TRX Gold Corporation (TRX) Earnings Call Transcript & Summary
January 18, 2024
Earnings Call Speaker Segments
Operator
operatorAt this point I'm happy to hand things over to Christina Lalli, who serves as Vice President of Investor Relations at TRX Gold. Christina, please go ahead.
Christina Lalli
executiveThanks, Gavin. Hello, everyone, and welcome to the TRX Gold Corporation presentation of results for the first quarter of 2024. <<operator_script>> This meeting is also being recorded. <<operator_script>> Stephen, over to you for the conference.
Stephen Mullowney
executiveThanks, Christina. We're dealing with some technical trouble this morning. What you're hearing is actually Mike's iPhone, so as different people talk, you'll see me pass the iPhone around the table, and I hope everyone can hear us okay today. Thanks for joining our first quarter 2024 results webcast. We're in a really interesting spot, because right now both Andrew and Mike are on the line with me. We're beginning to get a sense of the new plant and when it will come online. So we're really working our way through the crushing circuit. That's at roughly 60% to 65% built at this point, I believe. They've had a lot of rain, so we're hopeful it comes online somewhere between the end of January and early to mid-February. It all hinges on the weather. It has rained considerably more than expected this year in East Africa, especially in Tanzania. So that's exciting. And at the same time, the ball mill components and that sort of thing are underway and starting to be installed as well. So we're really excited about that, because it lets us really put on the drill bit toward the back half of the calendar year, given that the increase in cash flow should be coming through as that plant gets online.
Stephen Mullowney
executiveWe are genuinely thrilled, since this is a truly exciting time. So, without further delay, naturally, being a Public company, I need to point everyone to the cautionary note and note that forward-looking statements will appear in this presentation. Therefore I'd encourage investors and anyone else to visit our website to review the cautionary note. Joining us on the line today is myself, the Chief Executive Officer. Andrew is with us from Tanzania. As you can see, he's wearing an orange shirt. We prefer to keep him in Tanzania as much as we can. Then we have Mike beside me; and Christina, who is beside me too. So, beginning with a few points we include in every presentation, especially for anyone who's new to this call, we are TRX Gold. We're a group of experienced leaders developing — and developing quickly — a gold project in Tanzania. We operate a plant that has been delivering positive cash flow with high margins. We'll cover that shortly. And we hold a special mining license offering substantial — substantial blue sky potential for fresh gold discoveries. An overview of our property.
Stephen Mullowney
executiveThe 2020 resource statement showed 2 million ounces in the measured and indicated category. This deposit reaches the surface, and that is what makes all of this possible — it is 20 meters wide. Metallurgy is straightforward, and we use grind crush CIL. We hold full permits under a special mining license. Our present license runs until 2032 and can be renewed entirely through to the end of the deposit's life. We have had a processing plant operating for a little more than a year at 1,000 tonnes per day, and it consistently meets production guidance. Our environmental footprint is minimal. We recycle water. Tailings management is solid, and we are tied into the national power grid. And, as I said earlier — it always puts a big smile on my face — there is exploration potential surrounding this property, and the business plan we have communicated is gold production to boost cash flow so that exploration can eventually be expanded. So one thing we take a lot of pride in, and it is beginning to really appear in the numbers. And it was beginning to really grow as — we have not done a capital raise in, I believe, more than 2 years now, Mike?
Michael Leonard
executiveThat's right.
Stephen Mullowney
executiveYes. So, as many long-time investors know, when we first entered this business, we had to recapitalize it in order to carry out everything we're now doing. In that regard, looking at the net equity cash raised a little over 2 years ago — roughly $23.5 million — and then considering what we've put into the property since that time, both from those raises and from free cash flow the asset has generated: the multiple on the equity raised now stands at about 1.7x and is still climbing. So this is beginning to demonstrate that the business model is quite different from what we're going to build as we proceed, stepping up that investment to step up cash flow. And you can see that in the production figures as well as in adjusted EBITDA and cash flow from operations. So in fiscal 2023, which was August, we posted sales of just about $38 million — more than $38 million — with cash flow from operations above $17 million and adjusted EBITDA of approximately $14 million. So we're really starting to see it in the financial results: the company's business plan is working.
Stephen Mullowney
executiveWe've accomplished that while also keeping G&A expense under control, which is great. During that stretch, we went from roughly 30 to 35 employees including Buckreef's staff to well over 500 people today, counting contractors at Buckreef, all while holding our G&A in check. Turning to Q1 2024 highlights, which Mike will cover in a moment, I'll frame this at a very high level. This quarter we again delivered positive operating cash flow, and that has been plowed back into the growth project. I believe we reinvested close to $4 million. As I said earlier, prudent capital management remains our approach. This marks our third mill expansion in a row. As of today, we've spent approximately $3 million to $3.5 million on it, funded through cash flow from operations and other sources. Our gross profit margins remain strong. Assuming gold prices hold at the same level, we anticipate those margins improving once the new plant is running. That new plant should be operational near the back half of the fiscal year, and just before the second quarter of the calendar year wraps up.
Stephen Mullowney
executiveAfter that, once that cash flow begins, we'll kick off a far more thorough drilling program, and planning for it is already underway. A portion of the cash would have to go toward drilling, but doing so would delay the plant expansion. Given the economies of scale the new plant should deliver, it makes far more sense to direct our capital toward that plant. That's why our exploration program is considerably stronger at the tail end of the plan. So that's genuinely the reason we're sequencing things the way we are. And at Buckreef, our safety record remains excellent. Once again — the second time now — we've reached 1 million work hours LTI free. So kudos to everyone at Buckreef for working safely. So at this point I'd like to turn the presentation over to Mike. As I mentioned, I'm going to pass the phone along. So you won't be hearing much from me on this, and Mike will walk through what the financial results were.
Michael Leonard
executiveThanks, Stephen, and good morning, everyone. I appreciate you being with us on today's Q1 call. Compared with the prior 3 quarters, Q1 was a relatively stable quarter. Output came in at slightly below 5,000 ounces. Looking at Q2, Q3 and Q4 of last year, that aligns with the guidance we've been delivering from our 1,000 tonne per day plant running at or near its capacity. Production fell a little year over year, since Q1 of last year was the first quarter in which we operated commercially. To get the operation started, we chose to prioritize high-grade oxide material, or 3 gram plus material, and ran it through that mill so it could be brought up and running in the first quarter. That said, in Q1 of this year, as you'll have seen, we processed a head grade of nearly 2.6 grams a tonne, which remains considerably above the deposit's average grade and is very strong for our open pit operations. You'd also have noticed, from an operational standpoint, that recoveries were partly affected, which weighed on year-over-year production. Average recovery rates came in at roughly 81%, which sits at the low end of what our MET studies indicate given the current rock composition — approximately 50-50 sulphide and oxide ore material that we've been feeding through the mill — along with the grind size and retention times we've been achieving in the plant.
Michael Leonard
executiveAs Stephen mentioned, we're extremely enthusiastic about the larger, upgraded crushing circuit that should be operational soon, and it's genuinely anticipated to boost the grindability of both the rock and the material, and as a result should enhance recoveries as we move toward the later portion of this year.
Stephen Mullowney
executiveYes. So Mike, let me stop you there for a moment and walk through that. In every mining operation, you're always balancing recovery rate against throughput rate. What you do is try to get the most cash flow from operations by striking that balance. We know that when ore stays in the tanks longer, or has a longer retention time, recovery comes out higher. We also know that grinding it much finer gives us a significantly higher recovery rate. And that ties into the MET studies we have. At present, since the plant is the bottleneck relative to the orders we have available, we balance recovery rates and throughput rates to try to maximize cash flow from operations, given that we're in a build out base. So we have a solid grasp of recovery rates and how to improve them. Once the new crushing circuit is online — this is one reason we chose to go with the crushing circuit ahead of the milling circuit of the ball mill — because crushing service is the bottleneck in the system as it stands. And to free things up so we can mill more even within the current system, we need the crushing circuit running first, which delivers a far more consistent product to the mill so we get a much more consistent grind size and lift those recovery rates through the milling process.
Michael Leonard
executiveThanks, Stephen. On the financial front, we sold a bit less than 4,900 ounces during the quarter — basically everything we produced. That generated revenues above $9 million. As you can see again, the realized price is up on the screen. Gold prices remain at high and strong levels. For the quarter, we realized $1,942. This quarter we've been selling at well over $2,000 million an ounce. So there's considerable upside potential in the gold price. Gross profit came in at slightly under $4 million, or 40%, as Stephen mentioned. So this remains a high-margin operation. And the EBITDA we reference there too is nearly $3 million — a solid proxy for cash flow. On cash costs, we posted a cash cost of a little more than $1,000 an ounce for the quarter. That's above the full-year guided range of $800 to $900 an ounce. This is mostly consistent with expectations, as we discussed on our year-end call. As we noted in our year-end results, our year-end and Q1 cash cost have been affected partly by increased fuel costs from having to run generators to keep the mill running at capacity, given unstable and inconsistent grid power.
Michael Leonard
executiveLike we mentioned on the year-end call and in the time since, we hooked up to a substation quite near the site in November, and we anticipate that will help with items such as processing costs as you move into the later portion of this year. At this point we're running on about 80% grid power against 20% generated power. So we anticipate cash costs getting better across Q2, 3 and 4 and returning to that full-year guidance figure of between $800 and $900 an ounce. And then last, I think Stephen mentioned this, but we've essentially accomplished what we set out that we'd like to do as prudent capital managers who organically generated cash flow to put into value-accretive opportunities such as -- so we generated operating cash flow of over $5 million. We returned almost $4 million of that into the operation, partly toward that expansion Stephen mentioned as well as a tailings storage facility to handle substantially larger growth, and also to put pieces of capital equipment in place that allow for that growth profile. We have a strong, robust balance sheet with cash of over $8 million, positive working capital and <<inaudible>> low for fixability the asset compare.
Stephen Mullowney
executiveYes. So Mike, I want to briefly address the cash cost point you raised. On mining costs, we're quite comfortable with where they stand, and we believe we can bring that down somewhat. But the place where those cash costs will begin to decline is in the processing cost per tonne. And the expanded plant doesn't take on any additional fixed cost, or very little extra fixed cost. So you're going to see much more fixed cost absorption because of higher throughput rates. And really, we still have a fairly small plant relative to the skies and scale of what Buckreef can be. And to get those costs out, we need to keep expanding and have that overhead absorption and other cost absorption in the processing plant. And that's really what's behind the higher cash costs. It's both on the <<inaudible>> plant versus mine.
Michael Leonard
executiveActually, Stephen, that’s a fair question. The facility is going to deliver meaningful economies of scale — precisely what you’re getting at. Throughput doubles from 1,000 tonnes per day to 2,000 tonnes per day, and overhead doesn’t rise at all. As a result, our processing cost — which came in at roughly $26 per ton, as we reported in Q1 — should be cut by about half once that expansion is up and running. So there’s a great deal of efficiency coming from the new scale we’re operating at.
Stephen Mullowney
executiveRight, exactly. So moving forward, that plant processing 2,000 tonnes per day — as I mentioned, we're smiling about it, considering how much progress we've been making here. You'll see a few photos here: the new crushing equipment has shown up outside. I believe you can spot our General Manager standing next to a cone crusher. Then there's our truck — the new jaw crusher — and you'll see the expanded tailings facility, with just a bit less left before we get to that. After that, you'll begin seeing conveyors going into position along with the concrete works and that sort of thing. You're all aware the soil remains fairly moist. Like I said before, Tanzania has had plenty of rain, far more than usual, yet we're handling it, and the crew keeps building on site. Right now they're working both day shifts and night shifts to construct our new plant. So there's a limited amount of labor and capital on hand, which is partly why we needed to tackle the crushing circuit first, then we'll proceed to the grinding or ball mill circuit so everything comes together — but what's happening has us quite excited.
Stephen Mullowney
executiveOur crusher suppliers have set up — well, we're going to set up a warehouse for critical spares and critical parts, and we want those located pretty near to us so we can cut down a lot of the potential and breakdowns and that kind of thing. So that's looking like it's turning into a very, very good relationship. And we expect this to drive a lot of cost savings plus increased production and increased cash flow, which hopefully will end up bringing the value of this project with exploration drill bit as well as an increased production profile over time. Anything to add, Andrew?
Andrew Cheatle
executiveI'm just sitting here, amazed at the excellent technical descriptions from both of you — thank you so very much. The direction we're taking here is extremely encouraging. I've been back on site since January 2nd. That crusher is now at roughly 65%, as I believe you noted. What matters most is that we'll be crushing down with sulphide, <<inaudible>>, but I need to call popcorn size, and that should significantly improve what we get from our mills and in terms of grindability. So I think it's <<inaudible>> all on core out like to add. The geologists are eager to see the <<inaudible>>. We're keeping them busy with the targets, and they're still getting them out and about, continuing to explore the SML around us.
Stephen Mullowney
executiveAndrew, I'll advance the slide and pick up from there regarding what ought to begin becoming visible during this year's second half.
Andrew Cheatle
executiveYes, considerably more toward year-end. What I'd like to remind everyone of is that the SML itself, obviously, sits within the red outline and covers 16 square kilometers. The main zone is visible right there. All those red, pink, and magenta spots are where we're mining at present. We're in the process right now of sourcing pumps to dewater the South pit. Dewatering there will happen quickly, and then we'll begin mining. On the exploration side, the key thing for us now is drilling that piece of ground between what we call the Eastern Porphyry's southern boundary, where there's an adjacent Chinese-run operation. We have more than 3 kilometers to go and test. But let me take a moment, Stephen, to remind our listeners that we had some excellent results right at the end of our last drilling campaign. The Eastern Porphyry, obviously, delivered the better results: 14 meters at 3.5 grams a tonne. And I really must point out these are very shallow — 27 meters from surface, or 25 meters <<inaudible>> 1.6 from 27 from surface. Then roughly 1.5 kilometers southwest of that, we had 3 meters running 13 grams a tonne in the Anfield, and again really shallow — 43 meters.
Andrew Cheatle
executiveSo all in all, drilling is going to require several quarters for us to work through. Still, it's a great story. The gold deposits are unchanged. It was sourced to the Northeast and mines in the Southwest, clear evidence with all those white dots of smart scale, operational <<inaudible>> miner, none of which is active and that's going to be picked up by the geology team. So it's a good thesis. It hasn't changed, and we like drilling.
Stephen Mullowney
executiveGreat. Thanks for that, Andrew. Moving to the following slide, what we're essentially doing here is restating our business plan and restating our production guidance regarding the timing for that mill expansion to be commissioned. The guidance for production is 25,000 to 30,000 ounces. As a reminder, that figure reflects the run rate — what we anticipate across the full year with the 1,000 tonnes, followed by the expanded plan of 2,000 tonnes per day. Clearly, those are <<inaudible>> place us above that level, and we'll provide the market with guidance on that at the right moment. On cash costs, we're restating our guidance of $800 to $900 an ounce, and regarding what the added cash from the new plant will fund — there will be extra capital programs, CSR and ESG programs. Obviously, as we operate, we'll have more staff, and there's a greater emphasis on exploration and drilling around the property. So, as I often say, we keep ESG in mind. We engage with communities, we build ESG into our operating cost structure. We bring on many local people — many local people through contractors — and they must construct other assets. We're beginning to pay considerable sums in royalties and taxes as a result.
Stephen Mullowney
executiveWe also remain focused on ensuring people are content and that schools, medical facilities and similar services in the nearby communities stay sensible in how they're run. As for what to anticipate across the coming 3 to 4 months: our MET study along with our Geotech studies are wrapping up. Right now, we're seeing quite a few surprises there. So we'll be coming — regarding that, we are doing so consistently, and it will feed into what I'd describe as an update to the mine plan. We're examining tailings solutions for the long term, thickeners and similar items. And at some stage we'll release a refreshed study. That will lay out a bit more detail on what is known as of today, along with what tomorrow's exploration program looks like, so the market and investors get a far better-guided business plan for how Buckreef will unfold over time. On the question of how markets have done: I doubt anyone on this call is pleased with the market as it stands. We're operating in an environment of higher interest rates than has been the case for the last 10 plus years or so.
Stephen Mullowney
executiveThat's likely to keep going, and it means capital costs are considerably higher. Beyond that, the other options available to people for putting their money to work are different as well. So we have to be out there — definitely be out there making our case. At this point we're a self-funded growth story, and that's a positive. As for our share price, sure, we'd prefer it to be higher — we always would. Against our peers, I'd say it has actually held up reasonably. But this is definitely something we stay focused on constantly, and we expect it to pick up within the investor relations framework. On that point, there are a few fresh images. Once again, we're a self-funded growth story expanding quickly, and we're eager about what lies ahead for Buckreef, especially with this plant expansion coming into operation. So Gavin, let me turn it over for any questions.
Operator
operator<<operator_script>> The initial question comes from Jake Sekelsky at Alliance Global Partners.
Jacob Sekelsky
analystSo, beginning with recoveries — I think Mike mentioned them briefly. This quarter they're in the low 80s, and there's some work you're doing to improve them through network and the upgraded equipment and so on. Should we expect those improvements this quarter? Or is that more of a second half of calendar '24 type thing?
Stephen Mullowney
executiveYes. So I’d say it’s more the second half. Actually, it shouldn’t be the second quarter—it should be the third quarter, when the grinding circuit, the crushing circuit, comes online so that a far more consistent product is fed to the ball mills. So with sulphide ore, it’s a trade-off among throughput, cash flow, and recoveries. And nothing we’re seeing raises concerns for us compared with the studies completed at Buckreef. We do know that a larger grind size—making the grind coarser and extending retention times—raises recovery rates quite substantially; in the press release we issued in August, retention times had been doubled versus what we’re currently experiencing in order to push throughput through, and that produced a much higher recovery rate. There’s also this overall balance. At this point in time, I’m not seeing anything about recoveries that is concerning.
Jacob Sekelsky
analystI appreciate that.
Stephen Mullowney
executiveThe ore is genuinely behaving as we expected it to. So that's a real positive.
Andrew Cheatle
executiveRight, and it's quite comparable to those earliest metallurgical test results. Stephen, I want to remind our investors that the old crushing circuit was still on site for the test plant during those final days. We're now mining into the sulphides, as expected. Quite literally, we're only weeks away from getting the new crushing circuit operational. As I said earlier, we'll be feeding a very good product into the ball mills. I'd also like to point you, Jake, to the photographs in the bottom right-hand corner — Paschal, our Senior Manager, is standing atop the high-grade zone, which is now into the sulphides, just so you can see it visually.
Jacob Sekelsky
analystAll right. Do you figure you could bring that back up into the 90s range, or perhaps the high 80s? Should we be expecting that? Any detail on that would be useful.
Stephen Mullowney
executiveYes. I think so, Jacob — yes, I'd say we'll reach the high 80s range. There are ways to push it into the mid-90s, but doing that would require capital, and we'll be assessing that along with trade-off studies at a later date. We've simply grown so fast. We can't commit to that right now. But mid- to high 80s is certainly achievable.
Jacob Sekelsky
analystThat makes sense. Okay, and staying on that theme of growth, now that the latest expansion is wrapping up here. You clearly have a few options for how you approach growth from here. Could you just speak to how you're looking at that across a couple of the paths you're weighing here, whether that's more staged expansions or one big expansion? And I suppose what that decision ultimately comes down to.
Stephen Mullowney
executiveYeah. So, as you correctly pointed out, what are the options or the way you think through that. So that's not something we've settled on right now. I would very much expect it'll either be a bigger expansion — say, another doubling — because I believe we're capable of that. But the emphasis will be on taking a step back at this stage, with that cash flow increase, and making those capital allocation calls, whatever serves the business best between the exploration program and an expansion. In the end, this project has to reach 100,000 ounces plus for well over 10-plus years, or even beyond that with an exploration drill bit. And that's the ultimate aim for us. There are various paths to get there, and we'll assess them following this expansion.
Operator
operatorHeiko Ihle from H.C. Wainwright has the next question.
Heiko Ihle
analystHow are you handling labor for that expansion of 2,000 tonnes per day? My assumption is that no outside employees are actually involved in the expansion work, correct? It's essentially your own staff, isn't it?
Stephen Mullowney
executiveCorrect, a portion of those are our own employees, and people from external firms too. Take electrical work as an example — you hire an outside contractor for that, and for certain welding tasks and similar items, you'll bring in some contractors from outside. So it's a mix of our own staff plus outside contractors, all of whom we oversee.
Heiko Ihle
analystCould you perhaps walk us through that a little?
Stephen Mullowney
executiveAndrew? Is that about a 50-50 split, roughly?
Andrew Cheatle
executiveWhile that buildout is underway — right. Since we’re hiring contractors for the civil work. As you noted, CSI Energy comes in for the electrical portion. After that, though, we supply quite a bit of what you might call the nuts and bolts — the operators who are then, more or less, assembling it, Heiko.
Michael Leonard
executiveApologies for cutting in, Andrew — would it be reasonable to describe the methodology and the way we're handling this expansion as comparable to the first one? In other words, it isn't really an EPC-managed project. We're running it in-house ourselves, farming out the trades where necessary.
Andrew Cheatle
executiveCorrect, that's accurate. What we did was bring <<inaudible>> the capital projects in-house. At the site we've hired a Capital Project's Manager, and he actually appears in one of those photographs — Gaston Mujwahuzi. But also Heiko, the thinking there is that if you keep that core team at the plant engaged in the construction as well, and then the specialized contractors drop away, you're left with a team at site that can keep the project moving forward.
Heiko Ihle
analystWe’re seeing intelligent individuals carry out the tasks, correct?
Andrew Cheatle
executiveWell, yeah. So one thing that really matters is having, as you put it honestly, smart people — when it comes to heavy electrical engineering, you want smart people. We actually work with one of East Africa's best contractors, some of the finest folks I've ever worked alongside, called CSI. You have to get that right.
Heiko Ihle
analystOkay, that’s reasonable. On the subject of personnel, what do you expect regarding labor expenses for the rest of this year? I mean, is there anything you might be able to tell us about negotiations, or simply what you’re observing when it comes to turnover — that sort of thing?
Stephen Mullowney
executiveI think, Heiko, that question is coming more from the perspective of North America and Europe when it comes to the labor rate increases we're seeing in our economies here. The increases we're seeing there aren't of the same kind as what you would have seen here in North America.
Andrew Cheatle
executiveRight. So at the moment, inflation cost — or inflation in terms — sits at roughly 5%. And to be clear, no negotiations are underway.
Stephen Mullowney
executiveNo. And you're getting into—similar to what happens in other emerging jurisdictions—you do see some depreciation of the currency in the sharing economy, though not to the degree that other jurisdictions experience.
Andrew Cheatle
executiveYou've got that right.
Operator
operatorOur next question comes from Robert Paulson, who is with Paulson Strategy Group.
Analyst
analystHi everyone. I want to congratulate Stephen, Andrew, Michael, Christina, and the whole TRX team for turning TRX around — it’s been around for a while, and they’re doing a lot of the things that truly need to be done to grow and become more successful. I appreciate the questions earlier about improvements, growth expansion, right — all great questions and great answers. And my curiosity, probably like many others’, is that with gold steady and basically holding at an all-time high of $2,000-plus, volatility being really strong in the sense that it’s minimal, companies profitable, cash flow positive, strong profit margins, a solid team, communities looking great, central banks just keep increasing their exposure, and de-dollarization is under way. My question really is — it’s more of a personal question — what do you believe needs to happen for TRX to reflect all these great things that are going on? Like, is that an internal event, something happening for us with exploration, or an external event — or I’m just wondering if you could elaborate a little bit?
Stephen Mullowney
executiveYes, that's quite a wide-ranging question, and I'll attempt to break it down with a bit more specificity, but I appreciate what you said up front regarding the company's turnaround. As you noted, this business has existed for many years. My own tenure here is a bit over 3 years, and to put it differently — this is how we tend to describe it internally — we're likely somewhere in the sixth or seventh inning of the effort we've undertaken. The initial phase involved stabilizing, recapitalizing, rebuilding relationships and similar items, and getting the company headed in the proper direction. After that, we began to grow it. So as for when somebody will actually step forward and pay attention to what we're doing — I believe that captures the gist of your question — we're engaged in marketing efforts. What I enjoy saying, and what I observe in today's markets, and I doubt you'd dispute this, is that plenty of companies will be out there doing a great deal, perhaps even more marketing than we do, yet you cannot out-market your financial results. Therefore, if your financial results aren't solid, no amount of marketing effort will help — your stock price falls.
Stephen Mullowney
executiveAnd considerably more than what we’ve seen across the past couple of years. So our emphasis has really been on stabilizing the operations, and we are growing that cash flow. Then we take that cash flow and direct it into the drill bit to broaden the resource profile, so this becomes a highly appealing mining project that generates cash flow and offers blue-sky upside. Doing that takes time. I think, as in the role I held previously, things moved very fast. With a mining project, progress comes more slowly than you’d prefer, but you have to watch it closely and stay focused on the long-term price. What’s required here, I think, is that we keep executing, keep doing, as we put it, keep improving those financial profile, those financial metrics, while at the same time expanding the resource base. The slow and steady approach I just described is what you must follow if you come along and you hit 100 grams a tonne in a drill bit. We’re going to be drilling more, then great. In any mining project, that is always a catalyst, but you can’t count on it. You have to get out there and keep doing what you do, and then that’s <<inaudible>> of the business.
Stephen Mullowney
executiveSo then just confirm that your business plan includes that flexibility to bring it in, assuming you're able to hit those drill holes. Does that make sense?
Analyst
analystYes, that does make sense. And thanks for taking the question seriously. You folks are performing wonderfully. I believe everyone would agree that this company today, compared with where it stood a short while back, is a substantially different enterprise — better grounded, with more opportunity and clean financials, which is much of what people genuinely seek in a marketplace that looks quite appealing. And my real question is this: since you have your fingers on the pulse and perceive things others might miss, is your intuition telling you that we're simply doing all the right things and it's a matter of patience? Or are there actions we ought to be considering that we aren't taking?
Stephen Mullowney
executiveYes. Look, these conversations happen daily for us around what we can control versus what we can't, right? That's one of the factors you've got to weigh when you're responding to the question you just responded to. I simply asked that we believe in steadily strengthening that financial profile, doing what you mentioned, being very prudent with capital. Many of these items can be accelerated, but it comes down to serving shareholders' best interest. So for example, when making that call, we could simply have gone out and raised equity last year and had the <<inaudible>> come online 9 months ago, or 6 months. But does that serve the long-term value of shareholders? So you've got to factor that in, and we chose instead to rely on internally generated cash flow. Yes, that requires somewhat more time, but the denominator now isn't as large in share count. So those are the kinds of things we work through and base capital allocation decisions on to secure the best value for shareholders over the medium to long term.
Analyst
analystThat's fair. If I could squeeze in one more question, sort of along the lines of what we've just been talking about. Is there anything we might see down the road, or something fairly near-term — like, when we talk about obstacles, is there anything visible at the moment that's in the way and would keep us from doing or being the things we want to be doing?
Stephen Mullowney
executiveAt the moment, I don’t believe that’s the case. We deliberately designed substantial redundancy into how this business model operates. For example, at the end of the year, we talked about motors being taken down in August, yet we had 3 ball mills available. As a result, output stayed level, and we came through that period with no shutdowns or anything like that. The crushing circuit matters a great deal, and redundancy will also be incorporated into that crushing circuit, since I review it with a team and ask for every item of equipment that could stop the entire operation at 100% and make sure that item of equipment is available on site. So we go around and fill that in. Over the medium term, I’d say we have to gain a much stronger grip on tailings. We must get a grip on it, but we also need to build it out. We need to develop a longer-term strategy for that. That is the only thing I could identify that can genuinely hold us back, and we must deal with it at present in order to enter. We’ll have a study to undertake at some point in the year soon on...
Andrew Cheatle
executiveYeah, Stephen, that’s already gotten underway first.
Stephen Mullowney
executiveYeah, that process is already underway. <<inaudible>> in order to reach a dry stack. So we're staying ahead of the things we can see. I think the real question underneath what you're asking is this: it's tough to forecast what you can't see that might trip you up. That's among the hardest questions out there. Exactly. I'm attempting to work out what <<inaudible>>, the unknowns, correct? And they come along, and then they occur from time to time, but our philosophy is that you build in redundancy and you ought to be fine.
Andrew Cheatle
executiveYeah. Stephen, we’ve said many times that things are much improved. Even though we had prepared, the El Niño impact has hit us really severely, but the pumps are keeping that pit dry. It comes down to cost. Still, that’s the rest of mining. We aren’t flooding, correct.
Stephen Mullowney
executiveYeah. So one thing I always keep an eye on is, okay, say something were to happen. We've got a big stockpile sitting on site. I believe there are 12,000 ounces in the stockpile right now. We need to build up a much bigger crush stockpile, and we'll work on that once the new crushing system is up and running. So I'd like to sort of think about, okay, how do I build all of those what I'd call internal insurance policies into the company.
Robert Paulson
analystI appreciate you taking those questions. I realize they're somewhat <<inaudible>> in nature. Some folks have been following things for quite some time and are supporters of what you, Andrew, Michael, and the rest of the team are accomplishing — we've been doing this a while ourselves, and we're definitely eager about what appears to be on the horizon. So perhaps the place we began was with congratulations, and maybe that's a fitting spot for me to wrap up as well. Congratulations, and thank you.
Operator
operatorI'll turn things back to Stephen Mullowney now, and he'll walk us through the questions that came in in writing.
Stephen Mullowney
executiveThe question came in writing. There's one question here about — I believe it's the 2005, 2006 commentary slides regarding M&A opportunities and timelines. Let's address that for a moment. I think it's really more about which M&A opportunities exist out there. We are constantly and consistently reviewing M&A opportunities that would make sense for our shareholders. As you're getting a sense, we don't really mind situations where you have to get in there, roll up your sleeves, and perhaps it's a little bit messy, and create value from it. That would be similar to when I came into this opportunity, as well as the team. So we'll evaluate things that make sense. What I would say is we're very prudent about making sure we do not cannibalize the growth opportunities at Buckreef, cannibalize the clean balance sheet, and bring on stuff that may upset that. When we look at companies that typically are in trouble from an equity price perspective, from a market cap perspective, usually they have securities that rank ahead of equity on their balance sheets that are very problematic. And that's very difficult to get out of because what ends up happening is your business becomes undercapitalized over time.
Stephen Mullowney
executiveMining is an extremely capital-heavy industry, so any opportunities we look at will get a careful, prudent assessment. Still, whatever we pursue has to be sensible for shareholders. It also needs to boost growth prospects relative to Buckreef, since Buckreef itself carries substantial growth potential. For a deal to be worthwhile, it must therefore offer shareholders stronger growth potential than Buckreef does — and that is a hard thing to find. That is the lens through which we assess M&A opportunities.
Michael Leonard
executiveYes. And let me quickly add to that, Stephen, regarding the comments on the ground for 2025 and 2026. So obviously, you've heard that our focus for this coming year is getting Buckreef to the point where it operates at 2,000 tonnes a day on a consistent and predictable basis and effectively runs itself before we start entering too deeply into strategic waters elsewhere.
Stephen Mullowney
executiveYes. Folks come to us constantly, having seen what we’re doing at Buckreef, and ask whether we can come help them. But once you begin speaking with that company’s equity holders, they tell you it’s worth this, it’s worth that, we’re already there. Thank you, but no thank you on a lot of those opportunities. So the next question here is whether there are any plans to get very long growth again, acquire additional mining mines cooperation, small-cap miners in the next 2 or 3 years. I think I just answered that question. Yes, we will evaluate that. We’ve also -- look, as we keep evaluating the growth profile for our group. Tanzania is an interesting landscape. And there are quite a few high-grade smaller deposits around. And there are other companies out there that do have hub-and-spoke models. And I think that will be something that will be evaluated further over time. So we have in Buckreef we had to build roads. We have learned how to build plans, very cost effectively. So there are growth profile opportunities that will start to, as we get through this expansion, which is where our focus needs to be today, to really look at for longer-term strategy.
Stephen Mullowney
executiveIn my view, some members of our board are quite pleased with the questions investors raised today.
Andrew Cheatle
executiveYes. And Stephen, perhaps to add a bit more context on what’s coming, as you’d expect from our geological team, we do like to know who’s around us and what they’re doing. At a very high level. We don’t spend a large percentage of time on it, but we just give a very high-level inventory.
Stephen Mullowney
executiveI believe that covers every question currently waiting in the queue.
Operator
operatorExactly. Before we wrap up, is there anything you'd like to say in closing?
Stephen Mullowney
executiveYes. Just one last point to add. I believe we've already mentioned this. The future has us really enthusiastic. We're progressing through the business plan the way we expected, and we're eager for the cash flow to rise thanks to this larger plant. And I can tell you, Andrew and the geologist team are — no pun intended — chopping at the pit.
Andrew Cheatle
executiveYou're right about that, in fact. I appreciate it.
Stephen Mullowney
executiveThanks, Gavin.
Operator
operatorThat brings us to the end of today's meeting. You're welcome to disconnect at this point. We appreciate your participation, and we hope the rest of your day goes well.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete TRX Gold Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to TRX Gold Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in TRX Gold Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.