operatorGood day, and thank you for joining us for Orsted's Q3 2023 earnings call. Please note that this call is being recorded. <<operator_script>> Our presenters today are Mads Nipper, Group President and CEO, along with CFO Daniel Lerup. Mads, Daniel, over to you.
Mads Nipper
executiveThanks a lot, and welcome to the earnings call covering our third quarter of 2023. Following the announcement we made on August 29, when we anticipated an impairment of as much as DKK 16 billion, a number of developments — some positive, though sadly the majority negative — have occurred across our U.S. offshore projects. Among them are developments regarding expected ITC qualification, an unsuccessful OREC petition in New York, a continued rise in long-dated interest rates, and further supply chain costs. Given these developments, we have chosen to halt development of Ocean Wind 1 and Ocean Wind 2. Taken together, these developments amount to a deeply unsatisfactory situation in which the net impairments in Q3 come in materially above what we estimated at the end of August. All of these adverse impacts combined result in an impairment of DKK 28.4 billion recorded in Q3 of 2023. Beyond the impairment losses, a provision tied to halting development of Ocean Wind 1 — roughly DKK 8 billion to DKK 11 billion, together with the EBITDA impact — will be recognized in Q4 of 2023. That provision covers cancellation fees not already captured by the impairment and remains subject to dialogue with individual suppliers. We will seek ways to deploy the contracted equipment across other projects in our portfolio.
Mads Nipper
executiveBut the impairment, along with the cancellation fees tied to it, accounts for every possible cost connected with halting development of that project — so any deployment there would represent upside relative to what our accounts currently reflect. Given how severe these developments are, we've launched a portfolio review covering our U.S. offshore projects and put a number of specific initiatives in place to de-risk that portfolio. Since August, the business case for Ocean Wind 1 has deteriorated very significantly, and we've therefore made the decision to stop developing both Ocean Wind 1 and Ocean Wind 2. The main drivers are further supplier delays that push our project schedule back, together with a revised view of certain assumptions regarding the likelihood and timing of final permits and the quality of tax credit monetization. As part of this process of ceasing development of Ocean Wind 1, our key focus going forward is on how to secure the highest reuse value from the contracted equipment. Turning to Revolution Wind, where an extensive risk review and a positive forward-looking business case have led us to take the final investment decision: despite rising interest rates, the added cost of a full installation using a backup vessel, and even in a scenario assuming no synergies from construction of Sunrise Wind, the 704 megawatt project holds an attractive forward-looking return above our guided range.
Mads Nipper
executiveWe anticipate beginning offshore construction in 2024, with commissioning of the project expected near the end of 2025. Sunrise Wind has taken a negative hit from the unfavorable OREC petition result as well as from elevated interest rates. As we keep developing the project, our assessment is that it can be classified as brownfield under the IIA guidance, and so it is very likely to meet the criteria for an ITC level of 40%. In light of the request for information that was announced recently concerning an accelerated solicitation in New York, the most attractive route forward for Sunrise Wind, as we see it now, is a rebid. And since our price under the dismissed OREC petition was lower and thus more competitive than the average OREC price of $145 per megawatt hour achieved by the New York 3 auction winners, we assign a 50% likelihood of success to a higher OREC. We are continuing the reconfiguration of Skipjack, where every bit of development work is paused so that spending stays at a minimum and no further capital commitments are made. And should no significant OREC adjustments occur in the near future, we will either stop developing the project or look into alternative commercial solutions. A decision on these projects is expected around the Q4 2023 financial announcement.
Mads Nipper
executiveClearly, these are some very difficult choices that we have already made and will need to make over the months ahead. Given the circumstances we face, we have taken steps to de-risk the portfolio's exposure by cutting back the number of projects that will be carried out, and we have concentrated on preserving value in the remaining contracted projects along with our uncontracted seabed. Let me state plainly that we are putting all the lessons from this into practice going forward -- when it comes to developing future projects and the timing of capital commitments. At the Capital Markets Day, we laid out an ambitious growth strategy supported by an investment program that is fully self-funded. As we execute that plan, our central priority is to protect a healthy capital structure and to secure the greatest possible value creation from the investment decisions we make. That said, the major adverse developments mean that over the coming months we must finish our review of the U.S. offshore portfolio and decide the best way forward. Meanwhile, we continue to feel confident about the value creation from our portfolio of construction and development projects in Europe and APAC, and on that basis we see meaningful impairment headroom. We anticipate that halting development of Ocean Wind 1 and Ocean Wind 2 will produce outcomes with a material negative effect on our short-term financials and capital structure.
Mads Nipper
executiveWith that review as a foundation, we’ll evaluate what it means for our long-term strategic ambition and financial targets, and we expect to be able to bring this forward to the market no later than the Q4 2023 announcement. Even though the overall growth outlook for renewables, including offshore wind, is stronger than ever, continued industry challenges and adverse macroeconomic development mean that we need to be extremely diligent and disciplined in our growth going forward. Despite the serious setback in the U.S., Orsted is committed to drive the transition to a world that runs entirely on green energy. Let’s turn to Slide 4 and the description of the impairments we have booked. Since we announced the anticipated impairment at the end of August, the adverse developments have resulted in an impairment of DKK 28.4 billion. Let me walk you through each of the components of the impairment. Compared to the anticipated impairment end of August, the adverse developments within the supply chain and permitting related events have led to a materially higher level of impairment amounting to DKK 16.9 billion. As described before, the further supplier delays and certain project assumptions impacting Ocean Wind 1 project schedule and leads to an additional significant delay of the project.
Mads Nipper
executiveAlso, the effect mirrors the revised installation method, which carries a longer timeline for Revolution Wind and Sunrise Wind. Regarding the expected impairments tied to the ITC level for Ocean Wind 1 and Sunrise Wind, several developments have emerged. On Sunrise Wind, there has been favorable news, since we anticipate qualifying for a 10% tax credit bonus thanks to meeting the energy community guidance. For Ocean Wind 1, we used a 30% tax credit level, so no bonus qualification is assumed there. Taken together, these developments result in an impairment of DKK 4.7 billion. In addition, the OREC petition's failure in New York hurts the business case. Even so, we continue to evaluate scenarios for securing a higher OREC price by resubmitting Sunrise into an accelerated RFP, and we now assign a 50% probability of reaching a higher OREC strike price, versus the 75% probability we assumed before. At this point in project development, our estimate of cancellation fees for Sunrise stands at roughly DKK 3 billion. Lastly, on interest rates, long-dated U.S. rates keep climbing.
Mads Nipper
executiveOn the yields side, this has led us to book an impairment of DKK 6.2 billion tied to our offshore development portfolio, along with DKK 1.4 billion linked to a certain number of operational onshore projects, reflecting where interest rates stood at the end of Q3. Worth stressing is that our business cases gain materially from the interest rate hedges we put in place back when we were examining a significant build-out of U.S. capacity. With long-dated U.S. yields having risen so significantly, those interest rate hedges come to a total value of DKK 4.5 billion. That said, customary IFRS accounting standards prevent us from using the significant positive value of the interest rate hedges in our impairment testing, yet that does not alter the fact that these interest rate swaps materially enhance the underlying value of the business cases for our U.S. offshore projects. Moving to Slide 5, I will go through how recent developments affect our capital structure. Those recent events have placed pressure on our capital structure, which Moody's decision to put us on negative outlook also illustrates. As already highlighted, the ceased development of Ocean Wind 1 is expected to have a material negative impact on our short-term capital structure.
Mads Nipper
executiveGiven where things stand, our immediate focus is on steps to shore up the balance sheet, since keeping our long-term commitment to a BBB+ BAA1 investment grade credit rating remains the number one capital priority. Industry challenges keep coming from macroeconomic shifts, particularly a higher cost of capital. Our sector-leading record on farm-downs has let us keep signing deals with attractive NPV retention. That said, if everything else stays the same, rising interest rates are expected to mean lower proceeds from farm-downs done in the future. Forward power price curves have also moved down, meaning we expect less revenue. And on top of that, supply chain constraints look set to persist, given the absence of the investments needed to expand capacity. Without those investments, we risk facing elevated costs in the years ahead. These adverse developments have directly led us to take a number of measures aimed at supporting our capital structure. To be clear, we have no active plans to issue equity. These initiatives are moving along well, as shown by reduced development activities already reflected in our Q3 accounts.
Mads Nipper
executiveBeyond that, we've launched multiple work streams—covering both operational and shared-cost savings efforts. And when the cost impact has been completely quantified and substantiated, we'll be able to share the result with the market no later than the Q4 financial announcement. Also, it's worth noting that halting development of Ocean Wind 1 and Ocean Wind 2 will broadly support our long-term capital structure, thanks to the lower investment level. Working capital is another lever, along with enhancing it, for example through supply chain financing. Lastly, we're carrying out a rationalization of our portfolio in which we will, among other things, evaluate joint venture partnerships and also use our farm-down model. Looking ahead, we keep our capital allocation priorities and stay committed to our long-term investment grade rating of BBB+ BAA1. With that, I'll pass the financials over to you, Danny.
Daniel Lerup
executiveThanks, Mads, and good afternoon to all of you. I'll begin on Slide 6 with the EBITDA for the third quarter of 2023. Across the group, we achieved a total EBITDA of DKK 5.2 billion, excluding new partnerships, which marks a substantial earnings uplift of more than 70% versus the same period last year. Let me take you through the main developments in our EBITDA for the quarter. At our offshore sites, earnings rose by DKK 3.6 billion. That reflects wind speeds considerably above last year, a positive contribution from ramp-up generation at Greater Changhua 1 and 2a, and higher prices on our inflation indexed CFDs and ROC wind farms. We also gained from lower balancing costs and BSUoS charges relative to last year. Lastly, the negative hedging impact from Q3 2022 did not recur this year. Earnings from our existing partnerships came in line with Q3 2022. Moving to onshore. Higher earnings from the ramp-up of new assets in operation were offset by significantly lower power prices, leaving earnings on par with the same quarter last year. In Bioenergy & Other, our combined heat and power plants recorded significantly lower earnings, driven by the lower power prices as well as the higher fuel cost compared to last year under the first in first out accounting principle applied to our fuel inventory.
Daniel Lerup
executiveIn our gas business, earnings rose versus the prior year, driven primarily by a temporary favorable revaluation effect on our gas and storage in the quarter. In Q3 2023, we booked a DKK 4 billion gain on the farm-down of the London Array wind farm. Including that gain, group EBITDA with new partnerships came to DKK 9.2 billion. Moving to Slide 7, net interest-bearing debt and our credit metric: at the close of Q3 2023, net debt was DKK 42.9 billion, down DKK 1 billion over the quarter. Operating cash flow got a positive lift from EBITDA and from cash coming in on the sale of the Hornsea 2 transmission asset. Gross investments for the third quarter reached DKK 9.2 billion, driven by money put into building out our renewable project portfolio. In the quarter, we brought in proceeds from the London Array divestment and bought Eversource's stake in Lease Area 500. As of the end of the third quarter, collateral payments tied to our energy hedges totaled DKK 6.6 billion. Our key credit metric, FFO to adjusted net debt, came in at 21% at the end of the third quarter.
Daniel Lerup
executiveAs Mads mentioned in his comments, we've put several actions in place to bolster the metric tied to our long-term credit rating. Now, moving to Slide 8, let's discuss what we expect for 2023. Our 2023 EBITDA — leaving out new partnerships and leaving out the provision tied to Ocean Wind 1 — remains the same, and we still anticipate it landing between DKK 20 billion and DKK 23 billion. Because of later timing across the project portfolio and because we terminated investments on Ocean Wind 1, gross investments for 2023 should now come in at DKK 40 billion to DKK 44 billion, which is a DKK 4 billion decrease. That said, we're ready to take questions now. Operator, please.
Operator
operator<<operator_script>> Our first question comes from Harry Wyburd at Exane.
Harry Wyburd
analystHarry Wyburd here from Exane. I'd like to ask about the DKK 8 billion to DKK 11 billion in possible contract cancellation fees you referenced for Q4. Could you walk us through what makes up those amounts, and in particular, what portion consists of break fees you would have to pay versus what portion relates to the supply chain? Also, what's the timing on the cash out for those? Does it land this year or next year? It would help to know when that shows up on the cash flow statement. And how locked in are they? You've provided a range — are you fully confident that DKK 11 billion is the absolute ceiling? Then, perhaps as a follow-on to that question, what would the break fees be on the existing ORECs for Sunrise and Skipjack, given that you've indicated you'll exit the current ones and rebid them?
Mads Nipper
executiveThat DKK 8 billion to DKK 11 billion range is really the core of the breakaway fees we anticipate paying to the supply chain. And keep in mind that on top of that, you'd add the gap between the present net book value of roughly DKK 13 billion and the DKK 20 billion figure. So to be clear, the gross termination fees here would land more in the neighborhood of DKK 15 billion to DKK 18 billion. Of course, this approach builds in some contingency, yet the vast bulk of it goes to the supply chain partners, and it's net of any possible reuse value. So, as we said in the script, there's upside there too. Our contracts differ from supplier to supplier. So we did an assessment built on walking through each individual contract among the 30 top contracts, and because of that, our confidence in the range we're providing is quite high. Danny, on the cash impacts, could you comment on that?
Daniel Lerup
executiveYes. So our expectation is that the bulk of it lands in 2024, though naturally there's a chance some shows up in '23 and a portion might not arrive until 2025. These are, again, conversations we have to begin holding with suppliers, and they'll determine what the shape of that profile ends up being, but most of it, I'd expect, falls in '24. You also asked about break fees on Sunrise and Skipjack. For Sunrise, the anticipated cancellation fee at present sits at approximately DKK 3 billion should we choose to exit that project; that said, as I mentioned, exiting isn't what we anticipate. We are chasing this rebid opportunity, or examining whether to chase it. As for Skipjack, the cancellation fees are negligible.
Harry Wyburd
analystAll right, though I have a few quick follow-ups on that point. Regarding those gross termination fees of DKK 15 billion to DKK 18 billion — if I heard you correctly, provisions had already been included within that figure, which would leave residual provisions of DKK 8 billion to DKK 11 billion. Is that accurate?
Daniel Lerup
executiveSo the way to understand it is that when we had to record our impairment on Ocean Wind 1, it had to be based on what the business case looked like at the close of Q3. And at that moment, the business case — including the one we were examining when the decision was made — was worse than what sat on our books. So essentially, you could say we're taking an over-impairment on Ocean Wind 1 because of that project's negative forward-looking value, and that comes to roughly DKK 7 billion of over-impairment. So once you add that to the DKK 8 billion to DKK 11 billion EBITDA provision we may potentially take in Q4, you arrive at the approximate total cancellation fee amount before we factor in any potential reuse value.
Harry Wyburd
analystUnderstood. And apologies — this really is the last one. Regarding the DKK 3 billion tied to Sunrise, my assumption is that this means scrapping the project entirely. What number would apply if we simply secured the PPA and then put it back into a different auction?
Daniel Lerup
executiveThose are pretty modest figures, and they're about what you've been hearing from other players as well.
Operator
operatorOur next question comes from Jenny Ping at Citi.
Jenny Ping
analystTurning to your balance sheet, you clearly mention that equity isn’t needed and that you’re actively considering the equity option. Still, under the status quo, I was wondering how much you’ve factored the FFO net debt and the rating agency’s 25% threshold into that analysis, and how much headroom that then leaves you for future growth. There are obviously 2 parts here: first, repairing the current balance sheet for the current portfolio; and second, having something of a war chest for future growth. I just wondered whether you could comment on those elements.
Mads Nipper
executiveJenny, I'll start us off. As we said, here's what we intend to do following the wrap-up of the portfolio review covering the U.S. projects. We want to carry out a thorough assessment of our long-term targets and ambitions, and then, as soon as we have that clarity — which would obviously include a review of the growth ambition — we'll come back to the market no later than Q4. At that point it would be good to take stock of the company's total forward-looking perspective along with our investment plans.
Daniel Lerup
executiveTurning to your question about the rating metric. As a starting point, the benchmark we analyze against is roughly 25% FFO to net debt, though of course the definition differs across the various agencies. But we're also using the updated view on those metrics when we run our analysis, and 1 example is that S&P raised their threshold requirement from 23% to 25%, and we of course factor that in when we look at these things.
Operator
operatorOur following question comes from Alberto Gandolfi at Goldman Sachs.
Alberto Gandolfi
analystThere are many moving parts, so I'll do my best to keep this organized, though I may not manage it. Could you put a number on how large the balance sheet restructuring you're referring to actually is? What's the funding gap? As I see it, an additional DKK 8 billion to DKK 11 billion in cancellation fees plus DKK 20 billion of gross CapEx savings is a credit-positive event across the next 3 years, yet the bulk of the payment falls between Q4 and next year, so a liquidity issue may arise. So I suppose the question has 2 parts. First, on Ocean Wind 1 and 2, which measures are you considering? My suspicion is that divesting 1 gigawatt of U.S. onshore wind would basically close this gap. Is that wrong? Would you consider suspending the dividend, a scrip dividend, or cutting the dividend, given that you mentioned DKK 12 billion over 2 years? And why haven't you presented a plan today already? The second part is this: since you were kind enough to disclose Sunrise and Skipjack, what happens if you were to walk away from Hornsea 3?
Alberto Gandolfi
analystDo you have another cancellation to consider, and what would your approach be there? Again, speaking of asset disposal, dividend, equity raise.
Mads Nipper
executiveLet me address a few of those, Alberto. For instance, we currently have no active plans for raising equity, and nothing is in place to alter or move away from our dividend policy. Another reason is that we want to complete the portfolio review as well as carry out the reassessment over the coming couple of months, so that we stand on as solid a footing as possible when judging what we need to work with. Keep in mind the levers already referenced — the cost saving program, supply chain finance, and our DEVEX and priority prioritization. That work remains underway. We are putting together a plan and will complete it, giving you a far broader overview no later than the Q4 announcement, so that we can have that holistic picture before jumping to any conclusions. That, from our perspective, is the wisest way to make sure we proceed holistically with a plan we can also, to the greatest extent possible, quantify toward the market. On Hornsea 3, this is a project where we keep working toward a final investment decision, and levers exist and will continue to exist that we are working on.
Mads Nipper
executiveAt the moment, I mean, we’re in discussions with the U.K. government. We’re still quantifying and working through the possible levers available to us. So we don’t want to speculate about the future of the projects until we’re in a position where we can hopefully take an FID toward the end of this year.
Alberto Gandolfi
analystMads, could I squeeze in one quick follow-up? I'd like to ask specifically about the wording you've been using regarding equity. You're saying there's no active plan for an equity raise at this moment, which sort of leaves the door open to one at a later stage. So I suppose my question is: what would shift your thinking compared with the status quo? At present, no equity raise. What could in fact open that door — which is what the share price seems to be signaling to us right now — and what would the alternative to an equity raise be instead? Apologies for pressing on this.
Mads Nipper
executiveI need to say it again, Alberto — there are quite a few levers we're working on, and an equity raise isn't something we have any active plans for.
Operator
operatorOur following question comes from Peter Bisztyga at Bank of America.
Peter Bisztyga
analystLet me just build on what Alberto asked and really probe how much room for maneuver you truly have. Because I believe we'd all concur that, operationally speaking, conditions have worsened far more quickly and far more often than anyone expected across the last 6 months. So saying there are no active plans today strikes me as fairly meaningless, since what we don't know is what else could go wrong or how large some other problem would need to be before it pushes you over the edge into having to raise capital. So could you clarify whether there are any known unknowns at present that are severe enough that they could in fact compel you to raise equity, or is it simply that if you cancel near-term growth projects and if you manage a couple more farm-downs, you're in completely safe scenarios? So can you just clarify that?
Mads Nipper
executiveI'll try to frame it this way: the single largest source of uncertainty—and lately the unpredictability and really sharp swings in our U.S. offshore portfolio have been that for us—is what I'd point to first. Given the decisions we announced today, or actually last night, we think that even with the very painful consequences for impairments and the disappointment of having to walk away from projects we truly would have loved to build, we are in fact bringing far greater clarity to the ones that represent the genuinely large swing factors. So I'd say Ocean Wind 1 accounts for roughly 75% of the overall impairment we've been examining. That project is now being halted. Meanwhile, we've reached a final investment decision on Revolution Wind, we've suspended all spending on Skipjack, and we're likewise taking a cautious stance toward a rebid in Sunrise. So basically that means—and as noted before, I want to repeat this—we regard these consequences as especially painful. Yet we're in a position where we see that what can and could affect us with great unpredictability is being substantially de-risked going forward, and that ought to also reduce the variability of future impairments that could otherwise worsen dramatically.
Peter Bisztyga
analystAll right, that's clear. Just so we're on the same page — on Hornsea 3, for instance, there's nothing we should be concerned about when it comes to financial headroom?
Daniel Lerup
executiveNo. So, as I mentioned earlier, we remain confident that Hornsea 3 can become a solid project, and we're moving it forward toward FID later this year, and it's also part of our capital planning.
Operator
operatorOur following question comes from Deepa Venkateswaran, who is on the line from Bernstein.
Deepa Venkateswaran
analystMy main question is that I was somewhat taken aback by the adjustments you disclosed between late August and today regarding additional supply chain effects. I realize most of it stems from Ocean Wind 1, but the size is pretty substantial — a DKK 12 billion swing in only 2 months. With that in mind, what reassurance can you offer that for Revolution Wind, where you've taken FID, and Sunrise, where you're hoping for the OREC revision, as well as Hornsea 3, we won't see similar surprises, since I believe the market is also concerned about that, plus the follow-on effect on the equity raise as the earlier question mentioned. So could you explain why these figures moved so dramatically and why we should believe this might not occur with the remaining projects?
Mads Nipper
executiveAbsolutely, Deepa. What’s happened, particularly on Ocean Wind 1 — and supply chain changes account for by far the bulk of it — is that the problems have unfortunately centered on the vessels once again, with further significant delays in vessel availability. In a project that had no additional float left, that meant the lack of backup vessel availability across the entire market would now translate into a multiyear delay for the whole project. The implication would be that, because of these substantial extra supply chain delays, we’d find ourselves needing to go out and recontract all or very large scopes of the project, presumably at higher prices. That’s why the swing — essentially tipped by these delays — carried such massive impacts, given the uncertainty of having to recontract many of the scopes in Ocean Wind 1. That’s the reason the impact is so massive. And at the same time, on all 3 projects, as you’d expect from us following the August 29 announcement, we’ve carried out an in-depth risk review — externally assisted as well — a deep dive across all the U.S.
Mads Nipper
executiveOn projects. That also caused us to adopt a more cautious stance regarding the remaining local construction permits for Ocean Wind 1, which clearly are irrelevant at this point; however, at that time and under the ongoing scenario that, per Daniel, we must complete by September 30. Those 2 effects were far and away the largest ones we experienced on Ocean Wind 1, which again is far and away the largest portion of the overall extra DKK 12 billion impact. Then I'll address the spillover exposure for Revolution, Sunrise and Hornsea 3. Let me begin with Revolution. It too has risen within the supply chain-driven impairments, and the reason is that we have now adopted a cautious and conservative stance under which we assume 100% of the projects will be installed by the backup vessel we mentioned earlier. So we are no longer reliant on the <<inaudible>> construction schedule whatsoever for Revolution, meaning that not only has de-risking it added cost, but it also serves as an insurance policy against the possibility that this project could slip because of insufficient vessel availability. And the SKYLER is not a newbuild project.
Mads Nipper
executiveActually, this is a project that has just been contracted for service right when we need it. So it isn't a new vessel where our timeline hinges on build schedules. That makes us far more at ease regarding overall vessel availability. We aren't picking up any signals of, say, turbine hold-ups, and we likewise have fallback options plus mitigation measures in place for certain of the most critical components related to foundations. So that risk assessment for Revolution ended up landing at a highly satisfactory level — one we're comfortable taking forward. And then, for both Revolution and Sunrise, as Daniel was hinting at, the breakaway costs or cancellation costs referenced in Harry's question are clearly very large when it comes to supply chain — but keep in mind that these sit at an entirely different scale. So the present estimate for the supply chain breakaway cost would land more in the region of DKK 3 billion per project, which is plainly a long way off from the DKK 15 billion to DKK 18 billion attached to Ocean Wind 1. So the material impact is much smaller even under the worst-case scenario. And then regarding Hornsea 3, I'll simply note that here we operate with a completely different degree of experience — a far more seasoned supply base and a market we know well.
Mads Nipper
executiveAll right, so on that project the execution risk overall ought to be quite a bit different from what you'd see on any project in the U.S. And I apologize for the lengthy response.
Deepa Venkateswaran
analystAlso, is it possible to take those turbines from Ocean Wind and use them at Hornsea 3? I realize it's GE, and perhaps you were going with Siemens Gamesa, but could they be reused for Hornsea 3? I understand that's a bigger project.
Mads Nipper
executiveDeepa, thanks for asking that, since we intend to examine each individual scope within Ocean Wind 1. And I'd note that some scopes are technically quite straightforward to repurpose. To give just a few illustrations: cables, steel, the crew transport vessel, and similar items can be reused 1-to-1 with no modification at all. That makes for a very easy reuse. On the remaining scopes, though, we'll carry out a technical assessment of how reusable each one is — for instance, switching the turbines from a 60 hertz to a 50 hertz configuration, or alternatively selling some of the equipment or reusing it across other U.S. based projects. So all of that will be reviewed, yet we're fairly optimistic that a meaningful portion of it carries value that isn't reflected in the present breakaway cost estimate.
Operator
operatorOur next question comes from Kristian Johansen, who is on the line from SEB.
Kristian Johansen
analystTo follow up on the supply chain and make things clear: first, just to clarify on Sunrise Wind, could you state which vessel you have booked and how you are covered on the risk part for that? And then also regarding the vessel supplier, which has caused these measures today, is there any possibility to reclaim part of this DKK 17 billion impairment you have done due to supply chain against given supplier?
Mads Nipper
executiveGlad to address that too, Kristian. And regarding Sunrise as well, we've locked in — should there be any additional delay, we've locked in a backup vessel covering the entire project scope. So we're not facing a scenario where any further hold-ups with the <<inaudible>> vessel could put the whole project behind schedule. Out of caution and lessons learned the hard way from, say, Ocean Wind 1, we've invested that money and effort to make sure the installation scope at Sunrise is de-risked just the way we did it on Revolution. So we observe a substantially and far, far smaller gap in the risk profile when it comes to the installation scopes. And then on recovering costs from the Jones Act compliant vessel supplier; yes, definitely, those routes will be pursued by us. But generally such contracts carry a cap equal to the total contract value. So the idea of obtaining any form of larger compensation, which would involve the knock-on implications, would unfortunately not be realistic under the contract.
Kristian Johansen
analystCould you put a number on the contract value? So what’s the most potential you can get?
Mads Nipper
executiveThat's not something I have in mind.
Operator
operatorOur following question comes from Rob Pulleyn at Morgan Stanley.
Rob Pulleyn
analystIf I could follow up on the effort to evaluate the bare case from this point, could you tell us conceptually how much of the Hornsea 3 supply chain you've already committed could be reused for a Hornsea 4 bid in AR6 next year, or for a Hornsea 3 rebid in AR7 in 2025 should the company choose that route, and whether any negative cost attaches to this? And as part of that bare case assessment — some of the other analysts have already covered the U.S. side in detail — but could you confirm what carrying book value remains for the U.S. offshore wind portfolio?
Mads Nipper
executiveOf course, Rob — in a worst-case scenario, reusing equipment from Europe is something we don’t subscribe to, and I want to stress that again. That said, if we did face a bare case scenario, the potential to reuse equipment for other U.K. projects, and particularly for Hornsea 4, would be significantly greater. The tricky aspect would involve the vessel scope, since that tends to be tied to a fixed timeframe. And with Hornsea 4 being a project that hasn’t been awarded yet — even though it does have consent — making that direct transfer would be difficult. For the equipment scopes, though, technically there shouldn’t be any obstacle to reusing them, or to capturing quite substantial value, and that would be technically easier than adapting something from U.S. standards to European ones. As for pinning down exactly what that quantification would be, I don’t believe we’re in a position to do that at this moment.
Daniel Lerup
executiveFor the U.S. offshore projects that are left, the value comes to approximately DKK 10 billion.
Rob Pulleyn
analystIf I could just follow up on something, Daniel — earlier you brought up Hornsea 3. You talked about conversations with the U.K. government. Is that the deciding element in whether you move forward with the existing plan or not — meaning, some tax breaks?
Daniel Lerup
executiveNo, that isn't really the deciding element, because the project gives us latitude on merchant exposure and on how we handle the CFD as well. So a great many pieces have to align before that FID call is made. Even so, we're working through every available route so we can reach the soundest evaluation.
Operator
operatorSam Arie from UBS has the next question.
Sam Arie
analystIs it safe to assume you're able to hear me clearly?
Mads Nipper
executiveWe do hear you.
Sam Arie
analystPerfect. So first off, let me just say that I believe everyone here values how candid this presentation has been and the acknowledgment of the challenges. I think we're all also conscious that a lot of the problems you're facing tie back to bids that predate the time you two took charge, so in a way you're contending with some substantial legacy matters. But I wanted to pose a question to you, if you will, a bit more about, sort of, what has unfolded this year and where we head next with your strategy update or the review you've mentioned. And I suppose my sort of opening remark is that if we look back at the various announcements this year since you really began tackling and communicating about the legacy issues — starting with the first impairment at the start of the year, the full year results for Q1 and Q2, the CMD, the August profit warning, and then the release we're discussing today — it does appear clear that on each occasion you've provided an update, the situation has been, sort of, worse than you believed it was the previous time, and the numbers have grown rather than shrunk. I guess that's what fuels the sort of questions we get from your shareholders and investors, and what people ask us constantly is when do we think a line can be drawn under all these problems and, sort of, move forward in a manner that puts the uncertainties behind us.
Sam Arie
analystAnd I'm certain you're wondering the same thing—I don't want to come across as dismissive about it. But let me just reframe it into something you can actually respond to. I mean, when you laid out this strategy update that you've discussed, is your intention that this update will then provide us with a new base plan—things like financial targets and a financing equation—that relies only on projects where you've reached FID, where contracts are 100% locked in, where project execution is in good shape, suppliers are delivering comfortably relative to your expectations, and so forth? So is there anything else you might be hoping for—for instance, projects that could move forward if they receive the bump in the tax credit or get a little more support, or anything else that would all represent upside to the plan? Is that the way you're thinking about it? And if so, how significant a reset does that imply, going from the sort of best case scenario plan that we have today to a truly de-risked de minimis plan that only includes projects where you can have 100% confidence you won't need to come back and revise things downward afterward?
Sam Arie
analystI realize that's a difficult question to answer, but getting whatever remarks you're able to offer on that topic would be genuinely useful, I think.
Mads Nipper
executiveGlad to address that, Sam. Honestly, it's simply too early and premature to say anything about what the outlook will be. That said, we'll clearly examine key dimensions of how we can both secure greater certainty—even amid a volatile environment—when it comes to value creation for investors. How we can de-risk what we do by learning from what we've witnessed in the U.S., while also making sure we hold a strategically sound and possibly well-founded view of where in our portfolio, both geographically and technology-wise, is the best place to deploy our capital. Those are very broad headlines and, as we've said, that could also lead—particularly given the capital structure implications here short term—to a revision of both our capacity target and our long-term targets. But the focus will indeed be that we want to de-risk and further increase the likelihood to create value. And as I described in response to Deepa's question, the first step of that, which we're already announcing today, is exactly to de-risk the most painful part of our portfolio, namely the U.S. projects. And we actually think that, if you look at our total portfolio risk, we have already come a long way with the decisions that we have taken now.
Mads Nipper
executiveAnd what we also shared at the Capital Markets Day is that the outlook for value creation on the non-U.S. projects still looks solid right now, as we mentioned, with good headroom as well. So while we don't have all the answers on what that will look like — because then it wouldn't be a review over the next few months — it will focus on value creation and de-risking, and indeed on avoiding coming out with this stream of seemingly ever-worsening news about the projects we are struggling with, because they were awarded at a price level that is now unrealistic.
Sam Arie
analystThat's really useful, and it helps me see how you all are approaching this. If you'll indulge me, this isn't a second question — just a brief remark before you go to the next person. I suspect every analyst on this call hears the same thing I hear daily: what are the existing assets worth? I'm sure you field a similar question. Still, it says something. It shows people recognize you hold a portfolio of valuable assets, yet what they aren't paying for is the conditional part. The "we hope to build this if" items — if we secure the tax credit, if the tax credit gets bumped up, if we can negotiate better terms, and so on. So my feeling is that if your strategy update can present a base plan that is genuinely dependable and as reliable as people consider the existing structured assets to be, I believe you'll be rewarded for it. And what I'd hope you can do is strip out any elements where uncertainty remains or where people must buy into a belief, since it seems to me the current share price is signaling that nobody wants to believe in those kinds of uncertainties any longer.
Sam Arie
analystI’m not sure whether that helps, but perhaps it’s fine if I add one remark, and then I’ll pass it along to the next question now.
Mads Nipper
executiveThanks a lot — we really appreciate it.
Operator
operatorWe’ll take our next question from Lars Heindorff, who is on the line from Nordea.
Lars Heindorff
analystThis concerns the Ocean Wind project. Mads, I believe you said earlier during the call that, in addition to the obvious reduction in CapEx from halting those 2 projects, you'd also see some working capital benefits. Could you give us any sense of how large those might be? And it would also be quite useful if you could indicate how much CapEx has been spent on those 2 projects so far and what the total CapEx is. I realize you likely can't provide an exact figure, but perhaps a ballpark estimate, or even a metric such as CapEx per megawatt, would be very helpful.
Daniel Lerup
executiveYes. So regarding Ocean Wind 1, our book value stood at DKK 13 billion at the close of Q3. That figure is approximately what we invested in that project. I'm somewhat unsure what you mean by net working capital. I don't know if you're pointing to 1 of the earlier questions — namely that we of course face a sizable cancellation fee from exiting this project. Yet at the same time, we also avoid having to lay out the substantial CapEx on this project, which ought to bring some relief to the capital structure over the shorter term. On CapEx multiples, I believe a set of numbers is already circulating in the market as we speak. Keep in mind it varies considerably depending on which region you're in, which project you're examining, and what scope applies. So there are many different metrics at play here. But I think if we're talking about the remaining larger U.S. projects, the indications we've previously provided point to roughly USD 6 million per megawatt.
Lars Heindorff
analystOkay, and then a quick question about net working capital. Maybe I got this wrong — I can't remember if it was you or Mads. But when it comes to the discussions around the Ocean Wind project, there were some remarks that the choice to stop developing those projects would, beyond obviously reducing CapEx, also result in a release of net working capital, if I understood that correctly.
Mads Nipper
executiveI believe I was the person who mentioned it most recently, though the CapEx deployment then was considerably smaller. As Daniel noted, that would translate into a notably smaller overall CapEx outlay over the coming, particularly 2 years, since in spite of the substantial cancellation fees, we have been spending several billion below our capital plan up to now, and that should ease the strain on our capital structure, particularly in '24 and '25. That is what I was getting at. Apologies if I put that poorly.
Operator
operatorMoving on to the next question, which comes from James Brand at Deutsche Bank.
James Brand
analystI have 2 questions. First, earlier I asked a few things about the capital raise and the dividend. May I just verify that what I took from your response is correct? My reading is that this reassessment of the business plan rules out nothing, whether on the dividend or on the capital. That's question one. Second, regarding Sunrise Wind, I was hoping you could walk us through the steps from here. Clearly you expect a new auction. From what I understand, the current contracts have to be canceled before you can bid in new auctions. So at some point do you cancel your existing contracts and try to bid into the new auction? While going through that process, do you keep on with construction, or do you try to also have some pushback contracts? A bit more detail on the steps you need to go through for Sunrise would be really interesting.
Mads Nipper
executiveJames, on your first question, the simple answer is that we don't intend to alter or modify the dividend in any way, and we have no current plans to issue equity. Regarding the steps for Sunrise Wind, there's a request for information that has gone out to the market, and that isn't the same thing as a request for proposal. The RFP is what we bid into. At the moment, in principle, it's a hearing round, and the preliminary proposal does in fact state that no party may hold an active agreement with the state prior to bidding in. Together with our friends who likewise have existing projects that didn't receive the OREC adjustment, we are pressing extremely hard to get that changed, since it's clearly a really, really important precondition for making this an attractive bid. It's intended to be an accelerated piece, with a very short timeline. And right now there are 2 timelines, and we're advocating for the first one, which would mean an award already in Q1. And since we know this project would depend on being able to secure a new deal, then the additional burn.
Mads Nipper
executiveSome cash outlay or capital commitments would be involved, though those would be manageable and not the sort of thing that would fundamentally alter the decision during the few months in which we hope to get clarity. That's our current view, so that in Q1, or hopefully early Q2, we would have clarification on a possible rebid. But if we learn even sooner — which is expected at the end of this year — that the risks of proceeding with a fully merchant project in the U.S., which is obviously unattractive, are present, then at that point we would have to evaluate the project's future.
Operator
operatorWe’ll take our next question from Vincent Ayral at JPMorgan.
Vincent Ayral
analystI'll get back to this very quickly. I know you've already asked this question several times today. But you keep stating that there's no active plan to raise equity, and clearly the market dislikes the "active" wording and is pricing in an equity raise regardless. So as you proceed along this path and will update us at the full year, I just want to ask the same question my colleagues have. If you use that phrasing, it means you must have made an assessment already, even before the detailed assessment we'll present at the full year. You must have done a solid back-of-the-envelope calculation telling you that basically you can move forward without raising equity. So what was the math that can give the market confidence and help the share price today? I think that would be question one. Question 2 relates to Ocean Wind 1. So clearly Governor Phil Murphy didn't really appreciate your walking away from the project. On the other hand, you were told very clearly by the authorities that you can always walk away from a contract.
Vincent Ayral
analystSo, that's what was stated at your committee, so that's fair enough. He mentioned that today's decision <<inaudible>> represents a commitment to New Jersey traders, voila. I recall that a few weeks ago you placed roughly $100 million into an escrow account in case you canceled the project. So I'd like to get a bit of clarity on the situation here. Were you compelled to act on this timeline? Did you already know you would be exiting the project? Were the authorities informed about it? And does the extra $100 million you presented today get included in your impairment and provisions, just so we can better understand this specific point?
Mads Nipper
executiveI'm sure you'd expect a brief reply to your first question: since there are no active plans, no assessment has been done, and it wouldn't be appropriate to reach any conclusion on that before we've completed the assessment toward Q4. So the statement remains that there are no active plans. On Ocean Wind 1, you're correct, and the reaction from the Governor of New Jersey is understandable. And by the way, I want to repeat that New Jersey has been a great partner on these projects. They enacted a law letting us, as a developer, retain the full tax credits, which we greatly appreciated, and we know that came with hardship. So that makes us feel even worse about the decision. But from an investor standpoint and from a capital discipline standpoint, it is the right call, and we don't feel this is a project we cannot walk away from. As for the $100 million, that was not forced. But it does indicate that the events leading us to the impairment here now, and the visibility of their impacts, are indeed very recent. And the agreement with the $100 million guarantee was something we wanted to post, also because until recently we were confident there were still good opportunities to move this project forward.
Mads Nipper
executiveJust to remove any ambiguity, that amount, along with the $200 million held in escrow for supply chain development, is entirely captured within the impairments as things stand. So no additional impairment downside exists on either of those amounts.
Vincent Ayral
analystOkay, and I just want to ask a very quick one. You still have a few projects online and some remaining book value. From what I understand, you still have DKK 10 billion of book value. Could we get a sense of the split, basically on Sunrise Wind — more specifically, how much does that account for, since we'll be tracking all of that? And where it gets complicated to fully grasp what the rebidding auction will look like — it seems New York said, I'm not sure how to put it, that these new options may come with some restrictions on who can go in and bid. It's hard to understand what the odds of success would be if you bid again. Could you give us some color on that specific point — Sunrise Wind, if you bid again, why is it a competitive situation there, and that could help us assign some probability of success for more?
Mads Nipper
executiveLet me address the final question, and then Daniel can speak to book value. So regarding New York: the fact that this RFP is expected to be highly accelerated means that, all else being equal, it ought to benefit projects at a much more advanced stage of development — in particular Sunrise, but also the projects from our friends at BP and Equinor. It is, of course, an open and competitive auction. But keep in mind that the winning strike price from the recent New York 3 solicitation, which is under 2 weeks old, came in at $145 per megawatt hour. And the price we at Sunrise were applying for under the OREC adjustment totaled less than $140. So even if we were to bid at the level we were applying for, we would have received the full amount we were seeking from the Public Service Commission, and we would still be meaningfully below the average winning price — which we believe gives us good reason to think our project is very competitive relative to the winners. I want to reiterate that I am not thereby revealing what our bid price will be in such a bid.
Mads Nipper
executiveThe point here is to give you a sense of what we consider a reasonably likely chance of success in a solicitation like that.
Daniel Lerup
executiveRegarding the DKK 10 billion book value for the U.S. offshore projects, that figure appears on Page 31 of the financial report, in the impairment note. There you'll find Sunrise at approximately DKK 0.5 billion. We applied a 50% probability to the rebid, which gives you an upside or downside of about DKK 1.4 billion on Sunrise.
Operator
operator<<operator_script>> Our following question comes from Klaus Kehl at Nykredit.
Klaus Kehl
analystIs this coming through clearly at your end?
Mads Nipper
executiveWe hear you.
Klaus Kehl
analystAlright, I have to admit I'm somewhat taken aback by how firmly committed you are to continuing dividend payments going forward. The reason I bring this up is that your equity has been hit hard here in Q3, and it will most likely suffer another blow in Q4, and 1 straightforward route to rebuilding where your equity stands would be to scrap the dividend. So my question is this: are you in any way obligated to the Danish government to pay some form of dividend, or are you free to do whatever you wish with your dividend policy? That's what I'd like to ask.
Mads Nipper
executiveAs for the dividend policy, Klaus, that decision rests with the company, and at this moment we have no plans to change it.
Operator
operatorOur next question comes from Ahmed Farman at Jefferies.
Ahmed Farman
analystMy question centers more on what additional steps, beyond the equity raise, could help shore up the balance sheet, and you laid out those 4 bullet points on Page 5 of your slide deck. Have you carried out any assessment? Could you give us a sense of how broad these measures are? What exactly do you have in mind? What cost savings or efficiencies do you believe can be delivered through what you have outlined? And then I would be particularly interested in your comments on farm-down, because I think you are also one of the drivers of, let's say, the adverse development being higher interest rates, right? So we can say interest rates have a negative effect on the future divestments received, but then farm-down also appears to be a lever that you seem would be deploying in order to shore up the balance sheet. So some thoughts there would be helpful.
Mads Nipper
executiveAhmed, and honestly it's too early for us to put a number on each one of those levers. So when you look at cost development expenses, supply chain financing, additional portfolio prioritization, and simply hitting pause on portfolio prioritization — something like Ocean Wind 1 represents a very substantial easing of capital structure pressure in the near term. So there really are some major levers here; a few of them are recurring and structural, like costs, and a few are very large potential reliefs, like portfolio prioritization. But what we're also examining is things such as joint venture partnerships on potential accelerated farm-downs. And our lever — as we also said at the Capital Markets Day — the filter we apply when assessing how attractive a farm-down is remains net present value retention. But obviously, given the return requirements for investors, we will in every single case make sure we evaluate it against what a normal return looks like, and therefore the belief around our capital structure — but unfortunately it's not possible at this stage to quantify the different levers.
Operator
operatorOur next question comes from Casper Blom at Danske Bank.
Casper Blom
analystMy question isn't about the U.S. I was just wondering whether you could give a bit of an update on the Polish Baltica 2 and Baltica 3 projects — what's there for each of them, and when would we expect that you potentially take an FID on Baltica 2? As I recall, it's sort of scheduled for completion at the same time as Hornsea 3.
Mads Nipper
executiveCasper, we don’t have a specific timing for Baltica 2, but that project is progressing nicely. Baltica 3 is still being reconfigured, though we’ve actually seen some favorable developments lately. Even so, it remains in reconfiguration, and we’re working to determine whether we can bring it to a point where it reaches a sufficient and acceptable return range. So there’s no timing on that yet. But we will — let me check, do we have a — it is completion — sorry. For Baltica 2, I’m just looking at my pages here. COD is expected in 2027, and if we work backward from that by a couple of years, that puts it late in ’24 or ’25.
Operator
operatorDominic Nash from Barclays has the next question.
Dominic Nash
analystI have just one question, please, and it's about the JV with Eversource, so Sunrise, Ocean Wind 1 and Ocean Wind 2. You've clearly decided to drop out of Ocean Wind 1 and Ocean Wind 2. I assume you did that unilaterally, or did you do it in — or did you sort of negotiate this with your partner, who of course has the whole package up for sale at the moment? And does that mean Sunrise might struggle to find you a partner in time to put it back? And just — I know I'm allowed 2 questions. But Ocean Wind 1 and 2, you've not permanently walked away. Do you still own the lease for those wind farms?
Mads Nipper
executiveIf I understood your question correctly, Dominic. So Orsted owns 100% of Ocean Wind 1, which means the call rests entirely with us as a company. The 50-50 joint venture with Eversource covers the south work on Revolution and on Sunrise. So because of that, the decision is ours. What we did previously was buy out our partner PSEG, a Jersey-based company, at cost, and as a result it is 100% owned. That project was 100% owned. And just to restate, you shouldn't conclude that we made a terrible decision. A contractual right existed that allowed them to step out at cost.
Dominic Nash
analystDo you still hold that lease, or do you have to give it back?
Mads Nipper
executiveFor each of these projects, we hold the lease rights, and that carries value as well—not just the seabed itself, but also, as with Ocean Wind 1, the fact that the site has received full consent. So those development costs carry value too.
Operator
operatorOur next question comes from Ingo Becker at Kepler Cheuvreux.
Ingo Becker
analystI've got 2 questions. First, on Page 5 of your presentation, you mention that updated forward power price curves have resulted in lower revenue expectations. Could you expand on that a bit? Which curves are involved, and which regions are you talking about? Because it appears the Nordic curves, as well as the Northern Continental ones, haven't really shifted much over the last quarter or even 2 — especially not since the first impairments were made. My second question concerns that relatively small impairment on the onshore assets of DKK 1.4 billion. Could you explain what you did there, why the impairments were taken, and what they relate to?
Daniel Lerup
executiveRegarding the onshore impairment, which comes mostly from U.S. onshore, the main issue is that we're raising the WACCs applied in our impairment test, since long-dated U.S. interest rates have risen fairly substantially. So you could describe it as a technical adjustment to the discounting factor used for U.S. onshore projects. Then, on your question about power prices, the main point is that we're beginning to see a modest decline in longer-dated forward prices across all the European countries where we hold power price exposure. That said, you're right that this isn't a major shift, but we are seeing somewhat lower levels than when we last ran the assessment in Q2 and in connection with the CMD.
Operator
operatorMarc from Berenberg has the next question.
Marc Ip Tat Kuen
analystI have a brief question regarding the confirmation political agreement. Could you remind us what that actually means for Orsted as things stand, and whether it could be extended, since it only ran through 2020? And if it can't be extended, what does it basically mean?
Mads Nipper
executiveSorry, could you say that again? I didn’t catch it. You’re referring to the agreement?
Marc Ip Tat Kuen
analystIs my voice coming through clearly?
Mads Nipper
executiveCorrect.
Marc Ip Tat Kuen
analystOn that confirmation of the political agreement, could you walk us through what it means for Orsted as things stand? And whether that ought to be extended? From what I recall, the last time I looked, it actually ran only through 2020. So we're talking about the Danish state's 50% stake in Orsted.
Mads Nipper
executiveNo, I wouldn't call that a political agreement. What I mean is there's no time limit attached to it. Sorry if we aren't fully getting the question. All right. I've just been given some clarification, Marc. So the political agreement has expired, but that has nothing to do with the state's 50.1% ownership, which carries no time limit. So that neither raises nor lowers the likelihood of any change from the state side.
Operator
operatorMoving on, our next question comes from Helene Brondbo at DNB.
Helene Brondbo
analystI've got two questions. First one is about Hornsea 3. I'm just curious — what does it take to reach enough project profitability so that you can get to FID later this year? And then on Sunrise, I'm also wondering: if the project ends up on a slightly later timeline, how much of the value chain would you need to recontract?
Mads Nipper
executiveWhat's required is just an improvement in the business case past the levels we've had and that we also saw back at the time of the CMD, so that it gets close enough to acceptable value creation. That comes from a mix of contracts, discussions with suppliers, it involves revenue levers, and it involves merchant flexibility — how we can achieve that, optimizing the layout, inclusion and maximization of value from battery capacity, and so on, which can raise the value. So we keep working these levers, together with, as Daniel said, dialogue with the state regarding any tax benefits that could help further, and that's how close we can get. It's about achieving a further improvement in value creation on the way to an FID, which we still believe in, but keeping all options open right now. And on Sunrise, I mean, based on this there would be no recontracting expected. So this is not a material delay at all. It would be very close to the FID timing originally planned. So there's no reason to fear that we'd need to recontract anything in a rebid situation.
Helene Brondbo
analystAlright, a quick follow-up regarding Hornsea 3. Would you anticipate reaching FID on the basis of merchant flexibility and cost by themselves, or is some kind of enhancement to your CFD required?
Mads Nipper
executiveWe aren’t counting on FID getting better within that framework. So the remaining levers are what we’re focused on.
Operator
operatorOur next question comes from Fredrik at BNP Paribas.
Fredrik Fremberg
analystThis is a question from the credit side, and I appreciate the dedication to strong credit ratings. Could you shed some light on why these matter so much to Orsted from both a business and a financial standpoint, and what the consequences would be if a credit rating downgrade were to occur?
Daniel Lerup
executiveFrom where we sit, the goal is naturally to build stability in our credit profile, and we also think the BBB+ level is one that keeps us competitive when we bid, given the right funding cost relative to the capacity within our key credit metrics. Beyond that, we also depend on, say, many counterparties for trading activity and for delivering on our farm-down model. We further depend on being a creditworthy counterpart toward investors. Those are among the main reasons we want to keep a BBB+ rating. However, we are not aiming for a lower credit rating. That, then, is our target, and we will safeguard it through our capital structure.
Operator
operatorOur next question comes from David Paz at Wolfe Research.
David Paz
analystRegarding your U.S. Northeast portfolio, what has increased your confidence about Sunrise qualifying for the bonus ITC since the August update you gave? Also, do you expect to reach any operational agreements with the prospective purchaser of the Eversource stake before your business review, or after it?
Mads Nipper
executiveOn your question about what makes us more confident regarding the 40% ITC, I have to say this is honestly the first moment in my life I've felt at least fairly pleased about contaminated soil. We're sending that soil out for testing, and the situation is that because of what the testing at the landing point for our power has revealed, it now meets the criteria for brownfield treatment under the energy community credit — and it qualifies even under their preliminary guidelines, which is exactly why we, together with Revolution Wind, have strong grounds to believe it will qualify. As for the Eversource sales process, there's an ongoing dialog between Eversource and us, and we see no reason why any complication should arise with the existing deals. And should one arise, Eversource would serve as partner for the Sunrise project, since that's who our partner is today. And if no agreement is reached with a potential new buyer, then Eversource would be the partner for Sunrise.
Operator
operatorOur following question comes from Martin Tessier, who is with Stifel.
Martin Tessier
analystStarting with your long-term target, what combined EBITDA figure have you published for Ocean Wind 1 and 2 for 2027, and perhaps also for 2030? Then one small question on how you'll approach farm-downs going forward. At the last CMD, you indicated a global ownership share of 50% by 2030. So, as we speak today and given where things currently stand, do you think it's possible you'd go below that 50% ownership threshold in the future and perhaps lose control of the asset?
Daniel Lerup
executiveI can't give you an EBITDA figure at the moment, but we can follow up with you on that. As for the farm-down model, the way we approach it starts with pursuing the 50% farm-down, as you mentioned. That said, there are situations in which we might revisit the idea of taking a different ownership stake, should we identify value in doing so, or where a JV structure makes a 50% share unattainable. Over the years we've also encountered partners pursuing project finance rather than balance sheet financing. In cases like those, reducing to a smaller ownership share could prove advantageous for optimizing the capital structure and investment capacity. On the offshore side, though, there are no larger plans in that regard.
Operator
operatorLouis Boujard has the next question on the line.
Louis Boujard
analystI'd like to circle back a bit on the possibility of eventually reversing some of those impairments, especially the one on Sunrise Wind, DKK 2.8 billion. I think if you look at the RFP, and my understanding is it's going to come with a higher price, more likely close to what some of your peers achieved 2 weeks ago — in that case, is it correct to think there would be a relatively good likelihood that you could reverse impairments, because with that price you'd have enough returns in this project to keep it on your books? And by the same reasoning, given that you took the FID on Revolution Wind at a DKK 3.3 billion impairment within the DKK 28.4 billion impairment, should we consider that this one, conversely, is a bit retaining at the moment, so the opposite of Sunrise Wind? Going a bit further on this topic as well — I was wondering whether you could eventually elaborate and discuss a little bit with regard to the bid from your peers 2 weeks ago with <<inaudible>>, where some of them got $145 on average. And I was wondering whether you did something with Sunrise Wind 2 on this one, and if yes, why you were not successful in this one?
Mads Nipper
executiveSorry, I’m not sure I understood the question. Could you begin with just the Sunrise piece, where you mentioned DKK 2.8 billion? What was the question about that, and about the DKK 3.3 billion on Revolution?
Louis Boujard
analystYeah, absolutely. Regarding that DKK 2.8 billion, the question is this: if you go out to an RFP and secure a more favorable price, how likely would it be that you could reverse this DKK 2.8 billion impairment on Sunrise Wind, since a better price might also give you the chance to reverse that impairment?
Daniel Lerup
executiveWith the DKK 2.8 billion tied to Sunrise, our assumption is a 50% chance that we can rebid at a price close to the petition price, and because we've applied a 50% probability, that gives us equal upside and downside of DKK 1.4 billion. So if we secure it at that price, there's a reversal of DKK 1.4 billion, and if we don't secure it, there would be a further impairment of DKK 1.4 billion. That dynamic doesn't apply to Revolution, since no rebid is involved there. It's a project we've now FID-ed with the existing OREC contract.
Louis Boujard
analystAll right, and going back to that other decision for a follow-up: two weeks ago, did you place a bid involving Sunrise Wind 2 in this round? If so, how do you view the pricing?
Daniel Lerup
executiveTo answer that, yes, we submitted a bid through our Sunrise 2 project, though it didn’t succeed in the third auction round. Still, one thing we take considerable comfort from is that PPA prices have risen quite sharply versus the prior auction round, and that’s clearly a strong signal that states are willing to pay and that competition is, you could say, becoming more rational as bidders pursue value creation. That also gives us more confidence that there’s a solid likelihood we can come in with a competitive price for Sunrise 1.
Operator
operatorOur following question comes from Chris Liang at Federated Hermes Limited.
Chris Liang
analystIs my voice coming through?
Mads Nipper
executiveWe hear you.
Chris Liang
analystMy question comes from the credit side and concerns the hybrid bonds you currently have outstanding. Given the news about provisions and the cash impact that will result, plus your commitment to paying dividends, I'd like to know what your intentions are regarding the hybrid — more specifically the one whose call date falls in 2024. In other words, are you committed to the hybrid market? And do you plan to call that one in 2024, or will you leave it outstanding in light of the recent news?
Daniel Lerup
executiveWe remain dedicated to the hybrid capital market, which we view as a crucial component of our funding mix, and we are still working toward a refinancing in 2024.
Operator
operatorSince we’re running short on time, we can’t take any further questions right now. So I’ll turn it back over to the speakers for any closing remarks.
Mads Nipper
executiveThanks a lot for being here and for all the questions. As usual, if anything else comes up, feel free to reach out. Our IR team will be available to help. Thanks so much.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ørsted A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Ørsted A/S earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ørsted A/S or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.