Talen Energy Corporation (TLN) Earnings Call Transcript & Summary

November 14, 2024

NASDAQ US Utilities Independent Power and Renewable Electricity Producers earnings 62 min

Earnings Call Speaker Segments

Ellen Liu

executive
#1

Thank you, Michelle. I'd like to welcome everyone to the conference call for Talen Energy's third quarter of 2024. Joining us on the line today are our Chief Executive Officer, Mac McFarland, and our Chief Financial Officer, Terry Nutt. Other senior leaders from Talen are also with us, and they'll be available to take questions during the latter portion of the call as needed. Our earnings release came out this morning, and the presentation was issued as well; both are available in the Investor Relations area of Talen's site, www.talenenergy.com. During this call, we'll be sharing forward-looking statements that reflect our current expectations and assumptions. A variety of risk factors and other matters outlined in our financial disclosures and other SEC filings could cause actual results to vary. In addition, today's discussion will touch on certain non-GAAP financial measures. Information that reconciles those non-GAAP measures with the most directly comparable GAAP measures appears in our earnings release and in the appendix of our presentation. With that said, I'll hand things over to Mac.

Mac McFarland

executive
#2

Alright, thanks, Allen. Good morning, everyone, and I’m glad you could join us today. Before we get into the quarterly results, I’d like to make a few brief remarks. Over the past few months, shifts in the market and on the regulatory front have made it even clearer just how vital our existing generation fleet is for serving growing demand and maintaining grid reliability. Since we completed the Amazon deal in March, power market fundamentals throughout the U.S. have only become more supportive for IPPs. The July PJM capacity auction results came in stronger, Microsoft made its Green Clean Energy announcement, and utilities are raising load forecasts — driven in large part by data centers, the reshoring of industry, and electrification across our economy — and all of that reinforces this view. U.S. data centers are expected to grow more quickly than those anywhere else, rising from 25 gigs of demand in ’24 to more than 80 gigs by 2030. Meeting that need will require substantially more generation, so bringing projects to market faster and locking in long-term power have moved to the top of the list for hyperscalers and data center customers. As I’ve said before, an all of the above approach is necessary to serve this massive data center demand. That includes co-location, like the arrangement we’ve put together with AWS, hybrid configurations that put primary power behind the meter while using the grid for backup, and front of the meter connections to utility transmission. Even though the initial ruling rejecting the ISA amendment was disappointing, it doesn’t change the fact that this load growth is coming, and it won’t slow our momentum. For starters, work on the data center campus will continue under the existing 300 megawatt ISA while AWS and we work together on the path forward. Talen’s co-location deal with AWS is part of the answer to issues raised at the FERC technical conference about large co-located load. It gets service to customers quickly, avoiding expensive transmission upgrades that would drive up a retail consumer’s energy bill. That said, we’re reviewing the full range of commercial and legal options to allow full development of the Susquehanna campus, as well as to advance other opportunities across our fleet. This includes filing a motion for FERC rehearing alongside AWS contract negotiations. When it comes to co-location, front of the meter, or the hybrid approach I mentioned earlier, we’re keeping every option open. I know the first questions in today’s Q&A will be about when this gets resolved, what it will look like, and what’s happening with your next data deal. The short answer to all of it: we’ll let you know when we’re done. Honestly, this brings me back a year, when we held our Susquehanna site day visit and data set at our data center campus and described co-location as a novel concept. Many of you asked those same questions then, and you heard me give the exact same answer. Everybody knows we don't haggle over commercial matters in front of the public, so no remarks from us on that front at this time. That said, our history of getting deals done, our strong grid location, and good relationships with stakeholders, I believe, let us keep all options open. Our sector, I'm certain, can meet the challenges in front of it and seize the opportunity to power the AI economy, bringing big economic benefits to Pennsylvania specifically and the U.S. overall. Turning now to our top highlights, starting on Slide 3. It's been a bustling third quarter at Talen, and I'd like to highlight several wins, starting with strong operational and financial performance. In Q3, adjusted EBITDA came to $230 million, with adjusted free cash flow of $97 million. With such a strong showing so far this year, we are raising and narrowing our 2024 guidance, while reaffirming the 2025 financial guidance we gave at September's Investor Day. Terry will share more on that, plus our 2026 outlook. In October, we acquired TeraWulf's 25% interest in Nautilus, granting us strategic flexibility over the building and its power use. Nautilus has stopped operations, which frees 150 megawatts of power for sale at better margins into the PJM wholesale market and, in the end, to Amazon. Last, we joined 5 equity indices over the last few months, spurring passive fund demand for our shares along with ongoing shareholder rotation. I'm proud of what the team accomplished this quarter while setting up future long-term value creation. On Slide 4, you've heard my thoughts on the ISA and the path ahead. We also joined the FERC technical conference on November 1st. Discussion was quite productive, and we appreciate the commission tackling this important issue. Our stance is still that every solution should stay available, so long as the RTO, the generator, the transmission operator, and the state PUCs — or the applicable state PUC — agree. Now to the PJM capacity auction. Following complaints from the Sierra Club and other NGOs, PJM requested and FERC approved a six month delay of the '26, '27 auction, which had been scheduled for next month. Later auctions will occur every six months, continuing through the '28, '29 auction in December of 2026. PJM is focused on reexamining the auction reference technology, which shapes how steep the supply curve is, and also how RMR, or reliability must run units, get treated. We largely support PJM revisiting the supply curve; still, we think PJM should close the spacing between auctions so they go back to the original three years ahead schedule sooner. One figure worth noting: 2.4%. If the capacity market continues to face delays, that introduces uncertainty into precisely the market that needs to send signals for investment in new build. On top of that, we believe that requiring RMR units to either bid into the capacity market as price takers or be regarded as phantom supply would distort price signals. RMR units exist to provide backup for transmission reliability, not to serve as a capacity resource. Removing RMR resources from the capacity market is logical so that proper signals indicate new generation is needed. We strongly encourage PJM to resolve these issues as quickly as possible, and we are ready to collaborate with them productively throughout the process. Having said that, let's move to Slide 5 and put some numbers behind what's occurring with supply and demand in PJM. Since 2020, 19 gigawatts of generation assets in PJM have been retired, and nearly all of those are gas and coal plants. At the same time, only 10 gigawatts of new gas plants have come online, along with 13 gigawatts of renewables and batteries, and those cannot provide the same dispatchability as gas and coal plants. On the demand side, PJM recently reported significant increases in requests submitted to the 2025 power demand forecast for expected large loads like data centers and manufacturing. Included among those requests are 15 gigawatts of demand by '26 and over 50 gigs by 2030. PPL's own projection is that by 2030, large loads could double the peak summer demand curve demand within its control area, and that's where the majority of our plants are located. What these data points demonstrate is how much additional reliable dispatchable generation PJM needs to meet the power demand growth that is coming. Moving to Slide 6, let's look at our operational and financial results for the year to date. Operationally, our team kept performing. Our fleet did well, generating more than 27 terawatt hours with an equivalent forced outage factor of only 2.4, which is better than 3.5% during the same period a year earlier. Roughly half of that output came from our carbon free Susquehanna nuclear facility. Equally important, our team remained safe through the busy summer months. We have a year to date TRIR of just 0.3, which is truly exceptional. That matches or surpasses our peers, and we continue to emphasize safety as our top priority across the entire fleet. We leveraged our strong operational foundation and commercial strategy to generate significant adjusted EBITDA and adjusted free cash flow on a year to date basis. During the quarter, we continued to prioritize capital returns and balance sheet discipline. Later in the presentation, Terry will take you through the year to date figures, our leverage and our liquidity. I want to pause here and take this opportunity to recognize and thank our employees across the company who have worked safely to deliver impressive operational results throughout the entire portfolio. The people on these teams are vital to how well we do as a whole, because they run, service, and improve our generation fleet along with our other assets. None of this would be possible without their commitment and the remarkable bar they set for themselves. With that, I'll turn it over to Terry. Terry?

Terry Nutt

executive
#3

Thanks, Matt, and hello everybody on this call. Let's shift over to our financial performance. Talen posted adjusted EBITDA of $230 million for Q3 2024, alongside adjusted free cash flow of $97 million. Versus the equivalent quarter a year ago, wider spark spreads plus greater power demand pushed generation margin higher throughout our fleet. That generation margin, together with the combined effects of our hedging approach and the PTC, more than made up for lost earnings from our ERCOT generation portfolio, which we divested in March of 2024. Adjusted free cash flow for Q3 2024 reflected a $40 million larger pension plan contribution, which speaks to our ongoing dedication to our employees and retirees. On top of that, we moved up certain raw uranium purchases in the quarter so we could capitalize on favorable pricing. Together, those items pushed adjusted free cash flow below what we saw in the third quarter of 2023. On a year-to-date basis, adjusted EBITDA came in at $606 million while adjusted free cash flow reached $262 million. Let's now discuss guidance, which is on Slide 8. Having completed three quarters, we're lifting and tightening our 2024 ranges for adjusted EBITDA and adjusted free cash flow. The new adjusted EBITDA range sits at $750 million to $780 million. Meanwhile, our updated adjusted free cash flow range is $265 million to $285 million. As we look toward 2025, we're reaffirming the guidance ranges introduced at our Investor Day in September. Adjusted EBITDA guidance stays at $925 million to $1.175 billion, and adjusted free cash flow guidance remains $395 million to $595 million. Beyond that, our 2026 outlook is likewise unchanged from the figures shared at Investor Day; these ranges keep illustrating Talen's substantial earnings and cash flow growth trajectory, encompassing an almost threefold rise in adjusted free cash flow per share by 2026. On Slide 9 now, we stay dedicated to keeping net leverage under our 3.5x target while preserving robust liquidity. As of November 8, our projected net debt to 2024 EBITDA ratio stood at just 2.1x, comfortably beneath our target. Furthermore, we hold close to $1.3 billion in liquidity, which includes more than $550 million in unrestricted cash on the balance sheet. We keep working with the rating agencies, and two of them have rewarded our balance sheet discipline with credit rating upgrades. Our S&P corporate credit rating moved up to BB- in September, and our Moody's rating rose to Ba3 in October. Our attention stays on creating value and giving capital back to shareholders. In September, we revealed yet another increase to our share repurchase program, leaving us with more than $1.2 billion of capacity through the end of 2026; so far this year we've returned roughly $950 million to shareholders by buying back about 8.3 million shares. Because of how our Investor Day and the follow-on non-deal road show were scheduled, there was only a small window to buy back shares late in this quarter. Even so, our view remains that buying back stock is the optimal deployment of our capital, and we keep aiming to give back 70% of adjusted free cash flow to shareholders. Moving to the following slide. Once Talen moved up to the NASDAQ, it qualified for inclusion in a number of equity indices, and that has produced considerable institutional and passive demand for the stock. Talen has joined five indices, and as a result passive investment funds picked up more than 6 million shares on September 11. Earlier in this month, Talen entered the MSCI USA Small Cap Index, effective November 25th, and we expect that inclusion to bring further passive fund demand. In addition, Talen might become eligible for extra value growth through sector specific indices, which would boost stock demand even more and speed up the natural shareholder rotation; with that, I'll give the discussion back to Mac.

Mac McFarland

executive
#4

Thanks, Terry. I know you've all heard this from me previously: Talen continues to be an IPP, and our focus is on remaining an IPP. That holds especially true right now, since dependable and adaptable generating assets carry greater worth than they have for quite a long time. We're grateful that you're interested in Talen and that you're with us on today's call. At this point we'll open up the lines for questions, and I'll hand things back over to the operator. Michelle?

Shar Pourreza

executive
#5

Good morning. Mac, based on what you read out, it sounds like nobody really wants to tackle my question about AWS strategy. So I'll pivot to resource adequacy instead, which clearly is a hot subject right now at EEI. Are you taking part, I suppose, in discussions happening at the state level in Pennsylvania as of now? And if the PAPUC were to ultimately issue an RFP seeking peaking PPAs, or if the state were to adopt something along the lines of a test mechanism, would Talen get engaged in fresh development? I guess, how do you expect this whole thing to play out across the session? Thanks.

Mac McFarland

executive
#6

Absolutely. So, clearly this is a wide-ranging policy matter, since I'm aware plenty of folks are discussing either issuing RFPs or putting generation into rate base. There seem to be a few dynamics at play. First off, for the first time in 7 years, we saw a capacity clearing price above $100 per megawatt day. And I believe there's a good deal of reactive chatter happening around how to fix the resource adequacy issue. I think above all, the fix for that, as I mentioned during my remarks, is to get the capacity market back on track so pricing is being provided 3 years ahead. Regarding the TEF that's been put forward, our company has been involved in discussions in Harrisburg. And look, we believe something along the lines of a TEF that offers low cost loans to generation could address the resource adequacy problem we see coming; we're supportive of it, though broadly speaking, it hinges on how those loans turn out, what conditions are tied to them, and so forth. So when you pose that question, Shar, there aren't many specifics available at this moment. People are asking whether we should rate base generation, whether we should pursue something like the TEF, a PEF, a Pennsylvania Energy Fund? Should we consider alternative approaches to solve resource adequacy? I think what gets overlooked in all of this regarding Pennsylvania is that Pennsylvania has excess reserve margins above 30%. It's other states with lower reserve margins that are, quite frankly, somewhat of the problem. That said, Pennsylvania has an opportunity since it has gas, local gas, plentiful gas, a pro-fracking stance on things, no matter which side of the aisle you're on there. And so they have the ability to export energy. I think they can keep doing that and I think capacity markets are the way to do that. But I'll turn it to Terry, so if you have any further comments, Terry.

Terry Nutt

executive
#7

Yes, thank you, Mac. There are a few points I'd like to add to that answer, Shar. To start with, the Pennsylvania PUC has scheduled a conference focused on resource adequacy just ahead of Thanksgiving, and our intention is to take part in it. Clearly, as a major generator operating within the PJM market, we are certainly involved in those conversations and will remain so. Turning to the broader policy matter, another point I'd add alongside what Mac said is that a Pennsylvania Energy Fund strikes me as a compelling idea. We've observed that approach being used in Texas. Whether we're talking about a Pennsylvania Energy Fund or some of the ongoing conversations regarding RFPs, the details always end up being what matters most, correct? If you place a new asset into that structure, how does that asset take part in a capacity market? What ultimately is it — which economics end up being carried by the asset on its own, and what is it able to do versus unable to do when it comes to participation? So my sense is these are productive conversations, we will stay involved, and we look forward to contributing to a resolution of the resource adequacy problem.

Mac McFarland

executive
#8

Shar, let me add one quick thought on that. When we refer to our locations sitting in the PPL zone as advantage sites, many of them can reach gas and occupy the correct position on the transmission network to interconnect, and we're examining ways to use those locations for redevelopment. Once more, it has to deliver the appropriate economics, appropriate returns, and so on, but we are looking into it there. And go ahead and ask your AWS question if you'd like.

Shar Pourreza

executive
#9

My apologies — I could hand that off to a different person. Still, the one thing I want to ask is this: once legislation begins taking shape, are you holding conversations with the wire companies, or is the spread between what each side wants simply too wide at this point for anyone to even sit down together?

Mac McFarland

executive
#10

The items being talked about at this moment are extremely early-stage. It's not as if there's a wide or narrow bid-ask spread. The simple fact is everything remains very preliminary; that's the reason I described these as having been somewhat reactive to this capacity clearing again; and honestly, it's being — I believe we aren't anywhere near the level required, and for the capacity to clear in a way that incentivizes new generation, and folks say we ought to rate base it. Let's simply be clear or go through an RFP process. Let's be clear. PJM is the most effective deregulated wholesale market in the country for one reason: people didn't want to pay for stranded assets; they wanted to shift to a deregulated market in PJM because they felt as though it would drive the lowest cost of supply possible. We continue to believe that and we will participate in that.

Shar Pourreza

executive
#11

Understood. That's great. I'll reconnect with everyone shortly. Thanks for that. I'll hand things over to another person. Thank you, Mac.

Jeremy Tonet

analyst
#12

I'd like to return to the technical conference, if that's alright. When you consider what happened there and read it as a signal regarding the amended ISA, what's your thinking? Or really, any perspective at all on data center growth more generally following that event? I'm simply curious about your impression of the technical conference.

Mac McFarland

executive
#13

Broadly speaking — and Cole, who testified on the third panel, is on the call and can chime in at the close of this — I'd say broadly speaking, many of the conversations helped advance our thinking on the question of how we address rising demand from data centers. My honest view is that ISAs became mixed up with resource adequacy, and the line between what people call front of the meter versus behind the meter, collocated, and so forth, found its way into that discussion, when in fact those matters ought to be examined on their own. Our position, Jeremy — and I made this point during the opening remarks — is that when the RTO — PJM in this situation — the transmission operator — for our particular ISA, that's PPL — and the generator all reach consensus, just as the state-level PUC, the PAPUC here, does, this being a matter for the state, then if all 4 of those parties agree and they determine there are no incremental costs, which is precisely what the ISA case established, and it delivered reliability, our view is that this represents a model deserving approval. Whatever works, provided those 4 parties concur; we might have counterparts who see it differently, and my sense is that's the conclusion they ought to reach as we head back; we'll find out how things develop. The PJM guidelines and a few other items still require attention. You opened your question by mentioning amending the ISA; that's under review at the moment. Setting aside the commercial side, which is where our attention lies, just for a moment, the regulatory track as it currently stands begins with filing a motion for rehearing, and that's the step we're pursuing along that track. Cole, would you like to describe what we're doing regarding the existing AWS contract for a bit?

Cole Muller

executive
#14

Right, of course. Hello, everybody. To begin with, regarding that question, as Mac mentioned, co-location ended up somewhat obscured amid the details during that conference, and resource adequacy, like Mac noted, rounded out co-location. Our view is that this will be resolved. It's going to require a bit of time, but we feel good that FERC will begin establishing a direction that brings clarity, especially around co-location. As for our commercial avenues ahead concerning the current arrangement with Amazon, it's worth restating what Max mentioned during the opening remarks: an existing ISA has received approval for 300 megawatts, and that gives us room to maneuver in optimizing our path toward reaching 960 megawatts for this deal as time goes on; together with AWS, we are assessing every possibility for speeding that up. And many of you likely noticed that AWS recently restated publicly its commitment to the site, correct? Thus, the fast forward spans a broad spectrum, as Mac also described during the opening remarks, ranging from roughly the current setup all the way to a complete grid connection. And numerous intermediate variations exist. We are examining each possibility and evaluating them thoroughly. Certain of those setups might involve technical and engineering modifications that will need some review and analysis. So we are working toward an ideal resolution together among all the involved parties, and we will share an update once we have one.

Mac McFarland

executive
#15

I'll just build on that. No, no. I was simply going to build on it — look, as I said, we've been examining a variety of commercial arrangements throughout the fleet. When we signed that initial 960 deal with AWS earlier this year, it isn't like we then began coasting; we've been examining a variety of commercial arrangements, and that's what lets us kind of concentrate on how we — call it a pivot, or call it finding another route to reach the 960 — we're actively pursuing that. We're also going to keep our optionality when it comes to colocation, since we believe colocation is among the ways to accelerate the market and to fuel the AI economy, and it shouldn't be abandoned. So that's the reason we'll keep going on that front, but our attention is on the commercial side of things.

Jeremy Tonet

analyst
#16

Understood. That's quite useful. Thanks. Moving to a different topic, data centers need reliable power sources, and nuclear capacity is limited; so I was wondering whether you have any fresh perspective on the willingness to use gas to meet that demand, whether it's behind the meter or something else. Any new thoughts on that front?

Mac McFarland

executive
#17

Well, I believe a few factors are involved here. Clearly, a lot of the hyperscalers, plus non-hyperscaler companies relying on cloud services and so on, every one of them wants to reach carbon neutrality eventually, at some future point. With that in mind, folks are examining nuclear's carbon-free nature, naturally, since it provides baseload power and matches the load profile required, here for data centers, which run essentially around the clock, all 24 hours a day, 7 days a week. That's not perfectly precise, yet let's go with it for the moment; plus they're considering renewables too, to fulfill their energy needs. However, in the short run, and I believe this matters greatly across the coming decade, before small modular reactors become available and can be deployed, say by the mid-30s, That shortfall, assuming you accept that demand is arriving, will need to be covered by natural gas facilities. Furthermore, I think that when you examine PJM, PJM holds a genuine chance to meet that demand given its geographic positioning relative to the data centers. And since, and to narrow it further, we believe we're positioned favorably since Pennsylvania offers plentiful gas, supports fracking, and is friendly to business. And, adding more electrons to the grid through new gas plants will be possible; and so — and I suspect the willingness will emerge since the necessity exists and it will serve as, if you'd like to label it so, a bridge fuel until we can obtain additional nuclear; now anyone who has ever — anyone I've ever talked to realizes I strongly favor nuclear and believe that for energy independence, on the electricity side, nothing beats having far more nuclear plants together with gas plants. Right? Yet reaching that point will require time. Consequently, bridging that shortfall will require gas plants. And we're evaluating which opportunities exist for us to contribute solutions, returning to Shar's earlier inquiry regarding resource adequacy, and how we could assist in bridging that shortfall.

Jeremy Tonet

analyst
#18

Understood, that's quite useful; and if I may shift gears quickly to the PJM auction, do you have any expectations for what might change there, or any reforms you'd get behind?

Mac McFarland

executive
#19

Well, I believe I mentioned this during the opening remarks, and then I'll pull Terry in as well. Look, we've talked with our peers and with industry working groups and similar forums. And I'd say the main point that nearly all of us see eye to eye on is that nobody wants extremely binary results where the outcome is either a clearing price of zero for 700. Right? Because whether you chalk it up to price shocks — and we can get into that, since capacity makes up the smallest share of anyone's bill; so the so-called 5 times jump from 50 to 250 represents the smallest share of the bill. It doesn't raise a bill all that much. But setting the politics aside, when you hear people reacting to prices climbing, we don't want that kind of volatility present. So that's the reason we back revising the curve as PJM, given this delay, works toward modifications to the RPM for ‘26, ‘27 — we're supportive of that broadly. As Terry mentioned earlier, there are always devils in the detail. We also, as I noted in the remarks and will repeat here, and we've been fairly clear, are willing to take part in RMR, and we're in ongoing talks regarding RMR, but what we've consistently said is that they shouldn't distort the capacity and energy market; and they exist, and the need for them exists as PJM has stated, for transmission reliability, but not as a capacity resource. And so, we consider those two very important matters here as we head into this auction. Terry, do you want to add to that?

Terry Nutt

executive
#20

Sure, I can add something to what Mac said. Another factor we're watching closely is simply the basic balance between supply and demand. A key thing that should be fascinating is how the demand forecast shapes up. A lot of folks probably know that PJM has several subcommittees, and a load analysis subcommittee met a few weeks back. Some of the demand projections coming from that group are quite intriguing. We hinted at this in the slides — if you review a few of those forecasts, there's clearly pressure building in the market, particularly over the coming years. To us, that's likely the largest unknown we'll need to watch play out. On what Mac said about RMR units, I couldn't agree more. If you place an RMR unit into the supply stack, or simply subtract it from demand, what's eventually going to occur when that unit retires at the conclusion of the RMR period? You'll just watch it disappear. In some ways, that's somewhat of a distortion and postpones part of what can't be avoided. So we're clearly against it. But we'll remain involved. We'll find out where PJM lands on the parameters, then we look forward to the auction as we head into next year.

Angie Storozynski

analyst
#21

Thanks. Turning to when this might get settled, regarding Susquehanna — I realize I'm the first person asking for a decision right away, but honestly, after talking with others in your position, I'm starting to reconsider. They raised some genuinely compelling arguments. What they're essentially arguing is that colocation remains the best available path, when you consider the speed-to-power logic; there's a new administration that strongly backs economic growth tied to AI within the U.S.; FERC could see some significant shifts starting next year; and you've got 300 megawatts ready to go, with what appears to be every option on the table, since, as you mentioned, transmission availability and so on. So once more, I realize this may sound odd, but why hurry into any choice about modifying the current contract? Why not allow some time to properly evaluate the landscape that's on the verge of shifting, or that might shift, for AI in this nation.

Mac McFarland

executive
#22

Angie, I'm grateful for that question. The — look, when we state that — and Cole, feel free to chime in. When we state that we're reviewing commercial arrangements with AWS, what I'd say is nothing, in our view, has been ruled out. A wide range of potential options exist. And like I mentioned during the opening remarks, colocation is among them, and we're keeping that possibility alive by submitting the motion for rehearing. Broadly speaking, I'll put it that way, we share some of the views you raised, yet there's also a dimension of — you've introduced the timing factor here. Clearly, timing matters too. And as we work through evaluating our choices and hold conversations with our counterparty, our counterparty, we consider how — what's the optimal approach for moving ahead. And it — factors in many different considerations, the economics among them; and so because of that, we'll proceed patiently. We'll be quite deliberate regarding how much time we devote, just as I'd like to think we've been viewed as deliberate concerning our commercial activities. So there isn't a simple response to what you asked, Angie, but I'm grateful. Cole, anything you'd like to add?

Cole Muller

executive
#23

Yeah, Angie, I'd simply say again that we aren't hurrying with your question, and we're taking a careful, step-by-step approach as we evaluate every possibility available to us. At the same time, we aim to be responsive to our customer, since at some point they do require clarity in order to speed things up and commit to big investments. So that factors into what we're weighing. Still, like Mac mentioned, we'll examine the economics along with the other advantages and disadvantages tied to each possibility, and once we've reached a conclusion, we'll share it with everyone.

Angie Storozynski

analyst
#24

All right. The next item on my list is that folks are already raising concerns regarding your gas holdings. What I mean is, you own previously coal-fired facilities that have been switched over to gas, which right now operate as peakers, though in the past they served as baseload resources running 80%, 85% of the time. An argument could be made that should these facilities remain connected to the grid, you can't really dial up their output unless market power prices climb, essentially. So we keep hearing all this talk about additionality and, say, extending nuclear plant operating licenses in connection with additionality, yet what about the possibility of boosting generation from certain gas plants you own? I mean, by a factor of four, if an above market contract were backing it, again, provided those facilities sit in a behind the meter type of arrangement. So.

Mac McFarland

executive
#25

Yes, Angie, I believe that's a valid observation, regardless of whether it's behind the meter or front of the meter, the load is coming, all right? And as you mentioned, for the most part these facilities have served as peaking assets across the past several years. And at present they're pulling in greater capacity revenues, yet where the energy margin is concerned, on a year-over-year basis it's essentially flat when it comes to sparks, so to speak, all right? But take Montour, for instance — we've got a 105 heat rate unit there, plus we have plenty of gas supply; we built a gas lateral at that site. We've completed the conversion. Where energy is concerned, that unit is capable of delivering far more. The issue is simply that no additionality exists at the peak, though there's plenty available during all those other hours when it isn't running, correct? So while it's operating 10%, 15% of the time, and we're beginning to observe that uptick — we saw robust loads during the second quarter, and Montour is running increasingly often. And so you'll see, regarding your point about — whether it's precisely fourfold, I'm not sure, I believe that's the figure you cited. You'll see greater dispatch even without a contract in place, along with higher sparks, which ought to reveal themselves gradually as supply — or rather demand begins to emerge. I also believe there's potential across many of those sites, as I mentioned earlier, given where their interconnections are situated, for repowering possibilities too. In fact, converting Montour into a gas unit is itself a repowering opportunity. So we're examining every avenue for expansion. Can we secure incremental megawatts? And so when folks inquire about resource adequacy — what are you doing to address it? Well, the initial thing that will occur is that as we explore ways to operate these units harder, to extract more megawatts from them, all right? And how can we — and that piece will be the first to add to resource adequacy. That isn't the announcement about a 1,000-megawatt CCGT. Yet, if you apply this throughout our fleet and other fleets, where everyone aims to gain 10 or 20 megawatts more, you gradually begin to fill part of that resource adequacy hold as time passes. After that, you'll reach new construction. Therefore, we believe those gas assets are ideally situated to capture higher energy margin or to serve as a way to supply the AI economy too. Cole, Terry?

Terry Nutt

executive
#26

Absolutely. Mac, I’ll step in for a moment here. Angie, this is Terry. There are a few points I’d like to add on top of what Max said. If you look at Q2 and Q3 of this year, our gas fleet ran significantly more. As a result, during stretches of tight conditions in warm weather and PJM, those assets were dispatched considerably more this year than in earlier years. So we’ve already observed part of that pattern showing up in 2024. On a weather-adjusted basis, I believe PJM load was greater, and it has been greater this year than last year. With that in mind, one thing is that when this starts, typically you get a handful of first responses to resource adequacy, and you observe that in most markets. Part of that is, as you said, whether you are dispatching the existing fleet across the supply stack incrementally. The second is then whether you have anything that was previously announced as a notice of suspension or retirement that you will unretire. Other things you might see include whether there could be conversions of assets that were formerly one technology or one fuel type, similar to what we did at our Montour plant, where we converted it to burning gas. So with that resource adequacy response, there are a few steps that are generally taken first, because they are faster and may be more economical. Then, clearly, when you consider a new build, and as Mac said earlier, a brand-new utility scale combined cycle plant will probably take you about 5 to 6 years to complete. So you will need these incremental measures done in the meantime to help address the additional generation. And then the final point on our fleet specifically to Talen: because of the additional dispatch we saw at our gas plants in Q2 and Q3, we have added some incremental maintenance cost into our numbers that were included on our Investor Day to ensure those assets are available, hardened, and ready to go as we move forward over the next several years. So that’s roughly where we think — how we think about the gas units today.

Mac McFarland

executive
#27

Also, Angie, incidentally, when you check the hedging percentage for 2026, it's clear that figure has declined. Part of that comes from the PTC put moving further out of the money, all right? Yet a significant portion is likewise due to greater forecasted dispatch from our gas fleet. So your assessment is accurate.

Nick Campanella

analyst
#28

Near the end of what you said, you brought this up — you did lower the hedges. I just want to confirm that this isn't a change in how you're looking at things, meaning freeing up additional capacity or energy for GPA across a longer time frame.

Mac McFarland

executive
#29

That's right. To put it plainly, taking those hedges off wasn't an action on our part. The divisor in that calculation is just forecast generation, and forecast generation rose. That came about because of small increases in sparks, particularly in periods when gas-fired units are more likely to run, so about the summer and winter months. So when you lift that generation, if the numerator doesn't change, it just drives it down. So it's not — we didn't take hedges off. No perspective is behind it. My view is, if you were looking for some kind of angle here, we feel more comfortable because we're moving toward more contracted revenues, with the PTC acting as downside protection, so we're more comfortable being a bit more open, especially as we think about demand coming in, as Terry mentioned, from the load forecast that the PJM subcommittee put out — that's the position we've taken. But the upshot is that we haven't added more hedges while generation projections have gone up. And that ties to a 10.5 heat rate unit.

Nick Campanella

analyst
#30

That's helpful background. Now, regarding the existing RMR proceedings at FERC, I realize you're in settlement talks, but could you just verify the timeline once more? Are you still anticipating a resolution by the end of the year? I'm also curious whether the broader RMR now being folded into the capacity auction discussion affects those talks. And might your ability to reach a settlement be pushed back? Because I understand the clock is critical on that front.

Mac McFarland

executive
#31

I'm going to turn to John Wander, our General Counsel, who's here, and ask him for some perspective on the RMR. But first, let me say this: even with the capacity auction pushed back and the RMR layered on top, no matter how those two things intersect — we have a plant in brand insurers with staff, fuel agreements, maintenance requirements, and outages and similar matters, and you simply cannot decide about that RMR a single day before it's slated to close. In fact, we've brought all parties to the table to reach a solution on the RMR this year; that was the goal and schedule we stated, since we must make numerous choices affecting or impacting our fuel contracts, everything I just mentioned; and those things don't change instantly. So we require time for that. With luck, we'll reach that point; now John, would you like to give an update on the process.

John Wander

executive
#32

Absolutely, Mac. Nick, I appreciate you asking that. Right now, what we're concentrating on is those talks aimed at reaching a settlement. We've got settlement conferences scheduled for late November as well as the beginning of December, and from the start of this process we've been crystal clear that our goal is to wrap things up by the close of December, knowing what we're able to agree on — whether that agreement ends up backed by a FERC order or not, we probably won't have that answer by the end of December, but by the end of December we will have a sense of what the shape of a settlement is going to be. We've communicated that plainly to everyone.

Michael Sullivan

analyst
#33

I'll simply continue from the point Nick stopped at, and perhaps go a bit deeper. How are you able to make a decision before whatever FERC issues in early December, which might affect the way these units get treated? Or when they release that in early December, is there sufficient time to reverse things before the year ends?

Mac McFarland

executive
#34

Michael, I don't think I grasp what you're asking. My understanding is that we aim, before this period finishes — John can walk everyone through it — to have a settlement that we need, in the early part of next year, to get ready for; we stated a May 31 shutdown; preparation has to begin and you simply — there's no switch you can flip to get ready; therefore we're requesting that everyone join the discussion and settle this right now. Still, I'm not certain I fully got the timing behind your question. Could you put that another way — is that what you're asking?

Michael Sullivan

analyst
#35

Yeah, perhaps I've got this wrong. From what I understand, PJM — or rather, FERC, excuse me — intended to bring certain capacity market rule modifications to FERC through the 205 filing at the start of December. Alongside that, I believe they were taking another look at the way those RMR units are handled, so if the handling does change, does that leave you enough time to work through the terms of a settlement?

Mac McFarland

executive
#36

John, would you like to take that one?

John Wander

executive
#37

Sure, Mac, I'll handle that one. So here's how I see it: those are really two separate matters. When the RMR units get folded into the capacity market, that's a question of their capacity, not of the compensation we receive through the RMR. Now, down the road, could that play a role? Once the auction takes place, and assuming PJM prevails and the RMR units are brought in, and if there are some offsets for those footing the bill for the RMR — we'll find out how it all plays out. But looking at it from where we sit, these are distinct issues. Being able to reach an RMR agreement that works for us regarding what's needed to keep those units operating going forward over the coming years is a separate matter from whether PJM puts the capacity of those units on the supply side in the auction.

Michael Sullivan

analyst
#38

All right, that makes sense. So I suppose, when you mention every possibility is being considered and that you're collaborating with Amazon, perhaps to make it clearer — you brought up that the 960 is potentially doing something even larger that's being considered and bringing in additional plants from your fleet?

Mac McFarland

executive
#39

Well, Michael, I believe, to start, as I mentioned, we've examined quite a few different business structures that we figure we could transfer from other ideas to how we might proceed with AWS. I think lots of folks have inquired of us whether the second reactor, given the first deal, served as a backup for the initial one once it was finished — if you remember that deal, I'm certain you do. That's the way it functioned, and how could you open that up. And at that point we discussed exploring how alternative kinds of business structures might exist. I won't discuss what we're negotiating with Amazon about; however, I genuinely believe there are methods through which utilizing the grid as backup, the grid as primary stores, co-location, everything — that's what we're referring to when we say all those items are being considered. I trust that helps, but we simply won't delve into what we're talking about with AWS. Cole, anything you'd like to add?

Cole Muller

executive
#40

No, I believe that's accurate.

Analyst

analyst
#41

Congratulations on the quarter. So, I suppose, could we discuss speed to market a bit, since that appears to be a key factor for the hyperscalers? Could you provide some sense of how long a <<inaudible>> deal might take to complete the process, once terms are agreed? How much time passes before contracts begin contributing through PPL, PJM? Is there anything you can reuse from the 960-megawatt ISA, and how would that shift if the deal ends up bigger than the combined 960?

Mac McFarland

executive
#42

Yes. That's getting too detailed regarding Susquehanna and the AWS. So I won't address that, but maybe if I just zoom out for a moment and discuss what a front of the meter solution is. And like I mentioned, we've examined all these various kinds of commercial arrangements throughout the fleet. The front of the meter is essentially a retail contract or the virtual PPA or PPA, as was done as we understand was done with Microsoft and TIM or the clean energy center. And regarding speed to market, our understanding of how PPL, the zone where most of our plants are located that we've been discussing here today, that speed to market, we believe, is quicker in that zone, whether it's co-located grid back up or front of the meter, because of the advantage PPL has in having a transmission system that can be easily attached to — and I think you witnessed that when PPL proposed basically $781 million, to be exact, almost $800 million worth of transmission upgrades to serve 6 to 8 gigs of what they view as highly likely data centers coming. And so the transmission system at PPL is advantaged. And since we have sites and assets in PPL, we believe we're also in an advantaged position; but one thing I'll tell you is that people — I think many questions center on this concept of the front of the meter. And one of the things I've mentioned in conversations is that nobody has defined what front of the meter is, no 1 to find a colocation deal to we did it — and now people are talking about a front-of-the-meter deal, I guess the closest and this is, incidentally, I applaud Constellation for their deal with Microsoft the crane center — that's the closest that we see. But I don't know that, that's necessarily been defined. But if you examine the characteristics of speed to market, I think you need an advantaged transmission zone, you need ample land, water, generation resources, et cetera, we think that we're in the right zone that has those. Cole, is there anything you'd like to add to that?

Cole Muller

executive
#43

I wanted to go back over that point you raised regarding PPL, since it set a record. Perhaps <<inaudible>> people should check out additional remarks PPL has provided, both during our earnings call and in notes from other analysts; regardless, they have addressed when things will happen. Their belief is that linking the front of the meter can be done reasonably fast. You could also review certain documents they filed with PJM and its subcommittees, which largely verify the schedule for big projects. So — in our view, that is not going to hold up any possible opportunities throughout our fleet. And clearly, when it comes to Susquehanna, we possess ample runway, as I mentioned before, given the 300 megawatts covered by the existing ISA.

Analyst

analyst
#44

If I could just ask, regarding new construction, I'm wondering whether you'd have any desire to develop a fresh CCGT at this point on a merchant basis within the PGM or another location.

Mac McFarland

executive
#45

Anton, that hinges on what your definition of merchant is. If merchant refers to receiving every dollar of revenue from capacity plus energy, then I believe, first and foremost, it comes down to what these capacity market modifications turn out to be, since those haven't been specified yet. A robust capacity market delivering the right signals is necessary, and after that, it naturally hinges on what one expects from energy margin. I can share that the generation landscape — and I've been doing this for some time — has seen a whole series of project-developed CCGTs pursuing a fully merchant approach that ended up bankrupt. So we would need to examine that very carefully; in fact, our view is that the model ahead will involve — I'm not sure whether it's that RFP or not, but I've mentioned before that hyperscalers are able to lend their balance sheet to this, or some mix of a data center developer together with the generating unit, and that pairing delivers an offtake agreement. We hadn't seen big loads such as these for quite a while, not since roughly the industrial expansion, especially in the Delaware River Basin involving refiners and so on. Yet when big loads like that exist, with a need for power, you can align those pieces and enter into contracts. Therefore, we regard that as the more probable route for our future involvement, at minimum keeping a share of the plant contracted, so to speak.

Analyst

analyst
#46

If I could just squeeze in one thing, very quickly. Could you perhaps describe what potential exists for uprates at Susquehanna? There have been quite a few over the course of many years. I'm simply wondering whether any such chance remains?

Mac McFarland

executive
#47

Yeah. Those are under review on our end. Clearly, that feeds into what people call the additionality case. So yes, we're examining them. During the early 2000s, quite a few upgrades took place throughout the nuclear fleet, and the subsequent generation of those gets pricier, requires more consideration of how it could affect your so-called margin at a nuclear site — that's safety margin — and reliability considerations play into it too. We are evaluating them. Whether it's as common in the opportunity we have as it could be for certain other operators, I can't say. So, many thanks to all of you for being with us today, and we appreciate your ongoing interest in and backing of Talen. Have a wonderful day, everybody, and we hope to speak with you again down the road. Take care.

Operator

operator
#48

This does conclude today's conference call. Thank you for participating. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Talen Energy Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Talen Energy Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Talen Energy Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.