AIC Mines Limited (A1M) Earnings Call Transcript & Summary
October 22, 2026
Earnings Call Speaker Segments
Operator
operatorAt this point, I'd like to pass the conference to our Non-Executive Chairman, Mr. Aaron Colleran. Please proceed.
Aaron Colleran
unknownThank you, Darcy. Our CEO, Clint Donkin, is here with me in our Sydney office, along with our CFO, John Callagher, our COO, Tim Benfield, and Duncan Bristow, who serves as our Business Development Manager and Investor Relations Manager. I know it's unusual for a Non-Executive Chairman to present a quarterly call, but our listeners will surely understand: Clint has held the seat for only three weeks, and I was the CEO during the September quarter, so the duty of delivering this result rests with me. The September quarter was pivotal — a quarter in which we positioned ourselves for success in the short term, the medium term, and the long term. On the short-term front, we turned out 3,072 tons of copper and 1,562 ounces of gold in concentrate, and we generated a record quarterly net mine cash flow of AUD 33.4 million. Back when we acquired this asset five years ago, I wouldn't have thought we could achieve that within three months. My sense is that it took us two years to reach that level. It surpassed our prior record of AUD 27.7 million, which was set in the March 2026 quarter, and it supports our growth spending. On the medium-term front, we finished the JS3 ventilation shaft and the second means of egress at Jericho, which let us begin stoping at Jolly ahead of schedule.
Aaron Colleran
unknownIn the quarterly report, you'll find a photo of the first production blast at Jericho, and it shows just how well it turned out. We've also included a cross-section of the stoping panel so you can see how nicely it behaved. Have a look at those images — they really do back up the saying that a picture is worth a thousand words. On the medium-term front, we began commissioning the 1.1 million ton per annum plant expansion, which is on budget, and we did so ahead of schedule. Looking longer term, exploration results from Brumby, Iris, Eloise South, and Oro Grande came back encouraging. We announced that we're acquiring the Mt Cuthbert copper project — something we'd been working on for nearly four years, a project we've long coveted, and one we regard as the most prospective undeveloped copper project in the Mt Isa-Cloncurry region. We signed an AUD 70 million placement agreement with Hawke's Point to back the Mt Cuthbert acquisition and to make sure our balance sheet is absolutely bulletproof over the next two years while we drill, baby, drill at Mt Cuthbert. We brought in a new CEO, Clint Donkin, along with a new NED, Mark Le Messurier, adding operational expertise and experience for the production ramp-up, operational improvement, and inorganic growth that lie ahead of us.
Aaron Colleran
unknownLet me walk through a few specifics. Eloise output came in somewhat weaker than our projection, because access to higher-grade material in the Eloise Deeps and Lens 6 deposits was delayed by a seismic event, and also because processing plant shutdowns for cut-over work to hook up new equipment happened sooner than we had planned. The shortfall in ore from the Deeps and Lens 6 was offset by getting Jericho ore from the Jolly shoot earlier than expected, though that ore carried a lower grade than what comes from the Deeps and Lens 6. Having Jericho ore there was clearly a big plus, and it already demonstrates what having two mines can do for us. We are back in the Deeps at present, and the high-grade ore we ought to have seen in September is what we are seeing now. In fact, we saw it yesterday. If you happen to have the quarterly report with you, have a look at chart one on page four of the quarterly, the monthly chart showing ore by source and TKM. Analysts will remember this chart, and a couple of quarters back I asked the analysts whether we could take it out going forward, and every one of them said, "No, it's useful." I have to concede now that you were right.
Aaron Colleran
unknownHearing that from me is unusual. This chart is quite helpful. When you check September's monthly production, it becomes clear how significantly Jolly contributed. According to the chart, the December monthly production forecast represents a smaller jump than it appears initially. It is approximately what we managed at Eloise in August and at Jericho in September, simply happening within one month, December. In September, searching for an upside, we have seen that the December quarter ramp-up schedule is achievable. We have in effect already accomplished it. The quarter's other problem, processing plant shutdowns for cut-over work, came sooner than planned since expansion commissioning is running ahead of schedule. Those shutdowns had been scheduled for October rather than September. Even though they cost us tons during September, the benefits ought to come through in the December quarter. Once more, a bit of an upside. We are running ahead of schedule. Eloise's AISC of AUD 4.86 a pound copper sold and AIC of AUD 5.01 per pound copper sold beat last quarter yet remain above the level we would have preferred. Those increased costs stemmed chiefly from lower grade ore treated, the sale of higher-cost concentrate inventory accumulated over the quarter, and higher diesel prices late in the quarter.
Aaron Colleran
unknownAt this point I'll pass things over to John Callagher, our CFO, who will walk you through how the finances came out this quarter.
John Callagher
unknownThanks, Aaron. During the quarter, Eloise produced AUD 69.6 million in metal sales after TC/RC deductions. That's a very strong result. An additional AUD 8 million of metal sales tied to Jericho came in during the quarter. As we flagged in the June quarter, those sales are captured within Jericho's net contribution of AUD 5.8 million rather than on the revenue line, since Jericho is still in the development phase. We remain on — excuse me — we remain on track for Jericho to be treated as a commercial operation starting January 2027. Eloise mine operating costs came in at AUD 28.3 million, lower than the June quarter. That reflects an overall decrease in Eloise development meters, as Eloise's second jumbo was relocated to Jericho. Diesel costs also declined versus the June quarter, though volatility persists and landed diesel costs rose above the guidance range by the end of the quarter. 25,000 tons of Jericho ore was processed and 360 tons of copper sold during the quarter. Jericho sales volumes are excluded from the Eloise AISC and AIC metrics. That's because they relate to development ore and the associated mining costs are capitalized as part of the expansion project. Commercial mining is expected to begin at Jericho in January 2027, and at that point Jericho's operating results will be consolidated with Eloise's.
John Callagher
unknownCapital expenditure deserves a bit of explanation regarding the September quarter costs versus the half one FY 2027 guidance. On a run-rate basis, underground mine development spend is running slightly above the half one guidance. That's because a larger share of Eloise mining activities is being allocated to capital, and the September quarter took a hit from close to AUD 1 million in rehab costs after the seismic event. Long-term mine development sits marginally above guidance for the same reason I just described. The Jericho access drive and mine development is roughly AUD 1 million over guidance, and that small overspend is tied to wrapping up JS3. Beyond that, it stays on track. Eloise expansion capital is now mostly spent, with just AUD 1 million left. Total spend is within AUD 1 million of guidance. That's an impressive result. Non-planned infrastructure expenditure came in at AUD 5 million for the September quarter, compared with half one guidance of AUD 8 million. We expect this to be substantially complete in the December quarter, in line with guidance. Tailings dam and water storage spend of AUD 4.2 million compares to half one AUD 10 million, and overall this remains on track. The net Jericho contribution is trending ahead of guidance, driven by strong copper prices in the first quarter.
John Callagher
unknownOn exploration, we’re running a little ahead of guidance on a run-rate basis, though part of that comes from seasonality, with spending expected to decline in the second quarter. Some activity here is at or above budget, tied to drilling at Brumby. Working capital was unfavorable by AUD 12 million for the quarter. The main cause is a rise in accounts receivable over the quarter, reflecting higher sales volumes in September 2026 compared with June 2026. During the September quarter, we brought in cash from those low June 2026 sales volumes. I’ll now pass it back to Aaron to wrap up the review.
Aaron Colleran
unknownThanks, John. That basically wraps up the review, so I’ll have the operator open the line for questions.
Operator
operatorThanks. Should you wish to pose a question, hit star one on your phone and hold until your name is called out. To withdraw that request, just press star two. In case you're using a speakerphone, kindly lift the handset before putting your question. Daniel Morgan of Barrenjoey has our first question today. Go right ahead.
Dan Morgan
analystHello, Aaron and the team. I’d like to ask about exploration. We saw a fair number of exploration results during the quarter. I’m hoping you can explain how you read those results in light of the most recent view on how targets are prioritized, and then just—
Aaron Colleran
unknownAll right.
Dan Morgan
analystWhat's your perspective on that compared with Mt Cuthbert? Thanks.
Aaron Colleran
unknownYeah. That's a solid question. And honestly, Dan, it isn't as straightforward as you might think. Let me give you a bit of background and context first. Our regional exploration strategy is built around hunting for something transformational. As you're aware, at Eloise right now — at a 1.1, never mind a 1.5 million ton per annum processing rate — we already have 20 years of resources. We aren't out there chasing 1.5% or 2% deposits. We already hold those; we've got lots of them. What we're after is either something substantially bigger or something as big as Jericho, which would tell us, whoops, we got 1.5 wrong. We'd need a 3 million ton per annum plant, or something grading 3% or 4% like Eloise was — or like Eloise is when it's selectively mined the way it was with long hole stoping in the upper levels, which would displace ore. In terms of our exploration strategy, what that means is this: if we hit something that looks nice, 5 meters at 1.5%, we will drill it, but then we'll move on and try to find something materially better than what we already have. Because if we're wandering around the bush with a drill rig and we find something similar to what we already hold, it won't displace that, and it won't change our outlook.
Aaron Colleran
unknownWe need to locate a target that is substantially bigger and substantially superior. That's the reason you'll notice those findings I felt deserved real emphasis. The pair of copper results and the pair of gold results—normally, those would get you fairly fired up. But the one we'll obviously return to, Dan, and this won't come as a shock, since we've got a rig sitting there at this moment, is Brumby. Brumby plainly appears as though—perhaps I'm letting my enthusiasm run a little ahead of me. I need to watch that. Deep down I'm an explorationist. It's a single hole. It might turn out to be a one-hole wonder. Still, based on what we've observed, if another project exists in this region, that project could be Brumby. We'll head back there. Iris possesses the strike extent and the similarities to Jericho that place it ahead of the rest. As for a few of these other targets, we retain them in the arsenal, yet we won't be rushing back to them, since they don't appear likely to displace what we already have at Eloise. That's Eloise. Now, shifting to Mt Cuthbert, that asset is a total lolly shop. We are spoilt for choice. You'll see that's precisely the reason we carried out the placement of Hawke's Point, AUD 70 million there to cover the cost and to, as I mentioned in the intro, drill, baby, drill.
Aaron Colleran
unknownNothing's holding us back from drilling 60,000 meters as fast as is humanly feasible out there. There will be no effect on our exploration budget at Eloise Regional or at Brumby. That is intentional. Perhaps what you're really asking is, how do we choose? We can't. Every one of these children is loved by us, all equally. They're all wonderful children. We've raised enough money to drill all of them. I hope that answers your question, Dan.
Dan Morgan
analystNo, that's great detail. I'm just curious about what still has to happen for your 2 projects that are in train to be completely wrapped up in the December quarter. What's left to do from this point? And are there any remaining risks you could point out to us? Thank you.
Aaron Colleran
unknownSo you're talking about the Jericho ramp-up and the commissioning of the Eloise expansion?
Dan Morgan
analystAbsolutely, sure — the plant, and Jericho as well.
Aaron Colleran
unknownRight, so regarding Jericho — no issues there at all. Like I mentioned earlier, we completed it back in September, and there's no reason in my mind we can't repeat that across October, November, and December. We've spent a while now mining development ores at Jericho, so from a metallurgical standpoint and everything along those lines, we're satisfied. Now, on stoping — development ore, as we've demonstrated before, came in where it was expected and at the grade expected. As for the stope, that's why I included both the photo and the cross-section in the quarterly, so you can take comfort from the fact that, touch wood, it's essentially business as usual at scale — at the 37,000 tons per month we originally intend to ramp up to. We've achieved that, even if only across a short range. So Jericho doesn't worry us. We're on it. It'll ramp up without difficulty now, in step with commissioning. There's ample ore on the ROM. It'll be low grade, but there's ample ore on the ROM. The moment that large crusher and large mill start running, we'll ramp up. What's left for us to do? We're in the enjoyable phase of running rocks through equipment and watching how it performs.
Aaron Colleran
unknownWe’ve switched them on. Everything operated as it should. We ran water through the system. Some water emerged from the incorrect location. We’ve been going around with the Silastic and sorted that out. Now we’re feeding rocks through. We’re working through that process gradually. Rocks go into the box, everything has performed well, and we keep going. That covers the next four to eight, or even 12, weeks. That’s what this quarter is focused on. Based on what we’re seeing right now, it’s gremlins, Dan. This isn’t a greenfield situation. The technology isn’t unusual. It isn’t big. For us, it is big. We consider it an amazing size, but it’s a 1.5 million ton per annum crusher and ball mill. Nothing especially complicated, though gremlins always show up. We’re dealing with those small items ourselves and with GRES literally at this moment. As John mentioned, we’re within AUD 1 million of that EPCM figure. That is bloody sensational. We’re two weeks ahead of schedule. That’s plus or minus. If we were two weeks behind, it wouldn’t bother me, so I don’t want to get excited about being two weeks ahead.
Aaron Colleran
unknownTo me, plus or minus four weeks on matters like these is quite impressive indeed. I'm pleased—really pleased, Dan, with the position we're in.
Dan Morgan
analystYes, of course. That’s such a defining moment for both you and your team. Thank you very much for this.
Aaron Colleran
unknownThat's my view as well. Thank you.
Operator
operatorThanks. The following question is from Daniel Roden at Jefferies. You have the floor.
Daniel Roden
analystHello, everyone. Appreciate the invitation to join you. Nice work on the solid quarter. Yeah, to restate that view once more, this is a really pivotal point for all of you. So well done on getting that delivery across the line.
Aaron Colleran
unknownAppreciate that, Dan.
Daniel Roden
analystThis likely sets up my first question too. How should we think about the December quarter and then on through the second half of FY 2027? If I work backwards from your guidance for the December quarter, it suggests something around the low 200s up to mid 200,000 tons, compared with 173,000 in September. I know you've addressed how commissioning is progressing right now, but what's your confidence in hitting that target, and which elements might concern you if risk existed in that profile?
Aaron Colleran
unknownDan, our confidence is solid for the reasons I basically just laid out for Dan Morgan regarding the Jericho ramp-up and the Eloise expansion commissioning. So we're quite confident. I don't know how you measure confidence, but on the point you raised about some of the maths, run the calculation. Yes. The September quarter leaves us behind. We're behind after the first quarter. Making up that ground won't be easy. Look, I did mention that the early cutover hurt us in September. It'll help us in October. The grade we lost from the Deeps in September, we'll make up in October, sure. But if we were 5% ahead of guidance at this stage, I would tell you we're extremely confident. We're behind, so hard work lies ahead of us. We're confident. We have a plan in place. You can see the guidance. You can work out the maths from the numbers we've given you. We bravely gave H1 and H2 guidance this year, and now we've given you December quarter guidance. You'll see that the midpoint is what we're targeting, not the top end. So, my suggestion to you, Dan, is that the midpoint is where we're heading. But we'll be doing everything we can.
Aaron Colleran
unknownYou’re familiar with us, and if grade moves in our favor, we’ll make every effort to exceed the midpoint and move back toward the top end of guidance. But we’re just one quarter into a four-quarter game. Boom, boom. Right now, we’d say we’re confident in the midpoint. I hope that answers what you asked. I hope you don’t take that as negative. That’s simply the usual sort of conservatism and sensibleness from AIC.
Daniel Roden
analystNo, that's great. I enjoy posing the open-ended questions—it gets you talking.
Aaron Colleran
unknownSure.
Daniel Roden
analystTo follow on from that, I suppose the CapEx tied to Jericho has been running fairly high this quarter. I'm just trying to get a handle on it — it sounds like that work is more or less finished. That said, is there any residual CapEx we should expect in the December quarter? Where I'm going with this is that you're sort of at the beginning of a meaningful inflection in primary copper production, and that kicks off from next quarter through to the end of FY 2027. In theory, a lot of that CapEx spending starts to fall away. So much of it is simply converting into free cash flow coming back onto the balance sheet. I guess, is there anything — any legacy or CapEx — that we should be aware of over the next one or two or-
Aaron Colleran
unknownYes and no. I’ll answer that quickly, John — sorry — and you can let me know if I’ve got it wrong, but as John mentioned in his remarks about Jericho, the JS3 ventilation shaft, the second means of egress, is AUD 1 million over. That’s otherwise why we wanted to sort of isolate that for you. That’s the reason the Jericho CapEx is above budget. It’s that component. It isn’t that development is costing us more, or that we underestimated, or anything along those lines. So although we’re over by AUD 1 million, John also noted that we’re now on track. What on track means is the other development. So, sure, we’re spending a lot of money on development this year and next year with the Matilda access drive. So, you’ve got those numbers. That’s in our guidance. That doesn’t really go away, because we’re rushing, we’re racing to Matilda, to get the better tons, the better productivity out of that ore body, as quickly as we can for the 1.5 million ton per annum scenario. Is that clear, Dan?
Daniel Roden
analystYes. Absolutely not.
Aaron Colleran
unknownSure.
Daniel Roden
analystIt's more—
Aaron Colleran
unknownIs that okay with you, Dan?
Daniel Roden
analystWhat'll likely matter more, thematically, is where you'll stand 12 months from now—sorry, what was that—
Aaron Colleran
unknownOh, yeah.
Daniel Roden
analystI’m attempting to obtain the steps.
Aaron Colleran
unknownOh, yeah.
Daniel Roden
analystDuring the period from now until that point.
Aaron Colleran
unknownIt's going to be raining cash. Twelve months from now, cash will be pouring in. Running the company will simply be so easy. The ease I'm leaving behind is hard for me to believe.
Daniel Roden
analystThat's something I'm happy to hear you say.
Aaron Colleran
unknownThanks, Dan.
Daniel Roden
analystPerhaps one last quick item from my side. As we head toward December, regarding weather and preparedness, are you considering ways to build a sales buffer? With the new Jericho integration, I suppose, and the new plant expansions, are those creating some complications in how you've traditionally gotten ready for, I guess, the wet season and certain access cutoffs, anything along those lines? And really, any risk mitigations on that front?
Aaron Colleran
unknownHonestly, the wet season is a concern for us, just like it is for everyone around here. Two rough ones have hit us back-to-back. Perhaps we're owed a good one, or at least a decent one. The last two years certainly haven't given us that. So yes, Dan, we're worried enough about it. And we have pumping and piping and everything else in place, ready to go in any direction. Right now we're also building a rise on the tailings dam, which you'll see noted in the quarterly, plus another water dam. So that work is already moving.
Tim Benfield
unknownOn the filter press side.
Aaron Colleran
unknownYeah. That was—yeah, sorry about that. Thanks, Tim. And here's another key thing: at this point we've basically shifted—we are shifting, we have shifted—away from solar drying and over to a filter press. That filter press is dropping concentrate onto the ground at—
Tim Benfield
unknownEight percent.
Aaron Colleran
unknownAround 8% moisture content, yeah, roughly speaking. It's ready to go — literally able to head straight into the back of a truck. Every other copper concentrate producer listening in on this call is probably thinking, "Good, these folks are stuck somewhere back in the 1950s." We've only just arrived in the 2000s, and it's wonderful. The concentrate we're making can be trucked right away, and that's exactly what we'll do. So those solar drying problems we've faced over the past two wet seasons largely disappear, to some degree. Road closures and pad closures at Mt Isa, though, those don't disappear. Still, a big chunk of that issue is already resolved.
Daniel Roden
analystYeah. No, that's great. I can't wait for you folks to get with the 2020s, but it'll be enjoyable. No, excellent question. Thanks to all of you.
Aaron Colleran
unknownAppreciate it. We prefer to keep things straightforward. Cheers.
Operator
operatorThank you. As a reminder, if you'd like to pose a question, just hit star one on your phone and hold until your name is called. Our next questioner is Shane Le Plastrier, who is a private investor. You may proceed.
Shane Le Plastrier
unknownHello there, Aaron.
Aaron Colleran
unknownHello there.
Shane Le Plastrier
unknownMy question concerns exploration drilling. Outside of Eloise and Jericho, where is drilling going to take place ahead of the wet season starting?
Aaron Colleran
unknownRight, so basically, with Brumby as things stand, we're going to be stretched right to the limit. We've got one rig at Jericho and another at Brumby, and that's likely all we'll manage to complete. Mt Cuthbert won't be started by us this year. Once the wet season wraps up, we'll be set to get going in full. So that's what's in front of us. That said, unfortunately, it's not as if there aren't some solid results to anticipate. If you take a moment to look through the quarterly, you'll notice we actually drilled quite a lot during the quarter that just passed. We're indebted to you. The labs have a big backlog of results for us. So there's plenty of results still to come, provided all goes well and they're favourable. Because I'm not sure whether you know, or whether many listeners know, but rigs are difficult to secure in Queensland at present, and lab turnaround has slowed considerably. Right now, we're nearly back to peak levels in Queensland — in North Queensland — for some reason. There's a lot of activity. Word is it's busier up there than in W.A., which is usually the bellwether. So Shane, that's 2 rigs running until the end of November, the start of December.
Shane Le Plastrier
unknownOkay, so is it fair to describe the second program at Brumby as turning out somewhat bigger than what was originally budgeted for?
Aaron Colleran
unknownSo on the budget question — yes. As I think you'll see in the commentary, the finance commentary from John mentions that we've shifted an additional AUD 0.5 million. It isn't a large amount, but AUD 0.5 million has been gated across into Brumby, and that's the program we currently have running out there. So that's four or five holes, all of them fairly deep. We're roughly a third of the way through it.
Shane Le Plastrier
unknownOkay, so there's the discovery well to start with, the two others, and then this second program—
Aaron Colleran
unknownThat is correct.
Shane Le Plastrier
unknownThose 4 to 5 holes.
Aaron Colleran
unknownYes, that’s right. So at the lab, there isn’t anything yet. Unfortunately, that is a solid 3 months off, given the turnaround times we’re currently experiencing.
Shane Le Plastrier
unknownAlright, sounds good — thanks a lot.
Aaron Colleran
unknownThat's fine. Appreciate it, Shane.
Operator
operatorThanks. That’s all the questions we have right now. I’ll turn things back over to Aaron for any closing comments.
Aaron Colleran
unknownThanks, Darcy. It's a real pleasure to be passing a fantastic business, one that's in fantastic shape, over to Clint. This is a business positioned to win over the short, medium, and long haul. We're on the home stretch of finishing the Eloise plant expansion. Commissioning at the plant has begun. The ore body is doing nicely. Copper prices are robust. The coming months look exciting for us. Looking further out, the Mt Cuthbert acquisition pushes forward our goal of becoming Australia's next mid-tier copper producer, since it adds a possible second production center in Northwest Queensland. You can never hold too many AIC Mines shares. Just ask Hawke's Point. Thanks for joining us. That wraps up the call.
Operator
operatorThat brings today's conference to a close. We appreciate everyone joining us. You're welcome to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete AIC Mines Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to AIC Mines Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in AIC Mines Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.