executiveGood afternoon, everybody, and thanks to each of you for being with us on this call covering Hindustan Zinc's Second Quarter and First Half FY 2021 results. Joining us today are our recently appointed CEO, Mr. Arun Misra, along with our CFO, Mr. Swayam Saurabh. Mr. Misra will start things off with an update on how the business has performed, and then Swayam will walk you through the financial performance. Once that's done, we'll open up the floor for your questions. At this point I'd like to invite Mr. Misra to get today's call started. The floor is yours, Mr. Misra.
Arun Misra
executiveThank you, Shweta, and good afternoon — a very warm welcome to everyone. I hope you and your families are safe and are keeping up all the precautions needed to guard against COVID-19 spreading. As the CEO who has just taken on this role, I'm glad to report that we keep delivering operational excellence even in a tough environment. That demonstrates how we bounce back and think creatively, along with our firm dedication to turning this into the biggest and most respected Zinc-Lead and Silver business anywhere in the world. At the same time, we stay just as mindful of our environment, social and governance responsibilities and of our sustainability targets. Looking after our communities is something every one of us at Hindustan Zinc treasures deeply. Our CSR team works actively with the communities around our sites and with other important stakeholders so it can grasp their requirements in detail and shape its initiatives to match. You can see this too in the COVID-19 mitigation work we continue to do, and we feel truly humbled that the Integrated Health & Wellbeing Council has honored us with its CSR Health Impact Award. That recognition came as a mark of appreciation for the outstanding way we responded and for our work on the ground, with heavy emphasis on life, livelihood, and on helping lessen the effects of the COVID-19 pandemic.
Arun Misra
executiveSafety and sustainability run deep in who we are, and I'm delighted about that — every leader across our operations makes sure business choices line up with those priorities. You can see that reflected in the recognition our work has earned, which keeps pushing and motivating us to remain ahead of the curve. I'm glad to report that Hindustan Zinc took home the CII Environmental Best Practice Award 2020 in the Most Innovative Environmental Projects category. I'm proud as well to tell you that our solar projects — 22 MW at Rampura Agucha, 12 MW at Debari, and 4 MW at Dariba — are each registered under Gold Standard, the toughest certification worldwide for carbon offset projects. That certification is assessed on the net positive contribution to economic development, job creation, and the environmental and social welfare of the communities hosting each project. On top of that, we've used wasteland at every site for installing solar panels. With that, the whole of our renewable power portfolio now sits under Gold Standard. And in line with our continuing waste-to-wealth push, the smelting complex at Dariba has successfully commissioned a freeze precipitation technology plant with capacity of 4,500 tons per annum.
Arun Misra
executiveThat's going to allow us to recover sodium sulfate from the final multi-stage RO projects, and it will serve one-third of the input salt requirement for the Dariba smelter hydro plant. Now, on the quarter's performance, I couldn't be more proud to report that we hit a few milestones during this quarter. We recorded our ever highest ore production, which our proactive mine planning supported, driven by greater technology use and improved targeting. That gives us tremendous confidence to reach the goal we've set for ourselves and become a top three primary silver producer globally in the years ahead. We're focused not just on raising output from our existing resources and improving recovery through technology-led disciplined operations, but also on working toward accessing new mining zones and partnerships. Most importantly, we succeeded in bringing our cost down to the lowest level since we transitioned to underground mining operations in March 2018. All of this further strengthens our confidence in the resilience of our people, new age technology in mind, and our long life rich assets. We adapted seamlessly to fast-changing conditions and rolled out various initiatives and proactive measures during these challenging times to stay ahead of the curve. Turning to the market update. Global mine supply kept facing threats of COVID-related suspension of operations and prolonged delays in new projects.
Arun Misra
executiveOperational challenges are hitting mines worldwide as they try to increase output while staying compliant with social distancing rules. On top of that, no significant new capacity expansions are moving forward. Per Wood Mackenzie, mine production forecasts have declined by more than 1.3 million tons relative to the beginning of 2020, which represents a 10% reduction in mined metal supply. That works out to a 5% worldwide decrease in mine output for calendar year 2020 versus 2019. TC for imported concentrate demand in China dropped sharply, from $310 in January to $115 in September, which is another signal of an existing concentrate supply deficit for Chinese smelters. Global demand, conversely, is projected to shrink by 5%-6% in 2020, with most of that occurring in the first half. As a V-shaped recovery takes hold in China's industrial demand, and with numerous governments rolling out stimulus packages aimed at restarting industrial activity, we can already see demand for base metal coming back. We further expect that low interest rates and the relative softness of the U.S. dollar will lend additional support to physical demand for metals as we move through quarter three and quarter four. Fueled by these fundamental tailwinds, zinc prices posted a robust rebound over the quarter, not only recovering to pre-COVID levels but also reaching the $2,500 per ton mark, a level last observed in October 2019.
Arun Misra
executiveTo expand on what I said before, the main factor here was demand out of China, and in bonded warehouses on the Shanghai Futures Exchange, inventories have dropped sharply — from 160 kiloton in March down to 60 kiloton by the close of quarter two. We anticipate that warehouse stock levels worldwide will stay on the low side, and that gives fundamental backing to prices over the quarters ahead. At home, with lockdown measures relaxed and India entering its unlock phase, demand for the metal has begun to bounce back. During quarter two, demand picked up and came in at nearly the same level as the equivalent quarter a year earlier. Restarting of infrastructure work, along with government stimulus, is supplying the support needed for that rebound. Steel producers — our key customers — are now operating their plants at close to normal utilization rates, and the rebound in demand shows up in their higher crude steel prices. The replacement battery segment has seen an uptick lately, thanks to the seasonal monsoons as well as roughly 70 days of complete inactivity brought on by the India lockdown. We believe that linear demand recovery will carry on across every segment, and we stay optimistic about the festive season coming up. Interest from investors globally pushed silver prices higher — silver was over 50% up in Q2 versus Q1 average prices — which translated into a significantly larger EBITDA contribution from silver.
Arun Misra
executiveWe anticipate that prices will stay robust, since physical demand for silver has begun to rebound worldwide, and locally too, which shows up in a narrower arbitrage gap between LBMA and MCX. Now to the operations update. In the quarter, mined metal output rose 9% versus a year earlier, reaching 238 kiloton, driven by greater ore production. After that, mined metal production increased 18%, helped by more ore output stemming from improved mine planning and efficient targeting along with greater technology use. That said, this gain was partially offset by lower metal grades and reduced ore treatment. Integrated metal production came to 237 kilotons, 13% higher than a year ago and 18% higher quarter on quarter, matching mined metal availability, with zinc at 180 kilotons and lead at 57 kilotons. Sellable silver output was 203 metric tons, jumping 51% year on year and 73% sequentially, thanks to more operation of the pyro lead smelter, improved grades at SK Mine and larger concentrate inventory. Turning to our projects update. I'm pleased to report that the Expert Appraisal Committee has recommended environmental clearance for the Zawar Mine expansion, from four to 4.8 million tons per annum. Both battery plants at Zawar are under commissioning, and operation is expected to begin in November 20.
Arun Misra
executiveI'm glad to give you an update on the new sales and marketing initiative we've launched. In the non-ferrous sector, Hindustan Zinc is now the first producer ever to sell metal through an online channel, with prices quoted in INR in real time. That platform, known as Evolve, launched pan-India on September 18th and got a very positive reception. Now an update on Fumer commissioning. Because of continuing COVID-19 disruptions, which include visa restrictions affecting Chinese nationals, we were unable to finish final commissioning of the Fumer plant at Chanderiya during quarter two. Work continues so that we can resume as early as possible. For my closing remarks, I'd like to point you to the FY 2021 volumes we previously guided for mined metal and refined metal, each in the range of 925 to 950 kiloton, along with silver at around 650 metric ton. I'm pleased to tell you that we remain on track to hit those previously guided figures. With that, I'll pass things over to our CFO, Mr. Swayam Saurabh, for an update on financial performance. Swayam.
Swayam Saurabh
executiveThank you, Arun. Good afternoon, everyone. Before I dive deep into the financial performance, I want to direct your attention to the targeted efficiency initiatives that we, as a management team, have launched since the third quarter of last year, which are transforming Hindustan Zinc and laying the groundwork for consistent volume growth and lower costs. Our unwavering focus on strict capital allocation discipline and continuous cost improvement—driven by new-age mining technology, rigorous benchmarking, and ongoing adoption of best practices worldwide—is helping us stay ahead and maintain our first-quartile cost curve. Many of these cost optimization initiatives, deployed across our operational units, are already visible in our financial performance and are yielding results. Now, turning to the financial performance for the quarter. Revenue from operations during the quarter saw a 25% increase year-over-year and stood at INR 5,660 crores, driven by higher Zinc volumes, which rose 8% year-over-year, and a 30% increase in Lead volumes year-over-year. This was further supported by higher Silver prices, as well as a significant jump in volume, along with overall higher price realization as the rupee appreciated over the year. Some of these gains were offset by a decline in Zinc Lead LME year-over-year.
Swayam Saurabh
executiveRevenue jumped 42% versus the prior quarter, mostly on the back of higher Zinc Lead LME prices. On a sequential basis, Zinc LME climbed 19% while Lead LME gained 12%. Additional support came from a higher metal premium spurred by a pickup in domestic demand. After quarter one. Part of those gains was offset, since rupee appreciation between quarter one and quarter two weighed on price realizations. For the quarter, Zinc cost of production before royalty came in at $919 per ton, 10% lower sequentially and 12% below the year-ago figure. This drop in production cost reflects our ongoing push on structural cost optimization measures, as Arun laid out earlier. We are genuinely proud to report that we have now hit the lowest quarterly cost in dollar terms since we made the move to a fully underground mine two and a half, three years ago. That comes from extraordinary effort across all fronts, spanning consumption, contracting, procurement, and fixed-cost optimization, which has driven sustained improvement in our cost base. It was also enabled by a series of firsts, among them a fresh approach to fixed cost, digitally-backed tracking of operational efficiency, redesign of certain contracts and renegotiation, plus efficiencies tied to consumption norms and favorable commodity sourcing.
Swayam Saurabh
executiveFor the quarter, EBITDA came in at INR 2,952 crore — that's up 39% versus a year earlier and 85% quarter over quarter, driven by greater revenue and reduced operating costs. Net profit during the quarter stood at INR 1,940 crore, which represents a 7% decline year over year, yet a remarkable 43% rise sequentially. The main reasons were increased depreciation and amortization, along with finance cost and a higher tax charge stemming from a shift in our income mix. Treasury income is usually taxed at roughly 11%-12% for us, whereas business income carries a tax of about 27%-28%. As interest rates began declining, our business income grew proportionally, and that altered mix caused the tax rate to swing between quarter one and quarter two. For the entire year, though, guidance can be given at an average effective tax rate of 24%-25%. I'm pleased as well to share that the Board has cleared an interim dividend of INR 21.3 per equity share — roughly 930% of the INR 2 face value per share — totaling a dividend payout of INR 9,000 crore. The record date for this is October 28th 2020. Moving on now to the costs and CapEx we guided previously for this fiscal year.
Swayam Saurabh
executiveWe’ve successfully reset our cost base to a lower level, and we’re confident that zinc cost of production will stay comfortably below $1,000 for this fiscal year — and that figure includes significantly higher mine development expenditure to support future volume growth. On CapEx, our guidance remains unchanged: we’re taking a focused approach by investing in high IRR projects and exercising continuous prudence amid an uncertain business environment, so we strike a delicate balance between investing in growth and conserving cash. With that, I’ll open the floor for questions.
Operator
operatorThanks a lot. We’re moving into the Q&A portion now. If you’d like to ask something, hit star and one on your touchtone phone. Should you want to drop out of the queue, press star and two. We ask that participants use their handsets when posing questions. Ladies and gentlemen, we’ll pause briefly while the queue fills up. To ask a question, please press star and one. Our first question comes from Amit Dixit of Edelweiss. Please go ahead.
Amit Dixit
analystThanks for taking my question. Congratulations on a good set of numbers. I have a couple of questions. The first one concerns your Silver production guidance. At around 650 tons, I believe it looks a little bit conservative considering what you have done in this quarter and the last. Last year, of course, being an exception. If the current run rate holds good, I think your Silver production should be higher than what you are guiding. Any comments on the same?
Arun Misra
executiveSilver output is still going to stay in line with the guidance, since in this quarter, if you look, the silver grade within the mined metal out of SK Mine came in higher than it did the previous quarter. That said, when we view the mine against the overall plan, we would stay with a balanced figure, and that will show up in the production we have guided.
Swayam Saurabh
executiveRight. To add to what was said, people also understand that COVID hasn't disappeared. These figures are cautious, yes, and your read is right, but we've completed C48 on an H1 basis. Should production hold to plan, we ought to be able to exceed our guidance. As things stand, that guidance remains in place.
Amit Dixit
analystAll right, so my second question concerns production cost. From what we see, it's fallen quite a bit, nearly $100 per ton QoQ. During the opening remarks you also pointed out that part of that is sustainable and that we've reached a specific cost level. I just want to grasp why you're guiding our production cost below $1,000 as well when we're running at $919. My sense is it ought to stay around the same level and we should finish well under the guidance. There are two parts to my question. First, naturally, which of these items do you view as sustainable? Coal cost can of course move, but some sustainable elements would exist. How much would that be? The second is
Swayam Saurabh
executiveSo,
Amit Dixit
analystAs with the question I asked earlier, this production cost will clearly as well
Swayam Saurabh
executiveOkay, that's fair. At the H1 level, our production cost stands at $965. Quarter two has shown substantial improvement, and a very big portion of that is going to hold, since these gains are structural — they come from actions set in motion a while ago that are reshaping our fundamental cost base. The reason we're guiding to a somewhat higher cost as we move into H2 is the point I raised, I believe, three quarters ago: we have to invest ahead of the curve in order to develop faster. What that should ultimately do for us is likely deliver a bigger immediately minable reserve. The benefits only arrive once I mine those reserves. We're trying to introduce a bit of flexibility into our system. As a reference point, a typical global company has roughly two months of production sitting in minable reserve. We aren't there yet, and we want to reach that point, because it also lets us be more predictable and more consistent when it comes to our volumes.
Amit Dixit
analystAlright, that's great. Thanks, and best of luck.
Operator
operatorThanks. Our next question comes from Pinakin Parekh at JPMorgan. Please go ahead.
Pinakin Parekh
analystThanks a lot. I have a couple of questions. First, on the dividend and the balance sheet: we continue to see INR 4,500 crores–INR 4,700 crores of borrowings sitting there. Looking ahead, what's the company's view on debt? Could you walk us through the thinking on how much the company would want to lever the balance sheet on a gross basis? Which metrics would be used — debt to EBITDA or debt to equity? Second, on the expansion projects, there isn't much commentary. The volume guidance suggests mined and refined metal production of 510 kt in the second half of the year. Given all the COVID-related shutdowns that have happened at this point, where do we stand on the roadmap to 1.2 million tons? Where might we see run rate production come through?
Swayam Saurabh
executiveYeah. I’ll take the first question, and Arun can handle the second one. We’re open to leveraging the balance sheet. It has more to do with the fact that the investments might have different time horizons and tax efficiency. It’s a choice between, if a dividend has to be paid, like the one announced today, breaking those investments and losing the coupon, versus a scenario in which you could borrow more cheaply. Leveraging also a cheaper interest rate environment. We are very conscious of net debt to EBITDA as well as the debt equity ratio. While I can’t be more specific here at this moment, we would like to assure you that this will remain very healthy, like our balance sheet has always been kept.
Arun Misra
executiveYeah, regarding those 1.2 million ton metal production rates, we're confident we'll reach that figure in quarter four. Based on our guidance, we ought to be turning out roughly 950 kilotons of metal. If we keep up the pace we're at now through quarter three and quarter four, we should get there — or perhaps do even better. Quarter four is expected to exit at 1.2 million tons.
Pinakin Parekh
analystGot it, and thanks so much, sir.
Operator
operatorThanks. We’ll take our next question from Anuj Singla at Bank of America. Go right ahead.
Anuj Singla
analystThanks a lot, sir. I’ve got a question about the investment side. You signed an MOU with the Gujarat government not long ago for a 300 kt greenfield smelter. Could you share a bit more detail on what’s needed for a greenfield smelter? As I understood it, we already have sufficient flexibility at the current sites to expand smelter capacity. Why Gujarat, and what incentives would be offered there—both tax-related and otherwise? Also, what IRR target are we aiming for there?
Swayam Saurabh
executiveRight. That MOU remains at the early feasibility stage. What I'll do is give you a very high-level view of why this still makes sense. A coastal smelter has, let's say, more efficient access to external concentrate, because we see an opportunity there. Also, once our volumes grow to the level they need to reach, as you know, as part of my current mix in percentage terms, today roughly 20%, 22% gets exported. It makes sense, and it fits our longer-term plan. Why Gujarat? For one, part of my product today does get exported, so it doesn't add pressure on my supply chain. And as an investment destination, Gujarat is very attractive for us.
Arun Misra
executivePort access is available.
Swayam Saurabh
executiveRegarding port access — on that last IRR point, again, I won't get into specifics, but we've set very high hurdle rates for ourselves so that any investment makes sense. We're quite confident that once the initial feasibility work is done, this project would deliver that kind of IRR.
Anuj Singla
analystDo you have any rough figures, sir — is it 20%+, 25%+? Just any kind of broad-brush number on the sort of IRR we might look at?
Arun Misra
executiveOnce the detailed feasibility study is finished and we've landed on the full budget cost, I believe that's the right moment to quote a number — that would be fair and correct.
Anuj Singla
analystAll right, got it. Sir, on the second question, it concerns the second phase of our growth — the volume increase from 1.2 to 1.5. What timeline applies to that now? Has COVID affected that as well? And will it involve additional smelter investments at the possibly existing sites, or somewhere else?
Arun Misra
executiveWhen you're looking at 1.2 million to 1.5 million tons, it's clear additional smelting capacity will be needed. That also comes with roughly 1,400 tons of silver, so obviously more silver refining capacity is required too. Those two things are under study right now — how do we debottleneck, and where do we take our smelting capacity? Beyond that, only if any additional facility needs to be provided. That's under study. The second part is on the mine side: how do we make this not just one year of production — it has to be sustainable. Life of mine studies are in place. Of all the mines, two have completed life of mine studies. The remaining mines are in progress, and by December we would complete the life of mine study and the feasibility report for this expansion. We can come back with a fairer number on what it would actually entail and the timeline it would take us to complete this project.
Anuj Singla
analystGot it, sir. Thanks so much, sir. Wishing you all the best.
Operator
operatorThanks, and now we'll take the next question from Indrajit Agarwal at CLSA. Your line is open, please proceed.
Indrajit Agarwal
analystHi, good afternoon. Thanks for giving me the chance to ask. I have a couple of questions. First, regarding employee cost, it has fallen sharply on both a YoY and a QoQ basis. What caused this decrease, and how should we think about it going forward?
Swayam Saurabh
executiveThat's correct. In Q2, employee cost came down to INR 166 crore, which works out to an annualized run rate of roughly INR 650 crore to INR 660 crore. When you examine how the cost reductions were delivered, optimizing employee cost has formed part of the structure. The straightforward reason Q1 cost was higher is really Q1 as well as YoY. In Q1, we had to pay some VRS, which isn't there in Q1 as part of our, let's say, employee cost optimization, part of de-layering the organization. What I'd say is the right answer here is really a guidance. We expect the employee cost to stay under INR 700 crore annually. Just as a reminder, two years back, employee cost stood at INR 904 crore.
Indrajit Agarwal
analystOkay, that makes sense. For my second question, turning to the COP side — is that right? I notice you've restated your first quarter COP. Is that entirely due to mine development expenses now being included in the first quarter figures too? It stood at $954 when you reported the first quarter numbers. Now it's $1,019. Is that the whole adjustment, or is there something else in there?
Swayam Saurabh
executiveNo, there's no adjustment there. Regarding the gap between INR 954 and INR 1,019, it was stated quite plainly that this reflects a donation of INR 105 crore made during Q1 in support of COVID, going to the PM CARES Fund. That is exactly what accounts for the difference between those two figures.
Indrajit Agarwal
analystOkay, that's useful. One final question, and it's about the balance sheet again. When I total investment, there's INR 12,000 crore in cash and investments, plus roughly INR 4,300 crore of debt. Even assuming INR 9,000 crore goes out for this dividend payment, you'd still have a solid cash balance left, and Hindustan Zinc generates plenty of cash on its own. So what's the thinking when it comes to capital allocation? Do we keep seeing larger special dividends, or might we get more expansion — organic, inorganic, aggressive — along the lines of the Gujarat smelter?
Swayam Saurabh
executiveIt's really a mix of the two. Honestly speaking, this is something that falls under the purview of both sides. We do want to put capital toward areas where we're able to create additional spaces and better returns for stakeholders. When there's excess cash, at a certain point it gets returned to shareholders. That's really all I can say right now.
Arun Misra
executiveI believe, sir, if I may add something here. The clarity around what we need for expansion stretches out to 1.5 million tons of metal, and as I mentioned, for silver to rise to 1,400 tons. A great many waste-to-wealth initiatives will accompany this as well, sitting on the minor mineral side. When you consider how capital gets allocated, those are the areas that will receive priority going forward.
Indrajit Agarwal
analystThat's right. Absolutely. Thank you very much.
Operator
operatorI appreciate that.
Indrajit Agarwal
analystI've got nothing further to add. Yeah.
Operator
operatorThe following question comes from Pallav Agarwal, who is on the line from Antique Broking. You may proceed.
Pallav Agarwal
analystYes, good evening, sir. I have a question about the fertilizer project, which you haven’t mentioned at all. Since we’re now looking at a greenfield smelter in Gujarat, are the plans for the fertilizer project still active, or have we shelved it for the time being?
Arun Misra
executiveTo start with, that project is proceeding, and we're pushing it hard. Also, within the Atmanirbhar Bharat campaign, we're now examining ways to increase our use of domestically sourced rock phosphate and to adapt the design to suit that. That's the first point. Second, the site has been settled on. Only some approvals are still being worked through, and shortly — once we bring it to the board and secure approval — we'll be making it public.
Pallav Agarwal
analystAlright, thank you. Sir, regarding these physical premiums, Zinc still appears to be sitting below where it was a year ago. Is that because the share of our exports is still elevated, or should we expect those premiums to improve starting next quarter?
Swayam Saurabh
executiveThree factors are at play. The first is the split between domestic and export business. As a data point, in quarter two, domestic sales as a share of total sales began returning to normal. It hasn't gotten back to last year's level yet, but the shift has been sharply positive. The second factor is LME itself. An import duty equalization component is part of the total premium. Zinc LME has improved quite substantially, though it remains slightly below where the LME stood last year. That creates another modest effect. Exchange premium is the third factor. We can plainly see premiums trending better. Three global Asian exchanges are tracked by us, and they serve as a benchmark for us. They have still not gotten back to last year's levels.
Pallav Agarwal
analystIs that happening because demand on the ground is lower? Is that what's making physical Zinc a bit subdued?
Swayam Saurabh
executiveI believe how demand is perceived plays a role here, since we're seeing premiums catch up to the price. That's a pattern we've observed over the last five, six months. With Zinc prices getting stronger and holding action pretty well, we're also seeing that the premium, the realization premiums, have improved quite significantly. In fact, that's almost as high as a 30% improvement quarter-over-quarter. We expect that trend to keep going, but of course, COVID remains a factor for everyone out there. We're seeing very clear signs of recovery. The fact that Zinc has nearly reached last year's level tells you a lot by itself, and it's holding on.
Pallav Agarwal
analystSure. And just as a final point on sulfuric acid and by-products — are you beginning to see some improvement in that area too?
Swayam Saurabh
executiveA very sharp upturn. During the prior quarter, as we noted, sulfuric acid realization had fallen to INR 1,350 per ton. Now those realizations have climbed past INR 2,100, INR 2,200. That is the path we projected three months ago, and I believe we have essentially reached it. Further gains should follow.
Pallav Agarwal
analystSure. All right, if I could just fit in one final question. On commercial paper — that's short term, correct? My assumption is we'd be keeping that. Could you give us some idea of where the rates stand? Is there any arbitrage between what we earn on our deposits and what we're paying on our short-term commercial paper?
Swayam Saurabh
executiveYes, I think that's a fair question. It ties back to something asked earlier about how we leverage the balance sheet. Right now, short-term borrowing really is quite appealing when I stack it against certain investments that are locked in for tax efficiency. You're weighing short-term borrowing against the option of breaking something that's locked for, say, as long as a three-year horizon. And short-term borrowing versus a short-term return, if I need to keep that money liquid, is clearly not appealing. Put simply, short-term CP rates are very attractive. Using our balance sheet to capture rates like those may also explain why we could be willing to cover some of our short-term funding needs through these borrowings rather than breaking an investment that carries an attractive coupon.
Pallav Agarwal
analystAll right, sir. Thanks a lot for everything you've shared here.
Operator
operatorThanks. Before we move to the next question, we'd like to let participants know that so management can get to questions from everyone on the conference, please keep your questions to two per participant. If you have follow-up questions, we ask that you rejoin the queue. We take the next question from the line of Ritesh Shah from Investec Capital. Please go ahead.
Ritesh Shah
analystHello, sir, and thank you for the chance to speak. Sir, my first question concerned the Vizag smelter. I just wanted to clarify whether it will handle only concentrate coming from the Rajasthan mines, or whether there is also scope for it to blend material from Zinc International?
Arun Misra
executiveSo this is a fresh area for us to look into, tied to the concentrate flow that moves around India's coastline to a range of destinations. As Swayam laid out, from a strategic standpoint it also lines up with the point at which we grow to 1.5 million tonnes. Should extra smelting capacity be required and should we choose to go ahead, this could still work as an export-oriented smelter situated on the coast. Right now, the business case on a standalone basis appears justified at the preliminary stage, based on the concentrate flow moving around India's coast to the various destinations in Southeast Asia and beyond.
Ritesh Shah
analystAll right, that’s useful. Sir, for my second question, can you give any update on the HZL divestment? I believe the government did signal that the arbitration process would begin. Has there been any news since that consultation with the government? If you could share something on that front, it would help.
Arun Misra
executiveThat's not something we're going to address, since it doesn't have anything to do with us.
Ritesh Shah
analystAlright, maybe I can squeeze in one more question. Sir, regarding the timeline for unwinding the pledges over at Hindustan Zinc, what's your view on that? How do you see it playing out? What kind of comfort level do we have there? How should one look at this, sir?
Arun Misra
executiveAre you talking about the commitments made by Vedanta?
Ritesh Shah
analystYes, sir.
Arun Misra
executiveOnce more, that isn't the correct way to frame a question about the quarter.
Ritesh Shah
analystAlright, that’s fair. Thanks a lot.
Operator
operatorThanks. Our next question comes from Rahul Jain at Systematix. Go right ahead.
Rahul Jain
analystHi there, thanks for taking my question. Sir, how should we think about our volumes for FY 2022 and FY 2023? Because I believe the expansion from 1.2 to 1.5 would probably take two years. Should we assume a flattish volume curve from this point on?
Arun Misra
executiveThat's still quite a way off. We've set a provisional goal of taking on a 1.5 million tons project and seeing it through, provided the life of mine study shows the investment can be supported with a solid economic IRR across a 10-year span. That would likely land around FY 2023 or FY 2024. As for the precise timelines and which figures will emerge, I'd rather not speculate at this point.
Rahul Jain
analystWhat sort of broad figure are we talking about for this type of thing?
Arun Misra
executiveTo explain how the mining gets done: that 1.5 million tons isn't a steel plant you switch on and it produces the following day. Mine development must begin. A lot of the preliminary work is already underway. The mine needs to be developed, the incline has to be completed, footwall drives have to be completed. At some point shaft work has to be completed. All of these are partly being studied, partly in progress. From now until FY 2024 you'll see the number step up gradually. If the other portions of the project — whether in smelting, whether in mine ventilation, whether in power infrastructure — are also in place, you'd see the final numbers kicking in toward that timeline.
Rahul Jain
analystWould you call that more of a 5% to 10% type of increase, or is it larger than that?
Arun Misra
executiveIt’s going to happen in stages, and I won’t attach a specific number to it, but it will keep increasing on a year-over-year basis.
Rahul Jain
analystSir, since our mine life is limited at this point, what's the reasoning behind putting so much money into smelting projects? In any case, the TCRCs are really low, which doesn't justify any genuine need to enter that business.
Swayam Saurabh
executiveNo. Like I mentioned, pre-feasibility work is underway. Looking at TCRCs from the past 5 years, there may still be a business case in there. What we're asking is: from an integrated standpoint for HZL, 5, 7, 8 years out, what sort of returns would this generate? We'll have clarity on that once the feasibility study wraps up.
Rahul Jain
analystOkay, thank you very much.
Operator
operatorThanks. We'll take the next question from Vishal Chandak at Emkay Global Financial Services. Your line is open.
Vishal Chandak
analystMuch appreciated for taking the question, sir. What I wanted to ask simply follows up on the Gujarat smelter. At the back of my mind, is there also a thought of moving the Gamsberg ore at some stage, given that we see TCRCs possibly staying low for a while — perhaps 3 years or 4 years out — as a means of integrating those two facilities, considering that power outages occur over in South Africa and Gujarat ranks among the best destinations for investment, as you said. Are we considering integrating the Gamsberg ore with the smelter to be set up in Gujarat?
Arun Misra
executiveThis smelter, as I mentioned, on a standalone basis, is constructed around the concentrate that circulates along that Indian coastline. That doesn't rule out Gamsberg or any specific facility, so to speak. Provided the business case supports it, every concentrate will be utilized whenever the technology supports separating the minerals on that basis. Since each concentrate carries its own particular characteristics. Certain ones contain more manganese, certain ones contain less manganese, certain ones contain more cadmium. Having said that, a decision will be made once we complete the detailed feasibility report.
Vishal Chandak
analystSir, my second question again concerns the capital allocation you brought up. When it comes to funding short-term debt via long-term investments, which makes sense, you do have some investments locked in for three years, and so on. But what is the rationale for the NCD at this point — do we actually have an immediate deployment for that amount, or is it essentially an attempt to fund the dividends right now? Because even on a net basis, even after removing the INR 9,000 crores of dividend, net cash on the books still stands at roughly INR 8,800 crores, assuming all the debt is paid out immediately.
Swayam Saurabh
executiveOkay, so the net cash figure you worked out wouldn't automatically be cash as such, since those amounts would sit within a pool under cash and investments. The current NCD fits in for the reason that its timing isn't necessarily tied to the dividend or to the liquidity required for the dividend, but also to some of the other commitments, and a few questions came up around those. We may need to commit to them over the next 6 to 12 months. This is essentially part of the planning that has been carried out regarding what kind of cash we might require over the next 12 months, and that's why the NCD is timed the way it is timed.
Vishal Chandak
analystThanks a lot, sir.
Operator
operatorThanks. Our following question comes from Vineet Maloo at Birla Sun Life. You have the floor.
Vineet Maloo
analystGood afternoon, and thanks for the question. It's encouraging to hear that you plan to increase dividend payouts and that you're comfortable taking on somewhat more leverage to address the mismatch between investments and their timing. You mentioned there would be guardrails governing how much leverage you carry, whether measured by debt-to-equity or debt-to-EBITDA. Could you walk us through some of those metrics — specifically, what are the outer limits you'd want to stay within at all times, no matter where we are in the cycle?
Swayam Saurabh
executiveI can't give you a specific ratio at this point, since we're planning to essentially get sign-off from the board in the near future. What I can assure you is that it will stay very healthy, no matter which industry you compare it against. That's all I'm able to share with you at the moment.
Vineet Maloo
analystAll right. I figured you'd already have a plan in place, since this is likely the first occasion on which you're actually taking on borrowing of this size. A great deal of deliberation would already have gone into that work. In any case, we're able to hold off until that takes shape.
Swayam Saurabh
executiveAbsolutely.
Vineet Maloo
analystMy other question concerned the Gujarat smelter. You said it might handle third-party raw material too. I'm just curious whether you see a point ahead where smelter economics could outperform those of standalone mining — that is, a non-integrated smelter and mine — such that you'd also consider processing some independent raw material?
Swayam Saurabh
executiveThat's a fair question. A custom smelter is a standalone operation. It's a really solid business model. Even with TCRC declining right now, if you look at just the past few years, well-run operations generate decent IRRs. Technologies keep evolving too, which drives very high recovery levels and adds to that. To give another bit of context, if you look around at the data on what type of concentrate gets shipped into Asia for processing, and at Asian metal demand five years out, you'd see the rationale for why we're exploring building a custom smelter. That's one angle. Another angle could be within Vedanta itself, if there's better integration. Third is really our own growth model. We're aiming to reach 1.35 and then 1.5. Sooner or later, a smelter is coming. We're simply examining it from a broader perspective — are there other adjacent opportunities? While we stay focused on mining growth, are there other adjacent opportunities that can also create value for shareholders? That covers the smelter as well as fertilizers, which came up earlier.
Vineet Maloo
analystI get the point that at some stage, as mining volumes increase, you'd need smelting capacity. I was kind of thinking a brownfield expansion with integrated operations would be the better way to serve that side of the overall picture, right, when mining volumes increase? Because you specifically brought up the capability to process independent raw materials, I was just wondering whether you think smelter economics on its own is going to look attractive relative to mining.
Swayam Saurabh
executiveNo. I think you're asking that question three to five months too early. Right now we're working on feasibility and pre-feasibility, and all of these variables are being assessed. When the time is right, we would announce that as well.
Vineet Maloo
analystAll right. That's reasonable. Right. I've finished asking my questions. Thanks.
Operator
operatorThanks. We have time for one final question, and it comes from Abhi Agarwal at Deutsche Bank. Go ahead, please.
Abhi Agarwal
analystYeah. First off, congrats on your results, sir. Could you give me a quick rundown of what kind of investments these are — the current investments? Basically, I just wanted to get a sense of what sort of instruments these are and how, if it's required, they could be sort of liquidated.
Swayam Saurabh
executiveWas your question about the investments we hold right now, or did you mean the overall investment figure?
Abhi Agarwal
analystAs for the current investments — actually, both of them, if we're being specific.
Swayam Saurabh
executiveRight. As for current investments, those would be FDs and liquid money market instruments, which are quite short-term. Beyond that, our overall investment mix would include FMPs and zero coupon bonds. The entire investment portfolio carries a very high rating. We keep that balance between long-term and short-term.
Abhi Agarwal
analystUnderstood. Appreciate it.
Operator
operatorMuch appreciated. That will serve as our final question. At this point, I'd like to return the conference to Ms. Shweta Arora, who has some closing remarks for us.
Shweta Arora
executiveThank you. Before we wrap up today's call, I'm glad to say that we're making solid progress on our path toward disclosures that are comprehensive and holistic. To that end, I'd like to let you all know that our first integrated annual report, covering the financial year 2019 to 2020, has now been published, and we would welcome your valuable feedback on it. In addition, both our tax transparency report and our sustainability report can now be found on our website. That brings me to the end of today's call. Should you have any follow-up questions or need clarifications, please don't hesitate to get in touch with the investor relations team. Thank you.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Hindustan Zinc Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Hindustan Zinc Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Hindustan Zinc Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.