JSW Energy Limited (533148) Earnings Call Transcript & Summary

May 7, 2024

BSE Limited IN Utilities Independent Power and Renewable Electricity Producers earnings 54 min

Earnings Call Speaker Segments

Operator

operator
#1

Good day, everyone, and welcome to the JSW Energy Q4 FY 2024 earnings conference call, hosted by JM Financial. Please be advised that all participant lines are in listen-only mode, and following the presentation's conclusion, there will be a chance for you to ask questions. If you require assistance at any point during this call, please signal an operator by pressing star then zero on your touchtone phone. Kindly note that this conference is being recorded. I will now turn the conference over to Mr. Sudhanshu Bansal of JM Financial. Thank you, and over to you, Mr. Bansal.

Sudhanshu Bansal

analyst
#2

Thanks, Nirav, and good evening, everyone. I'm speaking on behalf of JM Financial, and I'd like to welcome all of you to the JSW Energy conference call, where we'll be discussing the results for the fourth quarter and FY 2024. We're joined by the company's top leadership team, which includes Mr. Sharad Mahendra, Joint MD & CEO; Mr. Pritesh Vinay, Director, Finance and CFO; and Mr. Vikas Chaudhary, Head, Investor Relations and Treasury. Many thanks, sirs, for being with us so kindly and for giving JM Financial the chance to host this call. With that, I'll now hand things over to Mr. Mahendra for his opening remarks and to carry the call forward. Over to you, sir.

Sharad Mahendra

executive
#3

Thanks, Sudhanshu. Good evening, everyone, and thank you for being with us on this call covering quarter four and fiscal 2024 results. I'll begin by walking through several parts of the business, starting with how power demand has developed, then moving to capacity increases — and we've witnessed considerable capacity being added across the country — along with a number of other points. To begin with power demand: we recorded robust growth of 7.5% in FY 2024. Keep in mind that this came on a bigger base, since growth had also exceeded 8% back in FY 2023. For the quarter that closed in March, demand growth came in at 7.4%. More recently, the figures received for April 2024 showed demand growth near 11%, which points to strong demand through the summer season we are currently in the middle of. Another notable point is that peak demand hit 243 GW during FY 2024, and according to the Ministry of Power — and given the demand growth we are observing — it is expected to touch 260 GW, perhaps during this summer. As for generation nationwide, it rose 7.1% in FY 2024, while Q4 brought a 7.3% increase.

Sharad Mahendra

executive
#4

As everyone is aware, the hydrological conditions have been unfavorable. Large hydro generation declined 17% in FY 2024, and during Q4 we saw a 20% year-on-year drop. Meanwhile, RE generation rose 5% for the quarter and 11% in FY 2024. Looking at capacity installations, the country's installed capacity has now reached 442 GW, with total capacity addition of 26 GW in FY 2024, compared with 16.6 GW in FY 2023. Renewable capacity addition hit a record 18.5 GW, the highest in any single year, versus 15.3 in the prior year. Breaking that down, solar capacity addition set a record with an increase of 15 GW, while wind came in at 3.3 GW for the full year of FY 2024. Of this total capacity of 18.3 GW, 9.8 GW of RE capacity was added in Q4, comprising 8.5 GW from solar and 1.2 from wind. So we are seeing a significant rise in the capacity additions taking place. And looking at the bidding environment as well, it is very, very conducive, particularly, I would say, for serious players such as us. And with the government's target of 50 GW of bidding per annum, which was announced perhaps at the start of the previous year, we have seen tenders worth 47.5 GW announced, and auctions completed for more than 40 GW in FY 2024.

Sharad Mahendra

executive
#5

It's worth noting that during the fourth quarter of FY 2024, we saw a total of 19 GW of RE capacity auctioned, and that was the point at which we took part, when we judged conditions to be favorable. Of that 19 GW, JSW Energy secured 3.4 GW — 18% of all the auctioning that occurred across the country in quarter four. We're also observing a blend of bids arriving beyond straightforward solar and straightforward wind. Hybrids have been showing up, along with RTC, green power, and now FDRE. So it really reflects the need for round-the-clock supply, as well as demand patterns viewed on an hourly basis. FDRE, from what we can see, is here to stay, and that's quite interesting, since it isn't merely a power supply — it's delivery of a full solution to the DISCOM or state that requires it, and our team is engaged very closely on that as well. We managed to win the first meaningful share of the inaugural FDRE bid, which was introduced in Q4. As for the merchant market, it remains robust, and volumes during FY 2024 rose 12%.

Sharad Mahendra

executive
#6

Also, the average tariff was lower, at INR 5.24 versus INR 5.94 a year earlier. That's because, as I'll discuss, API 4 coal prices have fallen sharply as well. So the upshot is that the tariff reduction is smaller than the drop in coal prices, which is another positive for the sector. Turning to coal: looking at an index such as API 4, it stood at the $250 level in FY 2023 and was at $110 in FY 2024. In April, that index slipped a bit further, to $107. Beyond that, on the power sector outlook that has been announced, taking a somewhat longer horizon — say through FY 2032 — the National Electricity Plan states plainly that demand growth will run at 5.5% year-on-year on an annualized basis between 2024 and 2032, which is extremely positive on the demand side. Besides average demand, peak demand, which we saw at 243 GW in FY 2024 — and already this year, the Ministry of Power has announced, and given how demand growth is unfolding this summer, it is expected to hit 260 GW at peak.

Sharad Mahendra

executive
#7

Predictions indicate demand will rise considerably over the next several years. The figures announced for FY 2027 are expected to hit roughly 277 GW, and by FY 2032, 366 GW. That's a substantial jump in peak demand that will be with us, fueled by multiple factors. Look at the manufacturing growth now under way, and the pace of urbanization that should be occurring. Those are the main drivers, along with the country's shift toward green energy in manufacturing. These are very encouraging factors for the sector that we're observing. And looking at JSW Energy's performance this year, we posted record adjusted EBITDA and PAT, powered by RE capacity additions as well as solid thermal performance. EBITDA for the year rose 53% to INR 5,837 crore, while in the quarter EBITDA climbed 47% year-on-year to INR 1,292 crore. PAT likewise saw a gain, and total net generation also posted a notable rise. Turning to PAT, in FY 2024 it went up 17% year-on-year to a level of INR 1,723 crore, and in Quarter 4 it increased 29% to INR 351 crore.

Sharad Mahendra

executive
#8

Now, looking at the financial figures — the performance on that side. If we look at overall net generation compared with the growth I mentioned earlier, our total net generation for the year rose 27%, going from 21.9 billion units in FY 2023 to 27.9 billion units in FY 2024. For the quarter, it was up 26%, moving from 5.1 billion units in the prior year's Q4 to 6.4 billion units. That higher generation came from the contribution of acquired assets, plus greenfield RE capacity additions and greater thermal generation. Those are the key drivers behind the increase in generation. Another positive we're seeing in the sector, and for us as well, is that our receivables, including the acquired RE portfolio, stand at 54 days, and we're seeing very positive action from the DISCOM side on this, and it's very healthy for the sector too. Turning to the balance sheet, our net debt-to-equity is at 1.3, and net debt-to-EBITDA is at 4.5. If we exclude the CWIP — the work in progress that's there — our net debt-to-EBITDA, excluding CWIP, comes to 2.9. That again clearly positions us for future growth, which we have a plan for and which I'll speak about in a little while.

Sharad Mahendra

executive
#9

As all of you know, at the start of April we wrapped up our QIP successfully, and in QIP terms this stands as the biggest fundraise ever done through that route and the third biggest across the power sector, counting the IPOs the sector has seen. It drew very strong interest from a great many global and domestic funds, which also have faith in the JSW Energy story and in how we intend to grow. Now, to build our robust pipeline — this has made it possible for us to build a robust pipeline, and as I mentioned, we have already taken part in the competitive bid space, and we have been declared L1 for three, for a total capacity of 3.6 GW, of which 3.4 GW of LoI and LoA we have already got, and that brings our long-term capacity total — the work in progress, the commissioned capacity, and the order book — to 13.2 GW. We have been successful — we have been talking about the Mytrah asset, which we acquired about a year back — that we have successfully turned around the PPA asset performance, and we have increased to generate a 12% increase in the generation within one year of transaction.

Sharad Mahendra

executive
#10

And EBITDA came in at INR 1,400 crores — INR 1,403 crores, to be precise. We expect, and we're confident about, further improvement in FY 2025, when we'll also be able to capture the whole wind season. This aligns with the earlier announcement we made about where we intend to get in 24 months' time at Mytrah — EBITDA in the range of INR 1,600 crores. We're very well on track to hit that figure. Beyond that, our Ind-Barath Unit One was successfully commissioned in January, and during this quarter we generated 196 MU, and we were able to ramp up the capacity. Also, this project's execution is itself a record for a stressed asset that had been non-functional for a very long period — in record time we brought it on stream and began generation as well. Separately, Unit 2 — we're looking at commissioning it in the current quarter; the second Ind-Barath unit is also one we plan to commission. On battery storage, the 1 GWh project that we won — we're happy to announce that for part of the capacity we've already signed the PPA, and site work has already begun, ordering has been completed, and we're confident that by quarter 1 of FY 26, meaning April to June 2025, we'll be in a position to commission this 1 GWh project.

Sharad Mahendra

executive
#11

Alright, friends, that covers everything from our end. At this point I'll open it up for questions, and we'll be glad to respond. Thanks.

Operator

operator
#12

Thanks a lot. We're moving into the Q&A portion now. If you'd like to pose a question, just hit star and one on your touchtone phone. Should you want to drop out of the queue, press star and two. We ask that participants use their handsets when asking questions. Ladies and gentlemen, we'll pause briefly while the queue builds up. Participants, you can press star and one to ask your question. Our first question comes from Mohit Kumar at ICICI Securities. Please go ahead.

Mohit Kumar

analyst
#13

Good evening, sir, and congratulations on the successful fundraise. My first question concerns the fact that the board has approved raising funds worth INR 100 billion. What's the reason behind this fundraise? Are you planning to raise these funds in FY 25? Is that the right understanding?

Sharad Mahendra

executive
#14

Look, Mohit, thanks. Mohit, one thing we've stated — if you recall, we said we've announced 20 GW by 2030, up from the current level of 7.28 GW. In phase one, we said that by FY 2025 we'll reach a 10 GW capacity, and we're well on track to hit that on time. Now, as I mentioned regarding the demand environment and the opportunities out there, we're sure — and also on the inorganic side, opportunities are also present in the market. So we keep evaluating, and we're confident that with these kinds of opportunities existing, and the environment being healthy as well, we're confident of accelerating that growth of 20 GW, for which we'd earlier set a timeline of 2030. We're confident of speeding up that growth, perhaps a few years earlier. And so, we have taken board approval so that, as and when an opportunity arises, we should be ready to take full advantage of any opportunity that comes. That's basically the reason, and my colleague, Mr. Pritesh Vinay, would like to add to this.

Pritesh Vinay

executive
#15

Mohit, just to give some context here — Sharad already addressed this, but let me frame it. We've actually had an enabling resolution for raising capital in place since 2016. The only thing is, it took us 7 to 8 years before we actually pulled the trigger, what with macro headwinds and all, plus the size of the opportunity and the visibility of returns and accretive growth. So this too is an enabling resolution that we're seeking, and we'll keep seeking one every single year, the way we've done for the last 8 years. That's the first point. Second, to build on what Sharad said — he covered the bidding environment and demand growth and so on — there's also plenty of inorganic opportunity out there. Right now, as we speak, there are a few platforms where the fund lives of the financial sponsors are nearing their end, and a number of processes are underway. So who knows? If the right opportunity comes along, it's always good not to be constrained by necessary approvals being in place, from a capital raise flexibility standpoint.

Pritesh Vinay

executive
#16

And that gives you the full picture.

Mohit Kumar

analyst
#17

Got it. Based on the pipeline you currently have, what would CapEx be in FY 25 and FY 26? And could you also give us some detail on capacity additions over the next two years?

Sharad Mahendra

executive
#18

On capacity additions, Mohit — like we mentioned before, we will get to 10 GW by FY 2025. We're very much on track, and we're confident that we will hit that 10 GW figure by FY 2025.

Mohit Kumar

analyst
#19

On the CapEx side, if possible, could you provide a figure covering the next 2 years?

Pritesh Vinay

executive
#20

Right. So giving guidance for next year is simpler — and for the two years after that — because, suppose, for example, we take part in additional bids… and we come out on top in both, the larger bids, then that figure will shift on that basis, correct? So for the roughly 2.7 GW we must finish in order to reach the 10 GW mark, along with the storage, the battery storage project, we foresee total capital expenditure of approximately INR 15,000 crore in the coming fiscal year. As for the year after that, we believe that, you know, once the current fiscal year wraps up, we will be well positioned to provide guidance for the following year. And just to finish the point, for the year that has just closed, the numbers we are talking about, we spent roughly INR 8,000 crore.

Mohit Kumar

analyst
#21

Between 8,000 and 15,000 — got it.

Pritesh Vinay

executive
#22

Yes.

Mohit Kumar

analyst
#23

My final question concerns the reason behind exploring the establishment of green manufacturing capacity, and what timeline are you considering?

Pritesh Vinay

executive
#24

On that point, Mohit, we're looking into the option of manufacturing battery cells. As Sharad mentioned during his opening remarks, India will require a substantial volume of storage solutions to tackle intermittency from a grid stability standpoint. Also, increasingly we'll see complex bids that naturally incorporate a battery storage component, for FDRE-type tenders. So we believe there's a long path ahead when it comes to stationary storage. That's why we're seriously assessing this and carrying out detailed work on it. When the time is right, we'll make the appropriate decision, and should we decide to pull the trigger, we'll step forward and share every detail with the market.

Sharad Mahendra

executive
#25

Yes. And Mohit, to add further to that figure, if you look at things right now, as I mentioned earlier, storage is set to play a key role. And today in the country, from the battery standpoint, if you look, there is hardly any — almost nil — battery storage capacity in place. Only pumped storage of 4 GW is running as available. And the projections out there make it very clear that by FY 2027, the total storage capacity needed will be in excess of, close to 16 GW. Of that, roughly 8 GW is expected to be 8 to 9 GW of battery, with the balance coming in the form of pumped storage. So this is a huge opportunity that we see ongoing. As Vinay said, we are evaluating it, and rather than depending on procurement, whether it really makes a difference if there is a benefit, we'll be moving ahead.

Mohit Kumar

analyst
#26

Got it. Thanks, and best of luck. Thanks.

Sharad Mahendra

executive
#27

Thanks.

Operator

operator
#28

Thanks. The next question comes from Sumit Kishore at Axis Capital. Go ahead.

Sumit Kishore

analyst
#29

Hello there, and good evening. Thanks for having me — I appreciate the chance to be here.

Operator

operator
#30

Sumit, apologies for cutting in, but your audio keeps cutting out.

Sumit Kishore

analyst
#31

Is that clearer?

Operator

operator
#32

Yes, if you’re able to say something.

Sumit Kishore

analyst
#33

Yeah. Is this better?

Operator

operator
#34

Yes. Sure, go right ahead.

Sumit Kishore

analyst
#35

Thank you. My first question follows up on what Mohit asked. If your FY 2025 CapEx guidance is around INR 150 billion, I'm just looking at slide 13 of the presentation, which notes that out of your total committed CapEx of INR 186.5 billion, roughly INR 150 billion has already been spent. And on top of that, there is a SECI XII of INR 22 billion CapEx. So INR 150 billion appears to include CapEx that you would incur for the 3.3, 3.6 GW committed capacities as well. Is that correct?

Pritesh Vinay

executive
#36

Yeah.

Sharad Mahendra

executive
#37

Correct.

Pritesh Vinay

executive
#38

Yeah, that’s correct. Exactly right.

Sumit Kishore

analyst
#39

Yeah. So could you also—

Pritesh Vinay

executive
#40

Spending is going to occur on this pipeline.

Sharad Mahendra

executive
#41

Correct.

Pritesh Vinay

executive
#42

That will be distributed across 2 to 3 years. And, you know, storage CapEx is going to happen as well, so it all adds up together. On top of that, maintenance CapEx for the plant already in operation will be there too.

Sumit Kishore

analyst
#43

And that covers everything.

Pritesh Vinay

executive
#44

That brings us to the total for CapEx.

Sharad Mahendra

executive
#45

And on top of that, the projects already underway — those will also involve balancing CapEx, which is still pending.

Sumit Kishore

analyst
#46

That's right.

Sharad Mahendra

executive
#47

That too is going to get done this year, so it adds up to the whole amount.

Sumit Kishore

analyst
#48

Is it reasonable to think that, for the 3.6 GW you've recently secured, we ought to expect commissioning to occur after FY 2026?

Sharad Mahendra

executive
#49

Yes, a large share of it — that's correct.

Sumit Kishore

analyst
#50

Yes. So, regarding Ind-Barath — during Q4, 196 million units were sold. EBITDA came in at roughly INR 300 million. The margin looks somewhat slim. Is that because upfront O&M costs are running higher, and because this is an early phase of getting the unit stabilized?

Operator

operator
#51

Everyone, please remain on the line. Management’s connection was lost. Ladies and gentlemen, please remain on the line. Management’s connection was lost. Ladies and gentlemen, we appreciate your patience. Management’s line is now back. Sir, the floor is yours.

Sumit Kishore

analyst
#52

Yeah, my question is about the Ind-Barath project — 196 million units were sold in Q4, and the EBITDA on that came to roughly INR 300 million. Is the per-unit spread you're earning somewhat thin because of the upfront O&M cost, which would have been elevated while the unit was stabilizing? Could you comment on that?

Sharad Mahendra

executive
#53

Every time a new unit is being set up, there are a great many — the unit drops, then it returns again, and this happens often.

Sumit Kishore

analyst
#54

Yes.

Sharad Mahendra

executive
#55

That's definitely one factor that has an impact. But at this point the unit has gotten to nearly, I'd say, a strong degree of stabilization, so things will improve. Still, yes, when the unit starts up, this is a normal thing that occurs.

Operator

operator
#56

Thanks. Sorry to cut in, Sumit. I'd like to come back with a follow-up question. I'd ask everyone to please limit themselves to 2 questions per participant, and then kindly rejoin the queue for a follow-up question. Our next question comes from Atul Tiwari at Citi. Please go ahead.

Atul Tiwari

analyst
#57

Yes, sir, thank you very much, and congratulations on the successful capital raising. So my question concerns JSW Neo Energy. Could you share the consolidated numbers for JSW Neo Energy for FY 2024? Just the revenue, along with the fact — how much was it?

Sharad Mahendra

executive
#58

Atul, could you please reach out to the IR team? They'll be able to assist you with the figures, alright?

Atul Tiwari

analyst
#59

All right, all right, and the next question concerns how that INR 150 of CapEx splits up. So what portion of it goes toward battery storage?

Sharad Mahendra

executive
#60

And so, once the contractual side has been signed off — right now we're at a very advanced stage in wrapping up negotiations with the suppliers — by next quarter would probably be the right moment when we should be in a position, having secured the board's approval, to come and share with the markets what the final project cost for this one is. Yeah?

Atul Tiwari

analyst
#61

Yeah.

Sharad Mahendra

executive
#62

But it is going to come in lower-

Atul Tiwari

analyst
#63

Yeah.

Sharad Mahendra

executive
#64

Compared with where it stood 12 months back, that's higher. Correct.

Atul Tiwari

analyst
#65

Oh, okay. That’s great. Thank you.

Operator

operator
#66

Thanks. Our next question comes from Koundinya at Jefferies India. The line is yours — go ahead.

Koundinya Nimmagadda

analyst
#67

Yes. Hello, sir. Thank you for the chance. Sir, my first question concerns capacity. So 9.8 GW by the end of this year, that looks fine. If I were to go back and look, you know, when will this 3.6 GW be, and what would that day look like, you know? Or if I were to ask it another way, in a different way, you know, FY 2027, where do you see your capacity ending at?

Sharad Mahendra

executive
#68

Look, when we look at that capacity — the 3.6 GW we've won — it may be that it was only won quite recently. So now the PPA signing process gets underway. Once that signing process begins, depending on what the PPA terms are, on average you could say roughly two years is the period involved, and within that window, counting from the date the PPA is signed, the whole capacity will be commissioned. And if we're sitting at 10 GW, only a very small amount, as I mentioned earlier, will form part of that. But then, you know, that can be added, so let's take a two-year timeline from the PPA signature. That's how we'll get there — as we said, the total locked-in capacity of 13.2. Within two years from the PPA signing date, we will definitely be reaching 13.2 GW.

Koundinya Nimmagadda

analyst
#69

Got it, sir. You also mentioned moving forward with your FY 2030 targets. Is there any time frame you're considering, or is it too soon to say anything on that front?

Sharad Mahendra

executive
#70

It's a little early for that. When the moment is right, we will certainly share it, as I mentioned—but we feel quite confident given the order book we've managed to build in such a short span. That's one of the main reasons, along with the opportunities that exist in the year ahead as well. For the current year, we're quite confident that we'll be accelerating significantly, and when the time is right we'll let you know. Giving an exact timeline for that is a bit early.

Koundinya Nimmagadda

analyst
#71

Got it, sir. Sir, moving to my second question, which concerns the merchant market. As I recall, roughly a week ago a CERC paper came out that puts a ceiling on merchant power tariffs at approximately 1.2 times the variable cost on average, or 1.6 times for any given time frame. Any… how do you view that? Any particular remarks you'd care to offer regarding the sort of impact?

Sharad Mahendra

executive
#72

To repeat what I said earlier, it's really too soon to say anything about this, since it only came up about 24, 36 hours ago. And we also need to keep in mind that this is a staff paper — and a draft at that — which we as an industry have to examine and then assess the impact. All I can say is that what the staff paper states is unlikely to actually go through as written. But from where we sit, when we look at it, only 15% of the power is open power for us — the portion we sell on a merchant basis. And of that, a significant share is also sold through bilateral trade on a short-term basis. So we believe that even if this happens — and it's highly unlikely — the impact won't be there for us, at least as far as we can see, because the majority of our power is tied up in long-term PPs.

Koundinya Nimmagadda

analyst
#73

Got it, sir. If I could just ask one question on the bookkeeping side: what was the average merchant tariff you released during the quarter, sir, or for FY 2024?

Sharad Mahendra

executive
#74

I believe that if you reach out to the IR team, they ought to be able to help with that. But if my memory serves me right, the typical day-ahead market price on the exchanges during the quarter came in at roughly INR 4.3. Or is it around 4.69? 4.69. Our realization stands considerably above that level. Considerably above that level.

Koundinya Nimmagadda

analyst
#75

Of course, sir. Many thanks, and best wishes to you.

Operator

operator
#76

Thanks. Attendees, you can hit star and one to pose a question. The next one comes from Rajesh Majumdar at B&K Securities. Go right ahead.

Rajesh Majumdar

analyst
#77

Morning, and thanks for giving me the chance to speak.

Operator

operator
#78

Rajesh, your voice sounds muffled to me. Could you please use the handset when you speak?

Rajesh Majumdar

analyst
#79

Can everyone hear me at this point?

Pritesh Vinay

executive
#80

Yes.

Sharad Mahendra

executive
#81

Yeah.

Rajesh Majumdar

analyst
#82

Could you possibly provide the EBITDA figures for Mytrah — both for the quarter and for the full year?

Pritesh Vinay

executive
#83

Yes. The full-year figure for Mytrah came in at 1403. That covers the entire year—

Rajesh Majumdar

analyst
#84

Uh-huh.

Pritesh Vinay

executive
#85

Regarding the EBITDA figures for Mytrah — and just for this quarter, I'll simply,

Sharad Mahendra

executive
#86

Two hundred forty-four.

Pritesh Vinay

executive
#87

244 for the quarter. And, Rajesh, if you take a look at our presentation,

Rajesh Majumdar

analyst
#88

Yeah.

Pritesh Vinay

executive
#89

That brings us to slide 38. On slide 38, you'll find-

Rajesh Majumdar

analyst
#90

Oh, all right, all right. All right, all right, no problem. My apologies, my apologies, my apologies — I didn't catch that. Yeah. Yeah.

Pritesh Vinay

executive
#91

That’s not a problem at all.

Rajesh Majumdar

analyst
#92

And then, for my second question, sir: regarding that INR 15,000 crore CapEx you brought up — that figure doesn't include the effect of any acquisition, correct?

Pritesh Vinay

executive
#93

Yes. Yes. Yes, sir. We still find ourselves, you know, in a spot where a firm CapEx figure can be given without any firm target in sight, and—

Rajesh Majumdar

analyst
#94

Yeah, yeah, yeah.

Pritesh Vinay

executive
#95

We’re not in a position to provide any number—any CapEx figure—on that.

Rajesh Majumdar

analyst
#96

With so many distressed assets in a market like this, isn't it possible that the figure could be higher than that?

Pritesh Vinay

executive
#97

Sure — if that possibility exists and we’re earning the returns we want, the results we expect, then of course we’ll keep looking at any opportunity that appears on the market. Absolutely.

Sharad Mahendra

executive
#98

Rajesh, that's a fair point.

Pritesh Vinay

executive
#99

Right.

Rajesh Majumdar

analyst
#100

So in that scenario, could you provide us with some rough guidance on net debt to EBITDA? For instance, what's the maximum it could reach if we end up doing an acquisition like that? What's the—you know, it stands at 4.5 right now, and EBITDA might rise a bit this year. So how high are we able to go, both to fund our growth and to keep things within some sort of limits? Is there any approximate figure you can offer on that, some kind of range?

Pritesh Vinay

executive
#101

Right, right. No, no — asking for a ballpark figure is exactly the right question, since that's also, I'd argue, the key metric to watch: how the leverage profile is going to shake out, correct?

Rajesh Majumdar

analyst
#102

Yeah.

Pritesh Vinay

executive
#103

If you look back at everything we've said in our commentaries over the last couple of years, the thing we've consistently maintained is this: we have three competitive advantages that we believe we hold over the majority of our peers. The first is that our specific investment cost, or our CapEx per MW, typically tends to come in lower than peers. Our OPEX per MW also tends to be lower than peers. And we have one of the strongest balance sheets, which is why we hold one of the highest credit ratings in the private sector. That in turn means the financing cost for our growth projects ranks among the most competitive in the industry. So retaining all of these moats is very, very imperative for us, from a business standpoint and from a strategy standpoint. So we'll go by whatever the rating agency guard rail is, right? It's very important to understand what the guard rails are for the high credit rating we hold. The way the rating agencies see it — because typically when you launch a 3:1 debt to equity project with a 25-year visibility on revenue and cash flows, and you solve for a certain debt service coverage ratio — it translates into net debt to EBITDA of roughly 5 to 5.5 times.

Pritesh Vinay

executive
#104

And the rating agencies are at ease with that. The key point, though, is the term they apply: a sustained normalized net debt to EBITDA. What does that mean? It means that when debt sits on the balance sheet — debt tied to capital work in progress — they make an adjustment for it, since the EBITDA it will generate is going to arrive in a forward-looking way, correct?

Rajesh Majumdar

analyst
#105

Okay.

Pritesh Vinay

executive
#106

So at a headline level, what we're looking at is 4.5x — adjusted, you know, for the debt. If you check the slide, you know, there's a slide in the investor presentation deck where we, we break it out, the net debt bridge. There's, you know, adjusted for capital work in progress, slide number 12, it's 2.9x, right?

Rajesh Majumdar

analyst
#107

Right. Mm.

Pritesh Vinay

executive
#108

And keep in mind, every figure you're looking at, and the results, are as of 31st March. That INR 5,000 crore equity raise took place in the first week of April, correct?

Rajesh Majumdar

analyst
#109

Mm-hmm, mm, mm.

Pritesh Vinay

executive
#110

That hasn’t been factored in yet, correct? So if I were to hypothetically factor that in, what you’re seeing as 4.5 is in fact well under 4. It’s roughly 3.7 times. And what you’re seeing as 2.9 is around 2 times, right? So from a balance sheet standpoint, we have, I’d say, quite comfortable headroom to, you know, go after our growth aspirations.

Rajesh Majumdar

analyst
#111

Okay, so sir, my final question concerns Vijayanagar. With coal prices having come down, why is our average PLF still just 59%? Is it that we aren't able to secure the merchant capacity we're running at, you know, the level we need? And is there any guidance on that for the year ahead?

Pritesh Vinay

executive
#112

No. Look, whenever the capacities and the requirements exist, we are—the state wants the power that we generate. There are certain problems related to water supply and such, but those have been handled. So whenever a requirement arises, we supply that power. But, we are—see, if I could add to that, you know, there's also a Section 11 that the State of Karnataka has imposed, right?

Rajesh Majumdar

analyst
#113

Okay.

Pritesh Vinay

executive
#114

Regarding the Vijayanagar facility—

Rajesh Majumdar

analyst
#115

Mm.

Pritesh Vinay

executive
#116

Any capacity that isn't tied up, we'll sell it to the state at an agreed tariff, you know. So Section 11 is in place, and because of that, whenever we have generation beyond what we need, we can send it back into the grid.

Rajesh Majumdar

analyst
#117

So, do you believe that 59% PLF has room to meaningfully improve—whether it's Section 11 or merchant, wherever we happen to sell? I mean, at this point I'd say it has more to do with Section 11 than merchant, but could that rise significantly over the coming year?

Pritesh Vinay

executive
#118

We'd prefer to stay conservative rather than give aggressive guidance, because honestly, if you look back at what we said — at least 18 months ago — we used to tell people, "Look, merchant is so volatile, it isn't predictable," and so 85% of my capacity, which is locked up under long-term PPA, delivers 95% of EBITDA, right? The needle has decided to shift now. So although we're quite bullish on underlying power demand growth and the sustained deficit between power demand and supply, we'd expect firm merchant markets to keep going at least over the medium term. But as a management team, I wouldn't want to guide aggressively and say, "No, no, please take your base case as a much higher PLF." We're happy if you work with a 58%-59% PLF. That's not bad at all.

Operator

operator
#119

Thanks. Rajesh, please come back for a follow-up question afterward. Thank you. Our next question comes from Aniket Mittal of SBI Mutual Fund, on the line. Go ahead, please.

Aniket Mittal

analyst
#120

Thanks for the chance to speak. So first, regarding that 6.2 GW MOU we have with JSW, how should one think about structuring that MOU into, say, a PPA going forward?

Pritesh Vinay

executive
#121

Aniket, you know, you're right. This 6.2 GW MOU is, you know, for the additional RE capacities that they need for their decarbonization targets. This will happen in phases because this is 6.2 till 2030, not in one go. In one of the earnings calls before this, we had said that we are in discussions with JSW Steel, you know, for the phase one of this 6.2 GW. And we believe that, this quarter, we should be in a position to conclude the discussions, and have, you know, the board approvals of both the companies in place, and then sign the PPA, and at the right time, we will make the necessary disclosures to the markets. But, we are reasonably confident that during the current quarter, which is the June quarter, we should be in a position to conclude this, the phase one of the 6.2.

Aniket Mittal

analyst
#122

All right, that covers it. The second question concerned the bidding activity we have been engaged in for utility tenders. Historically, we have been reluctant to bid on, you know, plain vanilla solar projects, but I think during the past few months, we also secured certain tenders within those frames that are pure solar projects. I am just trying to get a sense of the thinking behind this. Are you observing a shift in the equity IRRs or in the intensity of competition in the market? And what kind of equity IRRs do you anticipate for these projects that you recently won?

Pritesh Vinay

executive
#123

You're right, Aniket, that historically we haven't taken part in this competitive bidding, in the bid space. But as we've said on various calls for a while now, we're aiming for IRRs of at least the mid-teens, and those weren't available. At the tariffs being discovered now, though, and with the CapEx involved, we will definitely — that's one reason we took part. And going forward as well, wherever at least the mid-teen IRR can be achieved, we are getting there, and we will definitely be looking at this space too.

Aniket Mittal

analyst
#124

All right. So a mid-teen IRR, and plain vanilla solar too. Just one final question: you touched briefly on, you know, spinning off the FDRE project. I believe we've won roughly 180 MW. So could you give us a sense of how that project will scale up in terms of wind, solar, and battery? And I'm just trying to understand how much of that is being built into this pipeline of 3.4 GW that you have.

Pritesh Vinay

executive
#125

So, Aniket, if I've got this right, what you're asking is how the bidding process will work in this FDRE space, right? Or is it about how the combination — the FDRE piece and what we've already secured, that 180 MW — will be put together?

Aniket Mittal

analyst
#126

Regarding the nature of it. How that 180 MW is going to be structured.

Pritesh Vinay

executive
#127

Look, generally speaking, you could describe it as a blend. It varies depending on the FDRE—it's not the same across the board. There's no uniform standard for this, since every state or DISCOM that wants to purchase has its own hourly profile, and we have to serve that. So that's how a project gets structured. It combines wind and solar, and possibly storage as well. That's the way it's put together. Still, broadly speaking, you could say capacity typically runs about two times, if you look at it. The split among wind, solar, and storage varies, though usually wind dominates. FDRE tends to be wind-heavy. The solar share is smaller, yet overall, in general terms, you could put average capacity at roughly two times.

Operator

operator
#128

Thank you. Aniket, I’d ask that you return for a follow-up question. To everyone on the call, please keep it to two questions each. Our next question comes from Nikhil Abhyankar at ICICI Securities. You may proceed.

Nikhil Abhyankar

analyst
#129

Yes. Thank you, sir. I appreciate the chance to follow up on that earlier question. So, is there any guidance you can give us on the BESS project — specifically, have we secured the remaining 40%, and are we planning to secure it through our own FDRE bids?

Sharad Mahendra

executive
#130

Look, Nikhil, at 40% right now — we haven't locked anything up, and the way we've designed this project is that we're watching the opportunities as they come, in the merchant market, at peak, both our demand and the price being discovered, plus the demand growth I mentioned in my opening remarks. That's how we see it, so I think at peak demand we'll be using this in the merchant market, during the morning and evening peak. That's our view. And on the gap — when I said peak demand is likely to go from 243 GW to 260 GW, that may be a particular moment, but across the year, between off-peak and peak, the gap is widening significantly, in demand, in availability, and in prices too. So I think 40% of that, we'll keep it open and sell during peak hours. Because if you look at off-peak prices as low as INR 2 and peak as high as INR 10, there's significant room to take advantage of this situation. So we'll keep that 40% of capacity open for merchant.

Nikhil Abhyankar

analyst
#131

Got it.

Sharad Mahendra

executive
#132

Since we do have that flexibility, whenever we need to provide it, we'll only be providing it during peak hours.

Nikhil Abhyankar

analyst
#133

All right. Sir, on the last call you said we might even consider adding greenfield thermal capacity. Is there any update on that?

Sharad Mahendra

executive
#134

Could you say that again, Nikhil? We just—

Nikhil Abhyankar

analyst
#135

On earlier calls, we also brought up the possibility of adding greenfield thermal capacity. So is there any update on that front?

Sharad Mahendra

executive
#136

Yeah. Look, Nikhil, even up to this point, there's barely any demand coming for PPAs from anywhere, from any of the states. So, but we're open to it — whenever an opportunity shows up, we'll take a look at it, but at present we can't give an exact quantity or exact timelines for this. And also, when we look at it, right now our main focus is at the neo level within the renewable energy space.

Nikhil Abhyankar

analyst
#137

Got it. So sir, one last question from me — what’s the precise reason we’re moving into wind manufacturing?

Sharad Mahendra

executive
#138

Look, Nikhil, we need to look at how wind capacity additions have actually occurred in India, and if you look, and what the—we've identified the various challenges that have been present. The wind capacity we've added, which is above 3 GW, is, I think, a high figure if you look at prior years. A major challenge that has emerged is bottlenecks in the supply chain.

Nikhil Abhyankar

analyst
#139

Mm-hmm.

Sharad Mahendra

executive
#140

Basically, we aren't viewing this as a business venture in itself. What we're doing is de-risking our plans — the execution of what we've put together — to get to 20 GW. It's essentially about de-risking, and it also lets us capture the cost benefits, given how heavily dependent we are on imports. So this is purely about de-risking the supply chain, making sure that whatever we're planning, we can actually execute on time.

Operator

operator
#141

Thanks, Nikhil. I'd like you to return for a follow-up. Our next question comes from Sumit Kishore at Axis Capital, who is on the line. Please go ahead.

Sumit Kishore

analyst
#142

I appreciate the chance to follow up. I have one more question about Ind-Barath. Now that unit one has stabilized, and given that the auction price is currently around a certain level, what variable cost per unit are you able to secure at Ind-Barath?

Sharad Mahendra

executive
#143

Sumit, as you're aware, when it comes to procuring coal for Ind-Barath, there are two approaches.

Sumit Kishore

analyst
#144

Yeah.

Sharad Mahendra

executive
#145

The first item is the SHAKTI auctions.

Sumit Kishore

analyst
#146

Mm-hmm.

Sharad Mahendra

executive
#147

-That applies to power plants without PPAs. Then there are Coal India's spot auctions, correct? Those are the two main channels. A third channel is also emerging: some players in the neighboring region hold a captive mine and are permitted to sell roughly half of its output to the commercial group, right? So those, I'd say, are the three main channels. Now, in the first batch of auctions we took part in—around the second quarter of fiscal 2024, the second and third quarter—premiums over the base price tended to be higher, right? So the landed cost of fuel from that batch, I'd say, was close to INR 3, you know, between INR 2.7 and INR 2.9, in that range. But then there was a SHAKTI—the next batch of SHAKTI auctions, which took place a couple of months ago, right? And that one is valid for the current fiscal year, you know. And here, in most cases, we secured it at the base price, with no premium over the base price in those auctions. But that coal will be arriving later in the year, right?

Sharad Mahendra

executive
#148

That coal, therefore, will be considerably less expensive than that. In my view, it will come in below INR 2.5. One positive development that has emerged for the first time under SHAKTI — beyond the quarterly and spot auctions that were already taking place — is that Coal India this time offered bids that are valid, with offtake covering a full 1 year. As a result, for a significant percentage of our total requirement for Unit 1, we succeeded in securing it at nil premium. That should begin arriving perhaps from June onward. Each month, the quantity will start flowing in, which will handle a large portion of what we need. And that is at nil premium. So, as Pritesh mentioned, fuel cost there will definitely be under INR 2.50.

Sumit Kishore

analyst
#149

Understood. So Unit 2 stabilization is now expected in Q1 or Q2?

Sharad Mahendra

executive
#150

No, no — for Q1, we're looking at the startup, and then at some point, perhaps in the early portion of Q2, we're confident that we can get that unit stabilized.

Sumit Kishore

analyst
#151

Oh, the third quarter.

Sharad Mahendra

executive
#152

Yeah, you’ve got to let it settle for at least 1 quarter.

Sudhanshu Bansal

analyst
#153

One quarter of stabilization, and perhaps around the middle, by mid-Q2, we ought to begin moving toward stabilization.

Operator

operator
#154

Thanks, Sumit.

Sharad Mahendra

executive
#155

Operator, could we please take the final question?

Operator

operator
#156

Yes, sir. Our final question comes from Nikhil at AB Bernstein. Go right ahead.

Nikhil Nigania

analyst
#157

I appreciate you taking my question. First off, I'd like to ask about the Gujarat battery storage tender, where JSW submitted a very aggressive quote. So with battery prices at these levels and bids of that kind, do you see your approach shifting away from pumped storage and back toward batteries in the future? Or do you believe both will be needed?

Sharad Mahendra

executive
#158

Yes, Nikhil — now that battery prices have been easing compared with where they stood around a year, a year and a half, or two years ago, and also given how projects get executed, the gestation period for pumped storage tends to run longer. The battery percentage will get better, but given that each option brings its own advantages, I think both will stick around. And with batteries, that's exactly why, as I mentioned earlier, by FY27 it's projected that somewhere between 8 to 9 GW of battery storage will come online, along with roughly 7 to 8 GW of pumped storage. But when we look at that percentage by FY32, pumped storage's share will rise relative to battery storage. Capacity additions will take place in both areas. That's because completing a project takes a long period. So both are needed. It isn't the case that batteries on their own could replace this. And we already have MOUs in place for pumped storage as well, which we're working on for PHC too.

Nikhil Nigania

analyst
#159

Got it. For my second question, I'd like you to point out what you consider the one largest hurdle standing in the way of hitting your plan for renewable capacity additions in FY 2025 to 2026 — what would that be? Could it be the availability of wind turbines? Could it be modules, land, or transmission?

Sharad Mahendra

executive
#160

No. Look, the point is that these three main areas — and we've already got the team, the operational team, and management level too — these three are extremely clear priorities we have to focus on. And I'll explain how we've looked at these areas and what we've done: land, of course, is definitely essential. That's the starting point, and we've already begun building the required land bank. And when you consider the 2 years to completion from signing the PPA, we'll be ready on that front. Second, alongside land — which we haven't mentioned — is evacuation and substation connectivity, where CTU is working and we're working as well. We've applied for the connectivities so they match the project completion; that connectivity should be in place. Now, on solar and wind turbine, WTG, availability, we don't view that as a challenge, particularly on the wind side. There's enough capacity right now — not in India, but the opportunities outside India, perhaps in China too. So we've already locked in significant capacities for what we need for wind turbines, and that will cover our requirement for maybe next year as well.

Sharad Mahendra

executive
#161

On the solar module side, when we say India now has sufficient capacity — plus the additional capacity set to come online during this fiscal year by December — we don't foresee any module availability challenge, at least for us, and the same goes for wind turbine availability. Those three areas are the ones we've identified as our focus, and the team, along with management, is certainly working on them.

Nikhil Nigania

analyst
#162

Great. Thanks. That covers everything from me. Appreciate you taking the questions.

Operator

operator
#163

Much appreciated. At this point I'll pass the conference call to the management team for their closing remarks. Yes.

Sharad Mahendra

executive
#164

Thanks. Thanks to all of you for being on this call, and if anything else comes up afterward, don't hesitate to contact the investor relations team — they'll be glad to address any questions you have. Many thanks.

Sumit Kishore

analyst
#165

Thanks. Thanks, everyone. Many thanks.

Operator

operator
#166

Appreciate it very much. This conference is now wrapped up on behalf of JM Financial. Thanks for being with us, and feel free to disconnect your lines at this point. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete JSW Energy Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to JSW Energy Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in JSW Energy Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.