with higher power prices in the U.S. and Europe. In the U.S., we gained from elevated power prices during the ramp-up phase of assets under construction, where PPAs did not begin until commissioning. On top of that, several of our more recent PPAs carry upside-sharing structures that permit extra revenue capture when prices are high. In Bioenergy & Other, earnings climbed 53%, lifted by substantially higher earnings from our combined heat and power plants.

Daniel Lerup

executive
#19

Profits from our combined heat and power plants rose more than threefold, driven by increased power prices and condensing power generation. That gain was partially counterbalanced by reduced earnings in our gas and market infrastructure operations, largely because of the favorable impact last year from renegotiating gas purchase contracts. Moving on to Slide 10, we'll cover net profit, ROCE, and equity. Net profit for the quarter came to DKK 9.4 billion, which includes the gain on the 50% farm down of ALCI. If you strip out that farm-down gain, net profit was approximately 0, lower than the prior year's net profit, reflecting greater depreciation as more assets are now in operation. Return on capital employed reached 24%, up versus last year, supported by higher EBITDA across the 12-month period. Equity at the close of September stood at DKK 54, versus DKK 79 billion 1 year earlier. That decline stemmed from unrealized losses in the hedge reserve tied to power hedges, caused by the substantial rise in prices. As of the end of September 2022, the post-tax hedging and currency translation reserve totaled DKK 66 billion. Higher future revenue from the underlying assets will offset that reserve once the contracts enter delivery.

Daniel Lerup

executive
#20

Roughly 58% of this hedge reserve will have materialized by December 2023's end, and as a result, our equity is going to rise steadily once more. Moving to Slide 11, let's look at cash flow, net debt, and our credit metric. Net debt came in at DKK 45.7 billion, which is DKK 4.3 billion higher than at the close of Q2. Cash flow from operating activities took a significant hit from a net cash outflow tied to temporary collateral postings, which totaled DKK 18.4 billion. As of the end of September, we had DKK 30.6 billion in total posted as collateral payments, and while these weigh on net debt, like the hedge reserve I mentioned earlier, they are temporary effects that will unwind over time. Gross investments for the quarter came to DKK 14.4 billion, driven mainly by what we invested in constructing offshore and onshore projects plus the acquisition of Ostwind and Ford Ridge. We brought in DKK 26.5 billion from the farm down of Hornsea 2, and exchange rate adjustments -- from a weaker pound -- had a negative effect of roughly DKK 1 billion. FFO to adjusted net debt, our key credit metric, was 35.3% for the 12-month period that ended in September 2022.

Daniel Lerup

executive
#21

That level came in lower than a year earlier, and the reason was greater net interest-bearing debt, though that was partly offset by larger funds from operations. So that we match the methodology the credit rating agencies apply, we've changed how we define FFO to adjusted net debt. Under our FFO definition, variation margin payments are now excluded, and in the adjusted net interest-bearing debt we have left out other interest-bearing debt as well as other interest-bearing receivables. To keep periods comparable, we restated the credit metrics for 2022 and 2021 to match. Calculated under our earlier method, the credit metric would be 6% for 2022 and 42% for 2021. Moving to Slide 12, I'll walk through where our liquidity stands right now. Over the quarter, collateral we must post on the exchanges kept rising, largely because power prices went up. By the end of September, we had posted 30.6 billion in collateral in total. So that we hold enough liquidity to handle possible additional collateral payments through the winter and to keep investing in the green transformation, we've launched several initiatives aimed at strengthening our liquidity reserve. In September, we issued green bonds denominated in sterling and euro with proceeds equivalent to almost DKK 15 billion, set up a new 2-year syndicated RCF of around DKK 15 billion, and raised existing 2-year committed bilateral credit facilities by an aggregated amount of DKK 9 billion.

Daniel Lerup

executive
#22

On top of that, the 50% farm down of Hornsea brought us total proceeds of DKK 26.5 billion. Our liquidity reserve was at 88 billion as of September 30, 2022. Given that energy prices are stabilizing, and with maturing energy hedges set to gradually lower our collateral exposure, we'll look at bringing our bilateral facilities down toward more normal levels over the next few quarters. We keep a constant watch on how the energy markets are developing, and we'll go on holding a healthy liquidity reserve, which includes being able to tap additional liquidity at short notice if we see significant upward pressure on energy prices again. Even with these very volatile markets, our strong balance sheet and liquidity position give me confidence. There's no change to our financial policies, and we remain committed to our ambition of raising the dividend by a high single-digit rate versus the prior year's dividends for the period through 2025. Moving to Slide 13, which gives an overview of our debt portfolio. As I said, we have secured extra financing to bolster our short-term liquidity needs and to fund our continued build-out of renewables. At present, our debt portfolio is one in which bonds account for roughly 70% of our debt financing, with the rest split between bank loans and hybrid securities.

Daniel Lerup

executive
#23

Regarding debt, I want to emphasize that our debt position remains stable, since over 95% of our bank and bond portfolio carries fixed interest rates. With such a heavy weighting toward fixed rates, our funding costs remain comparatively low even in this high-interest-rate environment. Consequently, our present debt portfolio has only limited exposure to rising rates, and the maturity of our portfolio — sorry, it does not call for refinancing existing bonds until 2026, though we do anticipate financing needs tied to our ongoing growth investments. Moving to Slide 14 and our nonfinancial ratios: in Q3 2022, the taxonomy-eligible portion of our revenue stood at 73%. OpEx accounted for 80%. EBITDA was 92%, and gross investments made up 99%. The non-eligible remainder of revenue is mainly linked to our long-term gas legacy operations and power sales that are non-eligible. The green share of energy reached 92%, versus 89% in the same period a year earlier. That change stemmed chiefly from additional wind and solar farms being in operation, along with stronger wind speeds. Because the Danish authorities have instructed us to keep SBI Power Station running and to restart operations at Stuart Power Station and the Kunpeakloa plant, this will adversely affect our green share of energy and our taxonomy-eligible KPIs, particularly in '23 and '24.

Daniel Lerup

executive
#24

Since the order calls for us to run the units through June 2024, our aim of reaching carbon neutrality in 2025 stands. Moving on to safety. There has been a discouraging development: the total recordable injury rate for the first 9 months of 2022 is 3.3%, versus 3.0 in the first 9 months of '21 — a rise of 15% relative to the same period last year. That increase stemmed from more recordable injuries among contractors and employees, partly offset by a slight decline in recordable injuries for our own employees. We are definitely not pleased with this adverse trend, and several initiatives have been put in place to improve safety. Among them are greater leadership involvement and interventions, safety stand-downs, and targeted safety campaigns on specific issues. To make sure these initiatives work, management sponsors them and they are updated weekly. Our efforts to cut the number of work-related injuries will continue, and we will ensure the safety of all our employees and partners. Last, let's go to Slide 15 and the outlook for 2022. As Mads pointed out at the start, we raised full-year 2022 EBITDA guidance by DKK 1 billion, to a range of DKK 21 billion to DKK 23 billion.

Daniel Lerup

executive
#25

The outlook for the rest of this year is based on typical wind conditions. Potential political moves, like price caps or windfall taxes, aren't factored into our guidance. On gross investments, we brought the guided range down by DKK 5 billion, to DKK 38 billion to DKK 42 billion, because of timing effects on projects where spending in 2022 will be lower than we first planned. Our long-term financial targets still feel comfortable to us. With that said, let's open it up for questions now. Operator, please?

Operator

operator
#26

With the operator's instructions noted, the first question today is from Alberto Gandolfi, who is with Goldman Sachs.

Alberto Gandolfi

analyst
#27

Starting with interest rates and returns, and if we look at Slide 7, could you share what share of those projects have funding costs locked in already? Then, for the ones where funding costs aren’t secured yet, since the top line is already known, do you still expect an IRR above WACC — in other words, a positive one? Also, could you update us relative to the original guidance of 100 to 300 basis points? And is there some threshold below which you might not proceed with certain projects? One of your competitors in the United States, in Massachusetts, has essentially been seeking a renegotiation because the economics don’t really work otherwise. So I’m just trying to assess how profitable your backlog is, and any color would be very helpful.

Mads Nipper

executive
#28

Thank you very much, Alberto. Perhaps I'll begin somewhat in reverse on your question, since I suppose it has several dimensions, and then Daniel can address the funding side. Still, I'd say it's a fairly wide-ranging question, Alberto, because as you're aware, we don't provide commentary on returns tied to specific assets or projects, yet those returns differ greatly in that certain ones will include revenue lines indexed to inflation. A number of them are more advanced, while others remain comparatively early-stage. So the question stays quite broad. More specifically, though, as we've mentioned on a few occasions, the recent developments clearly haven't benefited the nearer-term projects. That's also the area where we keep turning over every stone available to us, which includes securing stronger top lines for those projects so that they improve. Still, it's difficult to state that, yes, naturally, we will only take FIDs on projects that can be defended. Yet at present, our portfolio — together with the project portfolio locator projects, given the current outlook — remains one we are committed to. Danny, perhaps on the funding — if you have anything to add there.

Daniel Lerup

executive
#29

Yes, absolutely. So, as you’re aware, Alberto, project financing isn’t something we do. Our method for funding through debt operates at the portfolio level, and you’ve got the figures for our overall debt size — so essentially, it boils down to how advanced the individual projects you mention on Page 7 are. And here, as you know, we’ve made quite a lot of progress on Greater Changhua, since we’ll reach COD there next year. We’ve also begun construction on the German portfolio, and beta has moved forward, along with the remaining assets currently being built. So it really comes down to financing the awarded portfolio. And at this stage, we remain in our development phase. So naturally, we’ve already spent some capital on these projects. But naturally, the bulk of the CapEx comes after FID. So that’s when we’d need to go out and begin funding those projects. However, we’ve already secured interest rate exposure for a portion of the CapEx tied to our near-term development pipeline, amounting to roughly DKK 60 million to DKK 70 billion.

Operator

operator
#30

The next person to ask a question is Casper Blom, who is calling in from Danske Bank.

Casper Blom

analyst
#31

There's a question here that also kind of grows a bit regarding interest rates, and around interest rates and WACC and so forth. But I was somewhat surprised to see your farm down within onshore in the U.S., and I found it very positive that you mention 100% NPV retention there. So does that mean we should begin to see additional onshore farm-downs? I mean, if you're able to achieve 100% NPV retention, isn't that an attractive and favorable route to take? And speaking of farm down, last quarter you provided an update on the possible next farm-down in Taiwan, saying there was still solid interest and that price levels were more or less unchanged. Is that still true?

Mads Nipper

executive
#32

Yes. Thanks, Casper. You're completely right. I mean, we're really pleased with the onshore farm down we completed involving the 4 assets. And by the way, that was also the first portfolio farm down we've ever done, though not at an asset level. So the straightforward response to that question is yes, this is certainly something we'll consider. And if we're able to retain that kind of NPV, which we've got no reason to think we couldn't, then this is definitely another key tool in the toolbox for financing growth. I don't believe there's any news regarding the interest in our farm down in a potential upcoming farm down in Taiwan.

Daniel Lerup

executive
#33

That farm-down process is getting underway gradually. Our team has actually been over in Taiwan, visiting to get some initial sense of where investors stand, and the feedback coming back to us there has been positive. So from what we can see at the moment, all of it is proceeding as planned.

Mads Nipper

executive
#34

So there's nothing new relative to what we shared on the previous call, Casper.

Operator

operator
#35

Vincent Ayral from JPMorgan has our next question.

Vincent Ayral

analyst
#36

Yes. One more thing, again, about returns as interest rates climb — obviously, renewable costs are rising. And we're seeing that with companies like Vestas and with manufacturers too, and we recognize prices are increasing 15%, 20%. So financing costs are climbing. What I'd ask is, your spread for your investment criteria — could you shed some light on how you're adjusting to this shift, so we can better grasp how value creation is evolving across your pipeline?

Mads Nipper

executive
#37

Absolutely — and thanks a lot, Vincent. Regarding the standards we apply when we go after new projects: at the bidding stage, we hold to that. The margin over wage is still a spread of 150 to 300 basis points. That's plainly what we're aiming for, so nothing there has changed. And that's exactly why we're making a forceful case that, in today's conditions, there has to be recognition — regulators need to recognize — that the pressure cannot fall solely on pushing prices lower and lower, since inflationary forces are at work and the cost of capital does rise. So, as Daniel laid out earlier and as he did in response to the very first question I was going to pose, clearly the area where we're struggling right now is our projects that have already been awarded but have not yet reached FID. That is where the difficulty persists. For the incoming projects, though — and this is partly why we decided against bidding in Taiwan — we are factoring that in actively as we bid, and we are still aiming for 150 to 300 basis points.

Vincent Ayral

analyst
#38

My question was a bit different, though. I get what Alberto asked earlier—that's the case where your top line is locked and you're not in your financing, so you could be facing a squeeze. What I'm getting at is this: if you maintain a spread of 150 to 300 over the WACC, and the WACC is rising, then value creation is the ratio within the 2. So that ratio is falling. So will you revise your investment criteria on stage? Do you expect the entire industry to widen the spread over WACC in absolute terms, so that in relative terms it stays at the same level of value creation?

Mads Nipper

executive
#39

Are you asking about the process when we submit bids for new projects, or are you referring to all media projects that have already been awarded?

Vincent Ayral

analyst
#40

For projects down the road, if your WACC spread is 200 bps — say you're at 4 and the work moves to 6 — then you should, or if the spread on a piece of work exceeds 200 bps, that's what it takes to generate the same amount of value.

Daniel Lerup

executive
#41

Yes. So I think that whenever we go into new auctions, we refresh our WACC, and then we ensure that in bidding into a new auction, we obtain the spread over WACC based on that updated WACC. For the portfolio of projects that have been awarded, as you mentioned, on certain of them we have more or less fixed the top line, and some of them carry an inflation indexation. But you will, of course, observe that as wax rises, you are eroding the spread to WACC. And that is precisely why we are, of course, working hard with the awarded portfolio to make sure we optimize the value in those projects so that we do what we can to keep the spread to WACC. But it is, of course, a challenge when you have both CapEx rising and also the cost of funding. On the other hand, we are also seeing good developments on the regulatory side, for instance with the IRA, which is, of course, a big positive for our U.S.-awarded portfolio. So we have things moving in different directions, but of course, with interest rates rising, that is, of course, something that is hurting our spread to work.

Mads Nipper

executive
#42

Just to be clear, on anything we bid into going forward, we want — if the RAC rises, then we need to see our IRRs rise correspondingly so the same spread to WACC is achieved. That's our clear — that's a commitment we're giving.

Operator

operator
#43

The next question we have is from Deepa Venkateswaran, who is with Bernstein.

Deepa Venkateswaran

analyst
#44

I guess I have one straightforward question about your collateral and net debt. So, Daniel, you said there's 30 billion locked in collateral at the moment. If I understand correctly, the way you present your ratios, net debt still isn't offset by the receivables from collateral. So when you deliver power, you should get back a substantial portion of that as soon as next year — I believe around 60% based on earlier discussions. Can you confirm that? And second, if you mark to market today, I mean, some commodity prices have declined, so the collateral level has probably fallen. Could you tell us by how much?

Daniel Lerup

executive
#45

Correct. That roughly DKK 30 billion of collateral is, you could say, a drag on our net debt. And if prices remain where they stood when we produced the Q3 numbers, you would see approximately 15% of it run off toward the end of the year and rise to 60% by the end of 2023. We have, however, seen prices come down a little since the close of Q3. So we've likely gotten back a bit more than a handful of billions in collateral. So we're probably more at around DKK 24 million, DKK 25 billion in collateral right now, and that's, of course, a figure that changes every day. But it is going down.

Deepa Venkateswaran

analyst
#46

That ought to ease part of your funding requirements, correct? Since once you have the collateral bank in place, there's no need to return to the market and issue new debt. So this will help as well, including with the funding we talked about earlier.

Daniel Lerup

executive
#47

Yeah, it will. And at the moment I also see our liquidity reserve of approximately DKK 90 billion as fairly conservative. But of course, we're also heading into a winter where predicting precisely what will happen is difficult, so it's better to err on the conservative side. Still, as we move through the winter and, of course, as more and more hedges settle, we'd expect to reduce that liquidity reserve.

Operator

operator
#48

Robert Pulleyn from Morgan Stanley has our next question.

Rob Pulleyn

analyst
#49

I want to apologize — my question is a bit muddled, sorry about that. Still, when we look at the updated 2022 guidance you've issued, can you help us get a handle on how much in overhedging losses and incremental IFRS 9 accounting you've built into 4Q within the outlook you provided today? Obviously, those are the 2 dynamics that weren't well understood or anticipated when the year began, and they've been a drag across the last couple of quarters. The macro backdrop points to those improving. So some clarity on what's actually baked into guidance would be great.

Daniel Lerup

executive
#50

Yeah, what we're anticipating is that about DKK 0.5 billion is going to run off as we get toward the close of the year.

Mads Nipper

executive
#51

Also, just for context, Rob — I can mention that October's wind speeds came in a bit higher than usual, which is a pretty encouraging way to begin the quarter.

Rob Pulleyn

analyst
#52

My apologies, Daniel — I just didn't catch that. Was it an additional 0.5 billion in cost, or 0.5 billion less? Sorry, I didn't quite follow.

Daniel Lerup

executive
#53

That's essentially the runoff of the 1.5% temporary negative IFRS 9 effect sitting in our accounts right now. So once that largely unwinds, our EBITDA will get a lift. And that 0.5 billion figure relies on forward curves as of the end of September.

Operator

operator
#54

Peter Bisztyga with Bank of America has our next question.

Peter Bisztyga

analyst
#55

I'd like to build on what Deepa asked about net debt, if I may. So you have, I believe, 30 billion of collateral that could potentially come back to us across the next 2 or 3 years. And in the 9-month cash flow statement, there was roughly an 11 billion negative swing from derivatives and then about another 10 billion of negative working capital movement. What I'm curious about is whether that 20 billion combined is also something we should look for to reverse over the quarters ahead. Any clarification on that would be much appreciated, please.

Daniel Lerup

executive
#56

I can't quite tell if you mean the change we're seeing between Q2 and Q3, but that's just under DKK 20 billion in additional collateral. And about 60% of that should come back toward 2023.

Peter Bisztyga

analyst
#57

Right. I mean, if you look at the cash flow statement in your quarterly report, the change in derivatives within cash flow from operating activities comes to roughly 10.8 billion actually across 9 months. Is the collateral included in that? Is it on top of the glass is not entirely clear? Maybe we take that offline.

Daniel Lerup

executive
#58

The derivatives movement reflects variation margin, and the initial margin sits within the change in other payables.

Peter Bisztyga

analyst
#59

And apologies — maybe just touching on working capital. I mean, clearly, we've seen some significant working capital swings during the year up to now as well. Should we expect that to reverse, or is it something that will keep building? Typically, a substantial portion of our working capital comes from our Opto assets. So that's naturally something that will shift once we divest the off-core asset, and going forward you'll also see that when we, hopefully, FID hold C3 at some point, that will be building off as well.

Operator

operator
#60

The next person to ask a question is Mark Freshney with Credit Suisse.

Mark Freshney

analyst
#61

Turning to the U.K., which by my figures accounts for roughly half of your enterprise value. If you go by what's in the press and talk to the Energy Ministry, the government is proposing measures that in effect add up to expropriation of, in particular, some of the older VOC assets that you put money into in good faith. Obviously, the CFDs enjoy enormous protection under the agreements you hold with the government, and you have independent arbitration rights. They're very well protected. The ROC assets, though, are a massive letdown. And given that, I think a number of investors are taken aback that you haven't been more forceful about possibly withdrawing spend from the U.K. when it comes to Hornsea 3 — because not moving ahead with FID, since existing assets have, in my view, been expropriated, would look like an entirely rational reaction. So why aren't we hearing tougher language on Hornsea 3?

Mads Nipper

executive
#62

Thanks, Mark. The U.K. is clearly still a very important market for us. And I would — I think saying it could be preparation is going too far, because first, on the ROG assets, we've heard nothing suggesting the ROG share would disappear. Then there's speculation about whether it would be this kind of price cap or whether it would essentially be a windfall tax. As we said already, we're in fairly intense talks, both with base and with the treasury, to make sure this is done in an intelligent way. And if it turns out to be something where we would actually convert the rock assets into CFD, that could be something of mutual benefit. That's probably not the most likely outcome in the short term. But we also hear — and we probably — I mean, we don't have anything firm because the market dialogue hasn't officially happened yet. But it really depends on where such a price would end up, because the variation in which we've heard those levels could be is very, very big. So we think it would risk being counterproductive if we <<inaudible>> threaten not to take FID on Hornsea3 before we have anything firmer on how attractive a measure would be, whether that's a price cap, whether that's conversion to froth CFD or whether that's a windfall tax.

Mads Nipper

executive
#63

As I mentioned, though, we're engaged in fairly intensive discussions with both ministers.

Operator

operator
#64

Jenny Ping from Citi has our next question.

Jenny Ping

analyst
#65

I want to circle back to a point you made earlier about the U.S. So if I'm hearing you right, you're basically saying that only value-creating projects will get investment, which in effect means there's a risk you won't reach FID on certain projects, since some of your peers in the U.S. have described projects as not viable. And on that same note, PSEG has spoken about reaching final decisions on Ocean Wind 1. Can I just confirm what your plan B is should they not move forward with it? And then, returning to the 60 billion to 70 billion mentioned in the initial question, the first question that was asked. Could you just -- I didn't catch what those figures referred to, which projects you just called near-term projects, which projects exactly have you locked in interest rate exposure for.

Mads Nipper

executive
#66

Thanks, Jenny. I believe the response is essentially the same: the returns on our U.S. projects, Ocean Wind 1 included, are not at the level we'd like. Even so, we keep examining those options. And as we've mentioned before, I think, we're also in talks about possibly having the largest possible portion of the IRA benefits flow back to us. So it's just too early to make any statement. Because of that, we stay committed to these projects. We're not in a position of saying this is something we'd no longer get behind — we still believe a value-creating path exists here. I can't share specifics of the discussions. They're confidential in nature, and they're handled case-by-case for those projects. But this is something we clearly monitor closely and discuss with the PSC. We're coordinating closely with them as they develop their thinking, both regarding Ocean Wind 1 and, as I noted on Monday's call, regarding a possible investment in Oceanwide Skipjack 2.

Daniel Lerup

executive
#67

Regarding your second question, the figure I cited was DKK 16 billion — that's 1-6 — up to DKK 17 billion, or 1-7, which we had secured via interest rate swaps covering our near-term U.S. development projects, namely the Northeast portfolio and Ocean Wind 1.

Operator

operator
#68

We’ll take our next question from Kristian Godiksen, who is on the line from SEB.

Kristian Godiksen

analyst
#69

My question is about the Danish open-door projects. Could you elaborate on the milestones and approvals and so on that are needed to reach FID? And also, to clarify, you said you intend to build transmission as well. So will that transmission be yours long term? Or will you have to divest it at some later point — what's the model on transmission?

Mads Nipper

executive
#70

Yes. Thank you for asking. The — it's still — this is clearly at a very early stage, obviously, but we genuinely hope, and we have solid confidence, that a real route exists toward faster consent and approval here. And as we've mentioned, this might actually be something that could be — the first commissioning could happen as soon as 2027, 2028, which would basically coincide with, or come sooner than, the first centralized tenders — or the centralized tenders coming up — in Denmark that have already been awarded. So what comes next would basically be that the Climate Ministry would have to approve the projects. So they've cleared the hurdle with the DEA and the legal hurdles for that. So, because of that, the project so far — they are viable, but a ministerial approval is required, and we believe there are very good chances with the nations. And in this case, the world's biggest offshore developer, and one of the world's biggest, going together. But that's what it would take to get through, and we could see that arriving as soon as within the next 2 to 3 months. When it comes to the transmission assets, the honest answer is I simply don't know.

Daniel Lerup

executive
#71

And obviously it's still early to tell, but we anticipate that building and investing in the transmission asset would fall within the scope. As for ownership down the road, I'd say it's premature to say how we'll approach that. That said, this is a large portfolio of projects. So naturally, our thinking could be that it would make sense not to have too much capital tied up in it.

Operator

operator
#72

Up next, we have a question from Louis Boujard, who's with OVH.

Louis Boujard

analyst
#73

Sure, I actually have a question about hedging, and more specifically about something you mentioned in the presentation. I believe you said that for the offshore business, you'll stay almost fully hedged in 2023. You also mentioned that you expect to keep seeing an offsetting effect on the portfolio next year. I'm struggling to see where that would come from. Because if it comes from wind, well, for next year it's a little early to know what wind conditions will do. So should we assume it would come from IFRS 9 and the proxy hedge? And if so, could you maybe quantify how large that potential offsetting effect might be for next year's earnings in the Offshore division?

Daniel Lerup

executive
#74

Yes. So what I meant is this: looking at the offshore wind business, by the end of 2023 we're nearly fully hedged against P50 production. However, at the portfolio level, once you factor in onshore and the combined heat and power plants as well, then naturally we sit below that 100% — roughly 70% to 80%. Still, that doesn't alter the fact that offshore carries a high hedge, and within that segment specifically, low wind speeds would mean we'd need to go out and purchase hedges. With high wind speeds, we'd instead be selling into the market at whatever merchant prices prevail at that moment.

Mads Nipper

executive
#75

So to make it — to try to make it perhaps even clearer, Louis, what Dani and I are saying is that through next year, or until we get near the end of 2023, there's still a risk of an earnings mix similar to what we've seen this year, where we have higher earnings on onshore and on Bioenergy and comparatively lower ones on offshore, if that happens, if production is lower and prices are elevated. So that's why, when it comes to the overall risk profile on our earnings next year, we view it as very low. But the risk next year of a mix where we still have 1 more year where our earnings sit below what we could call the natural level, especially for offshore, is still there. Depending especially on the wind, because the wind really is the risk to that. But past 2023 — that's also why we mentioned in the presentation that this is where, when those hedge levels, due to our — to the fact that we aren't rolling our head is now and we will implement a new hedging framework, then we'll return to not only high but also stable — a high and stable earnings level for the group, but also much more predictable and high for offshore specifically.

Mads Nipper

executive
#76

That's exactly our point. At the group level overall, the risk is low, though the mix of earnings remains a risk that might shift next year. But by 24 and beyond, that risk will be considerably lower, if that makes sense.

Operator

operator
#77

And moving on, our next question is from Lars Heindorff with Nordea.

Lars Heindorff

analyst
#78

There's also a question about hedging. Dan, I believe you mentioned early on that the hedging framework will be changed, meaning shorter and fewer hedging periods going forward. And just conceptually, I wanted to ask how that fits with your ability to — you can't say guarantee, but your goal of getting to the 150 to 300 basis point spread between IRR and WACC going forward. Will that raise the risk on future projects, since you can't lock to them?

Daniel Lerup

executive
#79

No. Again, these assets are extremely long-lived, with earnings stretching across many years and decades. So hedging that case isn't the main thing that defines the spreads. So I wouldn't expect that, and in situations where we do have merchant exposure, we would also look at still corporate PPAs as produced PPAs, where you aren't exposed to volume risk the way you are with financial hedges.

Mads Nipper

executive
#80

Yes. So the way we look at it, keeping a really large portion of revenue either contracted or regulated is still our plan. In any typical year, we remain at roughly 90%. And we'll keep doing what we did with Hans on CFD-style contracts — and where merchant volume exists, if attractive PPAs can be secured, we'll keep pursuing them. So this is something that we, at group level and across our investments, genuinely don't see — this approach and the hedging staircase — as materially affecting the predictability of our earnings in any way.

Operator

operator
#81

We’ll take our next question from Deepa at Bernstein.

Deepa Venkateswaran

analyst
#82

I’d like to pull back for a moment and talk about the partnership you announced with CIP covering 5 gigawatts of projects. Could you walk through how that arrangement might function? And what would you require in order to reach FID on those projects? Is it green hydrogen, or something else that’s needed? More broadly, do you see that kind of thing available in countries outside Denmark as well, where you aren’t competing for the sale back leases ?

Mads Nipper

executive
#83

The line was a bit unclear there, Deepa. But I think what we need — clearly, for the question that came before — is to secure the ministerial approval allowing these projects to be built. Then we'd be looking at the mix of what can be fed into the grid, and also because there are sizable power-to-X projects being planned in Denmark today. Some of them we're involved in, some are by ship, and some come from third parties. So we would, of course, work with potential offtake from those major projects, including what that would mean for the predictability of earnings and so on. All of that would go into the calculations of the business case, which would need to be quite solid before an FID. So it's about talking to our TSO regarding what — how much can and should go into the grid — what — are there any PPAs that can be meaningfully strong, and then potentially most — our highest potential here, what agreements can be made to feed the power to X projects that are already being planned or could be planned, knowing that this green power would get there for sure.

Deepa Venkateswaran

analyst
#84

And when you notice that pattern elsewhere, is it because securing seed leases that way could be simpler or less costly?

Mads Nipper

executive
#85

Yeah. Beyond making sure, frankly, that the Danish government is quite at ease with our 2 companies proceeding jointly on these open-door projects, that's one of the aims. And take Germany — the German government has said already that a significant chunk of open-door projects will be theirs — and if other governments, particularly across Europe, can observe the Danish government, with backing from our 2 companies, moving forward quickly, then we're hoping this opens considerably more doors, so to speak, for these open-door projects, not just in Denmark but especially in Germany, and potentially in other countries too. So we regard it as more than merely a Danish undertaking — rather, as something that could be a sort of foot in the door for speeding up open-door products in Europe, where consenting and planning the centralized tenders, unfortunately, remain too slow.

Operator

operator
#86

The next person to ask a question is David Paz from Wolfe Research.

David Paz

analyst
#87

I've got a question, and it actually has 2 parts, both about the U.S. First, roughly where do returns stand for the Northeast and Ocean Wind projects? Would you put them at the low end of the 150 to 300 basis point spread? I know you've said they're under pressure, but just give us a sense of where things sit. Then the second part: now that we have IRA, the Inflation Reduction Act, what uplift do you potentially see, both offshore U.S. and then onshore U.S.?

Mads Nipper

executive
#88

Thanks, David. We’re not able to comment on the sort of return levels for individual projects. But they are — as we’ve noted previously, they are — neither of the 2 projects you brought up is at the stage where we want them to be, which is why we keep working on those returns, including top-line measures. But that’s as close as we can get to it. As we — like we said last time, after Q2, we said that the sort of for our offshore projects, we were looking at, depending on what project is sort of a meaningful double-digit number of bps in business case improvement. But there are so many moving parts, still including also, obviously, the interest rates, and therefore, the WACCs that this is something that we are working on very, very tightly to ensure that we do what we can to improve the cases. But I, unfortunately, can’t get any closer. But — and what we do say is just to maybe add a quick comment on onshore that through the PTC improvement and extension. This is something where we also see significant improvements of onshore. And just commenting on onshore, which is one of the reasons why that is — remains attractive is that we both have a clear site of improvements due to the IRIA.

Mads Nipper

executive
#89

And yet, on both sides of the Atlantic, because onshore deals are shorter-term in nature, we're watching PPAs keep climbing — really rising along much the same trajectory as inflation, which we keep observing across the various areas, from the turbines, for instance. So returns remain whole, perhaps even better for onshore as of late, and that's exactly why those investments continue to look very appealing.

Operator

operator
#90

Vincent Ayral from JPMorgan has the next question.

Vincent Ayral

analyst
#91

Yes. A really quick follow-up on the hedging side. Typically, utilities tend to begin the year at 80% hedged. You're saying that for offshore wind, you're already fully hedged for our P50 for 2023. And you've known since the start of the year that pulp poses were extraordinary, and you were buying back at a great expense delay on Hornsea 2. So what's the reason we end up at this point where basically we're still over hedged on offshore wind specifically for next year? And I'm just struggling to understand what led us here. Any color on that would be welcome.

Daniel Lerup

executive
#92

Yes, and of course I get that question. The reasoning here is that for over a decade we've used a 5-year hedging staircase, and in the first 2 years our hedge percent has been very close to 100%. When we began seeing volatility in power prices at the end of 2021, we stopped rolling that hedging staircase, because we knew we ought to lower our hedge level in a volatile market so that we'd do whatever we could to avoid having to buy back very expensive hedges. So our question to ourselves at that point, when power prices started to rise, was — we of course didn't know power prices would climb that significantly. So we of course had an internal discussion about whether we should lower the hedge level in the front 2 years. But here, had the power price not risen that significantly, we probably would have brought it down further. That's one thing, but we've kind of gotten caught in this very steep rise in power prices. And two, this concerns the offshore part of our business.

Daniel Lerup

executive
#93

We also have onshore assets, plus combined heat and power plants, which give us longer power exposure even in these near-term years. And if you look at the whole portfolio together, we're closer to — out of that remaining 10% of merchant exposure across the company, our hedged portion is only about 70% to 80%.

Vincent Ayral

analyst
#94

So what hedge level are you aiming for going forward? I mean, 100% or 90% of the P50 is likely too high. Last year we saw wind volumes come in materially below normal. So where do you want your hedging to be going forward? Even if getting there takes a few years?

Daniel Lerup

executive
#95

Yes. So, as I mentioned before, we'll return with additional details on that. But one point is quite evident in this highly volatile market for power prices: we'll have both a reduced hedge percentage and a shorter time frame for hedging, at least where the offshore portion of our business is concerned. Keep in mind, though, everything we're discussing here applies solely to the remaining 10% of our earnings. The initial 90% of our earnings comes on a regulated long-term regulated or contracted as-produced basis. So the final 10% is the only part we're addressing here.

Operator

operator
#96

Mark Freshney from Credit Suisse has the next question.

Mark Freshney

analyst
#97

On the coal burn specifically — whatever coal combustion is left inside the CHP portfolio is obviously not something we want from an ESG standpoint. My understanding is that you'd targeted halting coal burning, I believe, this year or by the end of Q1. Could you remind us where things stand with that coal burn and when you think you'd be in a position to state that your final ton of coal has been burned, and that it's now solely biomass plus wind and power 2x?

Mads Nipper

executive
#98

Yes, gladly, Mark. You're completely correct. So the 2 boilers we mentioned at KubiandStusto have already been retired — they were out of service. Now, though, they're being called back into operation. And you're entirely right: ESP, the final coal-fired power plant, had been slated for decommissioning by the close of Q1 next year. At that point, we'd be fully done with coal combustion. We will still keep a very — and we'll keep a very, very tiny portion of gas, basically for startup of the biomass-fired power plants and for the emergency-type systems balancing plant we have in Kuni. With the new order we've received from the Danish state, that runs until summer of '24. And we'll — as expected, everyone we've spoken with in Europe anticipates that next winter will be the final potential emergency winter. By then, we'll have, in terms of both LNG, biomass and other sources, we ought to be past that emergency — energy emergency. So we don't expect, and we will — frankly, we'll fight hard against any extension of it — so as we, I think, touched on briefly in the presentation, we remain firmly committed to our carbon neutral and 99% carbon-neutral Scope 1 and 2, including not burning any coal by 2025.

Operator

operator
#99

The following question is from Jenny Ping at Citi.

Jenny Ping

analyst
#100

To pick up where Mark left off regarding coal exposure: have you spoken at all with the clean energy index providers—the people who run those clean energy indices—about how they plan to handle the coal exposure, now that you're either retaining it or keeping it open? Is there a chance of exclusion? Or have you already received an exemption? Any clarity on that would be great.

Mads Nipper

executive
#101

No, I don’t believe we’ve received any kind of exemption from that. Still, I’m fairly confident — because of how temporary it is — that if we can show this is a directive from the Danish state, it shouldn’t end up having a material impact. That said, let’s be sure we follow up on that point specifically and make it available through our IR team, so we can state it with more certainty.

Operator

operator
#102

Peter Bisztyga from Bank of America has our next question.

Peter Bisztyga

analyst
#103

Just a quick question about that recent U.S. onshore farm down — the proceeds work out to under 1,000 dollars per kilowatt, which seems roughly consistent with the CapEx you'd have put into those projects. So there's only a small cash gain in there. Is that right? And if it is, why is it so low? Then, could you repeat the billion figure for the portion of your U.S. pipeline where you've locked in interest rates? I didn't quite catch it.

Daniel Lerup

executive
#104

Yes. So the interest rate swaps tied to the U.S. pipeline come to a bit over USD 2 billion. That's roughly DKK 16 billion to DKK 17 billion, so USD 2 billion. And regarding the onshore piece, I think what matters to keep in mind is that we're retaining — this leaves out the tax equity investment put into the projects. So that is being kept, so to speak.

Operator

operator
#105

There's one more question coming in, and it's from Lars Heindorff at Nordea.

Lars Heindorff

analyst
#106

On your question about expansion: earlier you noted that you're weighing how the tender in the Netherlands turns out, and a few others are also on the way, plus there's still a lot of temps coming up. I believe you've already won roughly 3 gigawatts this year. You've been very specific about your plans, and you've sort of — whether you calculate that you can grow by the 3 gigawatts on a yearly basis without the need for further equity. So if you win more than that, or maybe to put it another way, how many more wins will you be able to cope with without raising equity?

Mads Nipper

executive
#107

Yes. Thank you, Lars. We can actually work that out using the wins, since in principle those projects could carry very different CapEx spending profiles and so forth. So a number of the wins we might secure over the coming years could in fact land quite late, or some could even come after 2030. But here's what we said: on average — and at this point we're speaking specifically about offshore — to reach roughly 30 gigawatts by 2030, compared with the launch of our CMD last year, we would need to lock in an approximate average of 3 gigawatts per year so that construction could be completed in time for 2030. So that is — and yes, you can more or less translate that into the statement that the fully funded plan of approximately 50 gigawatts by 2050 is what we described as fully funded, and it still is. So if we observe a burn rate significantly beyond that, then you're right — it would mean either that we would have to prioritize offshore even more, or that we would need to raise capital. But it isn't the case that you can say, if we, for instance, are fortunate and able to win Holland Coast West, whose outcome we expect within the next few weeks, then that automatically signals that we will require additional capital.

Mads Nipper

executive
#108

You can’t really say that.

Operator

operator
#109

That brings us to the end of the Q&A — no more questions remain. Mads Nipper, over to you for the closing remarks.

Mads Nipper

executive
#110

Yes. I'd also like to say thanks to Daniel for pushing through with a sore throat, and to all of you for the excellent questions. The questions are always excellent, and if anything else comes up, you know our IR team is available to help. Thanks so much. Stay safe, and have a great day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ørsted A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ørsted A/S earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ørsted A/S or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.