Applied Digital Corporation (APLD) Earnings Call Transcript & Summary

August 28, 2024

NASDAQ US Information Technology IT Services earnings 40 min

Earnings Call Speaker Segments

Matt Glover

executive
#1

Thanks, Shamali. Hi everybody, and we appreciate you being here for Applied Digital's call covering the fourth quarter of 2024. Ahead of the prepared remarks from management, a quick reminder: some of what we discuss today may count as forward-looking statements under securities regulations, and those come with various risks and uncertainties. Given that, we want to flag that numerous elements — many beyond our ability to influence — could lead actual outcomes to diverge significantly from whatever those forward-looking statements set out. To better understand the potential risks, unknowns, and presumptions connected to the forward-looking documents we file with the Securities and Exchange Commission, please review those materials. We make no commitment, and assume no responsibility, to revise any forward-looking statement because of situations or occurrences arising later than today, unless the law mandates it. Additionally, we'll address financial measures that aren't based on GAAP. We urge you to review thoroughly what we disclose in the reconciliation tables, along with the corresponding GAAP figures included in our earnings release, which is available within the Investor Relations area of our site, when evaluating these metrics. For more detailed information about our business and the various unknowns and shifting conditions we face—among them the risks and uncertainties spelled out in the Risk Factors section of our Annual Report on Form 10-K and our quarterly report on Form 10-Q—we encourage you to consult the filings we make with the SEC. Applied Digital's SEC filings can be obtained at no cost through the SEC's website, www.sec.gov. Please be aware that a recording is being made of this call, and a replay will be accessible through a link posted in the Investor Relations portion of Applied Digital's website. At this point, I'll hand things over to Applied Digital's Chairman and CEO, Wes Cummins. Wes?

Wes Cummins

executive
#2

Appreciate it, Matt, and welcome everybody on this afternoon's call. Thanks for being with us for our fiscal fourth quarter 2024 earnings discussion. To kick things off, I'd like to thank all of our team members for the continued dedication and effort they bring, and for standing behind our goal of delivering purpose-built infrastructure to the fast-expanding high performance computing sector. Prior to handing things to our CFO, David Rench, who will walk through our financial results in detail, I'd like to touch on a few recent items from across the business. We ran into a number of issues during the quarter that weighed on our financial performance, stemming from facility power outages within our data center hosting business. Even with those near-term headwinds, the company achieved meaningful advancement on our main growth efforts, which include building out our cloud services business and constructing our purpose-built 100 megawatt HPC data center in Ellendale. As we shared earlier, we signed an LOI with a US-based hyperscaler covering 400 megawatts at our Ellendale campus, which takes in our existing 100 megawatt facility plus two buildings still to come; I'll now give an update on each of our business units. Let's start with a look at our data center hosting business. Our Jamestown facility, at 106 megawatts, has continued to perform as expected, running at full capacity with no downtime during the entire quarter. That makes the seventh quarter in a row this facility has operated at full capacity. Although Jamestown's results make us happy, we are facing difficulties at some of our other sites. As we've noted before, our 180-megawatt Ellendale facility in North Dakota dealt with a power outage that began in January, which we concluded stemmed from transformer failures. Before the fourth quarter closed, we had managed to swap out the transformers and related components using equipment supplied by top North American manufacturers. With those transformers now replaced, we hold 286 megawatts of data center hosting capacity for our blockchain clients across our two fully contracted North Dakota locations. Now let's turn to our cloud services business, which delivers high-performance computing power for AI applications. This segment keeps growing, as we make progress on fulfilling our existing contracts and pursue fresh opportunities in our pipeline. At the close of the fourth quarter, we had four clusters online, and we added another two clusters during the first quarter of 2025. Finally, an update on our HPC data centers. Right now we have 400 megawatts of capacity under development throughout North Dakota; on top of that, there's 7.5 megawatts of IT capacity at our HPC facility in Jamestown which, given how close it sits to Ellendale, ought to enable a low latency interconnected extended campus in North Dakota. Over the quarter, we kept making major headway on building our first proprietary 100-megawatt high performance computing facility in Ellendale, North Dakota. This cutting-edge facility is set to include cost effective, highly efficient liquid cooled infrastructure, purpose-built for the most demanding HPC applications. We've achieved considerable progress on construction of the 369,000 square foot facility. I'd suggest taking a look at our brand-new site, where you can see some fresh photos of the facility. We've already talked about this, but we've now secured exclusivity and signed a letter of intent with a hyperscaler headquartered in the US for a lease covering 400 megawatts of capacity; in our view, that hyperscaler has finished its technical and site-level due diligence on this location and is presently engaged in nailing down the lease terms. Once that's done, we'll wrap up project-level financing for this investment-grade tenant. Our priority right now is getting the lease and the project financing closed for the Ellendale campus, and we've begun marketing 3 more campuses that together come to 1.4 gigawatts. Power will be available at every one of these campuses in 2026. To wrap up, the favorable trends we're seeing throughout our business give us encouragement, and our confidence in the growth path ahead remains strong; we're enthusiastic about the many possible catalysts coming up and are dedicated to deploying our capital strategically so we can capture the best risk-adjusted returns and drive the most shareholder value. With that said, I'll hand things over now to our CFO, David Rench, who will take you through our financials and give an update on guidance. David?

David Rench

executive
#3

Thanks, Wes, and good afternoon to all of you. I'd like to start by talking about how complicated the financial reporting was for this quarter. Our adjusted EBITDA came in at roughly $4.8 million; that said, a number of onetime items had a major effect on our financial performance as well as on how comparable these results are to earlier quarters. In particular, a significant amount of power was unavailable at our data center hosting facility located in Ellendale, North Dakota, and that power then mostly returned right as the quarter was ending. On top of that, we took on numerous one-time professional service expenses, mainly tied to our capital-raising initiatives, financial analysis for data center financing and strategic transactions; we keep pursuing every remedy available to us in order to recover lost revenues and the additional costs the transformer outages caused. Let's dig into what the quarter's results look like. Revenues for the fiscal fourth quarter of 2024 came to $43.7 million, versus $22 million during the same period in 2023. That growth was mainly fueled by expanded capacity across our data center hosting facilities and by revenue contributions from the cloud service contracts. To break it down, our data center hosting segment brought in $26.9 million in revenue, while our Cloud Services segment added $16.8 million. Now for cost of revenue in the fiscal fourth quarter of 2024, that figure reached $46.3 million, an increase from $15.9 million in the same quarter of 2023. You can trace this rise to higher energy costs, which came from the greater number of megawatts used to generate hosting revenues. Beyond that, depreciation and amortization expenses, together with personnel costs, went up because the business grew as more facilities came online. Selling and general administrative expenses for the fiscal fourth quarter of 2024 totaled $31.3 million, compared with $12.3 million in the comparable period of the prior year. That increase stemmed primarily from start-up costs, since we were ramping up the cloud service business. It included higher depreciation, amortization and lease costs on assets not yet supporting revenue, plus personnel costs needed to support the business's overall growth. The net loss for the fiscal fourth quarter of 2024 was $64.8 million, or $0.52 per basic and diluted share. This figure is calculated using a weighted average share count during the quarter of approximately $124.7 million. By comparison, the net loss for the fiscal fourth quarter of 2023 was $6.5 million, or $0.07 per basic and diluted share, using a weighted average share count during the quarter of approximately $94.1 million. Adjusted net loss, which is a non-GAAP measure, for the fiscal fourth quarter of 2024 was $45.3 million, or adjusted net loss per basic and diluted share of $0.36, using a weighted average share count during the quarter of approximately $124.7 million. That compares with an adjusted net loss of per — I'm sorry, adjusted net loss of $100,000, or less than $0.01 per basic and diluted share, for the fourth quarter of 2023, using a weighted average share count of approximately $94.1 million during the quarter. On the non-GAAP side, adjusted EBITDA came in at $4.8 million for the fiscal fourth quarter of 2024, versus $3.4 million for the fiscal fourth quarter of 2023. A big part of the gap between our adjusted earnings and our adjusted EBITDA comes from the accelerated depreciation schedule on our GPU hardware. Now on to our balance sheet. We closed the fiscal fourth quarter with $31.7 million in cash, cash equivalents and restricted cash, plus $125.4 million in debt. After the fiscal year-end, we brought in over $150 million in funding from various finances and the settlement of the Garden City contingency. We're still looking into additional financing for the cloud service business, which would better match that business's economics to the life of the assets by stretching depreciation from two years out to six years, the industry norm. Let me repeat that our focus is project level financing for the Ellendale HPC campus, which we anticipate funding soon after we finalize a lease agreement with the US-based hyperscaler. With that, I'll hand the call to Wes for closing remarks.

Wes Cummins

executive
#4

David, thank you. We recognize that the last 12 months brought difficulties, since the firm dealt with an outage lasting multiple months at our Ellendale hosting facility, along with the financial strain of financing a $1 billion data center while also funding our cloud business. Even so, we have achieved meaningful headway toward locking in a lease agreement lasting more than 10 years with a Fortune 50 company for our Ellendale campus. Getting this lease signed will cement our standing as a leader in the HPC data center market and create a ripple effect on our capacity to obtain asset-level financing and to build out further sites. During this effort, we have worked tirelessly to arrange project level debt for our facility with numerous interested parties. Once the lease with the hyperscaler is executed, we expect our financing partner, SemGroup, to free up additional capital to back ongoing construction as we keep pursuing project level finance. In short, notwithstanding major difficulties this quarter, mostly driven by external factors, we stay completely dedicated to producing strong long-term shareholder value. Our aim is to turn into a development platform able to construct and run multiple HPC data centers. That begins with our Ellendale campus and carries on with three more campuses we are actively marketing right now, amounting to 1.4 gigawatts. To advance this aim, we have brought several industry veterans onto our team, and we are already at work on the design of our next two buildings, which will deliver 300 megawatts of capacity; we take enormous pride in the progress achieved this quarter and look forward to sharing further updates as we head into fiscal 2025. Going forward, we think Q4 represented the low point for our revenues and expect sequential gains in the top-line as we move into the first quarter. We are now happy to take your questions. Operator?

Lucas Pipes

analyst
#5

Thanks a lot, operator. Hello everybody, good afternoon. Wes, my first question for you concerns the Ellendale HPC campus; I was hoping you could address how much of the first 100 megawatts is complete and what capital is still needed going forward? Many thanks.

Wes Cummins

executive
#6

Absolutely, Lucas. As things stand right now, we've put a bit more than $200 million into that facility. The building — I'm certain you've watched some of that video footage — is completely sealed up, MEP work is what we're moving ahead on at present, and the final fit-out comes afterward, later this year into early next year. And we return to — so for that initial 100 megawatts, this facility runs approximately $1 billion — slightly above $1 billion, which matches what standard Tier 3 data center capacity costs. So with the $200 million already in, I believe I've mentioned this before. We're engaged with banks that usually supply project-level finance in this sector. Term sheets are in hand and we've in fact chosen a bank to proceed with. And the plan is for them to fund the rest in the — we've received 80% to 90% loan-to-cost quotations on this, we simply have to finish the lease and the project level finance process is already underway right now; so hopefully we close that soon after.

Lucas Pipes

analyst
#7

Thanks a lot for all those specifics. Wes, am I correct in understanding that you mentioned something along the lines of fit out happening in early next year? And does that cover the completion piece? Or in terms of that timeline, how would you put it? Thank you.

Wes Cummins

executive
#8

Lucas, as we've moved through this process, there are a few distinct timelines we're dealing with here. One is our build timeline, and the other is when our customer wants the facility ready for service. At this point, that isn't fully locked in. But from the build side, our schedule is what we've discussed previously — being ready late this year or early next year.

Lucas Pipes

analyst
#9

Thanks a lot for that; and switching subjects very quickly; regarding the cloud services segment, could you discuss the ramp during your fiscal first quarter, what number of clusters were live? And how would you sort of lay out the revenue opportunity for Q1 — fiscal Q1 here compared with the fiscal Q4 period you just reported? Thank you.

Wes Cummins

executive
#10

Absolutely, Lucas. So our position there, like we mentioned during the prepared remarks, is that we had 6 clusters live in Q1, and it won't cover all of Q1, but those went live I think in June, so it will cover most of it. So with those 6 clusters operating, that operation is at roughly a $110 million revenue run rate annually. And at present, I've mentioned on earlier calls that our team is extremely focused on the enterprise market. We began with the AI labs and the AI start-ups, we are extremely focused on the enterprise market now. We have been working on that for 7 or 8 months at this point. And we've probably seen lately, we've brought on a new CRO who joined from IBM and is extremely focused on that market. And so we see the demand there, and we will keep ramping that. The other part of the puzzle here is we have been working on financing that we are putting in place that finances this deployment, this equipment in a manner that makes it flow through our income statement more fairly compared with what it does today; so we don't want to keep adding a lot with the capital lease structure that we currently have simply because of — you see what it does to the financials since we are forced to do the depreciation over 2 years compared with the industry standard of 5 or 6. So those 2 pieces are coming together, and then — but we do still see a significant amount of demand, but really growing demand from the enterprise side of the market.

Lucas Pipes

analyst
#11

Wes, I really appreciate all the specifics you provided, and I want to wish you and your team the very best of luck.

Wes Cummins

executive
#12

Thank you, Lucas.

Rob Brown

analyst
#13

Good afternoon. I just want to follow up on cloud — regarding the AI cloud business, I believe there are six clusters; what kind of range of clusters do you think that business can grow into? And how do you view that compared with the data center business when it comes to capital investments.

Wes Cummins

executive
#14

Rob, when it comes to both of these businesses, our thinking is the same; they are asset heavy, capital intensive operations. For each of them, we need the right mechanisms in place to do asset level financing. So on the data center side, we've discussed that; we're nearly there. On the GPU side, we spoke about it quite extensively. I believe we're nearly there too. So once we have the correct asset level financing mechanisms in place, I think we'll be able to grow substantially on both sides of that business. As for the AI cloud portion of the business, with the data center capacity we have in place today and what's available to us as we go through 2025, we can generate significant growth in that business, and we see the demand for it, but we need to get the right capital base in that business to grow it aggressively. At the moment, we're kind of feeding both of them, and we need to move that financing down to an asset level from a company level.

Rob Brown

analyst
#15

Alright, that's excellent, thanks. Moving to your hyperscaler agreement, my guess is that regarding the schedule, the items needing the longest time would be due diligence — specifically on the site plus the technical side — but roughly what share of the work is finished when it comes to moving that contract along its path?

Wes Cummins

executive
#16

Putting odds on it isn't easy, though I'd put us past the 90% mark.

Rob Brown

analyst
#17

All right, excellent. Thanks — I'll hand it over.

Darren Aftahi

analyst
#18

Thank you. I want to pick up where we left off on the lease. From a broader view, how much of what remains involves minor points still being worked through, as opposed to the bigger structure? And my second thing about the lease is: how much of a queue exists at the law firm that's actually handling this process? Thanks.

Wes Cummins

executive
#19

Good question, Darren. On the details side, you've got major items and you've also got quite minor ones — and at times the minor ones wind up taking just as much time as the major ones. There's also a lengthy process involved with fiber connectivity, power, firm power, and power redundancy, which required a considerable stretch of time to finish. Still, plenty of little details remain, so I'd describe it as roughly even between the two — and it's odd, because occasionally the lesser items are what drag on longest. As for your point about — getting visibility into the law firm is difficult, though only a handful of them handle the bulk of these contracts. So a backlog certainly exists, but I'm not able to estimate or say how much of the delay stems from that. This is our first time going through it. So it's the only set of circumstances we've ever been in.

Darren Aftahi

analyst
#20

Understood. Then one last thing regarding the pipeline for additional campuses. First, at what stage does marketing stand? Second, how inclined are you to broaden the customer mix across those other campuses, compared with, hypothetically, the current US hyperscaler holding the LOI wanting additional capacity and choosing to absorb it — just if you could weigh those two perspectives. Thank you.

Wes Cummins

executive
#21

Certainly. We started that effort only a short time ago; there are prospects to whom we distribute tearsheets and binders covering these locations. At this stage, I'd describe our approach as more polished than what we used for the Ellendale campus, yet hyperscalers remain our primary target for these locations. Our attention is on locations offering no less than 200-plus megawatts of critical IT capacity, which translates, based on geography, into roughly 250 to 300 megawatts of utility power. Those are the kinds of locations and customers drawing our focus. Other customers exist in the market, though our go-to-market approach for these new locations is fairly narrowly defined.

Darren Aftahi

analyst
#22

Great. Thank you.

Mike Grondahl

analyst
#23

Hi, thanks guys. Wes, could you say that part again — those six clusters are producing an annualized run rate of what revenue amount? I caught $100 million, but the audio was a bit unclear.

Wes Cummins

executive
#24

Yes, it comes to roughly $100 million to $110 million, Mike.

Mike Grondahl

analyst
#25

All right. $100 million to $110 million; and my take on what you said is, hey, demand for that business is substantial, but you're basically going to remain at roughly six clusters until a better financing structure is in place, and after that you'd anticipate seeing additional growth. Does that capture it fairly?

Wes Cummins

executive
#26

Yes. That's an accurate summary, which is we're pursuing a better financing structure since you can see — I mean, you're able to look at where our adjusted EBITDA stands compared with where our earnings stand, and the accelerated depreciation schedule on those GPUs largely drives that. So we need financing of a kind that, first, comes at the right cost for us; and second, lets us depreciate these across the useful life instead of during the financing period, if that makes sense.

Mike Grondahl

analyst
#27

Absolutely, absolutely. And in that press release, you mentioned this HPC development platform that might scale from 400 megawatts up to 1.4 gigawatts — do you figure that initial hyperscaler client wants more than the 400 you're currently discussing with them? Might you become a one-stop shop for them, handling another large project or even two?

Wes Cummins

executive
#28

I certainly believe that's possible, though additional demand exists in the market from comparable customers too. There's a tremendous amount of need for this capacity, particularly short-term power; so '25 power — 2025 power is finished unless we've got that available for Ellendale. At this point we're targeting 2026 power and afterward 2027 power. But I'd say short-term power matters most, and you've got to have the correct kind of power. Again, that's one reason when we discussed offloading our Texas facility, we don't think that facility suits HPC, at least not in the manner we intend to build it out; so the correct kind of power is necessary. Thus we're truly centered on short-term power; and Mike, to be clear, that 1.4 gigawatts covers only the three additional sites. Ellendale isn't part of it. So that's our focus, the market in that area; but I believe the possible existing customer along with others of that sort, there's a tremendous amount of need for short-term power available in the market.

Mike Grondahl

analyst
#29

Understood. Excellent, hello and many thanks.

George Sutton

analyst
#30

I appreciate it. Wes, only one remark during this call caught me off guard. You said it isn't clear at what point the customer may wish to begin operating under the lease. Could you shed some light on that? I've been assuming we're aiming to have everything operational at the greatest speed possible, which explains why you're expanding so quickly.

Wes Cummins

executive
#31

Right; that's accurate, George, that's one valid perspective. However, various phases exist here regarding the fit-out, and what we're putting in as part of it. So plenty of elements are in motion. I'd say it's pretty well locked in, yet we'll hold off on the specifics until this wraps up, at which point we can make them public.

George Sutton

analyst
#32

All right. And when it comes to how the GPU financing is structured, based on what we know from following that market closely, things have improved substantially — there's far more willingness to finance now. Could you describe how much interest you've received from parties about assembling such a structure, and roughly where that effort currently sits?

Wes Cummins

executive
#33

Sure. We kicked off this effort some time back, and you're right that both the appetite has increased and the price of capital has declined. It genuinely, George, hinges on who the off-taker is — much the same as with the data center side; so what you pay for financing is heavily tied to the off-taker; consequently your priciest deals will involve AI labs and start-ups, whereas enterprise will be considerably cheaper. And should you carry out the deployment alongside a hyperscaler, the pricing drops further still. That said, we're observing a substantial number of newcomers entering that space, and we've encountered considerable interest, and I believe we will — manage to get that structure established for our own benefit.

George Sutton

analyst
#34

To put a finer point on it, the fiscal years indicate they're glad to group those together; they'd like to see who the customers are. And as soon as a name of sufficient quality is supplied, they'd be willing to provide the funding. Is that somewhat of a chicken-and-egg situation?

Wes Cummins

executive
#35

In a way it is, George, and what you ought to picture is a facility being established, and it's a drawdown facility as equipment gets purchased and customer contracts get shown. And usually, the sorts of structures we encounter here involve forming something like a bankruptcy remote SPV, after which the loans go in there, the GPUs go in there, and the customer contracts go in there, and in certain instances, the colocation contracts go in there too; so it's more or less a self-contained financing solution.

George Sutton

analyst
#36

Understood. Alright, appreciate it.

John Todaro

analyst
#37

Hey, Wes, I appreciate you fielding my questions. I've got 2 for you. First, just attempting to perform as much due diligence as I can regarding the schedule associated with that lease agreement. You brought up that they'd completed their technical requirements — do you view that as essentially the initial phase, and how many phases would you estimate exist? Or has it truly come down at this point to merely a handful of remaining specifics? And then my second question: you brought up the Garden City location and said you didn't believe it worked for HPC. Clearly, plenty of Bitcoin miners around are attempting to follow that West Texas path. Nobody has pulled it off yet. I'm just wondering what made you conclude that this location — and perhaps this area — could it genuinely be viable for HPC?

Wes Cummins

executive
#38

Hello John. Regarding the — I wouldn't claim, what I mean is everything is sort of — when you ask whether that's the initial phase in the leasing process, everything sort of happens simultaneously; however I'd put it this way: we're wrapping up the final specifics, that's how I'd describe it. Then regarding what we've discovered via this process, and what we'd observed before but particularly via this process, it's this — for us, for our organization, everybody else follows their own approach; however for us, I don't believe possessing a big flexible load within the ERCOT market will work for the sorts of clients we're going after in that line of business. I can't predict what shifts will occur, yet I'm aware there are shifts proposed within the legislature, in the Texas state legislature, that would render it even more difficult, given that big flexible load structure, to serve — once more — the sorts of clients we're aiming to serve; therefore at present, we aren't chasing anything within Texas right now. That might shift later on. Yet there's firm power, power redundancy — and not merely redundancy of whatever you construct at the site, such as UPS or backup generators, but redundancy from having several power lines or feeds arriving from varying directions at the substation or switching station you pull power from. There are numerous elements we've picked up while going through this process, and those represent the sorts of sites we've secured and are securing while marketing, yet there's — I'm not especially optimistic regarding simply the big flexible load within Texas.

John Todaro

analyst
#39

That helps, Wes. I appreciate it. Thank you.

Kevin Dede

analyst
#40

Thanks, hi Wes. I was curious whether you might spend a moment describing the broader landscape for us. I understand you're aiming at 1.4 gigawatts. How does the competitive picture look? And what gives you confidence that Applied comes out on top against your rivals.

Wes Cummins

executive
#41

Sure; so that breaks into two pieces. On the environment side, like I said before, demand for power in the near term looks really strong. So our attention is squarely on power that can be energized by the close of '27. That makes power the Number #1 constraint right now. Then, looking at what I'd call the Number #2 constraint, that would be the supply chain. Quite a few components in that chain are stretched. I'd gladly go through them, but that belongs to the second piece. So we carry a considerable amount of supply chain experience. Many of the items we — for that initial data center build we placed orders for last year, we secured our spots in the queue for switchgear transformers, many of the critical components required to construct these; so those are the two elements. And I believe our standing is excellent on both of those competitive fronts. What matters most for us, I'd say, is completing this first lease, which will serve to confirm what we're doing as a company in North Dakota and our capacity to locate these sites, develop them and bring them online for very large companies and demanding companies. And so competition in the market is plentiful. The bulk of what we compete against, in our view, consists of private data center companies that have spent years already building for hyperscalers, a decade even. So those are the players we regard as the bulk of the competition in the market. And a handful of those platforms exist that are building hundreds of megawatts or, in certain instances, more than a gigawatt of power out for hyperscalers. So this isn't really a new market. It's simply a new style of data center.

Kevin Dede

analyst
#42

Okay, when you're putting in a bid for a site and you're up against those other privately held firms that have been operating in this space somewhat longer than Applied, what's the reason you'd come out on top for that contract? Why should we have confidence that you'll hold an edge in that contest?

Wes Cummins

executive
#43

I'd say the key thing is to recognize that the businesses that we've traditionally — that have traditionally operated in this arena, and the manner in which the data center sector has traditionally functioned, is that whenever a company intends to add new capacity, they usually begin by identifying the region where they wish to be located. So, imagine I'm based in Dallas. Suppose they'd like to be in Dallas. That means there are a handful of various tools available for licensing to help identify data center space across the DFW area. Those tools are really centered on fiber maps. What they'll do, essentially, is pair up the specific kind of fiber connectivity you require with real estate that's available on the map, after which you'll identify a spot, buy that spot, and afterward submit a request to the utility for power. What has taken place in the market at present is that companies continue to operate that way, yet those power requests end up in a queue, and across many of the most sought-after markets that's extending beyond 5 and in certain instances, more than 10 years before you'll actually receive that power, particularly at the quantities of power required for these newly styled facilities. That, then, is the major gating item. We, by contrast, take what's sort of the opposite approach: we locate power availability first, then we confirm that — that the power available is the sort that can serve our sort of development; that's the redundancy point I brought up earlier. After that we confirm the fiber connectivity exists. And we've now honed that even more to incorporate things like latencies to various locations. Then we're able to either begin developing that site as we did at Ellendale, or begin marketing some of our remaining locations. So I'd say we're distinctive as one of the handful of companies that takes that approach and has progressed this far; if you review our history, this path began for us in 2022. That gives us a few years of hands-on experience with this, and at this point our level of knowledge has risen sharply over the last six months within the company regarding how to tackle this. So I'd say it's simply the availability of power, plus the correct sort of power at the correct sorts of sites with the correct sort of fiber connectivity, that genuinely provides our advantage.

Kevin Dede

analyst
#44

Would you also agree it seems fair to describe your approach as searching in unlikely spots, maybe more rural areas, where latency matters less?

Wes Cummins

executive
#45

Absolutely, that ties back to what I brought up before regarding the way legacy data center firms operate, whereas our method is quite different. We have certainly narrowed the ranges around our understanding of the sorts of latency needs. As a result, we won't really be considering places extremely distant, yet we now possess a much deeper knowledge base concerning the latency demands across North America that our site must satisfy. That has assisted us even further when choosing sites.

Kevin Dede

analyst
#46

Could you spend a moment on where Applied currently sits in the cloud AI business? What number of sites do you operate, and which of them are active? And once that structured financing is secured, how do you expect to reach those sites during this fiscal year?

Wes Cummins

executive
#47

Sure. A lot of the locations are the same ones, correct? There's Minnesota. We have the Jamestown site, and we hold colos capacity in Denver along with Salt Lake City. Those represent the main large facilities. Las Vegas has a smaller one. So that capacity is ours. Some of it is open capacity, which I believe is a really significant asset in the market. Finding it is incredibly hard and it's ready to deploy; demand is arriving from the enterprise side, and strong demand persists in that market. Once the proper financing is arranged, we'll be in a position to speed that business's growth back up.

Kevin Dede

analyst
#48

All right, so overall, could you provide us with an approximate figure regarding the megawatts you're able to tap into?

Wes Cummins

executive
#49

The amount of megawatt capacity we've locked down comes to slightly above — specifically for putting into service, slightly above 30 megawatts; and Kevin, that's available at this moment. It isn't something slated for later on.

Kevin Dede

analyst
#50

Right, that's exactly what I was getting at. Thanks for the detail, Wes. I appreciate that context. Thanks so much.

Wes Cummins

executive
#51

Thank you, operator. And thank you, everybody, for being on this call — we look forward to talking with you again in the next quarter.

Operator

operator
#52

That brings us to the end of the call today, and you're free to hang up your phones now. We appreciate you taking part.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Applied Digital Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Applied Digital Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Applied Digital Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.