operator
#1

Good day, everyone, and welcome. I'm pleased to hand things over now to Christina Lalli, who serves as Vice President of Investor Relations at TRX Gold. Christina, please go ahead.

Christina Lalli

executive
#2

Thanks, Chuck. Hello, everyone, and welcome to the TRX Gold Corporation presentation of results for the first quarter of 2025. Joining us today are Stephen Mullowney, our Chief Executive Officer; Michael Leonard, Chief Operating Officer; and Richard Boffey, who has just come aboard as Chief Operating Officer. <<operator_script>>. This meeting is being recorded. <<operator_script>>. At this point I'd like to hand things over to Stephen Mullowney, CEO. Please go ahead.

Stephen Mullowney

executive
#3

Yes. Thanks, Christina, and welcome everyone to TRX Gold's Q1 2025 conference call. First of all, I want to introduce Richard Boffey, our new Chief Operating Officer. Richard, how about giving us a brief introduction to yourself? You're at Buckreef right now, and you're in one of the rooms where our technical services team typically sits.

Richard Boffey

executive
#4

Thanks, Stephen. Good morning, everyone. Yes, it's a pleasure to join the call. I'm happy to be beginning now with TRX Gold and to get involved hands-on out at Buckreef. It's a fantastic resource, and it's still very early days, but this site holds great potential, and we're looking for -- I'm very much looking forward to turning Buckreef into a major operating gold mine in Tanzania.

Stephen Mullowney

executive
#5

Great. Thanks, Richard. We're glad to have you with us, and I know that on behalf of the executive team, everyone is very excited, and the Board too, to have you aboard. So glad you're enjoying Tanzania today. I'm sure it's much warmer in Tanzania than it is here in Toronto today. We're dealing with minus 15 degrees Celsius. So we're quite cold. And for our U.S. investors, that is probably minus 40, quite cold. So without further ado, Christina, can you forward to Slide #3, please? There we go. So what I would like to focus on is that on our prior calls, we've always focused on what we've done in the past. What I'd like to focus on is what we did in Q1 2025. And what does that really mean? So in Q1 2025, as we indicated in our press release, we had a lower grade profile than we had in Q1 2024. So what that did is a lower grade profile means there's less gold going to the mill. And that's normal in a single asset mining company where you'll go through periods of lower grade profile, higher strip ratio and then get into periods of higher grade profile, lower strip ratio over time.

Stephen Mullowney

executive
#6

Gold is located wherever it happens to be, and that's not something you can control. What you can control is how you mine it, and a mine plan is designed to maximize net present value across the short, medium, and long term. But with that lower grade profile we saw in Q1, my main takeaway is this: the expanded plant has come online and has cut cost per tonne, especially on an operating cost basis, by more than half. Even at a lower grade profile and a lower recovery rate — which go hand-in-hand given the metallurgy at Buckreef 4 — we remain a very low-cost asset. So what does that actually mean? It means that as we keep exploring and finding more and more resources, Buckreef will become more and more profitable. That way we can locate higher grade resources and bring them into the mine plan — like what we have with Stanford Bridge, what we've had at Anfield — and put the drill bit to work and expand those over time. In all likelihood, those will come in and be even lower cost than what we processed in Q1 2025. Our grade profile in Q1 2025 was below the deposit's average grade, at roughly 1.25 grams a tonne versus 2.5 grams a tonne in Q1 2024.

Stephen Mullowney

executive
#7

What we demonstrated during Q1 2025 is that this asset carries a low cost. Given that, our attention now must go toward growing the resource and over time growing the production profile. As additional resources keep entering the mineable resource category, we gain the ability to keep expanding processing. Yet a balance exists between what mining can make available, the size of processing capacity, and bringing those new exploration resources on over time. The way we strike that balance is our present business plan: take cash flow from operations — again very healthy in Q1, considering where the gold price stood and considering the lower operating cost — and continually reinvest it into our business so we keep growing. I'll stop there, Mike — anything I missed from the standpoint of the high-level overarching business proposition?

Michael Leonard

executive
#8

No, that was really it, Stephen. To put it another way, we've discussed this for a while, but we've been saying this operation is scalable, meaning we can expand the business without piling on a whole heck of a lot of extra overhead. And Q1 was really the first full quarter running the 2,000 tonne a day plant at capacity. So, going back to your earlier point, we saw a real benefit in operating costs, especially processing cost per tonne, which has fallen by over half. And once again, that reinforces the fact that this is a low-cost, high-margin operation.

Stephen Mullowney

executive
#9

Exactly. Next slide, please, Christina. So once more, the business plan is still intact. It's been demonstrated even more by the fact that we're able to do this at a lower grade and lower recovery rate and keep moving the football down the field, as we like to say in America, or, as Richards from New Zealand would put it, keep putting runs on the board. And so the ongoing business plan is to keep expanding over time. We are in the current planning phases for that now, and to keep a drill bit in the ground for further exploration and to grow that resource so it can be brought into the business plan over time. Next slide, Christina. So regarding what Q1 looked like, we had equivalent production to Q1 2025 with half the grade. We had an increase in adjusted EBITDA and cash flow from operations because those — because the cost profile was lower, and also the increase in gold price from Q1 2024 enabled us to have higher adjusted EBITDA and higher cash flow from operations than we did in the prior years. So the financial metrics are still very, very healthy. We have now reached over 2x investment into the Buckreef asset from the capital raises that were done well over 3 years ago now.

Stephen Mullowney

executive
#10

The business plan has been validated, even though progress has felt slow at times—both to us and in reality—and it represents prudent management of capital, limiting dilution for shareholders up to now. We'll keep growing operations along with the exploration drill bit. As I noted, the investment currently goes toward the stripping campaign needed to access additional sections of the ore body with a higher head grade. Once we work through that stripping campaign, the higher head grade will generate greater cash flow, which will then be reinvested continuously into the asset, especially in exploration. Christina? So, as I said, we're taking advantage of record-high gold prices while staying focused on cost. Costs are something we can control, especially per ton, and we've performed very well there. As mentioned, variable operating costs at the processing plant have gone down. We're also addressing operating costs from the mining side, which is trailing somewhat behind processing—the area we tackled first with the expanded plant. Mining costs will keep declining too as we make use of part of our owner-mined fleet.

Stephen Mullowney

executive
#11

At present, that fleet is being used to build out what I'd describe as infrastructure — tailings facilities along with other kinds of facilities at... Is there some background noise? Pardon me. I believe that's the service provider for this call. They aren't on mute at the moment. So <<inaudible>>, if you could mute, we'd really appreciate it. So we're using that owner mining fleet to construct the infrastructure surrounding Buckreef. We've also brought in a separate set of equipment to replace processing machinery — loaders and similar items. So that has affected operating costs. And it arrived near the end of the quarter. So we didn't have that fleet onsite during the quarter. So those cost savings from having our own fleet at the processing plant, like loaders, aren't yet fully reflected in those costs. So we're benefiting from gold prices. We're maintaining our focus on cost. Production aligns with the mine plan and expectations given the grade profile where we sit. We're benefiting from economies of scale at the asset, and we keep having solid drill hole and exploration success, especially around Stanford Bridge, which has delivered record drill hole results at Buckreef.

Stephen Mullowney

executive
#12

This sits right beside the main zone, positioned between the main zone and the Eastern Porphyry Anfield trend. So one thing we'll do next there — and we'll cover it shortly — is run a geophysical survey across the property, aiming to establish whether trends comparable to Stanford Bridge exist between the main zone and the Anfield and Eastern Porphyry zones, which would not be unusual in a deposit of this kind once you've found one of these. Next slide, please. Again, it's the same — this slide matches an earlier one. You'll see some photos of our newly expanded plant. Again, these things — this plant has delivered lower cost, and that's the focus. Buckreef is a low-cost asset even with a lower grade and a lower recovery rate profile. Next slide, please. Mike, would you like to present this slide, please?

Michael Leonard

executive
#13

Yes. Thank you, Stephen, and good morning to all of you. I appreciate you being with us today. I may repeat a few things Stephen has already mentioned, but I believe it's worth restating so that everyone grasps some of the main factors behind the quarterly financial results. To summarize, we flagged this in our year-end MD&A. We planned a strip campaign for the first half of this year, and under that mine schedule we were extracting a larger share of waste tonnes, aiming to reach higher-grade ore blocks during the second half of the year. As Stephen mentioned, we remain on schedule and on sequence. However, as you will have noticed, when you carry out this strip campaign and move a greater share of waste rock, you inevitably see a lower average head grade. In our situation, as we work through the harder rock, recovery is somewhat lower as well, once again due to that larger share of waste rock. But the positive side, which Stephen also mentioned, is that the expanded plant performed precisely as intended. Our throughput rose by more than 100% compared with a year earlier. We have reached more than 1,700 tonnes per day.

Michael Leonard

executive
#14

It's running at nameplate capacity, accounting for scheduled maintenance and downtime. That higher throughput made up for the reduced grade and recovery. As a result, as Stephen mentioned, our output came in essentially unchanged compared with a year ago. That said, we gained from those exceptionally high record gold prices. Our realized price for the quarter was $2,653 per ounce. That figure stood $700 an ounce above the prior year. As a result, it drove year-over-year increases in key financial metrics such as revenue, gross profit and EBITDA. So this really shows, as we mentioned a bit earlier, the considerable leverage Buckreef has to the gold price, and that is reflected in our financial results accordingly. In addition, and we brought this up at the start of the presentation, we had talked about how scalable this operation is. We did note that there is very little overhead we ultimately need to add in order to grow this asset. We did commission the 2,000 tonne per day plant operation late in Q4 of last year. And the point we raised in our press release is that we would gain from economies of scale. We did prove that we could achieve this directly in Q1.

Michael Leonard

executive
#15

This marked the first complete quarter running that plant at a capacity of 2,000 tonnes per day. As a result, the variable cost per tonne has improved and gained substantially from that. Throughput rose by more than 100%, and with only a very small amount of extra overhead, processing cost per tonne fell by 111%. Processing cost per tonne ended up at $12.60. That sits well under international averages and is certainly well below where we stood at this point last year. In a similar vein, Stephen mentioned this too, but mining cost has declined. And as we begin using this equipment on a more regular basis and it helps support items such as plant feed and site development operations and projects, we anticipate costs will decline there too. On guidance, we keep stressing that we expect gold production to be higher this year than last, and that reflects the greater throughput capacity of the expanded processing plant, and we also expect cash cost to be in line with last year's levels as we work through the strip campaign and reach those higher grade ore blocks in the second half of the year; we expect to quantitatively guide on both production and costs, which we expect will come through in our Q2 release.

Michael Leonard

executive
#16

Stephen, over to you.

Stephen Mullowney

executive
#17

Yes, thanks, Mike. Turning to exploration — Christina, could you pull up the next slide? We still need to do more exploration work around this property. The results we're getting are very strong, especially at Stamford Bridge. And let's not overlook Anfield, which we found over the last 18 months as well. Stamford Bridge is delivering the best grades we've seen. We still have plenty of work ahead to bring it into a mine plan. We also need our drill hole spacing at the right width — roughly 25 meters — so it can be moved into the indicated category. And we've got to determine the optimal mining approach, whether that's open pit, underground, or some combination of the two. But the encouraging part is that it sits next to the pit — that's actually how it was found, since it intersected the pit — and over time it will become part of mineable resources. Anfield also requires drilling, and that too needs to be brought into mineable resources. So exploration here will require a significant amount of money. At the moment, our focus is on lifting cash flow from operations following the stripping campaign, and after that we'll return to the market with what we expect to do on a drill hole campaign and how many meters we expect to put into those areas.

Stephen Mullowney

executive
#18

The drill hole results on the exploration side are quite strong, which is the good news. It's something I'm genuinely excited about. Over time, those results will feed into mine plans. Our exploration program keeps mineable ounces front and center. But we shouldn't lose sight of the main zone either. That main zone remains open to the south and it also remains open in the Northeast. Around Buckreef there's simply a great deal of potential to add this into reserves and resources over time and to keep growing the asset. Christina, next slide. As I said with respect to Stanford Bridge, look, whenever you hit 250-plus gram tonne meters, those are excellent drill holes. We've hit that in one hole. We recorded 200 on other holes. These results are truly, truly strong. I'm truly, truly excited about what lies ahead here. That's just how these kinds of properties work. Gold is abundant around them, and you've got to get out there, explore, find it, and keep at it. Now, Stanford Bridge is a name. As you can see, there's a bit of a trend here. We have plenty of soccer fans from a U.S. perspective, or football fans from a European perspective, or from the rest of the world's perspective, on site.

Stephen Mullowney

executive
#19

They are fans of English Premier League stadiums, and that's a pattern we saw. We had Anfield. Richard, I believe you support Liverpool, correct?

Richard Boffey

executive
#20

Correct, you were the reason I had to speak up for that.

Stephen Mullowney

executive
#21

That's right. Yeah. Sadly, Stamford Bridge belongs to Chelsea, doesn't it?

Richard Boffey

executive
#22

Sure, though it's a nice stadium.

Stephen Mullowney

executive
#23

Right, exactly. So you can tell that involving the local team in what these zones get called is something we genuinely enjoy, and they get pretty enthusiastic about it. I can't say what comes next, but one thing's certain: once we uncover another zone, there will no doubt be a lively discussion about the name we give it. Richard, you might not be a fan of it, and the others might not be either. A few names are already in my head.

Richard Boffey

executive
#24

I'm no geologist, Stephen, so that kind of thing isn't too much for me.

Stephen Mullowney

executive
#25

Right. So we're expecting additional drill hole results down the line. And once more, the cash flow from operations is what we keep using to fund growth on an ongoing basis. I won't repeat all that. We have solid CSR programs, which we haven't discussed here. We keep putting money into schools and health facilities in the area. That's very well received. And we'll keep upgrading infrastructure in the region. Another thing we've concentrated on with the new owner mining equipment on site is that road maintenance is considerably improved compared with before, and the community locals appreciate that a great deal as well. Next slide, please. Capital structure. Again, back in December, I believe, we were examining what's been happening with our share price. We've brought in people previously — folks watch short sellers and the like, similar people that other companies have brought in. Also, I believe — and we'll review this analysis in January — there was a fair amount of tax loss selling during the December period too, and we're beginning to see a modest recovery from that.

Stephen Mullowney

executive
#26

What I can tell you, though, is that at its core the company remains healthy, as I told shareholders. What we aim for is a build-the-business-up approach, delivering the underlying valuation from the asset so that it gets reflected over time in the market and by market participants, rather than trying to push the share price higher at the top without the fundamental asset value sitting beneath it. So that kind of business philosophy will stay with us. I don't expect that to change over the short to medium term or the long term. And with that, I'll open things up for questions.

Operator

operator
#27

<<operator_script>>. Heiko Ihle from H.C. Wainwright will be our first questioner.

Heiko Ihle

analyst
#28

Thanks for having me, Richard, and I think you handled being put on the spot with that soccer trivia pretty well. I'm an <<inaudible>> fan myself. Anyway, congratulations on some pretty nice drilling that you guys said should keep the site going for a long time, too. Looking at some of the historical head grades, obviously the 1.29 grams per tonne we had in the quarter was a bit lower. I assume that pendulum is going to swing back in the near term and for the rest of the calendar year as well and fiscal year. But that said, the recovery rate declined quite meaningfully. And obviously, this was due to the lower grade ore and the stripping. But then in the release, you also said it's going to get better in the second half of 2025. So just to confirm, is there going to be any impact at all this quarter? And if so, how much? Just trying to work on our model, please.

Stephen Mullowney

executive
#29

Yes. So for Q2, the head grade will be lower — and it's probably coming in a little bit slightly below what we saw in Q1. Recovery rates will be — I don't have — I suspect slightly higher. What you've got in recovery rates, Heiko, is that we do have powder gold. So the finer the grind, the higher the recovery rate you usually achieve. And we also have consistent tail grades. So regardless of your head grade, your tail grades are going to fall within a certain range. So the team right now — on the medium — I shouldn't even say short to medium and long term — is looking at, and I mentioned this before, operational efficiencies around the plant. So it's great. The plant has 2,000 tonnes per day, but it does need to be upgraded to get those higher recovery rates. And what the team will be looking at over time is putting in a SAG D ball mill in the front to get a — and then going through the ball mills, which should hopefully increase throughput over time and as well as having a flotation and a regrind.

Stephen Mullowney

executive
#30

You'll want to check out a press release we put out concerning the met study — the initial met study that included a flow sheet of that kind and raised the recovery rate substantially, since a much coarser grind size is what you get. So you're going from 80 micron — pardon me, 75 microns passing 80, which is where we are today, or 80% down to roughly 40 to 50 microns passing that same percentage. You end up exposing additional gold to the cyanide, and that gives you a better recovery rate. So work has gone into that over time. So it will have a favorable effect on cash cost and even on operating cost per ounce. So that is going to be the emphasis going forward as we keep examining operational efficiencies. And I'll ask, Richard, since you're knees deep in this — is there anything you'd add to that?

Richard Boffey

executive
#31

Not really. You're constantly balancing throughput against fineness, so at the operational level there's an ongoing optimization effort. The major factors, though — what would genuinely lift recovery — are adding a flotation circuit, pairing it with fine grinding in a regrind circuit for that concentrate, and then exposing it to solid cyanide levels, and you'd see recoveries rise well into the 90s. That's the substantial gain from a flotation circuit.

Stephen Mullowney

executive
#32

Right. So on head grades, Heiko, we expect those to pick up pretty dramatically during Q3 and Q4 of this year as we work through the strip campaign and reach the southern sections of our pit. The higher grades sit in and around the old workings that existed on the property from the underground mining era back in the late — late '80s, early '90s, I believe. And it's no coincidence that in the main zone they headed to that portion of the deposit first, given the grades found there. From a safety standpoint it does call for some maneuvering, since there are underground voids in that area, and we're handling that at present and looking into the best way to go about it.

Heiko Ihle

analyst
#33

Okay, that's fair. Fair enough. Let's move past that topic. That was a really thorough response, and I appreciate it. It has now been 4 months since your plant was officially commissioned back in September. Given how recent all of that is, are there still quantifiable improvements you're seeing, say, on a week-by-week basis at this point? You hinted at a few things in your prepared remarks earlier, but maybe you could just give the analysts and investor community some granularity, please?

Stephen Mullowney

executive
#34

Yes. So a few things — the crushing circuit, for instance, is running at full capacity now. And there have been a few adjustments to it regarding screen size and Shaker decks, plus making sure liners arrive on schedule and deciding which liners to order. Part of what I mean by that is we now understand how fast liners wear out, that kind of thing. So those operational efficiencies are in the crushing circuit now. On the milling circuit, what I'd say is the small — the 3 small ball mills, we're currently doing a major refurbishment on the last one, I should say. So we completed 2 of them in December, and we're doing another one now here in January. I think we're roughly 2/3 of the way through that. It should be back online within the next couple of days. And that's necessary to maintain the equipment and make sure we have the throughput over time. Now is the time to do it when you have a lower grade profile. When it's taken down and we get to that higher grade, I'd rather have the higher grade going through it.

Stephen Mullowney

executive
#35

That work is underway. As a result, Q2 processing will dip a bit. A genset has just come in during the past couple of days. With it, the significantly bigger 1,000 tonne per day ball mill can run continuously. So whenever power is lost, our existing electricity arrangement with the gensets takes it down briefly. That issue is now fixed. We're also arranging and placing an order for a new elution plant. It will let us strip and regenerate carbon — activated carbon — for the tanks, which should also lift the recovery rate. That project is in progress. What you're hearing from us is that plenty of operational efficiencies should show up in the second half of the year and early next year as we work through that plant.

Operator

operator
#36

Our next question is from Mike Neuhauser at Roth Capital.

Mike Niehuser

analyst
#37

About the flotation circuit, if you decide to proceed with it, what would the timing look like? And how much of that do you think could be funded internally?

Stephen Mullowney

executive
#38

Yeah, so that’s what we’re evaluating right now, and my guess is it’ll be roughly a 12-month undertaking, since it involves plenty of components and plenty of moving pieces, and as that gets upgraded we’ll come to the market over time. As for how we fund it, look, Buckreef currently generates more than $17 million to $20 million in adjusted EBITDA. We’ll get there faster by most likely financing it with debt. We’re talking with debt finance providers about that at the moment.

Mike Niehuser

analyst
#39

Alright. As for Stamford Bridge, I don't remember exactly how that discovery came about. It sort of revealed itself at the pit wall, I guess. When I was out there, it looked like there were higher grades in that zone where that could be coming from, though I might be mistaken. But how quickly could — how did that get found? And how soon might it be incorporated into the mine plan?

Stephen Mullowney

executive
#40

There were 2 ways it came to light. One was that we drilled a metallurgical hole in order to — no, my mistake, not the metallurgical hole; we drilled the geotech hole for the purpose of establishing what the pit slope angle ought to be. And that specific geotech hole contained gold. Then, when you examined the location of the geotech hole and looked at the pit wall, it was visible. So that is how it was found, and after that we added some exploration drill holes, and it turned out fairly well. So that is how it was discovered. It would not be the first mine to have that kind of discovery. So that is essentially it. That is the reason we need to carry out the geophysical and magnetic work to determine whether any other zones of this type cross the Buckreef property. What was the second part of your question there, Mike?

Mike Niehuser

analyst
#41

Sure. How quickly might that happen? My thinking was that since it’s visible along the pit wall, it seems you wouldn’t need to dig far to recover at least part of the value. Yet it also appears to continue much farther down. And I realize it’s still early days, naturally, but I’m just wondering what you think.

Stephen Mullowney

executive
#42

Yes. So that's the kind of dip you're seeing — just a slight one — and based on the drill results, you've read them correctly. So more drill holes will have to be added so we can gain greater confidence in the continuity. And then we — which might come back higher or lower, right, depending on what those drill holes return. And then we need to determine the best mining approach, whether part of it will be open pit and another part underground, and bring that into resource. I think at this point we're at a stage where we conceptually begin examining these kinds of scenarios, but we're not yet at a stage to move it into the mine plan.

Mike Niehuser

analyst
#43

That was a solid answer. Richard, before I wrap up with my final question, what has you excited about joining TRX?

Stephen Mullowney

executive
#44

Yes. That one’s his to answer.

Richard Boffey

executive
#45

Mike, good to hear from you. Honestly, Stamford Bridge is likely the most exciting one. That said, I was at Anthem before this and I do like working here. The team here is very willing and porous when it comes to absorbing information, and they really appear to respond well to the challenges we've got — again, challenges that we set for them. So it's a mix of good people and a very nice ore body. I enjoy the challenge.

Operator

operator
#46

At this point, I'd like to return the call to Mr. Stephen Mullowney, and he'll walk us through the questions that came in writing. Please go ahead, sir.

Stephen Mullowney

executive
#47

Yes. So there aren't too many questions in writing today. As you can tell, we always provide fairly thorough responses. So the question I have here is that some people have noticed that I've been appearing on more podcasts and are wondering whether we're going to sponsor podcasts or whether we plan to do more podcasts. So the answer to that is yes, we've been on more podcasts. I suspect we'll be on more podcasts. As for whether we're going to sponsor podcasts, we will look at that and see what the value is. I think that's certainly something we're open to. Are we going to do more podcasts? Yes. And I think you'll see a series coming out of Tanzania around podcasts around some of our employees, where we think we're going, how we're interacting locally and those sorts of things will be pushed through our media channels over time. We do have people hired in Tanzania to help us do those types of podcasts. And certainly, we are doing more podcasts over here. So yes, this business, as I said, it's a low-cost asset, even at low head grades, it continually expands. There is a good investment thesis here, and we need to get out to the market and tell more people about it.

Executive

executive
#48

Checking whether I received a second one.

Stephen Mullowney

executive
#49

Yeah, I believe Greg is on the line. Chuck, if you're able to connect him, that would be great.

Operator

operator
#50

We'll now take a question from Greg Weaver of Invicta Capital Management. Please proceed.

Greg Weaver

analyst
#51

I have just a couple of quick questions. Would you say the head grade is mostly determined by whether the ore body is oxide or sulfide?

Stephen Mullowney

executive
#52

No. Head grade simply depends on the fact that grades differ across various sections of the deposit, and you have to extract it in a set order.

Greg Weaver

analyst
#53

Alright, and in the condition it’s in right now, would that plant be able to process 100% sulfide ore?

Stephen Mullowney

executive
#54

That's not perfect, obviously. Ideally, we'd have that flotation circuit running ahead of it. In the plant, what you've got is activated carbon sitting in your tanks. The goal is for that carbon to float within the tank. So you need the viscosity inside the tank to be really good. The ideal blend is roughly 10% to 15% oxides, with sulfides making up the remainder, and under those conditions you can achieve reasonably good flotation of the carbon — which is basically how we feed it at present. So there are sufficient oxides on the property to make that work.

Operator

operator
#55

TRX's Al Krug has the next question.

Mike Neuhauser

analyst
#56

I've been listening to various TRX conversations on YouTube. Is there somewhere a shareholder could go where these different conversations and webcasts might be gathered together?

Stephen Mullowney

executive
#57

Yes. So Christina is in the process of gathering the different articles and podcasts that TRX has produced, and we'll get those posted on our website. For example, the Mining Journal ran a piece by me this week in which I discussed "you'll never explore alone," and it has gone out on LinkedIn as well as other channels. So we need to improve at putting that material up on our website for all of you.

Al Krug

analyst
#58

I also caught a few of those discussions featuring people from the oil world, Denny and Bill Holter among them. So with any luck, I'll be joining again.

Stephen Mullowney

executive
#59

Right, we ought to — I'll circle back on that — I do it every quarter with those folks. And definitely, both of them — Bill especially, and Denny too — have a following, and they also put it out through their different media channels.

Operator

operator
#60

I'd now like to return the call to Mr. Mullowney so he can take any written questions.

Stephen Mullowney

executive
#61

Yes. I believe — actually, no — hold on, we may have additional questions submitted in writing. Just a moment. No, I don’t believe there are any further written questions.

Michael Leonard

executive
#62

Stephen from Peter Smith has one more question.

Stephen Mullowney

executive
#63

All right. Mike, could you go ahead and read that aloud for me?

Michael Leonard

executive
#64

Okay, so the question was about whether TRX is still involved in Kagosi. And the remark was that it looks like the Tanzanian government is handing out 2,000 more mining licenses in that area, even though it had earlier been set aside as a forest reserve. Stephen, could you say something about Kagosi, please?

Stephen Mullowney

executive
#65

Right. So Kagosi is no longer held by TRX. When I came on board a little more than 4 years ago, Kagosi wasn't part of the company either. Back then there was litigation involving the government over Kagosi and Intatemia. As for licenses granted in that region, my understanding is that they're mostly primary mining licenses, meaning smaller-scale mining permits. In that area, assuming the figure of 2,000 is accurate, those would be the smaller licenses. So as things stand today, no, TRX does not hold Kagosi. The sole license in our portfolio is a special mining license at Buckreef.

Michael Leonard

executive
#66

David, I believe that covers every question we had queued up, whether by voice or by text.

Stephen Mullowney

executive
#67

Great, and thank you. Well, thanks to all of you for being with us today. I'll close with this. When you're dealing with just one mine asset, there are times you must work through lower grade profiles, plus a stripping campaign, which is normal. The encouraging part is that strong exploration results keep arriving. We anticipate that will carry on as time goes by. Beyond that, the asset is demonstrating that it is a very low-cost operation even under a low-grade profile and a lower recovery profile, in a plant that can become far more efficient, as you're hearing during this call — we remain a low-cost asset. So it's being proven that in Tanzania, we can run at a very low cost and we can build at a very low cost. As an example, this plant has cost us under $20 million, and I say this repeatedly, other assets building a plant of the same size land in the $70 million to $80 million range. We accomplished this on time, on budget, and extremely cost effectively, and it is still very low cost. Are there improvements to be made? Yes. But I don't believe — and I'm quite confident in saying this — I don't know anybody who has done it on this cost basis anywhere else.

Stephen Mullowney

executive
#68

And so, thinking about it, this company's growth trajectory can keep going at a very low cost compared with other miners out there. I'd urge you to spread the word to your friends that if we keep building this out, it's going to be done on a low-cost basis going forward. So that's what we're examining, Richard, in our discussion since you came on board — I think you're noticing the same thing as we put this together, since we have a flow sheet right there in front of us, we'll cost that out and it will be low cost relative to what others will build it for again.

Executive

executive
#69

There is a great deal of potential here.

Richard Boffey

executive
#70

Absolutely. There's also a great deal of room to improve — and it's a fantastic ore body to work with. So I'd say yes, we have plenty of opportunity to raise output and to scale up considerably, both in throughput and in production, once we reach those higher grades in the deeper portions of the ore body.

Stephen Mullowney

executive
#71

And we'll identify additional objectives similar to Stanford Bridge and Anfield, and with luck move <<inaudible>>. For sure. So plenty of upside exists in this. We're thrilled. We're pursuing this cheaply, so keep watching. Thus, as I mentioned regarding Tanzania <<foreign_lang>>. Many thanks.

Operator

operator
#72

That wraps up our session for today. You're free to leave the call now. We appreciate you joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete TRX Gold Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to TRX Gold Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in TRX Gold Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.