Aaron Colleran

executive
#1

Thanks, Cameron, and good morning to everyone. I'll break down the December quarter for you, then we'll take questions. I call it breaking it down this time because although the December quarter was a strong one, the figures are somewhat more involved than normal, given how much stockpile we've accumulated and the chance that today's robust commodity price is giving us. Eloise is a wonderful mine, run by wonderful people. In a quarter when Mother Nature was plainly grumpy, hurling geological and meteorological difficulties our way, the team hit both production guidance and cost guidance. My thanks go to the Eloise team, especially those on site through Christmas and the New Year in some really harsh conditions. At Eloise, we produced 3,202 tonnes of copper in concentrate. The all-in sustaining cost came in at Aussie $4.87 a pound, equivalent to US $3.26 per pound, while the all-in cost was Aussie $5.22 a pound, or US $3.50 per pound — both within guidance. It's worth highlighting that Eloise achieved a record quarter for mine production since AIC Mines took ownership, with 189,000 tonnes of ore. Now that half the financial year is behind us, we've delivered precisely 50% of guidance, and we're in a strong position to finish the second half successfully. December brought significant rain to Eloise: 571 mm in that month alone, including 357 mm over a 48-hour period. That's an enormous amount of rain. Mining operations were unaffected, but ore crushing and concentrate trucking were impacted. At the close of the quarter, our ore and concentrate stockpiles were unusually large, and you should take that into account when reviewing our cash flow figures. I'm certain that everyone listening expected the December quarter to deliver the strongest cash flow we've ever had, considering current commodity prices, yet you'll find it landed roughly in line with the June and September quarters. There are three simple explanations. First: cash flow in the December quarter reflects sales made essentially in September, October, and November. Second: reduced processing capacity caused by wet ore meant we accumulated ROM and crushed ore stocks totaling 27,000 tonnes containing roughly 450 tonnes of copper. Three: poor concentrate drying conditions plus temporary road closures and the delivery pad at Mount Isa smelter from rain meant we built a stockpile of about 2,000 tonnes of concentrate holding 464 tonnes of copper. That concentrate is worth roughly $8 million, and had we sold it in December, it would have given us our best quarter ever, which I expect is what shareholders were anticipating. Don't worry, it's all there, it's simply arriving in the March quarter. January prices beat December prices, a bit of a silver lining there, boom boom. While we're on Eloise, don't skip over the drilling results from the Deeps and Lens 6; they're on the front page, obviously in the report. Great width, great copper grade, and notably strong gold grades as well. That ore body is a beauty. Jericho, as you know, is just as impressive. Worth mentioning are the deep holes at Jumbuck and Squatter: 200 m step-outs, and all at once there it is. Mining at Jericho will keep going for a very, very long time. At Jericho, we hit some water in the access drive — we anticipated it — and it looks like we've now moved beyond it, although it did slow us down a bit in the quarter. As the quarter ended, we were 90 m from crossing the J1 Lens, and an update should be coming from us shortly. The plant expansion cannot arrive soon enough. We are pushing GR Engineering as hard as we possibly can, though with a feather boa rather than a cat-o'-nine-tails, since we know who we are dealing with there. Their performance remains strong. The plant expansion is coming along well, and while we are still early in the construction period, it is on budget and on schedule. Moving to financial performance: capital expenditure is broadly consistent with guidance. Specifically, most of our line items sat at roughly 50% of full-year guidance, which, halfway through the year, is exactly where they ought to be. The capex items running ahead of budget are Eloise mine development, Eloise resource definition drilling, and non-plant infrastructure. I'll take you through the exceptions. For Eloise underground mine development, the guidance is $32 million for the year, covering both sustaining and major. At the halfway point we've spent $21.7 million, which is 67% of that amount; we now expect to come in slightly ahead of guidance at $36 million, essentially because costs have crept up. Eloise resource definition drilling is guided at $2.5 million, and we've spent $1.6 million. We now expect to finish slightly ahead of guidance at $3.5 million, as initially gated expenditure — that is, success-dependent — is brought into budget. The NPI, non-plant infrastructure, is 59% spent, which is mainly a timing matter. Eloise's capex might come in $4–$5 million above guidance for the year — about 10% — though that's offset by revenue coming in significantly stronger than expected. That leads me to the final paragraph of the quarterly report. That's usually where the good stuff sits — a little trick, so always look at the very end, right at the very end, the last paragraph. Here's what it says: "Should prices stay where they are over the next 6 months, Eloise would generate roughly $30 million in additional cash flow compared with our original forecast. That commodity price strength, together with the solid drilling results at Jolly, has justified re-optimizing the development rate at Jericho." We're now looking at a faster development pace, even though that means higher upfront spending, because it would let us ramp production up more quickly to 1.1 million tonnes per annum and give us a better foundation for the Stage 2 expansion to 1.5 million tonnes per annum. In practice, that means we'll deploy that $30 million toward extra development work at Jericho. Opening up additional development areas gives us more stopes, which allows us to achieve a steady mining rate of 1.1 million tonnes per annum and then reach a 1.5 million tonne per annum mining rate sooner than originally scheduled. That's the same message we've carried from the start: when the market gives us incentive pricing, that money goes toward raising output; the work is being put in place right now, and we expect to share more details with you when our updated mineral resource and ore reserve estimate comes out in April. In the meantime, because of the JORC constraints, we'll keep describing the 1.5 million tonne per annum production rate as aspirational, but after April, I believe you'll hear us call it the new plan A. That wraps up my review. I'll have the operator open the lines for questions, and let's dig into the minutiae. Thank you.

Paul Kaner

analyst
#2

Hey Aaron, appreciate you taking the call. I've got a couple of questions. First one is about the grade at Eloise. The past two quarters were somewhat lower than the ones before them, and a bit below reserve as well. So how should we view the grade coming out of Eloise going forward? And of course, once it gets combined with Jericho, it ought to come down somewhat, correct?

Aaron Colleran

executive
#3

Yes regarding the last part of what you asked. It will fall somewhat once we begin blending in Jericho, particularly since we're starting at Jericho with numbers in the 1.5, 1.6 range right at the outset. Lower than it has been, likely lower than both you and I anticipated. The simplest explanation, Paul, is overdraw. Put simply, if tonnes are showing up, we'll take them right now. Don't read too much into it; that isn't a huge strategic shift, and it isn't a change to cut-off grade. In the upper levels, such as at Macy and a few of those areas we're basically closing out and wrapping up, we'll take that final stope or two, since we aren't coming back. Right now, at $18,500 a tonne, 1.5% isn't something to leave behind. It's marginal, but, Paul, you've rightly noticed that somewhat lower grade, yet then take a look, and you'll see this, far more tonnes. 189,000 tonnes mined during the quarter, a record. Where do you figure those came from? They came from, yes, grabbing everything we could see. Does that answer your question, Paul?

Paul Kaner

analyst
#4

Yeah, it does. So what would you say we should take as the base case for Eloise going forward?

Aaron Colleran

executive
#5

Let's go back to reserve.

Paul Kaner

analyst
#6

All right.

Aaron Colleran

executive
#7

Yeah. No, I should have made that clearer. Please don't take that as any shift in strategy. That was opportunistic. Go with reserve grade.

Paul Kaner

analyst
#8

That one's easy. So then, yeah, let's turn to those tenements you picked up just north of Cannington. Give us the rundown on them. There are some intriguing geophysical anomalies there, plus the background of those tenements, and so on?

Aaron Colleran

executive
#9

They were held up by a junior outfit, which is now Broken Hill Mines. The shell they rolled that into kept them for a good while. I ought to know the company's name, that was the outfit we were dealing with, it just won't come to me. We'd been trying to get our hands on those for a long stretch. We like it. The work historically was carried out 5, 6 years ago. There's a good anomaly. There's extremely little drilling, and the usual kind of shallow, let's not take this too seriously sort of drilling. One hole has a nice intersection, one hole doesn't, and so it just sat on the back burner in that junior company's portfolio in the past. We like the area. It fills a gap in our tenement pro—, our tenement package down there. As you correctly picked up, a nice anomaly, and copper in it. If the second hole didn't come in, it's still, historically it has been tested that there is copper there in that system. It won't surprise you, we're going to give it a better whack than what's been done out there in the past. Apologies for not being able to give you a lot of information. We just get tangled up by JORC these days, because we would have had to put out 50 pages worth of appendices to give you one historic number. We'll give you more detail when we get out there and drill some holes. Keen to do that. We have, it won't surprise you, Paul, we have a view on every patch of ground within 50, if not 100 km around us, what we like, what we don't, and the best way to get hold of some of that is to peg it, or acquire it, as we've done here. We haven't gone into the acquisition details because they are de minimis. We acquired for cash 100% of that interest, and there's not a blip for us, it's not a blip for BHM. They were keen to move it on, we were keen to add it to the portfolio. We'll keep you updated.

Paul Kaner

analyst
#10

That was simple. Nope, appreciate it, Aaron. I'm finished. Take care.

Aaron Colleran

executive
#11

Thank you, Paul.

Shane Le Plastrier

analyst
#12

Hi, Aaron.

Aaron Colleran

executive
#13

Good

Shane Le Plastrier

analyst
#14

Day. A quick question that kind of builds on the last one. Over the next 3 months, what should we expect when it comes to exploration, and maybe drilling especially?

Aaron Colleran

executive
#15

It's tough, Shane. Those 3 months are the difficult ones on account of the weather. I don't like saying it, but there isn't much to look forward to. We won't have a drill rig back on the ground until March, maybe late March. That means numbers won't start coming through until really April, May. The first is likely some infill at Jericho. Yes, once that weather improves from April, May, we go straight back into the regional prospects. That Cannington or Brumby project is on the list, and it's not better than, it's definitely no worse than a few of the prospects already in our Eloise regional package. We'll be out there again this year pushing through those; it probably deserves a bit of an update, an exploration note for you so you know how the program looks this coming dry season. We'll get that out in due course. Unfortunately, Shane, that's probably not the answer you were hoping for; in the next quarter, the exploration or drilling results you'll see will only be drilling from underground. We will, obviously, be drilling underground at Eloise, Deeps, Deeps Northwest; we'll be out at Jericho. Some drilling platforms could be set up out there shortly. The June quarter is probably the one to watch.

Shane Le Plastrier

analyst
#16

Great, thank you.

Aaron Colleran

executive
#17

Thanks. Cheers, Shane.

George Ross

analyst
#18

Hey, Aaron. Good morning.

Aaron Colleran

executive
#19

Good

George Ross

analyst
#20

Hello there. I'd like to ask, I guess, about how the upgrade at the Eloise plant is being carried out. What would you say are the main risks when it comes to the schedule?

Aaron Colleran

executive
#21

Nothing we're doing is complicated, in my view. The key items are power upgrades; the plant itself needs upgrading, and we also need upgraded power delivered to it; and then, George, there's a crossover. In the past you've seen how cautious we've been about this. It's not the two plants, but rather the existing plant and the expanded one — we aim to keep those work areas separate so that construction doesn't affect current throughput. That can be done, though it isn't perfect. We've also aimed to make the transition as smooth as we can, though clearly that switchover requires taking the existing plant offline, connecting and piping in the fresh crushing circuit along with the new float cell, and then bringing it back online — likely wet — prior to feeding ore through it. A massive stockpile will be sitting there ready, and we'll want to move through that as fast as we can. This definitely isn't a case where we'll circulate water and waste simply to check how it performs. We may do that briefly, for 30 seconds, but ore is already available and waiting, and that holds true even 9 months from now. From my view, George, the build timeline isn't where the exposure sits right now — it's the ramp-up during the December quarter. How much can we actually push through the new mill that month? Can we even hit the 700,000 tonnes per annum run rate for that quarter? I'd certainly hope so; that's the target I'll be driving hard for — a million-tonne annual pace during those three months. That's the question December will answer.

George Ross

analyst
#22

Aaron, how's the ore stockpiling coming along?

Aaron Colleran

executive
#23

Two points. First, we talked about this not long ago — for that reason, giving you guidance in July for FY27 is going to be tough. We'll do our utmost, we'll walk you through it, and we'll share as much detail as we can, as you know from us. On stockpiles: we already hold nearly more crushed ore and ROM pad material than we can handle. Building up that stockpile won't be an issue. The stocks will definitely be there. The chance — and I believe we've talked about this before — over the next 6 months is being able to run some sizable parcels of Jericho through the existing plant on its own to see how it goes. Clearly, we can begin blending some through; nothing untoward is expected. We've completed enough met testing, as you're aware. Chalcopyrite is chalcopyrite, and the stuff jumps on the bubbles; that's the chance over the next 6 months — to try not to build too large a stockpile, really, and to use the opportunity to treat it and see how it performs. Current plans show we'll have a decent stockpile ready for that plant at commissioning, with everything going well in the December quarter.

George Ross

analyst
#24

That's wonderful. Thank you, Aaron.

Aaron Colleran

executive
#25

Did that address it? Is that all cleared up? Yes.

George Ross

analyst
#26

Just one final question. This document refers to the 1.5 million study. What's your current sense of the timeline for it?

Aaron Colleran

executive
#27

The Time of

George Ross

analyst
#28

on execution; we have started

Aaron Colleran

executive
#29

we have started the engineering work. GR Engineering has been given the go-ahead by us on that engineering design and the engineering drawings. No long-lead time orders have been placed by us, since they are not long enough that doing so has been necessary for us. We still have some time available to us to place those orders. The schedule and the timing all come down to production and the quantity of development, which, obviously, is what we are alluding to right now: how quickly we ramp up, how quickly we push the underground. That, no spoilers today, sorry, George, you will have to wait for the MROR estimate in April, that work is ongoing. That work is exactly what we are doing at the moment, and instead of me starting to throw around numbers now, we will get you something useful in a couple of months' time, a few months' time.

George Ross

analyst
#30

That's wonderful. Thank you, Aaron. I have nothing further to add.

Aaron Colleran

executive
#31

Thank you. Cheers, George.

Paul Hissey

analyst
#32

Hi there, Aaron. I had a bit of earlier commentary mixed up on my end. Could you just walk me through the mechanism again — the timing lag on your shipments? My assumption is that it works something like 90% recognition at a provisional price, followed by perhaps 3 months for settlement. Is that right?

Aaron Colleran

executive
#33

Look, we can walk you through the details. I know we've done this before and included it directly. John is here with me if we need to go through it, but the challenge is—yes, you're right, Paul, and like I said, September, October, November is roughly the period we were paid for, what we pushed through. We understand that 90% of it arrives, and then the remaining 10% comes afterward, whether that's one month later or 3 months later. What we currently have with Traxys is M, M+3. They're able to choose whether they take the month of shipping or the month of shipping plus 3 pricing. That was shifting around. Look, rather than us—John, why don't you have a chat and run through that.

John Callagher

executive
#34

Correct, that's spot on. Basically, the way to look at it is this: yes, 90% provisional during the month after shipment, and the only question is whether that 10% final invoice lands the following month or a few months down the line, which really hinges on the nomination, so it can differ. We map that out internally according to those nominations. Again, glad to talk it through offline, but that's pretty much how it works in general.

Paul Hissey

analyst
#35

No, that's fine, John and Aaron. Thanks. Probably the main point is that when prices move around a lot, there'll be a bigger gap between, I guess, the average price for a quarter and what you guys actually get when the price swings back and forth the way it is right now. I guess that's just something we'll keep an eye on from our end.

Aaron Colleran

executive
#36

Look, I think you folks manage that lag, the 1-month lag, quite well. It's more the mum-and-dad type of shareholder who probably believes we're minting $18,500, $19,000 a tonne for copper right now; that won't happen for another month, and that's likely why I'm overly sensitive about it, and why I said in the commentary that I suspected shareholders were expecting our best cash flow ever, but really save that thought for March, yeah.

Paul Hissey

analyst
#37

Alright, just one final quick question from me. Is there any additional cash bonding that has to be provided between this point and when the growth projects wrap up, or would you say you are essentially fully bonded at this moment?

John Callagher

executive
#38

Right now, there could be some margin requirements, though that is at minimum 12 months away, and it sits around the margin. Fundamentally, the answer is yes, fully bonded.

Aaron Colleran

executive
#39

That's precisely what I had in mind. There's nothing in the financial year, and it amounts to a couple of million bucks — we'll walk you through that for the next tailings dam lift and items of that kind, Paul. Nothing material.

Paul Hissey

analyst
#40

Understood; that's all for me. Thank you.

Aaron Colleran

executive
#41

Cheers.

Aaron Colleran

executive
#42

Thank you, Cameron. Well, as you observed, the December quarter proved to be another excellent quarter, even in a tough operating environment. Eloise is a fantastic ore body, and the crew we have operating it is excellent too. Calendar year 2026, calendar year 2026, marks a transformational year for AIC Mines; a big year lies ahead of us. Our team is in place, our funding is in place, the ore body keeps getting better and better and closer and closer, and copper, gold, and silver prices are supportive, to put it mildly. For AIC Mines, 2026 is going to be a great year. You can never own too many AIC Mines shares, though do gamble responsibly. Thanks for dialing in. That brings the call to a close.

Operator

operator
#43

Thanks a lot; that brings today's conference to a close. We appreciate your taking part. You can go ahead and disconnect now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete AIC Mines Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to AIC Mines Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in AIC Mines Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.