operatorLadies and gentlemen, thank you for joining the Ørsted Q4 2024 Earnings Call. <<operator_script>> Please note that this conference is being recorded. <<operator_script>> Recording this conference for publication or broadcast is not permitted. Speaking today will be our Group President and CEO, Rasmus Errboe, along with CFO, Trond Westlie. Gentlemen, the floor is yours.
Rasmus Errboe
executiveGood day, everyone, and thanks for being part of today's presentation. Taking on the CEO role at Ørsted marks my first earnings call in this position, and after 13 years with the company, I feel both honored and humble to step into it. Alongside our talented employees, I and the remaining members of the group executive team will strive tirelessly to generate value for our customers, shareholders and stakeholders broadly. Ørsted rests on a solid foundation with distinctive capabilities, and I look forward to leading the transformation that is required to steer through the headwinds currently confronting Ørsted and our industry. Although I am just a few days into this job, I understand Ørsted and the difficulties before us quite well. And I firmly believe the actions we are announcing today are necessary, especially when it comes to reducing our projected investments through 2030 by roughly 25% on a like-for-like basis via a more disciplined approach to capital allocation. Ørsted will remain active across our 3 regions, and delivering on our committed construction program will be our #1 priority. That said, as we chase new development opportunities spanning offshore wind, onshore wind, solar PV, battery energy storage and carbon capture as well, we will above all prioritize the offshore wind opportunities that are most financially attractive, in regions and countries where framework conditions and the investment environment look most attractive and where our competitive differentiation is most distinct and where we can best leverage and unfold our business model across the full life cycle.
Rasmus Errboe
executiveOffshore wind remains the area where our capabilities are most unique and distinct, just as it has been previously, and our allocation of capital moving forward will keep mirroring that. In addition, our scaled-back growth ambitions toward 2030 will unavoidably mean we become a more focused company. Right now we are building over 8 gigawatt of offshore wind, yet expecting lower gigawatt construction each year as we approach the latter part of 2030, so in the years ahead we will be rightsizing the organization to match our future needs. Simultaneously, we anticipate growth, especially in our Generation and Trading and Revenue business, as additional offshore wind farms get commissioned in the coming years, adding to the existing operating fleet of 10 gigawatt offshore wind. Also, I want to restate that in spite of the recent, deeply disappointing difficulties concerning our U.S. offshore wind projects under construction and the negative effect on our capital structure, we stay fully committed to the goal of holding a solid investment-grade credit rating. Having said that, allow me to begin with the performance highlights and strategic milestones reached during 2024.
Rasmus Errboe
executiveLooking at the full year '24, we delivered EBITDA of DKK 24.8 billion, which was right in line with the guidance range we had given of DKK 24 billion to DKK 26 billion. If you adjust for cancellation fees and the new partnerships, that works out to a gain of DKK 700 million versus last year, along with an earnings mix in which our offshore and onshore assets made significant contributions — again underscoring the strong operational platform that we have. Through 2024, we also succeeded in settling a substantial number of contracts tied to Ocean Wind 1 and FlagshipONE. A portion of those settlements closed on terms that were better than we had assumed, which produced a total net reversal of cancellation fees of DKK 7.3 billion. As we stand here now, under DKK 2 billion is left in the provision, so we have essentially worked our way through nearly all of the contracts connected to those projects, with outcomes considerably better than expected. Group EBITDA for 2024 in total, when you include the new partnerships and these cancellation fees, came to DKK 32 billion — one of the highest EBITDA levels the company has seen in its history. Within the 2024 accounts, we have booked total impairments of DKK 15.6 billion for the year, the bulk of which relates to the adverse development within our U.S.
Rasmus Errboe
executiveTurning to the offshore wind portfolio. Part of these impairments stems from rising long-dated U.S. interest rates, along with market uncertainties that prevail beyond our control — yet the execution challenges leave us deeply dissatisfied, and going forward we will make sure there is an ever-sharper focus on bringing these projects in line with the revised schedules and budgets. We will also aim to be more granular when we communicate about progress and risk across our offshore construction projects. Across the full year, after adjusting for impairment losses and cancellation fees, our return on capital employed came in at 10.1%, a touch under our average ROCE towards 2030. We will revisit that figure later in the presentation. Finally, our sustained, relentless attention to safety keeps paying off, since we brought down our total recordable injury rate in 2024. That marks the second consecutive year of improvement, which we attribute to our long-term focused efforts. Much as this development pleases us, we will never rest where safety is concerned, and each day we will go to work aspiring to push it down still further.
Rasmus Errboe
executiveMoving now from the operational results to our strategic milestones, and I'm glad to report that we achieved meaningful progress during the year. To begin with, we have brought into service approximately 2.4 gigawatt of renewable capacity in total, spanning both offshore and onshore assets, which amounts to a substantial input into expanding the operational asset fleet we hold. Furthermore, quite recently we reached a final investment decision on the Baltica 2 project located in Poland. Contracts for all the major components as well as the vessels for the projects are now signed, thereby fixing most of the project's CapEx and cutting the risk on the projects considerably. We feel good about the value this project will create, given its appealing balance of risk and reward. This FID demonstrates that sound investment possibilities remain available even with the difficult conditions in the industry, and I take pride in the team for bringing the project to this crucial milestone. A further important milestone in 2024 came with the award of 3.5 gigawatt of offshore wind under the U.K. allocation round 6, including an inflation-linked offtake covering a 1.1 gigawatt share of the Hornsea 3 project along with 2.4 gigawatt for the Hornsea 4 project. The auction result leaves us highly satisfied, occurring as it did in one of our core markets, and we recognize that the U.K.
Rasmus Errboe
executiveThe government has demonstrated resolve in adjusting its support schemes for offshore wind so they reflect today's market conditions. Beyond the U.K., we consider the recent regulatory developments for offshore wind in Poland and Denmark to be encouraging. Under our divestment program, we made significant progress during 2024 and delivered in line with what we expected. Across 5 divestments in '24, we secured proceeds of around DKK 22 billion. That shows our capacity to bring projects to market, and we still see interest in our broad asset portfolio. Even with the challenging market conditions, we remain on track to deliver on our divestment program toward '26, which Trond will discuss further later in the presentation. During the year, we also shut down our large coal-fueled combined heat and power plant, the SBI power station in Denmark. That marks the end of a chapter in our green transformation and is the last major step in our journey toward meeting our industry-leading science-based targets of producing our Scope 1 and 2 emissions intensity by 98% by '25. Looking ahead, essentially all of our energy generation will be fossil-free. On innovation, we introduced new groundbreaking technology as part of installing Gode Wind 3, and we have successfully developed and used a first of its kind, noiseless monopile installation technique, which enables a further reduction of the potential impact from construction activities on the marine environment as well as constructing in a more cost-effective way once we have adopted this at scale.
Rasmus Errboe
executiveMoving to Slide 5, I'll take you through the changes we're making to the business plan. We did complete meaningful strategic steps in 2024, but we also encountered adverse developments and market conditions that stayed challenging. Most of those industry-related difficulties were captured in the updated business plan we shared a year ago, yet additional challenges have since emerged, and those have placed pressure on our capital structure. So beyond the ongoing activities we've discussed previously, we're now putting additional measures in place to strengthen value creation and competitiveness and to make sure we have a self-funded plan capable of improving our capital structure over the medium to long term. All of these measures sit within our control, and they will help make our business more efficient, more focused and simpler going forward. As I said, our first priority will be offshore wind opportunities in markets offering the most attractive investment environment and where our distinct capabilities can be leveraged. That focus means we will pursue and invest in fewer opportunities than we anticipated before, and together with a dedicated effort to execute the current construction portfolio and hit our 2026 targets, we have decided to step away from the previous 2030 gigawatt ambition.
Rasmus Errboe
executiveWith that said, I want to be crystal clear that our fundamental belief in the long-term appeal of offshore wind—and renewables in general—remains intact. Following the unfavorable developments affecting our capital structure, and as an extension of the lower expected build-out, we're cutting our investment program through 2030 by roughly 25% relative to our earlier ambition. This aligns with our dedication to maintaining a robust capital structure capable of supporting a solid investment-grade rating. We aim to be a focused, efficient business, so we're adding further measures toward that end. The cost savings plan we launched a year ago is being delivered, and it will yield permanent savings of DKK 1 billion annually as part of organizational efficiency initiatives—and we'll take additional steps beyond that. We won't be expanding and constructing at the same pace as our current buildout program, and as a natural consequence, we'll keep rightsizing our cost base and organization in the years ahead to match our value and capacity ambition. The last piece of this is a very clear prioritization of value over volume, including more focused capital allocation.
Rasmus Errboe
executiveGiven the difficult renewable sector backdrop and the negative trends we've seen in recent years, our approach to allocating capital will be more focused than ever. We also recognize there are ample opportunities in our core markets to draw on our core capabilities. Given the opportunities available to us, we'll pick and advance investments only in the most appealing market opportunities, and we'll keep evaluating which markets we ought to keep prioritizing. Moving to Slide 6 and our investment program: in February of last year, we gave guidance on our long-term investment program, under which we anticipated investing roughly DKK 270 billion through 2030. Taking an adjusted look at that figure now, reflecting the same set of projects, we find that the CapEx program would be up by approximately 10% on a like-for-like basis. That's mainly driven both by higher costs on the offshore projects currently under construction and by cost increases in the projects in our pipeline that we have not yet committed to. Because of the negative developments in 2024, we've chosen to prioritize our investments and cut our total gross investment by roughly 20% to 25% on a like-for-like basis through 2030, meaning we now anticipate investing somewhere in the range of DKK 210 million to DKK 230 billion through 2030.
Rasmus Errboe
executiveWe can break this range down into 3 parts. First, last year we put roughly DKK 43 billion into our construction portfolio. Second, for our 9-gigawatt construction portfolio, the additional investment is expected to be about DKK 130 billion, and that spending is planned toward the latter part of 2027. Beyond the construction portfolio and the committed CapEx, our investment capacity comes to somewhere between DKK 40 million and DKK 60 billion. Going forward, this capital will be directed first to the opportunities that create the most value, while we also make sure our capital structure stays stable. Let me move now to Slide 10 and the build-out plan we have today. At present, our installed renewable capacity stands at 18.2 gigawatts, and over half of that sits in our offshore business. We have 9.2 gigawatts of renewable capacity currently under construction, and 8.4 gigawatts of that is offshore capacity. The capacity being built will be brought online over the next 3 years, and once it is fully commissioned by 2027, the installed capacity across our portfolio will rise by approximately 50% overall, with offshore wind nearly doubling. This won't be easy, and more challenges will come up, but if we deliver on this plan over the coming years, we will go into the latter part of this decade from a position of strength and cement our standing as the undisputed global leader in offshore wind.
Rasmus Errboe
executiveFor the projects currently under construction, our CapEx visibility is quite strong, and going forward we anticipate sustaining investments of roughly DKK 30 billion to finish installing that construction portfolio. One thing worth stressing is that we genuinely possess meaningful investment capacity to back additional growth past this buildout. That said, let me repeat and underline that future capital allocation choices will be driven purely by value creation and our capital structure. Within the strategic parameters we've outlined, we've identified several near-term opportunities, among them Hornsea 4, where offtake has been secured although a final investment decision has not yet been made. And because we make sure to cap capital commitments during the early phase of project development, we're able to prioritize or deselect according to each project's risk reward. Our development pipeline offers a wide opportunity set, near term and long term alike, and only those opportunities consistent with our capital allocation principles will move forward. Even though we've stepped back from our 2030 ambition, it's worth underlining how broad the opportunities available to us are. We hold numerous options spanning centralized and decentralized tenders, seabed licenses, and greenfield opportunities throughout our 3 regions.
Rasmus Errboe
executiveThis demonstrates that the long-term prospects for both the renewable sector and Ørsted are still appealing. Moving to Slide 8, we'll discuss our earnings outlook and return on capital employed. As we consider earnings growth over the next several years, we anticipate delivering meaningful growth. By '26, we project an EBITDA level between DKK 29 billion and DKK 33 billion, implying a CAGR of 12%. The earnings uplift heading into '25 will mainly come from ramp-up generation in our offshore business. Trond will go into more detail on that shortly. Turning to the earnings increase from '25 to '26, it comprises 2 main categories: the first is ramp-up generation from our offshore and onshore assets, including a full year contribution from assets commissioned during 2025. The second is that we expect higher earnings from our existing partnership agreements due to the timing of transactions. That second component obviously carries some uncertainty. As you may have noticed, the EBITDA guidance range for 2026 has been slightly reduced because of delayed installation and therefore ramp-up generation from our Revolution and Sunrise Wind projects. As for our ROCE through 2030, we continue to view it at an attractive level.
Rasmus Errboe
executiveIf we look back at the outlook from 1 year ago, the reduced investment program will lead to an improvement in our ROCE. That said, this gets offset by the greater costs and schedule delays experienced on our U.S. construction projects, along with increased costs on our pipeline projects. Taken together, these developments prompt us to revise the ROCE figure for the period to roughly 13%. On this metric, we keep guiding towards 2030, since the various scenarios and opportunities we are assessing internally and working within over that longer-term horizon will all deliver a comparable ROCE level across the period. Turning now to Slide 9, I'll provide a status update on our construction projects. In our German program, the Gode Wind 3 project is producing at full capacity. Final part testing should be finished in the next 2 months. At Borkum Riffgrund 3, every foundation and turbine has been installed, and our mitigating actions have successfully kept the project's installation on schedule. As noted during our Q3 earnings call, the German transmission system operator has experienced a delay to the grid connection, so first power is now not expected until the end of this year.
Rasmus Errboe
executiveCompensation for the grid connection delay will come through market regulation, and that is captured in our 2025 EBITDA guidance. In Taiwan, work on Greater Ghanghua 2b and 4 keeps moving forward, and we expect the offshore substation jacket and topside to be completed during the quarter. Foundation and cable fabrication remain on track per plan, turbine foundation installation should begin in the first half of 2025, and we anticipate first power over the summer. Project commissioning is presently slated for the very back end of '25, with a risk it slips into early '26. At Revolution Wind, construction is still well underway. As things stand, 52 monopiles and 18 turbines are installed, and the vast majority of the export cable is in place. Nearly all remaining components, monopiles and array cables included, have been fabricated. Visibility is strong on fabricating and installing the remaining components, including the offshore substation monopile, for which we have secured a viable installation path. Onshore substation work continues to advance in line with our updated plan. The project carries a suitable level of contingency reflecting the remaining risks, and we are delivering to the updated schedule.
Rasmus Errboe
executiveWe anticipate finishing the offshore construction activities at some point later in 2025, and the project should be commissioned toward the end of 2026. On Sunrise Wind, construction keeps moving forward. As we mentioned a few weeks back, this project has experienced unfavorable developments when it comes to increased costs and delays to the schedule, and those are now reflected in the business case. Although we are working with great dedication to meet the revised schedule and time line, progress has been solid on the onshore construction side, along with fabrication of offshore components including monopiles, turbines and export cable. We expect offshore construction to get underway in the first quarter of this year. Turning to the U.S., we have been watching the recent political and policy developments closely, and at present we are reviewing the executive order on wind energy that was issued on January 20. Appointees are being confirmed right now and are moving into their positions, and those officials will interpret and implement these policies. Our assessment will keep being updated throughout this process. At Hornsea 3, construction is still advancing according to plan, covering both the onshore scope and the offshore activities, which will begin later this year.
Rasmus Errboe
executiveFor the offshore portion, the work involves preconstruction items like bolar clearance and rock dumping. In addition, construction of the battery storage solution located alongside it is scheduled to begin in the second quarter of this year. At present, our expectation is to commission that project toward the end of 2027. Finally, we've reached the final investment decision on Baltica 2. That project carries a 25-year inflation-indexed CFD contract, and we have locked in all major component and vessel contracts, which accounts for the majority of CapEx. We're pleased with the value this project creates — it offers an appealing risk-reward profile — and we anticipate commissioning it in late 2027. Turning to onshore, building out our European and U.S. portfolio is moving along nicely, with active construction in the U.S., Germany and Ireland. I'll wrap up my portion of the presentation with Slide 10, which sums up how we create value. Although our investment program is being trimmed, we still possess the investment capacity needed to chase the most appealing projects among the growth opportunities within our portfolio, on top of what is currently under construction. Our value creation target is unchanged, with a WACC target of 150 to 300 basis points.
Rasmus Errboe
executiveWe're still very confident that our business is going to keep delivering value through a strong and appealing platform. Our operational renewable assets keep generating robust cash flows, supported by a high level of contracted and regulated revenue. And as I pointed out on the earlier slides, we have a lot of visibility over the near term -- over capacity expansion and EBITDA growth in the near to medium term, driven by our construction portfolio of renewable assets. The mix of earnings from our operational assets, our construction portfolio, and the return requirement for future investment capacity will keep ensuring appealing returns on our investments, with a ROCE of around 30%. With that, I'll hand things over to Trond, who will walk through our financials.
Trond Westlie
executiveThank you, Rasmus, and good afternoon to all of you. To begin, I'd like to turn to Slide 12 and go over the EBITDA for 2024. Throughout this presentation, every figure we cite is denominated in Danish krone. During '24, we achieved an underlying EBITDA totaling DKK 24.8 billion. When new partnerships and cancellation fees are included, total EBITDA comes to DKK 32 billion — among the highest EBITDA figures ever recorded in Ørsted's history. Operational earnings remained robust and steady across all four quarters, arriving right in line with what we had anticipated. Now let me take you through the key earnings drivers for the year. In our offshore segment, overall earnings landed at roughly the same level as the prior year. Site-level earnings rose considerably, fueled by ramp-up generation, stronger wind speeds over the year, and better pricing on green certificates as well as inflation-indexed assets. On top of that, the sites' performance got a positive boost of approximately DKK 900 million stemming from a change in how we allocate costs, which has no bearing on the overall earnings profile. Earnings from our existing partnership fell relative to last year, driven chiefly by revised assumptions and larger provisions tied to the operation and maintenance contracts for the U.K. offshore transmission assets.
Trond Westlie
executiveThose losses represent the net present value of what remains of the project's lifetime, and they stem from costs that came in higher than expected tied to assumptions about transmission charges and servicing of the offshore substations. Even though we don't own those assets, we've assumed their operations so that we can maximize generation output from the wind farms and make sure any potential downtime in the export cables gets identified and fixed as fast as possible. We've also seen higher costs for Borkum Riffgrund, and those have led to reduced earnings under the construction agreement. And lastly, there's an increase in other bucket mainly driven by the cost reallocation of overhead I mentioned earlier, of about DKK 900 million. On the onshore side, earnings rose by DKK 1 billion, in line with expectation, mainly because of ramp-up generation from new assets commissioned during '24. In Bioenergy and Other, earnings from our combined heat and power plants came in around the same level as last year, while earnings from our gas business fell, since a temporary positive effect from revaluation of our gas at storage recognized in 2023 was not repeated to the same extent this year. Finally, we've kept working through the contracts relating to Ocean Wind 1.
Trond Westlie
executiveAnd for the full year, we've reversed cancellation fees amounting to DKK 7.3 billion, thanks to outcomes of the contract settlements that came in better than assumed. Moving to Slide 13 and our financial guidance for '25: across the full year of '25, we anticipate an EBITDA within a range of DKK 5 billion to DKK 28 billion. Let me walk through the expected drivers across the different segments. In our offshore business, overall earnings should come in higher in '25. At the sites, we expect earnings performance to rise, driven by ramp-up generation from a number of projects along with compensation for the grid delay at Borkum Riffgrund 3 in Germany. In a similar vein, we anticipate higher availability rates in '25 versus '24, which leads to an increase in earnings. We also expect an earnings increase from inflation in ROCs and CfD farms, partly offset by lower offtake price assumptions for our merchant assets, as well as lower earnings at Anholt and the older German assets as they respectively see a phase out and a step down in the subsidy level. Additionally, we expect to incur ramp-up costs relating to Revolution Wind and Sunrise Wind as they are preparing for operations, but no ramp-up generation is expected.
Trond Westlie
executiveProfit from our current partnership should rise, since we don't expect the adverse impacts seen in '24 to recur in '25. In offshore, we expect a larger portion of project development costs to be expensed, along with higher fixed costs as well. Onshore, we look for improved earnings performance. That comes from capacity ramping up and availability rates that are expected to be higher. Partly offsetting these factors is the effect of reduced generation capacity after the divestment of a project portfolio to ECP. In Bioenergy, we anticipate earnings from our combined heat and power plants at the same level as last year. In Gas, earnings should grow on the back of greater gas volumes becoming available once the Tyra field is fully reopened. Lastly, gross investments are expected in the range of DKK 50 billion to DKK 54 billion, driven by investment in our offshore and onshore construction activities. Our gross investments guidance is especially sensitive to our divestment program and could be affected by shifts in transaction timing. Let's move to Slide 14 and our sources and uses.
Trond Westlie
executiveIf we consider how our funding is composed as we head toward 2030, the lowered future expected build-out together with our investment program means our plan stays fully self-funded. To finance that investment program of DKK 210 million to DKK 230 billion, the biggest source is still the robust, steady cash flow our operational portfolio generates, which covers over half of what we need. Around 30% will come from the partnership and divestment program, so that is a sizable share too. That portion is intended to be weighted toward the front end, and it is one element of our funding program that we have consistently demonstrated over the years we can deliver, bearing in mind as well our 2024 divestments. Tax equity funding, plus debt and hybrids, are the last 2 components. As for our tax equity funding, most of it is expected to originate from our Revolution and Sunrise Wind projects. Net issuance of debt hybrid will stay limited too as we move through the years ahead. On the user side, we have strong visibility into gross investments, since we are building and advancing a renewable portfolio exceeding 9 gigawatts.
Trond Westlie
executiveBeyond that, we also have some hybrid coupons and minority dividend payments that we intend to carry out. Given the steps we've taken to keep attention on bettering our credit metrics, our funding plan contains headroom to reinforce our capital structure. Let's move to Slide 15 and our divestment program. In '24, we delivered proceeds of roughly DKK 22 billion, in line with what we expected, and that keeps us on track toward our target of DKK 70 million to DKK 80 billion in proceeds for the 2024 to 2026 period. As we mentioned 1 year ago, we have several transactions in the market, and the deals announced during '24 testify to that. We still hold a wide range of opportunities we can take to the market and ultimately move forward with the transactions most attractive to us. In assessing how attractive a transaction is, we do so using 3 nonprioritized criteria: value creation, capital recycling, and risk diversification. Since conditions for divestments differ from 2 years ago, we do see advantages from the experience in the farm down market that we've built up via frequent engagement for more than 2 decades.
Trond Westlie
executiveAnd we're still seeing enough demand out there, especially when it comes to high-quality assets. Over the next 2 years, we expect to deliver the rest of our targeted proceeds. We still assume a relatively balanced split of proceeds across the 3 years. Ultimately, though, it will depend on the timing of transactions, which can move how the proceeds are distributed between calendar years. Let's go to Slide 16 and our capital structure. During '24, we've taken a number of steps to support the trajectory of strengthening our capital structure and ensuring a solid investment-grade rating. First, we managed to settle contracts related to Ocean Wind 1 on better-than-assumed terms, so that we can -- so that we have preserved more than DKK 7 billion in '24, which would have had an FFO as well as net debt impact. We've also brought in a reduction in our development expenses through market prioritizations, which will lead to a reduction of DKK 3 billion towards 2026, and we continue to make progress on this number. In addition, we've succeeded in cutting our cost base on a like-for-like basis by DKK 1 billion through simplification and efficiency increases. Lastly, we have so far delivered on our targets for our divestment program, where we've secured proceeds of DKK 22 billion during '24, and remain on track to secure in the range of DKK 50 million to DKK 60 billion over the next 2 years.
Trond Westlie
executiveBut after the recent negative events in our U.S. offshore portfolio, we've seen additional short-term strain on our credit metric. Beyond advancing what we've already started, we're implementing further steps to bolster our balance sheet. Put briefly, that covers cutting back our investment program and adding extra cost-efficiency initiatives. Moving to our credit metric: we finished the year at 13%. That's stronger than what we anticipated 12 months ago, since we've achieved settlements on the Ocean Wind 1-related contracts on terms better than assumed. Over '24, we've repaid DKK 6.3 billion in cancellation fees. And stripping out how this affected our credit metrics for the year, the figure would have come in at roughly 22%. When we look at our near-term credit metric projections, we do see that the recent negative trend in our U.S. offshore portfolio puts strain on our credit metric in the short term. Because of that, improvement in our credit metric is going to be slower than we'd previously expected. Even so, we remain on track to deliver the path toward an FFO to net debt of 30%. We've taken note of recent rating agency decisions after our impairment announcement earlier in January, and our quick response to ease the pressure on our balance sheet, together with the extra levers at our disposal, is how we make it very clear that we're serious about our rating commitments and about the path of strengthening our capital structure, even where that demands more or less than what we expected 12 months ago.
Trond Westlie
executiveAll right, with that said, let’s move on to the question-and-answer portion.
Operator
operator<<operator_script>> Harry Wyburd of BNP Paribas has the first question.
Harry Wyburd
analystAnd first off, congratulations to Rasmus, and also, assuming you may be listening, all the best to <<inaudible>> too. And thank you for your stoicism over these past few years. So the question is a very high-level one for Rasmus. And it is — do you think this is enough? And I ask that from 2 perspectives. So first, is there a lot of buffer here if anything else goes wrong, so loss of bonus adders in the U.S., et cetera. And then second, is this enough of a growth proposition given that you've discontinued your 2030 target? And would you, for instance, consider coming back maybe in the summer or the autumn with, I guess, a CMD also sort of new investment plan, given that presumably you didn't have a huge amount of time to put the current plan together since the earlier write-downs a few weeks ago?
Rasmus Errboe
executiveThanks, Harry, and thanks a lot. So your question has 2 parts: is there sufficient cushion in the plan? And second, is there sufficient growth in the plan? On the cushion, the plan we're presenting today is fully self-funded. And we do believe it's robust enough. There's no question we've experienced more strain on our metrics, and clearly in particular because of the recent events in the U.S., first at Revolution Wind and then Sunrise, as we communicated in Q3 and then a couple of weeks ago. We've gone through both projects quite thoroughly, obviously. We've rebased the schedule. We've rebased the CapEx. And from what we know today, we feel good about those projects. Overall, obviously, when you're building a construction program of 8.4 gigawatts of offshore wind, I can't stand here today and claim there are no risks tied to that. Of course there are. But what I can tell you, Harry, is that delivering on that construction program over the next 3 years will be our #1 priority in everything we do. And by doing so, we also believe that the plan we're presenting today is a robust one.
Rasmus Errboe
executiveOn the growth side of your question, you're correct that we've revised our CapEx projections for 2030 downward as of today. However, there are a couple of things to keep in mind. To begin with, by executing on our construction program at present, particularly on the offshore side, we'll nearly double our offshore capacity by the latter part of 2027. In my view, that represents very meaningful growth. And we believe it will firmly cement our standing as the clear global leader in offshore wind. Then, regarding further opportunities within our portfolio, as we've also shared today, we have between DKK 40 million and DKK 60 billion in uncommitted capital available through 2030. We do consider that a very meaningful amount for us, and it's something we'll now deploy into the very best investment propositions that come our way, while being highly financially disciplined in how we choose to allocate that capital.
Operator
operatorMoving on to the next question, which is from Kristian Tornøe at SEB.
Kristian Johansen
analystSort of a similar question. For that DKK 20 billion range you're mentioning for the investment program, should the DKK 210 million to DKK 230 million be seen as your buffer here? I mean, if the bonus adders were taken out, which per our impairment is slightly above DKK 5 billion, then roughly DKK 5 billion comes off the spread. Is that how it should be thought about?
Rasmus Errboe
executiveKristian, that's not how I look at it. That's not the way I view it. What you should take from those figures is this: of the DKK 210 million to DKK 230 million, DKK 130 million is committed. Then DKK 43 billion was spent in '24. After that, something remains — the DKK 40 million to DKK 60 million — and that's the range as we see it. So that's how to think about it. And on your specific point about the energy communities, the 10% — our investment decisions rest on treasury guidance currently in force. And we do consider it unlikely that changes with retrospective effect would be introduced regarding our energy communities 10%. You'd really need to distinguish between assets under construction and development. But again, as we've done previously, we've been very explicit in the notes to our annual account about precisely what the implications would be if we didn't have those 10% energy communities, and that figure is DKK 5.3 billion.
Kristian Johansen
analystGot it. Maybe I should have phrased that differently. What I'm really asking is whether you could go above DKK 230 million — or do you think that, for whatever reasons, something would come up that you'd have to offset, so that it stays at no more than DKK 230 million?
Rasmus Errboe
executiveWe think a plan for investing toward 2030 in the range of DKK 210 million to DKK 230 million is the right figure for us. That, in our view, is a solid plan. And we feel it is the correct plan for us.
Operator
operatorPeter Bisztyga with Bank of America has the next question.
Peter Bisztyga
analystYou spent a fair amount of time discussing the cost pressures behind the weakening in your credit metrics. Of course, we know about the DKK 4 billion overrun at Sunrise Wind, but the CapEx inflation you laid out today comes to DKK 30 billion versus the roughly DKK 270 billion CapEx plan you had until now. So I'm just trying to reconcile where that probably DKK 25 billion has come from and why it wasn't disclosed before today, because your Q3 slides still show that DKK 270 billion. And on the deterioration in your credit metric, how much of that also stems from OpEx costs running higher than anticipated?
Rasmus Errboe
executiveI'll take the first section on cost pressures, and then, Trond, I'll hand it over to you for OpEx and the credit metrics. So, Peter, your question about where the extra DKK 30 billion of gross investment comes from — of course, I completely understand it. The way to look at it is this: on a like-for-like basis, since the CMU update we did in February, we've seen CapEx rises from our U.S. projects of roughly half that amount, a little bit more. As for the rest of the DKK 30 billion, the vast majority of that remainder is CapEx tied to projects that weren't committed at the time. So that reflects our expectations for the projects in our portfolio that aren't committed as of now, and also, at the time, how much we believed they would have gone up. So I think that's the best way to look at the DKK 30 billion. And then on the second part, Trond?
Trond Westlie
executiveYeah. Regarding the cost increases in '25, most of it really comes down to how spending is allocated between what gets capitalized and what doesn't — that's what's driving the bulk of it. So as I mentioned before, on the <<inaudible>>, our total cash out will come down. And a few pieces involving non-recurring compensation from '24 factor into that as well.
Operator
operatorAlberto Gandolfi from Goldman Sachs has the next question.
Alberto Gandolfi
analystI've got a question that also has 2 parts. First off, congratulations to you, Rasmus <<inaudible>>, for having the courage to cut CapEx — which I personally think is the right move. But my question on this is, where do we think things land if we look 2, 3 steps ahead here. And my thinking was that with power prices potentially declining in the medium term and some contracts running out, is there a risk in a renewable business such as this that when you lower CapEx, your medium-term profit at some point starts to plateau. So is there a risk that your 2030 net income — not EBITDA — actually ends up very similar to what you'll see in 2026, because our fixed costs keep rising and your margins are falling. So I suppose the question is, what takes priority beyond that level, and do you think at that point your FFO to net-debt will be in check. So if the market rewards growth, will you begin to raise investments, or do you think FFO to net debt will sit at an acceptable level — meaning returning to roughly 30% much later in the decade — so we shouldn't expect any optionality on growth until perhaps much later in the decade?
Rasmus Errboe
executiveThanks, Alberto. So I believe I've got the question. First, regarding power prices and how sensitive our earnings and our FFO are to them—and, in turn, our fortunate debt—let me remind you of something important about the value proposition at Ørsted: roughly 80% of the revenue in our business is contracted. And as you know, we don't give specific guidance on that. But we do expect that proportion to stay roughly the same as we approach the back end of the decade. It's not for me today to be very specific or to speculate about our FFO-to-net-debt levels. Trond has been quite clear on our short-term expectations, but speculating about the longer term isn't for us. Then, of course, the last point I'd like to make about our profitability, you could say, also at the back end of the decade—a point I've made before—is that right now, as I said, we're constructing 8.4 gigawatts. And I'm sure you can appreciate that this is not what we expect our future construction levels to be, including toward the back end of the decade, given the projections we've shared today.
Rasmus Errboe
executiveNaturally, that also means we'll be examining our costs and making sure the organization is right-sized—particularly as we get toward the back end of the decade, once we've delivered on our execution program, which would likewise affect our numbers.
Operator
operatorCasper Blom from Danske Bank has the next question.
Casper Blom
analystAnd Rasmus, congratulations from me as well. I'd like to ask about the DKK 40 billion to DKK 60 billion in available funds that remain uncommitted at this point. Clearly, there's a policy angle that could present an opportunity. But might we also see you thinking somewhat outside the box here? Could it be that you'd also spot chances to consolidate things here? Might it all ultimately go into onshore, since that's where you see the opportunities? I heard you on the call being quite clear that it comes down to value generation. But I'm just trying to understand how far you'd take that, given that you still carry a legacy of being an offshore wind developer. I hope you understand where I'm going with this — a bit of a question about the strategy of staying an offshore wind developer and then afterward trying to sell off some of that development, or whether you'd be more opportunistic, simply seeking out where the value lies?
Rasmus Errboe
executiveThank you, Casper. Turning to Hornsea 4 consolidation and onshore. On Hornsea 4, first of all, naturally, we completely recognize that this is an extremely large and extremely significant project. We continue to be pleased with how <<inaudible>> turned out last year. And at this very moment, as we speak, we are pushing that project ahead toward a possible FID. Should we take FID, we would most likely do so at some point during 2025, purely because of the U.K. rules, obviously, under which your milestone delivery date has to be met at the start of '26, 18 months following award. Clearly, we will not be taking that project through an FID unless we feel entirely at ease regarding the value it creates. For us it is value over volume, and the same will plainly apply to Hornsea 4. Having said that, the reason we remain, shall we say, pleased with this opportunity is also plainly because, if anywhere on earth a project at that scale is sensible for us, that place is the U.K. And if any location in the U.K. qualifies, it is the Hornsea zone.
Rasmus Errboe
executiveWe're pushing that project ahead. Since it's a large project, we'll weigh it carefully. On your point, and as I understand what you're asking about what we can do with the money: first and foremost, we'll prioritize the opportunities that make the most financial sense in the regions where we operate, but with a strategic emphasis on offshore wind as well. In our view, that's where our competitive differentiation is most distinct and, in many ways, where our capabilities are most unique across the entire life cycle — development, construction and operations. As I said, we remain committed to onshore wind, solar, battery and carbon capture. And as mentioned, we'll move the best product forward. But of course, offshore wind is where we've historically put the vast majority of our capital, and that would also be the case going forward. As for consolidation in the industry, I don't think I need to speculate about that today.
Operator
operatorOur following question is from Rob Pulleyn at Morgan Stanley.
Rob Pulleyn
analystCongrats, Rasmus, on the new position, and best of luck. There are many questions, so may I begin with the one about Hornsea 4, please? I remain somewhat puzzled here. In your earlier response, you mentioned being happy with the result and that you're proceeding to FID. Yet you appear to be casting doubt on value creation. And clearly, you hold an inflation-linked CfD with a double edge. So why would this be questionable? If I may say so, it sounds as though CapEx came in above what was expected, based on the earlier answer. And since you said you would be more transparent regarding projects, could you kindly indicate roughly where CapEx would land for this project? And would that be covered by the DKK 40 billion to DKK 60 billion of uncommitted CapEx — sort of a multipart question on Hornsea 4?
Rasmus Errboe
executiveThank you, Rob. So, to address the final part of what you asked: yes, Hornsea 4 would be among the projects included in the DKK 40 billion to DKK 60 billion of uncommitted capital. Regarding what you said about the value, I wouldn't describe it as questionable. At least, that wasn't what I meant. What I would say is that for us this project is very attractive. But an FID genuinely means something. That's the moment when you commit for the long run. And obviously, right now, while we of course had matured the case as much as makes sense as part of the bid, what we're of course doing now is further maturing the case and also speaking with select key suppliers, et cetera, essentially firming up the case towards an FID. And before that work is finished and before Trond and I have gone through every detail of a case like that, it would not be prudent for me to be very bullish on whether or not we take an FID. Nothing has changed, if you will, since we bid the case. And then specifically on your point about CapEx, I don't want to disclose our specific CapEx projections for Hornsea 4 at this stage.
Rasmus Errboe
executiveSure, though I'd bet there are some useful comparisons you could locate over in the Hornsea zone.
Operator
operatorJenny Ping with Citi has the next question.
Jenny Ping
analystI have a few questions about Slide 14, if I may. Looking at where the funding comes from, I wanted to ask the following. First, regarding hybrids, what kinds of discussions have you had with the rating agencies? Because 7.5% of DKK 220 billion looks like a substantial figure when it comes to your hybrid capacity. Have the rating agencies already confirmed that they would permit that? Second, on the tax equity part, we've already touched on it somewhat with respect to your expectations for the RS allowance. But when do you expect to receive the cash for it? And third, on partnerships and divestments, it would be helpful if you could give us some additional detail about which assets you intend to sell beyond what has already been mentioned previously.
Trond Westlie
executiveRegarding the hybrid portion of that 15%, the hybrid cap is essentially 15% of the top load capitalization. So from that angle, I'd say the clearing path is quite clear, to put it that way. In that sense, and as I mentioned, it forms part of the funding plans going forward, though it isn't a major part of those funding plans going forward. As for the tax equity piece, the timing of that credit really depends on when the project is commissioned. That, then, is the timing of the tax equity.
Operator
operatorOur following question is from Deepa Venkateswaran with Bernstein.
Deepa Venkateswaran
analystThanks, Rasmus. So my question is about how you've adjusted the near-term figures, correct? The CapEx reduction looks like it comes more toward the back end. What I'm trying to get at is you had that delay plus the Sunrise win, and there's a higher cost involved. Yet it doesn't appear that your CapEx for '24 -- sorry, '25, '26, '27 has moved. So I'm just wondering what steps you're taking to bring that metric back to the 30% FFO to net debt by '26 shown in your chart. And as part of the divestment program, could I also get confirmation of what your assumptions are on Sunrise Wind and whether that risk has been factored in?
Trond Westlie
executiveRegarding the FFO piece, I really think the way to get there is to assume that farm downs are distributed evenly across both '25 and '26, at a roughly even pace. Beyond that, if you start with the FFO of '24, add the cancellation payments, and then factor in some further cost efficiency measures for '25, '26, and '27, you would expect to come very close to the 30% FFO, the net debt level. On the second part, I've forgotten it. Could you repeat that, please?
Deepa Venkateswaran
analystYeah, what are you assuming for the Sunrise Wind farm in the plan you laid out today? When does that take place?
Trond Westlie
executiveApologies for that. And as we discussed earlier, we aren't commenting on particular farm downs or particular assets we currently have in the market and are working on. But of course, our way of operating and our business plan is the standard approach of owning 50% of our assets. And of course, that will include the 100% ownership we hold on the projects we are running. So in that sense — though on the timing of it, we haven't been very clear.
Deepa Venkateswaran
analystBut when you think about potential deals, have you built in any risk around something like Sunrise being part of your new plan?
Trond Westlie
executiveOn that question, the response is naturally affirmative. We've already incorporated some expected slippage on the farm downs, though that isn't really tied to the underlying effect itself. What we're really focused on is more a matter of capital availability rather than a net debt consideration.
Operator
operatorThe next question is from Olly Jeffery of Deutsche Bank.
Olly Jeffery
analystJust following up on the Sunrise project. I wanted to get a sense from you of how confident you are that you could sell a project like Sunrise before its commissioning date in the second half of 2027, given the complications that have come up with the project. So how confident are you that you could sell that? And then also just on the U.S. projects, Revolution and Sunrise, do you feel that the U.S. supply chain for the continued construction of those products could be compromised by a lack of demand from further build-out of other offshore wind projects this decade? And if you think it's robust, why do you think that supply chain will be robust?
Trond Westlie
executiveOn the farm down, we’ve built up a lot of experience making sure we have solid partnerships and investors in assets across different regions. So in that sense, of course, we’re sort of prewiring this in the market. We’re speaking with investors constantly. That said, we’re of course aware and see that the market has changed over the last year. And I think we’ve discussed that — there are more assets out for sale now than there have been for quite some time. That said, we’re still in good shape when it comes to investor interest in the farm downs we’re working on right now.
Rasmus Errboe
executiveYes. And if I could address the supply chain question, Olly. So I think there are 2 points to make on that. First, specifically regarding Revolution Wind and Sunrise, the supply chain is predominantly European, delivering on the projects, of course, with some elements of local presence. But no, we don't see any implications whatsoever for the supply chain of those 2 projects from, you could say, the current uncertainty in the market. Of course, when you look at U.S. offshore wind going forward, we are, of course, carefully following the market right now. And we, of course, see some colleagues moving forward with projects and also a couple of colleagues stepping away from projects. And as I said, we are firmly committed to moving forward with Revolution Wind and Sunrise, but of course, everything on the other side of that, we will carefully consider. And of course, over time, if that trend continues, that could, of course, have an implication on the supply chain in the U.S., but I think it is too soon to have a firm view about that.
Operator
operatorMark Freshney from UBS has the next question.
Mark Freshney
analystRasmus, a year back when you presented, you noted Hornsea 3 is the material farm down given how high the CapEx is. You provided additional detail on that, and from what I remember, the expectation was to have that farm down done in Q1 2025. I'm just curious what the expected timing is now. And thinking back to when you and your colleagues presented several years ago, you explained the reasoning behind not using project finance and instead going with 50% farm downs, equity funded. I mean, surely other ways exist to extract capital from projects, as you saw with the Brookfield deal. So is it possible we should expect you to consider alternative approaches to structuring transactions beyond selling large equity interests — project finance, for instance.
Trond Westlie
executiveMark, farm downs fall under my remit, so I'll take that. On the timing for Hornsea 3 — obviously, that's a large project. Because of that, as we mentioned last year, we're working on the farm down through '25, and that work is still underway. So internally, the timeline hasn't really moved. And there's no recollection on our side that we said first quarter of last year or this year — what we said was during '25. With that in mind, regarding how this transaction is structured and the cash available going forward, we see farm downs as the most significant piece of the funding, coming from the proceeds. Then, of course, some other assets — smaller ones — will be partly involved as well, to lift the number so we get to the proceeds we need to reach. Beyond that, we really haven't examined other kinds of restructuring funding for these projects.
Operator
operatorDominic Nash from Barclays has the next question.
Dominic Nash
analystI might be belaboring this, so let me just walk through the numbers. I believe Jenny put them up starting on Slide 14, and I don't think you addressed a third item, which is that 30% of your gross growth needs come from farm downs and disposals. That's roughly DKK 250 billion in total, probably, so 30% of it works out to DKK 75 billion. And could you confirm for us — that's through 2030, yet you still target DKK 70 billion to DKK 80 billion of proceeds in '24 to '26. So am I right or wrong on this, that essentially what you're saying is everything done in '24-'26 is basically the entire farm down through the end of the decade? And second, on the secondary market, could you give us some color on how it's going — is it a buyers' market or a seller's market right now, and are your buyers more inclined toward the best price to get on post-commissioning or pre-commissioning, please?
Trond Westlie
executiveOn the logic, yes, it's true that most of our farm downs and proceeds will happen until '26, and from then on, of course, it's going to be more limited and more marginal as we see it now. Then again, the precision of '27 to '30 years than not sort of as precise as the '27 targets or of the job that we need to do to '27. So that is correct. When it comes to the market as such, it is a buyers market out there on the asset side. We see that on the interest or the return requirements from the buyers. It is, as you've seen in the market, both the last few weeks as well as you saw in the -- both in the third and fourth quarter last year, you saw that there were more assets coming into the market with more projects coming into market for either derisking or for selling. So in that sense, it's absolutely a buyers market out there. Having said that, there is, as we see it, still a good interest for high-quality assets with a high-quality operator. And we do think that, as I said, we have good tractions on the farm downs as we are progressing those as we speak, really.
Operator
operatorOur following question is from Helene Brondbo, who is with DNB Markets.
Helene Brondbo
analystI was just hoping you could take us through the steps that are still left before you receive your energy community bonus tax credits for Revolution and Sunrise. And when would you have expected those subsidies to come through?
Rasmus Errboe
executiveHelene, this is Rasmus. Thanks so much for the question. So regarding the steps, I think the key takeaway is that our investment decision was based on the treasury guidance currently in effect. So because of that, we're essentially working on the basis that we'll simply carry on as usual with our energy community. So in that sense, there aren't any particular steps, you could say, that we have to follow going forward, whether for Revolution Wind or for Sunrise. Naturally, on monetizing the tax credits, that's of course what you're then focused on, as Trond mentioned earlier too, in the period from now until COD for both projects, where we're obviously further along on Revolution Wind, where we are, you could say, in the market. That's also because Revolution Wind sits on a timeline that's more advanced than Sunrise's, with an expected COD in the back end of '26 for Revolution and the back end of '27 for Sunrise.
Helene Brondbo
analystYes. And when do you expect to receive that final approval from the U.S. government, so that you're certain to get those? The 95% probability.
Trond Westlie
executiveSo in the U.S., it's a process — I'm not entirely certain what the practical steps actually are. My understanding, though, is that it really kicks in once commissioning has happened: you file a tax return, and at that point you receive certain credits. That said, any question about the administrative side of how this works, I'll have to hand over to IR afterward.
Operator
operatorDavid Paz from Wolfe Research has the next question.
David Paz
analystI just had a question about Revolution. Could you walk us through the shift to the second half of '26 from 2026 that appears on your last slide? Maybe just describe the process, starting from the end of construction and rate '25 through to commissioning in the second half of '26?
Rasmus Errboe
executiveRight, absolutely. The main factor causing that shift in the timeline — as you're pointing to — is the onshore substation being finished under Eversource's scope. That's the primary reason we've added about 12 months to our schedule and pushed COD to the back end of 2026. The Eversource team is moving ahead per plan. We're clearly tracking it very, very closely. It sits on the critical path. But once again, progressing in line with plan, and that's the central driver behind the schedule change.
Operator
operatorPeter Bisztyga from Bank of America has a follow-up question coming next.
Peter Bisztyga
analystWe've gotten a handful of questions regarding Sunrise Wind's timing and several related aspects. Forgive me if I missed it, but I'm not certain you've really addressed whether the steps you're currently taking to strengthen your capital structure would be enough in a possible scenario where, for whatever reason, you're unable to sell it. So could you clear that up for us, please?
Trond Westlie
executiveOn the planning side, plus the farm downs and that 30% funding piece — like we mentioned, the portfolio holds a number of alternatives. Yet, as I noted before, the key point is obviously this: our model brand means reaching 50% of 100% assets. So that remains both our aim and our goal. As for the contingency elements and the way we'd pursue the alternatives should any asset prove unable to farm down, that is, of course, covered within the sorts of contingency measures we have in place. Beyond that, there's nothing further I can say on it.
Operator
operatorOur next question comes as a follow-up from Rob Pulleyn at Morgan Stanley.
Rob Pulleyn
analystTo pick up on the U.S. thread and carry on from that last question — I don’t think this one has come up yet. How seriously are you taking some of the risks that have been stated for the U.S., specifically around the possible revocation of your acreage and/or permits for Sunrise and Revolution moving forward? That’s the first follow-up. Second, and this is a bit conceptual — I know there have been plenty of questions about farm downs — but it sounds like you have many assets out in the market in an effort to secure the proceeds you want. So conceptually, the U.K. bundle sale of high-return operating projects that you completed in October: is that a needs-must event, a fire sale to help the balance sheet, so to speak? Or is it something the market should grow more accustomed to, for a range of reasons, because the 50% sell-down preference simply isn’t adequate anymore? And finally, a high-level one for Rasmus. Very high level: given the challenges you’ve inherited, what would you do differently compared with the previous management?
Rasmus Errboe
executiveThanks a lot, Rob. Three questions—I’ll handle the first and the third. On the U.S., I get that your question is essentially about the present political and regulatory climate. We’re tracking every relevant policy development in the U.S. very closely, and naturally we have done so for a very long time. What we’re doing at this moment is reviewing the executive order on wind energy issued on the 20th. Then, as I mentioned earlier during this call, we’re waiting for the Cabinet Secretary to take office, which is occurring right now. So, as you know, Doug Burgum has been named Secretary of the Interior and Chris Wright as Secretary of Energy. And naturally, we’re now awaiting guidance on how this order will be implemented. That’s a broader remark, because I think you genuinely need to draw a distinction here between—as I said—assets under construction and future development. So regarding Revolution and Sunrise specifically, remember that both are actively in construction, and we are fully committed to advancing these projects and delivering on our commitments.
Rasmus Errboe
executiveSo because of that, we don't anticipate any impact from the executive order on assets under construction. For assets under development, though, the situation could well be different. Then on your last question, it doesn't feel right to me today to get into specifics about what I'll do differently from previous management. Mads and I are 2 different people. Our backgrounds are 2 different backgrounds, but the green transition is a passion we share, and I've enjoyed working with Mads. So I'll leave it there for now, and you can rest assured that going forward, I will do my absolute utmost to deliver on the priorities we've set out in the adjusted CMU today.
Trond Westlie
executiveRegarding the farm-down question, looking ahead, I genuinely believe you'll see us returning more to the standard business model of routine farm downs to 50%, and you should view the <<inaudible>> transaction as a kind of U.K. minority deal that isn't necessarily a one-off, though it won't represent a significant portion of proceeds going forward.
Operator
operatorOur final question today is from Jenny Ping at Citi.
Jenny Ping
analystMy last question got cut off earlier. So regarding the 15% — going back to hybrids, that 15% threshold — from what I can tell, you're already near it. So just to double-check: you really do have EUR 2.2 billion of capacity, per your Slide 14, to issue hybrids. Then, secondly, a bit differently, back on CapEx — Rasmus, thanks for explaining the DKK 30 billion difference. But viewed another way, looking specifically at offshore: if I subtract the DKK 40 billion to DKK 60 billion — most of which sounds like Hornsea 3 and Baltica 3 — from the DKK 180 billion that was there before, your starting point on a like-for-like basis is really DKK 130 billion versus the DKK 173 billion you mention minus the DKK 7 billion of onshore in 2024. So that's actually a 20-plus percent increase in underlying offshore CapEx. Could you shed some light on that — is that calculation correct? Or is any further adjustment needed?
Trond Westlie
executiveOn the hybrid piece, we ended the year at 13.6%. So you're correct — we're close. And as I mentioned earlier, hybrid doesn't play a major role in our funding plans going forward. And on the other question, did Rasmus manage to follow your numbers?
Rasmus Errboe
executiveThanks, Trond and Jenny. No, that's not the right way to interpret it. First, keep in mind that Baltica 3, the example you're referring to, is, as we've mentioned previously, a project that's being reconfigured, and we'll only push it ahead, again, if we can identify an approach that makes the business case hold up very robustly. So we haven't planned to give any, you could say, particular alternative breakdown of capital allocation across our technologies within the DKK 40 billion to DKK 60 billion of uncommitted capital that we hold. So I think the starting point, in a sense, is what I said earlier today regarding our ongoing commitment to offshore as the area where we'll put the vast majority of our capital.
Operator
operatorLadies and gentlemen, that brings us to the end of the Q&A. At this point, I'd like to hand the conference back to our CEO, Rasmus Errboe, so he can offer any closing remarks.
Rasmus Errboe
executiveMuch appreciated to everyone for being here. We value the engagement. Thanks for the interest. And as usual, should you have any additional questions, feel free to get in touch, and our IR team will be available to respond. Trond and I are very much looking forward to carrying on the conversation with all of you on the road. Thanks. Stay safe, and have a wonderful day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ørsted A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Ørsted A/S earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ørsted A/S or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.