Tecogen Inc. (TGEN) Earnings Call Transcript & Summary

November 13, 2025

NYSE American US Industrials Building Products earnings 47 min

Earnings Call Speaker Segments

Jack Whiting

executive
#1

Hello, everyone. Jack Whiting here, General Counsel and Secretary of Tecogen. Please note that this call is being recorded, and a copy will be stored on our site, tecogen.com. You can find the press release about our third quarter 2025 earnings, along with the presentation shared earlier today, in the investor section of our website. I want to point you to the safe harbor statement contained in both our earnings press release and presentation. Any comments we make concerning the company's expectations, plans, and prospects are forward-looking statements under the safe harbor provisions of the Private Securities Litigation Reform Act of 1995. A variety of factors could cause actual results to differ materially from what those forward-looking statements indicate, including the ones covered in the company's latest annual and quarterly reports on Forms 10-K and 10-Q, under the risk factors heading, as filed with the Securities and Exchange Commission, and accessible in the investor section of our website under the SEC files headings. Although we might choose to update forward-looking statements, we expressly disclaim any duty to do so, so you should not treat any forward-looking statements as reflecting our views at any later date. On this call, we'll mention some financial measures that are not prepared in accordance with generally accepted accounting principles, or GAAP. A reconciliation of non-GAAP financial measures to the most directly comparable GAAP measures appears in the press release about our Q3 2025 earnings and on our website. I'll now hand the call over to Abinand Rangesh, Tecogen CEO, who will give an overview of Third Quarter 2025 activity and results, and Roger Deschenes, Tecogen CFO, who will share additional information about Q3 2025 financial results. Abinand?

Abinand Rangesh

executive
#2

Appreciate that, Jack. Hello everybody, and thanks for joining our third-quarter 2025 earnings presentation. During the last three months, our data center strategy has picked up a great deal of forward momentum. A year ago, when we started shifting toward cooling for data centers, most of the leads we saw were coming from independent developers. These days, interest has grown quite a bit; attention is now coming our way from well-known colocation data center developers. By this point, we've pitched our solution to NVIDIA, AMD, and hyperscale developers. The response has been favorable in every case. With this much interest, I have strong confidence that Tecogen will come out ahead in this market. On today's call, I'll walk through what the bigger developers are requesting from us, the validation steps involved, and give you a clearer picture of how we move forward from here. How the Vertiv partnership fits into all this matters a great deal to the strategy, so I want to walk through that too. Independent developers were the source of our first data center leads. Take companies that used to be in traditional real estate and are now shifting toward data centers, or ex-data center executives who went off and launched their own firms — early on, those developers proved more receptive to fresh approaches, our chillers included. Last quarter I brought up an LOI for six STx chillers, and it came from one of these developers. Since then, across the past three months, that developer has toured Tecogen and viewed our customer sites, and now they're considering putting us on three of their projects, where we'd handle part of their primary AI cooling load. That might translate into significantly greater chiller volume than the LOI anticipates. During the build-out's first stage, combined IT capacity should probably go past 200 MW, with considerably more added as time goes on. Conversations with prospective tenants are actively underway at the developer, and with power availability tight nationwide, our view is that this developer stands a good chance of succeeding. The remaining projects I brought up during the prior quarter continue progressing as well, each somewhere along the path of securing either financing or tenants. What's even more thrilling is that we've begun drawing interest from prominent, industry-established developers — among them ones who already have several AI data centers built or underway. Through our presentations and conversations with developers, hyperscalers, and chip firms, it's grown obvious that today's approach to data center cooling generates a host of issues we're able to address. For anyone who recently joined as a shareholder, let me restate the value proposition Tecogen brings to data centers. More powerful chips demand greater cooling, and those cooling systems have to be engineered around the worst-case scenario: the hottest day under a full AI load. In certain regions of the country, temperatures can reach 120 degrees Fahrenheit or higher. Designing for that peak means you end up reserving a lot of power, because you never know exactly when the cooling system will need to kick on. That used to be a fairly minor concern, but the newest AI chips have changed things—electric cooling could account for 25%-35% of a data center's total power, and those requirements continue to climb. By moving all or part of the cooling load to natural gas, data centers free up more power for IT, which boosts their potential revenue. I'm sure a lot of you are already familiar with data center cooling methods such as liquid cooling, immersion cooling, and similar approaches. Every one of those approaches focuses on what goes on within the data centers. Each of these approaches still hooks up to chillers such as ours to dump the heat, and those chillers right now run on electric power, demanding large amounts of it. Our chillers are able to connect with any of those liquid cooling or immersion cooling choices. The chart on the left demonstrates how much power set aside for cooling almost doubles on the hottest design day. That means in Texas, a 100-megawatt data center today sets aside 35 MW to cool it. There's another issue too for certain larger data centers. A factor behind the inbound interest we're seeing from hyperscale developers is that many of them depend on power generated at their own sites. According to what they've shared with us, their cooling requirements lead them to put in more generation capacity than they need, and that surplus sits idle for the bulk of the year. Given how hard it is to get gas turbines, these data center builders would rather redeploy those unused turbines to their next facility. The same developers have also told us that what it costs to install our chillers is less than 50% of what they'd pay to install an equivalent amount of power generation. Here's why that happens: backing up gas turbines requires a lot of additional infrastructure, whereas our chillers are able to step in directly where electric chillers would be used, which brings down how much electricity is needed for cooling. Among the data center developers we've spoken with, most are considering using our chillers to handle somewhere between 30% and 50% of the cooling load at a data center. Once temperatures cross a certain threshold, our chillers would operate on natural gas, letting the data center cap the amount of power it dedicates to cooling. There's a validation process in place before these established developers will adopt our chillers. That process involves providing test data, computer modeling of performance across various parameters, and other information. A lot of these developers understand we're not a huge company and that it'll take us some time to scale. That said, one thing we absolutely have to get right is how much we can build. So to address that, we've been reworking the way our factory floor is arranged so we can push more units out the door. We've also kicked off work with contract manufacturers, and we expect the first articles for the sheet metal assemblies on the dual power source chiller to arrive before the year is over. But that's only one route toward greater manufacturing capacity. In parallel, we've been partnering with Vertiv as a second route for scaling production. I get why shareholders may be concerned that things between Vertiv and Tecogen have moved slowly up to now. Over the past month, that's changed quite a bit. On this partnership, Vertiv put the person in charge of its U.S. Chilled Water Group in the lead role. Because of that, momentum has picked up noticeably. I'm not able to share details, but we're pursuing several paths to sell jointly and expand our natural gas solutions with these bigger developers while meeting the validation requirements they have. This is based on what we've heard in discussions with those bigger developers, the AI chip companies, and Hyperscalers. My confidence in how large this opportunity is, and in what our chillers are worth to it, is now solid. A lot of these developers require hundreds of chillers annually, and every one of them has affirmed the advantages. Roughly $4 million sits in our backlog right now, mostly from cannabis cultivation plus the 10-year service contract for the Las Vegas Convention Center. We anticipate closing a few multifamily projects and additional cannabis projects later in this quarter or in early next year. Since interest is now coming in from some well-known data center developers, our attention has to shift to landing first projects with them. Should we manage that, additional projects from other developers will follow. Beyond that point, we have several strategic choices for converting our data center market opportunities into value for Tecogen shareholders. Given where we stand as a tech firm of this scale, we don't need the broader AI sector to grow by billions of dollars each year in order for our shareholders to realize value. A single data center of 200 megawatts uses between 100 and 200 electric chillers. To put that in perspective, the order for the Las Vegas Convention Center consisted of just seven of our bigger chillers. We're working on technological improvements that provide test data along with engineering assistance, and we're accumulating chiller stock in anticipation of potential data center builds. Beyond that, we've completed several upgrades to our engine platform, allowing us to extend service intervals to twice as long while also improving performance and boosting engine power. To get essential information that helps us keep making our products better, and to reduce the impact of climbing labor expenses in places like New York City, we invested $700,000 in new engines for the service fleet. Because we expense engines, this weighed on our service margin more than proportionally, but over the medium and long term it should boost profitability. It also gave us much-needed information for ongoing R&D. Right now our cash position is roughly $14 million, and we expect to bring in $2.5 million over the coming weeks. We have also repaid the related party note, which means the balance sheet carries no debt. I'll hand it over to Roger so he can take us through the financials.

Roger Deschenes

executive
#3

Thanks, Abinand. Good morning, everyone. During Q3, our total revenues increased by $1.6 million, hitting $7.2 million, versus $5.6 million in the same period of 2024. All of that improvement comes from product revenue, which surged 115% across that timeframe. Net loss for the quarter expanded to $2.13 million, compared with a loss of $0.93 million in Q3 of 2024. The driver is a reduced service margin caused by elevated material and labor expenses, as Abinand mentioned before, while we directed capital toward engine replacements. Beyond that, operating costs also rose during the latest quarter. Gross profit declined 12% owing to higher expenses in our services segment. For Q3, gross margin decreased 13.7%, settling at 30.4% versus 44.1% in 2024; we'll examine gross margin more closely on the segment performance slide. Operating expenses increased slightly under 28% from the prior quarter, reaching $4.28 million, up from $3.35 million. That mirrors expansion in administrative and R&D payroll and, consequently, greater benefits, recruiting expenses, and widespread rises in business insurance premiums, depreciation, stock-based compensation, as well as bigger sales commissions. Now on to EBITDA and adjusted EBITDA: in Q3, the EBITDA loss was $1.94 million, and the adjusted EBITDA loss was $1.77 million, against an EBITDA loss of $0.77 million and an adjusted EBITDA loss of $0.75 million during Q3 of 2024. Both of the bigger losses this period come from softer gross margins in services and our higher operating costs. Moving to segment performance: product revenues for Q3 increased to $2.98 million from $1.39 million in 2024, fueled by additional chiller and engineered accessory shipments, partially offset by a decline in cogeneration shipments; we shipped one additional hybrid drive air-cooled chiller this quarter. Product margin declined to 36.8% from 42.7% in the comparable quarter of 2024. Greater material and labor costs account for that, and our air-cooled chillers also carry a slightly lower margin because these represent the product's first shipments. Services revenue rose 2.4% from the prior quarter, reaching $3.94 million in Q3 of 2025, up from $3.85 million in the same period of 2024. Gross profit margin dropped 19.1%, to 25.3% from 44.4%. The reason is escalating labor and material costs in our New York territory — or rather New York City — as we put capital into engine replacements. Energy production revenue fell 34.2% from the prior quarter, to $25,600 in 2025 versus $389,000 in the comparable period of 2024; just like last quarter, this results from contracts at certain sites expiring late in 2024, together with a few sites temporarily closed for repairs during the current period. During 2025, gross margin dropped 10.8%, to 34.4%, down from 45.2% in 2024. The cause is the temporary shutdown of those sites we discussed earlier, plus the additional costs we incurred to bring those sites back online. On a quarter-over-quarter basis, our overall gross profit margin fell 13.7%, settling at 30.4% versus 41.1%. That drop comes from reduced gross margins within our services segment. That $1.7 million figure ties directly to it, alongside $25.60 per share. So with all of that covered, our review of the third quarter 2025 financials is now complete. Abinand, the call is yours again.

Abinand Rangesh

executive
#4

Thanks, Roger. To wrap things up, I want to say this: for a technology company our size, we don't require the wider AI sector to expand by hundreds of billions of dollars in order for us to create enormous shareholder value. To give a sense of the scale of this opportunity, one 200-megawatt data center relies on 100 to 200 electric chillers. As I noted before, the Las Vegas Convention Center accounted for just seven of our chillers. So what we as a company must do is remain focused on meeting what data centers need, and that includes delivery and performance. From that point, we can turn this into shareholder value, whether by scaling up manufacturing or through other strategic options. Given how much interest we're seeing from some of the biggest names in the industry, my confidence in our strategy keeps growing. I'm eager to update investors as we make progress. With that, I'll open the floor for questions.

Chip Moore

analyst
#5

Morning, and thanks for taking my question.

Abinand Rangesh

executive
#6

Morning, Chip. How's it going?

Chip Moore

analyst
#7

Great. Hey, Abinand. First, I'd like to ask about that initial pilot involving the six units — perhaps you could share whatever update you have regarding how you're viewing possible timing for it, and after that, could you elaborate on the follow-on? It sounds like that opportunity is getting bigger. Are more sites being planned, or how should we think about those extra opportunities? Also, I believe you said they're keen on handling a larger share of their load — any idea of the scale involved there too?

Abinand Rangesh

executive
#8

Yes, excellent question, Chip. From our perspective, all three projects sit at roughly the same planning stage, since the developer is basically attempting to secure a tenant for each of them around the same time. What appears to be happening is that certain bigger organizations prepared to lease data centers of this type would look to absorb the entire capacity at once. It's conceivable that part could be leased on its own. Timing may be extremely tight, or it could stretch over several months, depending on how long securing a tenant takes them. It could take even longer, since many of those factors aren't within our control. Based on what we know, I'd say the developer is currently in highly active talks with tenants; we've been brought in as part of the engineering design phase. Our chances look quite strong, though tenants do get a say in what is included in the project. That's precisely where the Vertiv relationship becomes valuable, because should you wind up with a hyperscale tenant, you'd need an approved vendor-type relationship. Vertiv holds approved vendor status with most large companies, so we can always sell through that channel. There are some subtleties involved with that. That said, it isn't the sole opportunity we currently have in front of us. Several opportunities have emerged today. I'm unable to discuss details about a number of them, since we're under NDA with several companies, but I'd say this is merely one among many that are progressing along somewhat parallel tracks at present.

Chip Moore

analyst
#9

Understood. That's quite useful. Regarding what you said about Vertiv, it seems like movement is happening more quickly at this point. Perhaps share anything further you can provide on that front. Specifically concerning the validation and test data you brought up, clearly you're a company of smaller size. Just give us an idea of what's required and the timeline for some of those more in-depth items.

Abinand Rangesh

executive
#10

Of course. I'll begin with the Vertiv aspect. One factor behind the Vertiv partnership being somewhat sluggish to kick off, I believe, is that we were interacting either with someone too senior at Vertiv or someone at a more entry-level position. What Vertiv ultimately did was reorganize who our main contact would be within their organization and who would take charge of driving this initiative. At present, we have the person heading their U.S. chiller operations, and that individual possesses both the power and the capability to push this ahead rapidly. That has kind of sped things up at this point. Another item we're addressing as we begin to notice direct interest from big data centers—where the real advantage for both sides in this partnership would be significant—is if Vertiv could assist us in expanding supply chain manufacturing. Many of our talks have centered on that topic too, since, naturally, it offers a means for us or for final customers to feel at ease collaborating with a smaller firm such as ours. That's just how this relationship works. It isn't simply a case where Vertiv handles marketing and we just sell to them. There are various other paths currently being pursued. As for your second question about validation, some of it—and this is among the reasons why, as we start to witness genuine interest at this level as a business, we're putting major emphasis on it—whatever is necessary to supply the data; we have units in our test cells right here alongside our engineering staff; we've broadened that somewhat to genuinely handle part of this undertaking. We simply generate test data. I mean, we already possess some of it as a matter of course, since even across other sectors, certain of those demands are identical. When it comes to data centers, it's somewhat broader because they function under varying circumstances. Based on their location within the country, it differs. We must deliver much of that. Part of it involves having units in test cells at our plant, just producing that data whenever it's requested.

Chip Moore

analyst
#11

Got it, that's genuinely helpful. And Abinand, on the production side, I think you said you're taking care of the contract manufacturing piece. Did that tie back to the dual-source power unit? How do you approach contract manufacturing?

Abinand Rangesh

executive
#12

When we look at margins and at our capacity to scale, it's clear some components are better suited to outsourcing — the sheet, for instance, especially with the air-cooled chiller, because a lot of sheet metal assemblies go along with it. What we intend to do is send that sheet metal assembly outside, but the power drain and the final assembly stay in our own plant, where testing and shipping happen. That sheet metal part, plus every refrigeration system connected to it — basically the piping — we're working with a company that has a great deal of overflow capacity serving a number of the bigger chiller manufacturers. They can scale up quite a bit. The task on our end is to get the first article and validate it — we should have that first article in roughly a month to 1.5 months — so we can verify it aligns with our design and works with the rest of the components we'll put together at our factory. Once that step is complete, ramping up is pretty straightforward, because you're just drawing on that same plant. That opens the door for us to lift throughput substantially from the factory we have now. One more change we've made at our current factory is a layout that's more flexible; whichever chiller variety an order comes in for, we can deliver on it.

Chip Moore

analyst
#13

Great. If there's time for one more, I'd like to focus on service margins and those new engines you're bringing out — how should we think about that, perhaps in the nearer term, once we begin seeing some benefits? Clearly, my guess is that should assist you in landing larger deployments in data centers, but also, from a strategic standpoint, what else might it accomplish?

Abinand Rangesh

executive
#14

Yeah. Looking backward at service margin across the past twelve months, eighteen months or so, it's been somewhat uneven. Certain quarters saw us land right near the 50% mark. At other moments, we were sitting in the low 40s, roughly. Like we said during the prior quarter, the expense of running operations in New York specifically has climbed substantially, particularly travel time from one site to another. Consider the service side — take one engine in, say, New York; among your largest costs, right, it tends to be the engine itself. If you can essentially sidestep any engine work, or you can sidestep needing to — if you can double the interval between oil changes, then returning to a site becomes far less frequent. You can do this — the gap between installing a new engine featuring all the approved, like the updated systems, versus perhaps performing certain repairs or making minor increments, is fairly small. If you could double engine life or even raise it by 25 to 30%, that would improve your margin disproportionately. I'd say over the coming couple of quarters, we don't yet know where service margin will land, simply because we might choose — it depends on how the first results from this come in and how things begin to appear. We remote monitor each unit. Simply examining the data, examining near-term data and saying, "Okay, everything is performing really well. We're noticing this reduction in terms of needing to actually visit sites as frequently," we might deploy more throughout the fleet. Because as I said regarding the engine side, it's a mix of not just enhancing the actual engine system, but also items such as oil change intervals, where you can nearly — you can raise it 50% or even double it, which is what we've observed at initial sites. If we can observe this across this wider set of units, then we might apply it to additional units because, again, it'll help us reach that 50% or higher gross profit margin far sooner if we do so. Over the next two quarters, it's somewhat difficult to forecast until we see our own data from that. Beyond that point, I'd say this will certainly improve overall margins on service and bring us to the point where we're producing healthy cash from it, and we can truly concentrate on expanding the data center business instead.

Chip Moore

analyst
#15

Got it. Got it. Perhaps, apologies, just one final item. Your tone and confidence seem to have strengthened. Clearly, securing positions with companies such as NVIDIA and AMD and Hyperscalers is very impressive. Is there anything further you can share about that response and what you are hearing from certain of those larger companies and their openness?

Abinand Rangesh

executive
#16

Once more, I can provide you with general details on this. Many of these, particularly the larger companies, when we consider the bigger developers, we hold NDAs with them. More generally, I believe throughout the industry, what we are observing is that power constraints are becoming significant. What I mean is, folks are discovering that utility power is, I would not call it nonexistent, but obtaining the complete utility power is growing increasingly challenging. The cooling load is certainly rising with the present generation of chips, correct? Particularly when you are engineering data centers down in Texas or Virginia where your hottest day, since you are in fact not engineering only for the hottest day in a single year. You are engineering it for the hottest day in the last 20 years. That delta, the quantity of power required, is far greater. As I stated, the response regarding the alternative, which is, "Okay, what if you do on-site power generation?" That on-site power generation is actually where I believe our assumptions have been validated concerning the cost delta. We are certainly being told universally that on-site power generation is considerably pricier than selecting our chiller option. I think the actual obstacles for us as an organization to gain traction in this area will be to determine methods to de-risk somebody selecting a natural gas chiller, correct? That is truly where that dual power source chiller is especially appealing since you have got two power sources. You can back that chiller up with a generator if you require it. You can operate on natural gas. You can opt to switch over to natural gas some of the time. You have numerous different methods to run that. It is still going to be we must work our way through these steps. We are not receiving any resistance regarding the underlying value proposition, the cost benefits; it is truly a question at this point of determining methods to get projects, even if it is smaller projects with certain of these larger companies, to truly get people at ease with the technology. From that point, I think it will grow.

Chip Moore

analyst
#17

Wonderful. That's much appreciated. I'll jump back into the queue now. Thank you so much.

Abinand Rangesh

executive
#18

Thank you, Chip.

Alex Blanton

analyst
#19

Morning, and yeah, this is looking pretty solid up to now. Could you help us understand the dollar volume tied to that example you mentioned — a data center containing 200 chillers?

Abinand Rangesh

executive
#20

I'll give you rough, ballpark figures here, okay? Say roughly half of those 200 ended up being the kind of chiller we make, alright? That could run somewhere between $30 million and $50 million, or even beyond, based on the size of each unit.

Alex Blanton

analyst
#21

does that mean $30 million to $50 million for a hundred chillers?

Abinand Rangesh

executive
#22

well, that really hinges on the specifics, since quite a few variables come into play here, correct? The capacity of the chiller matters, for one. To some degree, Alex, the reason I am handing you such a wide spread is simply that competitors also offer this equipment. It also hinges on — the way we set our prices shifts somewhat based on whether the unit uses a dual power source, or whether we are talking about a standard DTx chiller, or something along those lines.

Alex Blanton

analyst
#23

What made you state that half of those would belong to you? And who else would hold the remaining portion?

Abinand Rangesh

executive
#24

Generally speaking — this is drawn from the initial discussions we've held with a few of the larger developers — their usual approach is to retain conventional electric chillers covering a portion, while relying on our offering for another portion. Part of the reason could simply be maintaining two separate supply chains for whatever data center is involved. My sense is that in numerous instances, dividing such systems this way appears to be a common approach. Once more, with regard to those larger projects, there are plenty of shifting variables.

Alex Blanton

analyst
#25

If the savings from the gas chiller are so big, why would they need electric chillers at all?

Abinand Rangesh

executive
#26

I believe as time goes on — and this actually ties into what I said before — the problem at this moment has very little to do with what the product offers. A large part of it, I'd say, is really about being comfortable, since in a data center we're doing something different, correct? Despite the fact that these chillers may be present in plenty of mission-critical cooling uses, such as hospitals and ice rinks, for us this remains a new industry. As time passes, perhaps the whole system could move in that direction, but.

Alex Blanton

analyst
#27

All right. So what it comes down to is believing in both the business and what it sells.

Abinand Rangesh

executive
#28

That's my view as well. At minimum, judging by what we hear back and how folks are evaluating it, they might hand over part of the AI workload at first, or a share of it, or apply it toward applications such as cooling for turbines, which once more lets them test the waters without exposing themselves to too much risk right away. Should results prove favorable, that's when, I believe, you would begin to observe considerably larger chunks of the workload shifting across to platforms along the lines of what we offer.

Alex Blanton

analyst
#29

Let's move to something else briefly — where do things stand with the chiller work at the Las Vegas Convention Center?

Abinand Rangesh

executive
#30

Our chillers have gone out to that convention center. My guess is the site likely goes live at the beginning of next year. Construction is underway there. Right now they are putting our chillers in. I'd say yes, we look for that location to come on stream at some point in the early part of next year.

Alex Blanton

analyst
#31

How far along is it right now, in percentage terms? Some units have gone out, though it isn't finished yet, correct?

Abinand Rangesh

executive
#32

Actually, no. The chillers have already gone to them. That project is done. What remains unfinished is the service contract, and naturally that continues, since it's prepaid. Recognition of it will happen across the coming 10 years.

Alex Blanton

analyst
#33

All right. So the revenue from those products is recognized by you.

Abinand Rangesh

executive
#34

That's right.

Alex Blanton

analyst
#35

Okay.

Abinand Rangesh

executive
#36

Correct.

Alex Blanton

analyst
#37

Turning back to data centers — how soon do you figure the mortars in that space would arrive?

Abinand Rangesh

executive
#38

Sadly, that's the piece that's toughest to forecast. Right now, I can't even give reasons. The one we hold an LOI for could progress really fast the moment they land a tenant, correct? That would fall into that category; as for the remaining projects, many of the ones from independent developers — the folks I first began working with — those are aiming to be online by 2027, and that means deliveries would have to happen in 2026. With many of those entities, once again, certain elements sit beyond our control, such as securing the tenants. When it comes to the larger, better-known developers, everything hinges on how much time the validation process consumes and what it involves, since they may begin deploying chillers sooner. It could be smaller batches simply to test things out. Tenant problems don't exist for them. Financing issues don't exist for them. Those situations could advance far more quickly. I'd say this falls among the instances where I'll do my best to keep everyone informed from now until our next report, the moment we gain any traction on any of these projects when it comes to pushing those over the finish line.

Alex Blanton

analyst
#39

That would be helpful. So these projects, none of them have broken ground yet. What sort of chance do you have to retrofit, or to take part in growing the centers that already exist? I mean, your conversations are with bigger Hyperscalers, or with folks in the industry who are already running such centers. Is there a chance for you to sell them anything? When it comes to retrofits, we aren't seeing that much. A handful of projects have come up on that side, retrofit-wise. Most of what's happening at the moment is ground-up construction aimed at the newest chips. Many retrofit chances involved the prior generation of chips, and as an industry, at least based on what we've observed, activity in the retrofit market is not something we're seeing much of. My sense is that will shift fairly soon, because of power constraints. In data centers of a very small size, we could see a few retrofit chances. Certain cloud-type data centers being converted so they have some AI element or some compute element — that could occur. As for the bigger AI data centers at present, the pattern tends to be new builds, constructed ground up for the newest chips, with liquid cooling and all the other related components. Yeah. Yeah. All right. I'm eager for your next report, or for a report on orders. Thank you.

Abinand Rangesh

executive
#40

Thank you, Alex.

Barry Hymes

analyst
#41

Thank you very much. Two things I wanted to ask about. First, going back to the Vertiv relationship, when did that point of contact switch happen? Are joint sales calls something you're doing on a regular basis, or was it necessary to run teach-ins for their sales team, or how is that whole process going, more or less? And if an order does come in through them, who handles the service — them or you? Second question, quickly: could you remind us what percentage of cost savings on average, or what range, you'd normally quote for your system compared with traditional? Thanks.

Abinand Rangesh

executive
#42

On the Vertiv relationship, the point of contact change happened roughly three to four weeks back, I'd say. It's quite recent. We had been engaging with Vertiv at higher levels ever since the agreement was signed, but this was about getting their side to move more quickly and ensuring there was authority to genuinely push this relationship ahead. That change took place, yeah, three to four weeks ago. Teach-ins for their sales force are already done. A few joint sales calls have happened too, though many of them were more about figuring out which key pain points data centers are flagging beyond simply how much power gets freed up. Other factors exist as well. In one of those calls, for instance, stakeholders brought up things such as uninterrupted cooling. Take an electric chiller: if power is lost, what has to happen is the electric chiller shuts down, the diesel generator kicks in, and then the chiller comes back online. With natural gas, you might be able to keep running right through an outage. You simply shift some pumps over to backup power, and you could ride through an outage. Benefits of that sort aren't always immediately apparent unless you speak with end customers. Those are the kinds of things we've worked on alongside the Vertiv sales team to really pin down what those pieces are; now it'll begin to ramp. Vertiv has been doing some initial quoting to potential customers. Where exactly those projects stand isn't always that clear to us. Most of the bigger opportunities we're discussing today originated from Tecogen's direct marketing. Us reaching out directly, or meeting big data centers at trade shows, or, yeah, direct outreach to some of them. I think the Vertiv side is spinning up. I think the right things are happening; that change, I think the acceleration really began, I think, over the last month or so. As for your question about savings, you really have to think about it in terms of power available, right? Once you've allocated power to cooling, that power is no longer available for those IT chips. It's really a revenue reduction for a data center. Imagine 30 MW is allocated toward cooling. With the figures we see right now, if you happen to own a colocation data center and a hyperscale tenant is basically occupying it, that tenant is shelling out somewhere between $150 and $200 for each kW every month. Each extra megawatt translates into over $2 million in extra revenue that a colocation data center owner stands to gain. Now if you're a Hyperscaler, well, it comes down to whether your facility runs at 70 MW, meaning you've got 70 MW of computing power, or whether you've got 100 MW of computing power at your disposal. What it truly comes down to is the capability it gives you inside that facility, the amount of extra computing you're able to run on-site. This is genuinely a revenue gain instead of merely a cut in operating cost — and yes, a cut in operating cost does exist, yet it's actually minor when set against the revenue gain.

Barry Hymes

analyst
#43

Got it. Makes total sense. Thank you.

Operator

operator
#44

That wraps up the Q&A portion. We're bringing today's call to a close. Feel free to hang up your phones now, and thanks so much for joining us.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Tecogen Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Tecogen Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Tecogen Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.