Jack Whiting
executiveGood morning. Jack Whiting here, serving as General Counsel and Secretary at Tecogen. Please note that this call is being recorded, and afterward it will be archived at tecogen.com. You can find the press release about our second quarter 2026 earnings, along with the presentation shared this morning, in the investor section on our site. I want to point you toward the safe harbor statement that appears in both our earnings press release and the presentation. Any comments we offer concerning expectations, plans, and prospects for the company count as forward-looking statements under the safe harbor provisions of the Private Securities Litigation Reform Act of 1995. Actual outcomes could vary materially from what those forward-looking statements suggest, owing to numerous factors, such as those covered in the company's latest annual and quarterly reports on forms 10-K and 10-Q, under the caption Risk Factors, filed with the Securities and Exchange Commission, and accessible in the investor section of our website under the heading SEC Filings. Although we might choose to update forward-looking statements, we expressly disclaim any duty to do so, and you should not treat any forward-looking statements as reflecting our views at any later date. On this call, we'll mention some financial measures that were not prepared under generally accepted accounting principles, or GAAP. A reconciliation of non-GAAP financial measures to the most directly comparable GAAP measures can be found in the press release about our Q2 2026 earnings and on our website. I'll now hand the call to Abinand Rangesh, Tecogen's CEO, who will give an overview of second quarter 2026 activity and results, and Roger Deschenes, Tecogen's CFO, will supply further details on Q2 financial results. Abinand?
Abinand Rangesh
executiveThanks, Jack. Hello everyone, and welcome to the Q2 2026 call for Tecogen. I'd like to begin today with the main question that a lot of you are probably asking. Tecogen has spent quite some time developing its data center strategy, and the product appears to be an ideal fit for the market, so why are orders taking so long to finalize? Is some piece of the story absent? To address those questions, I think we should begin with the objective. From my perspective, the objective is this: given that we possess excellent technology yet face resource limitations as a small company, what is the quickest path to maximizing Tecogen's value? Initially, we aimed at smaller-scale data centers. Those would give us a proof point that could draw in larger players. When the bigger players showed interest, our technology would start being picked up by major-brand data centers, and then we'd hold something everyone wants, making Tecogen very valuable. Today, we may be able to go straight after the ultimate objective — hyperscale and big brand developers; back in March of this year, I walked you through a pipeline of opportunities. Many of those opportunities centered on smaller-scale data centers. A lot of these projects are probably going to get done, but they're exposed to things outside our control — tenants, construction permit holdups, and so on. The major brand data centers aren't constrained in that way. So in addition to those smaller chances, we've at the same time been pursuing access to the bigger players. Getting a foot in the door with certain large names has demanded a huge effort from our sales team, yet I think we've now built some real momentum. Over the last 2 months, we've put on 12 product demonstrations — six in person and six virtual. Among the in-person attendees were four data centers that are hyperscale or are constructing hyperscale campuses, plus partners. Chipmakers, engineers, plus four additional data centers took part in the virtual session. Together, those data centers account for more than 8 GW of capacity that is running right now, along with several gigawatts currently being built. I'm not able to disclose which data centers joined, though I'm confident lots of them are familiar to you. For context, the facilities that participated — whether online or on-site — add up to somewhere between 15% and 20% of all U.S. data center capacity at present. So the obvious thing to ask now is whether showing up to this product demo actually signals any genuine commitment or interest? When it comes to the face-to-face segment, data center engineers and senior folks have very packed schedules, so setting aside an entire day for several team members is a big ask. Reaching this stage required a long stretch of identifying the right advocates inside these bigger organizations — people who carry real sway — and walking them through what our offerings can do for them. And apart from those who showed up, we're also in conversations with additional large-scale and hyperscale data centers. Those who are further along in the process turned down the invitation to come; that matches what we've seen in other regions, since when a prospective client does show up for a site visit, we tend to close at a high rate, because they are serious about forming a business relationship. And finally, I believe the market itself has changed; beyond power, there are certain major challenges that larger data centers confront which our products address. As you might have seen reported, a lot of data centers are running into pushback over water use at the site, noise, and air pollution. That's exactly where our products stand out. All three of those issues are solved by us. Since the chiller with two power sources operates as a closed loop, you don't get any water evaporating. We've already got units out in places where noise matters — say, up on a roof right next to a penthouse apartment. Recently, during that really brutal July 4th weekend, you could see black smoke up in northern Virginia, and the reason was diesel generators at data centers that just kept running. Why were they running? To keep a blackout from happening, because the grid was short on power and making data centers drop load. So rather than a diesel generator, which brings noise complaints and pollution, a data center can install our products and not worry about it; and that's exactly where a product demo makes these advantages something you can actually see. Hearing our products in person is a different experience from simply reviewing a spec sheet with a decibel number on it. The same holds for witnessing an emissions analyzer's live readings versus only reading that NOx and carbon monoxide output is close to zero. Consider as well the distance between asserting that additional megawatts for compute can be brought online during hot weather and actually observing cooling demand spike in real time while electrical power remains at its limit — or between saying uninterrupted cooling can be maintained through an outage and actually seeing a running chiller have its electrical supply severed. Permitted projects, capital, and the ability to influence the whole industry all sit with these prominent data centers. We've gotten great responses across the board, and with particular projects, timelines, and similar details now settled, we feel confident enough to begin accumulating stock of our dual power source chiller and power gen modules so we can stay ahead. Outside of the data center work, backlog for our base business has reached more than $8 million. Alongside what's already booked, we foresee an additional $2 million-$3 million in projects being finalized over the coming months. As a result, we look for product revenue to increase in Q3, and we also expect to bring in further deposits, which strengthens cash flow. Even though our emphasis has mostly been on the data center strategy, on the previous call we noted that we expected to cut expenses in our service group to boost margins. During Q2, those cuts happened partway through the quarter, so the complete effect will show up starting in Q3. One-time costs in Q2 lowered margin by roughly 7 percentage points. Absent those nonrecurring charges, service margins are beginning to bounce back. Alongside trimming expenses, we've begun adjusting contract rates where it makes sense, and we're collaborating with clients—particularly at bigger locations—on enhancements that would assist them in raising run hours while helping us lift both revenue and margin. Since our service revenue came in well above the prior-year figure, this ongoing progress should translate into better margins and, as a result, a meaningful gain in gross profit dollars. At this point I'll pass things to Roger for the financial discussion.
Roger Deschenes
executiveThanks, Abinand, and good morning to all of you. I'd like to start by walking through what happened in Q2. Total revenues came in at $5.8 million, which represents a drop of 21%, or $1.5 million, versus the $7.3 million we posted in the same quarter of 2025. The primary driver here is softer revenue from our product segment. As Abinand mentioned a short while ago, we're anticipating top-line growth in Q3, supported by the backlog we've recently built up and the projects we expect to finalize over the coming months. Gross profit fell 11.9%, landing at $2.2 million for Q2 of 2026, down from $2.5 million during the equivalent period in 2025. Once again, the products segment is behind this. Our gross profit margin, pardon me, rose by 4% to reach 37.8% in this year's second quarter, up from 33.8% in 2025. That improvement stems from better gross margin in the products segment. Operating expenses were up 11.6% in Q2, hitting $4.3 million versus $3.9 million in the second quarter of 2025. The reasons are higher operating costs across both our products and services segments, plus the broader rise in operating costs tied to the manufacturing capacity expansion we're currently undertaking, along with ongoing development and refinement of our dual source chiller, which, as everyone knows, is aimed at our entry into the data center market. During the quarter that just ended, we trimmed headcount at several of our service centers as part of our effort to cut spending there. On the whole, operating expenses were roughly $400,000 lower in this year's second quarter than they were in the first quarter. Our net loss for the quarter widened to $2.2 million, compared with $1.5 million in the same quarter of 2025; the causes are reduced products segment sales and gross margin along with higher operating expenses. Turning to adjusted EBITDA for the quarter, we recorded a loss of $1.7 million in this year's second quarter, which is worse than last year's loss of $1.2 million; again, this reflects lower products segment sales and gross margin as well as elevated operating costs. Now for segment performance: Products revenue dropped 64% to $1.1 million in Q2 of 2026, compared with $3.2 million in the second quarter of 2025. Last year's product segment revenue got a boost from cogeneration systems shipped during that period to customers pursuing tax credits under the Inflation Reduction Act of 2022. As we've noted before, product revenue swings considerably from one quarter to the next. Our products gross margin climbed 19.2% to 48.5% in this year's second quarter, up from 29.3% in the same quarter of 2025; the gain comes from price increases and a shift in product mix. Services revenue grew 10% quarter-over-quarter in 2026, reaching $4.4 million, compared with $4 million in the second quarter of 2025. The reason for this comes from more billable work being done, along with our equipment running for a large number of hours, across the service contracts we already had as well as those we gained through the Aegis acquisition. Compared with the prior year, our service gross margin came in basically unchanged. In this year's second quarter, like Abinand mentioned, roughly $300,000 in one-time costs were incurred at a small number of locations we service — these are electric chillers tied to the energy sites we divested to SDCL Kyotherm in 2029; in fact, at the beginning of the cooling season, a catastrophic failure occurred at one of those electric chillers, requiring substantial repairs plus the extra expense of bringing in rental cooling while the systems underwent repair. If you set aside that one-time cost, as Abinand noted before, our gross margin on service operations would have come in 7% higher for the 2026 period. Revenue from energy production rose 35% during this year's second quarter, reaching $0.24 million, up from $0.17 million in the 2025 period. The driver here is better uptime at certain energy production sites. For the second quarter of 2026, the energy production gross profit margin fell 29% from 25.2%, which reflects the guaranteed shortfall of slightly less than $100,000 that we booked during the quarter. At this point I'll turn the call back to Abinand for his closing remarks.
Abinand Rangesh
executiveThank you, Roger. Right now, you might land on one of two takeaways. The first: today has dragged on quite a bit, which suggests this company's odds in the data center space are thin. Or the second: getting our bearings in the data center world and reaching the proper advocates at the biggest data centers took some time. Having done that, the addressable market in front of us is enormous. Otherwise, why would several of the biggest data centers carve a day out of their packed calendars just to watch a product demo? Since we now hold a spread of opportunities, ranging from modest data centers all the way to the biggest names, how likely is it that zero deals get signed? Particularly when we're carrying some inventory and the risk around delivery is off the table. Suppose we secure even a trial engagement with a major-brand data center — what does that do for our standing across the entire industry? Both management and the board have kept purchasing shares, since we trust that this company's technology addresses certain core issues confronting not only data centers but an entire array of markets. Which takeaway strikes you as most reasonable is your call. Thanks, and I'll open the floor for additional questions.
Bobby Brooks
analystMorning, everyone, and thanks for letting me ask. It's really thrilling to learn about those 12 demonstrations, though I'd like to dig into the details a bit. Did each of those 12 demos involve a distinct prospective client? Back at the start of July you told us about six demonstrations, meaning six more happened during the past month. Did things speed up at all? I'm just interested in hearing a bit more about that.
Abinand Rangesh
executiveExcellent question, Bobby. Among the 12, 8 involved prospective direct end customers. The remaining ones were engineers or other individuals, whether they design data centers or are partners who might assist us in speeding up some of this, so they truly hold significant sway over the final outcome. A chip manufacturer was among them. By and large, every visitor was high-profile. As for how we handled scheduling, we certainly aimed to place the most significant ones later on, simply so we'd gain more practice with the demonstrations; it simply turned out that the schedule unfolded that way. We increased steadily when it came to size, which explains why our press release from earlier in July likely displayed a smaller installed capacity, while we had additional ones later on.
Bobby Brooks
analystUnderstood, that clears things up. Across those 12 visits, there were 12 separate customers.
Abinand Rangesh
executiveRight. Precisely — 12 distinct entities.
Bobby Brooks
analystUnderstood. After the previous results came out, we talked, and you said the bigger data center players fell into two camps — both had interest, but the first group, so to speak, would find out about the capacity constraints you have right now, lose that interest, and tell you, "Get in touch once you're able to handle more." Yet what was interesting is that you said the second group included some who appeared ready to grow alongside you. So I wanted to circle back on that and ask what today's view is on these bigger prospective customers — is it a kind of maturing of that second group becoming more at ease with the technology, or is there any other detail you can offer about that situation?
Abinand Rangesh
executiveYeah. No, that's an excellent question. Once again, I think when folks show up for demonstrations, there's usually some degree of interest, correct? The way I at least conceive of the sales process, it has two pieces. The initial piece is building the interest until someone reaches the point of saying, "This is something that works for me." The next piece, naturally, is removing whatever could introduce friction or could work against them and keep the deal from closing, correct? Capacity is among those factors; that's partly why we've begun building up some inventory, so we're able to shorten the lead time and get these units delivered without telling a customer they must place an order immediately and that this is our lead time, correct? We're able to get a jump on some of that. That said, I think from everything we discussed across these meetings — and again, the benefit of having them, particularly the in-person ones, is that you get a fair amount of time to genuinely dig into their needs, what they want, and where their thinking is — we're beginning to identify, I believe, use cases where we could basically begin on a small scale and expand together with them. That's another one of the benefits of these larger data centers that already have sites in place, since you could either add it more or less as a retrofit, as a pilot, or you could do it as one stage of a larger project. So there are approaches that don't require having all of that capacity from the start; we think the capacity problem, while it matters, can, in this instance, be worked around; but we'll find out more as talks continue.
Bobby Brooks
analystThat's genuinely useful context. Then perhaps regarding adding capacity before orders come in, since confidence has increased, I was just interested in understanding how large that might be and what it could run us. Thank you.
Abinand Rangesh
executiveI can't really speak to a precise figure there, though I'll share the way we approach it. Our thinking goes: what might customers need, say, at the tail end of this year into the start of next year, correct? Some approximate quantity. And then, suppose we have, say, 3 or 4 prospective buyers each telling us, "We require about this much capacity," we'd respond, "Fine, if we add X amount, the likelihood is we move it to at least 1 among those 3, or 1 among those 4," correct? The chances look favorable for moving that capacity; so that's our framework when weighing risk, cash, and scheduling too. Since I believe one thing on everyone's mind is what this implies for cash flow and inventory. Get the timing right, and in principle we ought to be able to bridge. We wouldn't necessarily have to commit the entire capital sum upfront, correct? Considering when these items might be shipped or delivered, that's our expectation. Yet should it wind up sliding somewhat, that still lets us handle the risk against the cash flow.
Bobby Brooks
analystThat's really useful context, thanks. I'll get back in line.
Eric Stine
analystHello, Abinand. Hello, Roger. Good morning.
Roger Deschenes
executiveGood morning, Eric.
Eric Stine
analystHey. So, when we talk about those 12 demos, I'm just wondering, is there a way to think about it in terms of which opportunities you might pursue under the Vertiv relationship or not? Or is that even the correct way to think about this? I mean, is that sort of a separate path?
Abinand Rangesh
executiveI would say the two are parallel paths. Pretty much every demo that came was arranged through us and our sales team and our marketing efforts; we, of course, if it makes sense in these projects, there are places where it may make sense to collaborate; but right now, those all came from our marketing efforts.
Eric Stine
analystUnderstood. So perhaps staying on the topic of Vertiv, I realize you received that first order. I'm just wondering whether you could address how things are going with getting the MPA finalized, and also, I recall you've mentioned previously that Vertiv was including you in the specifications for, I believe, 25 to 50 MW worth of projects. Perhaps you could simply provide an update regarding where those particular projects currently stand.
Abinand Rangesh
executiveYes. One point regarding this specific call: as we've stated regarding anything, naturally, involving either side, prior approval is required from both parties. In this instance, I spoke with my counterparties, and we concluded it would be better to allow something near completion so that we preserve the approval process with Vertiv for a matter that's more significant. Therefore, right now, I'm unable to say much about that. So I'd suggest remaining patient, allowing events to unfold, and we will make announcements about deals when they occur.
Eric Stine
analystAll right. Setting aside those agreements, though — when it comes to how far along things stand with the MPA, is that still ongoing?
Abinand Rangesh
executiveYes. My sense is that, on the whole, matters sit in a really solid spot with them. The thing is, I'm not able to say anything right now, since, once again, on this occasion I didn't get-
Eric Stine
analystYep
Abinand Rangesh
executivespecific permission for it.
Eric Stine
analystYep. Got it. Okay, one more. On the inventory build, I'm aware you've added some stock during the past three quarters. When you call out building inventory specifically, both in your prepared remarks and right now, does that mean additional inventory buildup is still ahead? And then how do you handle that against some of the capital constraints you've mentioned?
Abinand Rangesh
executiveYeah. We did have a modest amount of inventory previously, but since our backlog for the non-data center projects has grown, much of that stock will be consumed as part of it; we need to add more. It's also, like I said, we're attempting to handle this so that it's less about the total inventory and more about determining how to shorten the lead time. Because usually with certain of these projects, right, plenty of things are happening behind the scenes, and you might receive different progress and verbal approvals, yet a purchase order may not arrive for some time, even if we may be aware that things are advancing, things are taking place. We don't want a delay when that moment comes; we'd prefer to know that, okay, we feel really confident we'll secure these projects, in which case, let's get this. The moment a purchase order arrives and we receive a deposit, we can begin shipping. That's the way we're approaching it. We're attempting to balance the cash flow against that. We also believe it matters to be capable of acting fast, particularly since right now, we have the interest of these bigger names; we want to ensure that we can react swiftly. Then hopefully, once we have some units beginning to ship, we can then start scaling up very rapidly from that point.
Eric Stine
analystAll right, thanks a lot.
Chip Moore
analystHello there, good morning, and thank you.
Abinand Rangesh
executiveI was hoping perhaps to build on— Abinand Rangesh: Good morning.
Chip Moore
analystMorning, Abinand. I'd like to circle back on the demos, and on a few things you said that make sense regarding striking a balance between working capital and shortening those lead times. As for the conversations you've been having — I believe you even mentioned discussing dates — perhaps you could lay that out for us, say a range covering whether we're talking about those early pilot stages or bigger potential opportunities, just some indication of how those kinds of dates are shaping up.
Abinand Rangesh
executiveTo some degree, I'm limited in what I can say about that. Our aim is to genuinely collaborate with the event customers to determine how we can grow alongside them; at this stage of the company, given where we stand, securing the right names for the initial projects is likely the more important thing, if that's achievable. The reason being that when you land the right names, you wind up shaping the entire future development, correct? Once a proper brand name is on board, everyone else will hopefully follow, on the basis of that right name adopting it. Since, from a reputational standpoint, I think getting that right matters more than — well, whatever sequence things come in, naturally, if a smaller data center arrives first, we'll accept it; but what takes priority for us at present is closing the right brand names if we're able to.
Chip Moore
analystGot it. No, that's useful, and we're eager to hear what's new down the line. For my follow-up, maybe just on the base business — with the backlog growing, which is nice to see, and it sounds like you're expecting more ahead. Just the patterns you're observing there, and anything shifting in the base markets broadly. Thanks.
Abinand Rangesh
executiveAcross the board, in every region, power limitations are beginning to appear. Previously, much of what we sold — chillers, cogeneration, whatever it was — was driven mostly by economics. What we're now beginning to notice is a shortage of power, extended lead times for electrical equipment, that sort of thing, and it's hurting the ability of customers outside the data center category to obtain cooling, power generation, or any of that gear. We're beginning to see that push some of this. We're also beginning to see the cogeneration and standard power generation side recover somewhat, after a period where it had dropped off considerably. But now some of the bigger multi-family buildings, along with other building types facing steep utility rates and, in certain instances, insufficient power, are starting to consider our equipment. My sense is the base business is expanding simply because of some of the same pressures the data center segment is dealing with. One aspect of what we've observed in that base business — items such as switchgear and similar products taking longer to arrive — is also what gives us confidence that keeping some of that inventory available will probably attract prospective customers who are chasing other electrical equipment. They can't get electrical-based equipment installed simply because switchgear and similar items may take longer, so we can essentially win projects in exactly that manner too.
Chip Moore
analystYeah, that's clear. Okay, I get it. I appreciate that. Thanks a lot.
Alex Blanton
analystMorning.
Abinand Rangesh
executiveI have something I'd like to ask regarding how you— Abinand Rangesh: Morning, Alex.
Alex Blanton
analystOh, yes. I have a question regarding where you expect the market to head for your company. Will it mainly involve brand-new data centers constructed from the ground up, or will it be upgrades to facilities that already exist? And when that happens, would you be taking part in adding capacity to current data centers instead of only modernizing what has already been constructed?
Abinand Rangesh
executiveThat is an excellent question. In fact, we do both. Previously, a large share of our opportunity pipeline involved newer kinds of projects, but we are beginning to observe more involving current data centers across a few different categories of applications. First, the AI portion draws a great deal of media attention, correct? Yet plenty of current cloud data centers remain that support either AI infrastructure or simply ordinary web workloads. And a large number of those are hitting limits on power. Their cooling demand might not be nearly as large as what an AI data center requires, but it remains present; and should they be able to release some of that capacity, advantages follow. So we are beginning to notice some possibility in those sorts of applications. We are hearing from some prospective customers who say they can fold this into a larger campus, doing it during a single phase or as they incorporate it into a particular phase of an expansion. There are additionally the smaller data centers that may adopt it as their main cooling source. So various applications are emerging that we are beginning to observe. There is furthermore a broader industry push, in my view, toward perhaps smaller data centers situated nearer to urban areas, simply so you can capture pockets of power. In such locations, once again, our cooling products might prove to be an extremely strong match. But at present we are witnessing a blend of various application types.
Alex Blanton
analystIs there a chance to retrofit a situation where a facility already has an electric chiller and decides, "Let's pull that unit out and put in Tecogen instead"? What kind of opening does that present?
Abinand Rangesh
executiveSome possibilities of that nature are showing up, though in those sorts of uses, what tends to be the more probable outcome is that, since an existing data center is a live site, performing that retrofit usually happens for that reason. So they could install it almost as a form of expansion, since a lot of these data centers generally have extra room they've designated for growth down the road, and in that case they may not remove the electric chiller at all. It could stay where it is while we get added, with the electric chiller then serving as a backup. So that scenario is more probable than simply taking electric chillers out. Even so, we do have some customers who want to take out electric and have ours installed.
Alex Blanton
analystThanks. I'd like to hear more about what you mentioned before regarding fixing, or assisting in fixing, the issues of pollution and noise — and there was a third item as well.
Abinand Rangesh
executiveThe consumption of water?
Alex Blanton
analystRegarding water pollution and noise — how are those handled in your situation?
Abinand Rangesh
executiveSure. There are a couple of distinct approaches for doing that. The first involves the chiller, since when a utility asks you to shut down or cut back on grid power, that request typically comes on the hottest days, simply because that's when everyone's air conditioning is running. Once the utility becomes heavily constrained, they begin requesting that big load users reduce their consumption. In that situation, your fallback — and this is what took place in Virginia, as an example — was that the diesel generators got switched off. What we'd do instead is either shift that load dynamically over to natural gas, or simply have those chillers switched on in those applications, so the load transfers to natural gas. That works because our equipment is built for continuous operation, and our Ultera emission system was initially engineered for Southern California, so our emissions are very clean. Our carbon monoxide and NOx are very low, so in that regard, it's considerably cleaner than a diesel generator. Another point: since our machines are engineered for continuous operation — whether that's the InVerde product or the chillers — they're built for fairly low-noise urban settings. You could stand beside one and you'd hear it, but it won't be irritating, no worse than ambient noise. So in that regard, it's considerably quieter than those diesel generators. So the chiller application is the first one. The InVerde is potentially the second application as well. It won't necessarily power all your loads, but certain standby loads exist. There are also other loads — again, you probably don't want your enormous full data center load running on smaller power systems such as InVerde. But since it's modular, you could essentially pair the InVerde with the chillers to shed a portion of that load during the peak period, without starting the generator, keeping the diesel generator truly reserved for emergency use.
Alex Blanton
analystAll right, I appreciate it a lot.
Abinand Rangesh
executiveThanks, Alex.
Abinand Rangesh
executiveMuch appreciated, everybody, for joining us on this Q2 2026 conference call. As matters progress, I'll make sure all of you stay in the loop. My sense is that the interest has been secured; at this point we'll do whatever we possibly can to convert that interest into projects. People will be kept informed, and with any luck, some interesting news will come your way during the next few months. Thanks.
Operator
operatorThanks. That wraps up today's call, so you're free to hang up now; we appreciate you joining us.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Tecogen Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Tecogen Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Tecogen Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.