Yujia Zhai
executiveThanks, Operator, and good morning to all of you. It's a pleasure to welcome everyone to the Bitdeer Technologies Group Fourth Quarter 2025 Earnings Conference Call. Here with me today are Jihan Wu, our Chief Executive Officer; Matt Kong, our Chief Business Officer; and Haris Basit, our Chief Strategy Officer. Haris is going to walk through a high-level look at Bitdeer Technologies Group's results for the fourth quarter of 2025, talk about where the company's strategy stands, give a thorough update on the business, and go over the quarter's financial results. Once the prepared remarks wrap up, Jihan, Matt, and Haris will take questions. Alongside today's call, we've made a supplemental investor presentation available on Bitdeer Technologies Group's investor relations website, listed under Webcasts and Presentations. Before management delivers its prepared remarks, I want to remind all of you that we might make certain forward-looking statements during today's call; such statements rest on management's current expectations and carry risks and uncertainties, and those could lead to actual results differing materially. For a fuller discussion of forward-looking statements along with the risks and uncertainties tied to Bitdeer Technologies Group's business, please see the company's filings with the SEC. Beyond covering results determined under International Financial Reporting Standards, or IFRS, we will also cite certain non-IFRS financial measures, including adjusted EBITDA and adjusted profit and loss. For greater detail regarding our non-IFRS financial measures, please see our earnings release that was published earlier today, which is available on Bitdeer Technologies Group's IR website. With that, I'll hand the call over to Haris. Thank you, John, and good day, everyone.
Haris Basit
executiveIt's wonderful to be here with all of you. For Bitdeer Technologies Group, 2025 stood out as a pivotal stretch of execution and strategic advancement. We hit key milestones spanning our three strategic pillars, and we've put the company in position for lasting growth as a vertically integrated Bitcoin and AI infrastructure business. I'll kick things off with a quick look at how we performed financially during the quarter. Total revenue for the fourth quarter came in at $225,000,000, which is a 226% increase year over year and 33% higher sequentially. Gross profit was $10,600,000, while adjusted EBITDA for the quarter reached $31,200,000. Although both of those figures came down quarter over quarter, the outcome mostly mirrors a mix of softer average Bitcoin pricing, somewhat elevated electricity costs, significantly greater depreciation expense stemming from how quickly we've expanded self-mining capacity, plus additional spending on new talent to back our expanding AI HPC initiatives. I'll go into these factors more thoroughly later on in the call. Let me start with a quick rundown of our power and infrastructure portfolio. We kept making solid headway during the quarter, pushing forward a worldwide set of sites that we think are ideally positioned to serve both large-scale Bitcoin mining and next-generation AI and HPC workloads. No matter the region, we stay focused on building power-rich, capital-efficient infrastructure that delivers flexibility, speed to market, and long-term strategic optionality. Looking at energy infrastructure, execution stayed on schedule throughout the quarter. As of January, we had more than 1.66 gigawatts of capacity online, along with a total global power pipeline of three gigawatts. We see this as one of the industry's most appealing and AI-suitable power portfolios, giving us an enormous opportunity as demand for that kind of capacity keeps rising. Over the last several months, market dynamics around AI data center development have shifted considerably. Demand for large-scale colocation capacity has grown substantially, and we've adjusted our approach in response to better capture this opportunity. As a result, we're now giving priority to colocation services delivered in Norway and the United States that fit large-scale AI HPC deployments. Let me take you through a few sites and where our development plans stand. To begin, Teadle, Norway, is our closest-term colocation opportunity. This 225-megawatt facility was built to Tier III data center specifications originally, which leaves us well positioned for conversion to AI workloads. We estimate the retrofit will need far less incremental capital expenditure to install uninterruptible power supply systems, backup batteries, and generation, plus some extra cooling capacity, relative to industry benchmarks for greenfield Tier III data center development, which usually fall in the $8,000,000 to $12,000,000 per megawatt range. The site enjoys hydropower with appealing economics; independent 100-megawatt transformers deliver redundancy. We're presently negotiating leases with several counterparties and anticipate being able to announce a signed lease agreement for Teadle as soon as possible in 2026, though pinpointing the exact timing is extremely difficult. This location ought to be able to handle its first test GPU deployment in late 2026, with the first production GPUs anticipated in early 2027. Next, our Clarington site, at 570 megawatts, stands as one of the bigger AI data center development opportunities anywhere in the United States. We've moved forward on two fronts there. To start, the local utility has sped up our interconnection timeline. And second, we're presently negotiating with several prospective tenants. These are highly recognizable names in the industry, and talks are moving ahead. Although litigation was filed recently that might hold up development at this location, we believe our claims are meritorious and our defense is strong, and we'll seek a swift resolution. Considering how large this site is, even a partial lease or a first-phase lease would mark a major milestone for Bitdeer Technologies Group and would deliver considerable contracted revenue while reducing risk on our development capital. Third, at Rockdale, we're following a strategy that lets us keep our existing Bitcoin mining operations running as we build out new HPC capacity. We're looking at buying adjacent land next to our current facility so we could potentially build a purpose-built HPC data center. That approach would keep disruption to a minimum while we develop the data center alongside our 563-megawatt mining operation, which keeps producing revenue. The greenfield HPC build would be engineered from scratch for AI workloads. The Rockdale site gains an advantage from sitting in the ERCOT market, which offers operational flexibility; we're currently in talks with prospective colocation tenants for this site. This dual-track approach — keeping Bitcoin mining going while building HPC capacity — shows our dedication to both businesses and our capacity to optimize our power portfolio across use cases. Even though we're putting colocation first for our bigger sites, we still see opportunity in GPU-as-a-service for select markets. We're growing our cloud platform in Malaysia by 10 to 15 megawatts, following the success we've enjoyed in Singapore serving customers in biomedical, robotics, and gaming sectors who require fully managed orchestrated infrastructure. Within the United States, we intend to add 10 megawatts of GPU capacity in Washington state and are assessing a partial conversion of our Knoxville site from Bitcoin mining to GPU cloud. Let me be clear that the scale of our long-term US GPU-as-a-service expansion depends on signing customer contracts. We do not plan to deploy large speculative capacity. We expect every major GPU deployment to be backed by committed revenue from enterprise customers looking for meaningful capacity along with comprehensive managed services. This disciplined approach guarantees that we deploy capital where we have revenue certainty. One key part of our strategy is the way we tackle data center development. We've assembled an internal development team with experience in very large data center construction, and we're strengthening that team through strategic hires, partnering with seasoned EPC contractors and general contractors on a fee basis instead of via joint venture arrangements. What this does is give us tighter command of schedules and specs, and crucially, it lets us keep a bigger share of the economic value that comes out of these assets. Going forward, our three strategic pillars will keep driving the growth — mining, ASIC development, and HPC AI. Put together, they form a vertically integrated platform with strong defenses, one that draws on our deep technological know-how, our in-house chip design strengths, and our broad worldwide power portfolio. On the AI compute side, the gap between supply and demand keeps getting bigger, and we see that shortage lasting well into 2027. Time to power matters enormously, and in our view Bitdeer Technologies Group sits in an exceptionally strong spot to serve customers who need capacity both near term and midterm. Turning to Bitcoin mining, our self-mining platform keeps scaling up fast. We closed out the year above 55 exahash per second in self-mining hash rate, and during January by itself we added another eight exahash per second, finishing that month at more than 63 exahash per second. That cements Bitdeer Technologies Group's place as one of the biggest publicly listed Bitcoin miners measured by total hash rate under management. Thanks to the disciplined rollout of our SealMiner fleet, faster deployment of SealMiner rigs has produced substantial gains in efficiency across the fleet.
Haris Basit
executiveWithin our self-mining operations, the SealMiner A2 and A3 are being actively put to work, delivering roughly 15 to 16.5 joules per terahash and 12.5 to 14 joules per terahash, respectively, which puts them at the forefront of power efficiency in the industry. As these next-generation rigs take the place of legacy third-party equipment, our blended fleet efficiency keeps getting better, and as of 01/31/2026, our overall fleet-wide efficiency sits at 17.5 joules per terahash. With SealMiner penetration rising across 2026, we anticipate that our overall fleet-wide efficiency will keep improving, which boosts our mining margins. When we look ahead, our self-mining operations are not plateauing. Tangible results are coming from our investments in chip design. We kicked off mass production of the SealMiner A3 series during the quarter. Shipments got underway in November, and to date we have deployed 8.7 exahash of our SealMiner A3 in total. As we keep retiring older-generation third-party rigs, we expect the A3 series to keep contributing meaningfully to our fleet efficiency improvements and growth across 2026. Turning to R&D, our CLO4 to 1 chip was finished back in September. The CLO4 to 1 marks a meaningful leap in efficiency and puts Bitdeer Technologies Group in position to hold technological leadership as the industry keeps up its relentless push towards lower power consumption per unit of hash rate. Mining rigs built around the CLO4 to 1 chip will enter mass production in Q1 2026. Work on the CLO4 to 2 chip design is still ongoing at our US-based design center. On top of that, we have successfully taped out a new Litecoin chip, SEAL-DL1, built for Doge and Litecoin mining. Initial test results for SEAL-DL1 have beaten comparable rigs on both energy efficiency and hash rate. As for recent market conditions, the CLDL1 delivers higher fiat-based returns per megawatt than our SealMiner A2. Preparations for USA SealMiner manufacturing are still moving forward. This initiative is a core piece of our vertically integrated strategy and lines up with both operational resilience objectives and shifting trade and supply chain dynamics. Now let me take you through our detailed financial results for the quarter. Before I start, I want to remind everyone that all figures I mention today are in US dollars. Fourth quarter consolidated revenue came in at $224,800,000, which is up 225.8% year over year and up 32.5% sequentially. The year-over-year growth and sequential growth in revenue was mainly driven by a significantly higher self-mining hash rate resulting from continued CLMiner deployment, along with contributions from SealMiner sales, partly offset by slightly lower Bitcoin prices for the quarter. Self-mining revenue was $168,600,000, versus $41,500,000 in Q4 2024 and $130,900,000 in Q3 2025, which represents year-over-year growth of 306% and a sequential growth of 28.7%. Continued growth from Q3 2025 levels reflects a significant increase in average operating hash rate and associated Bitcoin production during the quarter, partly offset by 13% lower average Bitcoin prices quarter on quarter. SealMiner sales revenue was $23,400,000, up 105.4% over the $11,400,000 reported in Q3 2025. For the quarter, gross profit came to $10,600,000 in total, which works out to a 4.7% gross margin. That compares with 7.4% in Q4 2024 and with $40,800,000, or 24.1%, in Q3 2025. The substantial drop in gross margin comes from a mix of several factors that hit during the quarter. First, as you'd expect, Bitcoin prices were 13% lower across the quarter, and at the same time the worldwide hash rate kept climbing steadily. Second, looking at costs, our average electricity cost per unit rose by roughly 5% for the quarter relative to Q3 2025, driven mostly by the seasonal winter pricing patterns at our Norway sites. Third, as our self-mining hash rate expands, that brings with it a noncash depreciation charge tied to this new fleet of miners. On top of that, we switched our depreciation calculation methodology this quarter to take a more conservative stance. Under the new approach, rigs are depreciated on a three-year straight-line basis, whereas previously we assumed a five-year depreciable life for hardware. Operating expenses totaled $66,300,000 for the quarter, against $42,500,000 in Q4 2024 and $60,500,000 in Q3 2025. The quarter-over-quarter rise in operating expenses stemmed mainly from these factors relative to Q3: we brought on additional headcount to support mining site operations as well as our AI infrastructure buildout, we booked extra holiday season compensation, and we saw more year-end general corporate activity; all of this spending reflects what our expanding infrastructure footprint requires operationally and the resources needed to carry out our strategic initiatives. Other operating expenses came in at $43,800,000 for the quarter, compared with $3,700,000 in Q4 2024 and other operating income of $26,500,000 in Q3 2025. That was mostly due to the fair value change on Bitcoins pledged for the Bitcoin-collateralized loan since Q3 2025. Other net gain reached $208,900,000 for the quarter, compared with other net loss of $4 and $79,800,000 in Q4 2024 and $238,500,000 in Q3 2025. This mostly stemmed from the noncash fair value change on derivative liabilities tied to the convertible senior notes issued in November 2024, June 2025, and November 2025. Adjusted net loss came to $82,600,000, versus $37,400,000 in Q4 2024 and $36,300,000 in Q3 2025. The larger loss was mainly the result of higher energy and depreciation costs plus greater operating and interest expense, partly offset by revenue that was higher year over year. Adjusted EBITDA was $31,200,000, against negative $4,300,000 in Q4 2024 and positive $39,600,000 in Q3 2025. The decline from the prior quarter was mainly caused by higher energy costs and greater operating expenses from salaries and wages for the headcount we recently added, together with several elevated costs related to year-end holiday allowance and year-end general corporate activities. To give you a clearer picture of our G&A expense on a run-rate basis, our Q4 2025 results include roughly $3,000,000 of salary, wage, and benefits expense that will mostly recur, plus another $6,000,000 to $7,000,000 in consulting, legal, and travel expenses, which can swing considerably from one quarter to the next. Operating activities consumed $599,500,000 in net cash, a figure driven mainly by SealMiner supply chain and manufacturing expenses, plus electricity costs tied to the mining business, general corporate overhead, and interest expense. Investing activities produced $97,900,000 in net cash, a total that includes $50,700,000 of capital expenditures tied to building out data center infrastructure, procuring GPU equipment, and paying tariffs and freight on mining rigs delivered to the data centers, along with $150,600,000 in proceeds from selling cryptocurrencies. Financing activities brought in $454,500,000 in net cash for the quarter, stemming largely from $388,500,000 in proceeds from issuing convertible senior notes, $168,000,000 in borrowings from a related party, and $141,500,000 in proceeds from shares sold through our ATM and ELOC program, partly offset by $171,100,000 in repayments of borrowings; across the full calendar year 2025, capital expenditures for continuing to build out our global power and data center infrastructure came to $176,000,000. As we look ahead to full year 2026, we expect total infrastructure spending to fall within a range of $180,000,000 to $200,000,000 for crypto mining data center construction. Keep in mind that this guidance addresses power and crypto mining data center infrastructure alone and excludes CapEx for SealMiners and GPU. AI cloud and colocation capital expenditures likewise are not part of it. Now let's move to our balance sheet and financial position.
Haris Basit
executiveWe closed out the year holding $149,400,000 of cash and cash equivalents, $83,100,000 of cryptocurrencies carried at cost less impairment, $135,600,000 of cryptocurrency receivables recorded at fair market value, plus $1,000,000,000 of borrowings, not counting derivative liabilities. Those derivative liabilities totaled $501,100,000 and are tied to the convertible senior notes from November 2024, June 2025, and November 2025. That marks a $171,400,000 decrease versus the quarter before, which came from a noncash fair value adjustment caused by movement in our stock price along with settlement of partial principal on the November 2024 convertible senior notes. Like I said before, none of this affects our liquidity or how we operate. When it comes to our outstanding ATM and ELOC facility, we brought in roughly $143,600,000 of gross proceeds over the quarter. That involved issuing approximately 6,700,000 more shares. All year long we've applied disciplined capital allocation, tapping the ATM and ELOC when opportunities arose to fund our growth initiative while keeping dilution to a minimum. One last item for our financial update: we'd like to point out that beginning in Q1 2026, we'll switch to GAAP from IFRS as our accounting standard; in short, we're proud of how our team executed this quarter and all through 2025. I want to say how deeply proud I am of what our team achieved this year. We established Bitdeer Technologies Group as one of the world's largest publicly listed Bitcoin mining operators by total hash rate under management. Our leading position in self-mining, together with our proprietary SealMiner technology, offers multiple paths to value creation that few, if any, competitors can match. The pipeline of developed and contracted power capacity we hold gives us a significant competitive edge in serving a variety of customers. The colocation opportunity in front of us is enormous, and we're going after it proactively; we head into 2026 with strong operational momentum, a differentiated asset base, and a team that has proven it can execute at scale. I'm excited about what lies ahead and remain committed to delivering long-term value for our shareholders. Thank you, Operator. Please open the call for questions.
Nick Giles
analystYes. Many thanks, Operator. Morning, everybody. Haris, I truly value the thorough update, particularly regarding colocation. My first question was simply this — and I'm certain you're talking with a variety of customers — at this stage of talks or conversations, which items are mainly on the table? Does it come down to pricing, length, scheduling? Plenty of effort is still underway concerning design. Any extra detail on where things stand in that process would help.
Haris Basit
executiveEach possible counterparty is different, and everything you listed is under discussion, though perhaps not with the same counterparty. Still, I'm reluctant to reveal too much regarding these conversations. They're delicate, and very active right now. So we feel fairly confident that colocation deals will be completed soon. Forecasting that timing is difficult; and the talks are quite intense with a number of counterparties.
Nick Giles
analystNo, I get it. That helps, thanks. My follow-up was about how we should think of financing. You said some significant things there about capturing a bigger portion of the economics. But on the debt cost of capital side, what should we anticipate, and what sorts of credit enhancements, if any, are you considering?
Haris Basit
executiveFor these projects — the colocation ones — the cost of capital is going to be largely set by who the counterparties are and the specific terms of each deal. So predicting that at this point is difficult, until we actually, you know, come out and say which deals have closed and with whom. Did that answer what you were asking? I'm not certain whether that's the one you meant.
Nick Giles
analystGo ahead and ask.
Haris Basit
executiveThat element matters in every transaction, honestly, because it heavily shapes what development ends up costing. So we're currently reviewing quite a few different strategies on that front. Getting this piece right is crucial to closing a deal properly. That's why it's also getting our attention. Which options are stronger or weaker isn't something I can really judge. A lot rides on who we're dealing with, and beyond that, there are multiple methods available for doing this. The bulk of them have already been utilized within the Marketplace. And honestly, once we make our announcement, I doubt you'll notice anything wildly unlike what's already out there.
Nick Giles
analystAll right, that makes sense. Once more, thanks for the briefing, and keep it up. Wishing you success.
Jihan Wu
executiveThanks.
Mike Colonnese
analystStarting off today, I've got a question about the infrastructure side of things. From what I'm hearing, negotiations are fairly advanced on a possible colo agreement at the Teadle location. I'm wondering which kinds of customers you're talking with, particularly at that campus. Also, Haris, assuming I heard you right, it seems the entire retrofit for 225 megs might wrap up before this year is over. Is there a PUE that you're using for that figure? I realize it's designed with Tier III standards in mind, yet any extra detail would be useful there.
Haris Basit
executiveYes; that's right; we do anticipate that Teadle Norway site being finished at the close of this year, followed by production GPU installation early next year. And the PUE at that location is in fact quite low, and that's among the site's greatest benefits. As you know, it's 100% hydropower. The climate is nicely cold. Plus chilled water can be drawn from a lake close by; so for estimation purposes, the PUE there comes to roughly 1.1. That's substantially better than what most locations offer.
Mike Colonnese
analystUnderstood. And regarding the usual customer profile for that particular site, I realize you're having conversations with a variety of customers throughout the portfolio. With that international facility, I'd just be interested in what kinds of customers you're considering.
Haris Basit
executiveYes. I mean, there's a certain amount of variation, but, you know, a great deal of overlap still exists between the customers in that location and customers in the United States. So, but, you know, I truly don't wish to reveal too much regarding whom we're speaking with and what exactly those deals entail. At this stage, those negotiations are quite sensitive. Understood. Understood. And then when it comes to the Bitcoin mining business, you're among the small number of public miners still quickly growing your self-mining capacity. In 2026, how should we think about growth in this business? Especially as you aim to go after those AI infrastructure deals in various parts of the portfolio? One point to make is that we believe in Bitcoin for the long haul; and, naturally, Bitcoin is currently in something of a down cycle. But over the long term, our belief in Bitcoin holds. And we'll keep putting money into our Bitcoin mining capacity. We haven't provided any projections for what our company's total hash rate could be by the end of this year or in any quarter ahead. That's still being assessed, and we might provide a projection at some later point. However, right now, we have no projections we can share publicly concerning future expansion of our hash rate.
Mike Colonnese
analystUnderstood. Thank you for that detail, Haris, and I wish you the best with these possibilities.
Kevin Cassidy
analystRight. I appreciate you answering my question. Also, congratulations regarding all the capacity you have brought online. Yet perhaps continuing that same line of thought raised earlier, given weaker Bitcoin prices, does a price point exist at which you would reduce your mining operations, since expenses run higher compared with what the hash price would be?
Haris Basit
executiveSuch a price certainly exists, I believe, though we have not hit it as of yet; as you know, the efficiency of our fleet continues to get better. And so it also, you know, when price declines, it would be the whole fleet. Certain portions of the fleet, you know, thanks to the efficiency and thanks to the power cost at that site, are able to keep running for quite a while, you know, through quite a bit more of a drop past this level. And then you would, a number of the older rigs that have been in service for multiple years, those could be shut down initially. Correct? Actually, within our regular replacement schedule, we are going to swap those out. So there is, you know, we have not gotten to that stage at present, and I do not expect that we will. However, you know, naturally, such a price does exist. It is simply far below where we stand right now.
Kevin Cassidy
analystAll right, that's helpful. I suppose if your expenses keep coming down, you're able to tolerate weaker Bitcoin pricing. On a separate note, though, regarding GPU-as-a-service, does a solid market exist for, let's say, N minus one GPU clusters instead of putting capital into the most advanced GPUs available? Is GPU-as-a-service still needed when it comes to older GPUs?
Haris Basit
executiveIndeed, it is. That said, we generally go after the newest and most powerful GPUs. Even so, demand continues to come in for, you know, the H100s we've had the longest, the ones located in Singapore.
Kevin Cassidy
analystAll right. That's excellent. Thank you.
Darren Aftahi
analystHello there. Good morning to you, and good evening as well. I appreciate you answering my questions. Haris, might you expand a bit further on the approximate size and reach of the personnel additions you've brought on board for digital infrastructure as the year drew to a close, which you mentioned, and then also the pace of ongoing spending perhaps in Q1 and on into 2026? At what stage, I wonder, would you consider the team sufficient to really pursue this opportunity?
Haris Basit
executiveSure. What I'd say is that a few of our latest additions have left us quite happy. Individuals we've brought in carry hands-on knowledge in AI as well as in cloud services. Many of those individuals are located in the United States, though some are in Asia too. The group — the count of individuals focused on this effort has increased enormously. An exact figure isn't something I can give. Even so, we keep bringing people on. I don't believe we've arrived at a point where we feel we've got sufficient staff as of yet. Still, we're continuing to search for candidates, particularly when it comes to the engineering side of constructing data centers, where open racks remain; so, no. My expectation is that additional hiring will carry on across the year. A large portion of those individuals will be located in the United States; however, we've likewise carried out considerable AI recruiting in Asia.
Darren Aftahi
analystUnderstood. Then regarding Rockdale, my follow-up has two parts. On the land purchase side, where do things stand, and how long will that process take? Also, I'm aware Oncor plans to add a second substation, and I believe you've mentioned further capacity there — somewhere in the range of over 100 megawatts. Given the back-and-forth happening with ERCOT and its batching decision, I'm just wondering what you think about Rockdale's chances of expanding as a site. Thanks.
Haris Basit
executiveWith the latest news about ERCOT and power distribution in that area, our view is that it won't impact growth at Rockdale. That means the 179 megawatts — up to 179 megawatts — we expect we could add there shouldn't be impacted. I phrase it that way since, naturally, the precise rules remain unknown. They're still being debated. So we do anticipate receiving most, or possibly all, of that extra capacity. As for buying the land, that effort is progressing. Of course, nothing is settled until it's settled, but we are — yes. I'm not certain how best to describe our position in that process, though we are actively working on it. And we anticipate completing it; however, before we do, pinning down exactly when is difficult. Great. Thanks for the insights. Appreciate it.
Greg Lewis
analystHey, thank you, and good morning. Great start. So first, I guess, if we look at the numbers you reported, I think your company is the top bitcoin miner by XFASH among public companies — so congrats on that. I wanted to discuss the GPU business a bit. You mentioned possible expansion. That was quite a statement. The possible growth in Malaysia. Just curious — is that infrastructure we're building, or are we leasing it? And how should we think about the rollout there? I think you said 15 megawatts in Malaysia for the GPUs.
Haris Basit
executiveYeah. That infrastructure is something we're leasing. I'd like to invite Matt or Jihan to chime in on this. They may want to; but could you repeat the latter portion of your question? What's the right way for us to think about the process of getting those 15 megawatts up and running and producing revenue from it? Well, we went ahead and bought some in advance — the GB200 NVL72, I believe — and it was just installed there not long ago. So as of now, that's already in place. When it comes to further machines at that location, my understanding is no announcements have been made yet. So that's really where things stand.
Greg Lewis
analystAll right. Even so, it seems like we might begin to see revenue perhaps during Q2, and from there it could ramp up quarter over quarter across a few periods?
Haris Basit
executiveYes. Honestly, John and Matt have a better handle on that than I do. So I'm not sure whether — is that something you two can confirm as accurate?
Jihan Wu
executiveMy guess is that we can get GPUs placed into those environments sometime in Q3 or Q4 of this year. The timing hinges on when that infrastructure is finished. We won't run any tests. It should be done near June. That said, there could be a slip of one or two months. So I'd say 2024 is the safer, more cautious estimate.
Greg Lewis
analystAll right. That's really useful. Good to everyone. I appreciate you taking the time, and I hope your day goes well.
Jihan Wu
executiveThanks, Greg.
John Todaro
analystHey, awesome. Appreciate you fielding my question and all the additional detail, man. So, I suppose, could we receive a little further insight regarding Clarrington? For instance, is it necessary to have litigation outcomes prior to bringing on an HPC client in that location? You see that in a different way. Perhaps there are any constraints around the schedule there? After that, I've got a follow-up concerning the mining component.
Haris Basit
executiveSince this involves a legal matter, we need to be a bit, you know, cautious about our wording here. You know, our lawyers are quite convinced that our position is strong, that the case has little merit, and that we will, you know, come out on top. And when it comes to the business, we are, you know, looking into an option that could reduce the effect of the litigation. I would rather not go beyond that. You know, as we mentioned in the remarks we had scripted, we do expect there will be, you know, some possible delay. But, you know, we remain confident about the site as a whole; however, it is still early, and we, you know, are reviewing a few major alternatives.
Jihan Wu
executiveYeah. I think the other path, the other path here, we have several other paths available. Developing other paths is how we address those issues. In my view, addressing those issues is extremely important. And when you look at the whole company, Clarrington, Rockdale, and our smaller chin size, we'd have plenty of other paths. Apart from Carrington; that's at the company level. And beneath the Clariton level, we think we have a number of solutions. So I don't believe we're truly stuck in this sort of litigation.
John Todaro
analystAll right, got it. Thanks for that. Now, about that most recent tape out for Dogecoin and Litecoin mining — do you expect to be mining any of those other assets? At the same time as Bitcoin? And maybe I was taking a look at part of the margin profile. There still seems to be some margin in there. But perhaps the opportunity in those too.
Jihan Wu
executiveOkay, so I'd say Bitcoin mining will still account for 98% or 99% of things. Because of the market cap, autochrome mining operations just can't scale up all that much. So we're looking at fairly small-scale operations. But with that kind of capacity, the manual rates yield we get out of it should go up quite a bit. So I figure putting in some effort to add a few is worthwhile. And by the way, this is our first b commanding chip, and the manual machines — how they're designed and made rests entirely with our Singapore and Malaysia offices, plus the Malaysia operation too. The Malaysia operation, we began building it last year or even before that. I believe this product also shows that our supply chain center over in Malaysia has matured considerably. So we'll end up with two supply chain centers for companies — Malaysia and Vietnam. I'd say that's really strategic and matters a lot for keeping our business resilient down the road.
Haris Basit
executiveUnderstood. That is helpful. Thank you, gentlemen. Appreciate it. Thanks, John.
Brett Knoblauch
analystHello everyone, and thanks for letting me ask something. Since we're already a number of weeks past the start of the year, I'd be interested to hear whether you've formed any views on how wafer allocation will shape up over the next several months relative to the prior year. Following on from that, given that the Bitcoin price has been declining, network cash remains resilient, and hash price is hovering around historic lows, does this situation give you a stronger incentive to devote manufacturing capacity toward, say, internal purposes instead of selling it externally? Or put another way, how should we think about the breakdown between the volume you produce for your own needs and the volume you sell during this year? Thanks.
Jihan Wu
executiveWe aren't able to specify the precise figure or circumstances behind that other allocation, though our relationships are quite strong. And despite everyone recognizing that demand tied to the AI business is enormous — many times over. Then take them to rehab, yet we'll obtain some co coda out of extra capacity; plus the hash price has fallen to historic lows as of lately. And it turned extremely hard to make the money work profitably; however we possess our own capacities, or electricity cost ranks among the cheapest available in the market. And our CapEx, so maybe taken all together, we're the lowest in the market. Thus our self money certainly turned into a sort of highly defensive, extremely secure strategy for our companies to guarantee that even under this sort of environment, our Bitcoin mining operations stay profitable. So self deployment is going to be a really key strategy in 2006, particularly amid this kind of quite bearish marketplace. I believe our market share concerning the Bitcoin mining output will keep expanding. Into something.
Haris Basit
executiveGreat, thanks.
Mike Grondahl
analystHi, thanks. So Haris, I just had a question — back on the November call, there was a lot of focus placed on GPU rental, and that's what Bitdeer Technologies Group was looking to pursue. Now it kind of looks like you're tweaking that somewhat at some of the bigger sites, you know, colocation. Could you just explain the shift away, or why it appears you're putting less emphasis on GPU rental at certain of those large sites?
Haris Basit
executivePerhaps, Jihan, you could take that question first, and then I can add something if anything remains.
Jihan Wu
executiveYeah. For me, being right there on the live site, colocation is honestly a pretty natural and solid pick for a company. And when it comes to GPU rental, we’ve got smaller footprints in Washington State and Tennessee State. We can definitely take care of that on our own. And maybe bigger capacitors, since there’s a lot of interest, are besides, like, 10 megawatts or 50 megawatts. They want the nitrocytes regardless, and the nitrocytes in before company better to have some coefficient deal.
Haris Basit
executiveMike, is there anything else you'd like to ask?
Mike Grondahl
analystNope. Hey, let me make sure I've got this right — for the bigger locations, you'll use colocation. For the smaller ones, you'll rent GPUs. I think that's roughly what I took away from it. Does that sound accurate?
Haris Basit
executiveRight, that's accurate. Understood.
Steven Glagola
analystHi, appreciate you taking the question. I've got a couple. The first one is for Haris. Could you make clear if Bitdeer Technologies Group's growth of its US AI cloud business, plus possible growth in Washington and Tennessee, hinges on locking in multiyear reserve capacity agreements? And if that's the case, would one of those commitments mostly be aimed at bare metal deployments — that's the first one. Then the second one, for Jihan and Matt, it would be useful to hear how you see things regarding why USA cloud expansion makes strategic sense right now. How are you weighing, say, long-term competitive advantages in AI cloud as you extend past the Asia-centric footprint you have today? Thanks.
Haris Basit
executiveOn the first part, our GPU expansion within the United States hinges on, you know, getting contracts signed — at minimum, any sizable large-scale expansion does. You know, we could do a small expansion speculatively inside the United States. But as we stated in the statement, anything significant would have contracts behind it.
Jihan Wu
executiveAlso, the data centers belong to us. In today’s US market, I believe that’s a really significant edge. That means by the close of this year, we’ll have the ability to roll out the H300 and roughly rubings using our own data centers. At present, the United States serves as the worldwide hub for AI innovation. Demand here is far greater than in any other market, and US customers likewise simply want one thing. Capacity located on American soil. So we possess that kind of capacity within the US, and we intend to construct it, after which we can construct it. We will complete it. In my view, this will be the single most crucial advantage available in the market today.
Operator
operatorThanks. Thanks. I see no additional questions right now. I appreciate everyone joining today's call; that brings the program to a close. You're welcome to hang up now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Bitdeer Technologies Group transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Bitdeer Technologies Group earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Bitdeer Technologies Group or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.