Talen Energy Corporation (TLN) Earnings Call Transcript & Summary

February 27, 2025

NASDAQ US Utilities Independent Power and Renewable Electricity Producers earnings 55 min

Earnings Call Speaker Segments

Ellen Liu

executive
#1

Thanks, Kevin. I'd like to welcome everyone to the conference call for Talen Energy covering our year-end 2024 results. Joining us on the line today are our Chief Executive Officer, Mac McFarland, and our Chief Financial Officer, Terry Nutt. During the Q&A portion later in this call, other senior leaders from Talen will be available as needed to help field questions. Our earnings release came out this afternoon, and we also posted a presentation — you can locate both of those in the Investor Relations area on Talen's site, www.talenenergy.com. During today's remarks, we'll be offering forward-looking statements that reflect what we currently expect and assume. Because of risk factors and other matters outlined in our financial disclosures and other SEC filings, actual outcomes may end up being different. In addition, we'll be referring to certain non-GAAP financial measures today. Information that reconciles those non-GAAP measures against the most directly comparable GAAP measures appears in our earnings release as well as the appendix of our presentation. With that said, I'll hand things over to Mac.

Mark McFarland

executive
#2

Alright, thanks Ellen. I want to open with a few quick comments before we dive into the results. Since signing the AWS contract last March and listing on NASDAQ last July, Talen has enjoyed powerful tailwinds. Whether shareholders have stuck with us from the restructuring or bought in more recently, they've witnessed solid outcomes. Both then and now, we hold genuine confidence in Talen, in our worth, and in what lies ahead. It's obvious that recent headlines have led some to doubt the IPP investments amid the extraordinary demand growth anticipated from data centers. Let me state plainly: in our opinion, the value we offer hasn't shifted at all, and we remain thrilled by the Talen narrative. For IPPs broadly, and for Talen's particular territory, market fundamentals are still tremendously robust, and within the developments of the past few weeks we perceive genuine opportunity; our roadmap ahead is sharply defined. Within our share repurchase program, Talen holds over $1 billion of dry powder, plus balance sheet flexibility to carry out this SRP, or to move strategically should suitable opportunities arise. Talen already has a relationship with a hyperscaler that exhibits no indication of slowing its expansion and has put substantial capital in sweat equity into the Susquehanna arrangement up to now, and continuing forward. Right now we are performing under a PPA with Talen, with line of sight to 300 megawatts before regulatory matters regarding our colocation arrangement become a concern, and site development proceeds as we work through start-up alongside AWS. Given this visibility toward the initial 300 megawatts, Talen has room to shift the contract into another commercial structure, and/or settle the regulatory questions, and we feel confident and determined to pursue one of those paths, perhaps even both, eventually. Talen is long power, long PJM, and will keep gaining from a capacity market undergoing encouraging reform attempts, along with a demand cycle demonstrating ever-growing strength. Talen enjoys a distinct view of our cash flows through the nuclear PTC, the price rises in the PJM capacity market, the RMR we recently carried out in Baltimore, and the early revenue from the AWS contract as we electrify the site. To restate, we firmly believe Talen is ideally situated to power the future, and our approach stays the same. Now let me turn to our operational and strategic accomplishments for 2024. Beginning on Slide 2 of our presentation, covering our robust operational and financial performance: we produced $770 million of adjusted EBITDA and $283 million of adjusted free cash flow across the year. Our fleet reached record standards of safety and reliability, and I want to express gratitude to the men and women of Talen who turned that into reality. Absent their work, none of this would be achievable. The momentum we built has carried right on through into 2025, and we're standing behind both our '25 guidance and our '26 outlook. Cold weather swept through the Mid-Atlantic, and on January 22, PJM logged a brand-new winter instantaneous peak load record above 145,000 megawatts, so the year is off to a solid start. Under our contract with AWS, we keep delivering. Revenue from them is already coming in, and work on the campus is ongoing. AWS clearly sets the schedule, but together with them we're working to supply power under our PPA within the currently approved 300-megawatt ISA, meaning interconnection services agreement. Beyond that, we're advancing along the commercial and legal track to scale up to the campus's full 960 megawatts, along with other opportunities throughout our fleet. As I said earlier, in late January we reached a reliability-must-run, or RMR, agreement with PJM, FERC staff, the Maryland PSC and local utilities. Under these RMR arrangements, Brandon Shores and Wagner see their lives extended from May 25 to May 29, or until the needed transmission upgrades in the region wrap up. This schedule puts us in step with the PJM planning year, which is why the extension runs through May of 29. Starting June 1, 2025, annual payments to us will total $145 million for Brandon Shores and $35 million for Wagner, plus reimbursement of variable costs and project investments. Those yearly revenues factor in incentive fees tied to performance we plan to hit. FERC's final approval is still needed for the settlement, and we're heartened by how much backing we've seen from key stakeholders. Through these arrangements, we keep critical infrastructure running and safeguard grid reliability in Maryland and across the wider PJM. Now to our strategic achievements on Page 3. In 2024, the focus was on unlocking value from the assets we already have and giving it back to shareholders, all while keeping balance sheet discipline. I believe everyone is familiar with this story, and we'll stay on this course of maximizing value with shareholder returns front and center in 2025, while also hunting for compelling growth opportunities. As I've said, the story hasn't changed. On to Slide 4. Here's an update on a page we've shown before. The chart's green bars come from our Investor Day last September, when we discussed tripling free cash flow per share by 2026, assuming the share count stayed flat. As we noted in September, buying back shares could improve that, and that's exactly what we did. The impact of the share buybacks we completed in 2024 now shows up in the blue bars, which rely on a static share count as of 12/31/2024 for the years '25 and '26; those moves made late last year shifted the midpoint of free cash flow per share in '25 and '26 by roughly 11%. Let me remind everyone that in presenting our free cash flow per share metric, growth CapEx is not excluded. What you're seeing here is the full picture on how we allocate capital and what cash is available for shareholder returns, and any future buybacks we might do are left out of those figures. For 2025, we're aiming for more of the same — squeezing out maximum value and giving it back to shareholders; that will remain our yardstick for investment whenever we weigh future growth opportunities. Moving to Slide 5. This slide backs up what I mentioned at the start of today's call. Headlines break, markets shift, and markets can be fickle, yet Talen's fundamental value story hasn't changed and continues to trend upward. We plainly anticipate substantial load growth across the coming decade. AI is still in its early innings, and Talen is putting a data center power arrangement into action right now and is positioned well to power what lies ahead. On the next slide, Slide 6. This holds especially true within PJM, and in the PPL zone in particular. If you look at the graphs, should even a portion of that demand materialize, it would represent a massive step-up compared with the prior decade, and as we see it, it hasn't shown up yet in the forward curves. As a matter of fact, '26 and '27 are backward dated at present, and to us that's illogical. Rising demand translates into greater run times at elevated prices for the generation fleet we already have, plus better economics for possible data center arrangements. On Slide 7; we take encouragement from what's happened on the regulatory front over the past couple of months, FERC, PJM, state governments and other stakeholders recognize these mounting power needs and have begun taking some long-overdue action. We're grateful to all the groups working efficiently to keep capacity auctions progressing as soon as possible, to incentivize new generation, and to give more clarity on serving important data center customers. We filed comments recently backing Governor Shapiro's settlement in PJM regarding the capacity auction. Our view is that this is a solid interim step toward reducing volatility; even so, we believe the market ought to be allowed to work. The market requires clarity on long-term rules for capacity auctions. We need to return to the normal course of running these auctions well in advance as intended by the RPM. Put plainly, we need regulatory certainty surrounding the capacity market since it's critical for long-term investments. We'll keep being active participants in the regulatory process. We'll work constructively with FERC, PJM and the states where we operate. Getting successful outcomes here is critical to ensuring grid reliability and bringing new generation online. The RPM has worked since its inception, bringing tens of thousands of megawatts of new generation to PJM, and now is the moment to redouble our efforts on this front. Not long ago, FERC instructed PJM to evaluate its tariff and proposed rules for governance of co-located load connections. We will advocate for a simple and noncontroversial solution. Provided the generator, the local utility, the RTO, and the customer reach an agreement on terms, and the customer commits to paying for whatever amount it draws from the grid, then that load ought to be able to interconnect; having said that, I'll hand the call over to Terry.

Terry Nutt

executive
#3

Thanks, Mac, and good afternoon, everyone. If you'll turn with me to Slide 9, we'll review our results for the full year, both financial and operational. As Mac noted, this year we reached record levels for reliability and safety. More than 36 terawatt hours of power was produced by our fleet, and our Equivalent Forced Outage Factor came in at just 2.2%, versus 5.5% a year earlier. Our carbon-free Susquehanna nuclear facility accounted for half of that generation. On top of that, 2024 brought a notable rise in power demand for PJM. With weather normalized winter peak load during January and February up 1.7% against 2023, this reinforced earlier demand growth forecasts with actual results. Dispatch opportunities rose significantly for our gas-fired fleet, which drove higher volumes and energy margin. Across the fleet, safety remains our top priority, and our 2024 TRIR was 0.34. That is in line with, or better than, our peers, and ranks among the lowest incident rates in Talen's history. Because of this performance, our 2024 adjusted EBITDA and adjusted free cash flow came in above the midpoint of the guidance we raised last quarter, which lets us keep returning capital to shareholders. I'll share a few more financial details on Slide 10. Strong generation performance, hedging activities, including the impacts of the nuclear PTC, and disciplined cost management supported our full year 2024 results, even without earnings from the ERCOT generation portfolio we sold in May. In the fourth quarter, adjusted EBITDA came to $164 million, and adjusted free cash flow was $21 million. Adjusted EBITDA was $41 million above Q4 '23, while adjusted free cash flow was $43 million above, mainly because of lower financing costs. Now to guidance on Slide 11. The 2025 guidance ranges we previously announced are being reaffirmed. Our adjusted EBITDA range stays at $925 million to $1.175 billion, and our adjusted free cash flow range remains at $395 million to $595 million. If I were to offer any color on how 2025 has started, it would be this. Our fleet ran reliably through peak winter weather events, and our commercial results were strong. Our 2026 outlook is also unchanged from what we disclosed at our September Investor Day; these ranges continue to demonstrate Talen's robust earnings and cash flow growth profile, which includes tripling adjusted free cash flow per share by 2026. On to Slide 12. We are committed to maintaining ample liquidity and net leverage below our target of 3.5x. As of February 21, our 2024 net leverage ratio was 3.3x, and pro forma 2025 was 2.4x, well below our target; in addition, we have approximately $1.2 billion of liquidity, with over $470 million of cash on the balance sheet. In December, we executed a series of refinancing transactions that both improved our capital structure and enabled us to complete a large share repurchase. We brought down the rates on the Term Loan B we already had, along with our revolving credit facility, ended the cash-backed Term Loan C, and grew our letter of credit capacity by signing a new facility. On top of that, we put out a new Term Loan B carrying a lower rate and applied those funds plus cash we had on hand to repurchase roughly 5 million shares from our biggest shareholder. Finally, we tidied up the covenants and baskets on our debt, which gives us more room for capital allocation. Moving to Slide 13. From the beginning of 2024 through now, we've bought back about 13 million shares, equal to 22% of what was outstanding, handing back close to $2 billion in capital to shareholders — which, as we noted before, represents 75% of our market cap since emergence. Buybacks remain our number one use for excess cash, and we'll keep using them as the yardstick for judging the return profile of any growth opportunity. Our target is still to return 70% of adjusted free cash flow to shareholders. We've got substantial buyback capacity running through year-end '26, backed by $470 million of cash sitting on the balance sheet and more than $1.2 billion of adjusted free cash flow generated in that period; with that, I'll pass it back to Mac.

Mark McFarland

executive
#4

Thanks, Terry. The year '24 was a thrilling period, and '25 has kicked off with real momentum. Even so, our work isn't done — and it never will be — since our attention stays fixed on driving shareholder value as high as possible while building chances to grow. We're grateful that all of you take an interest in Talen and decided to be with us on today's call. At this point I'll hand things back to the operator and open up the line for questions.

Michael Sullivan

analyst
#5

I want to begin with the question that I believe you and all of your counterparts keep getting. Right after the FERC order regarding colocation, how fast do you expect they can resolve this? And what options are available to you meanwhile?

Mark McFarland

executive
#6

Certainly. Let me take those as — really 2 separate questions. On the first, how quickly could this be resolved? Look, what happened at FERC, sending it to PJM with a schedule attached, gives us encouragement. Christie issued his press release or statement one day after the open meeting, and essentially he said he intends to move quickly and send that to PJM. That encourages us. Like I said, we believe they're capable of acting quickly. I'll repeat my earlier point: I believe there's a straightforward fix where, if the local utility, the transmission owner — for us, PPL — the state PUC, the RTO, which is PJM, and the generator are all in agreement, and payment reflects the service actually consumed, then in our view that fix ought to be acceptable to the market, ought to be made available to the market, and ought to be one among many options within an all of the above strategy for meeting rising AI demand. So what we're seeing encourages us. How fast? This is a regulatory proceeding, yet the timeline Chairman Christie laid out, and his request that PJM respond, encourages us. Meanwhile, what are we able to do? I think the narrative, once more, hasn't changed. However, Talen — perhaps — I think our situation differs because we currently have an arrangement in place with AWS; and we shouldn't overlook that. I don't consider it complex, and I don't think it carries the same regulatory ambiguity that could be present in other places. There's a deal we are carrying out. Incidentally, that deal — looking back, we are 363 days past the point when we signed it; and from then until now, we've been carrying it out. As I mentioned, we're on the site at this moment, electrifying it; anyone who attended the Investor Day in September — October of '23, pardon me, and saw the site back when it was just a shell would find it looks enormously different today. It resembles a place where somebody disturbed an anthill. Trucks and cars are all over, equipment keeps arriving. We're progressing through start-up and electrification, and we're collecting revenues under that contract. So look, we see this as a race to power the future, to power AI demand. An existing contract is ours. In a sense, I see us as already out of the blocks and moving down the track. So we're executing and looking ahead rather than behind. And what does that mean? We have time. The development timeline gives us until 2027 to get this resolved. As I've said, I believe we'll land on a fix — whether that comes via a commercial deal or, as I've noted before, while keeping co-location intact, since we're running a dual track at present. My view is that co-location has to be a piece of whatever final answer emerges down the road. So that's what we're working toward, and we're thrilled about bringing electrification to the campus and watching it progress. Ground is being broken. It's a thrilling moment for us.

Michael Sullivan

analyst
#7

Fantastic. I appreciate the detail you provided. Perhaps you could share a bit more about your current thinking regarding the optimal deployment of cash. You mentioned the phrase "economically justified growth." How would you characterize that in today's environment?

Mark McFarland

executive
#8

Well, at this moment I'm looking directly at Terry, since he's likely to stretch his arm over the table and, who knows, make certain I remain disciplined. Michael, the situation hasn't really changed; as I noted during my opening remarks, our standard for capital allocation has always been comparing against giving money back to shareholders. That continues to be the yardstick we use when assessing options. However, considering the range of possibilities available to us in data center projects, long-term contracts, and similar areas, we're generating substantial cash. Our cash flow trajectory is increasing, which means a significant amount of money is accumulating on the balance sheet. Relative to our net leverage objective — as Terry described, an unlevered balance sheet — we therefore possess balance sheet capacity. Yet in evaluating all of this, we intend to deploy it strategically toward growth prospects aligned with that strategy. And should we fail to identify growth prospects aligned with that strategy, or even if we do identify them, we will measure them against repurchasing our own shares; that's essentially our guiding principle. Terry, would you like to add something?

Terry Nutt

executive
#9

Right, Michael, expanding a bit on what Mac said — he touched on this during his prepared comments. You should anticipate seeing the same pattern continue. During 2024, in under a year, we repurchased 22% of our market cap; in our view, share buybacks represent the top and finest application of our cash. When we evaluate alternative uses, they have to beat that bar. Consider December as an illustration — we completed a solid deal with our biggest shareholder, and that single transaction alone lifted our free cash flow per share by 11% across '25 and '26. So that's where our attention sits, especially as we considered our debt covenants and our baskets, since with all the refinancing underway, we concentrated hard on ensuring we'd secure enhancements in those areas so we can keep carrying out what we've been doing.

Shahriar Pourreza

analyst
#10

Do you have any thoughts about what the landscape looks like for resource adequacy legislation in Pennsylvania? What are you anticipating from lawmakers right now? Could something along the lines of a regulated or quasi-regulated structure such as a PPA still be on the table as we move toward what looks like a busy March in Pennsylvania? Is it possible to reach an agreement with the wireless companies? Are conversations happening with them? Could you elaborate a bit more on the resource side?

Mark McFarland

executive
#11

Sure. So here's how I see it — we've been able to sit down with the governor and members of his team, and I'd say Governor Shapiro in Pennsylvania is very focused on ensuring resource adequacy exists, that data center growth brings economic development along with it, while also balancing the need to protect consumers on price. That's the reason we proposed the collar — the floor and the cap on capacity auctions — which, just so you know, we recently filed in support of. In my view, that's a short-term solution. Longer term, we have to get the capacity markets functioning properly so that new generation gets incentivized; and Shar, as you pointed out, there are conversations underway about whether there's a way to consider contracting for load through the local utilities. Broadly speaking, that concept strikes me as very sensible, and it's very sensible for a state like Pennsylvania that exports energy. I believe the governor wants to keep Pennsylvania as an energy exporter and backs that idea, and he wants to see new generation get built; those talks are still at an early stage. On the subject of reregulation, here's what I'd say. The markets have delivered. The markets have delivered by bringing in tens of thousands of megawatts of generation — conventional gas-fired generation as well as renewables. And I believe we shouldn't necessarily react with knee-jerk reregulation. That doesn't strike me as the most economic way to incentivize generation; however, some form of longer-term contracts entered into by the load-serving entities might be an interesting possibility. Still, it's early, and with ideas like that — the devil is always in the detail, and you have to let them flesh out, and this is very early. But my sense is there isn't a huge appetite for reregulation. And I think people support the markets and what they've delivered in terms of lowering consumer costs over time across the past decade. Across the past decade, energy and capacity prices in our zone have been flat on a nominal basis, which means on a real basis, they've actually declined 25% to 30% over the past 10 years. And when you look at Brent at $270, compared with the 50 to 100 we saw at most across the past 10 years — perhaps somewhat above that during the earliest portion of those 10 years — that figure takes into account what I've been describing, namely that energy and capacity have stayed flat. So the right combination is something we still have to work out, and that's a fascinating concept, though it's still early on that front, Shar.

Terry Nutt

executive
#12

Regarding those long-term agreements.

Shahriar Pourreza

analyst
#13

So then, when you all are considering or holding conversations about long-term contracts, is Michigan roughly that reference point — a structure similar to Michigan's, where a longer-term PPA exists? The wireless companies are able to earn on the PPA? Is that roughly the standard? Or should we be looking at something different?

Mark McFarland

executive
#14

Well, I'll admit I'm not familiar with Michigan; so using it as a standard is difficult for me, Shar; but if what you mean is that they go out and secure capacity resources over a longer stretch and rely on that to serve provider of last resort, or the backstop for serving customers, then sure, that would be the standard. It's also somewhat akin to self-scheduling, which is what Dominion does within PJM, where they possess their own supply and their own — but in this instance it isn't the transmission owners' supply; that supply would originate from the generation owners, and the transmission owners would subsequently purchase it through self-scheduling. But those talks are at a very early stage, like right now — you keep peeling the onion back so far, there's no onion left.

Shahriar Pourreza

analyst
#15

Understood. Understood. And finally, there's been a lot of attention this week on additionality given what some of your peers have done. Do you have any fresh perspective on your own development plans? At this stage, are you considering turbine slots or projects?

Mark McFarland

executive
#16

Well, let's see — first off, what exactly are we examining? We're examining ways to squeeze additional megawatts out of the fleet we already have, whether upgrades might be possible. Could we recover some megawatts that might be forfeited under particular designs throughout our fleet? What could be gained through upgrades, say, at lower mount vessel? Those all count as megawatts. And I believe that's genuinely what will carry us through the near term. So when I consider resource adequacy, I break it into roughly 3 phases: near term, midterm, and long term. For the near term, we must nail the balance between load and extracting maximum value from what already exists, since fresh development won't reach the grid until quite late in this decade, or perhaps not until the 2030s. So our attention is on delivering additional megawatts while preserving the megawatts we already have. Brunner, Brandon Shores via the RMR. What might be possible at Keystone and Conemaugh — the owners are in talks about that. That's where our attention sits. Regarding the longer horizon and development, there — I genuinely believe, and I've stated this, I think — or we've stated this, for at least the last 6 months, perhaps even further back, that gas will need to be the answer during that midterm, in that second of — the trimesters, so to speak; and that — yet it won't come online until roughly 2030. But what I believe will occur there is that you'll need to see longer-term contracts get signed. And I do believe that in time, what you'll observe, whether you want to label it additionality, I'm not sure. But I believe you'll observe companies figuring out how to contract for assets so that new generation can be brought to bear. That, in my view, is how additionality gets resolved. I think the entire notion of singling out any given load and declaring it must supply its own generation is truly a false narrative. And the reality is, that isn't how anything else connecting to the grid works. You could go plug a server into a wall outlet at this very moment, call that front of the meter, and it isn't required to bring its new generation. So I don't believe we ought to view data centers, specifically, as this unique load that has to bring additionality. That isn't how to fix this. What we should do is create the proper incentives so that new generation gets brought to bear.

Jeremy Tonet

analyst
#17

As we look ahead to 2025, I have a question about EBITDA. I'm curious, if you total up the new PTCs, the RMR payments, and the PJM capacity payments shown in brackets, approximately what share of your forward EBITDA would you say you currently have complete visibility on?

Terry Nutt

executive
#18

Jeremy, my take is that when you consider those items, you factor in capacity, the AWS contracts, I'd also include our hedge profile. A substantial portion of 2025 margin is bracketed. Obviously, as time goes on and the AWS contract ramps up, plus the reality that there's now a floor and ceiling on capacity markets for a few years, that provides us with even more trajectory across a range of outcomes as we consider the years ahead. So it's a pretty significant portion. Off the top of my head, it's well north of — if hedges are excluded, you're north of 40% that's sort of locked in for '25; and clearly, once you add the hedges in too, you'll be upwards of 90%.

Mark McFarland

executive
#19

To add to what Terry said, when you consider the PTC's position — how our portfolio's pricing compares on a mark-to-market basis, both against Susquehanna and against the PTC itself — the PTC sits out of the money. So in terms of our hedging approach, we treat it like a put option we hold, or a floor that guarantees those cash flows. What I'm saying is that at present, if we simply sold those megawatts at market, we'd be above that level.

Jeremy Tonet

analyst
#20

Understood, that helps. I suppose there's been quite a bit of chatter in the market, and plenty of worry among some folks regarding what hyperscalers are up to, and we recognize commercial negotiations can hinge on many variables. Still, what's your take on how quickly hyperscalers are spending on AI right now, and how does that shape things for you folks moving forward?

Mark McFarland

executive
#21

Well, as I said, there's been a great deal of news circulating in the market, some of which I touched on in my opening remarks, and it's fascinating to watch — I'd describe the markets as fickle, since it's intriguing how they respond to this. My view is that we're in the early innings of the AI boom, and demand may shift around, yet that demand exists. We see no indications of a slowdown, and we're seeing CapEx plans get announced. You've got the NVIDIA announcements; and from what we observe firsthand at our site, I can say development keeps going on the campus and it's full steam ahead. So we're enthusiastic about where things stand. And with news coming out in both directions, I believe overall, demand is up and to the right and hasn't shown any signs of slowing.

Jeremy Tonet

analyst
#22

Understood, that's useful. And if I may squeeze in one more. Regarding how unpredictable the market is right now, there appears to be a discussion about conventional utilities becoming stronger contenders when it comes to securing data centers, and on top of that you've got the regulatory situation in PJM that you mentioned. I'm just curious how you're viewing your competitive standing today, taking into account those factors you laid out?

Mark McFarland

executive
#23

Correct. Well, here's the thing — data centers are going to end up in competitive markets. My guess is you'll see announcements happening throughout the country, and certain of those markets will be regulated. And I believe that, looking at it once more, we're in a unique position on the whole since we're currently electrifying a campus. That represents the speed to market we're able to deliver. As for the inquiries we've received — and Cole might want to chime in on this — the inquiries we've received throughout our fleet and the chances to pursue more have not slowed down, and that keeps going. Demand clearly exists out there, and it will make its way into PJM. Considering our situation, it came down to speed to market in terms of getting connected. I believe you've heard PPL state they can offer extra speed. They filed their large load with PJM toward the end of last year, demonstrating thousands of megawatts of backlog they're capable of connecting fast; and when you consider where PJM stands, especially our location within PJM, and Pennsylvania's position, it's situated right in that spot between Northern Virginia and the load centers up in the Northeast, and that's an ideal location for them to occupy. But from a hyperscaler's perspective, I completely get it. If every one of them intends to build 30 gigs of data center by a certain date, diversification across the country becomes necessary. So when those announcements come out, would we prefer they be ours? Of course. But do we recognize that hyperscalers will diversify? Without question. Still, we're happy with where we stand and remain happy with it. Cole?

Cole Muller

executive
#24

Absolutely. Like Mac mentioned, there's been a lot of interest in additional possibilities beyond the ones we've already made public, coming from many kinds of data center operators and end users. And, as Mac noted, certain of those possibilities will have their requirements satisfied within regulated markets, while others will be satisfied in competitive markets. Let me return to something we discussed during our Investor Day in September. That was long before the FERC ISA matters arose — there are various structures that suit various counterparties, correct? That all-of-the-above strategy. Whether it's behind the meter, as we do at Susquehanna, or a front-of-the-meter answer, or some sort of hybrid approach that frees up additional megawatts, whether at Susquehanna or throughout our gas fleet, we were already examining those and expecting them, and that has been somewhat validated through our conversations with different counterparties — some prefer one approach, others prefer another. So we're enthusiastic about the fleet we possess and the prospects in front of us.

Mark McFarland

executive
#25

Yeah, I suppose this might be a bit of inside baseball, but as I mentioned, we put pen to paper on that AWS agreement 363 days back. And I believe it was 362 days ago when I asked Cole, what's our approach going to be here, and how do we execute it in a different way throughout the fleet? And we've been at it from then on. There are many possible approaches, whether that's behind the meter, front of the meter, or any combination in between — meaning co-located grid backup — and we've been evaluating every one of those options, talking them over, and considering how they could work. And we simply keep pushing ahead with it.

Jeremy Tonet

analyst
#26

Understood. That clears things up nicely. So to sum up on Talen, you're sitting in a really strong spot, able to move quickly and take advantage of a trend that isn't slowing down, with plenty of visibility into cash flow for this year. That sounds good.

Mark McFarland

executive
#27

Nicely put.

Angie Storozynski

analyst
#28

So, I mean, look, it's clear you were getting nervous. You've got every possible option that you or we could come up with. From where we sit, it seems like you could just sign some of those meter deals overnight. Transmission lines are all around you, and still there's no announcement. So what's the reason? And like I said, I get that it takes time — you just mentioned it's been 12 months. We've definitely had some FERC problems. But it kind of feels like there's a disconnect in the PPL zone between what PPL is telling us and the absence of announcements coming from your side. So what are you waiting for, again? What does the schedule look like as of right now? Is it necessary for the whole FERC process to keep moving forward? So do we just have to wait around until the end of this year? Do we expect the PJM filing to yield any results within the next 30 days? Are you inclined to delay? I mean, eventually those time-to-power advantages are going to vanish, correct? So wouldn't signing these contracts while there's demand be the smartest move for you?

Mark McFarland

executive
#29

That was quite a question. But I appreciate it, Angie. Look, I don't — what you're really asking is whether regulatory uncertainty is what's holding us up. And as I mentioned in my earlier remarks, our situation is different. We're not sitting around waiting for regulatory clarity on anything. Right now, we've got a contract — the first of its kind — and we're moving ahead with it: energizing the facility, collecting revenue, all of that, while collaborating with AWS to get it operational. Plus, we hold an ISA that grants us a two-year window on the regulatory side — that certainty is already in hand. So we keep moving. On the commercial front, we're evaluating every option available; like I've mentioned previously, and I realize that at times this leaves people wanting more, we just keep working. Once something's finished, we're ready to share it. Even so, we keep quiet about our business talks and what we're up to publicly. So I understand completely — folks are watching the clock, and I think Talen sits in a different spot because we're operating under an existing agreement that gives us room to keep talking. Cole?

Cole Muller

executive
#30

Right. So like Mac mentioned, we did make the announcement about that deal, and keep in mind that we devoted a solid chunk of the following 6 months afterward to getting it right, correct? There was an escrow that needed to be freed up in August. Plenty of zoning benchmarks plus other permitting items that had to be completed there. Naturally, we're capable of handling multiple things at once, and we've been pursuing a few other possibilities. The FERC ISA rejection that came on November 1 clearly shifted how a few of those setups could play out regarding timing, and it takes 2 parties for a deal to come together. Plus our counterparties need to determine what suits them best. Would they prefer to accelerate and pivot toward another option? So we've been sorting through all of that. Like Mac said, the moment there's something to share, you'll hear it before anyone else.

Mark McFarland

executive
#31

To me, Angie, the fact that no transaction has been announced throughout the sector — and I mean the whole sector — doesn't indicate any shortage of interest. My view is simply that interest exists, and completing something will require time. That period is certainly not going to be '27 or '28, nor '26, in my opinion. I believe there is time available to complete things, and under the existing contract we do have time. We're pursuing two tracks simultaneously, correct — carrying out our obligations under the present contract to bring the campus online; and as I mentioned, it is online. It's coming online at this very moment; we're enthusiastic about that, and we keep carrying out that work. That provides us with some capacity to pursue — to examine other transactions and complete the appropriate ones, rather than simply any transaction.

Angie Storozynski

analyst
#32

All right. Let me challenge that just a bit. Like I usually do. What about the gas plants? I get that there's ambiguity regarding how the colocation is set up, or whatever the arrangement is, for the data center at Susquehanna. But wouldn't gas plants be somewhat simpler? They could sit in front of the meter, they could simply be standard commercial deals, and still we've heard nothing at all on that side.

Cole Muller

executive
#33

Yes, Angie, excellent question. Look, as I mentioned before, and I think Mac did too, we are reviewing quite a few opportunities throughout our fleet. Naturally, we own one nuc, which means nearly all the remainder of our fleet consists of gas units. And look, interest has picked up even over the past 3 or 4 months regarding particular deals involving several of our assets there. And we have some appealing sites, we think, sites with plenty of land, over 2,000 acres in certain instances, around the plant. We have solid interconnections, as you noted, the transmission, water access, and simply the overall siting. And it truly comes down to what the counterparty is seeking? What suits Talen? And what the appropriate long-term answer is, and we're moving through that process.

Mark McFarland

executive
#34

Honestly, what I'd say is that interest has risen — pretty frankly — when it comes to gas. These are simply gas transactions, Angie, and like we've talked about before, I've consistently maintained that in my view, gas deals are the thing that will bridge that gap. You've got nuclear deals too, and those carry a carbon-free element, but gas will be the one that has to bridge it. Then when you examine what are called regulatory — regulated transactions, or vertically integrated ones, that have been made public — take that Louisiana one, it centered on constructing new gas plants; and that leads into additionality, and so on. But it revolves around a gas portfolio; and my sense is that folks are after that. And my sense is those are on their way, they simply haven't arrived at this point.

Durgesh Chopra

analyst
#35

This is Durgesh, actually. Nice conversation. Everything else I wanted to ask has been covered. Perhaps just a single fast point of clarity. When we consider the 2025 and 2026 guidance, in what way do the latest RMR agreements play into your figures? If they get approved, would that be additional upside? Or what's the right way to look at it?

Terry Nutt

executive
#36

Durgesh, this is Terry. When we released those ranges, we had built in an assumption regarding the RMR arrangement. That sits inside our range; therefore it's part of those guides we've put out there.

Rinny Singh

analyst
#37

This is Rinny Singh, sitting in for Ross Fowler. I had one quick item regarding the RMR matter at FERC; I'm simply wondering whether you perceive any — I noticed the Maryland People's Counsel submitted a filing, sort of a protest, and Christie's remarks regarding consumer rates. Do you perceive any problems with how that proceeding is going? And is there a chance it gets stretched out, meaning you wouldn't receive those revenues, I suppose — do you have clarity on that?

Mark McFarland

executive
#38

Sure, Rinny, I'll begin, and perhaps John Wander, our General Counsel, will chime in. First off, I'm pleased you raised the RMR, since it's a topic that arose in the interval since our last calls, something we submitted, and something we feel good about, because we managed to secure a settlement alongside every major stakeholder, FERC staff and the Maryland PSC included, and we have backing to proceed; we're also glad about being able to keep delivering grid reliability in Baltimore and across PJM in particular — doing our share there. As for how the proceeding unfolds, I'll hand it to John shortly, but it's important to recall that FERC, which gave the green light to PJM's auction rules back in July for '26 and '27 — as part of that, what's baked in is that those RMR units sit within that auction's rule set, effectively bidding in at zero as a resource; yet for the auction to proceed, the RMR must be established, and we've said so pretty consistently from the start. John, is there anything you'd like to add?

John Wander

executive
#39

Appreciate that, Mac. Honestly, Rinny, there isn't a whole lot for me to tack on there. What I can do is hand you a few key dates. We've requested that FERC give its approval to the settlement by May 1. Should things remain unresolved when the RMR is scheduled to kick in, we retain the option to keep the plant operating under those financial agreements up until FERC grants approval. After that, a true-up occurs whenever FERC takes action further along. That said, we aren't anticipating that, given what Mac laid out; our belief is that the stakeholders backing this — and the ones who've filed in support — along with the character of those stakeholders, plus the counterparties receiving payment, are all aligned behind the settlement, since it delivers reliability and ensures Baltimore keeps getting heat through the winter and lights once night falls.

Craig Shere

analyst
#40

I'd like to explore further Angie's gas-fired topic, Michael's growth investment, and Shar's additionality points. To put it plainly, given what we've recently seen from NRG and Williams in Industry News, is it fair to state that attracting hyperscaler interest for a long-term gas powered option requires deploying substantial nuc capacity? If so, what return threshold would you need to see to motivate a Talen move in that direction, considering your emphasis on return of capital?

Mark McFarland

executive
#41

Wow, Craig, that question covers a great deal — regarding return analysis and similar matters, a longer-term contract would be necessary; but perhaps a few remarks about how the question is framed. The NRG announcement, in my view, points in a favorable direction. There are 2 distinct elements involved. The first element concerns additionality. Based on our reading alone, the LOIs with the 2 separate data center providers are not — they rely on existing generation or simply use existing generation, without delivering additionality. So that element contains 2 parts. As I mentioned, I believe new generation arrives in the midterm rather than the near term, and that's likely why they split it out that way. I'm not certain. I haven't talked with them. I'm only going by what I read, which is that I consider it positive for the industry to keep pushing forward the capability to supply power to data centers; however, for us to put money into that, we'd need to see something offering a contract with — I'm not prepared to name a figure. I doubt Terry is prepared to name a figure either; but a figure delivering a sufficient return exceeding and outperforming our free cash flow yield from repurchasing our stock, which as I noted is always the yardstick. Yet it wouldn't rest on a roughly one-year horizon; it would span a longer-term horizon involving a longer-term contract with a solid credit counterparty. I believe our situation differs as a long-only generator. I think you must pursue that within our portfolio since I don't think folks wish to bear single asset risk. And we can extend that because, in my view, those deals will most likely resemble either a co-located arrangement with grid backup, or a front of the meter arrangement supporting that build. But should that unit be lost, you'll need to supply it from another part of your portfolio. We're eager about the chance to hold a portfolio. A versatile portfolio of assets capable of backstopping alongside new generation. That’s the way we expect this to unfold on our end. Is this a stronger place to put capital than repurchasing our own shares? Does it come with a solid offtake contract for the long haul? And are we able to place it into a portfolio and deliver a complete solution, while perhaps improving its environmental profile through credits of that kind, so that we can offer what amounts to a C&I front-of-the-meter arrangement? That’s our perspective on it.

Craig Shere

analyst
#42

That's useful. Last thing—about the outlook. Obviously we're at the beginning of the year, so nobody expected big revisions, yet a few favorable items stand out. The opening remarks mentioned that tight supply-demand balance lasting multiple years. You've also got the Maryland RMR settlement, and I believe your initial outlook assumed capacity markets staying flat rather than that step up in the 2025 and 2026 auctions; but at this point it appears that will likely shift from around 270 to near that 325 cap, at minimum for the upcoming auction. So would it be reasonable to say that, inside the guidance range, matters are tilting toward the upper half right now?

Mark McFarland

executive
#43

Terry and I met up ahead of this call, and we glanced at one another and asked, are you going to be the one? And Terry and I have worked side by side for — I'm not sure, quite a while; but listen, under ordinary practice, in our view it simply isn't standard to revise guidance for '25 at — not even once the first quarter has ended. So we'll give an update on that later in the year. I'd say the ranges capture commodity movements, both favorable and unfavorable, and RMRs are baked in. I believe capacity for '25 and '26 went into that figure. And as the year unfolds, we've gotten off to a strong start. There's no — we've gotten off to a strong start. But full year results take a 4-quarter gain, and right now we simply won't alter guidance. As for our '26 outlook, once more, if you examine the markets, they've risen. I think if we — through the cold weather event. I'm glancing at Chris Morice, our Chief Commercial Officer. The market, you know, was strongly bid early this year in the term market, and it has pulled back somewhat; still, markets broadly are moving higher, and load is beginning to show up. So if you check our hedge position, found in the appendix, we can take part in that; and that commodity sensitivity sits inside those ranges; therefore we'll give a more detailed update on it; we simply won't do so right now.

Terry Nutt

executive
#44

Yeah. Craig, I mean, obviously you should figure that, as we go along, we're going to tighten things up and tweak the guidance to match. But like Mac said, we're 2 months into the year; so we'll keep updating it as we go along.

Mark McFarland

executive
#45

Alright. I appreciate that, Kevin, and I want to thank all of you for being here with us at this time, as well as for the ongoing backing and attention you've shown toward Talen. I hope your day goes well.

Operator

operator
#46

That brings today's presentation to a close, everyone. You're welcome to disconnect at this point, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Talen Energy Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Talen Energy Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Talen Energy Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.