Ørsted A/S (ORSTED) Earnings Call Transcript & Summary
January 20, 2023
Earnings Call Speaker Segments
Operator
operatorThanks for joining us on this Ørsted conference call. During the opening portion, everyone will be in listen-only mode. After that, we'll open things up for a question-and-answer session. <<operator_script>>. This call is being recorded. I'm happy to introduce today's speakers: Mads Nipper, our CEO, and Daniel Lerup, our CFO. Gentlemen, go ahead.
Mads Nipper
executiveGood morning, everyone, and many thanks for being on the conference call today. Last night, we released our preliminary, unaudited EBITDA figures for 2022, along with what we expect for 2023. It was a year of unusually volatile market conditions — especially the highly fluctuating energy prices and a considerable rise in inflation — and we are happy to report that we hit our most recent 2022 EBITDA guidance, which actually sits above what we first anticipated for the year. That significant turbulence across the year, however, meant the makeup of our earnings mix came out very differently from what we had anticipated. Our diversified asset portfolio worked in our favor, and we delivered considerably stronger earnings in both Onshore and Bioenergy and other, which benefited from market conditions and beat the expectations we held entering 2022, while earnings in Offshore declined. The unexpected negative trend in Offshore was largely caused by adverse hedge effects and by delays at the Hornsea 2 and Greater Changhua 1 & 2a construction projects. Even with these unusual market conditions and challenges, we reached a record-high EBITDA, including new partnerships, of DKK 32.1 billion — a notable milestone for our business. Likewise, our EBITDA excluding new partnerships came in at DKK 21.1 billion, a record-high EBITDA for the company.
Mads Nipper
executiveIn reaction to the unintended negative effects stemming from our hedges, we've put in place — and are now rolling out — a new framework for managing risk, aimed at cutting down the volatility arising from our hedging instruments and restoring the inherent predictability of earnings that comes from our very high level of contracted and regulated activities. Backing our financial performance is an operational asset fleet running continuously at excellent availability rates and adding to the security of energy supply in every market where we operate. When we reported the 9 months of 2022, we refreshed our full-year guidance for 2022, drawing on the most recent outlook for power prices and weather conditions over the rest of the year. Since that point, unexpected developments have emerged which, as I mentioned, produced a different makeup of our earnings mix. Within Offshore, a number of adverse developments appeared near the end of the year, among them ineffective hedges, overhedging tied to volume, and elevated balancing costs. Beyond that, we encountered additional installation delays at Greater Changhua 1 & 2a. Within Bioenergy & Other, we booked earnings from our gas storage activities that were significantly above expectations and released a provision connected to our B2B business in the U.K.
Mads Nipper
executiveLower earnings from our CHP plants, driven by power prices that came in below expectations, partly offset that. As we move into 2023, we anticipate a substantial rise in earnings from our renewable assets, whereas earnings from our Bioenergy & Other business are projected to fall because of weaker energy prices. Daniel will go into more detail on what we expect for 2023 shortly. I'd also like to take this moment to note that our confidence in the long-term EBITDA growth ambitions remains very strong. Even with the unexpected and adverse developments of late, we stay confident in our business, in the renewable sector and in its promising outlook. Over the past 2 decades, we have transformed ourselves from a fossil fuel-based company into a global leader within the renewable sector. That transformation was achieved thanks to our strong and innovative capabilities in project development, construction and operations. And we keep seeing growing and exciting opportunities across our business segments, as shown by rising targets and government support for the build-out of renewables. At the same time, political backing for our industry encourages us, including the inflation Reduction Act in the U.S. and the proposed Net Zero Industry Act in Europe, which would broaden the addressable market and amount to important support for the entire industry.
Mads Nipper
executiveOur vision remains a world powered fully by green energy, and we'll keep pursuing it. If we move to the next slide, I'll discuss the impairment we recorded in 2022 tied to Sunrise Wind, our offshore wind project in the U.S. In 2022, the offshore wind sector dealt with unprecedented cost inflation and sharply climbing interest rates. Sunrise Wind, a U.S. offshore wind development project in which we hold a 50% stake, has been hit especially hard by those broad market trends, along with project-specific CapEx increases. As we disclosed earlier, project costs have risen substantially since our award of the bid. Over the past year, the project has seen further acute cost increases, driven specifically by prices for installation vessels and the associated services. Rising interest rates have likewise affected our cost of capital. That is despite the benefit from the USD 2 billion interest rate swaps we discussed previously. Anticipated increased tax benefits from recently enacted U.S. tax legislation have partially offset the higher cost of capital and the cost increases. As a result of these factors, we will recognize an impairment of DKK 2.5 billion on Sunrise Wind in 2022. Despite this impairment, I want to stress our continued commitment to Sunrise Wind and the rest of our U.S.
Mads Nipper
executiveTurning to our offshore wind portfolio. We'll keep working to bring those projects forward and mature them, with the goal of making sure we can supply renewable energy to the states while achieving satisfactory value creation. We're also continuing to look at every avenue for strengthening the economics of these projects. In the same way, we'll maintain our constructive dialogue with all the relevant stakeholders and partners. With that, I'll now pass it to you, Daniel, to walk through our fourth quarter EBITDA and the 2023 guidance.
Daniel Lerup
executiveThanks, Mads, and thanks to all of you for being on the call. I'll begin on Slide 5 with how EBITDA developed in the fourth quarter of 2022. At the group level, EBITDA excluding new partnerships came in at DKK 6.6 billion, versus DKK 5.0 billion in Q4 2021, which works out to a 31% increase. In Offshore, our EBITDA was DKK 3.7 billion, a touch under last year's figure. Several items moved around during the quarter, and I'll take you through them now. In Q4 2022, wind speeds came in a bit above the same quarter a year earlier, giving a positive effect of roughly DKK 200 million. Even so, the wind was under the norm. During the quarter, we encountered several unintended effects tied to our hedging framework. We booked a loss of DKK 0.7 billion on inflation-indexed power purchase agreements covering some of our U.K. rock assets. That loss mirrors future losses we expect to incur on these contracts should inflation and power prices stay where they are now. Put briefly, within our cap floor structure — which is inflation-indexed — we agreed to purchase our partner's share of the power generation from our U.K. Rock assets so as to give them revenue certainty.
Daniel Lerup
executiveTo lower the exposure we have to the power price we pay, we've put power hedges in place that mirror what inflation was expected to be at that moment. Because the actual inflation forecast has come in higher than those expectations, some of our hedges running toward 2026 are considered ineffective. So we're required to book that loss in our P&L right away. That said, should inflation expectations or power prices fall back down, we'll reverse a portion of the entire amount we've recorded in our accounts. On top of that, once those hedges expire in 2026, we stand to gain if power prices sit above the partner's cap price. We also experienced negative impacts from overhedging tied to volume. As we hedge the power we'll generate in the future, we attempt to factor in the gap between the power -- the price our generation will bring in and the price at which our hedges get settled, which is what we call intermittency. Beyond accounting for intermittency when we lock in hedges years ahead of time, we've made trades to soften the nearer-term risk of even wider price gaps between peak and off-peak periods across the '22, '23 winter period. Over the recent quarters, the high and volatile power prices have produced a positive market value on these hedges.
Daniel Lerup
executiveThat said, the worth of those trades shrank over the quarter — Q4 — because base peak spreads narrowed. Since hedge accounting can't be applied to these trades, we booked a negative hit in Q4. Even so, the hedges' market value stays positive, reflecting how peak and off-peak periods are expected to develop. A smaller amount of overhedging than in Q4 2021 partly counterbalanced that negative effect. Lastly, IFRS 9-related hedges gave us a positive impact of DKK 0.1 billion in Q4 2022. Speaking of hedging, let me restate that our new hedging framework is currently being implemented. And moving forward, we'll lower hedging levels and shorten the horizon so as to minimize the risk of unintended adverse hedging effects later on. Historically, our hedging framework has served us well, giving us stability and visibility of earnings. Because power prices are significantly higher, though, we've seen adverse impacts on our financials whenever we haven't generated power at the levels forecasted at the time we hedged production. It will take time for the effects of our revised hedging framework to be realized.
Daniel Lerup
executiveEven though we haven't signed any new power hedges since late 2021, our offshore hedge level for 2023 remains high. Should prices stay elevated, we would expect the portfolio to keep showing offsetting effects, so the risk to our overall financial performance is low. As a proactive step to counter the unintended impacts of our hedge portfolio, we have taken opportunities to buy back forward sold volumes at attractive prices, lowering the risk of awaiting. As we head into 2023, the hedge level we now see is lower than in 2022, at around 90%. At group level, we hold a hedge level of around 70% for 2023. Under the updated hedging framework, more details will be shared with you as part of our full year results on February 1. For the rest of our offshore sites, earnings rose by DKK 0.2 billion, driven by ramp-up generation at Hornsea 2 and by value-creating market trading activities. This was partly offset by negative effects from our high ROC recycle settlements in Q4 2021, balancing costs that came in higher than expected, and our expanding portfolio, which led to higher OpEx issues and tenuous tariffs. Earnings from our existing partnerships came in DKK 0.1 billion lower, owing to a further commissioning delay of the turbines at Greater Changhua 1, which increased the total project cost.
Daniel Lerup
executiveSo because of that, earnings under the construction agreements came down. Now moving to Onshore: we grew earnings by over 60%, largely on the back of ramp-up generation and stronger realized power prices throughout the portfolio. In Bioenergy & Other, earnings rose by nearly 50%. At our CHP plants, earnings matched Q4 2021, while earnings in our Gas business went up by DKK 1.3 billion versus Q4 2021. That gain came mostly from a favorable impact from our gas storage operations and from releasing a provision tied to shutting down our B2B business in the U.K. Moving to the next slide, I'll take you through the financial guidance for 2023. Just like in prior years, our EBITDA guidance leaves out earnings from new partnership agreements. EBITDA, excluding new partnership agreements, is projected to land between DKK 20 billion and DKK 23 billion in 2023. We've widened the guidance range from the earlier DKK 2 billion to DKK 3 billion, reflecting greater volatility in the energy market. As was the case in 2022, we might see offsetting effects among the business units relative to our directional guidance. In offshore, earnings are anticipated to be significantly above 2022 levels for a number of reasons.
Daniel Lerup
executiveFor 2023, we anticipate EBITDA will receive a boost as generation ramps up at Greater Changhua 1 & 2a, which we expect to be commissioned during the second half of 2023. We do not anticipate a repeat in 2023 of the negative effects stemming from overhedging and ineffective hedges. In addition, we foresee upside for our assets under the CfD and Rock regimes, since the relevant subsidy price gets inflation-adjusted in April, which should deliver a positive effect starting from Q2 2023 and continuing thereafter. At our other sites, we expect a favorable impact from greater generation at Hornsea 2 along with reduced balancing costs. Higher operating costs and weaker anticipated trading results will partially counteract this. We do not anticipate material earnings from the partnerships we currently hold. Lastly, we expect costs to rise in connection with project development, our P2X business, and general cost inflation. Now moving to onshore. We expect earnings to match 2022, reflecting several offsetting effects. We anticipate ramp-up generation from the wind portion of the <<inaudible>> Energy Center, Old 300, Sunflower, Haystack and <<inaudible>>. Furthermore, we expect a positive full-year earnings contribution from Ostwind, which we acquired in Q2.
Daniel Lerup
executiveThat increase in output will be counterbalanced by prices in the U.S. that we anticipate being lower, along with price caps in Ireland. And lastly, we anticipate a modest rise in project development costs as well as general costs. Within Bioenergy & Other, we anticipate earnings from our CHP plants and from gas markets and infrastructure both being significantly below the 2022 level. During 2022, very high power prices and spreads worked in favor of our CHP plants, and we do not expect that to be repeated to the same extent in 2022. During 2022, earnings in gas markets and infrastructure got a positive lift from optimizing our Northwestern European gas activities, where we managed to lock in gains from the offtake flexibility contained in certain sourcing contracts and gas storages. On top of that, we saw a positive effect from releasing a provision tied to our B2B business in the U.K. For 2023, we anticipate earnings being fairly limited, which reflects normal margins in these activities together with lower volumes owing to the absence of the gas from volume. Notwithstanding the challenges we dealt with in 2022, we take encouragement from the fact that the financial outlook for 2023 shows a significant improvement in earnings from our operating renewable energy assets, especially in the offshore business.
Daniel Lerup
executiveRegarding what we're projecting for 2023, we anticipate earnings from offshore power-generating assets rising by over 80%. That segment is a crucial driver of growth and value creation for us. Moving ahead, we'll keep working to lock in a steady and transparent level of earnings that our renewable assets can deliver. Make no mistake: even though EBITDA results hit record highs within our guidance, we're unhappy about the numerous negative effects stemming from our hedging activities. During 2022, we discovered the hard way that the risk management framework we'd relied on for years had been built for vastly different market circumstances and had grown overly complicated. We're acting on that lesson and putting a new framework in place now. And although 2023 remains a transition year, the new framework — pardon me. The new framework will keep supporting strong earnings predictability while cutting the downside substantially when markets turn extreme. With that, I'll hand things back to the operator.
Operator
operatorThanks. <<operator_script>> Our first question comes from Deepa Venkateswaran at Bernstein.
Deepa Venkateswaran
analystI have 2 questions. First, regarding the '23 guidance, it's somewhat under what the Street had been anticipating. I just want to verify what your assumptions are concerning the adverse hedging impact in '23? I believe many of us have likely assumed a clean unwind, but could you tell us what is implicit at least at the midpoint of your guidance regarding additional hedging losses or proxy hedging or whatever? And second, is there anything else of a one-off nature or anything that you think the market might have overlooked in its expectations? My second question concerns the U.S. impairment. First, I want to understand why only Sunrise and not the Others? I mean, if you look at the auction prices, Sunrise was at the upper end. So I'm just wondering what was specific about Sunrise? And could I also check that when you've done your impairment, is it only on the DEVEX that you've incurred so far? Or is this kind of looking further out, including any future CapEx that you might put in the overall value creation, and this is a forward-looking impairment? So just checking whether you're going to have ongoing impairments on this or the Other project.
Deepa Venkateswaran
analystAnd I take it you've doubled down on your dedication to these investments. So could you sort of reconcile for us why you're booking the impairment while still putting money into the U.S.?
Daniel Lerup
executiveYes. Thanks, Deepa. So, as the guidance slide shows, we have approximately 6 billion coming back on hedges in 2023. Since the effects we experienced in 2022 were primarily FX-related for that year, we'll see a modest runoff of the IFRS 9 temporary effect, which currently stands at about 1.2 billion for 2022, and a couple of DKK 100 million that we expect will run off during 2023 — and our guidance accounts for that. Now, turning to the impairment.
Mads Nipper
executiveLet me add just one more point there, Deepa. So what you were essentially asking is whether there are additional factors the market might have overlooked — and to a very substantial degree, that comes down to the fact that we now foresee a ramp-up curve for Changhua 1 & 2a that likely differs from what the market anticipates. Previously, we had expected a delay that would have pushed things into the start of the year, and now that will stretch into the second half of the year. So the generation mix relative to when that asset would be near fully ramped up is, in our view, the other key element we would point to that could be feeding into that mix versus market. And impairment, Daniel.
Daniel Lerup
executiveRight, yes. So on impairment — as we mentioned, we remain fully committed to the whole U.S. portfolio, and we still see value in it. The reason we're taking an impairment on Sunrise Wind now is of course the broad rise in costs, on both CapEx and interest rates. But specifically for Sunrise, it's one of the later projects in the NEP portfolio, which means it has been hit harder on transportation and installation costs than the other projects. So we've of course reviewed all the projects now for impairment purposes, and we don't expect that we'll need to impair more going forward. But as you know, that of course depends on, among other things, how interest rates develop. The value we've impaired isn't the full value we carry on our books for Sunrise — it's a little more than half of that. And that's a combination of both the DEVEX we've capitalized and then regular CapEx elements.
Operator
operatorOur next question comes from Casper Blom, who's on the line from Danske Bank.
Casper Blom
analystThank you very much. To build on what Deepa asked about the U.S. portfolio: you mentioned that you continue to see value there. Should we read that as meaning every project, in your assessment, still delivers a positive NPV, even if the IRR is lower than what was initially anticipated? That's my first question. Then, second, on earnings from the offshore sites — if we look at it, it seems like a better outcome. Have you adjusted your longer-term expectations for how much earnings those assets can produce? In other words, are you factoring in higher OpEx than what was originally planned when these projects were acquired years ago, or anything else — such that, even though you remain within your 2027 EBITDA guidance of DKK 35 billion to DKK 40 billion, there has been some movement inside that range?
Mads Nipper
executiveYes, I can start us off. Yes, when we say we think we can achieve value-creating costs in the U.S., and in running this impairment test, it's definitely our ambition and expectation that we're able to do NPV positive cases in the U.S. And as we said, we're having ongoing, constructive dialogue with key stakeholders, including, for instance, in New Jersey with the relevant stakeholders, and that's what gives us that belief. I can't get more specific than that, but we clearly do believe this is a portfolio that will be able to be positive. So, on longer-term value creation at offshore sites, you're right that there are extra costs. But on the other hand, the inflation indexing in our contracts means that, net overall, that should actually be a positive. So in that sense we haven't at least seen any adverse impacts on our longer-term outlook for our portfolio — if anything, it's the opposite.
Operator
operatorWe’ll take our next question from Alberto Gandolfi at Goldman Sachs.
Alberto Gandolfi
analystThank you. I appreciate everyone taking the time to walk through all of this, and for your patience — I'd like to return to the impairment topic once more, if that's alright. There's a question that comes in two parts. First, setting the impairment aside for a moment, if you marked equipment costs and interest rates to market as of today, would you consider the U.S. project backlog to be NPV positive? And on that same basis, what IRR divided by WACC would you estimate at present? Second, please forgive me because my line dropped briefly in case this was already raised — but why only Sunrise, and why only half of the impairment, if I understood correctly? So why not — what is it that makes this one special? And if conditions stay as they currently are, should we anticipate further impairments across the remaining backlog? And as an appendix to that, does this make the prospect of securing partnerships that would pay a premium over invested capital more difficult or more complicated, given that the net present value of this project isn't what you had expected it to be in?
Daniel Lerup
executiveYes. Thank you, Alberto — I'll begin with the last point. We don't expect this to affect investor appetite in a scenario where we intend to go out and farm down. Naturally, they'll be examining forward-looking cash flows. And as we've mentioned, we continue to see value creation in these projects. That will, naturally, also serve as the foundation for what we'd divest at a later point in time. The reason Sunrise has ended up impaired rather than the others is that Sunrise, within the NEP portfolio, is the final part to be constructed, and hence also the project where we signed the — some of the larger contracts later in the cycle of signing contracts. And hence further into the cost inflation and supply chain bottlenecks that we're seeing. So again, returning to what we indicated earlier — we're seeing a significant cost increase on transportation and installation, and that is the impact we're seeing on Sunrise. Also the fact that it's being built at a point in time when there are a lot of competing projects under construction in 2025.
Daniel Lerup
executiveSo, Alberto, on that first part of what you asked, I'm a little unsure what the question was actually about there. Could you repeat it, maybe? And an IRR over WACC indication is not something I'm going to give you.
Alberto Gandolfi
analystSure. Sure. No, my question is about the impairment you disclosed yesterday evening—does that number capture equipment costs as they stand now and interest rates as they stand now? And if it doesn't, why not? Basically, the idea here—what I'm attempting to work out—is how much of the project backlog isn't hedged, basically, against interest, raw materials, or equipment? And on impairment, does that impairment reflect a projection using the recent average, or does it reflect where we are right now? So I'm trying to gauge whether there will be additional impairments on those same projects or further impairments on other backlog projects.
Daniel Lerup
executiveIf we thought additional impairments were coming, we would need to record them at this point. So this reflects a refreshed assessment of how we forecast the market will appear at the time we construct the various projects. And then, naturally, incorporating that refreshed assessment into the scenarios regarding inflation and the interest rate environment.
Operator
operatorOur next question comes from Jenny Ping at Citi.
Jenny Ping
analystThank you. Tough luck that I’m the person who gets to ask the first question. I’ll return with more later. So, first, picking up on the U.S. discussion. Can I just verify, Mads, that you mentioned earlier that while you’re unable to share any specifics at this point regarding the conversations you’re having with the various stakeholders and regulators. Could you just kind of lay out, without getting into project specifics, what those discussions involve in broader terms? Is it about the price going up? Is it about projects being delayed? What’s on the table as a possible way to improve the NPV of these projects?
Mads Nipper
executiveYes. And again, thank you, Jenny — it is a fairly strong commitment to the stakeholders we're in dialogue with that we can't be specific, and not even in a broad way, because that could point to something very particular and might be read that way. But it is something that could potentially have a material effect on the value creation of these projects, which, as we said, obviously are not where we want them to be, but we have not factored that in. So when we ran the impairment test, we had not simply included wishful thinking about the expected or intended result of those discussions. But it could be — I mean, there is nothing we are not potentially discussing. Yet as you know, for instance, we have IRA or tax benefit pass back losses in some states, and there are other routes through which we could potentially improve it as well. But that is as close as I can get. We're discussing everything with stakeholders that can potentially do this, and some of them more likely than others. And sorry for being extremely general, but that is staying loyal to the commitment we have with our stakeholders.
Operator
operatorOur following question comes from Rob Pulleyn at Morgan Stanley. <<operator_script>>
Rob Pulleyn
analystAll right. So the question from the loud one is that you mentioned installation vessels being especially scarce, and because of that, costs will be higher in 2025. With the Jones Act vessel shortage in mind, do you already have a vessel or several vessels secured? Or might we end up seeing even more delays? That is the question. If I could ask for one clarification, since I didn't catch it earlier and the line was somewhat fuzzy: how does the impairment on Sunrise compare with the carrying book value? I believe you may have answered that already, but if you could just confirm it again, that would be great.
Mads Nipper
executiveYeah, yeah — regarding your first question, Rob, the response is affirmative. The Dominion vessel we have has been commissioned. It's running a bit behind schedule, though we don't anticipate any effect on the project as a whole, since it's been ready since 2024. So that one — it's available, and it's already under contract.
Daniel Lerup
executiveRegarding book values, we aren't going to provide specific figures for each of them. What I can say, though, is that the forward-looking value at the Sunrise projects remains positive. That is the reason we have not written down all of the book values we hold on Sunrise. As a result, we have taken an impairment of slightly over half on that project.
Rob Pulleyn
analystThanks. I’ll hand things over now.
Operator
operatorOur next question comes from Kristian Johansen at SEB. <<operator_script>>
Kristian Johansen
analystYes. So, if I'm reading you right on Sunrise Wind, it sounds like you've now more or less secured the installation vessel contract and found that the cost runs above what was budgeted. So if that's the situation, could you say how much of your CapEx for your <<inaudible>> portfolio — leaving out Ocean Wind 2, since that also belongs to the other part of the portfolio — how much of CapEx you've locked in at this point, and can you give a percentage?
Daniel Lerup
executiveWe're nearly at that 90% mark now. So at this point our confidence level on CapEx is really high.
Mads Nipper
executiveAlso keep in mind, Kristian, that this isn't only about Ocean Wind 2, which is quite a ways out — the Skipjack project is in there too, and that one is also weighted toward the later part of the decade.
Kristian Johansen
analystGot it. So just to be clear, does that 90% apply across the whole portfolio?
Daniel Lerup
executiveThat covers the near-term development portfolio, meaning the NEP project along with Ocean Wind 1.
Operator
operatorVincent Ayral with JPMorgan has our next question.
Vincent Ayral
analystTurning to the U.S., where conditions remain, let's say, challenging. I'd like to step back for a moment and talk about partnerships and the capacity to utilize tax credits. PSEG's sale of its 25% stake came less than 48 hours ago. I'm just curious about how the timing relates to all of this — did they have to exercise the option at this point, or not, given that Eversource's uplift of its partnership may potentially be under review? And you're saying that with respect to discussions on what can be done to enhance value creation across all these projects, so I suspect that could tie into the ability to use tax credits. What I'm getting at is I'd like to understand where you stand — you already have one partner that has chosen to exit. And you have to search for all the partners. We know CapEx is up, returns aren't great out there. From the outside, it looks like a difficult position to be in. It could simply be a question of time until your discussions conclude, and then trying to gauge whether, given the situation in resources, it's actually better to wait, or whether you have some option coming up where we'll have to make a decision — that would be interesting for us to know.
Mads Nipper
executiveI'll start us off. Thanks, Vincent. But I think — what I mean is, you shouldn't be looking at the conversations between PSEG's message or ours regarding the 25% in Ocean Wind 1 as connected to what we're discussing here. The point there is that PSEG wanted a tax credit profile that differs from what's currently on the table. And that also means that, from a total value creation standpoint, we — there would be more value in securing a different tax ITC, meaning an investment tax credit partner, to maximize value for the project. That's the main reason. And the one-off effect this would produce would not have been PSEG's primary interest. So that's the primary reason for it. We don't have any concerns, as Daniel alluded to earlier, because, I mean, for example, on Ocean Wind 1, now that we're the 100% owner, that would potentially also permit a farm down process of 50%, which will be closer to what we know. And so we strongly believe as well that this can help us create value. So we don't have any strategic concerns around partnerships in the U.S.
Mads Nipper
executiveAnd every one of these conversations has been conducted in a very positive spirit, and they've also been quite constructive with the joint venture partners we already have.
Vincent Ayral
analystRight. What I’m trying to get at is this: you’ll be seeking a new partner that can use the tax credits PSEG had been expected to provide. And as you search for one, what that party sees is returns declining, CapEx problems and all of that. Then — what’s the timeline for your talks with the core authorities, where you’re fairly optimistic that some value-accretive solution will be found? Could we get a sense of the timeline there so we can understand the dynamic a bit better around these partnerships, for instance, working up in <<inaudible>>.
Daniel Lerup
executiveRight, that's accurate. And those conversations are happening at this moment with possible buyers of the tax credits. As you're aware, the tax credits available for these projects have gone up enormously, and that growth is bigger than what PSEG and Eversource can offset against their tax positions or otherwise monetize. So finding a party that can make better use of these ITC tax credits is the more efficient route. And talks are underway. And naturally, the IRA should reduce the risk around monetizing these credits, since transferability now exists, meaning the buyer won't need to carry as much project risk as was typical back in the old onshore PTC era. So with transferability, we anticipate monetizing the ITCs more easily.
Mads Nipper
executiveAnd regarding the conversations with the stakeholders as well, those are fairly near term, but for valid reasons, we can't provide any particular timelines either, since, for instance, clarity on what is required, say, to qualify for the domestic content credit is also something we expect to be released. We hope it comes out in Q1 from the treasury in the U.S., but definitely in the first half. And prior to that, being very specific about those upsides would be impossible. But -- and the dialogues also happen state by state. So because of that, there isn't a onetime number. Yet it clearly is something where we hope to gain stronger visibility of any additional upside during the first half of this year.
Operator
operatorUp next, we have a question from Mark Freshney of Credit Suisse.
Mark Freshney
analystThanks for carving out some time for me. It has been obvious for quite a while that expenses in the U.S. are enormous. Daniel, roughly 4 years ago at CMD, your predecessor discussed extremely steep costs. The crucial point is that those costs have risen, and you -- it might look as though, with PSEG on Ocean Wind, a 100% commitment is required from you. So, when we examine your business plan alongside the CapEx profile and the balance sheet envelope, it seems there are some quite substantial cash outflows occurring before the EBITDA starts arriving from 2025 onward. And I suppose what I'm asking, Mads, is this: you've been clear that the agreement you struck with the Danish government regarding issuing equity would serve only to finance new additional growth. But considering the CapEx plan and the project plan you have in place, is equity needed in order to fund the existing plan?
Mads Nipper
executiveMuch appreciated, Mark. No, that remains outside what we anticipate. That said, clearly, you're correct. I mean, raising the stake as well as 100% to, say, in Ocean Wind 1 would imply that, for instance, a farm-down conversation is something we might seek to speed up even more, so as to examine what those are when we absorb extra cost in constructing the projects — whether that comes from inflation or, in this instance, from a larger ownership portion — and that is precisely where we would have to engage our balance sheet to make sure that we — that those extra earnings can be produced. So for instance, cash flows sooner in construction, or from farm downs sooner in that process than we would otherwise. We don't anticipate any negative effect from that; rather, it's something where flexibility remains, since we have completed farm downs both pre-FID and post-COD. Our clear intention still stands to say that a potential capital raise is for growth.
Operator
operatorOur following question comes from the line of <<inaudible>> at Exane.
Analyst
analystI'll stick to the single question I'm allowed. I just wanted to ask a bit more about Greater Changhua, which I believe you brought up earlier, if I heard that correctly. So on your slide, I think you were referring to an effect of DKK 1.5 billion year over year. I just wanted to verify what weighted average COD date that assumes? Put another way, what would that year-over-year impact have looked like had the project started on the first of January. So what was the annualized EBITDA, and what do we treat as the year-over-year growth from that project as we go into 2024?
Mads Nipper
executiveYes. Thanks a lot. It's a bit tricky to draw a direct comparison, because had we been completely prepared with a COD starting January 1 of this year, our ramp-up profile would have looked different over the course of this year as well. So we would have earned more this year too. Still, looking at the actual result for this year, I'd say that in a year of full operations, that would be on the order of, say, DKK 3.5 billion. And so, with where we stand right now, it will be something along those lines. I can't give you a specific date, but we won't be fully finished until the second half. What really matters, though, for earnings into next year is the shape of the ramp-up. Because at present, we have 15 producing turbines. That number needs to rise to 111, and that's where — the more of that we can front-load out of the 80 turbines currently installed, the better we can do it. So essentially, from an earnings standpoint, the ramp-up profile actually matters even more than the final file commissioning date.
Mads Nipper
executiveFor the whole year, though, earnings should land near 3.5, so you might frame it as us expecting roughly a weighted average of about 50% of what a normal full year would bring, given the ramp-up profile we have — if that answers your question.
Operator
operatorWe'll take our next question from Dominic Nash at Barclays.
Dominic Nash
analystOkay, just the one question from me, and it's clear. Regarding your EBITDA guidance for 2023, can you give us some color on whether the EGL tax levy has any impact there — will it hit EBITDA or the tax line? And also, what's your sort of view for the EGL level next year, please?
Daniel Lerup
executiveRight. Thanks. So there isn’t anything meaningful from the EGL in there at this point, since our hedge level in the U.K. is very high. There could be a bit in there past 2023, but naturally that will hinge on where power prices happen to be. Still, because the hedge level is so high, we don’t anticipate paying anything under the EGL.
Operator
operatorWe'll take our next question from Tancrède Fulop, who is on the line from Morningstar.
Tancrède Fulop
analystRegarding the U.S. project, no FID has been taken on any of them. Is it reasonable to assume that some of those projects won't proceed if you can't secure the maximum benefits of the IRA?
Mads Nipper
executiveThanks. No, you can’t make that assumption, since it would hinge on where the project stands right now and what kind of profitability it currently has. And clearly, if we’re able to capture the full IRA benefit and perhaps an even larger portion of it in states where a pass-back clause applies, then that’s a situation in which we would still be in a position to take an FID. So that link can’t be made. But naturally, if we do receive that extra support through a full 40% ITC — which, frankly, we think we’re very well placed to obtain — then obviously that would lift things. And just to be clear, not to correct you, we have in fact taken FID on <<inaudible>> So that’s the first of the 3 projects in the Northeast program. So the first one has been FID’d. The others, however, remain, and hopefully the next one won’t be too far off in the future.
Operator
operatorOur next question is a follow-up coming from Jenny Ping at Citi.
Jenny Ping
analystLet me circle back to the Taiwan project. In the statement, you brought up how the construction delay is creating a problem for the 2022 figures. Is this purely a shift out of '22 and into '23? Or does the construction holdup carry an overall negative effect — in other words, some kind of financial penalty tied to the rollout?
Daniel Lerup
executiveYeah, so as we headed into 2022, we’d been hoping to see some production toward the end of the year, but we essentially had almost no earnings from production in 2022. That's, of course, on the sites side. On the side of the existing partnership, as we mentioned, we saw a negative impact, since we’ve seen costs rise a little because of the delay. And that, of course, means we ended up with a lower margin on our construction agreements with the partner on the project, even though we are, of course, still making money on that CA.
Mads Nipper
executiveRight. So you might put it this way — aside from that element of higher cost and reduced earnings on the CA, it's simply a shift of those earnings into 2023. In other words, it's a postponement that means the ramp-up profile will now take place in '23, along with the production. So roughly speaking — approximate, I'd call it — a delay of about 6 months overall, which has now pushed into '23, with full-year production expected in '24 rather than '23.
Jenny Ping
analystAnd I apologize — does that fall within the DKK 1.5 billion guidance you provided?
Mads Nipper
executiveYes, that’s part of it. Now, we’ve taken — I wouldn’t describe it as concierge — but here’s what we definitely think we’re able to do when it comes to the guidance we’ve provided for 2023.
Operator
operatorWe have one more question, and it will be a follow-up coming from Rob Pulleyn at Morgan Stanley.
Rob Pulleyn
analystOkay, so there's been a great deal of commentary and a lot of granularity. In my view, the single most significant remark you made throughout the whole presentation announcement was that the U.S. projects came out NPV positive. So can we simply confirm that looking ahead? And can you make clear whether that applies to the full U.S. portfolio? Does it cover the initial phase portfolio of 5 projects? Or should we interpret it as meaning that each one of the individual projects is NPV positive?
Mads Nipper
executiveYeah, go ahead, Rob — I can start us off. I mean, this is also the point where, when we walk through the impairment test using the assumptions we hold right now, it's clearly our conviction, and both our intent and our belief, that this is what can happen. Of course, there are — I mean, if we keep seeing interest rates, particularly rate hikes, and if we — and depending on how those turn out — how those dialogues we're having turn out, yes, we believe we're able to make projects that are NPV-positive. But of course, the clarity on that is significantly greater for the nearer-term ones than for those that are back-end loaded, especially, or i.e., for Ocean Wind 2 and for Skipjack, where it's so far out in the future that, of course, developments — positive ones, but they could of course also be adverse — can still have an impact on that. But yes, that's our belief: the portfolio can be NPV positive.
Rob Pulleyn
analystAppreciate it. That's all from me.
Mads Nipper
executiveOkay. Operator, I think that was the last question, wasn’t it?
Operator
operatorYou've got that right. We have no further questions, so I'll turn it back over to you.
Mads Nipper
executiveYes. And many thanks for your question. And apologies for rousing you so early. And allow me just 30 seconds to wrap everything up. While the — as you can surely picture, this year's result has come together in a different way. I simply want to restate that this really is something demonstrating the robust portfolio and diversification of our asset base. And truly a key takeaway is: don't worry about the long-term earnings profile of our — and cash flows of our — particularly of our offshore business, which is where we've had these, hopefully, one-off impacts. Both our — our future cash flows, our underlying operations but also for the future, the strength of our pipeline, which has been expanded significantly in recent months, and our deep capabilities to struggle and even very different to navigate even very difficult circumstances operationally is something that we believe continues to put us in a strong position. And we firmly believe that both with the passing of the IRA and the policy actions that Europe is now taking — I met with commission President Von der Leyen and many of the staff from EU. There is no doubt that the European response to the inflation Reduction Act is going to have something that have a material positive impact for the entire industry.
Mads Nipper
executiveAnd that's especially true for offshore and hydrogen production. So while this isn't the 2022 finish we'd been hoping for, we are — and will stay — very confident about what's ahead. So thanks again so much for your questions, and have a great day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ørsted A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Ørsted A/S earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ørsted A/S or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.