#1

Good day, ladies and gentlemen, and welcome to the 2Q FY ’23 Earnings Conference Call of Techno Electric & Engineering Limited, hosted by Asian Market Securities Limited. This call may include forward-looking statements regarding the company, and those are based on the beliefs, opinions and expectations of the company as of the date of this call. Such statements do not guarantee future performance and carry risks and uncertainties that are hard to predict. Actual results could differ from those expectations, projections, etc., whether expressed or implied. We ask participants to exercise caution when referring to such statements and remarks. <<operator_script>> I now hand the conference over to Mr. Kamlesh Kotak from Asian Markets Securities Limited. Thank you. And over to you, sir.

Kamlesh Kotak

analyst
#2

Thanks, Pooja. Good afternoon, everyone. We at Asian Markets welcome all of you to Techno Electric & Engineering Company Limited's 2Q FY ’23 earnings conference call. Joining us today are Mr. P.P. Guptaji, Managing Director, and Mr. Ankit Saraiya, Director, representing the company. I'd ask Shri Guptaji to walk us through an overview of the quarterly results, and after that we'll begin the Q&A session. Over to you, Guptaji. Thank you.

P. P. Gupta

executive
#3

Thanks, Kamlesh. Good afternoon, everyone. Once again, welcome to the discussion of our financial results for the second quarter and the first half of the year ended 30 September ’22. Any remarks made on this call that reflect our future outlook, or that might be interpreted as forward-looking, need to be considered together with the risks the company faces. Let me briefly go over our performance, which you may have seen in the newspapers and in the filings made with the stock exchanges. Total revenue for the second quarter is INR228 crores. EPC revenue is INR180 crores. Revenue from the Wind segment is INR47.5 crores. EBITDA is approximately INR31 crores. Operating profit in the EPC segment is about INR28 crores. We have seen some pressure on EBITDA from higher commodity cycles and from overseas freight that has partially corrected but is still elevated relative to when we signed the contract. In addition, some top-line has been sacrificed in order to protect the bottom line. Other income is INR19 crores versus INR10.28 crore last year, PBT is INR78.43 crores, PAT is approximately INR59 crores, and EPS is INR5.35. Looking at the first half in total, revenue is just above INR400 crores, including EPC of around INR325 crore.

P. P. Gupta

executive
#4

Wind segment revenue stands at INR78.3 crores. EBITDA comes to roughly INR120 crores. EPC segment operating profit is approximately INR50 crores. From the Wind segment, it's around INR70 crores. Other income is INR32 crores, versus INR27 crores a year earlier. Profit before tax for the first half is INR127 crores. Profit after tax is roughly INR94.5 crores. EPS is INR8.58. Cash and cash equivalents in hand currently carry an investment value of INR1,200 crores — that's nearly over INR100 per share. Over the quarter, we brought in additional business valued at about another INR400 crores. Plus, we've booked one more order — the Goa TBCB project of Sterlite — for INR126.2 crores. We're also part of one of the <<inaudible>> projects of J&K, supplying and installing 2.5 lakh meters for INR338 crores. Taking it all together, business in hand today is approximately INR3,600 crores, and business in pipeline is a further INR500 crores, though our marketplace holds far more opportunities. We're confident of booking additional business of no less than INR1,000 crores to INR1,500 crores by year-end, as we're seeing an all-time high in the company.

P. P. Gupta

executive
#5

Turning to the outlook, as we pledged last quarter, we have managed to navigate through challenging periods and delivered growth even though last year's expansion was only marginal. We anticipate substantial growth this year, though mainly across the next two quarters, and most heavily in the final quarter. We believe the growth momentum will be stronger than this year in financial years ’24 and ’25. We look for more business from segments such as FGD, AMI and data centers. The order book I mentioned earlier does not include our own in-house data center order, which will add roughly another INR1,215 <<inaudible>> crores. Over the years ahead, we anticipate robust power sector reforms, as I have been saying and as reflected in parts of our printed documents covering manual accounts. With power and energy converging, there is also considerable attention and emphasis on the availability and reliability of power supply, on the cost of power, and on improving the overall financial health of the sector. While attention will stay on renewable power and the infrastructure tied to it, there is considerable emphasis on delivering reforms and investing in the distribution segment known as RDSS, which is the distribution reforms-cum-system centering. Transmission infrastructure for renewable power, as needed to reach 500 gigawatt by 2030, will remain a way of life.

P. P. Gupta

executive
#6

On top of that, we anticipate that our energy storage offerings will become a component of the energy sector as it moves forward. And I foresee growing prospects in logistics, transportation, electric vehicles and so forth, with everything electrifying. As a result, substantial growth should occur in energy-based consumption over the next several years. It will, I am certain, double by 2030 — perhaps even reach 2.5 times per capita. Turning specifically to the FGD segment, that segment will remain a focus. The Government of India has already pushed the deadline out from December ’24 to ’26. Considerable headway is being made with the CPSUs and a number of the states — forward-looking ones — in placing orders for projects while implementation proceeds, and this will gain further momentum and take place among SEBs and the private sector as well in the near future. According to the government and the Ministry of Environment and Pollution, plants located near populous regions and capital towns will need to meet all the orders by 2024 or possibly sooner, whereas utilities in less polluting areas may have until ’26 or beyond, contingent on further modifications by GA. The Supreme Court likewise declined to entertain the Delhi Government’s petition that sought directions for 10 allegedly polluting coal-based thermal power plants in Uttar Pradesh, Punjab and Haryana to halt operations immediately until FGD technology is installed to cut harmful emissions.

P. P. Gupta

executive
#7

This year we've secured orders valued at INR1,450 crores for FGD. And we expect this pace of business to hold up for at least the coming four to five years, since 80 to 100 gigawatt still has to be ordered out by CPSUs, SEBs and the private sector. On the Transmission side, we mostly anticipate a status quo in the inter-state region, whereas in the intra-state region there will be greater focus on reinforcing transmission networks and adding more transforming capacity. Those are two load centers. Our TBCB bidding for the last lot of 60 gigawatts of renewable energy out of 175 gigawatt has begun, and we expect it to wrap up before March ’23. Previously, the dates for distributions kept getting extended. I trust it should close shortly. The allocation for strengthening the power system has been doubled to INR29.8 million in union budget ’22, ’23 from INR14.55 million, but the government also had this program to spend INR3 lakh crores over the next five years under the RDSS scheme and has also extended many kind of situations for state governments and discoms. We're also witnessing good interest from wind mills and large investors by making projects bankable and portable on the financial side, particularly in renewable power as well as on the transmission side.

P. P. Gupta

executive
#8

And it could also involve the AMI segment down the road. On the metering side, the government intends to install close to 250 million meters over the next seven years, featuring prepaid and smart metering capabilities, which operate automatically and involve heavy communications at work sites. We're seeing power distribution networks get stronger so they become smarter, more reliable, and less oriented toward losses. All of these steps are aimed mainly at boosting efficiency and curbing losses, which would improve the health of the discoms. As I mentioned, we are L1 in the smart meter order in J&K for 2.5 lakh meters valued at INR338 crores under the DBF-40 <<inaudible>> model. The government also moved forward with the Electricity Amendment Act in August 2022. The government wants to give consumers a choice — a long-awaited one, I'd say — regarding power supplies, and also to enable discoms to deliver timely and adequate results, tariff results. It also seeks to amend Section 42 in order to facilitate non-discriminatory open access to the distribution licenses. This likewise seeks to amend Section 40 to facilitate use of distribution networks by all parties in that area. Power supplies at Page 14. It also seeks to amend Section 62 to provide a greater revision in tariff over India, along with mandatory fixing of sealing and minimum tariff by appropriate commissions.

P. P. Gupta

executive
#9

We believe the power sector is at a really critical point right now. And as we move forward, things can only improve, both for stakeholders and for consumers. On wind, we have a broad resolution in place to exit those assets. Techno holds 129 megawatt of wind power spread across three buckets: 61 megawatt in Tirunelveli, 51 megawatt in the Coimbatore Madampatti area, and 18 megawatt in Karnataka. Given the current difficulties in the power sector stemming from the coal shortage, we are seeing solid grade availability as well as offers coming in for our wind assets from local industries looking to use captive power. With that in mind, we felt it was prudent to sell part of the capacity where feasible. Roughly 51 megawatt of capacity is meant to be parked in our own SPV to support our data center operations. COVID-19 has touched life in many ways, but one silver lining has been the expansion of the digital space. With that digital growth, underpinned by confidence in data production, it is expected that the third-party — and also the IT services delivered on cloud, it is expected that the third-party data center industry will expand considerably from present levels of 500, 600 megawatt to 2 megawatts over the coming three years and at least 5 megawatt by 2030.

P. P. Gupta

executive
#10

Up to now, the majority of data centers have been situated in Mumbai, and now that's shifting to Chennai because of the undersea cable that's available there. Calcutta is also waiting on the undersea cable, which is expected to arrive by March ’23. We're seeing a lot of data centers springing up around our site at Siruseri Industrial Estate in SIPCOT IT Park from other competitors such as Equinix, Symphony, Yota <<inaudible>> and others, which validates the relocation choice we made. Construction on our data center is moving ahead very strongly. And as you're already aware, it will hit 24 megawatt IT load, with ultra-scale hyper-density nature features. The project is now in full construction. All the foundation and ground floor work has already been completed, we're approaching finishing it, and we're now getting ready to launch the first flow by the end of this month. We've already spent roughly INR55 crores on the project, apart from the capex on the land. We're hopeful of commissioning the project by the third quarter of 2023. In addition, we'll consume renewable energy from our operating wind energy capacity so the data center can be classified as ESG compliant, which is a major requirement of hyperscale customers like Amazon, Google, Microsoft, etc. What's more, we're seeing aggressive interest from strategic partners in forming a JV to develop data centers in India.

P. P. Gupta

executive
#11

We're weighing the choices that are on the table and will certainly be settling soon on the path ahead. Given a capex of roughly INR1,300 crores, that works out to about INR50 crores for each megawatt of IT load, and 60% to 65% of capex going toward electro-mechanical works — an area where Techno has in-house expertise — we'll be able to draw on our capabilities and relationships to carry out such works. Thanks to our own renewable energy, our efficiency capability, and earlier experience developing infrastructure projects across more sectors, we sit in a unique position relative to many newcomers in this industry. With that, I look forward to participation from my esteemed investors, and I am available to all of you.

Operator

operator
#12

Thanks a lot. <<operator_script>> Our first question comes from Sandeep Tulsiyan at JM Financial. The line is yours — go ahead.

Sandeep Tulsiyan

analyst
#13

Yes. Good afternoon, sir.

P. P. Gupta

executive
#14

Good afternoon, everyone.

Sandeep Tulsiyan

analyst
#15

Thank you, sir. Sir, I think it's clear we reported very strong inflows during the first quarter, but for this quarter, you pointed out that an extra INR400 crores of inflows have already arrived. My assumption is that these INR400 crores sit on top of the Goa TBCB Sterlite and the J&K INR338 crores you mentioned — or do those orders also form part of that figure?

P. P. Gupta

executive
#16

No, no — Goa and INR338 crores aren't part of that.

Sandeep Tulsiyan

analyst
#17

All right, could you break down that INR400 crores for us, and also give us the precise order backlog as of the end of September, please?

P. P. Gupta

executive
#18

Yeah. We received one order from <<inaudible>> for Ladakh. And we also received an order from Tripura Electricity Board worth roughly INR237 crores, plus PGCIL at INR157 crores. So together those come to around INR400 crores.

Sandeep Tulsiyan

analyst
#19

Understood. And sir, at the quarter's close, what figure would the order book stand at?

P. P. Gupta

executive
#20

Right now, you could put it at INR3,600 crores in LTE, and that figure will keep rising as we induct more. During this month, we ought to receive a further INR400 crores — INR500 crores, I should say. Even so, we do anticipate a further INR1,000 crores to INR1,500 crores before the year ends.

Sandeep Tulsiyan

analyst
#21

Alright. Sir, just…

P. P. Gupta

executive
#22

By the time this year wraps up, our order backlog should stand at, in my view, no lower than roughly INR4,500 crores, excluding any data center order. Our in-house work isn't part of that figure.

Sandeep Tulsiyan

analyst
#23

Got it. Sir, just let me square away these order figures, if I may — we were at INR3,200 crores when 1Q closed. We've booked INR400 crore in fresh orders and executed somewhere around INR180 crores. That puts closing orders at roughly INR3,400, correct? If not, inflows ought to land near INR570 crores or so. So is there anything further on the order side, or…

P. P. Gupta

executive
#24

Right. We have a few amendments that keep coming in through a number of orders, adding up to under INR150 crores — some at INR30 crores, others at INR40 crores.

Sandeep Tulsiyan

analyst
#25

Got it.

P. P. Gupta

executive
#26

Yes. Just like <<inaudible>> did, one job wasn't moving ahead. Now it has learned to move ahead like seekers. So we weren't including it in the order book because they couldn't get the land, which they are now ready to get. So those sorts of orders get revised that weren't active.

Sandeep Tulsiyan

analyst
#27

Got it. And on top of that, sir, you also said there’s another INR1,000 crores to INR1,500 crores pipeline for the rest of the year, and that’s over and above the INR500 crores pipeline details you shared. Could you share some of the major orders from that? And also, possibly which area they’re coming from?

P. P. Gupta

executive
#28

As I mentioned, beyond our usual segments, we're now focused on three areas. We anticipate one FGD order worth roughly INR500 crores, plus at minimum 10 lakh AMI meter work; several tenders are in the pipeline, and something similar applies on the power supply side for data centers being run by third parties. We might also gain from some RDSS elements already out in the market — the first lot there exceeds INR25,000 crores.

Sandeep Tulsiyan

analyst
#29

Got it. So on that basis, how should we think about the total revenue growth target for the EPC division over the next two years?

P. P. Gupta

executive
#30

At minimum, I'd put it at 30%, 40% annually starting in ’23 and ’24 onward. No matter what order book we're holding, sir, we've got to execute — those are time-bound. So the strongest year will be ’24, ’25.

Sandeep Tulsiyan

analyst
#31

All right, so for next year, our target should be 25% growth in the EPC division, correct?

P. P. Gupta

executive
#32

Yeah, yeah, absolutely. And I think you can expect INR1,750 crores to INR2,000 crores in ’24, ’25.

Sandeep Tulsiyan

analyst
#33

All right. And sir, previously you've pointed out that margins are clearly facing pressure. And I'm not sure whether it's being conservative or just how Techno runs things, but you've guided that people should scale back expectations compared with the 15%, 16% the company historically operated at. Do you still hold to that guidance of roughly 12%, or given these orders, would you want to revise it either up or down?

P. P. Gupta

executive
#34

Regarding this year, my preference is to maintain it at 12.5% to 13%, as I mentioned, though we'll need to watch how the commodity cycle plays out. Should China decelerate and Europe enter recession, our nation might experience a more steady commodity cycle. We are especially concerned about CRGO transformers, which could have been shaped alongside other transformer manufacturers as well. CRGO prices stand at nearly 2.5 times to 3 times what they were two years ago. So pricing has typically corrected there, since additional CRGO goes into CR — for EV vehicles and other uses, batteries. So we'll see how that develops. Nickel carries a very high price. That's one factor. Steel could stay flat or I'm unsure whether the government lifts the export ban and some market cycle might shift. Even so, I'd note steel runs roughly 10%, 15% higher, yet all our current orders rest on present-day costing. Therefore that sort of impact won't show up. So it ought to recover in ’23, ’24. My view is we should return to 50%.

Sandeep Tulsiyan

analyst
#35

All right, got it. Sir, if I could, I have a couple of additional questions to ask, if that's okay. The first concerns the Wind side. From what I gather in your commentary, you plan to carve out one portion of roughly 51 megawatts into a 100% subsidiary for the in-house data center, and the remaining around 79 or 80 megawatts will be disposed of. Have I understood that correctly?

P. P. Gupta

executive
#36

Yes, that's pretty much the situation, sir. Absolutely.

Sandeep Tulsiyan

analyst
#37

Alright. And the second point concerns the data center. If you could just shed a bit more light on precisely where we stand regarding securing a joint venture partner. In the event that a partnership cannot be finalized within the coming six months, do you see the execution timelines slipping, or would you proceed regardless and fund this entire data center of INR1,300 crores with your own capital? How would that play out, if you could share a few more specifics on it?

P. P. Gupta

executive
#38

No. First off, we're pretty far along in a partnership, and a term sheet is getting close, but we're in a quiet period with them. So I can't share details on that front. That's one. Two, but regardless of whether we can strike a relationship or not — because those have long-term implications for any investment — we are definitely going to move forward and finish Phase 1 by the end of the second quarter or the third quarter of '23.

Sandeep Tulsiyan

analyst
#39

Alright, got it. And regarding the cash balance, sir, I believe the buyback we're doing right now is, of course, not moving forward as expected. What I mean is, we might not hit the full target or use all the capital we set aside for it. So what's the overall plan? How much of this are you planning to dispose of? Is there any other alternative approach? Will we raise the buyback price, or would you prefer to issue a dividend? Any thoughts on that front for utilizing INR1,200 crores?

P. P. Gupta

executive
#40

To start with, I don’t share your view. As of today, we have already completed a buyback of 17.5 lakh shares for INR50 crores. We are actively in the market right now. I’m confident that with still two months to go — more than two months — we will be able to spend the entire amount. But if any sum remains after the buyback closes, it will be paid out as dividend.

Sandeep Tulsiyan

analyst
#41

Alright, and I have one final question, sir, regarding the outstanding debtors. Are there any that remain sticky or slow moving? Of the balance portion you typically update each quarter, how much is still pending? And from the doubtful receivables, how much has yet to come in?

P. P. Gupta

executive
#42

No, there aren’t any doubtful or sticky years apart from Afghanistan, in one of the contracts where we’ve kept reinforcing over the last one year. That was a project funded by ADB with us, and it’s nearly 80% plus performed. So it’s a Central Asia project. I’m sure the World Bank and ADB will step forward to back the project. Along with us, KPTL, KEC — all are involved. And the Government of India is also working through the Ministry of External Affairs as well as via its political networks. I’m sure this project will go ahead, but right now, I can say that it’s the sticky part. Apart from that, there’s no concern, no large concern, I would say.

Sandeep Tulsiyan

analyst
#43

Sir, how much is this order worth?

P. P. Gupta

executive
#44

The order was valued at $35 million. We’ve already executed $29 million.

Sandeep Tulsiyan

analyst
#45

Okay. $35 million?

P. P. Gupta

executive
#46

Yeah, yeah.

Sandeep Tulsiyan

analyst
#47

So that's still outstanding — the receivable value, correct?

P. P. Gupta

executive
#48

Right. No, regarding <<inaudible>>, the pending portion comes to just INR45 crores.

Sandeep Tulsiyan

analyst
#49

Is it INR41 crores that's still pending?

P. P. Gupta

executive
#50

You could put that at INR45 crores.

Sandeep Tulsiyan

analyst
#51

INR45 crores. All right, understood. Then regarding the investment side, are there any investments — those ICDs or whatever you've lent out — that remain outstanding and still need to be reduced, or is that fully…

P. P. Gupta

executive
#52

Thank God, that's finished. Everything's wrapped up on the last one — that came in on November 10 as well.

Sandeep Tulsiyan

analyst
#53

Alright, understood. And apologies — may I ask just one more thing? Regarding those overseas projects, I believe you'd shared some update on the one in Afghanistan. Could you bring us up to speed on it — what exactly is happening there?

P. P. Gupta

executive
#54

That's what I'm sharing for Afghanistan alone. The ADB-funded piece — that's what I showed you — $35 million, with $29 million executed.

Sandeep Tulsiyan

analyst
#55

All right, understood. My mistake — I apologize. That makes sense now. Thank you very much, sir, for your patience in fielding all of these questions, and all the best to you.

P. P. Gupta

executive
#56

Thanks.

Operator

operator
#57

Thanks. <<operator_script>> Our next question comes from Sarvesh Gupta of Maximal Capital, on the line. Please go ahead.

Sarvesh Gupta

analyst
#58

Good afternoon, sir. Sir, my first question concerns the revenue target, sort of, for FY ’23. So I think earlier we were looking at 25%, 30%, sort of a growth, for this current financial year, but given that we have done only INR400-odd crores in H1. So what kind of number are we targeting for this financial year in the remaining two quarters?

P. P. Gupta

executive
#59

Yes, it’s still the same, sir — INR1,200 crores, INR1,250 crores. And at a minimum we ought to be able to do another INR800 crores, if not more, over the next two quarters. This time the fourth quarter is going to be really heavy. It’ll be a little bulky, since a lot of things may happen during those three months, but the third quarter will also be better than the last two quarters.

Sarvesh Gupta

analyst
#60

All right. Turning to wind power — that remaining 79 megawatts we're looking to sell, where do things stand with the sale process? You also talked about this on last quarter's conference call. So has any progress been made on selling it? Where are we now, and how much money do we expect to realize this financial year versus the next one?

P. P. Gupta

executive
#61

Sir, my view is that most of the sales ought to occur within this year alone, along with the cash coming in. At present we're securing contracts for 35 megawatts; from that total, cash has already come in on 6 megawatts, and the remaining 28, 29 megawatts will likely arrive this month or the next one. Those are binding contracts, while the rest are still being negotiated.

Sarvesh Gupta

analyst
#62

So your expectation is that all of it—other than the 51 megawatt—gets sold during this financial year, and the cash comes in within this same year?

P. P. Gupta

executive
#63

I'd like to, though I'm not certain. You're welcome to put it that way. Perhaps 20 megawatts here and there.

Sarvesh Gupta

analyst
#64

And what sort of average price are we achieving on sales of these assets?

P. P. Gupta

executive
#65

Roughly INR4 crores for each megawatt, and then some — INR4 crores plus.

Sarvesh Gupta

analyst
#66

Alright, alright. Sir, regarding what you said about the cash balance — I didn't catch it properly. Is it currently more than INR1,200 crore?

P. P. Gupta

executive
#67

That’s exactly correct.

Sarvesh Gupta

analyst
#68

Got it, sir. Thanks — and best of luck. Thank you.

Operator

operator
#69

Thanks. Our next question comes from Sonia at Dalal and Broacha. Go ahead, please.

Analyst

analyst
#70

Hello there. Sir, I appreciate the chance to speak. Sir, first of all, I’d just like to verify…

Operator

operator
#71

Sonia, apologies for cutting in. You’re not coming through for us. Could you raise your volume a bit, please?

Analyst

analyst
#72

Alright. Can you hear me at this point?

Operator

operator
#73

Yes, please go ahead.

Analyst

analyst
#74

Yes. Thanks for the chance to speak. Sir, first, I just want to verify something — we haven't sent out our quarterly presentation for this quarter.

P. P. Gupta

executive
#75

Sorry, could you repeat that?

Analyst

analyst
#76

The quarterly presentation we normally give each quarter — that one hasn't been shared this quarter.

P. P. Gupta

executive
#77

We’ll probably share that tomorrow. It’ll be posted on our website.

Analyst

analyst
#78

Right, right. And my next question is about the growth in order inflow. You mentioned that you expect fresh order inflow of roughly INR2,000 crores. So I'd like to get a sense — since a lot is happening in the power sector and capacity is likely to pick up overall — of what kind of fresh order inflows you're expecting over the next two, three years?

P. P. Gupta

executive
#79

Ma'am, this trend ought to keep going, since power is now a priority area for the government — more strongly than it has ever been. And of course, COVID has had an effect too, and if manufacturing and industry are to help us reach a $5 trillion economy, power cannot be left behind. So all of these areas have turned into major capex in power, which is easy for you to measure. One relates to this <<inaudible>> side, where the government is spending INR3 lakh crores. Then there are AMI metering system solutions, where the government wants roughly 250 million meters by 2030. In the same way, climate change. So there are plenty of valuation issues around thermal capacities, such as FGD solutions and <<inaudible>> water pollution systems. All of them are going to be the futuristic way of life, as well as the green power target of 500 gigawatt that I discussed. So you have to build a lot of green corridors to transmit the power and balance out load consumption, and there is so much stress on the electric side going forward when it comes to consumerism, like logistics, transportation, electric vehicles. It is all turning into a power-driven economy mode rather than one based on hydrocarbons anymore. So all of this is going to make power consumption at least 2 times to 2.5 times our present consumption, which is no more than 1,200, 1,250 units per capita.

P. P. Gupta

executive
#80

So it follows that we need to reinforce the power networks, metering of power is required, and power sales must double over the coming seven years. So all of that sounds encouraging, and capacities plus reliability, availability and sustainability all need to be looked after.

Analyst

analyst
#81

Right, got it — thanks very much, sir. My second question concerns margins in the EPC business. In the past, we ran at roughly 17%, 18% margin on EPC. At present, that has dropped to about 15%, 16%. So what I'd like to grasp is this: it's low right now — do you see it widening over the coming three, four years, or do you think it will stay at this same level?

P. P. Gupta

executive
#82

Honestly, that's a really tough thing to forecast or predict, since everything hinges on commodity cycles in our country and on inflation. Still, we're hopeful that the commodity cycle—which hit us hard last year, to the point where we gave up some of the top line in order to protect the bottom line—won't have as strong an effect going forward. That said, I prefer to stay conservative when I give my guidance. Should anything favorable come about—say, Europe entering a recession, China slowing down, or commodity cycles turning easier and more affordable—then there is definitely room to do better, ma'am.

Analyst

analyst
#83

Thanks, sir. Thanks.

Operator

operator
#84

Thanks. <<operator_script>> Our next question comes from Prolin Nandu at Goldfish Capital. Your line is open.

Prolin Nandu

analyst
#85

Hi there, and thank you sir for taking my question. I just — if I look at your past history in terms of your EPC execution, we have — in all the last five years, we have reported an ROCE of upwards of — on an average upwards of 50%-odd. And now if I look at your order book, the nature of order book is slightly more heavier towards FGD projects, towards these smart metering projects. Do you think going forward with the change in order book mix, will we be able to maintain similar kind of a ROCE number?

P. P. Gupta

executive
#86

Yes, absolutely — the reason is that previously our projects were spread across multiple locations. Any set of locations functions as a cost center and certainly drives costs up. However, when you're handling a bigger volume of work at a single location, it does generate economies of scale. So it benefits us in both respects. And we're confident that we can maintain this margin guidance.

Prolin Nandu

analyst
#87

Sir, I’d rather focus on ROCE than on margins, if I may — and you also said that FGD, at least in the first round, was very competitive. Now, if I’m not mistaken, conditions are less competitive than they used to be. So my question was really about the ROCE side, not merely the margin side when it comes to receiving the money, because there too we have expertise, correct, in the sense that — you have said before that securing the project isn’t the point; it’s about executing on schedule and getting paid on schedule. So across all those parameters, do you believe that with the shift in the order book mix, we will be able to sustain similar return ratios as well?

P. P. Gupta

executive
#88

Sure — regarding ROCE on capital deployed in the EPC business, yes. But we have a lot of verticals, and they keep shifting from one vertical to another. So capital gets deployed in different ways. That means not all verticals are being transmitted equally. Still, if you mean only the EPC piece, then yes.

Prolin Nandu

analyst
#89

Right. Yes, sir. What I meant was just the EPC piece. Sir, my second question concerns the data center. Over the last two or three calls, we've said that we're assessing some term sheets. Is there a specific milestone in terms of completion that we're waiting on so we can execute these term sheets and move forward with them, or are we simply looking — because, I mean, as we get closer to that completion milestone, the valuation at which these deals get done should also improve. So are there particular milestones you want to finish before we close the deal, and is that why this part is taking longer?

P. P. Gupta

executive
#90

Ankit, would you mind taking this one?

Ankit Saraiya

executive
#91

Yes, absolutely. So, essentially, when it comes to…

Operator

operator
#92

Pardon me for cutting in, Mr. Ankit, but the audio on your end isn't coming through clearly for us, sir.

Ankit Saraiya

executive
#93

Hello.

Operator

operator
#94

Sure, go right ahead.

Ankit Saraiya

executive
#95

Can everyone hear me?

Operator

operator
#96

Yes, at this point you are.

Ankit Saraiya

executive
#97

Yes. Like I mentioned, those term sheets have come to us often over the past 1 to 1.5 years, ever since we began talking with partners and potential partners. But as time passes and the project moves forward, you correctly pointed out that with development risk falling at each stage, the valuations and terms keep getting better too. Much more visibility has been gained as well, so stronger partners are now lining up. We have stayed patient, believing that at some point we would secure something better than what past term sheets delivered. That is why we are taking our time. And hopefully, we will bring something on board once we have a term sheet that satisfies us and is reasonable in nature as far as the terms are concerned as well.

Prolin Nandu

analyst
#98

All right, Ankit, that's quite clear. But could you offer some kind of timeline for when we might finalize this — perhaps this year, or would it land in the next year? I realize it hinges on how good the term sheet is, but even so, a timeline of some sort — is there a timeline you're working with?

Ankit Saraiya

executive
#99

We expect to have that finished by the time this year ends.

Prolin Nandu

analyst
#100

All right, all right. So before this year wraps up. Excellent, sir. That's all I had. Many thanks for taking the questions. Thank you.

Operator

operator
#101

Thanks. Our following question comes from Sarvesh Gupta of Maximal Capital, on the line. You have the floor.

Sarvesh Gupta

analyst
#102

Sir, a question about the data center. I believe on the previous con call we said the first phase of the Chennai data center was meant to be commissioned by June 2023. And I think on this call you've stated it's the third quarter of 2023. So are you saying it's been pushed out roughly another six months, from June ’23 to December ’23?

P. P. Gupta

executive
#103

I really apologize — I was only referring to Q3 of the fiscal year that wraps up in September. I mentioned the second or third quarter of 2023 and 2024, which spans June through September, though it could land around just June or July.

Sarvesh Gupta

analyst
#104

All right, all right. Then second, sir, about what we discussed earlier regarding the term sheet. I believe previously you gave us the understanding that you'd want to issue those shares to a prospective strategic partner at the — with no premium, since this is more of a long-term strategic investment. But are we now seeking a premium to book value for this business, and is that why acceptance of the term sheet is being delayed?

P. P. Gupta

executive
#105

Ankit, would you mind taking that one?

Ankit Saraiya

executive
#106

We’ve had several quality partners come to us over time. And today it’s very hard to say there’s a premium <<inaudible>>, since that hinges on the whole structure and the potential opportunity we get from that strategic partnership. At this point, it’s a little too early to comment on it. But as I said, with time passing and development on the project decreasing, one can expect better than before.

Sarvesh Gupta

analyst
#107

Even so, our plan is still to divest a 51% stake or more in this project, correct?

Ankit Saraiya

executive
#108

Yes, definitely.

Sarvesh Gupta

analyst
#109

Thank you. That covers everything from my end.

Operator

operator
#110

I appreciate that.

Kamlesh Kotak

analyst
#111

Hi there. Guptaji, this is Kamlesh. I just have one question, and I wanted to get your take on it, sir — it's regarding the data center. Have we begun recording any revenue from that yet? I mean, on the execution side, the EPC portion?

P. P. Gupta

executive
#112

No, no, not yet. That's not reflected in our books, sir.

Kamlesh Kotak

analyst
#113

What amount of revenue do you expect the company to accrue from this first phase commissioning in terms of EPC revenue?

P. P. Gupta

executive
#114

The first phase should come in at roughly INR600 crores, plus or minus, and as far as possible we'd prefer to book that next year only going forward — but we'll take a call by March, February-March, depending on how it progresses.

Kamlesh Kotak

analyst
#115

Sure. All right, thanks. Yeah, I’m finished on my end. Pooja, go ahead and take over, please.

Operator

operator
#116

Thanks. <<operator_script>> Since no one else has questions, I'll turn the conference back to management for some closing remarks.

P. P. Gupta

executive
#117

Yes, thank you everyone for dialing in and for the thoughtful questions you brought to the discussion—we really appreciate it. Should anything else come to mind regarding how we performed or how we operate, please feel free to send an email to Vishal Jain at our office, who handles investor relations for us. And if you find yourself over this way, do stop by—we would be delighted to show you around our office and give you a sense of how we work. All I can say is that a great future lies ahead of us. In spite of every difficulty we have faced previously, what lies ahead looks very bright indeed. We clearly see growth momentum returning to this sector once more, along with all the multiples we lost over the last three, four years because of government sluggishness or COVID. All of that now sits behind us. With that sense of optimism, I would like to bring the conference to a close. Thank you all once again for joining. Have a good day.

Operator

operator
#118

<<operator_signoff>>

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Techno Electric & Engineering Company Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Techno Electric & Engineering Company Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Techno Electric & Engineering Company Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.