Morning, everyone. I have to say, it's really great to be here in person rather than just addressing a screen. It's been almost two years — well, a year and three quarters — since our last meeting. So it's a huge pleasure to see all of you. I'm also glad to walk you through the third quarter results 2021. As usual, Mikkel and I will handle this. I'll begin, Mikkel will take you through the figures, and then I'll give a brief summary. Looking at the bullets covering the last three months, I think it shows up in solid performance on power production. Compared with last year, we're up by nearly 2.5x, rising from 430 GWh to 1,065 GWh. Proportionate revenues came in at NOK 1.25 million, and EBITDA was NOK 767. We've gone through our project pipeline, and I'll cover that on a separate slide, detailing where the various projects stand right now. The good news — I actually followed this directly on YouTube last night — Minister Mantashe gave a presentation in South Africa on Round 5. We were awarded three projects totaling 273 MW. That's one more demonstration of our position in South Africa, a market we regard as a home market.

Raymond Carlsen

executive
#2

Later, on a separate slide, I'll go into more detail regarding South Africa. A few weeks back, I was in Cairo. Well, over the last few months I've been there several times, and we signed an agreement with Fertiglobe, which is a big fertilizer producer in Egypt. I'll come back with additional information on that as well. That, I think — for us, I believe it's a hugely important milestone. Now, cost increases are being felt by everyone. I mean, it isn't just in our industry. Everyone sees it, and you ask yourself, where will this end? Despite these cost increases we've seen on the panels, on some of the equipment, our industry is in fact stronger than ever. I'll take a little time to explain that, to put it into perspective on a later slide. On the projects that have been in our backlog that earlier in the year we were hoping to bring to financial closure and begin construction on this year, we've had to make some adjustment to the time schedule, and I'll explain the reason for that. In Pakistan, the government is responsible for providing land. Land in countries such as Pakistan is a fairly complex matter, and the authorities informed us that there will have to be some delays due to demarcation — actually, you know, fencing in the land.

Raymond Carlsen

executive
#3

That process has taken far longer than we expected. Naturally, we don't control the authorities. This process is being run by the authorities on their own. We've chosen to optimize the schedule and shift the start of construction into 2022. In South Africa — this was covered in a separate press release earlier this fall — financial closure is being pushed toward the last part of January or the start of Q1. Yesterday Minister Mantashe reiterated and confirmed that this is the plan. The reason it's taking somewhat longer is that, you know, there are — I mean, it may not be clear to everyone, but the processes involved in securing approval for this project, particularly when there are many projects, take a long time. I have to admit this delay is not the first occurrence of its kind in South Africa. It has happened previously as well. They require additional time to ensure everything turns out correct. Now turning to an important market for us presently and going forward, India. We've been collaborating with ACME for nearly a year now — closer to 15 months — on developing a project in the northern part, the north-central part of India.

Raymond Carlsen

executive
#4

At 900 MW, this is a massive project. Naturally, developing something like this involves a lot of moving parts. You have to carry out environmental impact assessments. I mean, we do those for every project we take on, and, you know, that doesn't get finished in a week. In fact, it can take as long as a year sometimes. In any case, we were hoping to place — or rather, ACME is handling that — place the order for the modules, you know, roughly around the middle of the third quarter. That didn't happen. At the same time, the authorities decided to put a duty on importing modules from India — sorry, from China and other places. We see now that, you know, there's — you're kind of stuck between a rock and a hard place. I mean, there isn't enough time to get the modules delivered before the potential duty takes effect, beginning, you know, on April 1 next year. Within the industry, we're not the only project — many other projects find themselves in a similar situation, and they aren't receiving their modules on time. What the Indian government intended was to actually get a manufacturing line for modules up and running.

Raymond Carlsen

executive
#5

They are doing that, though it is taking longer. The industry is in place, and the signals from the industry support this. The authorities are giving positive signals about, you know, moving the importation duty out in time, and also the COD out in time. As a result, together with our partner in India, we have decided to move the construction start and financial closure prior to that into next year. Tunisia — those of you who follow Tunisian politics know that the government was, you know, resolved or dissolved towards the last half of or at the end of July this year. A new government is still not in place. We have a comprehensive package of documents that needs to be ratified, approved by the government, and that has not yet happened. I mean, we're getting signals now that things are sort of approaching a more normalized situation, so they can move the projects ahead. Again, we think it's wise to move it out in time. Brazil, that is not in our backlog. That is a pipeline project. This is a project that we have been developing together with Equinor. The off-taker here is Norsk Hydro joint venture. In fact, we have also invited Norsk Hydro into the project, so it's Hydro, Equinor and us.

Raymond Carlsen

executive
#6

Concluding these agreements has taken somewhat longer, though I expect it to happen shortly. That's where things stand with the backlog. I mean, these projects aren't going away. I mean, for solid reasons they get pushed later in time. After construction is finished, they'll begin the lengthy stretch of 20 to 25 years of production and revenues. I think, you know, to restate this point, and I believe you get it, this is, you know, how the projects are set up. I can add as well that the projects currently in operation carry remaining production time under firm contracts of nearly 19 years. That matters in the short term, but the long term counts just as much. We, when glancing somewhat forward, I mean, where do we stand? I mean, there's sometimes a tendency to focus on what's close by, and that's important while you're executing projects. We're building a company with a forward view, one that grasps the market, that seeks to bring the business model to bear in seizing the advantage, you know, in reaping the opportunities that come our way. We have, from being purely a solar provider during only the last 15 months, of course, we began well before then, but when you watched this unfold, we bought SN Power, slightly over a year back.

Raymond Carlsen

executive
#7

We entered the wind and storage space through a sizable project in South Africa, plus some other smaller efforts out there. And then, finally, hydrogen. That one matters to us. It has formed part of a plan, and I will walk you through the reasoning behind it a little later on. Our focus will stay on high-growth markets. What I mean is, not just displacing what you might call dirty electricity, but also targeting markets that require extra energy for growth. Those are going to be our core markets going forward, and I will give a more precise explanation of that on a slide further on. It is, you know, a pleasure to note that our business model shows resilience and adaptability. What I mean is, we are able to apply that same model — develop, construct, own, and operate — while also broadening the technology scope with these technologies shown on the left-hand side there. Turning to our pipeline, it is a strong one. It has grown as well since July, when we last gave the presentation. In total, it now stands at almost 1.4 GW. When you look at how the technologies are distributed, you will notice that nearly half is PV, meaning our traditional business.

Raymond Carlsen

executive
#8

Wind has clearly expanded a great deal—by 28%. Then there's hydro. Developing hydro, naturally, takes somewhat more time. Hydro is, naturally, quite distinct from solar. Solar runs 20%-25% of the year, whereas hydro runs 100% of the time. So these are different technologies with different attributes, yet in certain cases they combine very nicely. Then there's Release and hybrid solutions. I'll say a little more on that. If you look at the project—if you were, say, inside our company and examined how development on the project is going—you'd see that, well, over the past few months they've matured, getting nearer to, well, being realized. There are also a bunch of projects that in fact haven't yet entered the pipeline. It isn't as though we're only working on 14 GW. We're working on a huge set of projects within the market areas we prioritize. We also prioritize long-term PPAs, long contracts, and the market is willing to enter into long-term contracts. We see growth in short-term contracts, which our Release concept addresses as well. It's, I mean, and that is also, well, important for us to sort of recognize.

Raymond Carlsen

executive
#9

Turning to returns — once more, what we're saying is that when we examine the pipeline, the projects sitting in it, broadly speaking and on average, land inside the 12%-16% IRR target. Some of them actually come in above that level, though certain ones will sit somewhat below it as well. The majority of these projects fall inside that band. On value creation — I mean origination, where you develop the project and build it — that will stay in the 10%-12% range. That, of course, also speaks to our ability to produce cash before we begin the projects or start generating electricity. If you consider these six markets, they account for 11 GW, which is roughly 70% of our backlog and pipeline. That's a solid indicator of the direction we're going and which projects we're concentrating on. South Africa ranks as the eighth most polluting country globally. They have now made public — a decision their own, though of course with help from other nations that are encouraging them to eliminate dirty energy production — to really, you know, further boost investment in renewable projects.

Raymond Carlsen

executive
#10

Eskom is doing it — the main operating electricity company in South Africa. They've actually now also opened things up for up to 100 MW of PPAs that you can enter into directly without any governmental approval. The Minister talked about that yesterday. He gave the award yesterday. It was a pleasure to be among the winners. Again, RMIPPPP financial closure first quarter next year. Then he also talked about Round 6 that will also be launched — that's like Round 5, but Round 6 in the first quarter next year. It'll be a high level of activity, and it's good because we have a very professional company in South Africa. If you look at the backlog, it's solid. It contains solar. It contains wind, and we are developing it, and we have very good partners. Vietnam, a market that is fundamentally on a growth path towards 2030. I've mentioned this a few times before. We have 40 MW in operation at the wind farm. Very good operational statistics on that one. We have a good pipeline. An important part of this pipeline is offshore wind or nearshore wind. It's not that far away on the shores of Vietnam, but it is at the best location that you can imagine.

Raymond Carlsen

executive
#11

Look, if you dig into this, you'll notice that a number of the larger offshore wind players are eyeing that same region too. It'll be built out across the coming 2 years, and when the moment is right, we'll bring partners in to join us there as well as on other offshore wind developments. Brazil is another key market for us. There, we're partnering with Equinor on the solar side. We're in fact talking about whether to bring in additional technologies, though it remains too soon to say precisely when that might take place. Mendubim matters as a project, but naturally we're building out a pipeline of projects. We're engaging with the market. A big market exists for corporate PPAs. Power prices in that country at present, as we see in many parts of the world, are likewise elevated, which makes people keener on signing corporate PPAs. The Philippines gets its own slide. On India — for us, India is appealing. I mean, they've got plenty of dirty power. Their population keeps growing. Their electricity demand keeps growing. Since we're a multi-technology company, we see plenty of openings for what we offer, not just solar but wind as well, and up in the north, both within India and if you go a little farther into Nepal, there are some quite compelling hydropower opportunities that are being matured right now.

Raymond Carlsen

executive
#12

We're going to expand our organization in India to really capture these opportunities, and we believe this will be a key market for Scatec going forward. Egypt — I mean, 380 MW is, you know, the biggest solar installation in Egypt. It's located near the Aswan Dam. We've grown Scatec into a significant energy company in Egypt. I've devoted considerable time in Egypt, along with our team there, and the deal with Fertiglobe didn't happen on its own. I'll have a separate slide, as I mentioned a bit later, to dig into that. Egypt is set on becoming a hydrogen hub for the world. They're set on exporting electricity. If those of you who follow Egyptian news saw that they signed an MoU with Greece a week and a half ago for an export cable. If you consider the capacity Egypt has to tap into the solar resources they possess, like Aswan, it's enormous. I mean, there's plenty of desert there and cheap, competitive energy. Good for the energy itself, but also for the X, you know, Power-to-X. That's a snapshot of what we're focused on. Of course, there's another 30% of projects too that exist that are very interesting that fall within our core markets.

Raymond Carlsen

executive
#13

That happened yesterday evening. The three projects sit side by side. You could think of them as a single project, but in fact they are three separate SPVs — special purpose vehicles — as they were bid, since our maximum bid was 75 MW AC, which is somewhat higher on the DC side. That explains the 273. They will generate through 2041. Counting from our completion in 2023, they'll be producing power until 2043. Our ownership stake is 51%. We'll proceed the way we always do. I mean, this reflects our integrated business model. We developed them — that's the reason we bid. We'll handle the EPC, and we'll handle operations and maintenance. In fact, they'll be connected to the central control room — or, you know, the global central control room — that we operate in Cape Town, optimizing plants worldwide, and after that we'll carry out asset management on the partners' behalf. Financial close is anticipated in the first half of 2022. South Africa is going to be extremely, extremely busy for the solutions organization. I mean, the folks who, you know, run EPC projects next year, especially in South Africa. Yeah, let's spend a little time on the Philippines. I mean, the Philippines is a deregulated market. It's among the few deregulated markets in Asia or Southeast Asia — possibly the only one.

Raymond Carlsen

executive
#14

When you take a look at the power mix last year, coal really stands out as the dominant source—there's a substantial amount of it. Electricity demand in the Philippines keeps rising. It's an economy that's expanding. It isn't stable. It's growing at a sensible percentage, so growth will continue toward 2030. You'll notice some oil-based generation, a small amount of natural gas, and there are factors concealed within those figures, since we're examining natural gas. Essentially, this has been drawn from their domestic fields. The Malampaya field—I worked on it 25 years ago as an oil and gas project—is now depleting, so a replacement must be found. Hydro is constrained in scale, yet it's reliable and beneficial, and our position there is quite strong. After that come the expansion opportunities in wind and solar. When you attempt to look ahead to 2030—and we conduct such studies across several markets—you must form a view on how the market will develop. You will observe growing demand and greater electricity requirements. Coal will be phased out, or no additional coal will be connected. As a matter of fact, only a couple of weeks ago they announced that they intend to reach 50% renewables by 2040.

Raymond Carlsen

executive
#15

And that's on top of everything else. For us, this matters a great deal, or is quite fascinating, since we hold a position in hydro. We take part in ancillary services — not merely selling electricity at the kilowatt hour price, but also delivering services. Should the grid go down or some plants go down, we're able to pump in additional hydropower. If there is, you know, a stabilizing — I mean, you need power for stability, so the light doesn't flicker. I mean, that's another service we provide there. For us, given our 640+ MW installation, we hold a strong position. Together with Aboitiz, a very prominent company and energy company in the Philippines, we will add more renewable energy to this platform over the next two years — a strong drive. We've also been leveraging that position to examine, okay, what other renewable energy sources would be interesting, where we can position ourselves based on our knowledge. Of course, we did as we have done in Vietnam — we began scouting, you know, the seas around the islands of the Philippines. This was actually assisted by DNV. They helped us. They have done a lot of that. We found some very, very good locations.

Raymond Carlsen

executive
#16

You know, the water’s pretty shallow there. The yield — you know, the wind speeds across the year — and this is statistics gathered over many years, were excellent. We’ve been ahead of the pack, or at least at the front of it, and secured 1,750 GW, or 1.75 GW, of project. These are going to be developed. Of course, we acquired these projects without having to, excuse me, bid for them. We spotted it, we spoke with the authorities, and we received the award. The last one was just two to three weeks ago. For these projects we develop, we’ll erect a mast that measures and confirms the wind speeds. We will, you know, take them further when it comes to environmental impact assessments and so on. At the right time, we’ll bring in partners, you know, for financial reasons, but perhaps also for execution reasons. I mean, we’re not in a rush to do that. We’d like to get to a good mature stage before doing so, so that we can capture the value being generated. Those who know the difference between developing the project yourself from the start versus buying into the project know there’s a lot of value to be captured when you do that.

Raymond Carlsen

executive
#17

From where we sit, the Philippines is going to come close to — or I'd say it's around the same level as South Africa for us, in the sense of treating it as an entire market. Egypt, I believe, will reach that point as well. Now, when you look at us, we've been a solar company, and being a solar company is a good thing. I mean, that serves us well. Naturally, you always need to watch the market closely. Where is the market heading? In the early days, you know, people said, "I want solar at the lowest price I can get." After a while, the mindset shifts somewhat. "Well, I want to have electricity. I want green electricity, and it ought to be delivered whenever I need it, you know, around the clock, 24 hours a day, seven days a week." Naturally, as a company you need to think somewhat differently. That's what drove us to broaden our technology range, because, you know, we need additional technologies in our toolbox so we can deliver stable electricity. Now internally, we're kind of — you know, I've said this externally as well — we're saying, "To the customer, we should come across as a solution provider, someone who provides clean, green energy, stable, at a highly competitive price."

Raymond Carlsen

executive
#18

Over on the right, you can see a few of the elements and a few of the points that let us approach customers and put that proposal forward. Firm renewable power — well, that is precisely the solution, and it's what I laid out. In cases where you mix various technologies, you might even purchase a little electricity to top it up, you know, or, you know, sprinkle in some batteries so the electricity stays stable. Hybridizing PV and hydro. I hadn't imagined there would be so many opportunities from combining hydro and PV. I've discussed this previously, and we observe that you can optimize reservoir utilization by actually, you know, drawing on the sun during the day. You know, when the peak is high, you just — rather than, you know, lowering the water level in the reservoir, you rely on the sun to actually compensate for the variation. Again, understanding how the grid works. There are regions where you must conserve the water during the day, or as much as possible, because dry seasons exist. In Africa, plenty of places where solar on top of a reservoir makes good sense. Release — a different way of thinking about the customer, because not everybody wants to move into long-term contracts.

Raymond Carlsen

executive
#19

They’re saying, “Oh, okay, so my mine is going to be depleted in five to seven years. How do we deal with that?” Well, right now, I mean, they’re paying—you know, I’m not claiming $1, but perhaps $0.50 per kWh. With Release, we can address this. I mean, that’s a containerized PV system. Once you place the order, it gets shipped, and after three months it’s installed and generating power. We’ve been discussing this for some time. The market has moved a little more slowly than we expected. What we’re seeing now is partly a result of the very, very—I mean, $85 per barrel, right? Diesel—you know, this is being, you know, pushed further along. We also discussed Power-to-X. I mean, when you generate electricity from solar, for instance, in Tunisia or Egypt at $0.025 per kWh—I mean, what are we paying at present in Norway? One, yeah, one kroner and DKK 0.50. We can make this for DKK 0.25 or DKK 0.20 per kWh. I mean, and it’s independent of fuel. I mean, every other technology depends on fuel. Not hydropower in Norway or anywhere else, not PV, not wind, but all the remaining technologies. I’ve mentioned—I mean, just to restate something I should have, I’ve briefly addressed.

Raymond Carlsen

executive
#20

What the world is going through right now is something people will go through in the coming decades, since they rely on fuel — be it gas, oil, diesel, or other kinds. That is going to create market volatility, and it will be a powerful incentive for anyone seeking stability to move toward renewables. We don't depend on fuel. So when we quote a price, we tell them, "That price holds through 2040. No need to worry about it. You can plan in a different way. Put your attention on other matters." That is why, out of the current energy crisis, renewable energy will come out as an even stronger option, and it will speed up the green shift, which in my view benefits everyone. People might tell us, "Okay, we're worried about cost inflation." Yes, so are we. The panel prices rise somewhat. The steel prices rise somewhat. Even at the cost levels we're seeing right now, for us we sit far below every other technology when it comes to levelized cost of energy. It really doesn't leave a dent. It simply confirms that the business case for renewables is in fact getting stronger even while we face some cost inflation at present.

Raymond Carlsen

executive
#21

Honestly, this is a little awkward for us too. The only real effect is in cases where we can't shift projects slightly later or fine-tune the schedule and things like that. Going back to the slide, Power-to-X — I mean, it's X one, X two, X three. Let's focus on X one. What we signed in Cairo a week and a half ago, in front of the Prime Minister and quite a few other ministers in Egypt, marked a significant milestone for us. I won't call it transformational, since it isn't, but it matters because it extends our business model, in which we take cost-competitive renewable energy and use it to produce hydrogen and then ammonia. In this instance, we stop at hydrogen, though moving from hydrogen to ammonia isn't a very long step. President Sisi has said repeatedly that, given Egypt's strategic location, the country aims to become a hydrogen hub for the world — or at least for this region. That shows they are already concentrating on how to support the initiatives now underway. The agreement we signed was a C2C, a Company-to-Company arrangement with Fertiglobe.

Raymond Carlsen

executive
#22

Fertiglobe stands as a major fertilizer manufacturer based in Egypt. OCI, itself a sizable fertilizer producer, holds a majority stake in that business. Their scale sits roughly in the same league as Yara. Yara, as you know, leads globally. ADNOC from Abu Dhabi participates as a minority shareholder with an interest in the company. Naturally, we worked through what you might call a prequalification process in which we faced off against all of the usual contenders. In the end, they chose us as the partner they wished to engage. The rationale behind that choice, naturally, is our standing within Egypt as a dependable renewable energy firm. Yet it also comes down to how we can structure projects, bring new technologies into operation, run the financial simulations, and ultimately deliver a price that stays cost competitive. I'm unable to disclose the pricing at this point, though it will naturally reach the market at the right moment, and it will be competitive — if it weren't, we would not be in this position. On our side, we now have a team of highly qualified individuals examining ways to grow this market. I mean, I don't know whether you've visited that region, but naturally, you surely recall that container vessel which got lodged in the Suez Canal a few months ago.

Raymond Carlsen

executive
#23

So, this sits right at the rim, or at the end, or alongside the Suez Canal. Ships go past that spot. Plenty of vessel owners are shifting away from, you know, dirty diesel and dirty oil toward renewables. Ammonia will actually serve as their fuel. Naturally, the strategic siting of the facility we're constructing — and that we'll hold majority control over — matters a great deal. Naturally, we're hopeful it ends up, you know, considerably larger when all is said and done. Naturally, we have to prove the concept. What we have in mind here is this: we've kicked off the feasibility study, financial closure comes next year, and operations begin in 2024. I believe it's your turn now, Mikkel.

Mikkel Tørud

executive
#24

Thanks. Some figures, then. So let's return to the quarter and go through the numbers, the proportionate financials shown here. Q3 revenues came in at NOK 1.3 billion, with EBITDA of NOK 767 million, and cash flow to equity of NOK 300 million. EBITDA rose roughly 28% versus the prior quarter, which was mostly due to better hydrology in the Philippines, and I'll come back to that in more detail shortly. Against last year, you clearly see the effect of the SN Power assets acquisition, with big contributions into the power production segment this year. Across the last 12 months, revenues got to just under NOK 3.9 billion and EBITDA of NOK 2.2 billion, with cash flow generated from these plants after debt service of slightly above NOK 1 billion. Power production. Again, a very positive trend in terms of growth and production and EBITDA generation. Clearly, compared with last year, once more, the SN Power assets contributed, but also quarter-on-quarter, we've seen grid connection of new plants in Argentina and Ukraine and higher production in the Philippines. The hydro assets accounted for an EBITDA of NOK 383 million now in the third quarter.

Mikkel Tørud

executive
#25

Solar assets have been pretty steady when it comes to revenue and EBITDA generation now, year over year, so versus Q3 of last year. We figured we should also spend a little time on power production, since it's grown quite a bit. There were some questions about the hydro assets, and we wanted to shed a bit more light on that this quarter. First, over on the right you can see a graph showing how EBITDA is distributed year to date. This is definitely a well-diversified portfolio, with quite a few markets where we operate. That's also reflected in the number of currencies and technologies we work with as well. On variability and seasonality for solar and wind, we're accustomed to a fairly stable resource as the basis for production, right? Both annually, and also within the year and across the quarters. Power prices here are secured, as you know, via long-term PPAs and feed-in tariffs. For hydro, we see somewhat more annual variability and certainly more seasonality across the quarters of a year.

Mikkel Tørud

executive
#26

Once more, Uganda—one of the assets here—works differently, since it receives fixed capacity payments no matter how the plants are dispatched or what the hydrology looks like. In Laos, by contrast, 90% of the offtake is sold under a PPA with EGAT in Thailand, and this plant's storage capacity lessens seasonal volatility. That follows a different pattern. The Philippines, as you can see here, accounts for 27% of the year-to-date EBITDA and operates in a power market. You also see greater reliance on hydrology there in the Philippines. That's what we've observed this year as well, and we wanted to explain it a bit further. On the right, once again, you can see a graph displaying the five-year average production by quarter. That's the dark blue bar on the left in this graph. You can see Q1 and Q2 being, you know, somewhat lower, followed by much higher production in the second half of the year. We touched upon this in the second quarter, when there were some questions around the second quarter performance. As you can see, the second quarter this year was not really that far off what we saw as a five-year average of the production. Now we're also selling a large portion of the energy that we produce, either through ancillary services or through bilateral contracts.

Mikkel Tørud

executive
#27

For the production year that lies ahead, 80% is already committed through bilateral contracts signed a year in advance. What that means is we've got a hedge against pricing exposure to the spot market's greater volatility, which is what you see here as in the Nordics. Once you look two years out or three years out, the hedging ratio drops. Going forward, that ratio rises until it reaches one — up to 80%, that is, one year ahead. It's worth keeping that dynamic in mind. Because of this, revenues and EBITDA for the Philippines are driven really mostly by the production profile and by hydrology. At least near term, the prices are locked in. Over the longer term, naturally, we're exposed to power price trends in the country. We also wanted to point out that, when it comes to production, the bilateral contracts match this profile in terms of what we're obliged to deliver. Balancing the portfolio over shorter time periods will always be necessary. That varies with time, and across quarters as well. Exposure there is limited, though some balancing is required.

Mikkel Tørud

executive
#28

So during specific periods when hydrology is strong, you know, we'd have excess production that we could sell into the spot market. And then, based on the market and where market prices sit, we can either deploy that capacity to sell at elevated prices in the spot market or provide more ancillary services, grid stability services. So the team at SN Aboitiz Power — the JV we hold with AboitizPower — is carrying out an optimization exercise. This JV has roughly 200 employees, with about 40 to 50 people focused on market analysis, you know, power sales and optimizing these power plants. It's a highly experienced team running these plants. And then finally, ancillary services, as Raymond also mentioned, form a stable base of net revenues. These revenues aren't always, you know, backed by production. When you look at the results, you need to bear that in mind, because we're paid for keeping that plant available to be called upon when needed for grid stabilization. It isn't always a production volume behind the revenues that are part of what we report from the Philippines. Okay. Services is a much smaller portion of our business. Stable results, NOK 69 million of revenues, NOK 22 million of EBITDA now in the third quarter.

Mikkel Tørud

executive
#29

On development and construction, Raymond walked through the near-term hold-ups in Pakistan that keep weighing on construction revenues—quite modest overall, at NOK 43 million for the quarter. Conversely, project development activity has been very strong, which I think Raymond also underscored during his portion of the presentation. In addition, we booked an impairment of NOK 50 million tied to discontinued development projects in Ukraine and Brazil. We gave advance notice of that in a separate release on October 1. Turning to the balance sheet, I'd describe our cash position as quite stable versus the prior quarter. We still hold undrawn credit facilities totaling NOK 1.6 billion, with group equity of NOK 11 billion. As you can see, consolidated assets came in at NOK 33.3 billion. On cash and cash movements: we collected NOK 328 million in distributions from operating power plants during the third quarter, and development CapEx on our projects came to NOK 130 million. So, as I mentioned, the overall cash position has stayed fairly flat relative to the end of last quarter. A little on near-term guidance: power production for the fourth quarter is expected to land in the range of 1,000 GWh to 1,100 GWh, roughly in line with the third quarter.

Mikkel Tørud

executive
#30

As I mentioned earlier, we're also pointing out that in the Philippines we anticipate output a bit above the five-year average. But we also want to remind you that the Philippines will see maintenance costs and OpEx above normal levels in the fourth quarter. It may also be worth noting that Ukraine has strong seasonality. Winter is here now — we're heading into winter in Ukraine — and that has an effect on production. I'd encourage you to look at prior quarters and how that effect played out in Ukraine, but at present we have more production operating in Ukraine. On the D&C side, we essentially expect Q4 to be in line with the third quarter, and that, you know, follows from us pushing these projects out in time and from Pakistan also having this delay that Raymond touched upon. There are no changes, then, to guidance on services and corporates compared with what we've mentioned before. Okay?

Raymond Carlsen

executive
#31

Thanks so much, Mikkel. This time I've chosen to include just a single slide at the close, since I believe I already went over quite a bit of ground before Mikkel went through the figures. I realize I'm taking up some of your time here, so I'll keep it brief, and after that we'll take your questions. It's encouraging to see that cash generation at the company remains strong. Naturally, we anticipate that will keep going. That provides a really firm base for the growth ambitions I'll touch on a little later. I don't think I need to go over it again. As I believe everyone now recognizes, the market is going to be strong. Perhaps not everyone grasped that cost inflation, or higher costs in certain areas, has no effect — or at the very least a very limited effect — over the long term, or on the pipeline we have. There could be some near-term effects. Yes, I'm optimistic about what lies ahead. Plenty of things are heading in the right direction. Naturally, as in any business, a few matters need addressing, but that ought to be routine business as well.

Raymond Carlsen

executive
#32

I'd propose I wrap up with that. Given that everyone is gathered here—there's quite a crowd present—I figure it makes sense to give all of you the chance to pose questions prior to opening things up for those viewing via the web to submit theirs. Mikkel, if you'd like to come join us, or, and Andreas, I'm not sure.

Mikkel Tørud

executive
#33

Andreas is going to handle the questions.

Raymond Carlsen

executive
#34

Yeah. All right.

Andreas Nygård

analyst
#35

Yes. We’ll begin by taking a question from the audience, and Nina is going to hand you a microphone. Hello?

Liv Grønsberg

analyst
#36

Thank you. It's Liv Grønsberg from Nordea. Please, take a seat. Perhaps I could follow up on what you said about the growth framework — and clearly you have certain ambitions for 2025 that you've communicated before. Do you think that at some point you'd put a number on the nearer-term ambitions in the form of a target? Or, if not, can you say anything about how you expect the path toward 2025 to unfold — whether it will be front-end loaded, back-end loaded, or closer to linear? The reason I ask is, of course, that linear growth is presumably simpler to digest from a funding standpoint, whereas greater lumpiness clearly introduces some other dynamics. Thank you.

Raymond Carlsen

executive
#37

Sure. If you take a look at how the company has evolved, it's been somewhat uneven from time to time. A few years ago — 2018 and 2019 — we posted our largest-ever revenues on the execution side. That wasn't intentional; it's just the nature of things, since certain projects run into delays nobody expected. Then you might ask, well, shouldn't we know better by now? And yes, we do. That's exactly why we're expanding the pipeline we've got, giving ourselves a larger pool of projects so the situation becomes more steady. What's going on right now, I'd say, is unprecedented — not just for us but across the whole market. It's extremely difficult to forecast. We expect volatility to continue down the road as well. The long-term objective hasn't changed. Naturally, the 15 GW figure refers to 15 GW of installed power. And I think you should also bear in mind that beyond that, there will be opportunities in storage. There will be other elements that factor into the equation too.

Raymond Carlsen

executive
#38

A delay has occurred at this point, and I’m sorry about that. I wish we had been able, you know, to take some step that would reduce the effect — and we are doing that. Naturally, you know, what’s favorable now, or the wise course, is to act sensibly and revise the schedules so they align with what is reasonable.

Liv Grønsberg

analyst
#39

Thanks. Let’s turn to the topic everyone likes best: cost inflation.

Raymond Carlsen

executive
#40

Yeah.

Liv Grønsberg

analyst
#41

Think about what went into your budgeting process around 12 months ago. If that CapEx per megawatt is set at an index of 100, where does cost inflation leave that index today? Clearly, we've all watched how raw material prices have moved. Different sources cite varying figures for CapEx increases. Could you tell us something about when you source through contracts with your partners, and how you see that cost inflation being indexed?

Raymond Carlsen

executive
#42

What we do — and this is the way I handled things in my prior career as well — is you don't want to lock in a fixed price before you understand your cost base. Usually you head out and issue inquiries that come with a scope. Subcontractors send their prices back, and they might face the same situation. Then you can see where you stand. That's not what we rely on across the board. With a few of our bigger suppliers we have a really tight relationship, particularly the module suppliers on the solar side. There's a spreadsheet where, well, we list a bunch of different module types along the Y-axis. The other axis is time. Then you enter your price expectation for the stretch from today through when delivery is supposed to happen. It gets refreshed regularly, but that's the basis for how we price. What we observe is, well, there's a trend — a downward trend — in modules, though it could arrive sooner than expected. When pricing, we lean as best we can on our grasp and reading of the market. The prices we give at that point reflect, well, the costing plus the guidance — I mean, the margins we expect.

Raymond Carlsen

executive
#43

I believe—though I can't recall whether I brought this up before—that in Spain's most recent auction, PPA prices climbed by 20%, which signals the market is beginning to accept that pricing will be higher going forward. There's invariably a delay in that, right, since you figure, oh, this will roll through in 2 or 3 weeks or 2 or 3 months. What I mean is that upcoming projects will incorporate the costs as we see them, and we'll set prices as well as we can.

Liv Grønsberg

analyst
#44

Thanks. I've got one final question, and it's about how the pipeline is developing — I'd like to get a bit of a handle on what's been moving there, particularly in light of what came out of South Africa.

Raymond Carlsen

executive
#45

Mm-hmm.

Liv Grønsberg

analyst
#46

So yesterday, you announced awards totaling 273 MW. When we look back at what was shared on your Q2 report, I believe the phrasing was that you added 1.2 GW to the pipeline, with most of that being preparations for Round 5 in South Africa.

Raymond Carlsen

executive
#47

Mm.

Liv Grønsberg

analyst
#48

Would it be reasonable to think that the 273 MW you won yesterday is about a 50% conversion rate on what went into the pipeline? Or could you share any thoughts on the total megawatts you submitted in Round 5 compared with what you ended up being awarded?

Mikkel Tørud

executive
#49

I’m not sure we’d want to disclose the overall volume we bid. What I mean is, obviously we bid more than we won—I think that much is clear.

Liv Grønsberg

analyst
#50

Yeah.

Mikkel Tørud

executive
#51

I think you also noticed that on the solar side, we were, you know, at the top of the price range when it comes to the tariffs and winning bids. I think we're reasonably pleased with that.

Raymond Carlsen

executive
#52

I mean, there's some strategic bidding involved here. I mean, we were aware that Round 6 was coming up, and you'd want to—I mean, this is always tough. I mean, how do you set the price? We want to win, but we don't want to win at the lowest price. We want to win at the highest price that gets us awarded. That means some three projects fell inside, some fell outside, but they're now ready for the next round, Round 6.

Liv Grønsberg

analyst
#53

Thanks a lot.

Thomas Dowling Næss

analyst
#54

Hi. Thomas from SpareBank 1 Markets here. I think a few of my questions have already been addressed. First, congratulations on a solid quarter. Back to costs and cost inflation — when would a drop in module prices and freight costs need to show up for you to hit the adjusted timeline you've just announced? Does a decline have to happen, or is that fixed? The new timeline only came out today, right?

Raymond Carlsen

executive
#55

What I mean is, when we adjusted the schedule, we factored in the pricing we're currently seeing in the market. That schedule change is mainly down to other reasons. A price reduction would be welcome on our side, because it's true that margins on some projects have come down from where they would have been had module prices been lower. That said, it doesn't mean those projects are unprofitable or that they fail to hit the return targets we're aiming for. I mean, historically, certain projects have been well above what we guided on. I mean, I study and follow the logistics side — container ships, container pricing — 10x higher than a year ago. I mean, that hits us and everyone else. I don't think that's going to come down. I don't know that for certain; I'm just reading up on this information myself very soon. There are too many constraints around the world. I mean, look at the containers — congestion outside of California. It has a global impact. That is factored in. I don't think it's going to rise further. That's our view.

Raymond Carlsen

executive
#56

We also don't think that, if you look at solar, wind has comparable problems. I don't see it rising any further. Additional capacity is coming online on the silicon side — silicon prices are quite high — and on the module side as well. India, you know, aims to add 6 GW, 7 GW, or 8 GW, but that doesn't have to happen overnight.

Thomas Dowling Næss

analyst
#57

You brought up the 20% higher PPA price in Spain. Given that most offtakers will likely assume CapEx is going to come down over the next two, three years, how willing are they to adjust those PPA prices back?

Raymond Carlsen

executive
#58

It really depends on the situation. If you've already won a project through bidding, going back afterward to request adjustments strikes me as quite hard. In cases where that can be done, we'll do it. I don't believe there are many projects like that in the backlog, though. For those that haven't been bid yet, you're free to do whatever you like. What's interesting is that even at a somewhat higher price — where it's 20% up — you're still far below the other technologies. That makes sense. Paying 20% more than what renewables have historically cost is actually much cheaper than going the other route, through traditional energy. It makes sense.

Thomas Dowling Næss

analyst
#59

All right, thanks.

Mikkel Tørud

executive
#60

All right, time really does move fast. I mean, is there a chance we could take maybe 2 or 3 questions from the web?

Andreas Nygård

analyst
#61

Yeah, we’ve got a couple of questions from Eivind Garvik at Carnegie. He’s asking us to comment on the Mainstream awards. I’m not sure whether we can comment on that. Congratulations on the 273 MW in South Africa. Aker Horizons with Mainstream was awarded 1.27 GW of capacity. Why were they so successful? Do they have a lower return requirement?

Raymond Carlsen

executive
#62

Well, honestly, I think the math is something you need to work out on your own. We aren't running those numbers. What we're calculating is for our own project. We landed in the upper range, and that was the plan.

Andreas Nygård

analyst
#63

Eivind Garvik has another question. For a hydrogen facility of 50 MW to 100 MW, what amount of solar and wind capacity, measured in megawatts, would be required?

Raymond Carlsen

executive
#64

If my memory serves me right, that's 150 MW of wind plus 30 MW-40 MW of solar. That's the proposal we put forward. Right now we're in talks with Fertiglobe and the Egyptian authorities about speeding things up, so that we can reach COD on the first plant, with certified green energy that's already available in Egypt today.

Andreas Nygård

analyst
#65

Eivind Garvik has the final question. What percentage of Philippine revenues comes from ancillary services?

Mikkel Tørud

executive
#66

Yes. I believe we’ve said this previously: roughly 40% is a figure worth keeping in mind. It will also shift across the quarters within a year. You know, that’s simply another point to remember. That revenue stream does not depend on hydrology, so clearly it will move around. Again, when you examine average selling prices, as I’m aware some of you are doing, bear this in mind, since you can’t simply subtract the average selling price from revenues and production here.

Andreas Nygård

analyst
#67

Okay, so we've got one coming in from Magnus Solheim. He's asking whether Scatec would think about halting dividend payments to shareholders so that the cash could be preserved, and instead put that money into new projects.

Raymond Carlsen

executive
#68

Yeah. I mean, there’s a policy in place that the board has approved, and, you know, that’s just the way it is.

Mikkel Tørud

executive
#69

Yeah, yeah. To say it again, the policy is to distribute at minimum 25% of dividends received from the operating assets to our shareholders as dividends, right? That's our current policy.

Andreas Nygård

analyst
#70

Alright. We have a couple of questions coming from Manuel Palomo at Exane BNP Paribas. Would you be able to provide a bit more detailed guidance regarding the assets that you anticipate bringing into operation during full year 2022?

Mikkel Tørud

executive
#71

So, given what we laid out today, the schedules have shifted, and expecting anything meaningful from new power plants in 2022 just isn't realistic, in my view.

Raymond Carlsen

executive
#72

Naturally, plenty of plants are going to be under construction — no doubt about that.

Andreas Nygård

analyst
#73

Alright, here's another one coming from Manuel. This concerns inflation, and I believe we've already addressed it somewhat. Would you be able to explain the company's policy when it comes to hedging installation cost for assets that have already been awarded but are still in the pipeline or currently under construction?

Mikkel Tørud

executive
#74

Right. Yes, we do put in orders. Generally speaking, orders get placed for every critical component only after financial close has been reached and we've made the investment decision on the projects. Up until that stage, we aren't, you know, ordering anything at all. That's the moment when we lock in the entire CapEx for a project.

Raymond Carlsen

executive
#75

Perhaps we should wrap things up there.

Mikkel Tørud

executive
#76

Yeah, I believe that's the case. We could handle the remaining questions one by one, I think. Yeah.

Raymond Carlsen

executive
#77

All right.

Mikkel Tørud

executive
#78

All right.

Raymond Carlsen

executive
#79

Much appreciated.

Mikkel Tørud

executive
#80

Appreciate it, everyone.

Raymond Carlsen

executive
#81

It was good to see everyone. Until next time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Scatec ASA transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Scatec ASA earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Scatec ASA or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.