Good day, ladies and gentlemen, and welcome to the Q2 FY '24 Earnings Conference Call of Techno Electric & Engineering Company Limited, which is being hosted by Asian Market Securities Limited. This call might include forward-looking statements regarding the company, and those are based on what the company believes, opines, and expects as of today's date. Such key statements do not guarantee future performance and carry risks along with uncertainties that are hard to foresee. Actual outcomes could vary from those expectations, projections, and so on, whether they are expressed or implied. We ask participants to be careful when referring to these statements and remarks. <<operator_script>> Kindly note that this conference is being recorded. I will now turn the conference over to Mr. Suraj Sonulkar of Asian Market Securities Limited. Thank you, and the floor is yours, sir.

Suraj Sonulkar

analyst
#2

Thanks, Nico. Good afternoon, everyone. We at Asian Market Securities are glad to have all of you join us for the Q2 FY '24 Earnings Conference Call of Techno Electric & Engineering Company Limited. Joining us today are Mr. P. P. Guptaji, Chairman and Managing Director, and Mr. Ankit Saraiya, Director, representing the company. I'll now ask Mr. Ankit to walk us through the overview of the quarterly results, after which we'll begin with the Q&A session. Over to you, Ankit, sir.

Ankit Saraiya

executive
#3

Thanks, Suraj. Good afternoon, everyone, and welcome as we go through Techno's financial results for the quarter that closed on 30th September 2023. Any statement made on this call that reflects how we expect the future to unfold, or that might be taken as forward-looking, needs to be considered alongside the risks confronting the industry and the company. So let me now move quickly through our performance for the second quarter of FY '24. I want you to be aware that during FY '23 we sold the wind assets located in Tamil Nadu. In connection with that, as per the accounting standard, the operations relating to those assets have been shown as discontinued operations in the results. Techno has set up a subsidiary whose purpose is to promote the data center business. This company is not operating and does not add to revenue. Under the accounting standards, we eliminate the financials of this data center SPV in the consolidated results. That accounts for the main difference between the stand-alone and the consolidated results. Once this asset begins contributing revenue to the business, its contribution will start appearing in the results, and so it would be worthwhile to analyze them at that point. Total revenues for the company from EPC come to INR 482 crores, which includes execution of the data center subsidiary order at cost, an increase of 167% year-on-year.

Ankit Saraiya

executive
#4

We anticipate a comparable revenue level in the quarters ahead. The company’s EBITDA is at INR 75.62 crores, a 133% year-on-year increase. For the quarter, EBIT in the EPC segment came to INR 72.37 crores, rising 161% year-on-year. Other income in Q2 FY ’24 was INR 28.30 crores versus INR 19.03 crores a year earlier. EBT from continued operations for the quarter is INR 98.08 crores, up 103% year-on-year. PAT from continued operations for the quarter is INR 71.42 crores, up 98% year-on-year. EPS in quarter 2 FY ’24 was INR 6.63. Turning now to the half-year results: Revenue from EPC in H1 FY ’24 is INR 825 crores, up 152% year-on-year. Company EBITDA stood at INR 123 crores, up 125% year-on-year. EBIT for the EPC segment in H1 FY ’24 was approximately INR 117.67 crores, up 129% year-on-year. Other income in H1 FY ’24 was INR 58.94 crores versus INR 33.77 crores. PBT for the half year was INR 170 crores, up 106%. Profit after tax from continued operations stood at INR 125 crores versus INR 60.54 crores, up 107%.

Ankit Saraiya

executive
#5

For H1 FY '24, earnings per share came in at INR 11.64. As of 30th September 2023, the value of our current investments, which includes cash and cash equivalents, is roughly INR 1,500 crores — that works out to over INR 140 per share. Order intake during H1 FY '24 totaled INR 611 crores. Since September, 2 L1 orders have been converted: a smart meter order from Indore covering 5 lakhs smart meters valued at INR 536 crores, and a transmission order from PGCIL for a INR 765 x 400 kV substation at <<inaudible>> worth INR 288.32 crores. As a result, our unexecuted order book currently sits at approximately INR 4,361 crores. Beyond that, we hold L1 status on orders valued at INR 3,550 crores, made up of 1 transmission order from power grid at INR 225 crores, 1 transmission order from Sterlite at INR 200 crores, 1 transmission order from NTPC at INR 227 crores, 2 smart meter orders — 1 from Jharkhand at INR 1,395 crores for 12 lakh smart meters, Jammu and Kashmir at INR 1,041 crores for 7.25 lakh meters, and Tripura at INR 445 crores for 4 lakh smart meters. Our bids in the pipeline exceed INR 5,000 crores and have yet to open, and we are hopeful of securing at least INR 2,000 crores worth of orders from that pool.

Ankit Saraiya

executive
#6

Now turning to how each of our business verticals is likely to perform. As we promised three months ago, we managed to bridge the tough period, and we see meaningful expansion ahead. In our view, this upward trajectory has only started and ought to carry through FY '24, '25 and '26. We anticipate bigger businesses emerging from the smart meter segment, transmission and data centers. The FGD segment remains somewhat soft owing to the energy problem the country is dealing with right now. This may well be the first year in which energy demand rises at a double-digit rate, whereas across the last 3 years what we saw was at most 3% to 4% each year, or perhaps flat. So the Government of India has pledged a further 30, 40 gigawatts of thermal capacity, though most of it will be brownfield and within the PSU segment. We are likewise witnessing robust power sector reforms, since the government wants to make sure generators get paid on time and also watts to curb discom losses. The amendment of the Electricity Act December '22 is firmly in place too, and the central government is now attempting to assume a bigger role through those amendments, guaranteeing that power supply is available and reliable, along with billing and last mile collection from power sales.

Ankit Saraiya

executive
#7

I think the sector's overall financial health is probably going to get better over the next few years, assuming this focus is actually put into practice. The emphasis will remain on renewable power, with close to 500 gigawatts being added by 2030, as the Government of India has committed. We will certainly require energy storage solutions — battery, energy storage system or pump storage — covering no less than 20% of that capacity. On top of that, many kinds of capacitive reactive power management solutions in the grid will also need to support this. And we are seeing substantial activity where Techno is fully qualified and competent to deliver solutions. Turning to the FGD segment, that segment is still somewhat subdued right now. Still, plenty of work remains pending. Thermal capacity sits largely with the private sector, and the owners probably think they might get more time, up to 2030, in the future. So they are certainly reviewing things and waiting for the commodity cycle to soften further, so that solutions can come back down to sub INR 50 lakhs per megawatt, as was the case 4 years back. Our orders in Rajasthan are moving along smoothly. We have secured orders worth INR 1,450 crores in the FGD segment.

Ankit Saraiya

executive
#8

We expect this kind of business to keep going for the next 5 to 7 years, since 100 gigawatts has still not been ordered by CPSUs, SEBs and the private sector, which adds up to a scope of almost INR 1 lakh crore. On the transmission side, I would say that after a long gap, momentum has returned to this sector. <<inaudible>> bidding is now taking place for 50 to 100 gigawatts, and much bidding is underway at present. And what we are seeing is that each month, 4 to 5 concessions get awarded to power grid or to the private sector. As for the interstate transmission system for evacuation and grid integration, 15 gigawatt of renewable energy from Ladakh has been proposed, with an investment of INR 207 billion, including central support of INR 83 billion. Bids open for transmission total roughly INR 40,000 crores, of which Techno expects to book orders worth INR 3,000 crores over the next 3 to 5 years. We have won orders worth INR 610 crores in the first quarter, and we are L1 in a further INR 940 crores within this segment. Turning to the metering segment, or distribution: on the distribution side, we see a lot of activity happening going forward, particularly when it comes to smart meters.

Ankit Saraiya

executive
#9

In Budget 2023, there's also a key measure aimed at the financial health of state distribution utilities, linking 0.5% of the deficit to reforms in the power sector. That gives states an added incentive to reform the discoms. We're seeing attention being paid to strengthening the power distribution network so it becomes smarter and more intelligent. What the government chiefly wants is better efficiency and contained losses, which would improve the health of discoms. Roughly 22.22 crore meters are at various stages of awarding, amounting to about INR 2.22 lakh crore, and close to 88% of that would fall under the RDS scheme. Of those, approximately 73.53 lakh smart meters — 9% of the total awarded meters — have already been installed. From this segment, we expect to receive orders worth INR 2,000 crore to INR 2,500 crore each year. We've already secured one smart meter order in J&K covering 2.5 lakh meters, worth INR 338 crore. And there's one smart meter order in Indore for 5 lakh meters, worth INR 536 crore, under the DBA-40 model, and we are L1 on orders valued at INR 2,900 crore for 23 lakh meters. We're quite hopeful — the power sector stands at a very critical juncture, and something good ought to happen as we go forward.

Ankit Saraiya

executive
#10

Turning to data centers. Digitization plus cloud-based services, we all agree, stands as the leading driver behind data center expansion and the need for data centers, alongside other factors like 5G and <<inaudible>>. During the past 6 months, the industry has moved into a very dynamic position, largely owing to the manner in which AI and machine learning have grown more prompt and are turning into a way of life, which in particular has shifted how data center infrastructure or design gets conceived. As the world increasingly adopts AI day to day, the infrastructure needed to serve those sorts of computing requirements will likewise evolve, though it will drive exponential growth in data center investments. Considering the land bank we hold relative to other countries across the Asia Pacific region, plus the renewable energy capacity we possess and the Digital Data Protection bill passed in the parliament, demand for data centers—or investment in them—in India will rise significantly. Techno, too, is at advanced stages of building a data center with 24-megawatt IT load of an ultra-scalable, hyper-density nature.

Ankit Saraiya

executive
#11

Construction has moved ahead considerably. The civil work on the data center building is finished. On this project, INR 222 crores has already been invested by us. Long lead equipment procurement is essentially done — almost up to 80%, or you could say substantially. We hope to commission the project's first phase by March 2024. Strategic partners are showing strong and aggressive interest in entering a JV to develop data centers in India. The options available to us are being evaluated, and a way forward will be concluded very soon. With CapEx of INR 1,400 crores — that is INR 45 crores per megawatt — roughly 60% to 65% of this CapEx goes into electromechanical work, which is an in-house expertise and strength of the company, and we will be able to leverage on the same for executing the work. Given the EPC capabilities and prior experience of developing infrastructure projects, we are uniquely placed because we have great control over cost, time and quality of the project. With this, we are opening to answer your questions that you may have. So we look forward to receiving questions from you now. Thank you.

Operator

operator
#12

<<operator_script>> The first question comes from Gunjan Kabra of Niveshaay.

Gunjan Kabra

analyst
#13

Congrats on that first.

Operator

operator
#14

My apologies for cutting in, ma'am. Could I ask you to pick up your handset?

Gunjan Kabra

analyst
#15

Has it improved at this point?

Operator

operator
#16

Yes, ma'am. Go right ahead.

Gunjan Kabra

analyst
#17

Nice work by the whole team on those outstanding figures. I have a few questions. The first one is that I'd like to get a sense of the size of the business — specifically in the transmission segment, how much could we actually execute in a year, assuming a project runs about 12 to 15 months? So given our manpower, our ecosystem and the rest of our bandwidth, how much of the total book, or how much of the overall order, are we able to execute in transmission and distribution within a year? That's what I'm trying to understand.

Padam Gupta

executive
#18

Is that all from your side, or do you have anything else?

Gunjan Kabra

analyst
#19

I've got a few additional questions. Would you like me to ask them at this point, or should I go one at a time?

Padam Gupta

executive
#20

Yes, that’s fine. Overall, we feel good about our position and are strong in delivering transmission and distribution solutions across the country. And at one point, we did at least 1,500 crores in a year as well. Given inflation and the projections you’re making, I believe we can even increase our capacity to handle about 2,000 crores annually. Did that address your question, ma’am?

Gunjan Kabra

analyst
#21

Yes. And also, if you could split it out the way you did in Q1 — roughly how much was the transmission order book by segment, if you're able to break that down — and for the EPC segment, how much came from FGD execution versus transmission and distribution?

Padam Gupta

executive
#22

Yeah, in Q1 and Q2, almost 0% comes from transmission. And also, you could say 20% or 15% — 18% might be from the <<inaudible>> work, and another 12% from <<inaudible>>.

Gunjan Kabra

analyst
#23

All right. And sir, suppose we end FY '24 with an order book of roughly INR 4,000 crores to INR 5,000 crores — what sort of revenue could we aim for from that in FY '25?

Padam Gupta

executive
#24

We're aiming for a bit over roughly INR 2,500 crores. And as I mentioned earlier, for this year we ought to land somewhere in the INR 1600 crores to 1,800 crores range, with execution steadying at INR 400 crores to INR 500 crores each quarter.

Gunjan Kabra

analyst
#25

All right. And another thing — this quarter ended up giving us a bigger EBITDA margin in the EPC segment. So did that happen because we folded in profitability from the <<inaudible>> business, which we previously accounted for on a cost basis, or can 15%, 16% EBITDA margins in this business be sustained?

Padam Gupta

executive
#26

No, ma'am — the way it works is that our guidance is going to stay at 13% plus or minus, and that hinges on the commodity cycle, quarter to quarter. At times things come in better, and it also depends on the mix of the job while it's being executed, if those are somewhat more of the closing-phase projects. So it's really a blended question — commodities — but right now, if it has cooled down, that has helped us too. Still, as far as the yearly guidance goes, we would not want to move it off 13%.

Gunjan Kabra

analyst
#27

Alright. Alright, and the final question: in FGD, demand has been weak. At first we aimed for roughly INR 1,000 crores annually in that segment. So what is our target there now, just...

Padam Gupta

executive
#28

No, our target has consistently been in the range of 500 crores to 750 crores, because these are medium-sized construction projects that are linked. So it takes more effort compared to station work. But at the moment, you can take it as roughly 500 crores per year.

Operator

operator
#29

<<operator_script>> The next question comes from Subhadip Mitra with Nuvama.

Subhadip Mitra

analyst
#30

I just want to reconcile a few of the figures you mentioned in your opening remarks. If I understand it right, you said that in transmission we're looking at potential annual order inflow of INR 3,000 crores. And for smart metering, you're looking at roughly INR 2,000 crores, INR 2,500 crores of annual orders — is that correct, sir?

Padam Gupta

executive
#31

That figure I mentioned — INR 2,000 crores — refers to transmission and distribution capacity, not to the order book. At any given time, our order book depends on the market. As far as transmission goes, I believe we should manage an order intake of roughly 1,000 crores to 1,200 crores annually, and perhaps another 2,000 crores from metering work.

Subhadip Mitra

analyst
#32

So for transmission, that's INR 1,200 crores a year in annual order inflow, and smart metering at INR 2,000 crores. Is that right, sir?

Padam Gupta

executive
#33

Yes. Typically, though it won’t stay the same.

Subhadip Mitra

analyst
#34

On average, naturally. Thanks for that. And in the same way, for FGD, what annual order inflow would you be expecting?

Padam Gupta

executive
#35

Regarding FGD, we already hold an order book worth roughly 1,600 crores. As for this year specifically, no fresh orders are currently in sight.

Subhadip Mitra

analyst
#36

Got it. But for FY '25 and '26, since there are far more orders in the pipeline, is there any figure you'd point to as a benchmark?

Padam Gupta

executive
#37

You can figure roughly INR 1,000 crores annually as the order book.

Subhadip Mitra

analyst
#38

Got it, got it. So looking at it as a whole, if I combine all 3 of those segments, I think you should be able to land comfortably somewhere around the 5,000 crores mark.

Padam Gupta

executive
#39

Definitely. That’s exactly how it ought to be.

Subhadip Mitra

analyst
#40

That's great. That's great. And with that, obviously, the macros are really strong when it comes to transmission and smart metering, and considering how your order inflows and order book are expanding, would you expect stronger growth on the top line, say, across '25 and '26? I believe you mentioned INR 2,500 crores as a FY '25 top line figure. So — could we take a guess that perhaps it will be INR 3,000 crores plus, let's say, by '26?

Padam Gupta

executive
#41

Yeah, it's safe to assume that, since for '24 itself we ought to land somewhere between INR 1,600 crores and INR 1,800 crores. Then for '25, our goal is going to sit below INR 2,500 crores. So when it comes to order intake, INR 3,000 crores in '26 looks achievable.

Subhadip Mitra

analyst
#42

That's great, really helpful. And when you look ahead, would you again be aiming to naturally lift the margin figure — perhaps not in '24, but as you move into '25 and '26, do you see reason to expect the margin could expand further?

Padam Gupta

executive
#43

Well, it really comes down to where the commodity cycle sits. So in my view, that's somewhat speculative. The safer approach is to land around 13%, give or take. But we definitely want to do better than that. We want to make sure we're in that 13% plus-or-minus range. We might revisit it after 6 months, perhaps, but not at this point.

Operator

operator
#44

Faisal Hawa from H.G Hawa and Co. is on the line with our next question.

Faisal Hawa

analyst
#45

Sir, what are our ROCE and ROE figures for this quarter? Next, how are we viewing the data center opportunity overall? Do we see it as a solid annuity income stream, where we build the data center and then rent it out to whoever ultimately holds the data? And third, how do you view the smart meter opportunity? Genus has also landed a very large order. Are we looking at any kind of tie-up for smart meters that would bring us orders of that kind? And in data centers too, sir, do we have any tie-ups with foreign majors so we can take advantage of the government's data localization policy?

Padam Gupta

executive
#46

Let me take your questions one at a time. Specifically, when it comes to smart meters, we are not looking to model ourselves on Genus. We believe the sector carries its own risk element for the discoms. In this segment we are more or less a developer, and most projects are DBFO in nature. Funding here also has to come from the concessioner in this case. So our target largely hinges on whether the scheme gets executed in the country over 5, 7, 10, or 15 years, because in the power sector generally we see schemes run 4 or 5 years, yet execution stretches on for 15 years. So if a scheme is designed for 5 or 7 years, our target collectively will be no more than maybe 5 million or 6 million meters. If it plays out over 10 years, then perhaps 10 million meters. And if the scheme runs 15 years, then we would aim for 15 million meters. So our game plan will be an average target of more than 1 million meters, 1 million to 1.5 million per year, to execute these projects — that's number one. Number two, we are definitely more excited about data centers, which is a very huge opportunity.

Padam Gupta

executive
#47

It's inside the building. Right now, it delivers more value accretion, but after '26 it will drive revenue accretion more strongly — though some revenue flow ought to begin in '24 and '25. With specialty, I'm glad to share as well that we have bid as well for <<inaudible>> land in Kolkata, now in Silicon Valley. That site sits right beside every prominent player in this segment, such as Adani, Reliance and others, SGT and <<inaudible>>. So we'll be positioned to expand this segment more strongly after '26, and we see traction emerging from it. Yet even within renewable power, we observe additional technologies joining the solutions, while nitty-gritty renewables move into the grid — more solutions, or capacitively active, the ability to be part of the group <<inaudible>>, storage joining the group. So we observe plenty of things evolving. We are transforming at present and growing as well — I'd say both. So you must leave room for transformation and growth too, and for new solutions in this space. So we will — as you know, as a company, we have never sought to be the biggest; that is not Techno's goal post. We will always want to be the best as a performer and also better when it comes to margins and the bottom line.

Operator

operator
#48

Is that what you were asking about?

Analyst

analyst
#49

Sir, regarding ROCE and ROE, what are the ROCE and ROE figures we have? And will data centers function like annuity income for us, where we keep getting paid each month? Will revenue arrive that way, or will we act as an EPC provider to the larger companies?

Padam Gupta

executive
#50

Sir, it could be a hybrid or both, depending on EBITDA. The equity income goes to the investor. If we don't get an investor, it becomes buying income. So the question is the long post — Techno's goalpost is not to be an equity income earning entity, but more of a business governed by entity in this segment. But in the past, also in transmission asset or in the wind assets, we have lived with the equity income also on a regular basis. And we are clearly exposed to these businesses or BBB or equity basis. So that is not the issue, sir. Depending on our asset is more demanding, we'll keep taking a call.

Analyst

analyst
#51

Sir, you said we have INR 156 per share in cash on the books — or was that INR 156 crores? And do you have any sort of plan for putting that to use so our ROCE and ROE genuinely improve?

Padam Gupta

executive
#52

As you can see, cash per share stands at nearly INR 140. And the total cash on the books is roughly INR 1,500 crores as of today. And of course, that money is intended to build out these assets such as data centers, smart meters and others, since we prefer being a debt-free company. And our ROCE target will never fall below 15% on any of these resources within the company. Cash is reality in any company, and we will always keep it productive. Cash, also do not generate money only by investing it, but it create value accretive application also. So we are very prudently utilizing the capital available with us.

Analyst

analyst
#53

So there's really no possibility of a buyback or a big dividend of that kind?

Padam Gupta

executive
#54

No, not in the current business. There are so many growth opportunities, so at the moment we don't want to spend money on buyback. But definitely, we will be a larger dividend payout company as we have done in the past. Over the last 5 years, we have paid out no less than — for 4 years almost INR 500 crores to the investors, both through dividend and buyback. The last dividend payout was almost 300%. It will improve going forward.

Operator

operator
#55

<<operator_script>> We now move to a question from Sarvesh Gupta with Maximal Capital.

Sarvesh Gupta

analyst
#56

Congrats on those strong results. Sir, my question concerns that L1 figure of INR 3,550 crores. When do we expect it to become a confirmed number for us?

Padam Gupta

executive
#57

Of that INR 850 crores, we've already received <<inaudible>> amounts. As for the remaining business, we're hoping to have it around December or January — it should come through. But the INR 850 crores, we've already gotten that within the last 1 month or 2 months, or 1.5 months.

Sarvesh Gupta

analyst
#58

And of that INR 3,500 crores, sir?

Padam Gupta

executive
#59

Yeah. Yep.

Sarvesh Gupta

analyst
#60

So at this point, counting that INR 850 crores, would the unexecuted order book stand at around INR 5,100 crores?

Padam Gupta

executive
#61

No, no, no. The order book that hasn't been executed, as we're reporting it right now, sits at roughly INR 3,600 crores. So once you add this INR 850 crores, that brings it to INR 4,300 crores. At the close of September, the figure stood at INR 3,600 crores. And adding this INR 850 crores puts it at around 4,400 crores.

Sarvesh Gupta

analyst
#62

So if we leave that out, we're looking at roughly INR 2,700 crores for L1?

Padam Gupta

executive
#63

That's correct — you're absolutely on point.

Sarvesh Gupta

analyst
#64

Alright, sir. And regarding the remaining bid pipeline of that INR 5,000 crore — we expect to secure INR 2,000 crores from it. So what timelines apply to that, sir?

Padam Gupta

executive
#65

So it’s a loan tendering process, and as of now we don’t have control over being a participant. At times the government closing — utilities shut these programs sooner than anticipated, and at times they take quite a while. So predicting it is really difficult. But my takeaway is that going forward, we can comfortably expect order intake of roughly INR 4,000 crore each year.

Sarvesh Gupta

analyst
#66

Got it, sir. And sir, I also had one question earlier about our management bandwidth, because right now I think we're growing by leaps and bounds. So is there any color or update you'd want to give regarding what we're doing to sort of upgrade the organization as well, sir, for the huge opportunities opening up?

Padam Gupta

executive
#67

Yeah, that's something the company keeps working at continuously. At our entry level, we bring in nearly 40 to 50 trainees — from solid engineering colleges, diploma holders, <<inaudible>> in Pune, plus plenty of other reputable schools. And in the same way, we're definitely putting money into our people; we're over relaxed, clearly. So I'd call it a continuous effort, with our own in-house development programs in place. Training programs, exposure programs — we run those. Our people receive training at institutes with good trainers, and we also arrange programs internally. So we're using several different methods to remain current, capable, and relevant to the business.

Sarvesh Gupta

analyst
#68

Got it, sir. Sir, one last question, then — when I look at the pipeline, we're seeing quite a few orders coming out of states such as Tripura, J&K, and a few of the Eastern states. So do you see any geographical risk arising from those kinds of regions? Because these aren't the usual ones, right? I mean, FGD — we have a big one from Rajasthan — but from the typical larger states, we're getting somewhat less business, and it appears more concentrated around these somewhat more, I think, states where the governments may not be in the greatest of health, or geographies that are a bit difficult.

Padam Gupta

executive
#69

To my mind, this comes down to perception. Consider “likely”: those states that are currently very inefficient are the ones needing more metering work and digitization in discoms — that’s point one. So the more inefficient you are, the more inclined you are toward performance by installing updated solutions. In a mature state, then, the chances of reward are always lower than in these kinds of states where revenue collection already stands at no more than 50%, 60%. If 50%, 60% revenue collection turns into 85%, 80% because of any solution installed by us, they will never want to deny you or share the benefit with you at a minimal cost per meter per month or even for any solution provided to them on the software side. So I trust that the more inefficient you are, the more inclined you are to a better performance in the solutions, but for your information, we’ll keep it properly blended — like the last metering order we received this month, it comes from the discom of Indore in MP for INR 650 crores.

Operator

operator
#70

We'll now take a question from Ashwani Sharma, who is calling in from ICICI Securities.

Ashwani Sharma

analyst
#71

Congratulations on those strong results. First off, you noted that INR 220 crores has already gone into the Chennai data centers. In the same way, what does our CapEx plan look like across these assets — data centers, smart metering, and TBCB — over the coming 2 to 3 years? How much outflow should we expect from our end?

Padam Gupta

executive
#72

I believe that moving ahead, we ought to put more money—INR 1,000 crores—into the data center, and a further INR 1,000 crores into meter work.

Operator

operator
#73

Sir, could you please move a bit nearer to the speakerphone when you're talking?

Padam Gupta

executive
#74

Sir, would you mind letting me finish?

Operator

operator
#75

Yes, that works fine now, sir.

Padam Gupta

executive
#76

My point was that we're putting INR 500 crores to INR 750 crores into data centers over the next 1 or 2 years, plus a further INR 1,000 crores into meter work.

Ashwani Sharma

analyst
#77

Is there anything to discuss regarding TBCB?

Padam Gupta

executive
#78

Could you say that again?

Ashwani Sharma

analyst
#79

Is there any update on TBCB?

Padam Gupta

executive
#80

When it comes to TBCB, right now our focus overall isn't especially strong—I'd say we're only <<inaudible>> there with private developers or power grid. And that business with them is going well for us. So we won't be seeking any investment on our part.

Ashwani Sharma

analyst
#81

All right, so what kind of return are we aiming for?

Padam Gupta

executive
#82

Regarding what?

Ashwani Sharma

analyst
#83

Now, turning to smart metering and data centers — what's your take there?

Padam Gupta

executive
#84

Yeah. Data center is a high-end solution. So obviously, everyone anticipates greater rewards. And smart meter, I’d call it a somewhat blooded business. So next to EPC, you’ll always look for a somewhat higher return. It’s a very broad distribution — none of them are the same when it comes to risk. So you need to mix them according to their risk-and-reward ratios, whether through technologies or through the financial risk you’re taking and building out the data set.

Vinit Anand

analyst
#85

Sir, we haven’t begun taking profits in the data center yet. Why — when we can — will we be in a position to start doing that?

Padam Gupta

executive
#86

Once we're near that revenue stream, sir — it doesn't make sense to book profit or bill out costs while it's still in the development stage. So right now it's value accretive. We'll recognize it in our books only at the point when it becomes revenue accretive.

Ashwani Sharma

analyst
#87

Alright, regarding the guidance, I believe there’s been a revision. So I just wanted your input by segment for FY '24 and '25. If you could tell us, within EPC, how much will come from transmission, how much from distribution per year, and how much from FGD?

Padam Gupta

executive
#88

My view is that if you just send us a note, we'll provide the answers, or come see us — that's no problem, since this type of business isn't conducted with that level of accuracy or precision across many opportunities. Certain opportunities you develop for relationships, and certain ones you develop for rewards. That said, overall, our guidance would indicate that we should aim for EBITDA of roughly 13% at the company level relative to the top line.

Ashwani Sharma

analyst
#89

Sir, I was actually hoping to hear more about the revenue guidance, sir?

Padam Gupta

executive
#90

For this year, I've already provided revenue guidance of INR 1,600 crores to INR 1,800 crores. For next year, it's INR 2,500 crores. And the year after that will be INR 3,000 crores.

Operator

operator
#91

Vinit Anand from 3P Investments has our next question on the line.

Vignesh Iyer

analyst
#92

Yeah, so I’m just trying to get a handle on how the data center business model works. I mean, you’re putting money into it. And clearly, once there’s a tenant leasing it, you’ll earn from that. So what kind of investment are you expecting — you mentioned INR 220 crore is what we’ve already put in. So — and will this play out over the next 3, 5 years? Or how does it work?

Padam Gupta

executive
#93

No, no, no. It won't take that long, sir. But Phase 1 is going to be ready by March '24, and by that March our CapEx will come to roughly INR 550 crores. And after that...

Bhavin Vithlani

analyst
#94

Out of that, INR 220 crores has already been completed.

Padam Gupta

executive
#95

Right. Of that INR 550 crores, INR 220 crores — I’m not sure whether the commitment could end up higher, at nearly INR 280 crores — and INR 220 crores of that has already been spent on this project. That spending will take place across the coming 4 to 5 months. To finish this project — the entire project is valued at roughly INR 1,200 crores — completion should come at about March '25, across all the project phases. These figures refer to Phase 1. After that, our Kolkata project will follow. We're also working on plans for a project in Hyderabad. So across the period down 3 years, you could say data center CapEx will also rise to 1,000 crores per year by the third year.

Bhavin Vithlani

analyst
#96

Therefore, annually — perhaps beginning in the next 2 to 3 years — you're going to be spending INR 1,000 crore on data, constructing data centers across whichever region.

Padam Gupta

executive
#97

Alternatively, we’ll monetize and reinvest—or we’d prefer to bring in capital at the subsidiary level so we can fund these expansions and grow.

Analyst

analyst
#98

You did note that this is high-end and that returns will be better. But do you have any broader qualitative figure — what kind of returns are you expecting from the INR 1,000 crores of investments you'll be making?

Padam Gupta

executive
#99

On a year-over-year basis, the IRR could fall anywhere in the 15% to 20% range.

Analyst

analyst
#100

Also, regarding smart metering, you mentioned an investment of INR 1,000 crore. What exactly is our spending going to be on that, sir?

Padam Gupta

executive
#101

No, the spending is going to be 1,000 crores. That is what I said, since all of these follow the DBFOT model, under which the government provides a grant of no more than 15%. And you have to put in just 80% from your own capital, which gets paid out monthly on a per-meter basis across 94 installments. That is the government's scheme.

Analyst

analyst
#102

All right, then. Take, for instance, that Indore smart meter project you won at INR 500 crores or INR 600 crores — in that case, whatever the initial investment might be, the revenue you'll receive gets spread across 94 months or, say, 100 months, correct?

Padam Gupta

executive
#103

Okay, so that works out to 94 months per meter.

Analyst

analyst
#104

Yes. So for that, let's take an INR 600 crore project as an example — how much would you need to put in?

Padam Gupta

executive
#105

It's a bit involved, as you can see. If you get in touch with us, we can walk you through it in more detail, since there's an 18% tax component in there. There's also a finance cost of nearly 20%. So once you strip all of those pieces out, the underlying CapEx might come to no greater than 70% in each case, or perhaps 65%.

Analyst

analyst
#106

Thanks very much. <<operator_script>> Our following question comes from Keshav Garg, who is calling in from Counter Cyclical PMS.

Keshav Garg

analyst
#107

So first, I'd like to get a clearer picture: of the roughly INR 670 crores in total receivables we have, how much is owed by the Tamil Nadu Trade Electricity Board as wind power receivables?

Padam Gupta

executive
#108

The figure comes to roughly INR 125 crores.

Keshav Garg

analyst
#109

Right, sir. And beyond that, sir, have we gotten all the dues and so on back from the state electricity boards?

Padam Gupta

executive
#110

Yes, absolutely. And out of that INR 125 crores, they're now included in the LPS scheme as well, which are disbursed under a strong — which has already been disbursed for the past 15 months, each month as a committed payment to REC PFC. This is a government scheme designed to settle them across 4 years. And of that, roughly 1.5 years has already elapsed.

Keshav Garg

analyst
#111

Yes, sir — and sir, I also recall that back in FY '21 you were quite confident we'd hit at least a 15% operating margin on the EPC side. But after that, commodity prices rose following COVID. And now they've fallen again. Sir, but then why — and with order inflow having risen as well, given that, sir, one would have thought margins might climb above 15%, yet you're still guiding to just 15%, sir, so that seems a little odd.

Padam Gupta

executive
#112

Nothing unusual is going on here. First, you have to realize that the tariff post '21 itself has dropped 20%. These are very developers, number one. Number two, not all commodities have cooled down in last 2 years. Electronics like semiconductor-based solutions are still almost double the price of what we used to get before '21, whether it is PLCC or CRP or your SaaS or DCS. So some commodities like steel, copper have bettered. Transformer prices are all time high. Nobody wants to manufacture CRG in the world now. Everybody wants CRNO to make batteries, storage batteries, vehicle batteries. So these pressures on cost as well as on pricing will always be there in a competitive market.

Keshav Garg

analyst
#113

Sir, but at this point, sir, regarding those new orders—when we bid on them, sir, we have to bid while keeping in mind whatever the cost is at the latest prices for the various inputs. Sir, so even on new orders, once our old orders are executed, sir, can we then expect our margins to revert back to 15%?

Padam Gupta

executive
#114

Perhaps, with the commodity cycle sports, the availability of electronic sports—please recognize that India is transforming right now. We're increasingly choosing renewable power. These solutions are designed for evacuating renewable power and integrating it into our main grid. In the same way, the entire world is now shifting toward renewable power. Considerable progress is occurring in the U.S., Europe, and other nations as well. So demand for all these high-end transmission elements is extremely strong in the market at present. And there are hardly any suppliers. All at once, it's a market led by suppliers. So we're squeezed between what a developer can afford once he secures supply expectations on prices, or their timely supplies. Thus no cycle is always free for EPC. EPC is invariably a somewhat challenging business, and you need the ability to make money in this market.

Keshav Garg

analyst
#115

Yes, sir. And finally, sir, when we look at the consolidated cash flow statement, sir, for this financial year's 6 months, sir, operating profit has fallen to INR 95 crores this year from roughly INR 123 crores last year. So I realize that on a consolidated basis, the data center EPC work we're doing isn't included. Sir, but the thing is, aside from that data center work we're handling within the rest of the EPC business, sir, why is operating profit for the first half lower than last year?

Padam Gupta

executive
#116

You're contrasting things that aren't comparable, sir, because that INR 123 crores takes in a discontinued business. That's the wind business. So please take it out. Once you do that, you'll find the margin has doubled compared with last year. Just look at our segment results.

Operator

operator
#117

Our following question comes from Vignesh Iyer, who is on the line from Sequent Investments.

Analyst

analyst
#118

My question concerns the data center part of the business. Just so I understand, you did mention that revenue would be a mix, depending on whether or not you have an investor. If I could get a sense of what the per-megawatt rent would be that we would receive each month if we rented it out, then we would have some number in hand, right?

Padam Gupta

executive
#119

Yeah. Typically, these data centers get rented or leased on a monthly per-KVA basis as an application, and the rates usually vary based on what kind of consumer you're dealing with — whether it's an enterprise or a hyperscaler, and what sort of capacity they're taking from you, or if they're a colocation customer. So depending on the type of consumer, it can range anywhere from $80 to $110.

Analyst

analyst
#120

And that's on a per-KVA basis, correct?

Padam Gupta

executive
#121

Yes, that's on a per-KVA basis.

Analyst

analyst
#122

Right, right. Since one of the rivals involved in this line of business did provide a...

Padam Gupta

executive
#123

Just to be clear, these are rental charges only. No electricity expense is included in that figure. Power is billed separately. It's charged at actuals.

Analyst

analyst
#124

Right, and I'm only speaking about the rental side here. A competitor of ours quoted a figure of roughly INR 90 lakhs per megawatt per month as a rental. So I just wanted to check whether our number on the megawatt side comes somewhere close to what they're saying.

Padam Gupta

executive
#125

No, no. These aren’t — you can work that out, but I’ve never done the math that way. So I can’t confirm that figure, though it may be nearer to what we’re discussing.

Analyst

analyst
#126

Okay, understood. Sir, just one more thing I'd like to ask. How much does it cost us to set up 1 megawatt of data center?

Padam Gupta

executive
#127

Roughly $5 million.

Analyst

analyst
#128

Right, and that $5 million figure is based on greenfield, correct?

Padam Gupta

executive
#129

Yeah, greenfield. Definitely. We only ever do greenfield. Right now, every data center is being built as greenfield.

Analyst

analyst
#130

Greenfield — and by that I mean the land cost is fully included in that figure, correct? I mean...

Padam Gupta

executive
#131

Yeah, yeah, yeah — everything, land that's ready to use. Sir, at times, it can vary based on location. If you head to Bombay, it could be $6 million since land there is expensive, but if you go to Chennai or Kolkata, it might be $5 million. So the price of land is a big surprise.

Analyst

analyst
#132

You're right about that.

Padam Gupta

executive
#133

Right, so in Kolkata and Chennai, land is still available at $1 million per acre. As for Bombay, you might have to pay at least $4 million per acre, perhaps.

Operator

operator
#134

Ladies and gentlemen, that brings our question-and-answer session to a close. Since participants have no more questions, I'll now turn the conference over to management for closing remarks.

Padam Gupta

executive
#135

Yes, starting with this quarter, I'd just like to say that from this quarter onward, we can look forward to a top line of INR 400 crore plus, quarter over quarter, going ahead. As I said in my statement at the close of the year and the start of the year, I will <<inaudible>> has happened for the sector and has only just happened. And looking ahead, there appear to be solid programs in place, and at least for the moment, 3, 4 years with -- and this is also the first year in which we are witnessing energy growth, or consumption growth, in double digits, as opposed to 2%, 3% over the previous 4, 5 years. So everything good is taking place in the energy sector, the power sector. Every company is moving, whether it is a dater, an EPC, a transmitter, or a distributor. All of them are making -- are being rewarded by this growth. And I hope India continues on this journey. It is the first time I am glad to tell you that grid load has reached 250 gigawatts, whereas on average it was no more than 170, 180 gigawatts only a year ago. So I want to thank all of you for joining the conference with us. And if you still have any query regarding our performance, please send a mail to us, as we will be -- or if you visit this part of India, please stop by our office, and we will be glad to welcome you and show you around how we work.

Padam Gupta

executive
#136

So that brings us to the end of this conference. I want to thank each of you for participating, and I wish you a very happy Diwali and a joyful festive season. Many thanks to all of you.

Operator

operator
#137

Thank you. That brings this conference to a close on behalf of Asian Market Securities Limited. We appreciate your participation, and you’re welcome to disconnect your lines at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Techno Electric & Engineering Company Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Techno Electric & Engineering Company Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Techno Electric & Engineering Company Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.