Good day, everyone, and welcome to the webcast for CLP's 2020 Interim Results Announcement. Our interim results were released earlier today at the Hong Kong Stock Exchange at roughly mid-day, and they're now up on our website as well, together with the presentation we'll be going through today. Here on the stage with me are our CEO, Mr. Richard Lancaster, and our CFO, Mr. Geert Peeters. As per our usual protocol, they'll take you through the presentation first, and following that, we'll open things up for a question-and-answer session. Dedicated telephone lines have been set up for local analysts who have preregistered. <<operator_script>> That covers the formalities, so I'll now pass things over to Richard Lancaster to begin today's presentation. Please go ahead, Richard.

Richard Lancaster

executive
#2

Alright, good afternoon everyone, and many thanks for being with us on today's webcast. 2020 has gotten off to a tough start, with COVID-19 affecting communities across the globe. On our side, the priority has been looking after our people and our customers, keeping electricity supply reliable, maintaining business resilience, and backing relief efforts in the communities where we operate. Given these challenging conditions, I'm glad to say that the work of our teams across the business has kept underlying performance broadly consistent with last year. In Hong Kong, we've concentrated on high reliability and high service levels while moving forward with infrastructure investments under the development plan. In Mainland China, the early hit from the COVID-19 outbreak was offset by the diversified nature of our generation portfolio. In Australia, margins came in lower because of retail price reregulation, weaker demand and shifting market conditions. Overall, business performance was broadly consistent with last year, apart from Australia, where underlying financial performance was markedly lower. Even so, operating earnings rose by 12% once significant favorable fair value variations on our hedge portfolio for Australia were included. Our outlook stays cautious and will depend on how quickly economic recovery takes hold in various markets.

Richard Lancaster

executive
#3

Our priority will be safeguarding cash flow, fulfilling the investments under the development plan so that Hong Kong government energy policy objectives are met, and putting capital into the energy transition. On the financial side, operating earnings came in at HKD 6.1 billion, which is 12% higher than the first half of last year. The main driver was a substantial turnaround in fair value adjustments in Australia. Operating earnings per share stood at HKD 2.43. The Board has recommended a second interim dividend of HKD 0.63 per share, matching both the first and second interim dividends of 2019. Total earnings reached HKD 6 billion, or HKD 2.38 per share. For comparison, in the first half of last year we recorded a goodwill impairment for EnergyAustralia, and as a result total earnings were negative at that time. We have come through this period with resilience in the business and very little disruption, keeping a strong financial position that supports funding for our operations. CLP is committed to 0 harm across all our activities and operations. Over the past year we have made concerted efforts to strengthen safety performance, and it is encouraging to see injury rates lower than in the first half of last year; we will keep up those efforts in this area.

Richard Lancaster

executive
#4

Reliability in Hong Kong remains exceptionally strong. Although our customer accounts grew, electricity sales came in a bit lower for the first half. In Australia, fierce competition at the retail level has cut customer accounts, and COVID-19 dealt a further blow to electricity sales. We kept decarbonizing our generation portfolio, adding renewable projects in India and China, while growing gas generation capacity at Black Point in Hong Kong and Hallett in Australia. Electricity center out was marginally down, driven by reduced generation from Jhajjar. I'll now pass it to Geert Peeters, who will walk you through our financial performance in more detail.

Geert Peeters

executive
#5

Thank you, Richard, and good afternoon, everyone. Results for the first half of this year showed that COVID-19's effect on our operations was mitigated. Revenue fell 12%, mainly because of Australian sales, which dropped 17% when measured in Australian dollars and 23% in Hong Kong dollar terms after accounting for depreciation of the Australian dollar. Pressure on operating margins and cash flow persisted across our businesses, but underlying operating performance proved resilient in Mainland China and Hong Kong. In Australia, underlying performance declined in step with the revenue decrease, although operating earnings rose once fair value changes on our energy hedging contracts were factored in. Accordingly, group operating earnings came to HKD 6.1 billion, up 12% from the first 6 months of 2019. Items affecting comparability consisted chiefly of a HKD 119 million revaluation loss on an investment property. A year earlier, we booked an impairment of retail goodwill at EnergyAustralia. Once items affecting comparability are adjusted for, total earnings stood at HKD 6 billion, versus a loss of HKD 907 million reported for last year's period. As everyone knows, we rely on adjusted current operating income, or recurring EBITDA, when discussing underlying segment operating performance.

Geert Peeters

executive
#6

The key thing to note when reconciling operating earnings to ACOI is that the sign of the fair value adjustments reversed between the first half of 2019 and the first half of 2020. In the prior year, forward prices in the wholesale electricity markets climbed steadily, which produced a negative mark-to-market, or fair value, change on our energy hedging contract. By contrast, this year wholesale prices in Australia came down, generating a positive fair value change. The net effect of this shift is a year-on-year variance of HKD 1.1 billion before tax, or roughly HKD 750 million after tax. Finance costs came in lower, reflecting both a reduced amount of perpetual capital securities and lower rates. Higher income tax, meanwhile, stemmed from the higher profit in Australia, among other factors. As a result, we delivered a consolidated ACOI of HKD 8.6 billion, which is a 3% reduction compared with the first half of 2019. Although headline ACOI fell 3% year-on-year after adjusting for foreign exchange movements, normalized ACOI was essentially flat. The negative foreign exchange impact, totaling around HKD 222 million, mainly reflects depreciation of the Australian dollar against the Hong Kong dollar.

Geert Peeters

executive
#7

This chart makes it quite clear that the change in ACOI across the 2 periods came mainly from Hong Kong and Australia. Now I'll go through each business unit in more detail, one at a time. Let's begin with Hong Kong. Once again, the operational results of our Hong Kong business were reliable. Electricity sales locally fell 1.2% versus the same period a year earlier. Measures introduced to curb the spread of COVID-19 hurt sales across all sectors except residential. Residential sales rose because more people were spending time at home, and higher temperatures in May and June meant air conditioners were used more. We hit a new local demand peak of 7,264 megawatt, an increase of 58 megawatt, or 0.8%. That gain would have been even larger if we had not activated demand response. Even with COVID-19 restrictions, we kept making headway on decarbonizing Hong Kong's electricity generation. This covered commissioning the new gas-fired generation unit at Black Point for baseload operation, ongoing work on new gas supply sources and infrastructure, the landfill energy from waste project, the rollout of smart meter installations, and strong uptake of our solar Feed-in Tariff scheme. On the financial side, ACOI rose 4%, reflecting a 3.6% increase in average net fixed assets in the first half of 2020 compared with 2019.

Geert Peeters

executive
#8

Capital expenditure during the first six months of this year came to HKD 4.2 billion. As we look ahead, our decarbonization efforts will carry on. And we remain on course to help meet the government's goal of roughly 50% gas-fired generation in Hong Kong this year. We'll keep building out new gas-fired generation capacity, and construction of the offshore LNG terminal will move forward. Our pursuit of renewable energy, along with energy efficiency and conservation initiatives under the new SoC, will continue. We'll also stay focused on reliability and on supporting customers who need help in these challenging times. Turning to our operations in Mainland, China. Reliable earnings are coming from our diversified portfolio there. Following the initial hit from COVID-19 in the first quarter of the year, our business began to recover in the second quarter, as did the economy in Mainland, China. Excluding renminbi depreciation, ACOI rose by approximately HKD 79 million, or 5%. More than half of the earnings in Mainland, China came from our nuclear projects. Daya Bay ran reliably, as always. Higher production was helped by the sixth unit at Yangjiang, particularly in the second quarter. However, earnings recorded by CLP from Yangjiang were lower, mainly because of a lower VAT reference and a higher spend fuel levy.

Geert Peeters

executive
#9

Results from our renewable portfolio got a lift from a new wind project plus stronger solar resources, though weaker hydro resources partly offset that. Regrettably, renewable national subsidies paid by the central government for renewable energy keep arriving late. The total sum owed to our subsidiaries has reached HKD 1.6 billion. Contributions from our thermal projects rose, partly because coal prices were lower and partly because seasonal competition from hydro power plants was lower for our Fangchenggang plant in Guangxi. Starting in April 2020, CLP and other partners began supplying electricity to customers via an incremental distribution network in the high-tech zone at Fangchenggang. Going forward, how quickly things recover from COVID-19 restrictions and how fast electricity demand rises will be major factors shaping margins and financial contribution in the second half. In addition, evolving market regulations and the rollout of market reforms are expected to squeeze margins further across many of our projects. We will keep pursuing strategies that grow sales from existing projects. And we will seek new zero-emission opportunities in a disciplined and selective way as the electricity market continues to reform. We will also keep exploring development and diversification opportunities, especially in the Greater Bay Area.

Geert Peeters

executive
#10

In India, some operations have had to be adjusted because of the national lockdown — that includes pushing a major maintenance overhaul at Jhajjar to the second half of the year. On the operational side, our renewable energy assets performed well. We saw high availability at the Jhajjar plant and 100% availability of our first transmission asset during the first half of the year. After several payments came in during the first quarter, total outstanding receivables for renewable projects have dropped from HKD 805 million to HKD 609 million. ACOI, once Indian rupee depreciation is excluded, was comparable to the first half of last year. That figure included lower costs at Paguthan and Jhajjar. It also reflected contributions from the new solar project and our first transmission asset, partly offset by reduced capacity revenue at Jhajjar under the terms of the PPA and by the fact that interest received on delay payments in 2019 did not recur. Going forward, our focus will remain on investments in renewable energy and transmission through our partnership with CDPQ. Construction of the Sidhpur Wind Project will begin, and Jhajjar will carry out a major outage in the second half of the year. Jhajjar's earnings will additionally be affected by lower capacity tariffs as set out in the PPA.

Geert Peeters

executive
#11

On top of that, we expect the financial position of local distribution companies to deteriorate even more because of the socioeconomic effects of COVID-19. That could mean receivables rise again. We'll be going after overdue receivables aggressively so we can keep the outstanding balance under control. Now let's move to Southeast Asia and Taiwan. Once again, operational performance in that region was stable. The Lopburi Solar Plant kept running reliably and got a boost from higher regions. ACOI contribution came in 30% above the prior year, driven largely by reduced coal costs and increased generation at Ho-Ping. Looking ahead, our regional efforts will concentrate on seeking out investment opportunities in renewable generation. Turning to Australia. Price regulation and weaker demand caused by COVID-19 affected our business there, while we concentrated on keeping electricity supply safe and reliable and helping our customers get through this tough period. In our customer segment, performance took a hit from price regulation, increased energy procurement costs, fewer customers, and reduced demand stemming from COVID-19 lockdown measures. As a result, the customer segment posted a negative ACOI of HKD 303 million for the first half of 2020. In our energy segment, the national energy market got off to a highly volatile start to the year, with bush fires and extreme weather.

Geert Peeters

executive
#12

Since then, oil prices have fallen, which mirrors reduced demand from business and industry stemming from COVID-19. Navigating those shifts was possible thanks to how effectively we managed our combined portfolio of power stations and energy contracts. Help came especially in the second quarter from greater output at our Mount Piper facility, where an adequate coal supply is back in place. Aggregate generation volumes came in slightly above prior levels, and we achieved better prices and margins. Consequently, the energy business's earnings contribution at the ACOI level rose in the first half of the year. These shifts meant EnergyAustralia posted an ACOI of HKD 1.284 billion, a decline of HKD 326 million, or 20%, once Australian dollar depreciation is excluded. Going forward, we will keep improving asset reliability and optimizing our generation portfolio. A major outage of Unit 1 at Yallourn has begun and will need roughly 3 months to complete. A further significant maintenance outage is likewise scheduled at Mount Piper in the second half of the year. On portfolio optimization, we signed an offtake agreement for the proposed 250-megawatt Kidston Pumped Hydro facility, which should be operational in 2024.

Geert Peeters

executive
#13

In addition, New South Wales's government has given us approval for a new gas generator at our Tallawarra site. We'll keep advancing these fast response generation projects, along with others. In the short to medium term, though, we anticipate that a sustained lower level of energy prices will place downward pressure on margins and earnings in the energy business. Within the customer segment, our focus remains on service excellence and customer support, especially amid the difficulties of COVID-19. We'll stay focused on uplifting compliance, reducing costs and making it easier for our customers to access new products and services. We do, however, expect an increase in debt and doubtful debt resulting from hardship for customers caused by COVID-19. We also expect market conditions will remain very competitive. To finish, a couple of words about the cash flows. This year, cash flow decreased by about HKD 0.5 billion or 9% in the first half compared with the first half of last year, where we received the remaining balance of HKD 1.4 billion from our 40% divestment of CLP India to CDPQ. The group invested around HKD 5.8 billion in the first half.

Geert Peeters

executive
#14

Of that total, HKD 4.7 billion related to Hong Kong, HKD 0.5 billion went to maintenance CapEx in Australia, and HKD 0.6 billion covered other CapEx, including construction of wind projects in Mainland China and the purchase of 2 solar projects in India. Once we funded those commitments, paid dividends, and took on debt tied to the projects acquired in India, net debt rose by HKD 4.3 billion to roughly HKD 48 billion. At the same time, the ratio of net debt to total capital is still low, at about 29%. Thanks to substantial undrawn debt facilities and strong credit ratings, our financial position is still solid. In the first half of this year, CLP pursued a variety of new financing initiatives aimed at supporting the business's operations and growth. In June 2020, we issued a USD 350 million energy transition bond to help fund part of the construction of an offshore LNG terminal project. NCLP Power also issued notes totaling USD 1 billion, with terms of 10 and 15 years. Those issuances drew strong investor demand and achieved favorable rates of 2.125 -- 2.125%, and 2.5%, respectively. I'll now hand things back to Richard to talk about the outlook for our business.

Richard Lancaster

executive
#15

Thank you, Geert. Looking forward, we remain dedicated to reducing carbon emissions from the electricity we generate. Despite COVID-19 difficulties, solid headway has been achieved on major capital projects. At Black Point Power Station in Hong Kong, the new 550-megawatt combined cycle gas turbine unit is now running and providing baseload power, and this will assist CLP in meeting the government's goal of 50% gas-fired generation for 2020. For a second combined cycle gas turbine unit, engineering design is finished and environmental permits are granted, and it is aimed to begin operating by the end of 2023. Construction contracts for the offshore jetty facility and subsea pipelines of our onshore LNG terminal project were awarded in January, and fabrication of those is under way. Turning to renewables, we advanced our wind power developments. Among these, in June we completed grid connection of the 50-megawatt Laiwu III wind farm in China, and a PPA has been signed for the 250-megawatt Sidhpur wind farm in India, which is set to commence operation -- apologies, set to commence construction this year. In Hong Kong, the renewable energy Feed-in Tariff program drew a favorable response, with a large number of solar projects approved. I'm glad to report that as at the end of July, more than 10,600 customer applications have been approved under our solar Feed-in Tariff in Hong Kong, representing over 130 megawatts of potential capacity.

Richard Lancaster

executive
#16

In Australia, we remain dedicated to a nationwide power network that delivers energy which is cleaner, more dependable, and more affordable. To help bring a greater share of variable renewable power onto the grid, our emphasis will be on installing flexible generation capacity that responds quickly, including the Kidston Pumped Storage Hydro project and an expansion at the Tallawarra site, while we keep evaluating further alternatives. As an added step toward decarbonization in Australia, the go neutral product we offer lets customers fully offset emissions from their gas and electricity use. It ranks among the leading offerings in this space, with roughly 250,000 customers enrolled. We have invested substantially in digitalization as part of continuing work to enhance how customers experience our services. CLP introduced a new mobile app built to span the entire digital customer journey, from registering as a new customer through managing electricity consumption and getting to billing details. Customers can now take advantage of a range of e-services at any time and in any place. Ongoing installation of smart meters will give every customer access to consumption data so they can boost their energy efficiency. By the end of June, over 576,000 smart meters had been connected. Cloud-based IT systems are likewise assisting CLP in delivering innovative services to customers, while also lifting operational efficiency and enabling employees to work remotely.

Richard Lancaster

executive
#17

We additionally use analytics on data to incentivize participation in demand-side management events. A recent example came on 14 July, when Hong Kong set a fresh peak record. That record would have been even larger had roughly 60 megawatts of demand-side management not been engaged to cut the load. In Australia, likewise, we lead in demand response management, with more than 50 megawatts available at critical moments. These efforts are only a portion of our continuing dedication to applying innovation as we pursue excellence in customer experience and operations. For the world, for Hong Kong, and for CLP, the second half of 2020 will probably stay highly uncertain. Our view remains cautious and will depend on how the pandemic keeps evolving and how quickly economic recovery proceeds across various markets. Through these difficult times, we keep our attention on operational excellence and continue placing the safety and well-being of our own people and of the communities we serve at the center of all we do. In times such as these, our people's experience and commitment, our diversified portfolio, and our strategic commitments to digital transformation and decarbonization serve us particularly well.

Richard Lancaster

executive
#18

When it comes to Hong Kong, our ongoing emphasis will be on delivering clean energy infrastructure and improving how customers experience our service. Across China and India, we expect to keep finding solid, long-term chances to grow our portfolio of noncarbon emitting assets. In Australia, a major maintenance outage at Yallourn has now begun, and with careful planning and close attention it will help make sure the plant is in the best possible shape to operate through the coming summer and for the rest of its life. We stay confident about the long-term strength of our market position, and about the need for investment in fast response generation and storage so that intermittency can be managed and volatility in the market reduced. Guided by our strategic focuses of decarbonization and digitalization, we will keep managing our operations and making investments. Our strengths in key markets leave us well placed to gain from the global energy transformation. So, thank you, ladies and gentlemen. And I'll now be very happy to take your questions.

Angus Guthrie

executive
#19

Appreciate that, Richard, for walking us through the presentation, and Geert too. At this point we'll begin the Q&A. <<operator_script>> I believe we can go ahead and take the first question from the phone lines, and that's Pierre Lau with Citigroup.

Pierre Lau

analyst
#20

I've got 2 questions regarding the customer business in Australia. First, we figure that in the first half of this year, things should go for the wholesale market in Australia. But why does your customer business show higher energy procurement in the first half of this year versus last year? And what's your outlook for the second half of this year? Second, we'd like to know how much better provision you've made for the customer business in the first half. And given that the Australian regulator recently requested more help at a port for end users suffering from COVID-19, how could we quantify the potential impact from bad debt provision and the impairment in the second half?

Richard Lancaster

executive
#21

Geert, I think it might be best for you to take those questions.

Geert Peeters

executive
#22

Yes, I'll begin with those questions. Regarding wholesale prices, they fell later in the year, though not right at the start of it. At the beginning of the year, as you may remember, there were bush fires and it was extremely hot, so prices were very high. We were therefore exposed from time to time to elevated procurement costs during that period, since we typically pre-purchase our retail inventory at a probability of 50 in the case of energy. That is what partly drove higher costs in relative terms versus last year, at least early in the summer. After that came COVID, and we then saw forward prices decline in anticipation of what might arrive in the future as a result of weaker demand. As for the bad debt provisions we took in the first half, we do have our formulas, and we test them regularly to see whether they still match expectations. We have examined them in detail. We have not seen significant changes in bad debt behavior as of now. But it is true that, given the hardship we expect as people are now engaging with us for payment facilities, the question is how much of that will eventually turn into bad debt.

Geert Peeters

executive
#23

We'll see what happens down the road. What I can tell you is that we've booked a further provision of roughly AUD 30 million, 3-0, on a pre-tax basis.

Angus Guthrie

executive
#24

Thanks. Right now, I don’t think there are any further questions on the lines. We do have a few submitted online. Let me just read the first one, from Wilson Ko at Iridium Capital. What is the EBITDA in Australian dollars, in millions, for EnergyAustralia, excluding the Yallourn Power Plant? Thanks. We may need to come back to that, so can I leave it there?

Richard Lancaster

executive
#25

Yeah. What I’d tell you, Wilson, is that we don’t have a precise figure in mind for the plant itself. We do give segment-level details in the attachment, but not plant by plant. And I’m also not sure, Angus, whether that’s confidential information we’d disclose at that level of granularity. We don’t normally do that.

Angus Guthrie

executive
#26

Right, that was actually what I was about to propose. The thing is, we typically don't break that out. What I can tell you is that Yallourn produced roughly the same quantity of energy as in the prior period, though it was on hand at certain critical moments during high-price events in the first half. As a result, the Energy segment's overall contribution is considerably larger.

Richard Lancaster

executive
#27

And naturally, Yallourn, because of how large it is, plays a major part in EnergyAustralia's EBITDA — no question about that.

Angus Guthrie

executive
#28

Maybe we can go to the second question now, from William Leung at Overlook Investments. Regarding SoC CapEx on the PowerPoint presentation, you mentioned a 30% compound average growth rate. Could you specify that? What base are you using? I'd actually appreciate some clarification there — a 30% compound average growth rate for SoC CapEx. I can't believe — I don't believe we actually made that statement, but...

Richard Lancaster

executive
#29

No. Typically, SoC CapEx grows at a rate of 3% to 4%. In recent years it has been on the higher side, since we've embarked on these decarbonization efforts, but it is surely not 30%. If you came across that, then it has to be a typo error, for which we apologize, and we're happy to receive an e-mail telling us where you found it.

Angus Guthrie

executive
#30

Geert mentioned in the presentation that net fixed assets rose by 3% to 4%. That may be the source of it. Let's go to the next question, from Simon Lee at Morgan Stanley. The question says they're impressed by the TSF balance increase even though Hong Kong power sales volume fell 1.2% year-on-year. What's driving the rise in the tariff stabilization fund balance? Could you share the details behind the investment property revaluation loss? That's a separate question.

Richard Lancaster

executive
#31

Let's take a quick look at the TSF balance. As we said, 1.2% year-on-year, with sales lower than last year, but the effect was actually smaller than we had expected for this year when we set the tariff based on our models and forecasts. So up to now, the TSF balance has actually gained from consumption running above what we anticipated. That's mostly due to extremely hot weather in May and June. And as we noted, with people staying at home, there was substantial air conditioning energy use. So it's still too early to say what the TFS -- TSF balance, sorry, will be by the end of the year. We're in the summer, and much depends on consumption during the summer. Regarding the investment property revaluation loss. We're talking about the building we're in, which we plan to transform into our new head office. Since this building is, from an accounting perspective, held for sale as an investment property, we have to get an appraisal yearly -- a reappraised value of that building last year. There was a gain on that.

Richard Lancaster

executive
#32

For this year, we’re recording a loss. That loss is noncash. It’s simply an update to the perceived market value.

Angus Guthrie

executive
#33

At this point, I don’t think there are any further questions. Actually, it looks like one more is coming through from someone at China International Capital Corporation. Please go ahead on the phone line.

Analyst

analyst
#34

Thanks, Richard and the management team. We have a few questions regarding the electricity distribution business in Fangchenggang, and could you give us more color on how that business performed — for instance, how many customers we have, and to CLP <<inaudible>> by the local trading platform or some EPC compared with the local business. Maybe CLP has ownership in this distribution business unit. Perhaps this is a joint platform. And how will CLP be appreciating this unit? Will this unit allow selling small class in both reproving or just this industrial move? Yes.

Richard Lancaster

executive
#35

Perhaps I can take that one. Thanks so much for raising it, Wang Song. It's still early days for us as we examine incremental distribution network businesses in Mainland, China. There's an opportunity we have in Fangchenggang — an industrial park where we secured the distribution contract through a tender. National policy in this area aims to encourage more private investment and greater diversity in how industrial parks are operated, so we were among the first wave of those tenders. It's a new area for us. We're exploring this business, though it offers quite clear synergies for us, since we have a large coal-fired power plant in Fangchenggang. So we entered this business in partnership — in partnership with a subsidiary of Tsinghua University, which supplies the smart technology. And we'll see how things progress with this. If this business looks promising, we'd seek further opportunities, not only in Guangxi Province but also in other neighboring provinces across Southern China.

Angus Guthrie

executive
#36

All right. We have another question coming in over the phone from Evan Li at HSBC. Evan, go right ahead.

Ming-Hon Li

analyst
#37

On the Australian retail side, I wanted to ask whether there's any cost reduction we can quantify that we might examine over the coming few years — not so much the medium term — that we weren't able to consider when we emerge, in terms of reducing costs and restoring value. And secondly, obviously you've cited value restoration as a strategy in Australia previously. Given how things have shifted during this year, has the overall strategy changed? How should we think about the business going forward? My third question is whether there's any major debt looking to be refinanced in the second half, and what the existing financing costs on that debt would be that can be disclosed?

Richard Lancaster

executive
#38

I'll take the second question first, giving a broad view of our strategy in Australia. Then, Geert, perhaps you could handle the detailed points regarding cost reductions and the major debt refinancing. Looking at our Australian operations, the fundamentals appear extremely solid: affordability is high, sovereign risk is low, and the market requires investment to complete the energy transition. Moreover, we hold a strong business there, vertically integrated across generation and a retail operation of comparable size, and we possess the scale in that market to remain competitive. So fundamentally, we regard our business as sound. One pattern we consistently observe from one half to the next when discussing our results is this: in a competitive market where prices shift quite often, value does move from our wholesale operation toward our retail operation. That's why, when examining our Australian business, it's important to consider the entire picture. It is an integrated business. We run it as one integrated business, though we do report results on a segmented basis.

Richard Lancaster

executive
#39

For us, this is a market where value is genuinely visible over the long term. Australia has been our home for 15 years. We've grown this business into what it is today. And we do believe that business holds real value. It's a market in transition. An energy transition is underway there. Regulation is very complex and moves quickly. And over the past few years we've been adapting to that. We've gone through a value restoration exercise, and that work continues. We're still seeking to extract value from that business. Part of that means leveraging our scale, but it does require investments on the IT side of our business so we can be more competitive longer term. So fundamentally, we still believe our business there is in strong shape. But we're looking at specific cost reduction programs and continuing to do so. And perhaps Geert could.

Geert Peeters

executive
#40

Yes. Regarding the cost reduction, you'll appreciate that in the current situation with COVID, the first priority for our colleagues has been to keep delivering so our customers have power, including during the bush fires. Now the focus is helping them through this hardship and all of that, while working from home and juggling call centers in Australia and, among others, in the Philippines. That doesn't mean our colleagues have forgotten that we need to keep costs under control. But what has been foremost in their minds is operating safely and reliably for our customers. That said, the cost reduction, as Richard mentioned, is an integral part of the retail strategy — you must be low cost. So we have kept investing in new systems. Despite the hardship, we have kept putting new systems into operation, and that should deliver cost reductions. As for your questions about debt, if we were about to launch a major debt initiative soon, we would not be able to mention that, of course, as you understand. What I want to point you to is that we have been very active in the year.

Geert Peeters

executive
#41

And I can tell you that every bit of debt raising we needed to complete this year is done. As a reminder, we brought in roughly USD 1.3 billion of debt overall, and USD 350 million of that was for the LNG terminal under CAPCO. The rest of the LNG terminal will be funded largely through an export credit agency facility with SINOSURE. Separately, for CLP power, to finance the combined cycle as well as all the other initiatives we have underway there, we issued a total of USD 1.5 billion. And as I said, we moved into the 15 years — we enjoyed such success that we went out to the 15-year horizon with that issuance, and we paid a 15-year coupon of 2.5%. So that tells you the market, complicated as it is, remains quite open to us. And so our next — our main initiatives will come next year, to fund the capital — the CapEx funding requirements for that year.

Angus Guthrie

executive
#42

Thank you, Geert. We've got a few more questions that came in via the web. Let me move on to the next one, from Dennis Ip at Daiwa. His first question concerns the outlook for Australian retail. I believe we've effectively addressed that already when answering the previous 2 questions. So, if that's alright, Dennis, I'll move to the second and third parts of what you asked. The second question is this: since China may issue specialty bonds to relieve subsidy receivables, chiefly on wind farms, then if most of the Hong Kong dollar receivables come back to CLP within the next 12 months, would we speed up our new wind farm developments even though subsidies may not be available beginning in 2022? There's a third question too, namely, if Hong Kong electricity sales volumes turn out weak in the second half, how could that impact the basic tariff for you beginning in 2021?

Geert Peeters

executive
#43

Perhaps I'll handle the second question.

Richard Lancaster

executive
#44

Question two is yours, and I'll handle question three.

Geert Peeters

executive
#45

That would be positive, then. We've also been hearing from many quarters that the government definitely intends to tackle this receivables situation. So again, the first thing would be welcome news if those outstanding amounts got paid. As for the second part of your question — whether we would put that money straight into new wind farms given what we've seen with the subsidy — I think the government's aim, actually, isn't so much to build lots of new subsidized wind farms, perhaps offshore and in other remote locations, but increasingly it wants to move toward grid parity projects. That's what we're currently exploring. Getting the numbers to work is challenging. So while the numbers don't work, we won't undertake projects. But if we identify grid parity projects — solar or wind — that work without subsidy, then we might, again, build a couple of those. Our new strategy, though, is to have projects that work without subsidy, rather than relying on subsidies anymore.

Richard Lancaster

executive
#46

And just briefly regarding the tariff review for 2021 — honestly, it's too soon for us to say anything meaningful about that review. One element we must factor in is the sales forecast, which is 1.2% lower than last year. Given that last year was an especially hot one, with extremely strong growth at the same point a year earlier, this isn't a major decrease. Keep in mind as well that fuel costs have declined too, owing to the COVID impact. So later in the year we'll be talking with government about what the 2021 tariff should be. With luck, we'll then be in a stronger position to offer projections regarding 2021.

Geert Peeters

executive
#47

Simon has a question?

Angus Guthrie

executive
#48

Yes.

Geert Peeters

executive
#49

Sure, Simon, let me try to get to your questions quickly. You asked about cash flow and how it went from 5.4 to 6.3. There’s a more detailed cash flow statement toward the back. The short answer, though, is that—as I said earlier—regarding the mark-to-market of our hedge positions in Australia, there was a significant flip of roughly HKD 1 billion. That also had consequences when it came to the collateral. So the collateral we had to post when we were out of the money has come back, and that has been a major driver of the free cash flow difference between the 2 years. If you look at how the free cash flow starts, recurrent EBITDA was roughly the same at the outset, at HKD 12.8 billion.

Angus Guthrie

executive
#50

We have more questions coming in, and these are also arriving via the webcast. Ken Liu from UBS. From what I understand, EnergyAustralia is currently developing a new gas-fired power station, Tallawarra B. Given the growing share of renewables in the generation mix, I think this could be a solid project, since peaking capacity needs would rise over time, and this one will be a peaking facility. Could you tell us about the CapEx, the timeline and progress, and the return for this project?

Richard Lancaster

executive
#51

Well, Ken, we do see your point, and that does make sense for the project. Those are quite specific questions, which...

Geert Peeters

executive
#52

Yes. On the financial figures you asked about, all we can say is that, from our standpoint too, this is still at an early stage. As for CapEx, we're in the tendering phase, so we're still refining those numbers. The same goes for the timeline — we'll have to wait and see what the contractors are capable of and what they aren't. On the return, a great many variables feed into it: how many wind projects will there be? What volatility will there be at peak and off-peak, and what will gas prices be? As you can imagine, for a 20-year investment there's an entire distribution around that return, as is always the case in our industry. So I can't really give you an answer on that, beyond saying that we approach it with a great deal of discipline.

Angus Guthrie

executive
#53

I might just add one thing — we've been pretty explicit that the final investment decision on that project will come near the end of this year. So at this point, it isn't a committed project yet. Then there's another question from Grace Ding at Cohen & Steers. Can I ask if you have any updated guidance for the retail business in Australia? Earlier, you said it would decline by HKD 200 million per annum. Could I maybe just clarify that point — when the impairment happened, we did state that the decline would be $240 million to $300 million per half. Annualized, that works out to double, roughly $500 to $600 million per annum. That's now fully reflected. But that's part one of the question. Second, also for Hong Kong, how much is the stability fund at present? I believe that refers to the tariff stabilization fund? I think the market may be worried that CLP can't secure a sufficient tariff increase given the situation in Hong Kong? So those 2 questions, please.

Richard Lancaster

executive
#54

Geert, you handle the first question and I’ll take the other one.

Geert Peeters

executive
#55

Yes, I can handle that one quickly — sorry, perhaps the first question. We aren't providing specific guidance for any of our businesses. We've given you indications regarding what drives the retail business. Many variables remain, among other things. COVID — what effect will COVID have on demand or not, what effect will COVID have on customer hardship or not. As for retail energy costs, typically in the second half we recover more costs than we do in the first half on a comparable basis, so the cost drivers ought to be favorable, but other ones exist. I think you should read between the lines of what we're telling you: the second half is still going to be a challenging and competitive environment.

Richard Lancaster

executive
#56

And regarding the tariff, the figures related to the tariff stabilization fund are published in our results. Yes.

Angus Guthrie

executive
#57

As of June 30th, the balance stood at HKD 1.5 billion.

Richard Lancaster

executive
#58

And, as I mentioned before, we may be somewhat ahead of our earlier expectations, since our sales projections for this year were below last year's, given how strong last year's sales growth was. So even with a sales decline of minus 1.2%, we are still ahead of where we thought we would be. And the key thing we need to deal with regarding the tariff is that in 2020 we are seeing a substantial increase in the volume of gas we use. So in order to hit the government's 50% natural gas target in our fuel mix, we must raise our gas usage considerably. That has a major effect on our fuel account balance. And although the volume has gone up, the advantage for us is that oil prices — and hence there is some knock-on effect on gas prices — have eased quite considerably because of the COVID epidemic. So our fuel prices are under less pressure than we had projected. So taking all of that together, we will need to run our calculations and our projections at the end of this year, and we will have to talk with the Hong Kong government, but certain factors so far are working to our advantage.

Angus Guthrie

executive
#59

We're almost out of time here. There are 1 or 2 questions left. Let's see if we can move through at least one of them quickly. Hugh Jonas has a question for us. Does CLP have a future road map or a goal for getting energy production from renewable resources? And if so, what percentage of its total energy production will be renewable based?

Geert Peeters

executive
#60

My sense is we can move quickly there and point you to the sustainability report, since that's where you'll find all the specifics.

Richard Lancaster

executive
#61

Also, our Climate Vision 2050 document — Hugh, if we could point you to our website, there's a document we call Climate Vision 2050, and it lays out the road map we have for decarbonizing. That means moving away from the mix we have today — coal, natural gas, nuclear power and renewables — toward generating almost entirely from natural gas, renewables and nuclear, and putting investment into transmission assets too.

Angus Guthrie

executive
#62

Alright, so one more question here from Tian Chan over at HSBC. About those Indian grid assets — what led to the cancellation of 1 of the 3 transmission assets that we'd said we were going to acquire? We closed on one of them. The second deal didn't go forward. Where does that third line stand at this point? Could you speak to how the grid assets are performing and how we should rethink the outlook for future deals?

Geert Peeters

executive
#63

Okay, that one we can answer pretty fast. Line three is still in the approval stage, though we've got more time now to work through it. The timeline for the second one was really tight. And with the COVID lockdown, everything slowed down on the government approvals side and it became very hard. We couldn't secure the approval in time. We do see solid opportunities for investing in transmission assets in India. It's required so that renewable energy development can be moved to the cities where the power is needed. So investment in greenfield transmission lines is needed. This is an area where CLP has deep expertise from our Hong Kong business. And while we're viewing these acquisitions as a means of establishing our foothold, of gaining a foothold in India's transmission sector, we would expect that growth to come from both a mix of acquisitions and greenfield investments as well.

Angus Guthrie

executive
#64

Tian's question had another piece to it. Since this is going to be the last one about the property project, I think, do you expect profits to be booked in 2020? Does the revaluation loss in one half '20 have any connection to it?

Geert Peeters

executive
#65

I believe I can state that we aren't making any comment on booking a profit from that real estate development. When the codeveloper came in, we sold the majority of our rights, and there is an earn out, though that will arrive gradually as the apartments there are sold. The revaluation loss is unrelated to that. As I said earlier, this is the appraisal carried out by third parties regarding the value of this building relative to where the market stands for offices. And it probably shouldn't come as too much of a surprise that during the course of 2019, given the challenges the city has faced, there has not been an increase in value, generally speaking, for the office market in Hong Kong.

Angus Guthrie

executive
#66

We’ll take one final question, even though we’re running past our time — please just bear with us. This comes from Alice Chay at JPMorgan. How should we think about the outlook for the wholesale business in Australia regarding generator availability on a full-year basis, given the planned maintenance for Yallourn in the second half? And what about wholesale price trends? Also, what is management’s view on the proposal for a possible early closure of Yallourn, which I believe refers to the recent IDMO report. Richard, may I hand that over to you?

Richard Lancaster

executive
#67

I'll keep this brief. Sorry for hurrying you all, but we're past our scheduled time. Basically, we've made the decision to keep the outages at Yallourn and Mount Piper proceeding as planned. Extensive planning has been required on our part to make that happen. Still, removing plant while wholesale prices are low—since demand has been softer—means the impact is far smaller than if we pushed those outages back and took the units out sometime next year, when everyone else is performing maintenance and prices may well be significantly higher. On the question of whether Yallourn might close early: right now, Yallourn holds an operating license running through 2032, and were it to serve its full natural retirement life, it would operate until 2032. A meaningful share of Victoria's generating capacity comes from Yallourn. Shutting Yallourn down would require replacement capacity to be built, plus a plan worked out alongside both the Victorian government and local government to address the economic consequences in the Latrobe Valley. So bringing that plan forward would demand many considerations and considerable discussion between EnergyAustralia and the Victorian government.

Angus Guthrie

executive
#68

All right. Ladies and gentlemen, many thanks for joining us on today's webcast, whether you're with us by phone or watching directly online. Some extra questions may have arrived via the web, and we'll do our best to address those in due course later today. But I believe that's all the time we have for now. So thanks once more. My team and I will definitely be around to take questions again this afternoon and over the coming days. Thank you for being with us, and we look forward to meeting up with people in meetings over the coming days. So many thanks, and I'll now close the webcast. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete CLP Holdings Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to CLP Holdings Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in CLP Holdings Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.