Bitdeer Technologies Group (BTDR) Earnings Call Transcript & Summary
August 10, 2026
Earnings Call Speaker Segments
Pretesh Dahya
executiveThanks, operator, and good morning to all of you. It's a pleasure to welcome you to Bitdeer Technology Group's Second Quarter 2026 Earnings Conference Call. With me on the line today are Jihan Wu, our Founder, Chairman and Chief Executive Officer; Haris Basit, our Chief Strategy Officer; and Michael Potter, our Chief Financial Officer. To get us started, Haris will walk through the colocation lease agreement in Tydal, Norway that we announced recently, and after that Michael will go over our business segments and the financial results for the second quarter. Before management delivers their formal remarks, I'd like to remind everyone that we may make certain forward-looking statements during today's call. Such statements rest on management's current expectations and carry risks and uncertainties that could cause actual results to differ materially; for a fuller discussion of forward-looking statements and the risks and uncertainties tied to Bitdeer's business and industry, please see the company's filings with the U.S. Securities and Exchange Commission. I also want to point out that we will be discussing certain non-GAAP financial measures and operating metrics today. A reconciliation of these measures to the most directly comparable GAAP measures appears in our earnings release issued earlier today. These non-GAAP measures should not be viewed in isolation from, or as a replacement for, the most directly comparable measures prepared in accordance with GAAP. As a reminder, changes to the fair value of our digital assets flow through GAAP net income and may bring noncash volatility into our reported results. With that, I'll hand the call over to Haris.
Haris Basit
executiveThanks, Tesh, and good morning to all. This marks our inaugural earnings call following the announcement that we executed a $4.7 billion colocation lease in Tydal, Norway. I'd like to start by framing that deal. For a number of years now, we've been assembling a power infrastructure portfolio that we think is ideally suited to serve both our Bitcoin mining business and our move into AI infrastructure. Tydal is a significant milestone in turning that portfolio into long-duration contracted revenue, and it cements AI infrastructure colocation as yet another pillar of our company, sitting alongside our AI cloud, Bitcoin Mining, and ASIC development and manufacturing operations; we're happy with both the terms we secured and the quality of Volta as our counterparty. We see Tydal as a meaningful validation of this approach, and we plan to chase more deals like it going forward. Transactions of this size and intricacy are the product of our team's work across the last several years, and I'd like to thank all those involved for getting us to this milestone. With that said, let me take you through the specifics of the Tydal deal. On August 4, we shared that our subsidiary, Tydal Data Center AS, signed a 16-year colocation lease and services agreement with Volta at our campus in Tydal, Norway. Per that agreement, we're providing 121 IT megawatts, backed by roughly 133 gross megawatts. This capacity will be distributed among 4 existing data halls and will be set up to run NVIDIA GPUs. The lease should produce about $4.7 billion in contracted base term revenue across the initial 16-year term, and an 8-year renewal option, should it be exercised, would lift the potential contract value to roughly $8 billion across 24 years, with a tenant termination right at the conclusion of year 10. The lease is structured with a modified growth arrangement. Volta pays a combined base rent and service fee carrying a 3% annual escalator, and electricity costs get fully reimbursed on a pass-through basis, which shields our margin from energy price swings and delivers highly predictable cash flow. Across the 16-year base term, we anticipate this agreement generating average annual revenue of about $2.4 million per IT megawatt. Notably, Volta's obligations are expected to be supported by an institutional grade credit structure. This anticipated credit enhancement substantially lowers our counterparty risk and boosts the financeable quality of these contracted cash flows, which underpins our plan to obtain attractive debt financing terms to fund the remaining development at Tydal. Our remaining capital expenditure sits at approximately $500 million, which we view as far more capital efficient than a typical greenfield data center build; we expect to raise project level financing to fully cover our remaining Tydal capital needs and to supply significant additional capital. Delivery is organized into 2 equal-sized phases, targeting December 31, 2026, for the first phase and March 31, 2027, for the second. A quick note on our tenant. Volta develops compute infrastructure, with a focus on deploying AI and data centers at scale in markets where power is an advantage. A $10 billion strategic partnership with an AI lab has been announced by Volta, along with a wider development pipeline that exceeds 1 gigawatt. When it came to choosing Volta as our partner at Tydal, we looked at their technical capacity to carry out a large-scale GPU deployment, how solid and enforceable the credit support they anticipate is, and their ability to move quickly enough to align with the expected Tydal construction time line. Worth noting: Tydal will use leading-edge NVIDIA GPUs, ranks among the most reliable grid connections in Europe, runs entirely on renewable energy, and achieves very high energy efficiency, with a PUE of roughly 1.1. At the close of the second quarter, our wider power and infrastructure portfolio totaled roughly 3 gigawatts of global electrical capacity, an increase of about 12% compared with a year earlier. On top of that, we keep assessing chances for more grid connected and behind-the-meter expansion sites around the world, at both new and existing sites. Our goal is simple. Keep acquiring, building and converting powered infrastructure; when it makes sense, we will provide updates on how that is going. I will now hand the call to Michael, who will go through our business segment updates and the financial results for the second quarter.
Michael Potter
executiveThank you, Haris, and good morning to everyone. It's a pleasure to be here with all of you for the first time in my role as Bitdeer's CFO. Our number one priority continues to be execution. The Tydal lease that Haris walked through has been signed at this point. Even so, a great deal of work lies ahead before we reach the first RFS date. As those milestones get hit, we'll provide updates at the appropriate time. From where we sit, what matters most is the quality of altered demand, how robust the financing structure is, and the contractual protections in place. On those dimensions, we think this transaction stacks up very well, and we're eager to prove that through ongoing execution. Going forward, we're seeing a great deal of interest across multiple sites in our portfolio that might be suitable for AI/HPC data centers. One major strength of our approach is that we can keep using capacity for crypto mining right up until an AI data center is ready, which keeps our power assets both productive and secured. Now to our Bitcoin mining business. By the close of the second quarter, self-mining hash rate had climbed to roughly 73 exahash per second, which is up about 342% compared with a year earlier, backed by around 243,000 self-mining rigs in active service. That marks a rise of roughly 113% versus the prior year; we mined 783 Bitcoin in April, 921 Bitcoin in May and 990 Bitcoin in June. Production for the entire second quarter came to roughly 2,694 Bitcoin, representing growth of about 377% from the same period a year ago. Our coal mining hash rate also kept speeding up substantially over the quarter. That mirrors our ongoing rollout of SEALMINERs into facilities owned by third parties; it expanded by more than 260% quarter over quarter; we think having self-mining, co-mining and hosting together provides us with several avenues to turn our expanding SEALMINER output into revenue. As market conditions shift, we can direct hardware toward whichever channel delivers the strongest returns. Our SEALMINER platform keeps strengthening the structural cost edge we hold. Commercial release of our A4 Ultra Hydro unit, which runs at 9.45 joules per terahash at the chip level, keeps driving down our internal cost per exahash. Over the quarter, we additionally brought out the SEALMINER DL1 Hydro, the first machine of ours built for script algorithm mining. That extends our product range past hardware focused on Bitcoin. Because we manufacture internally, we avoid third-party markups when putting SEALMINER rigs into our own fleet. That continues to be a structural cost benefit compared with other mining operators. In July, we held a groundbreaking for our first manufacturing site in the U.S., a 187,000 square foot SEALMINER manufacturing facility located in Sparks, Nevada. Completion is anticipated by the end of 2026, and it will be able to turn out 10,000 units per month. It should generate roughly 70 high-quality local jobs. At the Massillon, Ohio site, we currently have 174 megawatts of capacity online for mining; with reconstruction of 2 previously fire damaged buildings now underway, a significant portion of that cost has been recovered through supplier insurance coverage. We think the related capacity could be energized in phases over the third quarter. Back in June, we started construction at our site in Fox Creek, Alberta. That project represents a $155 million investment and it features a fully permitted 101-megawatt on-site natural gas power plant, complete with grid interconnection. A closed-loop dry cooling system is what the site relies on. Under Alberta's Bring Your Own Generation framework, we have the ability to curtail compute workloads and sell power back into the grid. During the quarter, our AI business kept scaling up. By the close of June, AI cloud annual recurring revenue had hit roughly $76 million, which is up about 77% compared to the prior quarter. Across 4,248 deployed GPUs, utilization stood at roughly 95%. In Malaysia, we additionally signed a fresh 10-year lease covering 21.7 IT megawatts of capacity, with handover anticipated during the first quarter of 2027. The design is meant to accommodate 128 NVIDIA GV300 NVL72 systems. When it comes to products, we brought NVIDIA's Nemotron 3 model onto our Bitdeer AI model studio on the very first day it launched. Now shifting to our financial results. Revenue for the second quarter came in at about $228.8 million, which is an increase of roughly 47% versus a year ago and about 21% from the previous quarter. Growth compared to last year was mainly fueled by ongoing expansion of our self-mining hash rate and the resulting rise in Bitcoin production, plus a growing contribution from our AI cloud business, which added $14 million — a jump of approximately 284% quarter-over-quarter. Total gross profit came to negative $8.5 million, with a gross margin of about negative 3.7%. Importantly, that marks a $30.5 million improvement sequentially, which showcases the operating leverage of our vertically integrated model. Two key factors drove this recovery: seasonal power costs returning to normal, which fell roughly 15% from the prior quarter, and our blended fleet efficiency improving to 15.8 joules per terahash; when looking at it year-over-year, our gross margins still reflect ongoing but easing pressure from extra depreciation expense tied to our growing mining fleet, along with a hash price environment that remains difficult. Adjusted EBITDA was about $31.1 million, up roughly 575% over the year and approximately 116% sequentially. This quarter-over-quarter gain demonstrates the operating leverage of our vertically integrated model as both hash price and power cost dynamics keep stabilizing. Operating loss for the quarter totaled $101.7 million, and net loss per share was $0.37. Moving on to the balance sheet and cash flow. Net cash used in operating activities was around $158.5 million, an improvement of about $188 million sequentially. That came about because of capitalizing SEALMINER-related inventory into PP&E as we allocate those rigs for internal use. We closed the quarter with roughly $496 million in cash, cash equivalents and restricted cash, versus approximately $298 million at the close of the first quarter. Total long-term debt stood at roughly $1.8 billion, down about $78 million from the prior quarter. The cash increase mainly reflects $457 million in proceeds from our at-the-market equity program during the quarter; we see this as a prudent capital raise, establishing the liquidity reserve needed to execute on our AI/HPC pipeline, powered land acquisition priorities and to help ensure our Tydal site stays on schedule. Earlier today, a fresh shelf registration statement was submitted by us, because the capacity under our prior shelf — roughly 1.5 years in age — had mostly been exhausted. As a well-known seasoned issuer now, we become entitled to automatic shelf registration. Given how our business has grown in both size and scale, we additionally submitted a prospectus supplement shifting our current ATM program onto the new shelf and drawing down $1 billion for offerings under that program. Going forward, we anticipate diversifying our capital sources, with a substantial portion of what remains of our 2026 financing requirements being satisfied via project level debt financing, grounded in the objectives we discussed before regarding entering the debt markets for Tydal. We anticipate that this debt financing will additionally free up meaningful incremental liquidity to back our wider AI/HPC pipeline. Wherever the underlying contracted cash flow provides support, our inclination is to place non-dilutive project level financing ahead of equity issuance. In line with that, during Q2, cash produced by our mining operations along with debt collateralized by our wafer bank — rather than equity issuance — covered all of our Bitcoin wafer spend; regarding guidance, our full year crypto mining infrastructure capital expenditures are being revised to $200 million to $280 million, prompted by further infrastructure development opportunities we identify across North America. Keep in mind that this guidance leaves out CapEx for SEALMINER hardware, GPUs, AI cloud or colocation development. When it comes to expenses, we keep actively managing overhead while scaling the organization to back our growing colocation and AI cloud businesses together with our core mining and ASIC manufacturing operations. Furthermore, we anticipate that our general and administrative expense run rate during the second half will mirror the added headcount and infrastructure required to support such growth. In summary, Q2 proved a solid quarter for Bitdeer. Over the last few months, our capacity to deliver on our HPC/AI objectives has been clearly shown. At Tydal, we completed our first major AI infrastructure colocation lease agreement, formally starting our colocation data center business as a core pillar of the company. This milestone was achieved on compelling terms, alongside the partner, Volta, whom we are thrilled to work with. Scaling of our underlying power portfolio keeps happening. Strong momentum is being shown by our AI cloud business, while our Bitcoin mining and SEALMINER platforms highlight the advantages of vertical integration. We appreciate your joining us this morning. Operator, kindly open the call for questions.
Nick Giles
analystHey everyone, nice work closing that first deal. You mentioned the pipeline and evaluating fresh possibilities around the world. I was just wondering if you could lay out some of what you're seeing beyond the U.S., and how soon those might come together?
Michael Potter
executiveLet me make sure I've got your question right. You're asking about what possibilities exist for us outside the U.S.?
Nick Giles
analystRight, that makes sense. I was simply trying to understand the pipeline outside the U.S. a bit better. What number of megawatts are you currently evaluating? Also, when is the soonest that any of those megawatts might start operating?
Michael Potter
executiveI'm certain Jihan can add some further detail here, though it's true that we have many sizable prospective clients based in Asia who are gradually beginning to come online. The GPUs we already have in Asia are pretty heavily utilized, and as those customers come online, we anticipate bringing on additional capacity. Whether Jihan has anything more he'd like to mention, I'm not sure.
Jihan Wu
executiveWhen it comes to GPU deployment, my sense is that most of it happens in Malaysia before long. We've already got a data center under contract, plus additional opportunities that we're actively talking through, and on the demand side things look very robust as well. It's also a multiyear contract with strong profitability. Our own execution is the bottleneck at this point, so we're pretty occupied with carrying out those AI contracts in Malaysia. After that comes Norway; we set aside roughly 50 megawatts for ourselves there — slightly under 50 megawatts, if I recall — and that will arrive somewhat later than Malaysia does. We expect it within the coming year. Beyond that, a few of our U.S. data centers will be brought online in Tennessee and Washington.
Nick Giles
analystThat's useful. Would you think about any new locations beyond the U.S. when it comes to colocation? Or do you see any chances to expand within your European footprint on the colocation side?
Jihan Wu
executiveIn Europe, we are actively seeking other opportunities involving power assets. But no deal has been completed by us as of yet, so in my view it is too soon to genuinely discuss what we plan to do in Europe; and at present, executing the deal in Tydal ought to be where our focus lies. For us, I think that matters a great deal. Should we manage to execute it, revenue and cash flows will be produced by us. I think that's — and a kind of credibility regarding our data center execution will also come from it; so for us right now, I think that is extremely important.
Nick Giles
analystGot it. And perhaps just one additional item, if that's alright. From what I gathered, if my reading was accurate, specifically at the Knoxville location, the project underwent a complete redesign, and I think the timeline for being ready for service got nudged out a bit. Could you elaborate — maybe give us a bit more context regarding what caused that? Was it something a potential customer pushed for? Or was it simply a matter of aligning better with NVIDIA architectures? What prompted it?
Michael Potter
executiveI'm not sure whether you'd like to address that, Haris, or if you'd prefer I step in on it.
Haris Basit
executiveI think probably best for you, Michael.
Michael Potter
executiveSo as we've taken our offering out to the market and examined what's needed at our site in Tydal, Norway, at first our assumption was that Tennessee would involve 2 distinct projects, yet what the market wants is more of a single, larger, monolithic block of megawatts delivered at one location. So rather than keeping 2 smaller separate sites within our larger site, we redesigned it to become just one data hall complex. That's the redesign we carried out, and it comes directly out of the conversations we've had with prospective customers and what they need.
Jihan Wu
executiveThat expectation is really in line with what we're calling the second phase. So you'll see a limited Phase I, then Phase II as a single phase, and everything comes online simultaneously; looking at it, the anticipated Phase II has actually slid quite a bit, though Phase I will activate early at a low level.
Mike Grondahl
analystCan you take a moment to explain how Volta ended up being the pick, and perhaps what their demand could eventually reach? Then second, regarding Rockdale and Clarington, what comes next at each of those locations?
Haris Basit
executiveI might begin with Volta, then let Michael or Jihan address the remaining sites. The reason Volta was selected comes down to how well they've performed in discovering creative approaches to serving this industry — across the capital markets, the clientele they've brought in, and the agreements they've signed with that customer. They could also act quickly, which mattered to us at Tydal given that the site goes live within merely a few months. Beyond that, the commercial terms proved quite attractive overall, so at Tydal we felt they were the correct partner. Their eventual demand has room to grow considerably, though naturally they are only at the beginning; therefore, we — the first lease covers 121 IT megawatts.
Mike Grondahl
analystUnderstood. So could you give us an update on what's next for Rockdale and Clarington?
Michael Potter
executiveI'm not sure whether Jihan would like to chime in with more detail, but at Rockdale we're still expanding the power infrastructure, following the schedule we laid out before. That work actually came before the batch or the site's power allocator. Meanwhile, behind the scenes, we're getting ready for what we think would be required should we decide to put an AI data center there. As for Clarington, at the moment we're building it out for crypto mining. Electricity will be ready shortly, and we want to make sure we're using all of it. On the Clarington lawsuit, there isn't much new to report. The judge rejected the motion to dismiss we had submitted, which happens often in this kind of pretrial stage, and the case has now entered discovery. Our view remains that this lawsuit lacks merit, and we're still working on it.
Kevin Cassidy
analystNice work securing Volta. I've got a couple of questions about that. So, given that the Texas state government has halted new data center grid connections, and Haris, perhaps you already mentioned this, what impact does that have on your colocation prospects in Texas?
Haris Basit
executiveMichael, would you like to take that question?
Michael Potter
executiveCommenting firmly on that remains somewhat premature, since the real criteria are not out yet. Regarding our single large site in Texas — Rockdale — everything happening at that location belongs to pre-batch 0 and has nothing to do with it; that's what we're working on. Once the news actually surfaces and the criteria are released, I believe we'll be better placed to speak with greater specificity.
Kevin Cassidy
analystAll right, that sounds good. Now, given that Volta is a major Neo cloud player operating globally, could there be an opportunity simply to broaden the partnership you have with them into additional locations?
Haris Basit
executiveNaturally, that possibility does exist when it comes to Volta, though nothing has been made public about it at this point.
Kevin Cassidy
analystAll right. There's one more thing I'd like to ask about: going forward, what's the right way for us to think about SEALMINER rigs, both for our own purposes and for selling to outside parties?
Michael Potter
executiveAt present, with the wafer stock we currently hold, we've set that aside for our own needs. Given how tough the hash rate environment is and how much we want to grow our self-mining and co-mining operations, we chose to keep it in-house. We've got both the ability and the available capacity to put it to work, and doing so is the surest path to making it productive and bringing in cash. This shows how adaptable our model is: we hold a decent chunk of powered land that's still in earlier phases of development for other purposes, and we can move fast to stand up cryptocurrency mining there and confirm we're earning money from that power. Beyond that, when the power keeps being used, there's a smaller chance the utility will attempt to redirect it elsewhere away from the land. That's why being able to respond quickly matters once land enters our portfolio and gets utilized, and our crypto mining activity is a major plus in that regard.
John Todaro
analystNice work on getting that lease done. To start, regarding that agreement, the signed capacity was 133 gross megawatts. My understanding is that we've got 225 available at that location. I'm just curious why Volta chose not to take the entire amount, and whether some is being held back for cloud purposes. If that's the case, what's the reasoning behind that approach? Then I have one more thing to ask.
Haris Basit
executiveThe total power capacity at that site is actually 180 gross megawatts. Out of that 180 gross megawatts, we are leasing 133 gross, which translates to 121 IT megawatts going to Volta, while keeping 47 megawatts gross for our own AI cloud operations at that location. As you're aware, this market shifts constantly. There's significant movement in both the colocation and AI cloud sectors; we believe substantial opportunities remain for us in Norway utilizing the 47 megawatts we've kept. No final determinations have been made regarding precisely how that capacity will be used or who will ultimately benefit in terms of the end tenants at that site. We view this as considerable potential upside, and we believed keeping that power for our own purposes would be advantageous.
John Todaro
analystGot it. Then I just want to ask one thing about the credit guarantee. In the past, we have observed situations where you have something like a Neo cloud, and the offtaker is an entity similar to Anthropic, yet a chip maker or a hyperscaler still plays a role in that credit guarantee. Could you take us through a bit more of how that process functioned, and perhaps what other options you were considering before you ultimately decided on the current structure?
Haris Basit
executiveYes. I would rather not discuss the alternatives we reviewed, because in many cases those are proprietary; however, the letter of credit structure in this case, I believe, is very helpful, and it could prove very helpful to the entire industry, since for the first time it has backing — or credit backing — from a party other than, as you mentioned, a chip vendor or a hyperscaler. That creates additional funding opportunities. And it represents a very high level of very high rating for letters of credit from the kinds of banks we anticipate these letters of credit will originate from. So we recognize this is innovative and new for the industry, but we believe it will be something that gains traction.
Brett Knoblauch
analystI've got a handful of questions, Haris, regarding the Tydal lease — I sort of mentioned that another $500 million of CapEx would be required. I'm wondering what amount you folks have already invested into that site, let's say, not counting the extra CapEx you still need?
Haris Basit
executiveIn fact, let me turn that over to Michael so he can address how much has truly gone in.
Michael Potter
executiveWhat I'd say is that we've already invested hundreds of millions of dollars in development on that site, and part of that money went toward the AI data center as well as the original work to build the site out for use as a cryptocurrency site. So a fairly sizable investment was made there previously, and that got us ready to move very fast once this opportunity presented itself. Rather than being a fully greenfield site, this one is more brownfield, or semi-developed. That's what let us move so quickly and hit the time lines Volta was looking for.
Brett Knoblauch
analystGot it. And at a high level, how do you plan to split your capital between, say, leasing out some of the power land you own versus constructing your own AI or growing your AI cloud operation? If we consider Volta alongside your AI cloud, in a sense those two likely go head-to-head, since both of you are selling compute. Do you lean toward wanting a larger presence on the cloud side? Will it be some kind of blended strategy? How are you all approaching this internally?
Michael Potter
executiveI believe Jihan can offer more detail on that, but we're staying flexible. Should a solid colocation opportunity come along that we believe serves the company's interests best, we're still able to move forward with something like that. And when we consider what's possible through owning the GPUs on our own or supplying the GPUs on our own and serving a customer on our own, that's also something we seriously weigh. We've stated that we will pursue one path or the other as the sole method of doing it.
Brett Knoblauch
analystGreat. And perhaps if I could just add one more question after that. When I consider roughly 3 gigs of current power plus capacity set to come online across the coming quarters, I suppose, is there a particular location we ought to be watching that's closest to being ready, or the upcoming catalyst for either getting leased or getting converted? Or anything we should keep in mind regarding how the future catalyst ramp shapes up here?
Michael Potter
executiveI believe Jihan touched on this somewhat earlier — over in Asia, we can expand rapidly in Malaysia thanks to the fresh site we've committed to there. So looking at the immediate near term, Malaysia strikes me as where you'll notice the greatest amount of activity. When you check the table, the 2 we give you — Washington State and Tennessee — are the ones more or less earmarked specifically for that purpose, where we're busy at work and building and so forth. So as far as any near-term announcements go, those are the 2 most probable to surface. The remaining location truly hinges on where things stand in our negotiations with customers and what we choose to activate there. And once that unfolds, we'll be sure to bring everyone up to date.
Mike Colonnese
analystNice work on the Tydal transaction. It's good to see that happen. There are 2 things I'd like to ask. To start, regarding the AI/HPC segment, Haris, you mentioned a little about it before, and I just wanted to dig deeper. Could you share what the intended purpose is right now for that extra 47 megawatts of gross capacity at Tydal? From what I gather, you're looking at either a model where GPUs are provided as a service or perhaps a different colocation arrangement. Should you go with some kind of colocation contract, might Volta want a piece of this added capacity? Alternatively, would you take that to market and pursue fresh potential tenants?
Haris Basit
executiveWell, I'd rather not put words in Volta's mouth during this call, yet Volta has shown considerable enthusiasm about growing the relationship between us, and we'll weigh that alongside various other possibilities.
Mike Colonnese
analystAnd so, simply considering the current state of GPU pricing, clearly, all of you have achieved a degree of success in that segment too. Would you say there's a greater or lesser chance that you'll put your own GPUs to work to take advantage of that extra 47? Or is it your view at this point that the colocation approach would be the one you'd favor?
Haris Basit
executiveNo final choices have been reached by us regarding the 47 megawatts; however, if what you want is a comment looking ahead, I'm not sure, Jihan, whether you'd like to provide a bit more detail on that.
Jihan Wu
executiveTo be honest, we already have certain customers who are engaged in conversations with us regarding those capacities. So when it comes to any GPU deal, both the financing side and the deployment technical side have to be taken into account together; therefore, I believe at this moment, it isn't really the appropriate time to say too much. As for where we stand on execution, I'd say Malaysia is currently at the forefront of it. That means we've received a great deal of interest from customers, and our focus will be on getting them to talk through some initial capacity. Following that, we will begin executing those 47 megawatts of AI cloud from Tydal.
Mike Colonnese
analystThen I have one additional question, this one regarding Bitcoin mining. Bitdeer is among the small group of miners that kept growing capacity aggressively despite the current conditions, which really puts you in a strong spot for the coming phase of the cycle. I'm just wondering how we ought to approach hash rate growth during the second half of the year? From what I understand, you've got the wafer inventory needed to build, roll out, and produce your own SEALMINERs for your own proprietary needs. I'm just attempting to work out the best method for modeling hash rate expansion going forward.
Michael Potter
executiveBroadly speaking, when it comes to modeling, if you consider the consistent gains we've posted across the past few quarters, it should look comparable, with roughly the same quantity of mining machines being deployed each month moving ahead. So it's going to be — my view is it won't speed up dramatically relative to where we stand now, but rather a consistent rollout at a fairly elevated pace, just as we've demonstrated across the past few quarters.
Kevin Pimental
analystKevin here, filling in for Brian. Regarding Tydal, what does Bitdeer still have to get done from this point until Phases 1 and 2 both begin?
Haris Basit
executiveWell, I mean, both Phase 1 and Phase 2 are full RFS, correct? That means when those dates arrive, everything will be fully prepared for the customers' GPUs. So in effect, every one of the long lead time items has already been ordered. They'll show up — the planned arrivals fall ahead of each RFS date. What remains is finishing the installation of those items. Commissioning is another piece of this that matters a great deal too. So as it stands, things are in a very good state. An engineering analysis has been done, and it appears we will meet the target dates we've set. Off the top of my head there are probably 100 tasks involved, though I couldn't list them for you, and hundreds of people are on site working on this, so it's progressing. Nothing specific stands out as more critical than the rest that might create a problem. So we feel we're in a pretty good position to hit those dates.
Kevin Pimental
analystUnderstood. Next, Bitdeer said not long ago that it would take a 21.7 megawatt data center in Malaysia on lease for AI cloud. Could you provide further specifics, such as the expense and the way you fund the GPUs along with any other infrastructure required? At what point do you anticipate this data center being prepared for your customers? And after that, perhaps you could give a range, at full capacity, for what the yearly revenue run rate from this data center would come to?
Michael Potter
executiveYes. Discussing details and a forward projection on that is a bit premature. I'm certain Jihan can offer some added color, but we do have a number of customers expressing interest in it; and the financing of GPUs is going to hinge on whichever contract we hold and the manner in which it must be structured according to that contract. If you have a high-quality customer providing backstop for the GPU usage, locating financing for GPUs tends to be far simpler.
Ben Sommers
analystHaris, you brought up looking into some behind-the-meter possibilities. I'm aware you're handling a bit of on-site generation up in Alberta, but could you share anything more about early talks or actions taken toward building out behind-the-meter power going ahead?
Haris Basit
executiveAside from what we've said before regarding Alberta, I'd say it's too soon to discuss that for any other location. Should any of those efforts progress further, we can bring it up down the line.
Michael Potter
executiveWe've mentioned that this is the initial location, yet we also possess the capacity to grow it; so in Alberta, beneath their bring your own power initiative, this serves as a kind of proof of concept for us, along with stranded gas being available in a fair number of places across Alberta, which more or less guarantees a sensible supply at sensible prices. It's a location that, should Fox Creek perform well for us, we can expand within. Applying the identical approach and the internal capabilities we've been building, we've examined additional locations where we could accomplish more. And should we choose to proceed, everyone will be brought up to date at that point.
Ben Sommers
analystThat's really useful. Then, quickly, regarding the AI cloud business, we talked about the growth there. I'm just wondering, when it comes to the duration of new GPU cloud agreements, what are you observing, and perhaps how does that compare, or how has it shifted during the last 90 days?
Michael Potter
executiveHaris or Jihan, would either of you like to say anything about that?
Jihan Wu
executiveAt the moment, whenever we're in talks with customers about CPU agreements, the main emphasis is on longer-term deals — I'm talking about 5 years — we aren't devoting much time to negotiating anything shorter; and our growth is going to be driven largely by that sort of long-term arrangement.
Michael Potter
executiveAppreciate all of you being here, and we're eager to talk with you again before long. Operator, please go ahead and close out the call.
Operator
operatorThis concludes today's conference call. Thank you for your participation. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Bitdeer Technologies Group transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Bitdeer Technologies Group earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Bitdeer Technologies Group or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.