This is the presentation of our year-end and fourth-quarter results. Just a reminder that everyone is in listen-only mode and this meeting is being recorded. Once the presentation wraps up, you'll have a chance to ask questions. If you'd like to pose a question, just click the Q&A icon on the right side of your screen. You'll see a Raise your Hand option so you can join the queue and ask verbally, or you can type out your question and submit it in writing. Your line will be unmuted automatically once you're introduced. Analysts who've dialed into the conference today can also press one on their telephone keypad to get into the question queue that way. At this point I'd like to hand the meeting over to Stephen Mullowney, Chief Executive Officer of TRX Gold. Stephen?

Stephen Mullowney

executive
#2

Thank you, Christina. Before we get started on today's call, I want to acknowledge that we lost our founder and chairman during the quarter — and during this year — and, you know, everyone here had a strong relationship with Mr. Sinclair, and his absence will be deeply felt. So, with that, this is our 2023 year-end conference call. Obviously, we'll hold an annual general meeting conference call in the new year as part of the annual general meeting. I'm quite excited about what lies ahead in 2023. We achieved a significant amount of growth. We're truly beginning to see the potential of the Buckreef Gold Project. We completed another plant expansion. We have another one underway. We're developing a much clearer picture of the property's geological potential and are quite excited about that, and about where it can go over time — particularly, hopefully, growing the resources on our property quite substantially, as well as continuing to build out the property's production profile too. So 2023 was a great year. We're quite excited for today's call and for where we're heading as a company as well. So obviously, there's a cautionary note. We will be discussing forward-looking statements, so I'd ask everyone to visit our website and our corporate presentation to read the cautionary note.

Stephen Mullowney

executive
#3

Today's speakers, obviously, include me, and Andrew is here — you can raise your hand — our COO in Toronto. Mike, our CFO, is with me as well, and Christina joins us from Montreal. So TRX, many of you will hear this in our presentations. We're a company that's growing a lot. We have an experienced management team that keeps delivering rapid growth, both on the production side — specifically on the production side — and we have exciting blue sky potential on our property and the growth resources over time. So the Buckreef Gold Project, just to remind everybody, the Buckreef Gold Project. Right now, under the 2020 resource statement, we have 2 million ounces in the Measured and Indicated category at around 1.8 grams a ton. As a lot of you know, the deposit does come to surface, and it's relatively flat, and it's a vertical shear zone, so it's easily mineable. The widths are around 20 meters, easy metallurgy, and grind crush CIL, in the oxide ore. As we'll get into in this presentation, which was very exciting during the year, is our results around the sulfide ore, which continue now to be moved into the mine plan and processed.

Stephen Mullowney

executive
#4

We have full authorization to expand to any size we can achieve. Our permit now runs through 2032, and it can be renewed for the deposit's entire life. Both the processing plant and the mine are consistently hitting production guidance. Our environmental footprint is minimal. We recycle every drop of water. Tailings management is solid. We're hooked up to the national power grid, and we comply with all international environmental standards and maintain a strong ESG program too. Our exploration potential is exceptional, which hopefully means this mine life continues for a considerable stretch of time, and with a Special Mining License, that's something we can do. Turning to the 2023 highlights, there was considerable growth. As we, as a management team, have communicated to market participants, our objective now is mainly to self-fund operations and manage capital — your capital — with minimal dilution, and I believe we accomplished that in 2023. We delivered record revenue, operating cash flow, and Adjusted EBITDA, with a great profit margin. Mike will walk through the statistics shortly. Then we largely reinvested that straight back into the business to keep growing it. So I think this is the first year we've managed to execute that business plan, and with the expansion coming in the next 3 to 6 months, that will let us have even more cash flow to reinvest back into the business and its potential, both on a production profile basis and on a resource expansion basis.

Stephen Mullowney

executive
#5

In 2023, we carried out the 1,000 ton per day plant. It was delivered on schedule and within budget, at $6.4 million. Right now we're in the middle of a further mill expansion, which is going to raise throughput capacity by 75%-100%. How much production capacity that yields will hinge on the grade fed through it, and we'll provide additional guidance on that down the road. We've also opened up the entire deposit, especially the Buckreef Main Zone, since all of what we're discussing at this moment is Buckreef Main. So Anfield, Eastern Porphyry, and the other exploration targets on the property aren't part of this discussion. The sulfide ore has been run through the mill. We completed a bulk sample. It's still being processed through the mill as we speak. What we're working through at present — and this is the kind of routine operational matter that comes with processing plants — is determining the correct blend of oxides and sulfides to feed through in order to achieve a suitable, better-balanced recovery rate over time and across the project's life. That's all tied to, you know, suspensions and similar factors that the metallurgists delve into deeply. During 2023, we expanded the known mineralization surrounding our Main Zone by 500 meters, and we've also made the discovery of the Anfield zones and are continuing to work out where to head next, Andrew.

Stephen Mullowney

executive
#6

You're going to touch on that—

Andrew Cheatle

executive
#7

I’ll begin with the quarter’s highlights.

Stephen Mullowney

executive
#8

... roughly 10 to 20 minutes from now regarding the way you intend to approach executing a solid exploration program, especially with this new plant coming online and extending — hopefully extending — the deposit's life. So on that note, I intend to pass things to Mike, and he'll walk through the 2023 financial results.

Michael Leonard

executive
#9

Thank you, Stephen, and good morning everyone — appreciate you being here. As Stephen mentioned, 2024 was a record year for us at TRX from an operational standpoint. We turned out just under 21,000 ounces over the year. That fell within our full-year guidance range of 20 to 25,000 ounces, and it came after we commissioned the 1,000-ton-a-day plant back in October of last year. Everything we produced during the year was sold, at an average realized price of $1,845 per ounce across the full year. You'll notice in Q4 that gold prices went above $1,900 an ounce, and today they're trading past $2,000 an ounce. In fact, this morning we were above 2,050 — so record levels, and that certainly points to record growth as we head into next year. On the financial side, that record production also drove record financial results. As Stephen mentioned, revenues hit a record of more than $38 million. Cost of sales came in at just over $20 million, giving us gross profit above $18 million, or almost 50% — so a very cost-effective, high-margin operation. Net income set a record at $7 million, EBITDA was almost $14 million, and importantly, operating cash flow exceeded $17 million, which was reinvested back into the business, and I'll get to that.

Michael Leonard

executive
#10

For investors who have followed this story, this marks the third year of growth since we came on board. We've seen growth year after year after year, and we definitely expect it to carry on next year as we scale up to 2,000 tons a day. Regarding cash costs, we posted $904 an ounce for the full year. That figure came in above the top end of the guidance range we had previously given of $750-$850 an ounce. The main driver was processing costs that ran higher than anticipated in Q4. There are a couple of reasons for that, which we highlighted in our MD&A, and one was maintenance costs that came in above expectations. We wound up hitting a mill motor failure on one of our ball mills that called for unexpected maintenance, and that was combined with an overhaul of our crushing circuit. So the unplanned maintenance accounted for roughly a $30 an ounce variance, which we expect to normalize next year. And second, during Q4 we had inconsistent, unstable power coming from the TANESCO power grid. As a result, we ended up relying on gensets power more than expected, which burned fuel at a higher rate than we had forecasted or budgeted previously, and that produced an impact of about $18 an ounce on full-year cash costs.

Michael Leonard

executive
#11

Also, and this matters, we've now got a connection to a brand-new substation that sits much nearer to Buckreef. The distance from Buckreef to this substation is roughly 60 km, whereas the old one was more than 250 km from Buckreef. Connection to that grid happened in November, and across the past few weeks the grid power has been steady, so as a result we anticipate reduced costs as we go into next year. Guidance is something we'll get to shortly, but we're pointing toward costs being lower versus last year. The final point I'd mention, which Stephen raised at the start, is that our guiding principle is to take cash flow we generate organically and plough it back into the operation through activities that add value. That $17-$18 million of operating cash flow we produced went straight back into the business. As we've said repeatedly, we grew the plant from 360 tons a day up to 1,000 tons a day. We're progressing toward 2,000 tons a day and have already bought a mill. We've positioned ourselves for that growth by enlarging our tailings storage facility so it can handle the greater production volumes. Once more, we're examining further infrastructure and capital assets. We're carrying out long-term studies, all aimed at underpinning the long-term growth of this business and at doing exactly what we promised, namely reinvesting cash flow in a value-accretive manner.

Michael Leonard

executive
#12

Moving on to the following slide, if you would.

Stephen Mullowney

executive
#13

Great. Well, thanks, Michael. That's wonderful. As you know, the financial metrics are getting much better, and we keep expecting those metrics to keep improving as we move into this year — and we'll talk about guidance again. And these are… I think it's reasonable to say these are projects where, you know, once you get one underway, you can then grow it far faster as time passes. So it's nearly like rolling a snowball down a hill. It grows larger and larger and larger on the way down, and it becomes simpler to do. Yes, so we're pretty enthusiastic about that, and the sulfides are one of those factors. So last year we had an extremely wet season. It was raining — I believe it was once in a hundred years or something along those lines, Andrew?

Andrew Cheatle

executive
#14

You've got it.

Stephen Mullowney

executive
#15

As far as the rainfall is concerned—

Michael Leonard

executive
#16

Yeah.

Stephen Mullowney

executive
#17

...during the springtime. And so, you know, once you find yourself in that kind of setting, processing hard rock is simpler than dealing with oxide rock, since hard rock isn't as sticky, lacks clay content, and sulfides—sorry, oxides do have those. So we shifted somewhat toward the sulfides just to test how they'd perform. They turned out perfectly well. As I recall, the metallurgical study from 2019 or 2020-

Andrew Cheatle

executive
#18

Twenty.

Stephen Mullowney

executive
#19

Right, so the preliminary metallurgical study from 2020 indicated we ought to achieve recovery rates somewhere in the mid- to high 80s%. And that is exactly what we saw once we ran the mill feed through our mill. Going forward, that information now feeds into both the long-term mine planning and the current mine planning. The reason this matters so much is that 90% of the resources at the Buckreef Main Zone sit in sulfides. And we are indeed reaching those sulfides. Andrew, who is that sitting on top of the harder rock in the pit there?

Andrew Cheatle

executive
#20

Oh, that's Pascal — he's our senior mining engineer.

Stephen Mullowney

executive
#21

That's right.

Andrew Cheatle

executive
#22

... and that individual is clearly marking out where the sulfides are, as you're able to observe. What you're looking at is competent rock. It has that sort of gray hue, and that specific block is in fact grading 5.8 grams per ton.

Stephen Mullowney

executive
#23

Andrew, let's go to the image at the bottom. Could you walk the investors through what they are actually looking at in the pit? Since the transition zone is visible, along with the oxide zones, and you can also see where the sulfide zones begin.

Andrew Cheatle

executive
#24

Exactly, Stephen — thanks so much, and good morning, everyone. Now, in the photo at the bottom, clearly, when you look at the pit, you can see the upper section — the very top of the pit — where there's the brown layer. That's our topsoil, and then we move into those ochre orange hues, which represent our oxide zone. It runs roughly 20 to 25 meters in thickness. After that, if you look toward the back at the base of the pit, you'll notice the gray rock, and that's our sulfide zone. So we've begun uncovering the sulfides at the deepest point of our pit, which ties into what you've been discussing regarding our bulk sample.

Stephen Mullowney

executive
#25

Right, exactly. Turning to the following slide, that 2,000 ton per day mill expansion. As I've told many investors over the years, we operate on a pay-as-you-go basis. And what does that kind of program actually mean? It means that whenever the business brings in cash, that money gets put back into the business so it can grow. So basically, timelines can shift earlier and they can shift later, depending on whether we hit targets. So, as Mike said, during Q4 we encountered power problems, which have since been fixed, and a motor also failed, and that was really tied to power issues from bus. So we fell short of the production profile — even though we achieved year-end guidance, we were somewhat behind where we'd ideally hoped to be. So within the pay-as-you-go program, that has pushed the mill expansion back somewhat, though not by much. And so we anticipate this project being in place during the first half of fiscal 2024. The mill is already on site. The remaining long lead items are ordered. We're going to expand, and this marks a bit of a change from what I described earlier.

Stephen Mullowney

executive
#26

We’ll start by expanding the crushing circuit to more than 2,000 tons per day. That lets us establish a larger crushed stockpile, which should give us steadier feed to the mill. I’m hopeful, and I’ll be pushing the team, to exceed 1,000 tons a day while that crushing system is operating. We haven’t budgeted for that, but it is the goal. After that, the remainder of the system will be brought online, including the electrical works. The plinth will be poured soon. It’s a long lead item on the ball mill, and all the other parts and tanks and similar items will arrive after that. So the capital cost for the mill expansion is about $6 million. That will be funded from existing cash resources. Obviously, we have a large ore stockpile, and going forward, sales and bank financing, which we’re always discussing. And we’ll build this in a 100% Tanzanian way, just as we built the earlier mill expansions, and we expect it to come in and perform just as well as the existing plants have performed. We don’t expect any issues in the ramp-up of this expansion plant, because we’re producing 1,000 tons a day, really doubling it.

Stephen Mullowney

executive
#27

Oddly enough, this year the budgets already cover things without any need for higher mining rates, so that side is fine. As for the tailings facility, you can see it at the bottom — it's built. A couple of lifts are still required, though that part is simple. You can also see procurement and fabrication happening on site for various other components related to the mill expansion. I think the investors here will have plenty of questions about that by the time we reach the end of the presentation. But now for the exciting part — the expansion. I know everyone wants to understand how we're going to take these physical assets and processing capacity and obviously keep growing them once we hit 2,000 tons a day. But how will we feed it? And where will all the resources come from so that we can have a very, very long mine life here? Andrew, over to you.

Andrew Cheatle

executive
#28

Thanks, Stephen. Thanks, Mike. And, as you know, this slide is one I always especially enjoy. We'll spend a few minutes on it, folks, so please bear with me. As you can see, we had a program of drilling that came in at just under 7,000 meters, covering infill sterilization as well as pure exploration. As Stephen mentioned earlier, we've managed to extend the known mineralization to the north, somewhat deeper. To the south, it sits directly beneath the South Pit, roughly 500 meters out there, and to the northeast and southwest, plus at depth. We've also now obtained some exploration results through the drill bit at the Anfield and Eastern Porphyry, which has confirmed that multiple zones of strong mineralization lie subparallel and in close proximity to the Buckreef Main Zone. That's a very, very important opportunity for future mineral resources. Why do I say that? The way to sort of secure continuous increases in throughput is probably to have several pits available to us. We'll have the main pit, we'll have the South Pit. In time, we will also be going underground, and I think this is the first time you've heard me talking about this deposit will go underground.

Andrew Cheatle

executive
#29

Our geological efforts have allowed us to outline and define two to three high-grade shoots, so I can say with real confidence that this deposit is going underground, and that points as well to a considerably longer mine life. But there are multiple pits — Main Zone, South Pit, and then Anfield and Eastern Porphyry. That provides us with optionality along with continuity of mining over time.

Stephen Mullowney

executive
#30

Let me just stop you there for a moment, Andrew, before you move on to that. So could you walk the investors through how you decide when to make the transition from open pit to underground, and why the strip ratio matters so much in that decision?

Andrew Cheatle

executive
#31

Yeah.

Stephen Mullowney

executive
#32

... simply so that investors are able to grasp—

Andrew Cheatle

executive
#33

Absolutely.

Stephen Mullowney

executive
#34

How do you go about making that call on the economics?

Andrew Cheatle

executive
#35

That's a genuinely excellent question, Stephen. And it's also an extremely crucial piece in,

Stephen Mullowney

executive
#36

Yes

Andrew Cheatle

executive
#37

... the mine planning and scenario work that we have underway right now. So as soon as the strip ratio climbs to, let's say, 6 or 7-to-1, or a figure along those lines, going underground turns out to be the more economical route, and we need to locate those high-grade shoots. And in going underground, we will likewise be mining at a higher grade-

Stephen Mullowney

executive
#38

Yes, indeed.

Andrew Cheatle

executive
#39

... across that 20 to 30 meter span. The widths we've got allow for really cost-effective extraction underground in the stoping work we'll be carrying out. So there's a cost trade-off there-

Stephen Mullowney

executive
#40

Yeah

Andrew Cheatle

executive
#41

... that relationship involving the strip ratio — meaning the ore tonnage along with the waste material we must extract — compared with the development work that has to be completed before we can mine those stopes underground.

Stephen Mullowney

executive
#42

Since our deposit base is vertical-

Andrew Cheatle

executive
#43

Thank you.

Stephen Mullowney

executive
#44

…as you move outward and further in, you need to remove layers, and you have to get your walls—

Andrew Cheatle

executive
#45

Yeah.

Stephen Mullowney

executive
#46

... oriented correctly. Since our operation stands vertical and spans 20 meters across, this ore body is highly vulnerable, and the rock shows strong continuity.

Andrew Cheatle

executive
#47

Absolutely.

Stephen Mullowney

executive
#48

It's highly amenable to underground mining, and over time that method is likely to prove less expensive than open pit.

Andrew Cheatle

executive
#49

That will be the case, and beyond that, the rock quality beneath the surface — we have already observed that from—

Stephen Mullowney

executive
#50

Yeah.

Andrew Cheatle

executive
#51

The early reports look quite strong. And speaking from my own experience working as an underground miner, I can say the rock conditions are excellent for underground mining.

Stephen Mullowney

executive
#52

As we discussed earlier today, that means we won’t have to deal with all sorts of steel supports below ground that drive up expenses, since the rock is very competent where you install bolts and mesh.

Andrew Cheatle

executive
#53

Correct. We will not.

Stephen Mullowney

executive
#54

Sure.

Andrew Cheatle

executive
#55

As a brief note, we're extracting from some extremely small volumes of legacy stopes dating back to earlier times. That's documented in the reports, and those stopes, along with that development, have remained accessible for more than 40 years.

Stephen Mullowney

executive
#56

So they haven't fallen apart?

Andrew Cheatle

executive
#57

No, it's still—it's still present.

Stephen Mullowney

executive
#58

Yeah, I came across a photo of that recently. That's a key point—

Andrew Cheatle

executive
#59

Um

Stephen Mullowney

executive
#60

... how those historic stopes have sat there for four decades. Water had filled them — they hadn't, you know, gone dry. We pumped that water out, and they remain in very good shape.

Andrew Cheatle

executive
#61

You've got that right.

Stephen Mullowney

executive
#62

All right, sure.

Andrew Cheatle

executive
#63

Sure, it's been really strong. So maybe just briefly — one of the standout items, and I've… Naturally, you'd figure I'd simply pick two of my personal favorites, and that's exactly what I did. Over at Eastern Porphyry, what have we encountered? The top result there came in at 14 meters of excellent width grading 3.5 grams per ton, which includes 3 meters at just shy of 11. And keep in mind that this sits 27 meters beneath the surface. So it's extremely, extremely near surface. Beyond that, there's the Anfield Zone, roughly another 1.5 kilometers out. We hit 2.9 meters grading 13.7 grams per ton, and once more, pretty shallow, starting at 43 meters. Those of you who are investors that have stuck with us for a couple of years might — and I believe it's at the close of the presentation, right, Christina, we've still got that photo of a fellow holding a rock, and it comes from the Anfield Zone. So we drilled that spot, and here we are, just under 3 meters at close to 14 grams per ton. A fantastic outcome quite early in the program. I, I continue to feel very, very optimistic about that whole trend. And then below the South Pit, we've been quite pleasantly taken aback by wide intervals of mineralization running between 1 to 2 grams per ton, very comparable to our main deposit.

Andrew Cheatle

executive
#64

Right now, we're in the process of dewatering the South Pit, and we intend to bring it back into the mine plan at some point later this year.

Stephen Mullowney

executive
#65

That’s great.

Andrew Cheatle

executive
#66

Appreciate that, Stephen.

Stephen Mullowney

executive
#67

Regarding the guidance for the year, as everybody is aware when they hear the TRX story, we can build mills and capacity relative to the market extremely cheaply, Mike. I just don't see anyone who could put up a 2,000 ton per day plant. When we look at all the costs of that, including our expansions, it comes in under $20 million. It's more in the $16-$17 million range. I'd challenge people to go and see where else that has been accomplished, because for a similar type of asset in other parts of the world, I haven't seen anything below $50-$70 million.

Michael Leonard

executive
#68

My impression is that research exists pointing to exactly that.

Stephen Mullowney

executive
#69

Sure.

Michael Leonard

executive
#70

As you pointed out, this has been quite efficient with capital.

Stephen Mullowney

executive
#71

That's precisely right.

Michael Leonard

executive
#72

Sure.

Stephen Mullowney

executive
#73

So that's what we'll be carrying out with this third expansion at the mill. For the year, production guidance will land at 25,000 to 30,000 ounces. That figure isn't the run rate you'd get from the 2,000 ton per day plant. It reflects a 1,000 ton per day plant running for more than the majority of the year, with the 2,000 ton per day plant then coming online. So that 2,000 ton per day plant sits above this guidance. Cash costs will be $800-$900 an ounce as of next year. And once again, we'd expect that to be probably somewhat lower when the full plant comes online as a run rate.

Michael Leonard

executive
#74

Well, Stephen, I might just offer a couple of remarks on that. I mean, we discussed power and being connected to—

Stephen Mullowney

executive
#75

Yeah.

Michael Leonard

executive
#76

... a grid connection plus a substation situated much nearer to the site, so you should anticipate, you know, some advantage on that front. Yet the key point is that we anticipate gaining considerable economies of scale from-

Stephen Mullowney

executive
#77

Yeah.

Michael Leonard

executive
#78

... that bigger facility. We've said this to investors for a good while now. Growing from 1,000 to 2,000 tons per day doesn't require a big increase in headcount. So naturally, items such as your processing cost per ton and your cash cost per ounce decline, since you can leverage the crew you already have to generate double the output.

Stephen Mullowney

executive
#79

Right, exactly. So what we're showing you here are blended figures covering anywhere from 1,000 to 2,000 tons per day.

Michael Leonard

executive
#80

Yes. And I might just add one last remark. You brought up our mantra — the pay-as-you-go approach — and we described how, if there had been unforeseen negative variances, such as mill motor failures or power connection problems, things can also move in the opposite direction.

Stephen Mullowney

executive
#81

That's right.

Michael Leonard

executive
#82

Should the team manage to surpass a few of those targets and guidance numbers we laid out on this slide, then we'll pull forward part of that capex and look to get that plan up and running sooner than scheduled.

Stephen Mullowney

executive
#83

Yes, since if we examine the models, carrying that out is logical.

Michael Leonard

executive
#84

Absolutely, 100%.

Stephen Mullowney

executive
#85

Absolutely. So doing that really makes sense. Again, our business plan is quite straightforward: we produce gold, we cover the cost of exploration and drilling, we fund additional capital programs, and we strengthen our social license as we carry that out over time. That is the objective we have for 2023. We are capable of doing it, and I hope that in 2024 we can do it once more, and beyond that as well. So mindful ESG — when I hear ESG, we are good corporate citizens. I have always said this, that a mine involves a lot of inputs in mining, construction and capital costs, and matters of that kind. Therefore, as you can see in our operating costs, plus capital would be over 50% of the revenue, since you have to include capital expenditures in there as well. The biggest beneficiaries of that ought to be local people. We are able to do that, and we are 100% Tanzanian on site, and we procure as much as we can within Tanzania, and they are excellent workers and have done a good job building out our assets. That helps to lower local social risk. We also have artisanal miners in this area, around Buckreef, which is not unusual for Tanzania or Africa, and we work with them, and we reinvest into schools and into health facilities.

Stephen Mullowney

executive
#86

Our joint venture partner is STAMICO, and the overarching aim is to achieve an operation that is considerably cleaner, smoother, and more efficient by making the greatest possible use of local content and by complying with the highest standards of corporate governance we can.

Andrew Cheatle

executive
#87

Stephen, if I could jump in there, what I'd add is that it also brings a meaningful reduction in supply chain risk.

Stephen Mullowney

executive
#88

Absolutely. It certainly does. And yes, there's also the danger posed by inflation—

Andrew Cheatle

executive
#89

Yeah.

Stephen Mullowney

executive
#90

... as well, and what you're observing across the Western world. So when it comes to upcoming news flow, the mill expansion is progressing. We'll be providing an updated study, or at minimum modeling, of the Buckreef Gold Main Zone. So everything we've discussed regarding production concerns the Main Zone exclusively. We currently have metallurgical and geotechnical studies in progress that will feed into that, and after that we need to give the market a far clearer picture of where this Main Zone can go and what our business plan looks like for growing resources so that this project at Buckreef has a considerably longer life. On the subject of share price, over roughly the past year, our share price compared with other market participants, in my view, has held up reasonably well. We're sitting in a cash position of $7.6 million as of August 31, 2023. As of today, we're slightly above that, so we've been keeping up our liquidity profile in this, in this environment. And we're covered by three, you know, brokerages out of United States. I believe a few of them are on this call, and will be posing questions. So we, all in all, I'd like to see a higher share price. Everyone always likes to see a higher share price.

Stephen Mullowney

executive
#91

It's a difficult market, and I think we're handling it reasonably well, but in the end we really want to ensure that over time we achieve a higher share price. We believe we're able to do that by executing the business plan we have now. That might take a while, since we're on a pay-as-you-go program. It could shift forward or slip back slightly. At this point I'd like to turn things over to Christina and the operator for questions. As our slide shows — and many participants will have seen that slide — there's always plenty of activity taking place at Buckreef.

Michael Leonard

executive
#92

Thanks, Stephen.

Christina Lalli

executive
#93

Thank you. Thank you. Should you want to enter the question queue, just click the Q&A icon located on the left side of your screen. You'll find choices there to raise your hand so you can join the queue and ask your question aloud, or to type a question and submit it in writing. Once you've been introduced, your line will be unmuted automatically. Analysts who joined via the conference call might prefer to press Star, then one on the telephone keypad to get into the question queue. Our first question comes from Heiko Ihle of H.C. Wainwright & Co.. Please go ahead. Mr. Ihle, your line is open.

Heiko Ihle

analyst
#94

Is this coming through okay?

Speaker

unknown
#95

Yes, you're coming through. Yes, I've got you. Morning to everyone.

Heiko Ihle

analyst
#96

Great. All right, so it seems that even when the system tells you the mic is live, you still need to press that button. Fair enough, and my apologies for that. In your press release, you wrote — and I'm quoting here — that "Lower cash costs are expected in the second half of next year once the ramp-up is complete and the processing plant achieves steady state." Could you perhaps put a number on the lower cash costs that you believe we could see? I presume some kind of modeling has been done on your end. And then, just thinking conceptually, would it be reasonable to take the first half of the year at the higher end — the $900 mark of your range — and then assume the second half lands closer to the lower end of that range? Or is the delta actually larger, such that the first half comes in above $900 and the second half falls below $800?

Stephen Mullowney

executive
#97

Mike? Yeah, so we haven't really given guidance down to that level of specificity just yet, Heiko, but as I said, inevitably we anticipate gaining economies of scale as we progress toward 2,000 tons a day. So we definitely expect Q4 to rank among the lowest-cost quarters once that 2,000 ton a day plant reaches steady state capacity. That said, I think your framing is correct. The early part of the year should sit near the top of the range, while the later portion lands near the bottom, and it will certainly average out across the year.

Heiko Ihle

analyst
#98

Alright. With respect to your internal model, for the 2,000 ton per day processing plant, once it's planned... at what point do you expect it to turn cash flow positive on a monthly basis? Has any kind of modeling been carried out?

Stephen Mullowney

executive
#99

Regarding the fourth quarter.

Heiko Ihle

analyst
#100

But on a monthly basis?

Stephen Mullowney

executive
#101

Heiko, when you say monthly, do you mean positive cash flow each month, or are you asking about Q4?

Heiko Ihle

analyst
#102

In which month does more cash come in than go out?

Stephen Mullowney

executive
#103

I'd say the expectation is the beginning of Q4, assuming it comes online during Q3. So for us, that's probably, probably June.

Heiko Ihle

analyst
#104

All right.

Stephen Mullowney

executive
#105

Okay, Heiko, so the way it works is that it's always positive on operating cash flow — and substantially so. The thing is, that operating cash flow gets reinvested into CapEx to build it out. And so, once the new plant comes online, obviously we're moving — we're putting all of operating cash flow, or predominantly most of it, toward bringing this plant on as quickly as we can. So based on the current schedule, it'll be built and commissioned and sort of ramping up over the course of Q3, and then fully operational towards the start of Q4, at which point it begins generating excess cash.

Speaker

unknown
#106

A fair amount.

Stephen Mullowney

executive
#107

Absolutely.

Speaker

unknown
#108

Absolutely.

Heiko Ihle

analyst
#109

All right, I’ll rejoin the queue. Appreciate your time.

Stephen Mullowney

executive
#110

Appreciate it, Heiko.

Speaker

unknown
#111

Thanks, Heiko. Appreciate it.

Christina Lalli

executive
#112

Our next question comes from Jake Sekelsky at Alliance Global Partners. You have the floor.

Jake Sekelsky

analyst
#113

Hi everyone. Congratulations on such a solid year, and I appreciate your taking my questions.

Stephen Mullowney

executive
#114

Thanks, Jake. Morning, everyone.

Jake Sekelsky

analyst
#115

Morning. To add a little to what Heiko asked about the ramp toward 2,000 tons a day, could you speak to the grade profile you expect at the higher throughput levels? In other words, will it look much like what we've seen over the past year or so? Any detail on that would be useful.

Stephen Mullowney

executive
#116

Would you like to say something about how the grade profile is shaping up this year?

Speaker

unknown
#117

Yes, Jake, once we reach 2,000 tons per day, you will notice the grade easing somewhat. Two factors explain this. Clearly, we are accelerating the high-grade material to enable construction of the plant. Because of that, we wind up with a medium-to-lower-grade stockpile that we can draw on for processing. Naturally, we won't face mining costs for it since it has already been extracted. So anticipate a modest decline in grade during the final quarter.

Jake Sekelsky

analyst
#118

All right, that helps. Then, casting an eye toward the medium term — say, considering further expansions past the 2,000 ton per day plant — would you anticipate carrying on with the gradual scaling you've done so far? Or might you attempt to jump up to, let's call it, the 100,000 ounce per year range within one expansion scenario?

Stephen Mullowney

executive
#119

Okay, so we're ready to go either direction on this, provided it makes sense for valuation from the shareholder standpoint. So, as I said, at present the cost for us to construct these plants has been quite favorable. We know where to source plants that would get us there faster, and then it becomes a matter of financing—what capital is required for that versus the pay-as-you-go program. And being able to bring in outside financing sources, like bank finance, project finance, those kinds of things, would have to be arranged if you wanted to move much faster. But certainly, I think we'll examine that, and we'll proceed in the way that's most accretive to shareholders. Our aim is to achieve the highest NAV per share we can, the highest EBITDA per share, those sorts of metrics, when we do that evaluation for the expansion project. And we're in the middle of that right now. Looking at some of that analysis now, Jake, and it will be carried out that way. But certainly, that option will be completely on the table if it makes sense for shareholders.

Jake Sekelsky

analyst
#120

All right, and then just on the timing for that — I mean, it sounds like you're weighing both options at this point. Might we hear something on that in the first quarter, or more toward the middle of next year?

Stephen Mullowney

executive
#121

My guess is that it will lean more toward the middle of next year, based on what we're seeing. And simply because, you know, we introduced a specific kind of scenario to the market, we always make adjustments when it makes sense. So it could shift during that period, and we're now getting a solid understanding of the asset, and it has taken us some time to reach that point. Now that we have a really solid understanding of the asset, we ought to be able to bring any pivots to the market much faster.

Jake Sekelsky

analyst
#122

Understood. All right, that's everything from my side. Thanks once more.

Stephen Mullowney

executive
#123

Appreciate that, James.

Christina Lalli

executive
#124

Our following question comes from Mike Niehuser at Roth MKM. You have the floor.

Mike Niehuser

analyst
#125

Morning to you. Am I coming through clearly?

Stephen Mullowney

executive
#126

Yes, Mike, I can hear you now. How are things with you?

Andrew Cheatle

executive
#127

Morning there, Mike.

Mike Niehuser

analyst
#128

Thank you. Stephen, I’d like to commend you on your discipline since you joined, and especially across the last year—how operating cash flow is almost equal to your investment. It’s quite clear that you’re continuing to put all the money back into the project and really pushing it out in every direction, it seems. Most of my questions were answered either in your presentation or by the other analysts, but if I could just raise something, kind of asking again in a general way to get a bit more comment, I’d appreciate it, if you don’t mind. One thing you mentioned was the gold price and cost in Tanzania. How significant, from a U.S. or, you know, U.S., North America perspective, do you view the benefit of working in Tanzania on an operating cost basis?

Stephen Mullowney

executive
#129

Sure, this topic comes up a lot — I suppose mostly in the market — the question of what counts as a Tier 1 jurisdiction. And when I look at Tanzania, in terms of the social infrastructure being there, what does that actually mean? It means you're able to find qualified people to run and operate your business, people with solid experience in mining — world-class mining operations elsewhere, especially across Africa — who then come back home. So the education system is there to support that. Beyond that, the skilled labor exists to build tanks, plants, electrical works and all of that, which matters a great deal when you're building out an operation. There are plenty of contract miners around. Keep in mind, we haven't purchased a fleet to carry out our mining here — we use 100% contract mining. And then there's the cost profile: what labor costs in Tanzania compared with elsewhere, what electricity costs. Fuel, obviously, is a world product rather than a local one, so you have to accept that you're a cost taker on that front. So I'd say, based on our experience, operating in Tanzania has been very positive for us compared with some of the risks you encounter in the so-called Tier 1 jurisdictions, like cost overruns and labor disputes.

Stephen Mullowney

executive
#130

A lot of the assets in North America have already been picked over, you know, so then you run into operational problems as well, with recovery rates and that kind of thing. So, you know, as far as operating in Tanzania goes, it has been nothing but a positive experience. Much of the noise you hear from a Tanzanian perspective comes at the national government level in Dodoma. So I sort of separate what's in the press from the actual operating experience on the ground a little bit, because we handle the Dodoma atmosphere quite well, and that is easier to manage than the operational aspects of things on the ground. So on the ground, it has been, you know, very good. At the Dodoma level, too, it has been extremely good. Thus far, it has been a good experience. Did I answer?

Andrew Cheatle

executive
#131

That's a solid response.

Stephen Mullowney

executive
#132

Sure.

Andrew Cheatle

executive
#133

Mike, one solid example makes this clear. There's mention of that old power line being fairly unreliable. We went to the regional commissioner, the Mining Commission, and told them, "Hey, this simply isn't working for us the way we'd like it to." And in very little time, we were moved onto a different power line, one that runs only a few kilometers farther. As of November, our power reliability has been considerably better.

Stephen Mullowney

executive
#134

That line was put up by TANESCO, yes.

Andrew Cheatle

executive
#135

Was it them who got that line up and running?

Stephen Mullowney

executive
#136

That line wasn’t something we paid for.

Andrew Cheatle

executive
#137

Right. That said, the capacity to collaborate with the government was definitely present.

Stephen Mullowney

executive
#138

Yes. Ultimately, they’re looking for this to become a very large producer.

Andrew Cheatle

executive
#139

Sure.

Stephen Mullowney

executive
#140

There are substantial royalty streams, a great many jobs, and economic activity connected to it.

Andrew Cheatle

executive
#141

Sure.

Stephen Mullowney

executive
#142

That objective belongs to them just as it does to us.

Andrew Cheatle

executive
#143

And Stephen, here's another way to look at it: as we keep working in Tanzania, we are steadily lowering the risk on that project.

Mike Niehuser

analyst
#144

That was a really thorough response. It makes me want to ask a follow-up. I think that — isn't the... I got curious when you mentioned also going underground, and I'm not all that familiar with Buzwagi, but my understanding is that it was closing down — is that an underground mine or an open pit? And could you speak to, you know, your timeline for going underground and how that will affect culture, at least at the operating level?

Stephen Mullowney

executive
#145

That's a fair question, Mike. The way I see it, when you get right down to it, what we're discussing at this point is the Buckreef Main Zone. So my honest instinct — and I have a good deal of confidence in it — tells me this ends up being underground Buckreef Main, complemented by pits along with satellite pits throughout the property.

Andrew Cheatle

executive
#146

You've got it.

Stephen Mullowney

executive
#147

Ultimately, that's where this will hopefully end up taking shape. Clearly, some exploration and drilling remain to be done there, since, you know, personally I'm not a fan of having folks go dig up ground where there's no gold, and plenty of projects do exactly that, so drilling really is needed. And so in the end, that's the situation at Buck Reef Main — as you're aware, it's a vertical deposit. It's fairly wide, so you won't incur much dilution when mining it. Going underground will make sense. I'm a fan of underground, and it shrinks your surface footprint, and things such as security risk are simpler to handle underground rather than in an open pit setting. So, you know, as time goes on, I think the project gets de-risked further by going underground rather than remaining open pit.

Andrew Cheatle

executive
#148

Sure.

Stephen Mullowney

executive
#149

Tailings as well—every environmental aspect too, plus gates and backfill; all of that takes place with underground.

Mike Niehuser

analyst
#150

So I'd guess that this year, as you mentioned, you're still completely focused on mining Buckreef Main. But once we get to the end of the year, with the extra ball mill coming online in the last quarter, you'll likely be putting a lot of emphasis on making sure there's sufficient mine development — whether from Buckreef Main, the underground to the south, or those other pits — to keep it fed, and with more growth in mind. I realize it's too early to say, but how do you see prioritizing resource development outside of Buckreef Main?

Andrew Cheatle

executive
#151

Yes, Mike, we do put these in order, and I can give you a quick answer on that.

Stephen Mullowney

executive
#152

Well, honestly, I think that question kind of leads into… Right now, what comes first is growth — channeling that cash flow growth into a strong exploration program-

Andrew Cheatle

executive
#153

You've got it.

Stephen Mullowney

executive
#154

So Andrew has laid out the targets—basically, the spots on the property we think look most prospective. Is that about right?

Andrew Cheatle

executive
#155

That's correct. And once more, Mike, you know, if you look at the slide we've provided, the Anfield Zone sits just about 200 to 250 meters east of our Main Zone. It's very early stages, and we've gotten some spectacular grade results there. If you recall, just over 3 meters at 14 grams a ton. That also sits within a much broader mineralized zone. But, you know, when you're asking about priorities, you clearly start with the most attractive results.

Mike Niehuser

analyst
#156

I didn't catch that final sentence you just mentioned.

Andrew Cheatle

executive
#157

You chase down the best-looking outcomes, and that’s the reason I displayed those, Mike: Eastern Porphyry and Anfield-

Mike Niehuser

analyst
#158

All right, thanks.

Andrew Cheatle

executive
#159

That's what we're concentrating on most.

Mike Niehuser

analyst
#160

Correct.

Andrew Cheatle

executive
#161

Following that, the southern extensions of the primary pits.

Mike Niehuser

analyst
#162

Great, that helps a lot. So for analysts who need things spelled out, like me, it'll get clearer as the year goes on, and the priorities will emerge on their own.

Stephen Mullowney

executive
#163

Well, yes.

Mike Niehuser

analyst
#164

Well, those were basically all the questions I had. I just wanted to add one more thing about Jim Sinclair — that his involvement in Tanzania going back to Sutton really made him, you know, not just Mr. Gold but Mr. Tanzania when it came to bringing exploration to that part of the country. And I'm sure he was very pleased with what you did over the last year, and probably took a great deal of pride from it. But I'll leave it there, and thanks for taking my questions.

Stephen Mullowney

executive
#165

Yes, thanks.

Andrew Cheatle

executive
#166

Thanks, Mike. Wishing you the best.

Stephen Mullowney

executive
#167

Thanks, Mike.

Christina Lalli

executive
#168

Craig Sutherland of Conceptual Solutions Limited has the next question. The line is yours.

Craig Sutherland

analyst
#169

Morning to you. Am I coming through clearly?

Stephen Mullowney

executive
#170

Craig, we can hear you perfectly well.

Andrew Cheatle

executive
#171

Morning to you, Craig.

Craig Sutherland

analyst
#172

All right, thanks, and good morning, everyone. Most of what I wanted to ask has already been covered, but before anything else, congratulations on the progress — it really has been remarkable to watch how much you've fast-tracked this, in the way we were all hoping for. I suppose my question is this: our focus is on Buckreef Main, but we're also now looking toward future possibilities, as you mentioned, with Anfield and the Eastern Porphyry. In your drilling, or in what you're targeting, are you identifying anything beyond gold — silver, copper, for instance? Are there other possibilities that could raise the property's value, or not alter the scope but improve it as we move forward — the geologicals and the rest?

Stephen Mullowney

executive
#173

Right. So at the moment, what we're observing with our Doré bars is that silver makes up just a small share, since you do capture some of it during processing, along with a minor, tiny quantity of copper. Nothing in the assay results suggests this might be a copper-gold project, for example. That's simply not the kind of geological formation involved here. Andrew, would you like to go into that a bit more deeply, please?

Andrew Cheatle

executive
#174

Yeah. No, what we have here is an Archean greenstone system, and it's mostly gold.

Stephen Mullowney

executive
#175

All right.

Andrew Cheatle

executive
#176

Stephen, you nailed the summary. Sure, there's a bit of silver in the mix, but the real story here is gold.

Stephen Mullowney

executive
#177

This is a gold play, and pretty much every play in that region is gold as well.

Craig Sutherland

analyst
#178

Alright. Great, great, great. That's all from my side. Everything else has already been addressed. So,

Stephen Mullowney

executive
#179

That's right.

Craig Sutherland

analyst
#180

Once more, I wish each of you ongoing success, and I couldn’t be happier with how things are going.

Stephen Mullowney

executive
#181

I appreciate that.

Andrew Cheatle

executive
#182

Appreciate that, Craig.

Christina Lalli

executive
#183

We’ll take our next question from Stephen Reiser at a family office. Stephen Reiser, please go ahead.

Andrew Cheatle

executive
#184

Stephen, can you—

Christina Lalli

executive
#185

Mr. Reiser, could you unmute your line? On our side it shows as unmuted. All right.

Stephen Reiser

analyst
#186

Hello there, am I coming through clearly?

Christina Lalli

executive
#187

Absolutely, that’s something we can do.

Andrew Cheatle

executive
#188

Sure.

Christina Lalli

executive
#189

Much appreciated.

Andrew Cheatle

executive
#190

Steve, please go ahead.

Stephen Reiser

analyst
#191

Okay, just a few technical hiccups to get through, so to speak. First off, I'd also like to offer my congratulations to the team for the strong work in 2023 — cleaning up the balance sheet, raising output, the exploration effort, and naturally the very solid stewardship of shareholder capital and funds. The discussion makes that plain to see. What I'd like to ask the team really revolves around market positioning and bringing in customers — the somewhat softer topics — in a setting where liquidity in the gold mining industry has genuinely tightened and plenty of miners are vying for capital. From the perspective of an asset manager, as all of you are surely aware, there's going to be a certain natural hesitancy about putting money into Africa, especially if you happen to be a U.S. asset manager, hedge fund, or family office, when there are miners — Snowline Gold or Hercules Silver in Vancouver and in Idaho, say — that hold high intrinsic potential ounces and sit in regions that may be seen as simpler to operate in. So what I wanted to grasp is what the team is doing on one front — beyond the rhetorical conversations previously held about Africa, and that it's safe and you can drive the car successfully — what could be happening from a more structural angle to see reports or information published, perhaps even placed on the website, that push aside some of these worries regarding Africa and Tanzania?

Stephen Reiser

analyst
#192

Then as a secondary and connected matter, what steps are being taken toward bringing in more investors? I understand the 15% institutional portion and the 15% friends, family, and officer portion have stayed pretty stable for some time, yet considering the intrinsic worth of this company, there's merit in quite robust efforts aimed at gaining additional investors and customers. So once more, market positioning, and after that structural measures to get past impressions that might be held regarding Tanzania and Africa, plus actively cultivating investors with genuinely deep pockets.

Stephen Mullowney

executive
#193

Thanks for asking, Steve. Regarding that first risk involving Tanzania, quite a bit of headway has been made at the government level when it comes to foreign direct investment. As you know well, the former president, Magufuli, died a little more than 2 years ago.

Stephen Reiser

analyst
#194

Yeah, got it.

Stephen Mullowney

executive
#195

The incoming president is heavily focused on foreign direct investment. We have, you know, talked about the direction the government is taking regarding foreign direct investment and its intended destination, along with how Tanzania is getting better as a place to invest. You can observe that in the flow of funds. I believe we have covered that in earlier presentations concerning the investments Barrick is making. OreCorp was acquired by Silvercorp just recently. And we are beginning to witness considerably more investment in Tanzania's infrastructure. You are right that not much of that appears on our website, and, and as we have said previously, we need to add that to our website. Many of the favorable articles concern the, concern Tanzania. I think through my discussions and the team's discussions with investors, that is beginning to emerge, regarding a lower risk being seen in Tanzania's current administration compared with the prior administration, and that is starting to resonate somewhat. I think you will see that reflected in ratings such as the Fraser Institute and other ratings as time passes. Kind of similar. The comparison I enjoy drawing is Ecuador 10 years ago, not much investment.

Stephen Mullowney

executive
#196

So today, that's sort of up there alongside other jurisdictions. On the acquisition question, what you're really asking about is basically new shareholders. When we look through the shareholder registry, I do notice turnover among shareholders, and new shareholders coming in. I see it even in—you know... I just scroll down the screen here today and compare the participants on this call with those who'd have been on a similar call a year ago. It's far broader, and there are new priorities as well. And we, you know, as you're well aware, I was in Switzerland last week. I met quite a few shareholders, and they hadn't even realized they're shareholders, because they'd appear on the old list rather than the new one. So, you know, those communications carry on. We keep holding a lot of meetings and reaching out to institutional investors, and also to large retail and family offices. So that carries on. I'd say that will scale up considerably too, once we begin to formulate our business plans for the more medium to longer term. My hope is that once that's more formulated, we become more investable than we are right now today, and that relates to, you know, you're seeing the tenets of it today when it comes to talking about underground mining, Buckreef Main Zone, plant expansions.

Stephen Mullowney

executive
#197

Right now, suppose someone asked what 4,000 tons a day or 6,000 tons a day would actually look like at Buckreef Main — that question has no answer today. I'm in a much better position to respond to it, but I still don't have the full picture on that, and as we move ahead it'll shift further into the realm of knowns, which is what will let people apply a traditional mining valuation to the company. Does that roughly answer what you were asking?

Stephen Reiser

analyst
#198

That's right, it does. And we will definitely be thankful for, and eager to see, additional evidence-driven perspectives on the site that help clear up certain impressions that may be held, especially by Western asset managers, regarding—

Stephen Mullowney

executive
#199

Correct.

Stephen Reiser

analyst
#200

That covers Tanzania and Africa.

Stephen Mullowney

executive
#201

And honestly, Steve, it also helps that mining property acquisitions are beginning to happen in Tanzania too. What that tells you is there are bigger pools of capital willing to put money in there. Take the OreCorp property — the projected CapEx on it comes to $500 million. So somebody is going to be writing a sizable equity check for that.

Stephen Reiser

analyst
#202

That sounds good.

Stephen Mullowney

executive
#203

Appreciate that, Steve.

Stephen Reiser

analyst
#204

I appreciate everyone joining us.

Operator

operator
#205

Our following question comes from John Tumazos of John Tumazos Very Independent Research. You have the floor.

John Tumazos

analyst
#206

Thanks. Nice work on the earnings and the strides you've made — congrats.

Stephen Mullowney

executive
#207

Appreciate that, John. No problem whatsoever.

John Tumazos

analyst
#208

Good morning. Your press release is probably brief and may oversimplify things. Is installing the 1,000 ton a day ball mill the only thing needed for the expansion, given that there's excess mine capacity, and there's also spare capacity elsewhere in the process plant — flotation cells, et cetera — and tailings capacity is available? Or are other parts of the expansion also underway?

Stephen Mullowney

executive
#209

Okay, so other pieces of the expansion are also in progress. The crushing circuit is the first to be expanded, so that equipment is expected to reach shore this month and then head to Buckreef — jaw crushers and that kind of thing. A plinth has to be constructed for the ball mill, and that should also get built this month. Electrical components need to be brought in because of the expansion, and those will come online in the new year. Tank capacity does need expanding, and we have a plan for that too — it will be done locally. As for tailings, we do need — and I've mentioned this to many market participants — a longer-term tailings plan after roughly two years. We're working on that now, assembling it, examining plenty of dry stack options, whether that means dry stack tailings through filter presses. We're also reviewing thickeners and all those kinds of processes at the moment, so we can have that in place over time. But we can also expand our wet tailings facility, if we want to, during that period as well.

Stephen Mullowney

executive
#210

Your question is entirely fair, and I think we have every piece needed to address it. When it comes to mining, we're able to keep today's extraction rates in place and still hit our production target. We carried out substantial mining work last year, and our earlier NI 43 to 101 indicated that this unlocked the deposit for the medium term — and that's exactly what has happened.

Andrew Cheatle

executive
#211

To be clear on that, John — right now, a flotation circuit isn’t something we have.

John Tumazos

analyst
#212

Regarding regional exploration, could you describe what your drilling plans might look like for 2025 and 2026, as the cash flow starts coming in from—

Stephen Mullowney

executive
#213

Yeah.

John Tumazos

analyst
#214

What about funds earmarked for production or other purposes—could those take priority?

Stephen Mullowney

executive
#215

Over to you, Andrew. That regional initiative is going to build out gradually, you know, but there's definitely a great deal of gold to be found in that area.

Andrew Cheatle

executive
#216

Stephen, could we perhaps return to that single exploration slide for a moment, if you don't mind?

Stephen Mullowney

executive
#217

Sure — one moment, please.

Andrew Cheatle

executive
#218

Just, uh—

Stephen Mullowney

executive
#219

I need to move on to the Q&A. I’m unable to—

Andrew Cheatle

executive
#220

You’re able to—you can scroll down at the bottom there. Simply head to one of the arrows.

Stephen Mullowney

executive
#221

All right, that's working now. Now it's working.

Andrew Cheatle

executive
#222

John, this slide makes it a little simpler to explain. As you can see, the Main Zone — with all those colors in the middle — comes through very clearly. Right away to its east, you've got all those white dots. From what we know so far, there are 3 zones spanning over 3 kilometers, anchored in the northeast by the Eastern Porphyry deposit, which remains open toward the northeast, and in the south by an intermittent mining operation run by some locals along with a Chinese group. Drilling there has been very sparse, yet the opportunity is large enough that it has to be tested. Beyond that, you'll notice some extra red arrows. I'll begin on the east side. We've picked out another trend just to the east. You can see that red group of arrows there. You'll also see that it sits on the same trend as the Eastern Porphyry, Anfield, and the Main Zone. And in the same way, if I draw your attention to the far west, or the left, once again field work has allowed us to identify two additional trends in that spot. So 25, 26 — there's certainly no lack of targets to drill out there... broadly across the region, as you'd expect, and I always like to say, John, that we're clearly keeping tabs on who's who in the zoo around us, and as opportunities come up there, there could be some further activity.

Stephen Mullowney

executive
#223

Sure, we've also had plenty of people reach out to us. You know, so like—

Andrew Cheatle

executive
#224

Yes, that's right.

Stephen Mullowney

executive
#225

... as I work through this — and like I mentioned, the plan for the business will flesh out further as time goes on — once that processing plant is operational, could a hub-and-spoke setup be put in place here? Since plenty of high-grade, smaller-

Andrew Cheatle

executive
#226

Yeah.

Stephen Mullowney

executive
#227

...that kind of pit. And if you look at companies that have pulled that off successfully, Calibre is one that springs to mind, and...

Andrew Cheatle

executive
#228

Regarding graphite.

Stephen Mullowney

executive
#229

... down in Nicaragua. So that's really where things stand—right now, what's holding us back is human capital, plain and simple. But the clear priority is the processing plant first, then whatever sits on our own property, and after that we turn to figuring out how all of it fits together across the region.

Andrew Cheatle

executive
#230

Yes, that's accurate, Stephen. John, we've also been getting inquiries, and we evaluate those both locally and across Eastern Africa.

John Tumazos

analyst
#231

If I may squeeze in one more question. With gold now trading above $2000, other projects in Tanzania will likely move forward. East Africa's graphite sector is busy as well. Is there any scarcity of skilled workers, or of inputs used in production?

Stephen Mullowney

executive
#232

Yeah, so regarding that—on inputs—we've done well up to now. When it comes to skilled labor, there's an issue I'd say is worldwide rather than specific to Tanzania: highly skilled mining engineers are in short supply. That shortage is more global than Tanzanian, and we fill out our mining engineer capabilities by using professional services firms and individuals, plus site resources. As for the other disciplines—metallurgists and geologists—we haven't encountered any scarcity in that skill set, nor a lack of skilled labor in Tanzania to carry out the work. I'd say Tanzania actually has an excess supply of those skills, but the one facing a shortage, and it's a global one, is mining engineers.

Andrew Cheatle

executive
#233

Yeah, and I’d add this too, John: we’ve managed to bring in some really important people, and our turnover is quite low as well. Is—

Stephen Mullowney

executive
#234

Right.

Andrew Cheatle

executive
#235

Yes. So the people we want to keep, we've done a really good job of holding onto them.

Stephen Mullowney

executive
#236

And I think that, you know, when a project is expanding, it becomes simpler to draw in and keep hold of staff too. So provided we keep growing and compensate people fairly, we ought to be fine on that front when it comes to HR.

John Tumazos

analyst
#237

I appreciate that a lot.

Andrew Cheatle

executive
#238

I appreciate that.

Christina Lalli

executive
#239

Thanks, John. We’ll see you later this month. I believe we might have some text —

Stephen Mullowney

executive
#240

At this point I'd like to pass... Oh, right, apologies. I was about to turn things over to you, Stephen, for written questions. So there aren't any text questions, Mike. Maybe I'll just go to Q&A.

Christina Lalli

executive
#241

They do exist. All you have to do is click the text column over in the Q&A section. Up at the very top here, that's it.

Michael Leonard

executive
#242

Gaylene, are attendees able to view the questions themselves, or do we need to read them aloud?

Christina Lalli

executive
#243

No, it isn't possible for them to view those.

Michael Leonard

executive
#244

All right, Stephen, could you go ahead and read that question out loud?

Stephen Mullowney

executive
#245

Alright, I'll take that question. It comes from a private investor, and honestly, this is something I hear frequently — it's a question that dates back a while. Could future dividends realistically be paid out in physical gold? For the near to medium term, my answer would be that we aren't considering that at present. As you know, the Tanzanian government applies a royalty to gold. It monitors its gold quite closely, and through STAMICO we have a joint venture partner in the government of Tanzania. So in the short to medium term, I don't foresee a dividend paid in physical gold. The same individual's second question is this: given the strong exploration numbers the board presented, would I agree with his personal view that there's a strong likelihood TRX Gold holds roughly 5 to 10 million ounces of gold beneath the ground? Well, clearly we trade on the public markets. At this moment, that would be a personal opinion rather than one grounded in facts. You know, a great deal of work remains on the exploration potential of this property to drill it out to 5 to 10 million ounces.

Stephen Mullowney

executive
#246

Speaking for myself, I hope that property gets to roughly that kind of level. Andrew shares that hope — he expects the property will reach—

Andrew Cheatle

executive
#247

Yeah.

Stephen Mullowney

executive
#248

…up to that kind of level, though it still has to be confirmed at the drill bit.

Andrew Cheatle

executive
#249

You've got it right, Stephen. This is really just my own view. I'd repeat that the early results we've seen have been quite encouraging.

Stephen Mullowney

executive
#250

Sure.

Andrew Cheatle

executive
#251

Our Special Mining License still offers plenty of opportunities for exploration—there’s no lack of potential there.

Stephen Mullowney

executive
#252

Right, though that still has to be demonstrated.

Andrew Cheatle

executive
#253

A great deal of drilling lies ahead, yet that is simply how this business works.

Stephen Mullowney

executive
#254

That’s the name of the game, yeah.

Andrew Cheatle

executive
#255

Absolutely.

Stephen Mullowney

executive
#256

Then the next thing people ask is, when do you plan to release a revised Indicated and Inferred Resources report? How would you put it... All right, so that's really two questions. As for the revised Indicated and Inferred Resources report, our focus is on evaluating the economic potential that the Buckreef Main Zone holds, and included in that work would be a refresh of the resources that sit in the Buckreef Main Zone at present.

Andrew Cheatle

executive
#257

Yeah, that's right.

Stephen Mullowney

executive
#258

Did I get that right?

Andrew Cheatle

executive
#259

Yeah.

Stephen Mullowney

executive
#260

... Andrew? Right. So we expect that to be released during the first half of fiscal 2024... Yes. Yeah, by June. How would you describe-

Michael Leonard

executive
#261

Apologies — I need to check the calendar.

Stephen Mullowney

executive
#262

Calendar — right, so not fiscal. Yeah, sorry, calendar. Yes. So the follow-up to that is: how would you characterize the current relationship with the Tanzanian government? Because there were rumors, some rumors that the old aggressive Tanzanian president wasn't so friendly toward foreign investors. And I think we did, you know, and in Stephen Reiser's question, we did answer this. The current relationship is good. We have a good relationship with the mining minister and the old mining minister as well, who's now the vice prime minister. We have a good relationship with the permanent secretary. We have a good relationship with the Mining Commission and with our joint venture partner. The reality is, in countries in Africa, if you put an asset into production, you continue to grow it, you become a good taxpayer, become a good employer, have a good reputation, you generally have a good relationship with the government. They wanna see the asset grow just as much as we would, and that's in, you know what I'll say, aggressive regimes and more not so aggressive regimes. You're right, the old president was not as friendly to foreign investors. When we started, and I came on board with the old president in power, and as soon as we started to build the asset, that relationship was fine.

Stephen Mullowney

executive
#263

So, you know, I think they— You know, I've said this many times to people: when you head into foreign nations—and I've visited plenty of them, and conducted business in plenty of them, especially during my earlier position handling government relations, on both the government side and the investor side—the world is open. So what does that mean? Everyone owns a smartphone, everyone has an internet connection, everyone can reach the same information, which was not true 30 years ago. And so, in that context, and then many people nowadays are highly mobile and are educated at the same educational institutions, particularly in the West. As long as you maintain a fair, open, and transparent relationship, generally you end up with a good relationship, and that's the approach we've been, we've been taking.

Michael Leonard

executive
#264

So, Stephen, on the topic of foreign direct investment — that's been discussed quite a bit publicly — but there's a key metric the incoming administration has established, and that's expanding mining's share of GDP.

Stephen Mullowney

executive
#265

You've got that right.

Michael Leonard

executive
#266

They set certain goals and figures around it. It's definitely a new setup, and as Stephen mentioned, things are going smoothly between us, and provided we keep delivering, I wouldn't anticipate any shift there.

Stephen Mullowney

executive
#267

Right. So the following question is about the timing and method of rewarding shareholders. Markets rise, markets fall, sometimes conditions are favorable, sometimes they aren't. What we can control isn't really the markets themselves or the valuations markets assign to companies. What lies within our control is reaching as many investors as we can, presenting a story to as many of them as possible, and also arriving at a business plan that's investable — one that could withstand those swings in market perception. I believe we've accomplished that. That was one of my— I got asked this frequently over the past couple of weeks: why did you choose the business plan you chose? Many people don't realize that a substantial portion of my education is in economics. There's a complete understanding that interest rates could never stay at zero indefinitely. They never did throughout the history of mankind. When interest rates rise, valuations generally decline. It's a fairly straightforward equation. Liquidity typically dries up too, and the capacity to access capital typically dries up alongside it.

Stephen Mullowney

executive
#268

You therefore require a business plan capable of weathering those fluctuations. Let me be frank: at a junior explorer, the plan in place when I arrived would not have come through this market. As things stand today, that plan does come through this market. It is mostly an operation that funds itself. Our aim was to decelerate and accumulate liquidity, and that proved achievable. At this moment we don't regard that as required, yet the plan is able to endure a market of this kind. And as the business expands over time — its cash flow profile, its EBITDA profile, and its resource profile — shareholders should ideally be rewarded from that growth. So my next question is this: I hope investors who were in from the start could be made whole again. I am in good shape, but I feel for those who bought into the vision when TRE was trading at its all-time lows and highs. I appreciate the progress that you've made. I cover this in nearly every presentation: the management team arrived a little more than three years ago. I believe we have advanced the project since then. That business plan differs greatly from the original one, which was to be a royalty company and mainly an exploration co.

Stephen Mullowney

executive
#269

The risk profile tied to it is not the same. I'd say it's likely somewhat less risky now than previously. And when TRE peaked, the markets on gold were very bullish. That same bullishness isn't present in the market right now, and should it return, then hopefully we'll trade considerably higher. And that, and that is ultimately the aim and to reach as many investors as we can. So I hope that answers that question. Operator?

Christina Lalli

executive
#270

That brings us to the end of the question-and-answer session, so I'll return the floor to you for any closing comments.

Stephen Mullowney

executive
#271

Thanks. So, as all of you have heard from us, we're a growth company. We did quite well in 2023. We hope that growth carries on into 2024. And there's a lot of news coming, so stay tuned. I think 2024 is going to bring much more news than 2023 did. We have plenty in the works. There's the plant expansion, and there's the creation of a business plan for the Buckreef Main Zone, and then we'll really get the drill turning, and that's going to generate a lot of exploration results. Like I said, I prefer to stay flexible. The management team here also prefers to stay flexible. What we presented today is the current business plan for 2024, but if a new and better one comes along, we'll pivot. And so we'll always want to make sure we keep shareholder value in mind and try to minimize dilution as much as we can. I thank everyone on today's call for being a shareholder and for sticking with us. Thank you.

Christina Lalli

executive
#272

That brings us to the end of today's call. You're free to disconnect at this point. We appreciate your participation, and we hope the rest of your day goes well.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete TRX Gold Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to TRX Gold Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in TRX Gold Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.