JSW Energy Limited (533148) Earnings Call Transcript & Summary

May 15, 2025

BSE Limited IN Utilities Independent Power and Renewable Electricity Producers earnings 70 min

Earnings Call Speaker Segments

Operator

operator
#1

Good afternoon, everyone, and welcome to JSW Energy Limited's fourth-quarter fiscal-year 2025 post-results earnings conference call, which B&K Securities is hosting. <<operator_script>> Kindly be aware that this call is being recorded. At this point, I turn the conference over to Mr. Rajesh Majumdar of B&K Securities. Thank you. Sir, the floor is yours.

Rajesh Majumdar

analyst
#2

Hello there, and good evening to each of you—thanks again for joining us. It's a pleasure to host this conference call covering JSW Energy Limited's Q4 FY ’25 results along with the earnings for the whole of FY ’25. With us today is our management team: Mr. Sharad Mahendra, our Joint Managing Director and CEO; Mr. Pritesh Vinay, Director, Finance and CFO; and Mr. Bikash Chowdhury, who leads Investor Relations and Strategic Finance. So, without further delay, I'll invite Sharad sir to share his opening remarks. Thank you, sir.

Sharad Mahendra

executive
#3

Thank you, Rajesh, and good evening, ladies and gentlemen, and thank you all for being with us today. I'm delighted to walk you through the highlights of how we performed during the quarter and throughout the past year. FY ’25 proved to be a landmark year for JSW Energy, one defined by strong execution, strategic growth and achievements that lead the sector. I'm proud to report that we achieved the largest annual wind capacity addition of any renewable energy company in India this year. Over the course of the year, we passed an important milestone of 10 gigawatts set under Strategy 2.0. And at this moment, JSW Energy stands as a 12.2 gigawatt company, which reflects the momentum we have built through both organic and inorganic expansion. In FY ’25 alone, we added 3.6 gigawatt of capacity, which strengthened both the diversity and the scale of our portfolio. As a result, the company reported its highest ever annual EBITDA of INR6,115 crores and posted its highest PAT of INR1,951 crores. Before we go into our performance, I'd like to share a few sector highlights. The dynamics are shifting toward strengthening energy security and addressing the growing need for baseload and peak load management. FY ’25 marked an emerging trend in the dynamics of India’s power sector, as several state distribution companies increasingly turned to competitive bidding for thermal power procurement.

Sharad Mahendra

executive
#4

This trend shows how states are increasingly eager to lock in firm power and to complement intermittent renewable generation. Thermal power, especially from domestic coal-based sources, is regaining strategic importance. That said, we're pleased to report that JSW Energy has also secured a 1,600-megawatt ultra-supercritical plant in West Bengal, which is fully tied up with WBSEDCL. Turning to capacity additions, India's total capacity — installed capacity has reached 475 gigawatts, and the country added 33 gigawatts in fiscal '25. Notably, renewable energy led the growth, accounting for a record 29 gigawatt of total additions. This surge was primarily driven by solar power, which contributed 24 gigawatts, followed by 4.2 gigawatts of wind capacity. The power demand for the country grew 4.2% in FY '25. In the fourth quarter, we saw a demand growth of 3.2% year-on-year on a high base of 7.4% growth seen last year in the same quarter. Structurally, we continue to expect a strong power demand in the medium term. The peak demand witnessed in quarter four is 238 gigawatts, which was in February '25 and 250 gigawatts in FY '25. The merchant market remained resilient during the year, averaging around INR4.5 per unit on exchange on the back of soft coal prices.

Sharad Mahendra

executive
#5

We've observed merchant tariffs strengthening in quarter four relative to quarter three of FY ’25. During Q1 FY ’26, merchant tariffs are continuing to rise, reaching INR4.76 per unit. In the quarter that just ended, API 4 coal prices held steady on a year-on-year basis at $95 per tonne. As of our current discussion, API 4 coal prices stand at roughly $89 per tonne, and in the domestic coal market, adequate measures have been implemented to maintain a strong coal supply. Turning to company performance: across fiscal ’25, we added a total of 3.6 gigawatts of operational capacity. That figure includes 1.7 gigawatts of organic capacity, which demonstrates our ability to execute large-scale projects efficiently. Our organic wind capacity addition came to 1.3 gigawatts over the past year, accounting for one-third of the country’s overall wind capacity addition in that period. Among these greenfield wind additions is the completion of the SECI-X wind project totaling 454 megawatts. The rest of our first batch of wind projects under construction is close to completion. The quarter that just closed also witnessed commissioning of the second unit at Ind-Barath JSW Utkal, a 350-megawatt unit that has now stabilized and is running smoothly. Supplementing our organic growth, we have strategically broadened our footprint by completing two significant transactions: first, KSK Mahanadi Power, a 3.6-gigawatt asset, on 6 March, ’25, and second, O2 Power, a 4.7-gigawatt platform, on 9th of April 2025.

Sharad Mahendra

executive
#6

KSK Mahanadi is a 3,600 megawatt facility, and it ranks as the biggest thermal asset picked up through NCLT proceedings, with a total resolution amount of INR16,084 crores. At present, 1,800 megawatt is running, and 95% of that is tied up under PPAs, plus it has fuel supply agreements. During FY ’25, the plant posted full year EBITDA of INR2,895 crores at a PLF of 67.4%, while underlying EBITDA came in at INR2,382 crores. We lifted PLF from the 67.4% seen during the year to 79% after closing the transaction, achieved in just 25 days of operations, which we did in March. Deemed PLF came in at 99% over this period. Right now we are integrating operations with JSW Energy and rolling out the comprehensive plan to drive cost efficiencies. In another sizable deal, we bought O2 Power, a 4.7 gigawatt RE platform, for a total value of INR12,468 crores. O2 Power’s current installed capacity is 1.3 gigawatt, and we expect that to scale to 4.7 gigawatt by June ’27 through capital expenditure of between INR13,000 crores and INR14,000 crores. Moving to our under-construction portfolio: JSW Energy is currently building 11.3 gigawatts of generation projects, and every one of them is fully tied up under long-term power purchase agreements.

Sharad Mahendra

executive
#7

Our under-construction portfolio contains 9.7 gigawatts of renewable energy projects along with 1.6 gigawatt from the Salboni ultra-supercritical thermal power project, and that represents our first greenfield thermal investment in over a decade. On top of that, we hold a robust pipeline of roughly 4.9 gigawatts of projects for which letters of intent or letters of award have already been secured, though PPAs have not yet been signed. During this quarter, our untied capacity came down, since our Vijayanagar thermal plant is now fully tied up. This not only gives us stable and predictable cash flows, it also represents a fundamental shift in how our open capacity is composed. Now that Vijayanagar is fully tied up, our open capacity sits at approximately 976 megawatts of the total portfolio. Of that 976 megawatts, only about 9% to 10% depends on imported coal, with the remainder running on domestic coal. This transformation signals a decisive move toward open capacity based on domestic coal that is more resilient, cutting our exposure to volatility in global coal prices. As a result, the breakeven price for our open thermal capacity also declines as we use more domestic coal. Turning to energy storage, we recognize the critical role it plays in integrating renewable energy.

Sharad Mahendra

executive
#8

Our logged-in energy storage capacity has now grown to 28.3 gigawatt hours. One project worth noting is Bavali in Maharashtra — a 12 gigawatt hour hydro pumped storage facility that is tied up with MSEDCL and is presently being implemented. Also, during the first quarter of FY ’26, we recently signed a PPA with UPPCL covering a further 12 gigawatt hours of PSP capacity, to be delivered over the coming six years. As for our SECI 500-megawatt, 1 gigawatt hour battery energy storage system, we have filed an appeal with APTEL and are waiting for the result. Turning to operational performance in the quarter, net generation climbed 24% year-on-year to 7.9 billion units, helped by renewable generation rising 32% year-on-year. Thanks to new capacity additions, total net generation from the tied-up portfolio was 28% higher year-on-year this quarter, while short-term generation saw a modest increase. Our thermal portfolio delivered a healthy PLF of 77% for the quarter and 71% for the year. A substantial share of JSW Energy’s wind capacity was commissioned in the second half of the previous fiscal year. It is widely known that wind generation in India generally peaks in the first half, especially between May and September, whereas the second half usually brings weaker wind speeds and lower generation.

Sharad Mahendra

executive
#9

So because of that, we're in a solid position before the upcoming wind season, and we expect generation output to normalize. Finally, turning to the outlook. We're proud to share that we've gone past the 10 gigawatt capacity goal we set under Strategy 2.0 — a significant milestone in our growth journey. Riding that momentum, I'm pleased to announce and introduce Strategy 3.0, our fresh roadmap aimed at reaching 30 gigawatt of generation capacity along with 40 gigawatt hour of energy storage by 2030. That 30 by 30 strategic vision reflects how committed we are to powering India's energy security through scale, speed and sustainability. By FY '30, we anticipate our EBITDA on a run-rate basis will rise between 2.7 times to 3 times above FY '25 pro forma EBITDA levels. To back this expansion, we intend to put INR130,000 crores into capital expenditure from FY '26 to FY '30. With 11.3 gigawatt of projects under construction and a strong pipeline, our locked-in capacity is now at 30.2 gigawatts, which keeps us firmly on track to hit the target set under Strategy 3.0. That's everything from my end. With that, I'll hand it over to Pritesh Vinay to discuss the financial performance for the quarter. Thank you.

Pritesh Vinay

executive
#10

Thank you, Sharad. Good evening, everyone. As Sharad said, net generation for the quarter rose 24% Y-o-Y. That drove a 21% Y-o-Y increase in total top line, reaching just under INR3,500 crores. EBITDA came in at INR1,513 crores, 17% higher Y-o-Y. Profit after tax for the quarter was INR408 crores, up 16% Y-o-Y. For the full year, EBITDA grew 5% Y-o-Y to INR6,115 crores, and profit after tax rose 13% Y-o-Y to roughly INR1,950 crores. Turning to the balance sheet and leverage: net debt at quarter end, after the KSK acquisition closed, totaled around INR44,000 crores. Of that, roughly INR9,500 crores related to projects still under capital work in progress, and close to INR34,500 crores was leverage sitting on the operating companies. Against reported EBITDA of INR6,115 crores, the pro forma EBITDA — which assumes all the assets acquired mid-year had been with us for the full year — is approximately INR8,860 crores.

Pritesh Vinay

executive
#11

So because of that, net debt to pro forma EBITDA comes in at roughly 5 times. Another important metric I want to point out is that net debt to equity is at 1.6 times as of the close of the financial year. Our weighted average cost of debt rose nearly 18 bps quarter over quarter, landing at approximately 9.05%. And looking at receivables, they remain in good shape. We reported total outstanding receivables of INR2,900 crores. On a headline basis, DSO might look like 76 days, somewhat elevated versus March of last year. But there are 2 things I'd like to flag. First, since the volume of power sold on merchant — where you get immediate realization — is lower, a larger share of power is being sold on a credit period. And second, the quality of those receivables is very, very healthy. As for overdues within that total amount, the overdue trend as a percentage of the total is meaningfully lower on a Y-o-Y basis. Maybe I'll pause there, and we can open the floor for Q&A.

Operator

operator
#12

Thanks a lot. <<operator_script>> For the first question, we have Mohit Kumar from ICICI Securities, the lion. Go ahead, please.

Mohit Kumar

analyst
#13

Hello there. Yes, I appreciate the chance to speak, and well done on assembling such a robust pipeline — particularly for getting two acquisitions, both inorganic and organic, across the finish line. Naturally, my first question is this: you've now accumulated quite a substantial baseload portfolio, above all through the Mahanadi acquisition, and on top of that you're constructing a new power plant in West Bengal. So what I'd like to know is whether you still anticipate accretion to that baseload portfolio. Alongside that, could you tell me where things stand on equipment placement and on land acquisition for the West Bengal coal-based power plant?

Sharad Mahendra

executive
#14

Could you say that first question again, please?

Rajesh Majumdar

analyst
#15

Starting with the first question, how are you viewing accretion — additional accretion to that baseload portfolio? Do you still feel you'd want to add more of the coal-based power plant?

Sharad Mahendra

executive
#16

Look, Mohit, yes, we are indeed observing peak demand rising. We saw 250 gigawatts of baseload demand — particularly given the substantial growth in intermittent renewable energy, namely solar — and both peak load demand and baseload demand will certainly continue climbing steadily. One factor is demand growth, and another is the pattern of new capacity being added. Looking at last year, a significant share came from renewables, driven mainly by solar as well. So baseload demand is projected to rise progressively, and thermal will play a key role in that. As for your second question about readiness, I'm glad to say that all of the land where the plant will be built is already in our possession. So that poses no difficulty whatsoever. Everything — the groundwork, in fact, the initial preparatory work — has already begun. On equipment placements, we are at an advanced stage of finalizing those. And we don't view that as any constraint at all when it comes to completing the project within the PPA timelines.

Mohit Kumar

analyst
#17

For KSK Mahanadi in '25, what kind of improvement could be achieved over the next two to three years?

Sharad Mahendra

executive
#18

As I mentioned in my opening remarks, I discussed EBITDA — operational EBITDA — which came in around INR2,350 crores for KSK on a full-year basis. And given how we've shown what can be done through higher PLF and the efficiencies that brings, we're quite confident, and we're still at work on this. We're in the process of integrating. It's been only about a month since that happened. We're working on it, areas have been identified, but we see considerable room for improvement when it comes to efficiencies, which in the end will lift both revenue and the bottom line.

Mohit Kumar

analyst
#19

Could you put a number on that for us, sir?

Pritesh Vinay

executive
#20

No, Mohit, I don't think it would be appropriate to put a number on that right now. What I believe would work better and carry more credibility is to provide some form of quarterly progress update, and tracking it that way would be preferable, yeah.

Mohit Kumar

analyst
#21

All right. Thanks. Thanks, Vinay.

Operator

operator
#22

Thanks. Atul Tiwari with JPMorgan is our next caller on the line. You have the floor.

Atul Tiwari

analyst
#23

Yes, sir. And congratulations on reaching your capacity expansion targets. I have a couple of questions. The first is about the Salboni project once more. Could you give us some color on the PPA? Is it a regulated PPA? Or is it entirely a bid PPA? And if it's the latter, then what sort of prices are we looking at?

Sharad Mahendra

executive
#24

So look, again — Salboni is a Section 63 PPA, and that came through the competitive bidding process, which we managed to secure.

Atul Tiwari

analyst
#25

All right, so my assumption is that this will come through a two-part tariff, with the fixed charges and the energy charges billed separately?

Sharad Mahendra

executive
#26

Yeah, yeah. Yeah.

Pritesh Vinay

executive
#27

All right, so for Atul, under the two-part mechanism, the levelized tariff across 25 years is going to come out at approximately INR5.45 per kWH.

Atul Tiwari

analyst
#28

Alright, that’s assuming domestic coal supply, obviously.

Sharad Mahendra

executive
#29

Yeah, yeah. It’s 100% wrapped up, yeah.

Atul Tiwari

analyst
#30

Okay. So, on your plan to carry out INR1.3 trillion of capex by FY ’30, could you give us some insight into the thinking behind the equity requirement for that? And what portion of it can be generated internally versus how much would have to be raised externally?

Pritesh Vinay

executive
#31

So, Atul, as we've consistently discussed before, any aspiration for growth needs to be calibrated inside a particular framework of safeguarding the leverage profile and calibrating growth commensurately. So quantifying that may not be appropriate because, needless to say—and I'm sure you're aware of this—there will be a back ending to this. So as your capacity base rises, your cash accretion rises, and your ability to spend rises progressively. So it's not 130 divided by 5, equally spent in each year, right? So therefore, everything has been planned in such a way that capital availability is matched with the expected capacity increase going forward. And if need be, as we demonstrated about a year ago, if you look at that point of time, if you looked at our committed growth pipeline and our then prevailing leverage profile, we actually didn't need to raise any equity capital. So therefore, these are things out there, and it's very difficult to crystal ball and pinpoint exactly. But anyways, all the growth aspirations will be significantly calibrated to meet the guardrails, yeah.

Atul Tiwari

analyst
#32

Right. Right. Good. Thank you. Appreciate it, sir.

Operator

operator
#33

Thanks. Sumit Kishore from Axis Capital is our next questioner. The line is yours.

Sumit Kishore

analyst
#34

Good evening. I have a few questions. First, could you help us understand what total capex was in the prior financial year? And what do you expect to spend over FY'26 and FY'27 separately, if possible — otherwise just FY'26 would be fine too? That's my first question.

Pritesh Vinay

executive
#35

Sumit, the total capex we actually incurred for fiscal ’25 came to roughly INR8,000 crores. And as you may recall, at the beginning of the year we had given guidance of INR15,000 crores of capex for that year. Due to some delays on certain projects already underway and since we were stepping up the inorganic growth pipeline, we recalibrated that figure downward. For fiscal 2026, we expect to wind up spending somewhere between INR15,000 crores and INR18,000 crores, within that band, to finish the projects currently in progress along with the pipeline of new growth projects that have begun.

Operator

operator
#36

Pardon me for cutting in, Mr. Sumit, but we can’t hear you. Could you switch to your handset, please? Your voice keeps cutting out.

Sumit Kishore

analyst
#37

Can you hear me at this point?

Operator

operator
#38

Yes, sir. The floor is yours.

Sumit Kishore

analyst
#39

Can everyone hear me at this point?

Operator

operator
#40

Yes, sir. Go right ahead.

Sumit Kishore

analyst
#41

Right, so to follow on from that, when you brought up net debt at 5 times pro forma — regarding what you said about the pace of growth, our understanding is that under all circumstances you'd stay under 5.5 times net debt to pro forma EBITDA.

Pritesh Vinay

executive
#42

That's the endeavor, Sumit.

Sumit Kishore

analyst
#43

So it's possible to have some temporary overshoots without having to raise equity? Is that how we should interpret it?

Pritesh Vinay

executive
#44

Here's how I'd put it, Sumit: our track record speaks for itself, and people who follow this sector as closely as you do understand that when it comes to project progress — especially on infrastructure, and that includes power — there are simply too many factors outside anyone's control. At times, you may see some bunching of projects. But the bigger question is whether the capital you're deploying inherently earns a return above your cost of capital. And when you look at it from a leverage standpoint, rating agencies generally take a somewhat through-the-cycle view, since they also weigh whether the capital work in progress is accretive or dilutive to returns. So many elements feed into this. I may not be able to give you a precise answer, but I wanted to give you a sense of how to think about it, yeah.

Sumit Kishore

analyst
#45

That's fair. On the second question, regarding projects such as Salboni — with the renewable pipeline you hold, you could essentially begin executing right away, or you may already have begun work on the projects where PPAs are in place. However, when it comes to new project starts like Salboni or the KSK expansion, how are you viewing the pace at which capital will be deployed?

Sharad Mahendra

executive
#46

Look, Sumit, speaking about Salboni as well, the PPA is signed already. The PPA contains a timeline. So we're going to — typically that's around 48 months to 60 months per the PPA. So we will spread it out. And naturally, as Pritesh mentioned earlier, that first one or two years, which is largely groundwork and preparatory work, is more back-ended. So it's being planned that way. It can't simply be split evenly across years. It's more — it will be back-ended. So that's how Salboni has been planned. Again, the PPA is signed. On KSK, as we told you earlier as well, the three units already running and the balance of plant, which is fully ready for the full 3,600 megawatt — and one unit, the fourth one to be commissioned, 40% of that work is also done. So that one, at a very low cost, can be commissioned. And as things move beyond the fourth unit, the fifth and sixth units will also be planned accordingly. In my opening remarks too, as I said, many states are now stepping forward to meet their base demand, and thermal requirements are coming in.

Sharad Mahendra

executive
#47

So that gives us a really unique chance to get this project done in a much shorter timeframe than what a greenfield thermal power plant normally takes for KSK.

Sumit Kishore

analyst
#48

So essentially, that low cost ought to be read the same way as before — would it come to INR5 crores or INR6 crores for each megawatt when it comes to getting that third unit up and running?

Sharad Mahendra

executive
#49

Yeah. Look, it’s hard to put an exact figure on it. But yes, as I mentioned, whatever the benchmark figures might be, you know what’s involved in setting up a greenfield project, and if we assume that fourth unit is 40% ready, the balance of plant for the whole INR3,600 crores is ready. So one can estimate that it will be significantly lower than the usual benchmark cost for a greenfield thermal plant.

Sumit Kishore

analyst
#50

That's quite clear. One final item regarding other income for the quarter: it rose 149% to roughly INR3.1 billion. So would that essentially be treasury income tied to the acquisitions you were preparing to make?

Pritesh Vinay

executive
#51

Right, Sumit. That came from two main pieces. One was a deferred consideration owed on an earlier Mytrah acquisition, which carried certain conditions subsequent, and we wrote that provision back since it didn't need to be paid. The other piece, as you correctly noted, is a gain on treasury income, driven by the substantial cash and liquidity we held on the books.

Sumit Kishore

analyst
#52

Roughly how much did the Mytrah write-back come to?

Pritesh Vinay

executive
#53

My guess is that it lands at approximately — near enough to a ballpark figure of about INR100 crores.

Sumit Kishore

analyst
#54

There are additional questions I still have, but I’ll rejoin the queue later. Thank you very much.

Operator

operator
#55

Thanks. Bharanidhar from Avendus Spark is up next with a question. The floor is yours.

Bharanidhar Vijayakumar

analyst
#56

Yes. Good evening. About this Salboni project, could you…

Operator

operator
#57

Sir, could you please pick up your handset? Sir, we can’t hear your audio clearly enough, sir.

Bharanidhar Vijayakumar

analyst
#58

Hold on for just a moment. Is that working better now?

Operator

operator
#59

Yes, sir. Go right ahead.

Bharanidhar Vijayakumar

analyst
#60

Yeah, I was hoping to get a sense of where the Salboni project stands in terms of readiness — specifically on environment clearance and forest clearance?

Sharad Mahendra

executive
#61

All of that is currently being processed. At a comparable site nearby, a cement plant is already operating. So I believe those approvals are all in process at the moment. Therefore, we don’t view that as a challenge.

Bharanidhar Vijayakumar

analyst
#62

All right, on the roughly 12 gigawatts of construction portfolio — particularly the renewables part — what share has secured land, and what share has either CTU-approved or awarded transmission capacity? You said PPAs are in place, so please also touch on those other two items, land and transmission.

Pritesh Vinay

executive
#63

We've discussed this before as well, but just to jog everyone's memory: normally, the way we handle any project's execution is that you can't sit around waiting until 100% of the land is in hand before you do the groundbreaking, since you also have to honor the PPA timeline commitments. So usually, you either already hold control over a significant percentage of the land and you have a line of sight, or visibility, into reaching the finish line on an as-you-go basis, correct? That's the first point. The second is on connectivity: for the projects we must deliver in the immediate term, we already have — either connectivity is already in place or we're at very advanced stages of securing it. Another thing I'd like to add is that when we were acquiring O2, we had also mentioned the fact that O2 doesn't only have 100% of the connectivity it requires for its own platform, but it also holds some excess connectivity. So, we're planning projects in such a way that, from a synergy standpoint, we will be utilizing some of that excess connectivity O2 has for our own projects, because everything is JSW now, right?

Pritesh Vinay

executive
#64

So combining those two factors is what gives us a lot of confidence that we can commit to specific capacity targets on a specific timeline, yeah.

Sharad Mahendra

executive
#65

Also, to add — and to repeat what we've mentioned before — for perhaps the next 2 years, with whatever projects are currently under construction that need to be executed, we all recognize there's a challenge when it comes to securing CTU connectivity, something the industry broadly is dealing with. So as a strategy, for the PPAs that were signed and located within the same states, we identified areas that are suitable, whether for wind or solar. As a result, we've cut our reliance on CTU connectivity for the next 2 years. And within those states, STU connectivity availability is something that, as Pritesh mentioned, for the majority of projects we either already have connectivity in place or it's at a very, very advanced stage. So that strategy has genuinely helped us ensure we'll be able to execute the projects within the PPA timelines.

Bharanidhar Vijayakumar

analyst
#66

All right, sure. My last question is this: do you have any estimate for the peak debt that would sit on your balance sheet at some point between FY ’26 and ’30 — what would that figure be?

Pritesh Vinay

executive
#67

We don’t really believe that’s the correct frame, unfortunately, since what matters more to us is this: for whatever projects you’re carrying out at a given tariff and a given capital cost or project cost, are those returns accretive or not? If all of them are clearing your hurdle rate — let’s say a mid-teen equity IRR — then the debt can be serviced, correct? So in our view, what’s more important and more appropriate to monitor is the leverage ratio. And even more importantly, to understand the mechanics here, it’s your debt service coverage ratio, right? So as long as you’re comfortable on that front, you can make decisions on a continuous basis.

Bharanidhar Vijayakumar

analyst
#68

Sir, okay. Thank you very much. Best of luck.

Operator

operator
#69

Thanks. Abhishek from Motilal Oswal is our next questioner. The line is yours.

Abhishek Nigam

analyst
#70

Yeah, hi. Thanks a lot for the chance to ask. So, on the renewables capacity side, from what I understand, a few of those capacities were dealing with some issues, I think, around land acquisition and right-of-way, particularly for certain wind projects. So are those being resolved at this point? And is there a timeline for some of those capacities?

Sharad Mahendra

executive
#71

Yes, Abhishek, as we mentioned, we've commissioned — and we've demonstrated the commissioning of — 1.3 gigawatts of fresh wind capacity, and that capacity faced the toughest hurdles when it came to ROW matters and implementation problems; it represents nearly one-third of the capacity addition that has happened in the country. So we managed to get past those hurdles successfully, and the right mechanisms are now in place. Looking ahead, for the projects currently under construction as well, we're at a quite advanced stage on the ROW issues, and project execution planning has been done in such a manner that they stay within the timelines as these issues get resolved. So this is an ongoing process. We understand how things work in the country. But yes, this is something that is being tracked very, very closely. And we don't view it as a bottleneck that would keep us from meeting the timelines under the PPA within which we have to execute the project.

Abhishek Nigam

analyst
#72

All right, all right, that's fair enough. Sir, my second question: even though there's a solid five-year target of 30 gigawatts, could you perhaps give us some kind of capacity bridge — say, let's set aside KSK and O2 Power for the moment. So could you give us a figure for, say, the end of FY ’26 and FY ’27, purely on an organic basis, if possible — capacity?

Sharad Mahendra

executive
#73

Right. Look, as we put it — we're referring to a 12.2 gigawatt operating portfolio, and for the projects in the pipeline that have to be executed within the PPA timelines, you can take it that on top of 12.2 gigawatts, perhaps 3 gigawatt to 3.5 gigawatt of capacity addition — roughly 3.5 gigawatts added in a year — lets us meet the — and deliver those projects on schedule. So you can perhaps just work out what more is going to happen down the road.

Abhishek Nigam

analyst
#74

Alright, that's fair. One final question from my side. Your plate is quite full at the moment with plenty of projects. So does that mean, going forward, you'll be more selective when it comes to SECI tenders? And is there a particular category — say, we'll do more of FDRE or hybrid — or any thinking on that?

Sharad Mahendra

executive
#75

As you correctly noted, perhaps reaching 30 gigawatts by 2030 — the pipeline we have in place covers that, and it also allows us to be selective moving forward when it comes to taking part in the bids that are coming up. And as we've consistently said, any opportunity that arises, if it's return accretive for our shareholders, that's what we're going to look at, and we'll make sure our benchmark returns are protected. With those considerations in mind, only then will we move ahead — we'll be participating in the bids. Perfect. Thank you so much, sir.

Pritesh Vinay

executive
#76

Abhishek, there’s something I’d like to add here. Sorry — I just couldn’t resist.

Abhishek Nigam

analyst
#77

Of course.

Pritesh Vinay

executive
#78

I share that view as well — we've been selective all along. It's not as if something shifted recently and that's why we're selective, correct? Keep in mind that over the past four years, India has tendered more than 130, 140 gigawatts, right? Yet we went ahead and locked in a pipeline of only about 7 gigawatts to 8 gigawatts, right? So we've been quite selective, and that's how we'll stay.

Abhishek Nigam

analyst
#79

Alright.

Operator

operator
#80

Then we’ll move to the next question, which is from Aniket Mittal at SBI Mutual Fund. Aniket, please go ahead.

Aniket Mittal

analyst
#81

Yes. Thanks for giving me the chance. My first question actually has to do with wind. Beyond the issues tied to execution, wind PLF has generally been somewhat subdued across the last few years as well. So I just wanted to get your thinking on that — specifically, when it comes to building wind PLF into your assumptions, are you recalibrating that at all? What kind of PLFs are you assuming going forward?

Sharad Mahendra

executive
#82

Yes, Aniket, that's a really important question, and it's something embedded in our company's DNA. Look, whenever we plan to take part in a bid and the modeling gets done to arrive at the right tariff, our assumptions have always been quite conservative. As an industry, generally speaking, we've observed that in the case of wind, operations have run at P75. For us, though, P90 serves as the benchmark, and that leaves us sufficient headroom for this type of deviation, especially since last year we also saw that wind speeds were comparatively lower than what had been anticipated. So we're very careful with our assumptions, structured in such a way that even if these things go wrong, our benchmark returns stay protected, and we don't stumble when we're executing and when the project is operational.

Aniket Mittal

analyst
#83

And what would that P90 figure come out to, sir? The P90 PLF number that you're…?

Sharad Mahendra

executive
#84

The P90 figure really hinges on quite a few other considerations. What we're assuming there is the likelihood of something going wrong.

Pritesh Vinay

executive
#85

So Aniket, let me jump in on that, if I can — look, there are two, three elements at play here, correct? First is where you are, the specific site. Second is the kind of equipment you're intending to deploy at that site, right? And then what rating that equipment carries and what its efficiency factors are, and so on, correct? So it isn't a single standard where P90 holds true at every site no matter which equipment you're using. And because of that, in the end, what really serves us well is the LCOE figure, right, rather than P90 — that is, what levelized cost of energy you're likely to get at a given site with a particular machine configuration, yeah.

Aniket Mittal

analyst
#86

Alright, that's fair. And the other question was really just to get a handle on the interest cost. I believe in the press release you said the weighted average cost of debt has risen to roughly 9.1%. So I just want to understand: what's the average borrowing cost you're looking at now when it comes to financing these projects, both at the project level and at the holdco level?

Pritesh Vinay

executive
#87

It's a combination of factors, Aniket. What occurred is that for O2 — sorry, for the KSK acquisition, we drew down long-term debt that was priced at a certain level, assuming a BBB credit rating profile. We've achieved a better rating than that. So when we report in the June quarter, you'll see this figure decline, since it has already edged down because the credit rating is better than the base case used for pricing. That's the first point. The second thing is that a substantial portion of our borrowings — particularly all the project financing debt — is typically tied to a bank reference rate, a bank MCLR plus a spread. So depending on how the interest rate environment evolves — and all signs point to a more benign rate curve trajectory ahead — there will be an impact from that. The third factor is the timing of when your resets occur, because typically, while these are long-term facilities, no bank wants an ALM mismatch. And effectively, these are floaters, right, which have annual resets. So periodically, based on when you draw down the first facility, an annual reset will take place quarter-to-quarter.

Pritesh Vinay

executive
#88

That's really a mix of every one of those factors, and in the end it all shows up in this chart. Next, depending on which kind of capital pool you're going after, those costs can be a certain figure. For instance, if you're looking at three-year issuances and taking on the rollover refinancing risk, that figure can come out considerably finer. What we've opted to do is make sure that for every project with PPA backing, you're arranging long tenure non-recourse project financing, correct? So it comes down to a mix of all of that, and from one institution to the next, one bank to the next, that figure will differ. But broadly speaking, 8.5% to 8% to 9% — that's the range you can typically obtain a long tenure project financing facility at today.

Aniket Mittal

analyst
#89

Understood, and that's useful. I'll get back in line to ask my question.

Operator

operator
#90

Thanks. Our next question is from Darsh Solanki with Axis Securities. Go ahead, please.

Darsh Solanki

analyst
#91

Yeah, thanks for the chance to ask. Sir, my first question is really more of a clarification. So once the acquisitions of KSK Mahanadi and O2 Power are done, going forward both of these companies will be consolidated into our company, right, for our modeling purposes?

Sharad Mahendra

executive
#92

Correct.

Pritesh Vinay

executive
#93

KSK, Darsh, yes. Hopefully.

Sharad Mahendra

executive
#94

Yes. Of course.

Pritesh Vinay

executive
#95

No, no — not hopefully. Surely.

Darsh Solanki

analyst
#96

All right, thank you, sir.

Pritesh Vinay

executive
#97

So, look, KSK has already been completed. As for O2, you'll see that reflected once we report the June quarter results, since that deal only closed in April.

Darsh Solanki

analyst
#98

Got it. Sir, my second question actually concerns O2 alone. So with O2 in the press release, as I understand it, we expect roughly 2.2 gigawatts of capacity to be operational by June ’25. So could you give us a split of that 2,259 megawatts across solar, wind, and hybrid?

Sharad Mahendra

executive
#99

So right now, with this asset we bought, the operating capacity stands at 1,343 megawatts — 271 megawatts of that is wind, and all the rest is solar. That's what came with the acquisition. And over the quarter, we're looking at perhaps roughly another 500 megawatts being added, which should happen, and that brings it to close to 1.9 gigawatts; the remainder, given interconnection and assorted issues, we'll see in the next quarter.

Darsh Solanki

analyst
#100

Got it. And that would mostly be solar alone, correct — the plant coming online?

Sharad Mahendra

executive
#101

Yes. The additional new capacity needed to get to 1.9 is 100% solar.

Darsh Solanki

analyst
#102

Got it. And on balance, if you’re able to share — would that 2.2 gigawatt also be solar, or are we planning wind energy?

Sharad Mahendra

executive
#103

Yes. Through 2.2, it’s all solar.

Darsh Solanki

analyst
#104

Got it — understood. Nothing further from me. Thanks.

Operator

operator
#105

Thanks. The next person to ask a question is Nikhil Abhyankar of UTI Mutual Fund. Go ahead, please.

Nikhil Abhyankar

analyst
#106

Thank you, sir. I appreciate the chance to ask. Sir, we were also recently considering setting up solar manufacturing plants. That isn't part of Strategy 3.0. Should we take it that this has been dropped for now?

Sharad Mahendra

executive
#107

No. As you can see, we've held this in abeyance. The reason is that we're all aware of how module capacities have been added in India — close to 100 gigawatt. So we carried out the evaluation, and what we found was that, basically, our objective in going for manufacturing was supply chain de-risking, which is what we had announced at the time. That scenario has changed, and at present we don't view module availability at the right price as a challenge. So we'll stay watchful on that. We won't say we've dropped it, but we have kept it in abeyance. Whenever we feel the need, we will go ahead. But right away, for the current fiscal, we are not proceeding with this.

Nikhil Abhyankar

analyst
#108

All right. And sir, regarding that SECI BESS capacity, could you tell us how much capex has been spent so far? And if a significant portion of it is complete, are we also considering using it for, say, the merchant market to tap into the night-and-day arbitrage that's available?

Sharad Mahendra

executive
#109

It is — seeing that this took place, the timing was such that we haven't undertaken any major capex. It's still in single digits only. So at present, we haven't done anything substantial on this. And when I say single digit, that perhaps means around INR10 crores or less.

Nikhil Abhyankar

analyst
#110

But — I mean, that project was meant to be commissioned in March ’25, and it got canceled. I mean, it had been sitting in abeyance only 4 months before that. Even so, the capex is just INR10 crores?

Sharad Mahendra

executive
#111

Yeah, yeah. We had actually planned it so that commissioning would happen within 4 months. That really wasn’t a problem at all, because the preparatory work — the way this amount, which had already been invested, was handled carefully — meant that as soon as clarity arrived, we could move, since until then the regulatory approvals were still pending even though the PPAs had been signed. And as for the batteries we ordered, we have plenty of other projects too — our own captive energy storage needs as well as another bid we won. So those same batteries are going to other sites. So we don’t see any difficulty other than the ordering — yes, you’re right, we did order them, but they’re being used in other projects.

Nikhil Abhyankar

analyst
#112

All right, could you lay out for us the schedule for how commissioning will go for the remaining 1.9 gigawatt hours of that project?

Sharad Mahendra

executive
#113

So again, as I mentioned, the implementation we've put in place for energy storage — we've been discussing energy storage, and as we said in Strategy 3.0, we're keeping 40 gigawatt hours, which is also part of energy storage. So, 1.9 gigawatts balance, the PPAs that are signed, we will be executing, and this has a short lead time. So, we'll be doing a total — we have another five projects beyond this 1 gigawatt, and we will execute them according to the PPA timelines, which normally run 18 months.

Nikhil Abhyankar

analyst
#114

Absolutely, sir. Thanks, and best of luck to you.

Operator

operator
#115

Thanks. Dhruv Muchhal from HDFC AMC has the next question in the queue. Go right ahead.

Dhruv Muchhal

analyst
#116

Yes, sir. Thanks very much. Sir, could you share the run-rate EBITDA for the renewable capacities as of the end of March — for renewables, I mean, ex-hydro — and also, if possible, the gross block that you invested? Run-rate EBITDA or run-rate revenue is fine too, whichever is comfortable.

Pritesh Vinay

executive
#117

So, Dhruv, that run-rate EBITDA isn’t something we provide, but you’ll be able to — the IR team can assist you with it. You’ve got the particulars on all the RE projects, and the tariff is available to you since every one of them was secured via an auction process. That figure is public. So you can work that out yourself. Run-rate EBITDA is not something we give out. That, we won’t be able to do. On the gross block side, you’ll need to wait a while, because given the scale and the major developments that have taken place, we expect to be in a position before long to upload — once the annual reports are finished, we’ll be able to upload the annual reports for all the entities. And this year, we’re also going to publish JSW Neo’s consolidated numbers on balance sheet cash flow. That comes in response to popular demand. So therefore…

Dhruv Muchhal

analyst
#118

One more thing people are likely to ask about is run-rate EBITDA, since that’s a very useful metric — or revenue — for us to track, because with individual projects, and we also have a lot of hybrid projects, monitoring or gauging things project by project gets extremely difficult. So run-rate EBITDA is probably an industry standard. As a suggestion, if you could please adopt it as well. Great. Thank you so much for your time.

Pritesh Vinay

executive
#119

We will definitely take that under advisement, Dhruv.

Dhruv Muchhal

analyst
#120

Sure, thank you.

Operator

operator
#121

Thanks. Next up, we have a question from Amit Bhinde at Morgan Stanley. You have the floor.

Amit Bhinde

analyst
#122

Hi, sir. I was hoping you could help me understand what effect the wind speeds have had on the portfolio you acquired. From what I remember about Mytrah, you were guiding to roughly INR600 crores of EBITDA, and that figure now looks notably lower, even with the new acquisitions included. I'd also like to hear about any steps you're taking on that EBITDA at this point.

Sharad Mahendra

executive
#123

Yes. Look, one step we’re taking — true, those assets do see a somewhat reduced wind-speed effect. When we said we have to assume there are assets ranging from perhaps 650 kilowatt or 850 kilowatt up to maybe 2.7 gigawatt or 2 gigawatts — that’s the spread of turbines present, and all of it was assessed and factored in when the asset was valued. But yes, wind speeds have made a difference there. Still, what we’re doing now — beyond availability, our operations and maintenance team is working on the efficiency of the machines that are running, and we’ve managed to raise availability, which used to be 96%, 97%, up to 99% availability, which is where we ended. So that matters too: even when wind is present, are the machines available — that evaluation is underway. And also, we had — there were certain contracts that were medium-term operations and maintenance agreements signed with the suppliers. Some of them we canceled, and we brought them into — over the previous year, at various stages, we brought them under our own control, self-O&M. So that as well will definitely deliver meaningful savings in operations and maintenance cost.

Sharad Mahendra

executive
#124

On top of that, the O&M contracts — which are the prevailing ones, and which ran for medium terms — we've managed to renegotiate those in our favor. So all of that, we will definitely see it in the current fiscal.

Amit Bhinde

analyst
#125

That's right.

Pritesh Vinay

executive
#126

If I could just build on that, Amit — I'd like to expand on what Sharad said. Let me frame it a bit differently; everything Sharad told you is 100% correct. Look, every initiative has factors you can control and factors you can't. What you can certainly attempt and work hard at is the controllable side Sharad mentioned — making sure machine availability stays up, keeping the emphasis on lowering O&M cost, and extracting more efficiencies. So we're certainly doing that, right? Now, wind speed unfortunately falls outside what can be controlled. But that isn't something specific to this company, right? So there are two things here. First, obviously, when you run processes of this kind, you take a longer-term view, right? So we'll be monitoring things closely. And as Sharad said, whatever can be done to salvage that aspect. And ultimately, the bottom line is this: running any enterprise requires a certain amount of risk appetite, and these are inherent risks one has to live with, yeah.

Amit Bhinde

analyst
#127

Yes. And the other thing I was hoping to get some clarity on is your plan for manufacturing wind. So where does that stand right now? And what's the sourcing approach as things currently sit?

Sharad Mahendra

executive
#128

Yeah. Look, regarding wind manufacturing, I just want to mention that, as we said before, we signed a technology license agreement with Sany, and they have facilities in India—in Pune—which is where all the suppliers will now come from, and that's going to start sometime in quarter two. Beyond that, to further de-risk and optimize on both cost and deliveries, we're setting up two blade manufacturing units of our own for our captive requirements, and that will happen in the current year only. Both blade manufacturing units will also be commissioned. So those are the two steps we've taken on the manufacturing front on the wind side.

Amit Bhinde

analyst
#129

Okay, understood. That was useful, sir. Thanks.

Sharad Mahendra

executive
#130

Appreciate it.

Operator

operator
#131

Much appreciated. We now move to a question from Mahesh Patil of ICICI Securities, who is on the line. Kindly proceed.

Mahesh Patil

analyst
#132

Yeah. Hello, sir. Sir, my first question concerns O2 Power. So when the acquisition happened, you said roughly 2.3 gigawatt, 2.4 gigawatt ought to be operational by June 25. So has that capacity's timeline been revised at all?

Sharad Mahendra

executive
#133

Right. Mahesh, like I mentioned, when we bought that portfolio its operating capacity stood at 1.34 gigawatt, and the remaining work is still underway. So as we close out this quarter, we expect operational capacity to reach close to 1.9 gigawatt, plus roughly 300 megawatts of solar that carries into quarter two. That's really the only small adjustment here. We had projected 2.2 gigawatt operational by the end of Q1, and a modest 300 megawatt or so may now slip into quarter two.

Mahesh Patil

analyst
#134

Regarding the blade manufacturing unit, did you say earlier that you're setting it up?

Operator

operator
#135

Mr. Mahesh Patil, could you please say your question again, sir? We can't hear you.

Mahesh Patil

analyst
#136

Yes. Sir, my question is about the sourcing side. You said you're setting up the blade manufacturing unit, correct? So with the revised guidelines on domestic — greater domestic manufacturing content for wind as well, are there any challenges when it comes to sourcing for both solar and wind equipment on the upcoming projects?

Sharad Mahendra

executive
#137

No. On solar, as I mentioned before, India already has sufficient capacity at a very, very competitive price. So we don't see any challenge there, and we've already been buying modules locally for the projects we're currently working on. We don't view it as a challenge because close to 100 gigawatt of solar capacity, or module manufacturing capacity, is already in place in India. On blade manufacturing, as I said, there is of course a draft regulation on Made in India, where you can import some portion. After that, you have to go domestic. So our actions this year, when we commission our two blade manufacturing facilities, will take care of our entire capacity addition plan. So we don't see these things as a challenge for us.

Mahesh Patil

analyst
#138

All right, sir. And sir, my final question concerns the pipeline. We do have a robust pipeline, correct? So looking ahead, what would the bidding strategy be? Would you be seeking more solar, or hybrid, or FDRE, perhaps? Any thoughts on that?

Sharad Mahendra

executive
#139

As I mentioned earlier in response to one of the questions, our pipeline is sufficiently built out, and the opportunity size has grown so large that we're going to be selective. Everything is laid out—what sits in our pipeline and what remains to be installed; if you turn to Slide 24 of the presentation, you'll find all those details. Strategy-wise, though, we will certainly be selective, making sure that any opportunity coming our way fits within Strategy 3.0 to reach 30 gigawatt—the full pipeline is in place, but we'll be selective. And going forward, wherever we see return accretion that meets our benchmark returns, we will participate. That said, at present, our focus will be on executing the pipelines.

Operator

operator
#140

Thanks. We have a question coming from Anuj Upadhyay at Investec. Go right ahead.

Anuj Upadhyay

analyst
#141

Hi there, and thanks for taking my question. I'd just like to understand how our cash flows are positioned to support that INR130,000 crores of capex across the coming five years. My understanding is that the expanded KSK capacity along with Salboni won't be online until FY ’29 or ’30, since execution takes four to five years, and together those would need capex of roughly INR30,000 crores to INR35,000 crores. That leaves the remaining INR90,000 crores, which mostly goes toward renewable capacity, and that typically has an execution window of about 2 years, 2.5 years. So I just want a sense of the capex profile, because you guided to something like INR15,000 crores to INR18,000 crores next year. But in FY ’27 or ’28, could we see a substantial portion of that capex running at 25-plus at the company level?

Sharad Mahendra

executive
#142

Okay, perhaps I'll just touch on a few points regarding the figures you mentioned, and then maybe on cash flow, Pritesh will fill you in. First, as I said, these are all projects spanning perhaps a 4-year to 5-year window, with investment weighted toward the back end. And the figures for these 2 — KSK and the Salboni, West Bengal project — as you noted, that is a considerably larger number. As I mentioned earlier, the 1,800-megawatt capacity that we need to deliver perhaps by FY ’30, this will come at a far, far lower cost than what a typical greenfield project involves. So costs will be considerably lower across this entire 1.6 gigawatt in West Bengal plus 1.8 gigawatt at KSK — 3.4 gigawatt in total — and will not be in the range of the numbers you just cited. It will be considerably lower, that's point one. And regarding cash flow, with the new capacities coming on stream over a period, how that is going to help — perhaps Pritesh will walk you through it.

Pritesh Vinay

executive
#143

Anuj, let me try to restate, in somewhat different words, what I mentioned a while ago. Every growth ambition, along with how those ambitions get funded, needs to be calibrated against what you're able to spend. And simultaneously, on the other side, you have to keep your leverage profile in check. So we'll be working within those two guardrails, correct? So at various points — and there was a separate question earlier — you might see some temporary bunching, but by and large, that's the endeavor. So I'd rather not get into specifics, since that wouldn't be appropriate. But what we can certainly discuss is that for the current year, we're referring to a capital spending plan of INR15,000 crores to INR18,000 crores. And after that, it will be calibrated. Yeah.

Anuj Upadhyay

analyst
#144

All right, that's fine. Moving on to Vijayanagar — since that facility is now fully commissioned, could we get some idea of a sustainable ROE, or what the P&L for that plant would look like? That would be useful. My understanding is the equity contribution for the plant, regulated, comes to roughly INR1,300 crores, INR1,400-odd crores. So could you give us some sense of the kind of ROE it would generate under the captive arrangement?

Pritesh Vinay

executive
#145

So Anuj, regarding Vijayanagar, clearly the arrangement is based on CERC norms. But there's something else I'd like to point out, and it matters — this is a five-year tie-up. Yeah. Yeah, the tie-up runs for five years, since JSW Steel likewise has decarbonization goals, and for those they will eventually want to shift increasingly toward RE, right? So with that in mind, it was structured for 5 years. The rest is just arithmetic. You folks are very skilled at working that out. So I'd rather not weigh in on it. But that's the way you ought to think about it, yeah.

Anuj Upadhyay

analyst
#146

That's reasonable. That helps, and thanks. Best of luck to you.

Operator

operator
#147

Thanks. We’ll take our next question from Rajesh Majumdar at B&K Securities. Please go ahead.

Rajesh Majumdar

analyst
#148

Yes. Sir, what I asked actually follows what the last participant raised. So regarding the thermal PPAs, we're now seeing a much shorter duration of 5 years. Will that be the direction going forward? And given that you've secured a substantial amount of new coal-based capacity, will that pose a difficulty later on with respect to the coal-based capacity?

Pritesh Vinay

executive
#149

So Rajesh, I’d rather defer on that. I mean, PPAs aren’t meant for short durations. I mean, if you look at what UP did, what Maharashtra did, what West Bengal did, and what Karnataka has called for — those are all 25-year bids. What I was explaining was that Vijayanagar 860 megawatt that has been tied up; it has been tied up for five years. Yeah.

Rajesh Majumdar

analyst
#150

The long-term PPAs, though, remain in place.

Pritesh Vinay

executive
#151

JSW Steel — well, that isn't tied to the fiscal trend; it's a five-year thing.

Rajesh Majumdar

analyst
#152

Right. Yeah, so for the bigger… do those long-term PPAs still exist?

Sharad Mahendra

executive
#153

Right. The optional piece runs 25 years, and for pumped storage it's 40 years — those are the PPAs that are coming in.

Rajesh Majumdar

analyst
#154

All right, that helps. Thanks, sir.

Operator

operator
#155

Thank you. Ladies and gentlemen, that was the last question for today. As there are no further questions from the participants, I now hand the conference over to the management for closing comments.

Sharad Mahendra

executive
#156

Alright. Thanks to all of you for joining us today. Should anyone still have a query or any additional questions, I’d ask that you please reach out to our IR team. You’ll receive an appropriate response if any other questions are left unanswered today. Thank you very much.

Pritesh Vinay

executive
#157

Thanks. I really appreciate it, and good evening, everybody.

Sharad Mahendra

executive
#158

Good evening.

Operator

operator
#159

<<operator_signoff>>

Read the full transcript via the API

You're viewing the first half of this call. Get the complete JSW Energy Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to JSW Energy Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in JSW Energy Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.