Techno Electric & Engineering Company Limited (TECHNOE) Earnings Call Transcript & Summary
May 31, 2023
Earnings Call Speaker Segments
Operator
operatorGood day, ladies and gentlemen, and welcome to the Q4 FY'23 earnings conference call for Techno Electric & Engineering Company Limited, hosted by Asian Market Securities Limited. On this call, we may make forward-looking statements regarding the company, and those are based on the beliefs, opinions and expectations of the company as of the date of this call. Such statements do not guarantee future performance and carry risks and uncertainties that are hard to predict. <<operator_script>> Please be aware that this conference is being recorded. I'll now turn the conference over to Mr. Kamlesh Kotak of Asian Market Securities Limited. Thank you. Sir, over to you.
Kamlesh Kotak
analystThanks, Ryan. Good afternoon, everyone. Asian Markets welcomes all of you to Techno Electric & Engineering Company Limited's 4Q FY'23 Earnings Conference Call. Joining us today are Mr. P. P. Gupta ji, our Chairman and Managing Director, and Mr. Ankit Saraiya, Director, representing the company. I'll now ask Shri. P.P. Gupta Ji to walk us through an overview of the quarterly and yearly results, after which we'll open the Q&A session. Over to you, Gupta ji. Thank you.
Padam Gupta
executiveYes, and thanks as always for the kind remarks. I hope you can hear me clearly, sir?
Operator
operatorCould you speak up a little?
Padam Gupta
executiveIs everything fine at this point?
Operator
operatorCorrect.
Padam Gupta
executiveThank you. Good afternoon to everyone. I should say good morning as well. And welcome, everyone, to our financial results for the quarter and full year ended 31st March 2023. Anything said on this call that reflects our outlook for the future or that could be construed as a forward-looking statement must be reviewed in conjunction with this industry or sector faces as much reflects on our company. Let me highlight our performance. Firstly, I would like to seek your apology as this year results are not very -- as simple as they have been in the past because basically, these results comprise 3 segments now; one is where EPC, second is Wind, discontinued business in the State of Tamil Nadu and the thirdly the upcoming subs or subsidiaries in form of data center and AMI works we are doing now. As all of you know, and we have been waiting for the last 3 to 4 years, we are happy to now acknowledge and bring to your knowledge the wind assets in Tamil Nadu stands sold, and we have parted with 105-megawatt capacity and accounted further out of 112-megawatt, the balance to another 4.2 megawatts and sold or 3.6 already stands sold in April and balance 4.2 is remaining due to land title challenges, we are trying to sort out fast.
Padam Gupta
executiveFor the company overall, revenue from the EPC segment comes to roughly INR 450 crores plus, and that figure covers carrying out the data center works along with the AMI sub at cost. Looking ahead, we anticipate a comparable amount of output in the quarters to come, though it could vary by about another 10% either way. Company EBITDA comes in at INR 38.78 crores. At the EPC segment, EBIT is INR 39 crores. As accounting codes require, we have taken the work done on the data center and the AMI at cost, and because of that the EBITDA margin may at first glance look somewhat low or misleading; however, when you set it against the third party billing, which is INR 312 crores in the consolidated accounts, the EBITDA margin works out to 12.5% plus. Other income is INR 22.14 crores, against INR 7 crore. Profit before tax from continued operations is INR 52.75 crores, while VAT from continued operations is INR 36 crores. The VAT came in lower than last year mainly on account of higher tax outflow expenses. And it was also because of increased deferred tax incidence.
Padam Gupta
executiveProfit from the discontinued business, which includes the capital gain on the sale of wind assets, comes to INR 56 crores. For the quarter, total profit is INR 92 crores, and EPS for this quarter by itself is roughly INR 8.55. Turning to the full-year results, revenue for the full year is at INR 66 crores, leaving out close to INR 80 crores tied to discontinued operations. Had that been included, it would have come to about INR 1050 crores. EPC revenue is INR 959 crores. Company EBITDA stands at INR 118 crores. The EPC segment's EBIT is INR 113 crores. EBIT margin for EPC comes to INR 13.78% on third-party business, once you exclude our in-house subsidiaries, which take in data center and AMI. Other income for the year is INR 74.30 crores, versus INR 150 crores a year earlier, since as you all know we exited one subsidiary that was developed jointly with KPTL at Kohima, and that brought us other income of roughly INR 100 crores, plus or minus. That Kohima profit, as it was partitioned last year, is under INR 10 crores. So profit before tax for the year is INR 175 crores, PAT for this year on a standalone basis is INR 128 crores, and profit from discontinued operations is INR 90 crores.
Padam Gupta
executiveCompany profit overall stands at INR 218 crores. EPS comes in at INR 20 plus. Investments in cash and cash equivalents are at an all-time high for the company, exceeding INR 1500 crores — that works out to INR 140 per share. This comes after a buyback of INR 70 crores and a dividend payout of INR 22 crores last year. We have also declared a dividend this year of INR 6 per share, meant to compensate for the buyback amount that went unutilized. For the current financial year, order intake has reached INR 3,300 crores, and our closing order book sits at INR 3,800 crores, an all-time high. We hold L1 status in INR 1,250 crores of business across transmission and AMI orders, and we are in active negotiation in the FGD business with private segments — private players whose numbers we cannot quantify at the moment. Still, we are hopeful of bagging at least no less than INR 4,000 crores of business during this year as well, on an ongoing basis, or more. The outlook, I would say, is extremely promising. The past legacy, or the bad patch of the last 3 years — the COVID impact — is all behind us; I will say 4 years rather, the election year and the year thereafter.
Padam Gupta
executiveAnd we're now in completely new business segments that look very, very promising. Beyond that, we believe there's significant growth ahead for the company. So whatever we've lost, and I've been saying this for the last 4 years — we'll be well positioned to make that up over the next 3 years. We believe the growth momentum has only just begun. Good morning has happened at the company, and it will carry on through financial years '24, '25, and '26. We expect bigger business coming out of our FGD segments, the AMI segment, and data centers. And in transmission as well, we see more high-end technological solution offerings going forward. Over the coming years, we see strong power sector reforms as power and energy converge. On top of that, there's a focus on stressing availability and reliability of power supply. And beyond that, our grid must be ready to accept renewable power injection of up to 30% over the next 5 years, versus the current 14%, 15% on these. While the focus will stay on renewable power and its related — its related infrastructure, but when I say related infrastructure of renewable power, the grid has to be strengthened strongly, either by backing it up with pumping storage solutions or through voltage source converter solutions, VSC solutions as we call them.
Padam Gupta
executiveAll of these are digital and ICD based. A robust distribution segment based on reforms will keep existing; the transmission infrastructure needed for 500 gigawatt by 2030 will stay in place. The FGD segment is performing very well, and we hope to secure at least INR 1,000 crores of business annually from it. We already hold business valued at INR 1450 crores, which will be executed during the current year. From our viewpoint, close to 100 gigawatt of thermal capacity has still to be ordered out by SCBs and the private sector mainly, implying a business scope of no less than INR 100,000 crores. On the transmission side, TBCB bidding for 50 gigawatt of renewable power out of 175 gigawatt is underway, and we are hopeful of our share of business, whether backed by power grid or private players; the inter-state transmission, ISTS of 13 gigawatt in Ladakh has been proposed with an investment of INR 207 billion, and we expect a major share here. We are already L1 in one package, which we are discussing in this region, and one is in execution. Total bids for transmission are expected to be around INR 40,000 crores, of which Techno expects to book orders worth, I will say, about INR 3,000 crores spread over 4 to 5 years.
Padam Gupta
executiveFor Techno in this segment, we aren't really seeing substantial growth. On the distribution side, though, we're seeing enormous growth with <<inaudible>> Package B being executed, and with AMI forming an integral piece of those solutions — plus the government has allocated INR 300,000 crore for spending across the coming 5 years — so we anticipate significant business growth in this segment going forward. We're already part of AMI, that business runs on a TOTEX model, and we're parking it in a subsidiary that will be hiked off to some strong investors down the road, just as we did with the transmission assets. We expect to land orders worth almost no less than INR 1,000 crores to INR 1,500 crores annually over the next 4, 5 years. So altogether, we'd like to do roughly INR 1,000 crores -- INR 10,000 crores of business in this segment. And we're already L1 in one package here, while one is in execution in the State of J&K at about 2.5 lakh meters. The Electricity Amendment Bill is already in place and gives consumers multiple type of empowerments. And we believe the government will walk the lateral edge spirit imbibed in these amendments.
Padam Gupta
executiveIt ought to give equal, non-discriminatory access both to generators of power and to consumers. It should also make it easier for consumers to choose their power supplier. And it should also introduce competition that brings tariffs down going forward, so that the gap between what very generated power costs and what newly added power costs gets adjusted. We are hopeful about good days ahead for this sector, since it stands at a very critical juncture, and going forward, something good ought to happen on this front. As a generator, we have made a complete exit from the State of Tamil Nadu. Of this, we sold off 108.9 megawatts out of 111.90 megawatt, which leaves us with just 2 machines of 1.5 megawatt each. This has added roughly INR 425 crores of cash to our balance sheet. In data center, COVID — as I already said, COVID has touched our life in multiple ways, but the positive outcome is digitization. It is growing multiply in the country. With growth in the digital space backed by trust in data protection, the third-party data center industry is expected to grow significantly, from the current level of 500 megawatt to 2 gigawatts in next 3 years.
Padam Gupta
executiveAt that point I ask Ankit to take over all of this — data center development, the market, and what the prospects look like for Techno.
Ankit Saraiya
executiveRight, of course. So up to now, most data centers have been situated in Mumbai and Chennai. We chose to participate in the Chennai market ourselves. And in Chennai, we picked Siruseri as our site. We were among the earliest movers to seize the Siruseri market in Chennai. Although just 2 data centers existed ahead of us — those being from Airtel and Adani — and then, following our acquisition and our development, we've witnessed Equinix, Sify, <<inaudible>> enter, to name a few. So that has given further validation to our site selection, and location matters enormously and is critical where data centers are concerned, since they must sit <<inaudible>> infrastructure so they're well connected to the cable landing stations or to the fiber network deployed domestically within the country. Having so many data centers surrounding us lets us connect into the ecosystem and has given further validation to our choice. -- <<inaudible>> the data center of 24 megawatt IT load, because we hold control over cost, quality and the project timeline through our OPPC capabilities; nearly 60% to 70% of the CapEx in the data center goes toward electromechanical works, and with Techno's inhouse capabilities to deliver high-quality electromechanical works, we can exercise greater control over the project's time -- schedule, the quality and the costs, and that in itself would be extremely advantageous to us.
Ankit Saraiya
executiveAnd the industry has begun to recognize, slowly but steadily, what Techno can offer them. We've essentially finished — you could say 50% — of ordering for our long-needed equipment, and we expect deliveries to begin in July. On the civil side, ordering is 100% done, and we've finished casting through the third floor of the building. The whole building has 4 floors, so just 1 floor remains, and we're hopeful that we can wrap up casting on that final floor by July as well. That means mechanical work gets underway starting in July. Then, 3 months later, we should have the full project — or nearly so — ready for testing, commissioning and operations. Ideally, we're aiming to build a couple of additional data centers around the country. We've shortlisted a couple of other cities for projects of a similar size; one of them is Kolkata, while the other is still being discussed — though it's at an advanced stage, so we'll be able to talk about it during the <<inaudible>> — and we remain in active talks with a few potential strategic partners.
Ankit Saraiya
executiveAt the same time, though, some quite encouraging things have happened — where we have <<inaudible>> we've begun talking to end customers both indirectly and directly. And we could potentially be in a spot where we lease that space in the data centers ourselves, while we keep looking for strategic <<inaudible>> — we're still in talks with them. When the moment is right, we'll be able to bring a partner in to lower our exposure. The Chennai project's CapEx comes to roughly INR 1,400 crores, which works out to about INR 45 crores for each megawatt. And we remain hopeful that we can finish the project in the <<inaudible>>.
Padam Gupta
executiveAnkit, is that everything you wanted to say?
Ankit Saraiya
executiveYes.
Padam Gupta
executiveAppreciate it.
Ankit Saraiya
executiveYes. Thank you. And I’ll just add here that India’s national payment centers, which serve UPI and other applications, sit very near our data center — which also brings additional value to the very location or pocket where we are. Against that backdrop, I’ll now invite members to take part so we can clarify any further details or prospects.
Operator
operator<<operator_script>> The initial question is from Gunjan Kabra, who is on the line representing Nuvashare.
Gunjan Kabra
analystSir, I’m somewhat new to the company, and I have a few questions about the business model. First, on results, there’s a gap between consolidated and standalone numbers, since standalone is higher than consolidated. Is that due to the data center EPC, or how is revenue recognition handled? And going forward, how do we plan to recognize this revenue, because there is some loss and unallocable cost with segment as well. So I wanted to understand why such a discrepancy exists between standalone and consolidated?
Padam Gupta
executiveAs I believe all of you are aware, consolidating the accounts is mandated under the Accounting Standards and SEBI norms. When it comes to work carried out for wholly-owned subsidiaries of your own, such as the data center or AMI, the costs incurred on those projects must be reflected in the stand-alone accounts. However, those costs are largely recognized at cost until a significant stage has been reached. Beyond that point, in the very project, a profit margin can be added, yet it doesn't make much business sense to pay out additional taxes just to show that — and our preference is to capitalize this work performed in our subsidiaries once visibility on OpEx or operating revenue is near. So this is a better approach to managing your — an efficient approach to managing your cash, and consolidation is a requirement.
Analyst
analystSo actually, I was just thinking — since the stand-alone sales come in above the consol sales, that's the reason I was asking, okay.
Padam Gupta
executiveThey're always going to be there, mam, because for as long as you're working and handling certain assignments for the subsidiaries, whatever output that work produces will show up in the stand-alone figures but not in consolidated. They'll appear — separately — within the subsidiary accounts that get prepared for each company.
Analyst
analystAlright. Sir, one more thing — where exactly do we stand in the data center sector, even though it's still quite a new and fast-expanding industry at the moment. So when it comes to how competitive we are, where do we sit, since there are a fair number of rivals out there who are also building — who are following the same model as well. So where do we stand when it comes to firming, and at what cost? What does that come to for us? And how does the rental model play out going forward? And are we — I mean, looking ahead, are we planning, and how will this model function down the line — that's what I was hoping to get a sense of, in terms of revenue and profits?
Padam Gupta
executiveSo, Ankit, would you like to take that one?
Ankit Saraiya
executiveYes. Yes, I'll accept that. As you correctly pointed out, the data center sector remains very, very young and is still developing. The — there are extremely few businesses that could be regarded as mature within the data center sector, yet even those have only existed for the past 10 to 15 years, and at most 2 or 3 of them can be counted. The market will always be competitive whenever there is — we will continue to see more and more competition, obviously, since a demand-supply gap exists. Currently, just to provide some broad figures, where supply stands at roughly 650-odd megawatts, the industry's anticipated demand comes to approximately 1,100 to 1,200 megawatts. So there is nearly a 100% gap right here. And as long as this gap persists, we will keep hearing about more and more participants entering the industry. But given that this is a very high CapEx industry and demands specialized skillsets to serve as a data center operator <<inaudible>> as much as we observe across the industry, we won't be seeing deliveries occurring on the ground. And for a company such as Techno Electric, we are not attempting to compete with established data center operators.
Ankit Saraiya
executiveThere's no need for us to go head-to-head with them unless and until we've managed to develop those operational capabilities, and we're working on that in parallel. But until then, we'll be the ones capable of tackling the challenges the industry broadly faces, like procuring power and locating quality EPC contractors. And on top of that, delivering a quality project to the end consumers, because even now, it's only recently that high-quality projects have begun to be delivered. Up to now, the sort of skillset needed to deliver high-quality projects simply wasn't available. But slowly and steadily, the industry is maturing toward it, and customers have started pressing operators to deliver better and more reliable solutions. So that's how the industry stands. And we recognize that today, Techno may not directly want to assume any kind of business risk from a data center that's going into the market to lease the space. We'd prefer to first try to find a strategic partner and investor who can assist us in building those relationships with the customers who will ultimately lease out the sale and, in a sense, derisk Techno from those business risks. And Techno would like to play to its strength, which is EPC and power, because power is the raw material for any data center, at least today.
Ankit Saraiya
executiveWe’ll keep building on what we do best while looking for a partner who can reduce the risk we carry in the business—risks that inevitably arise. That’s the approach we want to follow until we’ve built our own operating model, which could take another 2 years.
Analyst
analystSir, when do you expect it to become operational — I mean, when will operations begin, when will rental income from the data centers start? Is it in FY '25 that you'll see revenue coming in from that?
Padam Gupta
executiveSure, I'm happy to.
Analyst
analystRight. And sir, you mentioned the INR 3,800 crores order book as well, which we closed on March 31. So I wanted to get a sense of how much of that we'll be able to execute this year. I mean, FGD, for instance, takes 2 to 3 years to execute. So for the total order book, at what stage are we in terms of execution, if you could tell us that? And on the smart meter side too, if you could explain what the order execution cycle looks like?
Padam Gupta
executiveMam, I would say that our office visit was the first one, number 1. But to address your question specifically..
Analyst
analystSir, I'd really like to come by your office...
Padam Gupta
executiveYes, you're welcome, and we'd be glad to have you with us. So first, the FGD order has been around for close to a year now, and the time to execute it has arrived. During last year, we didn't book any output from that work, even though we received that order around June or July of last year. Now, this year it's ready, and we expect at least 50% of the work to be finished this year, with the other 50% next year. You're absolutely right that this is a job of no less than 2 to 3 years. When it comes to AMI, that's a very fast-track job. The current 2.5 lakh meter job we're handling runs on just a 12-month execution cycle, and that has already begun. Of the 2.5 lakh, we've already supplied 1 lakh meters. We've installed roughly 15,000, 16,000 meters so far, and we need to wrap up this work no later than December this year. So all of the present AMI order in hand will be finished within this year.
Analyst
analystAll right, understood. I’ll rejoin the queue, and best of luck.
Padam Gupta
executiveThanks.
Operator
operatorThe next question is from Sandeep Tulsiyan, who is on the line from JM Financial.
Sandeep Tulsiyan
analystunintelligible Hope you're doing well.
Padam Gupta
executiveThe future is right now, sir. It's underway at this moment. We're on the bus.
Sandeep Tulsiyan
analystSir, I’ve got a couple of questions. First, in the way this whole reporting is presented, EPC margins are recorded at INR 39 crores. And beyond that, we’ve recorded other income of INR 23 crores. Yet owing to some loss, the total EBIT we’ve reported comes to only about INR 24 crores. So this arithmetic isn’t clear to me—if you could break it down, that would be great, sir.
Padam Gupta
executiveYou're directing that question to the wrong person, Sandeep. I believe we've brought a grand <<inaudible>> on board that matches what you're asking for. Our aim is to be the very best in accounting. And results from just 1 quarter will always wobble a bit here and there, since discontinued business, sub business, and third-party business each get classified in different ways. But when you view things on an annual basis, a lot of mud has now been cleared out of the company. We're now in good shape — I keep telling people that a good morning has arrived, and we need to look toward the bright sun ahead, and the company has to grow at no less than 30%, 40% a year from here. That way, over the next 3 years, we will have doubled the top line and at least doubled PAT. That's the mission we're on, sir. And if you need any specific details, you're welcome to come to my office and sit down with my accountants. They'll take care of it. No issue.
Executive
executiveLet me finish up, Sandeep, if I may put it that way. My bookkeeping begins with cash and finishes with cash. Yet my accountant informs me that Gupta Ji's method doesn't work on a cash basis — it runs on the mercantile system. There's a massive gap between how they view accounting and how I view this business. I remain convinced that EPC work ought to rest purely on cash and cash flows: what I've brought in as cash, what I've laid out as cash, and what I've handed over as cash. That's how I live, and I've made it work successfully. And I believe I'm no worse than anyone else. I'll leave that verdict to you — we have earned cash in this business. We're sitting on INR 1,500 crores of cash. All taxes have been paid. All buybacks and dividends totaling INR 1,000 crores over the last 10 years have been paid out. So we are a cash-positive, cash-generating company. That's the whole of what I understand as a business; the rest is just accounting figures.
Sandeep Tulsiyan
analystSir, should we simply add up these figures — it looks like something around INR 35-odd crores...
Executive
executiveDiscontinued operations usually need to be accounted for, and then second, taxes go out more heavily. Because of the wind assets, the capital gain tax by itself has taken away INR 55 crores. We have paid out tax this year of INR 110 crores, an all-time high, which I think was never more than...
Sandeep Tulsiyan
analystRight, the discontinued piece makes sense to me. What I was really asking about is EBIT before that whole tax outflow and before continued operations, since our corporate segment is posting a loss — an EBIT loss of INR 14 crores against the INR 22 crores of income we recorded. So it looks as though that INR 36 crores is essentially a write-off we've taken on an account?
Executive
executiveThey might have offset some deferred tax in a few places — that's just how it works — and you're welcome to stop by the office and...
Sandeep Tulsiyan
analystYeah. I figure we’ll link up on that one separately...
Executive
executiveAll told, we come out at a positive INR 218 crores net of taxes. To us, that matters more, and the whole amount is in cash.
Sandeep Tulsiyan
analystRegarding your second question, sir, which concerned the data center segment: during this quarter we have booked INR 150 crores of top line. And I believe the initial guidance you provided was that roughly 60% of this INR 45 crores ought to be EPC work. So, if you could quantify the total EPC order execution we will carry out across the next 2 quarters, where we expect to complete this — what would that size be about? Should it be INR 800 crores, INR 850 crores, or will it be larger than that?
Executive
executiveThe Phase 1 order, if I'm not mistaken, comes to roughly INR 540 crores for us. That's what Phase 1 of this amounts to. Up to now, we've spent — not invoiced, rather spent — around INR 120 crores, and the remainder, you could say roughly another INR 200 crores or INR 250 crores, will fall in the next 2 quarters, with the rest coming in the third quarter — a further INR 150 crores.
Sandeep Tulsiyan
analystUnderstood. So the cost portion comes next, and Phase 2 follows that — and that's included in the overall INR 45 crore project, correct?
Padam Gupta
executiveRight — at this point we’re only working on Phase 1, which Ankit mentioned should be ready by October.
Sandeep Tulsiyan
analystGot it. And sir, one question concerns these sticky receivables from the Afghanistan project — Bengal, from execution done <<inaudible>>, INR 80 crores receivable. Sir, what's your full outlook on this? How soon could you realize this total INR 150 crore, INR 160 crores of receivables that are sticky? Over what time period is the company able to realize this?
Padam Gupta
executiveMy belief is that it shouldn't take longer than 1 year at the outside, since we're currently in a closeout frame of mind and will commit every resource and lever we can. Working with Discoms has always been a headache. If matters were as our Central Government leads us to believe, there would be no reason to worry about exiting here. The real difficulty in exiting stems from the fact that we don't carry out what we claim. Our actions don't match our intentions. That is <<inaudible>> in my life. So -- but take it as 1 year; the cleanest response to your question is 1 year, and everything will be wound down. Actually, we need to recover considerably more, Sir. We don't wish to place it in <<inaudible>>. We'll recognize it on a cash basis whenever it comes in.
Sandeep Tulsiyan
analystGot it. And sir, my next question concerns this AMI business. On earlier calls, you mentioned that as execution gets nearer, you'd be able to share more detail on the business model. Could you walk us through it briefly — how revenue bookings will work and what the typical cost margins in that segment would be? Specifically, what the P&L of this entity, Techno AMI, will look like. A broader picture of the business model would be helpful.
Padam Gupta
executiveSandeep, I believe I’ll be in a better position to walk you through this when we report the June quarter results. As I mentioned, they are likely to apply an accounting process known as HAM, which was used in I-base and will function as a comparable accounting model here. That said, we will be somewhat more — innovative, given our level of comfort with the lending bodies. Looking ahead, we’ll assess how, beyond these receivables, we can win some of them.
Sandeep Tulsiyan
analystAll right, that makes sense. I get it. So we'll likely follow up on that during the quarter after this one. And finally, just to reconfirm the wind assets that we hold. Right now we have about 6 megawatts in Andhra Pradesh and roughly 3 megawatts — 3.5 megawatts — in Tamil Nadu. So once this whole transaction wraps up, 9.5 megawatts will remain, correct?
Executive
executiveNo, sir. In Karnataka we have 18 megawatts remaining, and in Tamil Nadu another 3.3 megawatts are left. We never held any asset in Andhra. So at present we have 21 megawatts with us; 3 megawatts of volume we couldn't execute owing to the lag issues. Digitization can sometimes be a blessing and <<inaudible>> both. That much you can see. So all of that data is digitized now, and multiple people have registered the same land parcel on which our windmills are located, although we have assurance <<inaudible>> the ultimate challenge that it belongs to them. But we will be able to unlock it, sir. There was a company in Chandigarh called <<inaudible>>, which made some kind of teak farming claims and collected a lot of money from investors. SEBI came down on them. There was a Lodha committee and whatnot. It was a mix of every type of scam, as you may know. So we have to go through all the processes to unlock that land parcel from there, sir. But we will be able to do it.
Sandeep Tulsiyan
analystAll 21 megawatts will be sold — or we'll keep some for our own internal use <<inaudible>>.
Padam Gupta
executiveNo, nothing is being set aside for consumption at this point, sir, since a great deal of policy change has taken place. With the recent amendment to the Electricity Act, renewable power now already has open assets over conventional power. So purchasing power through open assets, with ISTS charges absent, makes that power more competitive to buy out than to generate on your own. So these regimes shift every month, Sandeep, and we need to keep pace on that regulatory front. This is a highly regulated business. The government is eager to promote this business in India and to decarbonize India. So all these kinds of facilitations will keep coming. Just yesterday, a notification came from CRC that for our next 25 years ISTS charges are waived for generators.
Sandeep Tulsiyan
analystVery well, sir. Wishing you the best.
Operator
operatorThanks -- the next question is from Sarvesh Gupta at Maximal Capital.
Sarvesh Gupta
analystSir, my first question concerns the revenue guidance for this fiscal year. So this year, even though we have an order book of nearly INR 3,000 crores to INR 4,000 crores, overall EPC execution excluding the data center has been only about INR 830 crores. So it has come in much lower than last year as well. But looking ahead, if you could just help us understand how execution can go on the INR 4,000 crore order book that we hold, data center excluded, sir, that would be helpful.
Padam Gupta
executiveTo keep it minimal — and we're being quite conservative here — you could put it at roughly INR 300 crores, plus or minus, for third-party business beyond our own works that would be carried out for data center and AMI.
Sarvesh Gupta
analystRight, so that comes to INR 1,300 crores. And then, as you were saying, of the INR 540 crores for the data center, I think INR 130 crores — we've already completed INR 140 crores. So will another INR 400 come from the data center?
Padam Gupta
executiveCorrect. That should bring in another INR 350 crores.
Sarvesh Gupta
analystAnd regarding this INR 1,300 crores, sir, how do we expect the margins to play out for this financial year?
Padam Gupta
executiveI'll keep guidance at 12% plus for this year as well, though I'm quite hopeful it should come in a bit better—perhaps not quarter-on-quarter, but right now prices are easing because of the China backlog. Even steel prices have come down by INR 3, INR 4 over the past 1 month. That's a very positive sign. So with commodity prices easing and inflation declining, we're quite hopeful it should be somewhat better than just 12%.
Sarvesh Gupta
analystOn that previous call, we mentioned roughly 14.5% for the EPC side. So is our guidance pointing to a somewhat lower margin this year?
Padam Gupta
executiveI'm not claiming it will be lower or higher, sir. What matters here is that the interactive portion varies greatly from one job to another. In the end, 12% could turn into 14%, since when we gave guidance of 14% last year, we had those sorts of provisos in our contracts available on top of that. As things stand, under the TBCB model, the order is essentially struck at a future price with the developers. So should the commodity cycle stay soft, that can only help. Still, I have to give you a figure I can't go back on — as you saw last year as well, we are at almost 14%, which I told you was the average for the year. Yet quarter by quarter, it has been easing somewhat; last quarter, for instance, now stands at 12% or 12.5%. So in the same way, take 12.5%; somewhere between 12.5% and 13% should be safe enough.
Sarvesh Gupta
analystGot it. And regarding this INR 400 crore — sorry, this INR 540 crore data center project — in the current quarter we haven't recorded any margin at all, so that figure stands at 0. So looking ahead, when the milestones arrive, what's the approach for recognizing profit on this?
Padam Gupta
executiveThis will follow the accounting standard, sir. We’re not able to apply our own way of thinking here. I’m not certain how margins are handled. If it qualifies, then it will be taken. If not, it will be zero only — it will be cost-to-cost.
Sarvesh Gupta
analystSo even once Phase I is finished, there's still a...
Padam Gupta
executiveSo look — once you’re done, COD has taken place (it’s capitalized in the subsidiary, and it’s no longer work-in-progress), after that comes a final billing, and then it’s a close-out. COD has occurred. When the entire contract has been executed, margin comes through. I don’t doubt that. But as for exactly when it becomes eligible for margin, step by step, I’ll need to get guidance from my accountants.
Sarvesh Gupta
analystGot it, sir. And last thing, sir, regarding the order book. Right now we're sitting at INR 4,000, INR 3,800-odd crores. And did I catch that right when you mentioned that versus INR 3,300 crores of order flow in FY '23, you're looking at roughly INR 4,000 crores of order flow in FY '24? And how would that split up, sir, across the different segments, and particularly if you could flag the L1 as well, that INR 1,250 crores — where does that sit?
Padam Gupta
executiveFirst, as I mentioned, <<inaudible>> we're L1, having started out in the transmission asset business, and the other one is in AMI. Those are the 2 areas where we hold L1, and we're also heavily involved in FGD with a private developer whose name I'm not able to reveal right now. So without question, we're aiming for a year-end order close of no fewer than 6 projects a year by the end of '24.
Sarvesh Gupta
analystSo INR 3,800 crores, plus another INR 4,000 crores this year, and then reduced by roughly INR 1,300 crores from this year?
Padam Gupta
executiveThat figure is INR 1,800 crores, which takes in the data center, AMI, and third-party business. So with INR 1,800 crores, you're able to subtract that from <<inaudible>>.
Operator
operatorMohit Kumar from ICICI Securities has the next question.
Mohit Kumar
analystI'll start with a question about the pipeline of inquiries on the transmission side. Is there anything you're seeing — I realize the bidding pipeline is quite large. Could you comment on that?
Padam Gupta
executiveLook, I’d say the pipeline is <<inaudible>>, though not the value in transmission assets, since those are mostly confined to 2 states right now — Rajasthan and Gujarat. That’s where the bulk of projects are taking place today. And it’s already quite densely packed with transmission assets, yet we still see substantial room in the intrastate business when it comes to augmenting their own capabilities and capacities. Beyond that, the grid requires technological upgrades for injecting more renewable power relative to conventional power. We’re already at roughly 12%, 15%, which needs to rise to 25% to 30% over the coming 4, 5 years. So that will pose a great deal of challenge to the grid, which has to be supported by many new technology solutions as well as pumped storage backups or gas-based stations. <<inaudible>> ongoing technological innovation, but we, at this time, are approaching this sector somewhat conservatively at least for this year.
Mohit Kumar
analystMy second question concerns intrastate. Do you see — is there reasonable hope on your side that intrastate transmission activity will pick up over the medium term? And would that open up an opportunity set for us?
Padam Gupta
executiveSure, if there's an opportunity, it's there for us, sir. Whether it's <<inaudible>> or private, that isn't a problem. What matters is whether that opportunity is actually materializing properly and at the right moment, and the government keeps delaying the biddings again and again — that's the first thing. The situation on the ground differs somewhat from what you're seeing in the media or what the minister says, that's my takeaway. Because they still can't sign, since the counterparties <<inaudible>> are piling up daily. So the challenges in these sectors are growing too, sir, because as I've told you consistently, what this sector needs is market reforms, not regulatory reforms. And regulatory reforms won't get us anywhere in this sector. With 20 years of the electricity act, what has happened to the consumer when you generate electricity at INR 3 — you tell me. And at your house, it arrives at INR 10, and you're still making a loss, sir. And that DISCOM is making a loss. At the end of the day, how do you define the balance sheet of DISCOMs through reforms in this sector? So all of these are cosmetic progress, I'd say. So we're all happily going along with it.
Padam Gupta
executiveHowever, should this sector be left to market forces like aviation and telecom — that <<inaudible>> — you can see the sort of changes that occur. Things would look completely different, sir.
Mohit Kumar
analystSir, my third question concerns the data center — naturally, we're expanding our own. Is there a quicker route by which we could take part in, or construct, a data center on behalf of a third party?
Padam Gupta
executiveThat's exactly right — 100%.
Mohit Kumar
analystSo, what can we do, sir? <<inaudible>> let's say <<inaudible>> regarding what we have -- what's the scope we're working with?
Padam Gupta
executiveAnkit, would you mind tackling this question?
Mohit Kumar
analystOn the data center cost, how do you split that among the different parts and the latest of the scope — where is it you can work?
Padam Gupta
executiveYes, the scope will mostly sit in electromechanical and multilayered power supply solutions, sir, and that will belong to Techno. A data center is defined in terms of megawatt, number one. So — and it needs to have reliability of power supply. So there are multilayered power supply solutions around it. Two grids and 2 backups, then N+1 in backups, then you need plenty of renewable power storage solutions, if you can afford it going forward, that will be a way of life, then every kind of electromechanical solution from medium voltage to Dishy voltage, they will be digitally part of the solution. So then safety solutions around it. Security surveillance around it. So these are highly secured, reliable 99.99% available installations. They're not like power stations, which are configured around availability only. They should not have latencies, that's a very big thing. You have to have an internet exchange very close by to your data center to avoid latency, which we often experience in our line. So OTT is growing, apps are growing, e-commerce is growing. So this has quality demand of data center and cloud services are growing. So all this will mean a lot more use on data centers.
Mohit Kumar
analystSir, my final question — apologies, I skipped this earlier — but have you finalized the agreement with the client to lease out our data center? And what utilization level do you anticipate reaching in, say, 2 to 3 years?
Padam Gupta
executiveAnkit, would you mind taking this one?
Ankit Saraiya
executiveYes. So, as I mentioned when the call began—at the start of the call, we laid out where things stood at that moment. We're still in talks with a few <<inaudible>> that we're hoping to connect with customers or a client directly for this project, since we don't possess the kinds of skill sets needed to run a project in a way that would satisfy a client. Instead, we'd rather bring a partner on board who can assist us in operating these projects and who can help us lease out the facility or the space we have available in the data center to those particular end customers. So we're trying to derisk ourselves from those parts of the business that we aren't fully familiar with or aren't yet comfortable with. So the entire customer-side piece will be handled by the partner we ultimately select for the project. As for Techno, we'll keep focusing on what we're very strong at, which is making sure the project receives reliable power and that it's built to the best possible specifications for the end customers.
Mohit Kumar
analystGot it. Is it reasonable to think that you guys will be wrapping things up over the next 2 months?
Ankit Saraiya
executiveI'd rather not give a timeline, since <<inaudible>> hasn't been added for the last 2 years — or, put it this way, the past 1.5 years. Still, as the project moves forward, the quality of interest and the terms are both improving. So perhaps once we get closer to starting the project, I'm more hopeful that we'll have a <<inaudible>> position on the table that we can finally accept and move ahead with.
Operator
operatorThe next question we have is from Chirag Shah at ICICI Direct.
Chirag Shah
analystJust to clarify one thing: when you said you're guiding toward INR 1,800 crores in stand-alone revenues, do the margins you cited — 12% — include the margin on the revenue booked at both subsidiaries, AMI and the data center, right?
Padam Gupta
executiveNope. There's no margin on it — we're selling it at cost.
Chirag Shah
analystBut, sir, from what you said, my understanding is that if the entire order gets booked in FY '24, then once that order wraps up, you'll record some margins, correct? So that...
Padam Gupta
executiveYeah, definitely. That’s going to be included in the bottom line. For sure, by the end of ’24. You’re right about that.
Chirag Shah
analystAll right, then, sir — in that scenario, what would our margins look like if I just consider the stand-alone piece by itself?
Padam Gupta
executiveOkay, so in that case I won't claim the overall margin stays at 12.5% to 13%. There's no way I'm going to sacrifice profit at my subsidiary. But the revenue base that qualifies for margin will get bigger — that's the only point I'm making. Everyone has <<inaudible>>. Right now, the margin I'm referring to applies to third-party business, per accounting norms. On a consolidated basis, that picture will look better. However, once my own subsidiary's business qualifies for profit booking in the top line, the margin percentage stays the same, yet the revenue base eligible for margin increases.
Chirag Shah
analystThe reason I asked is this: going forward, if someone takes on a third-party data center execution project, what kind of margins can one expect <<inaudible>>? That was really what I was trying to get at.
Padam Gupta
executiveYou can count on roughly 15%, sir—easily, and possibly 20%.
Chirag Shah
analystAnd, sir, my second question focuses more on the FGD side of the business, since from what you said, your commentary suggests you're quite <<inaudible>> about that segment. But speaking personally about the market, a few of your competitors are saying that the FGD market is slowing down. And if you look at NTPC, its FGD ordering is almost done. So where is the scope, or where is the opportunity that you're looking at?
Padam Gupta
executiveYou're absolutely right, sir—the government has set a deadline for everyone to complete this work, and NTPC has more or less finished its assignment. However, states and private players are still lagging behind. They typically have a backlog on their side. Roughly 100 gigawatts still need to be equipped with NOx and SOx solutions. You're right about that. So now is the moment to address the market emerging from captive power, private players, and BSV State Electricity Boards. There's also something to do with the ICBs, and CPSUs like DVC as well. They have only just now come out with a tender at one of their units. Now they're further expanding capacity in the thermal world, which the government recently approved to the tune of about 25 gigawatts. Those projects will additionally be retrofitted with these solutions. So a market exists for the next 4, 5 years. Yes, there's a bit of a slow start, because the government has already granted them a time extension up to '27.
Operator
operatorDhavan Shah from AlfAccurate Advisors has the next question on the line.
Dhavan Shah
analystI'd like to get more detail on the order book side. We closed with an order book of roughly INR 3,800 crores. Could you break that down across generation, transmission, and distribution — what does your closing order book look like for those 3 segments, those subsegments?
Padam Gupta
executiveYeah, INR 1,500 crores sits in generation, with FGD counted as part of generation, and roughly INR 1,000 CR more is in transmission, while around INR 300 CR is in AMI, and then our data center order comes to about INR 400 CR or INR 425 CR. As for the AMI business serving our own TOTEX market, that's approximately — you could say — INR 250 CR.
Dhavan Shah
analystRight. Right. And you said that around 50% of the FGD contract work is done at this point. And the — I believe that 50% execution would wrap up this year, with the remainder falling into next year. So on the transmission side, I think the execution cycle would run 4 to 5 years, correct? So factoring in all of that, you said we'll land at revenue of roughly INR 1,300-odd crores for this fiscal — that's what was stated, right, excluding data center?
Padam Gupta
executiveWhat we've — I never said that, actually. Renewable power generation now begins inside a year, sir. Gone are the days of 3, 4 years or 4, 5 years. First, the transmission system must be ready within 1 year. Second, I noted that FGD does take 2 to 3 years, but that order is 1 year old and we have not booked any revenue on it so far. So this year — the second year — will be the first year of revenue booking, ending within the next year, the third year — that will be the third year of the order and '24, '25 of the company. That is what I was explaining. And I also said the metering order we hold today needs only to be finished within 12 months. But under the government scheme now, they generally allow us roughly 27 months in <<inaudible>> for schemes in new metering solutions. The old work I am doing for 2.5 lakh meters is to be finished in 12 months, that is by March '24. So all of this will be executed this year.
Dhavan Shah
analystAnd on margins, could you break out the subsegment margins for us — how do margins compare between FGD, transmission, and data center? Should we be assuming that 12% average, or does it differ across those 3, 4 subsegments?
Padam Gupta
executiveTypically, you could easily take 12% to 12.5%, though those are spread out unevenly. Transmission sits at 10%, FGD at 15%, and AMI adds another 13%, 14%. So roughly speaking, it averages out to around 13% plus or minus.
Operator
operatorThe next person to ask something is Shreyansh Gattani from SG Securities.
Analyst
analystMy question is about the data center, basically. What I'd like to understand is whether the partner is simply waiting for Techno to show certain capabilities when it comes to building the data center, and that's the reason things are getting delayed and the terms are, as you said, improving — or why wouldn't the contract be signed today and instead happen at a later point? And also, regarding the clients you're speaking with, as you mentioned — I believe over the last 2 or 3 con calls there's been a term sheet and going back and forth — so are these the same people you're talking to? Or are there different people involved when it comes to the partners you're considering?
Padam Gupta
executiveAnkit, would you mind laying out the response for us?
Ankit Saraiya
executiveYes, I’ll take that one. Essentially, the point we’re making is that each project has a cycle of its own. And at this point today, it sits somewhere where the bulk of development risk is now behind us. If you’re looking for a partner right at the concept stage, when it’s just a barren line, it is extremely, extremely blank. It’s essentially both developers coming in together, establishing a project, and sharing the development risk equally. <<inaudible>> to that extent, more development risk is moving behind us. And because of that, what you expect as a reward keeps shifting, and the way the market views the project shifts as well. Second, industry timelines—sometimes that actually works in your favor because <<inaudible>>.
Analyst
analystSir, your voice is cutting out. Hello?
Ankit Saraiya
executiveCan you hear me?
Analyst
analystYeah, yeah.
Ankit Saraiya
executiveWhat I'm getting at is that industry conditions shift over time, obviously. And right now, we're in a spot where -- look, for 2024, there's going to be almost no data center space left in the Chennai market. This is likely to be the sole project on offer with that kind of capacity. So the majority of customers ought to favor this project. And the edge we'd hold relative to the industry would be considerably stronger. A lot of projects that were slated for execution or completion in 2024 have, for evident reasons, slipped into 2025, which hands Techno a greater advantage within the industry. Third, sourcing power is always a major hurdle, particularly in a state such as Tamil Nadu. And somehow Techno's experience has been instrumental in helping us lock down the power needed for the project, something quite distinctive versus other projects. While some are battling just to get power secured, we already have that security in hand. So as we move forward, we're resolving certain challenges. And that is boosting the project's prospects and the -- you could say the valuations one is able to command with the partner. And the partner's quality shifts as well, because when you first talked with them, they too can see that the project sits at a fairly decent stage.
Ankit Saraiya
executiveCapital deployment still has room, as does the project’s availability in the market. Those conversations therefore need time to mature, but with civil works nearing completion and commissioning approaching—and with those development risks now behind us—more serious talks have begun to take place. It is simply a question of timing before we conclude that these are the terms and the valuation at which we are now comfortable closing.
Analyst
analystUnderstood. So you mentioned an IRR of roughly 18% for this. I believe that came up on the September conference call last year. Given that you're now seeking better terms, should we expect something above that level, or does it stay the same?
Ankit Saraiya
executiveUltimately, IRRs really come down to how much risk we’re prepared to keep on our books. The more revenue risk we’re ready to accept, the better the returns clearly become for us—but that also means Techno takes on more exposure. So the final decision will rest on what level of revenue risk Techno is prepared to accept. In the end, IRRs hinge on what kind of—if we don’t want to carry the project’s leasing risk and want it 100% borne by the strategic partner, the IRRs would clearly be very different from a scenario where we’re prepared to put the lease risk on our own table.
Analyst
analystUnderstood. And is it still the same set of partners we’re discussing, or have more partners joined, or have some of those partners changed, or…
Ankit Saraiya
executiveRight now, we are talking with 3 partners.
Padam Gupta
executiveLet me just add this for everyone, sir: any assets we built a decade ago, or 5 years ago, or those we're building today, we've consistently had a huge gain and never taken a haircut — whether that's transmission assets, wind power, or going forward our own AMI assets. We're quite certain we grasp the quality and the life cycle of an asset in terms of performance in this business. That's the biggest photo we have. We aren't commercially scaling up or creating some issues in order to be party <<inaudible>> to third-party at some margin. If the market supports me, I make a gain; if it doesn't, I take a haircut — that isn't Techno's business, sir. My business is to excel, first technically and then financially. So finance has always followed me — my excellence in the technical application of the solutions, more than the other way around. So finance isn't a criterion when we work on a project. But it matters, and we've always been positive on it, and benefited from it.
Operator
operatorSince no one else has anything to ask, I'd like at this point to turn the conference back to management so they can offer some closing remarks.
Padam Gupta
executiveI want to thank each of you for attending our investor conference and for posing such very, very thought-provoking questions, and you're invited to come by our office. Let me just say that with 4 years having passed, and with business flat through all those years, that period now lies behind us. A new dawn has come for the company. And we stand on a strong footing to expand over the coming 3 years. You'll see our top line and our bottom line double within the next 3 to 4 years. And we'll be creating more modern technology-driven solutions, whether in data centers, transmission, AMI, and everything else of that kind. We're very excited about our tomorrow today, I'd say. With that, I'd like to thank all of you for attending the conference, and if any question remains regarding our future technology journey or our performance, please send us an email. Should you be on this side of the city or in Delhi, we now have a large-size office that Ankit has added in Delhi in <<inaudible>>, and you're welcome to drop in and call on us. We'd be delighted to host you. Thank you very much, once again.
Operator
operatorThank you. That brings this conference to a close on behalf of Asian Market Securities Limited. We appreciate your participation, and you're welcome to disconnect your lines at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Techno Electric & Engineering Company Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Techno Electric & Engineering Company Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Techno Electric & Engineering Company Limited or any ticker on your watchlist.