executiveThanks a lot. Morning, everyone, and it's great to have you join us for Bitfarms' Third Quarter 2024 Conference Call. Joining me today are Ben Gagnon, our Chief Executive Officer and Director, along with Jeff Lucas, our Chief Financial Officer. Just before we get started, I want to mention that this call is being webcast and comes with a presentation. You can find today's press release and our presentation on our website, bitfarms.com, in the Investor section. Now let's move to Slide 2. I want to remind you all that we'll be making certain forward-looking statements during this call, and actual future results might differ from what those statements imply. These forward-looking statements rest on certain assumptions and carry risks and uncertainties, and I encourage you to review Bitfarms' MD&A for the full list. Also, please be aware that we'll reference some measures that aren't recognized under IFRS, so they may not line up with similar measures other companies present. We ask listeners to check today's press release and our MD&A for definitions of those non-IFRS measures and how they reconcile to IFRS measures. Keep in mind that all financial references are in US dollars, unless we say otherwise. I'd also like to mention that we'll be present at these upcoming equity conferences. Tomorrow, Cantor Fitzgerald's Crypto, Digital Assets, and AI Infrastructure Conference in Miami; ROTH's Technology conference in New York City on November 19th and 20th; B Riley's Crypto and Energy Infrastructure Conference in New York City on December 4th; Northland's Virtual Growth Conference on December 12th; and finally, Needham's Growth Conference in New York City on January 14th and 15th. If you'd like to meet with us on any of those dates, just reach out to me or a sales representative from the firm. And now, moving to Slide 3, I'm happy to hand the call over to Ben Gagnon, Chief Executive Officer and Director. Ben, go ahead.
Ben Gagnon
executiveThank you, Tracy, and I appreciate all of you being here today. During this call, I'll walk through a summary of what we've achieved so far this year, provide a Q3 operations update, give an overview of the strategic steps taken during the quarter, and cover our objectives and guidance for 2024 and 2025. After that, I'll pass things over to Jeff, who will go through the Q3 financial results. Moving to Slide 4. A year ago, we laid out our transformative fleet upgrade plan. That meant replacing almost all of our mining equipment throughout what was then a set of 11 data centers. We'd always anticipated that 2024 would be a year of transformation, yet we didn't fully appreciate how much transformation it would actually bring. So far in 2024, we have completed upgrades at 10 data centers and brought 3 additional data centers into our portfolio, removed more than 50,000 older generation miners from racks and installed over 46,000 new ones, lifted our hashrate by 83%, reaching 11.9 exahash as of today, boosted our efficiency by 40%, going from 35 watts per terahash down to 21 watts per terahash, which means we hit our year-end efficiency target 3 months early, and, above all, substantially expanded our megawatt pipeline from 324 megawatts currently to 950 megawatts by the close of 2025, with multi-year growth potential reaching as high as 1.6 gigawatts. These figures really demonstrate what we've accomplished and how dedicated our global team is to growing this company and delivering better performance. Beyond all these impressive quantitative gains, we revealed our acquisition of Stronghold Digital Mining, which stands as the biggest deal ever between two publicly traded companies in the Bitcoin mining space, and we also made substantial improvements to our Board of Directors and Leadership team. Moving to Slide 5; during our Q2 earnings call back in August, I laid out a number of objectives and initiatives in my role as Bitfarms' new CEO. These consisted of, first, continuing to diversify our portfolio past Bitcoin mining. The purpose there is to get the most out of our greatest asset, our megawatts, in the most efficient and cost-effective manner achievable by moving into high-growth and high-value geographies as well as into synergistic business lines like hosting HPC and AI heat recapture and recycling and energy generation. Second, a heavy emphasis on expanding in the U.S., especially within the PJM region, which we determined to be the most appealing energy market in the U.S. And third, developing an even deeper pool of operators and rolling out a new organizational structure so we can evaluate, plan, and carry out the major opportunity involving HPC/AI and the anticipated Bitcoin bull run that lies ahead. I'm happy to report that during the last 3 months, we've achieved meaningful progress toward every one of our objectives and established a solid foundation for executing our growth strategy. I'll now turn to the Q3 operational update and discuss the various strategic actions we've undertaken this quarter with those goals in mind. Moving to Slide 6. Consistent with the first and second initiatives concerning ongoing diversification of our portfolio and U.S. expansion. During Q3, we reached an agreement to purchase Stronghold Digital Mining; this combination, which is transformative, locks in a multi-year strategic growth trajectory that has us tremendously excited. Through this acquisition, we are achieving vertical integration by picking up two power facilities positioned strategically in Pennsylvania; growing and rebalancing our portfolio through more than 300 megawatts of U.S. power capacity, with room to boost our energy portfolio beyond 950 megawatts by the close of 2025 and 1.6 gigawatts within the coming years; establishing opportunities in energy trading and demand response that help reduce energy prices; and finally, opening the door to integrating HPC and AI into our portfolio in a cost-effective manner through a merged HPC/AI and Bitcoin mining data center. Moving to Slide 7. Once the deal closes, the expected 307 megawatts available across these two locations would produce a 47% lift in our 2025 year-end megawatts, going from 648 megawatts to over 950 megawatts. When we include our Sharon Pennsylvania site, combining these three locations yields a PJM portfolio of roughly 427 megawatts in 2025, which exceeds our whole operational energy portfolio as it stands today. Crucially, these sites shift our portfolio back toward the U.S. and North America, accounting for 47% and 65% of our year-end 2025 portfolio respectively, while LatAm exposure will shrink to 35%, markedly enhancing the size, quality, and distribution of our energy portfolio. We've already started maximizing the utility of the Stronghold sites through two hosting agreements, each covering 10,000 miners. Those 20,000 miners, originally slated for deployment at our Iguazu facility, are now being deployed in Pennsylvania at Stronghold's Panther Creek and Scrubgrass facilities, supporting approximately 4 exahash. Redirecting these miners lowers our logistics duties setup and energy costs, resulting in a more optimal deployment and offering a pathway toward continued profitable growth. Thanks to these two hosting deals, we expect that nearly 75% of our hashrate will originate from our North American data centers during the first half of next year, reaffirming our commitment to growing in the U.S. Furthermore, we keep actively pursuing additional site acquisitions and growth opportunities within the U.S. Moving to Slide 8. Consistent with our third initiative to strengthen our leadership team, we achieved significant progress by expanding our bench and reorganizing our operational structure, positioning ourselves for continued growth in 2025. Demonstrating our commitment to operational excellence, we've brought on numerous industry experts through the following leadership appointments. Liam Wilson, as our Chief Operating Officer, a newly created role. Alex Brammer, who takes over from me in Mining Operations as Senior Vice President. Benoit Gobeil, elevated from EVP of Operations and Infrastructure to Chief Infrastructure Officer. And Rachel Silverstein as General Counsel, a newly created role as part of our emphasis on growing in the U.S. Additionally, we reorganized our operations into two divisions: mining operations and infrastructure, with Alex and Benoit leading the divisions, respectively. So these newly formed divisions are already giving us more scalability and accountability when it comes to building, maintaining, and running data centers, and they're setting the stage for us to establish HPC and AI operations. With the people we've brought on, that operational base gets even firmer, which lets us carry out the growth plan. Moving to Slide 9. Beyond that, we improved corporate governance and made our Board of Directors stronger by bringing on 2 new directors, one of them being me, and with Brian Howlett, who previously served as Lead Director, now in the role of Board Chair. At present, 5 members sit on our Board of Directors, and 4 of them are independent. When the special shareholder meeting takes place next week on the 20th, assuming shareholders give approval, the Board should grow to 6 members, with 5 independents. On a connected point, during Q3 we managed to secure a settlement agreement with Riot Platforms, and in our view that serves the best interest of the company along with our shareholders. What matters here is that this deal, beneficial to both sides, lets us continue as an independent company and carry out our growth strategy, while steering clear of a proxy contest that would be expensive and distracting. Riot is still a Bitfarms shareholder, holding just under 20% at present. According to analysts, Bitcoin shares offer good value and considerable upside to Bitcoin price compared with peers, and having Riot stay a top shareholder sends a positive market signal, which highlights the value and potential of our growth. Moving to Slide 10.
Ben Gagnon
executiveI'll spend the next couple of minutes walking through our guidance. We currently sit at 11.9 exahash, but we've fallen behind on hitting our 12 exahash goal for the middle of the year, and here's why. To start, a handful of our sites ran into small construction setbacks that have since been resolved, though energization ended up pushed back by weeks, or in some cases a few months. Next, throughout the last several months, we dealt with delays in shipping as well as longer-than-expected minor warranty servicing — and that's on top of the 2,700 miners swapped out a few months back. Even though miner shipments have gotten better lately, the ongoing warranty work has kept us from reaching our hash rate objective. We've partnered closely with Bitmain on these problems and are putting an efficient fix in place. As part of the fleet refresh we announced last year, the remaining 18,853 Bitmain T21 miners due from Bitmain will be upgraded. Instead, Bitmain will deliver 18,853 S21 Pro units — more powerful and more efficient — running at 234 terahash and 15 lots per terahash, which is an improvement of over 20% versus the T21 miners in both energy efficiency and hash rate. Thanks to this capital-efficient upgrade, we can quickly move the remaining miners slated for delivery to better performance with only a minimal effect on the hash, all while keeping the full upside of the Bitcoin. Every one of these miners is set to ship before the year is out, yet this substantial upgrade combined with ongoing RMA servicing means our 21 exahash target for year-end slips into the first half of 2025. On top of that, it lifts our energy efficiency by another 10%, going from 21 watts per terahash down to 19 watts per terahash. Most of these upgraded miners will be deployed across Pennsylvania and Quebec. With macro conditions improving quickly in the background, we see this as a uncommon chance to upgrade miners for stronger performance ahead of any rise in miner prices. Now to Slide 11. As we look toward 2025, demand for immediate capacity from both HPC/AI and Bitcoin data centers is climbing sharply, and turnkey assets are in high demand. Data center development keeps speeding up, which drives greater scarcity and makes access to power extremely valuable. KKR estimates $250 billion will be spent each year on the data center boom. The US leads as the biggest developer of data centers, using roughly 16 to 18 gigawatts of power, versus about 6 gigawatts each in Europe and Asia. According to KKR's Global Head of Digital Infrastructure, that 18 gigawatts could double, or even triple, over the next three to four years; we hold just over 500 megawatts of secured power and infrastructure for 2025, which stands as one of the largest portfolios of flexible megawatts among any publicly traded miners. That hands us unmatched flexibility to navigate this bull market and seize strategic opportunities. With that in mind, we've taken key steps to make sure we extract the best value from our assets. First, we've revised our deployment plans by moving the miners from Iguazu to the US under the Stronghold hosting agreements. By doing that, we've completely opened up the 200 megawatts at Iguazu and submitted a request to push back energization by 60 days, to March 1, 2025, as the contract allows. With 200 megawatts of affordable, high-uptime renewable energy plus new infrastructure, Iguazu stands as a flagship asset entering a Bitcoin bull market, one that could generate roughly 15 exahash when populated with the newest S21 XP miners. Right now, management is assessing every strategic possibility to maximize the value of this site. Next, during Q3 we took over operations at our Sharon, Pennsylvania location. That's a 120 megawatt facility placed advantageously within the PJM interconnection market, which gives us access to inexpensive, adaptable power. This location fits perfectly for Bitcoin mining as well as HPC and AI, and at present we're weighing how best to capitalize on these megawatts. Third, as was mentioned a few minutes back, we picked up valuable megawatts in Pennsylvania via Stronghold. Out of the 307 megawatts that will be available in 2025, these locations are presently under contract to use about 100 megawatts for hosting, and we're looking at the optimal approach to monetize the other 200 megawatts. We currently possess enough megawatt capacity to exceed considerably the earlier target of 35 exahash by the end of 2025; nevertheless, since we keep honing our 2025 strategies and actively reconfigure around Bitcoin mining plus HPC and AI, we feel it would be jumping the gun to stick with the 35 exahash guidance. We'll provide revised guidance after these strategies are settled. Moving to slide 12. We hold and run a collection of top-tier energy assets that get monetized via Bitcoin mining. At Bitfarms, we don't chase hashrate regardless of expense. What drives us is achieving optimal utilization and extracting peak value from our energy assets on behalf of our shareholders. When we zoom out and examine our approach, we're convinced that blending self-mining, hosting, energy trading, and HPC and AI yields a stronger, more adaptable portfolio. We're carrying out an in-depth review of every energy asset we have, examining numerous metrics, both qualitative and quantitative, to figure out which locations fit best with which activities. Having said that, we're happy to share that we've got two separate US locations lined up for a one megawatt to two megawatt HPC and AI pilot. Though it's still early days, we've locked in both land and power at these two locations and are engaged in ongoing talks with prospective partners and suppliers about possibly speeding up deployment in 2025, and we're presently wrapping up terms, equipment plans, and budgets. We think both locations are ideal for development for several reasons. First, they sit in great spots, just a few hours away from major metropolitan centers, along major fiber trunk lines, and within or close to data center clusters. Second, the power is locked in and affordable, with high uptime and zero curtailment obligations. And third, the land has been cleared and is set for rapid construction. We think that by starting work at a pilot location, we can carefully and economically assess this major chance and gain a solid understanding of the space, technology, and infrastructure prior to dedicating a considerable sum of capital to a bigger HPC and AI site; this pilot strengthens our dedication to expanding past Bitcoin mining and marks a crucial initial move into an exciting new line of business. We anticipate giving an update on how things are going in 2025. Moving to slide 13. Before I hand the call over to Jeff, I want to stress how important what we have achieved during the last 10 months is; we have replaced almost our whole set of miners, greatly enhanced our mining economics, constructed a 70 megawatts cutting-edge data center from scratch, acquired three additional sites in the US, launched an HPC and AI strategy, and thoroughly overhauled our operational structure while reinforcing our leadership team. We now stand in a distinctive position with a strategic pipeline exceeding 950 megawatts in 2025 along with close to half a gigawatt of power infrastructure that is extremely flexible, which amounts to a huge secured and economical growth opportunity as we move into the expected 2025 Bitcoin bull cycle.
Ben Gagnon
executiveOur company is now in a much stronger position, having broadened our energy portfolio considerably, with as much as 1.6 gigawatts set to come online across the years ahead, and we have the right tools to seize the major opportunities ahead of us. Following the election, this is a thrilling moment for the Bitcoin sector, especially with Bitcoin reaching all-time records, and my excitement and confidence regarding our growth potential and our capacity to deliver have never been greater. Moving to slide 14, I will now hand things over to Jeff.
Jeff Lucas
executiveThanks, Ben — and I’m glad everyone could join us today. I’ll walk you through our financial results for the third quarter and where things stand. Starting on slide 15, let’s go over the Q3 figures. During the quarter, we brought in 703 Bitcoin, which represents a 14% increase over the 614 Bitcoin mined in Q2. The main factor behind that improvement was our average hashrate climbing 54%, from 6.7 exahash in Q2 to 10.3 exahash in Q3, which more than offset the impact of the April 2024 halving as well as a 3% sequential increase in the average network hashrate. Q3 total revenue reached $45 million, up $3 million, or 8%, from Q2, and 30% above the prior-year period. Mining revenue was $43 million, compared with $40 million in the preceding quarter — an increase of more than 7%. The remaining revenue came from Volta, our electrical subsidiary, which provides commercial services while also helping support our data center operations in a cost-effective manner. G&A — that’s General and Administrative expense — excluding non-cash stock-based compensation and the Q2 Canadian sales tax refund, was $22 million, versus $11 million in the previous quarter. That $11 million increase is largely attributable to one-time nonrecurring costs, which totaled $12 million for the quarter and accounted for $9 million of the sequential rise. Those one-time nonrecurring charges included the Riot requisition, costs associated with settling the employment dispute with the former CEO, and expenses tied to acquiring Stronghold and the Sharon, Pennsylvania site. The remainder of the increase came from higher compensation expense as the Company added several key management hires to expand our leadership team, along with greater insurance, duties and other expenses related to the Company’s growth; for Q3, our operating loss was $44 million, up from $24 million in Q2, due to the factors I just mentioned. That operating loss includes $29 million of non-cash depreciation expense, $10 million of which was accelerated depreciation on older miners, compared with depreciation of $57 million in the prior quarter, $46 million of which was accelerated depreciation. In Q3, reported financial income and expense includes a $6 million non-cash gain on revaluation of the financial liability for warrants issued in earlier financings, versus a $1 million non-cash loss on revaluation of this financial liability in Q2. IFRS requires us to recognize a liability for these warrants, even though they can’t be settled for cash. Net loss for Q3 was $37 million, or a loss of $0.08 per share, compared with a net loss of $27 million, or a loss of $0.07 per share, in Q2. Now let’s turn to operating performance and per-bitcoin metrics. Gross mining profit was $17 million, or 38% of mining revenue, down from $21 million, or 51% in the prior quarter. During the quarter, our company-wide power cost came in at $0.0047 per kilowatt hour, which is up from $0.043 per kilowatt hour during Q2. That increase was driven largely by higher winter electricity prices in Argentina, along with a Paraguay rate increase that kicked in at the start of Q3. The key point is that our electrical efficiency got better, going from an average of 28 watts per terahash in Q2 down to 23 watts per terahash in Q3, which meant our electricity cost for each terahash dropped 10% over the quarter, coming in at $0.027 compared with $0.03 per terahash daily. I should also note that in September we reached our year-end target of 21 watts per terahash, getting there three months ahead of schedule, which translates to about $0.024 per terahash — another 11% reduction in electricity cost per terahash. During Q2, our direct mining cost per Bitcoin was $36,000. Our total cash cost to mine Bitcoin came to $52,400, while revenue per Bitcoin was $61,000, which left us with a cash profit per Bitcoin of approximately $8,500. Turning to slide 16. Adjusted EBITDA for Q3 was $6 million, or 14% of revenue, compared with $12 million, or 28% of revenue, in Q2. That lower adjusted EBITDA mainly reflected the impact of the halving, along with higher G&A expense related to expanding our operating activities. As we've mentioned on prior quarterly earnings calls, our adjusted EBITDA is very straightforward — it's simply a measure of cash profitability from our mining operations plus the profit contributed by our Volta subsidiary. We exclude mark-to-market adjustments on our Bitcoin holdings, and any other balance sheet valuation adjustments, from adjusted EBITDA. To put it simply, our $6 million adjusted EBITDA in Q3 equals cash profit per Bitcoin of $8,500 multiplied by 703 Bitcoin mined that quarter, plus roughly $400,000 in profit from Volta, our electrical subsidiary. Now moving to slide 17. As of September 30th, total liquidity was $146 million, consisting of $73 million in cash and $73 million in Bitcoin, also valued at that amount. By October 31st, we held 1,188 Bitcoin, up from 1,147 Bitcoin at the end of September and 905 Bitcoin at the end of June. That bigger BTC Treasury balance reflects our strong cash position and solid cash flow from operations. In addition, our Synthetic HODL continues to grow, increasing from 208 equivalent Bitcoin at the close of June to 602 Bitcoin on September 30th, then to 802 Bitcoin by October 31st. As a reminder, our Synthetic HODL strategy allows us to use excess Bitcoin produced each month to fund our growth at a much lower cost of capital than outside funding sources would require, while keeping upside by allocating part of the proceeds toward purchasing long-dated Bitcoin call options. Regarding the ATM facility we launched in March, which is used solely to support our growth plans and fleet improvements, we generated net proceeds of $66 million during Q3, plus another $39 million after September 30th. There's one last point I'd like to raise: everything Ben described regarding expanding and diversifying is being done while keeping a keen eye on growth that adds value, and we have weighed—and will continue to weigh—ways of funding that give shareholders the greatest return while diluting them the least. That works out to roughly $0.047 per kWh, or about $4,000 in total. Before I hand the call back to the operator for questions, let me pass along how enthusiastic Ben is about the strong hand Bitfarms has been dealt. Over the course of 2024, we laid a firm groundwork that leaves us well placed to execute our expansion plans throughout 2025 and past that. Each member of our team, including those brought into leadership roles lately, shares the same focus and is pushing toward these goals, and we can't wait to keep updating everyone on how we're doing. So with that, I'll turn it over to the operator for the Q&A.
Mike Colonnese
analystHello, and good morning to Ben, Jeff, and the rest of the team. I appreciate you fielding my questions today. For my first one, could you share additional specifics about the talks underway with potential clients in the HPC/AI segment? As I recall, you stated last quarter that you intended to move into this area. So it would be helpful to hear more detail, and what should investors realistically anticipate regarding the possible economics of an HPC/AI hosting arrangement?
Ben Gagnon
executiveHey, Mike. I appreciate that question. Right now we are engaged in ongoing discussions with several separate counterparties. Honestly, in terms of what's required to stand up an HPC and AI location, there are several elements we must pull into our capabilities from outside partners. Specifically, that means niche know-how involving infrastructure that is genuinely quite distinct and equipment that is genuinely quite distinct. Quite a few counterparties are reaching out to us. Things are extremely hectic for us at the moment, since we possess a substantial pipeline of megawatts ready to go in the short term. And honestly, if you consider the top-line you can generate from an HPC and AI arrangement compared with Bitcoin mining, the actual worth — my sense is that the majority of these arrangements are heading toward somewhere above $100 per megawatt hour in revenue, and that's before you layer in the additional services and fees. So at present it delivers more top-line than Bitcoin mining. Yet something we've been discussing for a number of months now, Mike, is this: we think — and continue to think — that across roughly the coming 15 to 18 months, we'll see superior economics and a superior return on invested capital from our Bitcoin mining operations compared with what we'll get from HPC and AI. It's genuinely around late 2025, or around late 2025 into early 2026, when we aim to start folding HPC and AI into our portfolio in a significant manner that adds to revenue. As for that one-megawatt HPC and AI location, its purpose for us isn't really to be a significant revenue contributor, but rather to let us correctly build out this technology and pull that expertise into our company and into our portfolio.
Mike Colonnese
analystThat's fantastic detail, Ben. I appreciate it; and let me ask one additional thing. In terms of how hashrate expansion unfolds, what should our expectations be starting from the current 11.9 exahash and moving through the first half of 2025 until we reach 21 exahash?
Ben Gagnon
executiveYes; we keep putting miners online. On a consistent basis, we've taken delivery of and installed the initial miners under the hosting arrangements we announced with Stronghold only this week. So the first miners are arriving and being connected. Ongoing advancement on hashrate is what we ought to witness, though the reality is that — as we approach the close of the New Year, considering the holidays and all of that, plus our effort to adopt a considerably more cautious approach to guidance, what you should anticipate is essentially steady, straight-line growth that can be followed through our monthly production reports. And that progress will be — or rather, that goal of 21 exahash will be achieved within the first half of 2025.
Mike Colonnese
analystGreat. Thanks, Ben.
Ben Gagnon
executiveThanks, Mike.
Mike Grondahl
analystHello, and thanks a lot, everyone; also, nice work on the HPC developments. Regarding those 2 pilot projects, the 1 to 2 megawatts involved — those are megawatts located behind them, so once the pilots move forward and you've gained the knowledge you were after, those locations might support bigger projects. Could you share any figure for each location, such as the amount of additional megawatts that might be accessible, if there are any?
Ben Gagnon
executiveHey Mike, that's a good question. So, we have these 2 different sites. What we'd want is to settle on 1 of the 2 rather than developing 2 comparable pilots. Each site can expand, though by differing amounts. One of them can expand by roughly 20-ish megawatts, while the other sits in the triple digits.
Mike Grondahl
analystGot it. Okay. So one small and one is large. Okay.
Ben Gagnon
executiveThat's right.
Mike Grondahl
analystAt what point do you expect to make the call between the first location and the second one? And once that choice is made, will you let us know whether it's the roughly 20 megawatts option or the site in the triple digits?
Ben Gagnon
executiveI think that will mostly hinge on which strategic partner we ultimately team up with. Each site offers distinct benefits to each strategic partner, depending on how close it sits to various metropolitan centers. So it's difficult to say which site would end up being selected, since that truly depends on which strategic partners we choose.
Mike Grondahl
analystOkay. So it seems like things have moved forward somewhat with that strategic partner or customer. Have you had a chance to look into what financing options might be available, including the terms? And do you feel you have a solid grasp of that?
Ben Gagnon
executiveSure. I'll just say something brief here, and then perhaps hand things over to Jeff Lucas. We've held quite a few discussions regarding the finance angle. In my view, plenty of capital exists right now, particularly for infrastructure efforts of this kind, and given how Bitcoin is rising at the moment, the chance in front of us across both Bitcoin mining and HPC/AI is extremely, extremely attractive; capital, I believe, is very much within reach today. Perhaps I can turn it over to Jeff Lucas for a bit more detail.
Jeff Lucas
executiveYeah. Honestly, I believe Ben addressed that fairly thoroughly already. I'll just add a few remarks. We're currently seeing quite a lot of opportunities to leverage what we're doing with HPC/AI when it comes to our own financing requirements. That said, I think it's also crucial to recognize that, moving forward as we establish our partnerships, we understand that many of these parties bring far more to the table when it comes to raising capital, and whether we can do so as efficiently and as effectively. So to sum up, there are plenty of opportunities we're evaluating at this moment, in the several hundred million dollars range, if we decide to go down that road. But second, we'd want to collaborate with the partners so they'd play a fairly instrumental role in any capital raising, in order to benefit from their more efficient cost of capital.
Mike Grondahl
analystUnderstood. All right, appreciate it, everyone.
Joe Flynn
analystHello there. I was wondering if you could give us a bit more detail about what ultimately drove the choice to proceed with putting SH sites to work instead of what I believe was initially intended, which was adding megawatts over in Paraguay. And also — does that tie more to delays with the machines, or possibly to unforeseen issues in Paraguay? Thanks.
Ben Gagnon
executiveAppreciate the question. Moving that inventory out of Paraguay and over to the Stronghold locations came about because of several distinct reasons. Ultimately, we function as portfolio managers, and we're always reviewing our asset portfolio along with our growth pipeline, trying to manage our positions so we can achieve the best possible result. When we weigh the option of deploying in Paraguay against deploying in the United States, the reality is that going with the United States let us accomplish a few things very fast. First, we could zero in on deployments starting as soon as this month, which began, as I noted a few minutes back, with our initial handful of miners getting plugged in this week. Then the other piece is that deployment is really more optimal when it comes to the T21 in particular. That means we save on logistics duties. We also wind up with a lower all-in power cost at the Stronghold sites. And one benefit the T21 offers, which you don't see in the other miner models, is that they can be overclocked. Because of that, the PSU on those miners can handle well over five kilowatts. Plus, at the Stronghold sites, we're able to run plenty of energy demand response programs and energy trading; and that added flexibility with the T21s lets us extract far more utility from those assets than we could if we deployed them in Paraguay, where the electricity cost is static and fixed. Turning to Paraguay and Yguazu in particular, how do we extract the most value from that site? With that site, we could either have 100 megawatts accounted for plus another 100 megawatts that we'd need to fill out or assign to some strategy, or we could end up with a full site of 200 megawatts. And having the full site clean, ready, and strategically flexible delivers much more value for the Yguazu site when we consider what strategic opportunities exist to either deploy additional miners, host, or pursue something else with that site.
Joe Flynn
analystThat makes sense, and thanks for the detail. Then as we look ahead to 2025, I believe you said you're still working out the best way to deploy those megawatts. But I suppose, on the Stronghold site integration, do you already hold every approval required to produce electricity via the plants or to pull power off the grid? And how are you thinking about that split between buying power and generating your own?
Ben Gagnon
executiveYeah, so those locations are running. For more than 30 years at this point, they've operated as active power plants. On top of that, they can actively pull power down from the grid. So for a number of years those sites have been operating and doing both — producing electricity and taking power down from the grid. As we consider how to obtain the greatest usefulness and value from those locations, we've been doing things such as fine-tuning equipment deployment schedules so we can extract more usefulness from those miners and from those locations. Still, a great deal of strategic optionality exists there for the 200 megawatts, which stays in place; and when you consider a Bitcoin bull market along with HPC and AI, really the response is that opportunities to monetize those 200 megawatts are abundant at this moment. And much like the Yguazu site, having 200 megawatts of near-term capacity in 2025 in a cost-effective manner — that's a distinctive asset heading into a Bitcoin bull market or while you're in talks with HPC and AI hyperscalers.
Joe Flynn
analystExcellent, thank you.
Brian Dobson
analystHello there, good morning, and I appreciate you giving me the chance to ask. So, I suppose, could we perhaps zoom out to 30,000 feet and examine the wider industry briefly — in your view, in what ways might a change of administration in Washington affect rules and regulations across the United States? And, I guess, what's your perspective on that? Also, have you received any further detail regarding what those regulations could end up looking like? I realize it's early stages, but if you might be able to add just a small amount to the discussion currently happening within the industry, that would be appreciated.
Ben Gagnon
executiveAppreciate that, Brian. Yeah, that's a solid question. If you consider what took place regarding the election and sort of how the chips landed, one thing that stands out clearly is that Pennsylvania — a major battleground state — came down decisively for Trump, and I believe for energy policy as well. Our capacity to access the energy resources we hold at the Stronghold locations, plus the sites in Sharon, Pennsylvania, strikes me as far more advantageous and considerably more valuable at this point, now that the election has concluded and Trump came out on top in his campaign here. That signals something quite promising for energy assets, for energy infrastructure, for the regulatory climate, for regulatory hurdles, and for pushing ahead with our growth initiatives there. So our US energy assets have us feeling extremely optimistic. That's partly why we've made such a deliberate strategic pivot toward the US and our North American portfolio. But without a doubt, the outlook for energy across the United States — particularly in Pennsylvania and very specifically at our Stronghold assets — appears more promising than it ever has under a Trump administration.
Jeff Lucas
executiveAllow me to add a single remark here, if I may, on the capital-raising front as well. It goes without saying that they anticipate a different set of circumstances with the SEC. In point of fact, we have a highly constructive relationship and dialogue with the SEC, especially while we work through our filings related to the Stronghold acquisition, and honestly, if anything, we expect that to become only somewhat easier moving forward.
Brian Dobson
analystAnd maybe give us some extra perspective too on how you're weighing the possible payoffs from, say, expanding or constructing your mining sites against HPC, especially with Bitcoin having climbed so much lately? Does that shift the calculation for you regarding which direction you want to steer the company?
Ben Gagnon
executiveThat's a really good question, and I'd say it's especially pertinent right now with Bitcoin sitting at nearly 90,000. The underlying arithmetic hasn't shifted one bit, since these are precisely the same economic circumstances we've been discussing for 6, 9, perhaps even 12 months at this point. We've discussed the way hash price works out to an equivalent revenue figure per megawatt hour. What should we anticipate hash price doing once the halving is behind us? What we've laid out is that, looking at history, each halving cycle except the first has delivered a 300% to 400% rise in hash price, measured from the first month coming out of the halving through to the top of that Bitcoin bull market. And what I laid out here was that, should historical cycles play out again, we ought to see something ranging from a very, very conservative $0.12 hash price, to $0.15 at the moderate end, and on the high end perhaps as much as $0.20. Now, that presumes history would play out again. There's no certainty history would play out again; but those are the scenarios we as a Bitcoin miner are aiming toward. And when you consider the value that such a hash price would work out to per megawatt hour and you translate that into a T21 or an S21 Pro or whatever else, you'd find that once hash price begins behaving the way it is now, it's risen roughly 10% this week alongside the Bitcoin price. We'll find that hash price is in fact going to deliver a far superior return on invested capital in 2025 compared with an investment in Bitcoin mining — sorry, an investment in HPC and AI would today; but that isn't to say HPC and AI isn't a wonderful technology and a wonderful business line to bring in; it simply means that in the near-term future, the coming 12, 15 months, we continue to believe Bitcoin mining will be the optimal deployment of capital. And we believe there may be a phase shift occurring around that 12, 15 mark, correct, at which point HPC and AI genuinely becomes the more appealing destination for achieving superior returns on your invested capital. So that's what we've laid out for quite a few months now, and it remains consistent today with Bitcoin price climbing.
Brian Dobson
analystGlad to hear. Thanks so much.
Ben Gagnon
executiveThank you.
Fedor Shabalin
analystThanks a lot, operator, and good morning, everybody. Fedor Shabalin here, posing this question for Lucas Pipes. My first one concerns HPC, specifically Slide 12. You highlighted accelerated deployment on the HPC and AI front — so what does that actually involve? Also, what's the schedule, and what CapEx comes with this pilot project? Thank you.
Ben Gagnon
executiveAppreciate it; that's a solid question. Regarding HPC and AI, what we'd laid out previously is that the soonest anything could be live would be the close of 2025 or the start of 2026. That schedule suited us on both the infrastructure and construction side, and likewise matched when most HPC and AI clients would anticipate having their GPUs up and running. What we're exploring now is whether the pilot project lets us beat that Q4 or Q1 timing, so we gain that insight along with the skills and expertise in hand prior to committing additional capital toward a larger, lease-scale deployment; that's essentially where this faster deployment schedule comes from. On the CapEx side, I think I'll hand things over to Jeff Lucas shortly. Still, let me restate what we've mentioned previously: with HPC and AI, our emphasis leans far more toward infrastructure rather than compute. By concentrating on infrastructure instead of compute, you eliminate as much as 75% of the CapEx tied to an HPC and AI deployment when only infrastructure is involved.
Fedor Shabalin
analystThanks for that. Now, the second thing is a technical question. Roughly three or four quarters back, you were likely the first person to talk about how the Bitmain T21 miner performs, and you noted that it might outperform its stated specs. Can you perhaps say something similar regarding the S21 Pro miner — if you've had the opportunity to test these units, how efficient are they?
Ben Gagnon
executiveThe S21 Pro is actually even more efficient and more powerful. It's roughly 20% more efficient and roughly 20% more powerful. So this machine is extremely capable. The key distinction, I believe, between a T21 and an S21 — apart from the listed hashrate and the efficiency, which is greater in both respects — is that the T21 offers far more flexibility when it comes to power consumption. But the S21 Pro is a wonderful unit. Everyone who has been putting them out on the market has had only positive feedback; and we're eager to get our first S21s — S21 Pros — here next month.
Fedor Shabalin
analystUnderstood. And more precisely, has their performance gone past 234 terahash per second, or did they stay below that mark?
Ben Gagnon
executiveApologies — is your question about overclocking the S21 Pro?
Fedor Shabalin
analystYes. Regarding overclocking, as you mentioned earlier in connection with the T21.
Ben Gagnon
executiveThe key distinction with the T21 is that this machine was built from the ground up for that kind of energy adaptability. As shipped, it came with two settings from the factory: a standard power mode and a higher power mode. So with the T21, we weren't really overclocking at all. We were running the unit within the specs provided by its maker. As for the S21 Pro, that's something we haven't tried during testing, and we don't do it on a regular basis in our operations. That said, yes, the majority of these machines are capable of achieving greater performance through overclocking. And from what I've observed, most of the figures circulating in the industry for the S21 Pro show they can exceed 260 terahash fairly dependably.
Fedor Shabalin
analystThat's quite useful, thank you. And let me ask one final quick question, if I may. Apologies in case I overlooked this. What drove the quarter-over-quarter rise in SG&A costs primarily?
Jeff Lucas
executiveThe biggest factor behind that uptick was in fact non-recurring costs, largely tied to certain one-time events, among them the Riot requisition. There was a settlement involving the former CEO and other parties. During the quarter, we ended up incurring approximately $11 million in non-recurring expenses, $11 million to $12 million. My expectation is that these won't repeat. There were also, to a lesser extent, certain costs connected to the Stronghold acquisition. As we chase new opportunities moving forward, M&A costs will be incurred, though not at the scale seen in the third quarter.
Fedor Shabalin
analystThanks, Jeff. I'll hand things over at this point, and I wish you the best of luck. Thank you.
Martin Toner
analystGood morning. I appreciate you taking my question. You've touched on this somewhat already, I realize, but could you go over again what's behind the prudence regarding Paraguay and the exahash and build-out taking place there? And perhaps give us an idea of how that might slot into your plans as we move into next year?
Jeff Lucas
executiveCertainly. To begin, I want to reframe that — it isn't that we're being careful when it comes to Paraguay; rather, this has more to do with how we manage our portfolio as we aim to produce the best possible outcomes in terms of our schedules for deploying miners and how we allocate capital. So the initial approach involving Paraguay had been put together before the Stronghold transaction came to pass. Once the Stronghold transaction progressed and got announced, our capacity to generate an optimal result from the portfolio meant you can't simply remain static in your positions. We had to relocate miners. We had to modify the schedules; we had to take steps such as upgrading certain miners so we could achieve that optimal performance. So I'd emphasize strongly that this wasn't prudence regarding Paraguay. It's really more a matter of managing the portfolio as we aim to create those optimal outcomes for our miner deployment schedules and for our investors. We continue to be very long on Paraguay and LatAm. We have 280 megawatts nearly ready there in Paraguay, 340 throughout the whole LatAm region. And we continue to be very, very bullish on that area, since the power is renewable, cost-effective and high uptime. But how do we optimize the miner deployments that already exist, given the characteristics of the miners and various other factors. That was truly what was at play here.
Martin Toner
analystExcellent. I appreciate it. That covers everything on my end.
Ben Gagnon
executiveMuch appreciated. Thanks to each of you for spending part of your day with us. To say it once more, my enthusiasm regarding what lies ahead for this company has never been higher. I'm genuinely eager to share news about how things are going as we keep carrying out the strategy for transformation and growth — grabbing more of the market in Bitcoin mining while also moving into complementary, higher-value business segments. Thanks again.
Jeff Lucas
executiveThank you all.
Operator
operatorWe appreciate everyone joining us, and that brings the program to a close, so you're free to hang up at this point. Wishing you all a wonderful day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Keel Infrastructure Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Keel Infrastructure Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Keel Infrastructure Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.