Applied Digital Corporation (APLD) Earnings Call Transcript & Summary
January 14, 2025
Earnings Call Speaker Segments
Matt Glover
analystThank you, Julian. Hello, everyone, and welcome to Applied Digital's conference call for the fiscal second quarter of 2025. Before management delivers its prepared comments, we want to remind all listeners that certain statements made today may qualify as forward-looking statements under securities laws and carry various risks and uncertainties. Accordingly, we advise caution: numerous factors, many outside our control, could lead actual outcomes and events to differ materially from what those forward-looking statements describe. For a more detailed discussion of the risks, uncertainties and assumptions connected to our forward-looking statements, please refer to the disclosures in our earnings release and in public filings we make with the Securities and Exchange Commission, or SEC. We take on no duty, and make no commitment, to revise any forward-looking statements so they reflect situations or occurrences arising after the moment those statements were issued, unless the law demands it. We'll also go over non-GAAP financial metrics, and we ask that you review closely our disclosures and the reconciliation tables tying these to the relevant GAAP measures in our earnings release when weighing these metrics. For thorough disclosures and descriptions of our business, uncertainties and other shifting circumstances—among them, though not limited to, the risks and uncertainties laid out under the heading Risk Factors in our annual report on Form 10-K and our quarterly report on Form 10-Q—please consult our filings with the SEC. Applied Digital's SEC filings are available at no cost through the SEC's site, www.sec.gov. Also, please note that this call is being recorded and a replay will be accessible through a link in the Investor Relations area of Applied Digital's website; at this point I'll hand things over to Wes Cummins, Applied Digital's Chairman and CEO. Wes?
Wes Cummins
executiveMatt, thanks, and good afternoon to all of you. We appreciate you being with us on this call covering our Fiscal Second Quarter 2025 results. First, I want to thank our team members for their ongoing dedication and effort in advancing our goal of delivering purpose-built infrastructure to the fast-expanding high-performance computing sector. Before I hand things to Saidal Mohmand, our CFO, who will walk through the financial results in detail, I'd like to update you on some recent activity within our businesses. To begin with Data Center Hosting, we presently hold 286 megawatts of data center capacity serving our cryptocurrency clients at 2 locations in North Dakota, both fully contracted and running at full capacity. You're all probably aware that Bitcoin just crossed the $100,000 mark, and demand for what we offer in that space is still strong. Now I'd like to turn to Cloud Services, our business that delivers high-performance computing power for AI workloads. That segment keeps growing as we deliver on contracts already in place and pursue fresh prospects in our pipeline. By the close of the second quarter, we had 6 clusters running. Right now we're assessing quite a few opportunities in this area while watching how next-generation GPUs reach the market. Over in HPC hosting, we carried on building our 400-megawatt campus in Ellendale, North Dakota. December brought a significant milestone: we successfully energized the main substation transformer. Also, I’m really happy to share that our Ellendale Community and Economic Development initiative earned the DCD Community Impact Award. With the R-WISH program, we’re tackling housing shortages and helping workforce growth in Ellendale, North Dakota. For a newer company like ours in the data center industry, this is a big achievement, since we were finalists alongside well-established global firms including Google, NTT Data from India, and London-based Telehouse Europe. Now let’s move to what everyone is focused on: the lease of our campus in Ellendale, North Dakota. During the past year, we’ve come to understand that the hyperscaler contract process is very rigorous. Although their timing isn’t something we can dictate, our attention is on the elements within our control—finishing our 100-megawatt data center build on schedule and without exceeding budget. I firmly believe the Ellendale campus represents a valuable asset, with 100 megawatts of critical IT load ready in 2025; in our view, continuing to manage what is within our control and refraining from guessing at a precise date serves our shareholders’ best interest. Though this has been a lengthy process, a key advantage of going through such a substantial diligence effort is that we have been working alongside some of the world’s largest finance and investment partners. I'm glad to report that we've reached an agreement to enter a strategic partnership with Macquarie Asset Management. Macquarie Asset Management is the asset management arm of Macquarie Group, a worldwide financial services firm that operates across 34 markets and employs more than 20,000 people. Over the past 12 years, they have been regarded as one of the largest infrastructure investors anywhere in the world, and during the previous year alone they brought in over $80 billion of capital. Macquarie possesses extensive expertise in infrastructure investments related to data centers. They will bring their infrastructure investing and development skills, along with their growing digital ecosystem capabilities, to bear in complementing Applied Digital's expertise in providing and supporting data center infrastructure solutions for enterprise and hyperscale companies. A $5 billion perpetual preferred equity financing facility will be part of the partnership. Up to $900 million from this facility will go to the company’s Ellendale high-performance computing data center campus, and Macquarie will receive the right of first refusal to invest as much as an additional $4.1 billion across Applied Digital’s future HPC data center pipeline. The investment will come in the form of a perpetual preferred plus a 15% common equity interest in Applied Digital’s HPC business segment. The Macquarie investment, together with future project financing, will be used to repay project-level debt and let the company recover more than an estimated $300 million of its equity investment in the Ellendale HPC campus. We believe this larger partnership with Macquarie positions Applied Digital for considerable expansion within the industry, making Applied Digital one of the quickest-growing owners, operators and developers of HPC data centers in the United States. At current build cost, we retain a substantial share of the equity needed to build over 2 gigawatts of HPC data center capacity, including our Ellendale HPC campus. Holding an 85% ownership interest in both current and upcoming HPC assets under a project-level preferred equity financing facility adequate to finance our HPC project pipeline, we believe we are set up for transformative progress. We’re thrilled to have Macquarie backing us as we build our position as a leader in the Tier 3 data center infrastructure space, while we keep developing and running large-scale, state-of-the-art data centers for world-class customers who are at the forefront of the AI revolution. In short, the positive trends we’re seeing across our business encourage us, and we stay confident in our growth trajectory. With that, I’ll hand the call over to our CFO, Saidal Mohmand, who will take you through our financials and give an update on guidance. Saidal?
Saidal Mohmand
executiveThanks, Wes, and good afternoon to everyone. These past few months have been busy ones for our finance and accounting teams, and I'm very pleased to be leading the department in my new role as CFO. I'll start by calling out a few of our recent financial announcements, and then I'll walk through the quarter in detail. Back in November, we closed a $450 million offering of 2.75% convertible senior notes due 2030, and $84 million of that was earmarked for share repurchases; then in December, we announced a $150 million senior secured debt financing facility with Macquarie Equipment Capital and at the same time paid off our senior credit facility with CIM Group. That step let us clear encumbrances on assets along with the parent guarantee. As of today, we announced a strategic partnership with Macquarie Asset Management involving a $5 billion perpetual preferred equity financing facility. Now let's move to the quarter. Revenue for the fiscal second quarter of 2025 came in at $63.9 million, a rise of 51% versus the prior comparable period; the growth was mainly fueled by continued expansion in our Cloud Services Business from deploying additional GPU clusters. Altogether, our Data Center Hosting Segment brought in $36.2 million of revenue, while our Cloud Services segment added $27.7 million. Cost of revenues rose $22.6 million to $52.4 million compared with the prior comparable period, largely because of business growth as more facilities were energized and more services were delivered to customers. SG&A expense rose $9.5 million to $29.8 million, again reflecting growth in the business as more facilities were energized and additional services were provided. This quarter, depreciation and amortization expense climbed to $26.4 million, versus $13.4 million in the same period of 2024. Within that figure, $21.7 million came from D&A in our Cloud segment. That segment's D&A was mostly the result of amortizing our GPU leases over a 2-year period, something we've talked about on earlier earnings calls. During the quarter, we renegotiated the terms of our GPU leases, and that let us stretch the amortization period for GPU leases out to a more industry-standard time line of 5 years; this adjustment cut segment D&A expense by $8.5 million for this quarter. Looking forward, we expect this change to bring D&A expenses down further by roughly $7 million per quarter on a GAAP reported basis. All told, going forward we expect to recognize about $15 million per quarter in the cloud segment for the D&A. Turning to interest expense. Interest expense rose $4.9 million to $7.5 million, mainly because finance leases and interest-bearing loans increased between periods. Net loss attributable to our common stockholders was $138.7 million, or $0.66 on a basic and diluted share. I want to point out that this quarter was affected by the loss on conversion of debt of $25.4 million as convertible debt issued to YA Fund was converted during the period. There was also a loss we recognized on change in fair value of debt amounting to $87.2 million, which came from adjustments to the fair value of the 2.75% convertible senior notes over the 2-week period when the conversion option was recorded as a derivative. That happened before we obtained shareholder approval at the annual meeting on November 20, 2024, to raise our authorized share count. Adjusted net loss came in at $12.6 million, or $0.06 per share. Adjusted EBITDA also rose 93%, reaching $21.4 million. Now turning to our balance sheet. We closed the fiscal second quarter with $314.6 million in cash, cash equivalents and restricted cash, plus $479.6 million of debt. With that, I'll hand the call over to Wes for closing remarks.
Wes Cummins
executiveThank you, Saidal. The hyperscale data center segment is growing rapidly, driven by escalating need for AI functionality, and this is generating serious obstacles around electricity supply in the United States. According to a recent report from Morgan Stanley, a gap of approximately 36 gigawatts in the power accessible to U.S. data centers may emerge by 2028. Resolving this is no easy matter, because bringing new capacity online requires extended planning, regulatory sign-offs, and construction of fresh generation and transmission infrastructure — efforts that may stretch across years or even decades. In light of these conditions, we believe a substantial portion of the surplus power that is available in the U.S. today could be contracted within the coming few years. Applied Digital was one of the earliest firms to see this growing need for power and data centers. Because we expected these requirements, we began building our facilities before the market at large understood how demand was changing. Consequently, we think we are strongly positioned to benefit from these trends. During the past year, our strategy gained further confirmation through strategic investments from CIM Group, NVIDIA, and now Macquarie Asset Management; these investments confirm our vision and approach, and they also reduce our cost of capital and speed up development of our pipeline, turning it into a highly valuable asset for our shareholders. We aim to create a platform for constructing and running several HPC data centers, and this quarter brought substantial progress that we're proud of; we look forward to providing more updates as the year goes on. At this point we'd welcome your questions. Operator?
Nick Giles
analystWes and the team, congratulations on what you announced today. In the release, you mentioned that late-stage discussions are underway with multiple hyperscalers. I was wondering whether you can give us any color on where the due diligence processes currently stand with the other potential hyperscalers? Then my next question: would a point ever come when you would go back into exclusivity with any of these counterparties?
Wes Cummins
executiveNick, thanks for asking. I believe we disclosed in either October or November that the exclusivity we had with the first potential customer had expired. We opened the site up so additional customers could take a look. Those are at varying stages of progress, but it's — once — I would say that once it has been done once, everything is prepared for easy access on — when you are doing the diligence around technicals, the design, fiber, power, all of those things. So those move forward in a much more accelerated way. Does that answer your question?
Nick Giles
analystThat answers it, thank you. Perhaps one quick follow-up regarding the Macquarie investment. How long had you been evaluating comparable deals? And how much did the terms get better across that period?
Wes Cummins
executiveWe kicked this process off last year, so it's probably been 7 months now. We reviewed several proposals. As the market evolved, the year progressed, and given the progress achieved at our site, I believe we secured the strongest terms, and I'm really pleased with how things turned out on the terms we agreed with this structure alongside Macquarie. Still, we ran a full process to ensure we landed the best partner and the best terms.
Rob Brown
analystMoving on a bit more to the hyperscaler conversations. I realize nobody can forecast this with precision, but would you say they're progressing? Are final specifics being worked through? Or have you hit any kind of obstacles? Even a rough sense of where things stand and how much remains would help.
Wes Cummins
executiveRob, thank you. On that point, I'd frame it best through what we've experienced so far — again, a very thorough process, and we've done excellent work from a design and technical standpoint, fiber. The effort there, plus what's being installed at that site, particularly in Ellendale, along with power, all of it has gone well, and we've made enormous progress on that front. With our — today's announcement, I'd say we're reaching what is really one of the final pieces of the puzzle for us, which is — I believe I've said this previously, we — although we have this, I think demand for this capacity, again, I'm not aware of anything at this scale that's available in 2025, and it will let us break into full stack development and operations within the hyperscale market. Yet the final piece here is that we're new, a new entrant. We're a first-time supplier to any of these hyperscalers, and the financial backing from a very well-known partner holding a lot of capital, I think, genuinely helps in checking the box for the last hurdle we need to clear. Still, I'm quite optimistic about finalizing a lease on that facility and then advancing to the next level.
Rob Brown
analystAll right, understood. So with this funding in place, is the next facility — and the backing for, I suppose, another $4 billion plus — how does that widen things out in the market? How might it speed up some of those other conversations you're currently having?
Wes Cummins
executiveOnce more, I believe it's simply the backing overall, correct, since the entire amount goes through full due diligence. There's a reason both sides were keen to get into this partnership. Our power pipeline is strong; our data center development team is strong, our ops team is strong; so as we wrap up this first one, we have a meaningful amount of 2026 power on hand. That's the following step when it comes to marketing across 3 different locations. And what this truly delivers for us, Rob, and I believe this genuinely matters, is it funds — I've discussed this, I think, over our last 2 or 3 earnings calls, we truly needed to push financing and funding down to the asset level. This business is asset-heavy, a CapEx-heavy business. And this represents a massive step toward moving that down to the asset level. So each time we launch a new campus, each time we sign a new contract, there's no longer a question mark about where the equity comes from, how much dilution hits the public company; it simply sets out a very clear road map between the equity commitment and then project finance on the debt side that will be layered on top of that to let us go out and build, as we mentioned in the prepared remarks, over 2 gigawatts of the pipeline, which is what we have in the near term, '25, '26, '27 pipeline to go and build out; but I think what matters here is it gives a very clear road map for how we intend to finance that.
Darren Aftahi
analystTwo things, if I could. First, regarding the Macquarie announcement this morning, is there anything strategic about the process and timing as they relate to the lease? And second, I know you guys already covered this, the multiple hyperscalers in the PR. Is there a scenario in which that 400 megawatts at Ellendale could be divided between 2? Or are you basically down the path where one entity takes all the capacity?
Wes Cummins
executiveThanks, Darren. As for the first question, it's really about arriving at the right terms, and I won't get into whether there's anything else regarding the timing around that. On the second question, it could split. I strongly believe it's going to be a single customer for the entire campus.
Mike Grondahl
analystCan you remind us of the exact amount you had invested in Ellendale HPC? And what amount will you be able to take out through this Macquarie financing?
Wes Cummins
executiveSure, I'll have Saidal respond to that.
Saidal Mohmand
executiveMike, as we noted in the 8-K, we’ve got a little more than $700 million put into the Ellendale campus. And if we assume project financing on the terms entered along the lease, we’re expecting more than $300 million in cash proceeds that we can bring back up to the parent.
Wes Cummins
executiveBut Mike, I think it's worth remembering that the Macquarie Capital facility is in place there. There's some — there's also the additional debt that will be repaid. So when you're working through the calculation between the $700 million and then what we draw out, that debt repayment has to be factored in.
Saidal Mohmand
executiveSo basically, when you look at the Ellendale campus, think of it as the applied requirement on a megawatt basis of $1 million per megawatt from Applied, and outside the Ellendale campus, that's going to go down to $750,000 going forward.
Mike Grondahl
analystOkay. So out of the $700 million, or more than $700 million, that you've put into Ellendale, you'll wind up with a net $400 million once that $180 million of debt is paid off, and then you'll take out some additional capital. So your net investment comes to roughly $400?
Saidal Mohmand
executiveThat's a moving target as well, too. Just think about it, right? We're spending — every month we're putting dollars into the ground in the project as well.
Wes Cummins
executiveRight, so it's kind of a moving target in terms of how much we can pull back out. And yes, that cash does come back out of what's now the HPC subsidiary and returns to the public parent co.
Mike Grondahl
analystAll right, and that leaves a couple more questions. First, Wes, would you mind laying out what your pipeline looks like at present? Macquarie appears able to fund 2 gigawatts. Following that 400, how much additional capacity do you hold, or how much could you secure? Second, and I'm not sure how to put this, but demand sounds fairly healthy given all these hyperscalers — still, how does the pricing environment look?
Wes Cummins
executiveLet me take the second question first. The pricing environment mirrors the demand environment. Plenty of data points have appeared just in recent weeks regarding data center spending by some hyperscalers, and that is a strong signal of where market demand still stands. Turning to the pipeline, Mike, we discussed this on our previous call; we hold other campuses. The total, I believe, is 1.6. That means the 2 beyond Ellendale, 1.6 of campuses where we have 2026 power and 2027 power. Those are the ones where, in certain cases, we have already gone to market with those campuses.
Mike Grondahl
analystSo apart from Ellendale, 1.6 — and is that something you could have ready in '26 or '27? Okay.
Wes Cummins
executiveRight. If you're constructing the whole thing, '27 isn't feasible for all of it, though the first power comes online in '26. And honestly, at this stage that's the only thing that counts. Anyone who hasn't broken ground by now won't have power in 2025. So really we're looking at '26 for the remaining campuses.
George Sutton
analystCongrats on today's Macquarie deal. So I'm wondering, Wes, I realize timing is hard to predict. But in the facility, there seems to be a February 15, 2025 lease signing date that's required for this. Could you speak to that particular date?
Wes Cummins
executiveYes. Thanks, George. So the Feb 2015 is not a date for signing a lease. I'll need to go back and check, but my recollection is that outside date might be in June. The Feb 15 relates to finishing some other items, though it isn't a lease signature date.
George Sutton
analystAnd to make this clear for everyone, my understanding is—tell me if I've got it wrong—this is basically the infrastructure equity piece going forward. So you'd obtain a conventional construction loan for a large percentage. Below that would sit the infrastructure equity, which makes up a fairly significant share of the remainder; that's what this is, right?
Wes Cummins
executivePrecisely; so it's important to draw a distinction here between the equity portion, which is what this deal represents, and then the debt portion, which is project finance that later converts into an ABS or some other debt instrument; so if you consider total capital available once you pair that equity with debt, right, there's a substantial multiplier effect at work.
George Sutton
analystGot it. Then one last thing—I'd like to get a handle on that 15% stake Macquarie is taking in the HPC business. What are they putting in to get it? Is that the initial $200-ish million? Or do they have to fund some particular share of the $5 billion overall?
Saidal Mohmand
executiveGeorge, here's how to think about it: it's really done lease by lease. Every asset goes into what we refer to as—what we call the box of the HPC company, APLDH. So whatever asset enters that entity, they'll hold 15% of it. And assuming that it moves forward—they accept the lease and then it gets funded at the same time as entering into the entity.
Wes Cummins
executiveRight, so whatever asset they fund ends up inside that entity, meaning it comes in one asset at a time.
George Sutton
analystGreat. All right. So in the event they decide against backing a particular project, would the equity not be included then?
Wes Cummins
executiveThat's right.
Brett Knoblauch
analystCongratulations on this morning's announcement. Regarding the ROFR, does it apply only to the perpetual preferreds? Or would you need to use it before, for instance, raising traditional equity via a secondary? In other words, must you use the preferreds before you could take that route?
Wes Cummins
executiveSo think about it on 2 different levels. At the asset level, we want to finance everything with the preferred. As for anything up at the top company, like our public equity that you're referring to, there's nothing on that. And if that isn't what you meant, please correct me.
Brett Knoblauch
analystThat clears it up, I believe. Now, one more thing on — it mentions that Macquarie is going to get preferred and common. Roughly how many common shares will they receive? And what does that mechanism look like?
Wes Cummins
executiveIt comes to 15% of the HPC subsidiary.
Brett Knoblauch
analystSo it's not common of the parent?
Wes Cummins
executiveIt isn't common of the parent. 15% of the HPC subsidiary.
Brett Knoblauch
analystGot it. That's great. Then perhaps just regarding the terms, the 12.75% on the dividend. I believe you folks mentioned lease terms with yields on cost in the range of, say, low to mid-teens, which is roughly the cost of capital on the preferred equity side here. Have terms improved enough that you'd achieve a yield on cost exceeding the cost of the preferred?
Wes Cummins
executiveYeah. Just keep in mind, the preferred represents only a small slice of the capital; the rest of the capital consists of our equity in the site plus project level finance, which is SOFR plus 2.50 or 2.25. So looking at the blended cost, we fully anticipate the return will be comfortably above our cost of capital.
Brian Vieten
analystYou said there have been some lessons learned about the deliberate way hyperscalers approach this. Which of those lessons could you use in the upcoming round of negotiations, some of which might already be underway?
Wes Cummins
executiveYeah. So just getting everything ready that we need to supply as we go through the process — like I mentioned, it moved a lot faster with anyone else because all the prep is there; we have that knowledge base covering what's sought, potential changes down the road when it comes to design, and things keep evolving, particularly around cooling. So that piece is there. And then I think a major one is simply — I'd describe it as getting stamped, right, just making it through the process, executing a lease, being stamped by one of these kinds of customers that we're able to do all of these things, and I believe that will help speed it up. One lesson we've picked up is that as a first-time supplier, it will always take more time than if you're already supplying that company. That probably shouldn't come as a big surprise, I suppose, but the gap between an existing supplier and a first-time one is somewhat bigger than we expected.
Wes Cummins
executiveThanks. I appreciate all of you being here on our Q2 Fiscal 2025 Conference Call. I’m looking forward to talking with all of you in April.
Operator
operatorThanks, everyone — that brings today’s teleconference to a close, and we appreciate your taking part. You’re welcome to hang up your lines now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Applied Digital Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Applied Digital Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Applied Digital Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.